Giraffe Gasoline and NGV Service Station Building Model I UNA Architects

Page 1

UNANGI ARCHITECTS


GIRAFFE PETROLEUM (THAILAND) CO., LTD.

GASOLINE AND NGV SERVICE STATION BUILDING PROJECT MODEL ASIA ROAD, PHRA NAKHON SI AYUTTHAYA PROVINCE

Company Giraffe Petroleum (Thailand) Co., Ltd. Fuel distributor and petrol stations engine oil and natural gas, NGV as the project owner want to design the construction of a prototype NGV station and gas station on the Asia road Kilometer range at Bang Pahan District, Phra Nakhon Si Ayutthaya Province with a preliminary construction budget 100,000,000.00 (One hundred million baht only) (budget includes all necessary building equipment systems layout work around the area but not including mechanical equipment The interior furniture) in the 10-rai land size.


EXPAND ECOPHILIC BOUNDARY

GOAL IN PRAISE

SUSTAINNOVATION AS A FRAMEWORK

We are a creative platform community, A new prototype of sustainable living, Creating positive space using Biophilia.

WE BELIEVE BOOST STUDIO PRODUCTIVITY WITH BIOPHILIC DESIGN. WHERE CONTEMPORARY ATTITUDES TOWARDS GREEN SPACE ARE GEARED ALMOST ENTIRELY TOWARDS EITHER PRESERVING EXISTING NATURAL HABITATS OR IMPROVING BUILDING ENERGY PERFORMANCE, RECENT INTEREST IN THE BIOPHILIC HEALTH BENEFITS SUGGEST THE POSSIBILITY OF AN EXPANDED ROLE OF GREEN BUILDING INFRASTRUCTURE


CONTENT

PROJECT BACKGROUND ที่ ม าของโครงการ

SITE LOCATION ที่ ตั้ ง โครงการ

01

12

USER ANALYSIS

SITE ANALYSIS

วิ เ คราะห์ ผู้ ใ ช้ ง าน

วิ เ คราะห์ ที่ ตั้ ง โครงการ

03

15

AREA REQUIREMENT

CASE STUDY

พื้ นที่ ใ ช้ ส อยของโครงการ

ศึ ก ษาโรงการตั ว อย่ า ง

07

16

FUNCTION DIAGRAM

DESIGN CONCEPT

ความสั ม พั นธ์ ข องพื้ นที่ ใ ช้ ง าน

แนวความคิ ด การออกแบบ

09

24


CONCEPT DEVELOPMENT การพั ฒนารู ป แบบอาคาร

CONSTRUCTION PROCESS กระบวกการก่ อ สร้ า ง

26

76

ARCHITECTURE DESIGN

COST ESTIMATE

แบบทางสถาปั ต ยกรรม

การประมาณราคาค่ า ก่ อ สร้ า ง

28

80

STRUCTURE CONCEPT

SUMMARY

แบบทางโครงสร้ า ง

สรุ ป ภาพรวมโครงการ

54

84

MEP SYSTEM

BIBLIOGRAPHY

งานระบบของโครงการ

66

บรรณานุ ก รม

87


PROJECT BACKGROUND ที่มาของโครงการ

01


PROJECT BACKGROUND ที่มาของโครงการ

TERMS OF REFERENCE

GASOLINE AND NGV SERVICE STATION BUILDING PROJECT BY GIRAFFE PETROLEUM THAILAND CO., LTD.

PROJECT DESCRIPTION

BANG PA HAN, PHRA NAKHON SI AYUTTHAYA,THAILAND

DESIGN AND CONSTRUCT PROTOTYPE PETROL AND NATURAL GAS VEHICLE STATION

ANG THONG

SUPHANBURI

PETROL AND NGV PUMP PARKING AIR PUMP SPACE OIL CHANGING SPACE CONVENIENCE STORE PLAYGROUND APPOINTMENT PLACE PHOTOGRAPH SPACE TOILET

BUDGET ฿100,000,000

GIRAFFE

PROJECT REQUIREMENTS

GAS STATION

SITE LOCATION

02


USER ANALYSIS วิเคราะห์ผู้ใช้งาน

03


USER ANALYSIS วิเคราะห์ผู้ใช้งาน PROJECT USER ADMINISTRATIVE SECTION

MANAGER AND PERSONNEL : AMOUNT 4 PEOPLE MANAGER : 1 PEOPLE

PERSONNEL : AMOUNT 3 PEOPLE BUSINESS HOURS 09.00 – 18.00

TOTAL PERSONNEL

AMOUNT

STATION SECTION AND SHOP SECTION: AMOUNT 38 PEOPLE FUELING STAFF : 10 PEOPLE BUSINESS HOURS 24 HR

FINANCIAL OFFICER : 3 PEOPLE BUSINESS HOURS 08.00 – 18.00

GIRAFFE

42

SERVICE DEPARTMENT SECTION

GAS STATION

BUSINESS HOURS 09.00 – 18.00

CASHIER : 3 PEOPLE

BUSINESS HOURS 08.00 – 18.00

CLEANING AND MAINTENANCE STAFF : 6 PEOPLE BUSINESS HOURS 08.00 – 18.00

STORE CLERK : 6 PEOPLE

BUSINESS HOURS 08.00 – 20.00

FUELING AND CONVENIENCE STORE

CONVENIENCE STORE CLERK : 6 PEOPLE

BUSINESS HOURS 24 HR

BUSINESS HOURS 24 HR

06.00 – 14.00 N

CAR CARE

14.00 – 22.00 N

FINANCIAL OFFICER

22.00 – 06.00 N

STORE

CAR CARE : 4 PEOPLE

BUSINESS HOURS 08.00 – 20.00

04


USER ANALYSIS

วิเคราะห์ผู้ใช้งาน

TARGET CUSTOMER

LOCAL USER

GIRAFFE

GAS STATION

VILLAGERS AND VENDORS

CAR

BUS

MOTORCYCLE

CONVEYANCE

FUNCTIONAL AREA

TRAVELLERS TOURIST AND PEOPLE FROM OTHER PROVINCES

CAR

BUS

MOTORCYCLE

CONVEYANCE

FUNCTIONAL AREA

DRIVERS DRIVERS AND PUBLIC TRANSPORT

CAR

05

CONVEYANCE

BUS

TRUCK FUNCTIONAL AREA


USER ANALYSIS วิเคราะห์ผู้ใช้งาน

CALCULATION OF SUPPLY NOZZLES NUMBER OF VEHICLES CLASSIFIED BY FUEL TYPE

EXPECT AT LEAST

1,235

470,374 x 12 = 5,644,488 / 365 = 15,464 /DAY

1,549 138,340

ดีเซล

FROM THE POTENTIAL OF THE PROJECT EXPECT TO HAVE OF THE TOTAL NUMBER OF CAR USERS

329,250

เบนซิน

TOTAL 50,000

100,000

200,000

250,000

300,000

350,000

CAR

OIL

29%

NOZZLE

99.4 % NUMBER OF CARS

TOTAL

GAS NOZZLE

70.4 % ดีเซล

LPG

PEAK HOUR : TOTAL 6,185 / DAY = 6,185/24 = 258 PER HOUR FILLING UP THE OIL TAKES ABOUT 5 MINUTES. WITHIN 1 HOUR CAN FILL UP TO 12 CARS THEREFORE MUST HAVE 258/12 = 21

0.6%

4 7 0, 3 7 4

เบนซิน

/DAY

40%

GIRAFFE

PUBLIC TRANSPORT

150,000

6,185

0.6 % CNG

X6

OIL NOZZLE

-

DAY PER MONTH TO USE THE SERVICE

GAS STATION

LPG

1

X24 PEAK HOUR

X2

GAS NOZZLE

CNG

ส ถิ ติ จา น ว น ร ถ ต า ม ก ฎ ห ม า ย ว่ า ด้ ว ย ร ถ ย น ต์ จา แ น ก ต า ม ช นิ ด เ ชื้ อ เ พ ลิ ง สา นั ก ง า น ข น ส่ ง จั ง ห วั ด อ ยุ ธ ย า ณ วั น ที่ 3 1 มี น า ค ม 2 5 6 3

X4 PEAK HOUR

06


AREA

REQUIREMENT ความต้องการของโครงการ

07


AREA REQUIREMENT

พื้ นที่ใช้สอยของโครงการ GENERAL ANALYSIS

FILLING STATION DIPENSER FILLING STATION DISPENSER(OIL) FILLING STATION DISPENSER (NGV) CASHEIR TOTAL

SQM. SQM. SQM. SQM

480 2,062.5 700 480 2,542.5

SQM. SQM. SQM. SQM. SQM

CARPARK TRUCK CAR MOTORCYCLE BUS TOTAL

FUNCTION 1,2063.5

GIRAFFE

PUBLIC STORE CAFE’ PARK PLAYGROUND MEETING POINT TOILET ATM CANTEEN TOTAL

2200 360 1,600 1,600 240 622 16.5 712 7,350

SQM. SQM. SQM. SQM. SQM. SQM. SQM. SQM. SQM

322 125.5 311 758.5

SQM. SQM. SQM. SQM

GAS STATION

700 700 12 1,412

FUNCTION

total

SERVICE POINT CAR CARE INFLATING POINT OIL CHANGE POINT TOTAL

CIRCULATION 08


FUNCTION DIAGRAM

ความสัมพั นธ์ของพื้ นที่ใช้งาน

09


FUNCTION DIAGRAM ความสัมพั นธ์ของพื้ นที่ใช้งาน

GAS STATION

GIRAFFE 10


FUNCTION DIAGRAM

GIRAFFE

GAS STATION

ความสัมพั นธ์ของพื้ นที่ใช้งาน

11

ZONNING DIAGRAM


SITE LOCATION ที่ตง ั้ โครงการ

12


SITE LOCATION

ที่ตั้งโครงการ

650 m

GIRAFFE

GIRAFFE

GAS STATION

SURROUNDING

U-TURN

SITE 13

1. 40k m

NEARBY GAS STATION


SITE LOCATION

ที่ตั้งโครงการ

SITE EXISTING

SITE LOCATION

AREAS

TWO FLOOR BUILDING

GAS STATION

37,353 SQ.M. 23 – 1 - 38.5 RAI

BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND

MATERIAL : ZINC

MID LEVEL

GIRAFFE

PONDING FIELD

PATHWAY HIGHER LEVEL

POND LOWER LEVEL

TREE 196.00 M

14


SITE ANALYSIS วิเคราะห์ที่ตง ั้ โครงการ

15


SITE ANALYSIS

GENERAL ANALYSIS

วิเคราะห์ท่ต ี ั้งโครงการ SITE LOCATION BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND

GAS STATION

GIRAFFE 16


SITE ANALYSIS

GIRAFFE

GAS STATION

วิเคราะห์ที่ตั้งโครงการ

17

LAW AND REGULATION ่ ังหวัดพระนครศรีอยุธยา ผังเมืองรวมในท้องทีจ พ.ศ. ๒๕๕๔


SITE ANALYSIS

LAW AND REGULATION กฎกระทรวงสถานีบริการน้ามันเชื้อเพลิง

พ.ศ. ๒๕๕๔

สถานีบริการน้ามันเชื้อเพลิงประเภท ก ได้แก่ สถานีบริการน้ามันเชื้อเพลิงที่ให้บริการแก่ ยานพาหนะ ่ ี่ติดเขตทางหลวง ถนนสาธารณะ หรือถนนส่วนบุคคลซึ่งมีขนาดความกว้าง ทางบก ซึ่งตั้งอยู่ในพื้ นทีท ตามที่ กรมธุรกิจพลังงานประกาศกาหนด และเก็บน้ามันเชื้อเพลิงไว้ในถังเก็บน้ามันเชื้อเพลิงใต้พ้ื นดิน

GAS STATION

GIRAFFE

OFFICE

FUEL STORAGE

อาคารบริการ

ตู้จ่ายน้ามันเชื้อเพลิง

FUEL DISPENSER

ENTRANCE

ตู้จ่ายน้ามันเชื้อเพลิง

ทางเข้าโครงการ

CAR WASH จุดบริการล้างรถ

18


CASE STUDIES

กรณีศึกษาโครงการตัวอย่าง

19


CASE STUDIES

กรณีศึกษาโครงการตัวอย่าง ARCHITECTURAL ด้านสถาปัตยกรรม

CEPSA SERVICE STATION SAFFRON BRANO CONSULTANTS + MALKA + PORTUS

Location Architects

: Adanero, Spain : Malka+Portus Arquitectos, Saffron Brand Consultants : Canopy 320 m² : 2011

- Improve the experience to be really service oriented - Reduce the cost of maintenance through using the latest technology - Create visual impact, represent Cepsa in a new and meaningful way

MAIN MATERIAL

GIRAFFE

Area Year

CONCEPT DESIGN

GAS STATION

PROJECT INFO.

Self Cleaning

Light Weight

ETFE Recyclable

20


CASE STUDIES

กรณีศึกษาโครงการตัวอย่าง ARCHITECTURAL ด้านสถาปัตยกรรม

GIRAFFE

GAS STATION

UNITED OIL GASOLINE STATION /

KANNER ARCHITECT

PROJECT INFO.

CONCEPT DESIGN

LOCATION : LOS ANGELES, UNITED STATES ARCHITECTS: KANNER ARCHITECTS AREA : 630.80 M² YEAR : 2009

WITH THE AUTOMOBILE AND TODAY’S MODERN ONE-STOP SHOPPING SPIRIT OF IMMEDIATE GRATIFICATION AND CONVENIENCE.

MAIN STRUCTURE

MAIN FUNCTION 12-Pump Station

Steel Mini Market Concrete Carwash 21


CASE STUDIES

กรณีศึกษาโครงการตัวอย่าง SUSTAINABLE ด้านความยั่งยืน

HELIOS HOUSE / JOHNSTON MARKLEE & ASSOCIATED

Location

A Cultural Laboratory that aspires to become a place of exchange, stimulation of dialogue and discussion around the problems related to the environmental issue.

: Los Angeles, United States Architects : Johnston Marklee &Associate Year : 2007

ECO SYSTEM

Collect Energy With Solar Panel

Reflective Metal Panel to reduce energy using

GIRAFFE

CONCEPT DESIGN

GAS STATION

PROJECT INFO.

Collect Water Into the Tank 22


CASE STUDIES

กรณีศึกษาโครงการตัวอย่าง STRUCTURAL ด้านโครงสร้าง

NP GAS SATTION /

MONEO-BROCK

GIRAFFE

GAS STATION

PROJECT INFO. Location Architects Area Year

: : : :

Madrid, Spain Moneo-Brock 345.00 m² 2007

CONCEPT DESIGN To captures the flow of movement through the curves on its canopy, on a clear statement towards landscape.

MAIN STRUCTURE

Steel 23

Timber


design concept

แนวคิดในการออกแบบ

24


CONCEPT

ILLUSION 360 DEGREE

NATURE

OF VIEWPOINT

ILLUSION HIDDEN

Gas station is a place that we use around. With the center part of the pump And there are buildings around the pump, so the filling point is the point where every part of the pump can see

RARE 45

MAIN STRUCTURE

VIEW

VIEW

VIEW

OF BUILDING

115

LEFT

RIGHT

VIEW OF FRONT AND RARE

225

315

FRONT

25

In nature, we often find many illusions hidden. Various parts in nature Some things are not always what they see. Must see all around in order to know its shape Which is a special thing hidden in nature

ANGLE OF VIEWPOINT

ISOMETRIC

VIEW OF RIGHT AND LEFT

VIEW OF 45 , 115 , 315 , 225 degree

SHOWS THAT THE VIEWS IN EACH DIRECTION THAT USERS SEE ARE NOT THE SAME IN ORDER TO GET A DIFFERENT EXPERIENCE


CONCEPT DEVELOP

การพั ฒนารู ป แบบอาคาร

26


CONCEPT WORK

ILLUSION MAIN STRUCTURE OF BUILDING

ISOMETRIC

27


design

architecture แบบทางสถาปัตยกรรม

28


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

ZONE B

ZONE A

PLAN 29


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

ROOF PLAN 30


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

RESTAURANT WC

PLAYGROUND

PARK

CAR CARE

SHOP ZONING DRIVE THRU ZONING

CAR WASH

CAR PARK

GAS STATION GIRAFFE OFFICE

OIL STATION LOADING AREA

31

ISOMATRIC DIAGRAM


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

CIRCULATION 32


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

LOADING AREA

GIRAFFE OFFICE CAR WASH PARKING

SECTION A

OIL FILLING POINT

CASHIER and MANAGEMENT

01 2

5

10

20

40

01 2

5

10

20

40

GAS FILLING POINT

CAR CARE PARKING

SECTION B 33


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

GIRAFFE OFFICE

CAR WASH

FILLING STATION

RETAIL MC DONALD

GARDEN

DRIVE THROUGH

01 2

SECTION C

RESTAURANT WC

GARDEN AND PLAYGROUND

5

10

20

40

SHOP AND RETAIL ATM AREA

MC

SECTION D 34


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

GIRAFFE BANNER

GAS STATION BANNER

MAIN LOGO MINI CASHIER AREA

SITTING AREA

MINI CASHIER AREA

4.10 2.50

GIRAFFE

2.20

GIRAFFE BANNER 2.90

5.20

GAS STATION MAIN LOGO SITTING AREA

35

GAS STATION BANNER

1.70


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

C

GAS STATION LABEL DETAIL PLAN

A

D

B

D

E

G

A

B

E

DETAIL

C

A

ALUMINIUM COMPOSITE : LIGHT GREY COLOR THICKNESS : 2.5 mm

B

ALUMINIUM COMPOSITE : DARK GREY COLOR THICKNESS : 2.5 mm

C

ALUMINIUM COMPOSITE : BLACK COLOR THICKNESS : 2.5 mm

D

TRANSLUCENT ACRYLIC : MAGENTA COLOR THICKNESS : 2 mm , LED inside

E

TRANSLUCENT ACRYLIC : MAGENTA COLOR THICKNESS : 1.5 mm , LED inside

F

TRANSLUCENT ACRYLIC : SMOKE GRAY COLOR THICKNESS : 1.5 mm, LED inside

G

LED LINE MAGENTA COLOR

F

G

ELEVATION

ELEVATION

ELEVATION

ELEVATION

A

C

B

D

36


37


PERSPECTIVE GAS STATION 38


PERSPECTIVE GIRAFFE OFFICE 39


PERSPECTIVE CAR WASH 40


PERSPECTIVE CAFE AREA 41


PERSPECTIVE CAR WASH 42


PERSPECTIVE CAFE AREA 43


PERSPECTIVE WC BUILDING 44


PERSPECTIVE COVERWAY TO RESTAURANT 45


PERSPECTIVE GARDEN 46


PERSPECTIVE PARK AND PLAYGROUND AREA 47


PERSPECTIVE RETAIL AND SHOP 48


PERSPECTIVE RESTAURANT 49


PERSPECTIVE CAFE AREA 50


PERSPECTIVE DRIVE THRU AREA 51


PERSPECTIVE ENTRANCE AREA

52


DESIGN ARCHITECTURE

แบบทางสถาปัตยกรรม

SERVICE SUMMARY FUEL DISPENSER จานวนตู้จ่ายเชื้อเพลิง

GIRAFFE

GAS STATION

OIL

GAS

CAR PARKING จานวนที่จอดรถ

MOTERCYCLE

CAR

DISABLE CAR

BUS

SHOP AND SERVICE จานวนร้านค้า และบริการ

RESTAURANT

SHOP

DRIVE THRU

INFLATING POINT

OTHERS CONVINENCE จานวนบริการอื่นๆ

53

TRUCK

CAR CARE

PARK

PLAYGROUND

ATM

CAR WASH


STRUCTURE CONCEPT แบบทางโครงสร้าง

54


55


ROUND TUBE – MILD STEEL เหล็กท่อกลม

SAE 1008 (Si less than 0.03)

COLOR

WALL THICKNESS

3.00 OUTSIDE DIAMETER

193.70

mm

mm

DETAIL JOINT ROUND TUBE – MILD STEEL

ISOMETRIC

Día 193.70 x 3 mm FRONT AND RARE COLUMN AXIS RELATION

STEEL PLATE Thickness 3 mm

LEFT ANT RIGHT

COLUMN AXIS RELATION

CONCRETE

COLUMN BASE TILT

10

WELDING JOINT

o

DEGREE

FRONT ELEVATION

SIDE ELEVATION

CONCRETE PILE

56


RECTANGULAR PIPE MILD STEEL เหล็กแป็บแบนขนาดพิ เศษ

A

B

AxB THICKNESS

I BEAM ,MILD

STEEL

เหล็กตัวไอ

TURN BUCKLE

CONNECTED BY WELDING

DIA 30 mm.

BRACING ROD RB 25 mm

ISOMETRIC ROOF STRUCTIRE 57

I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]

RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm

I–BEAM JOINT


TEXLON® ETFE 2 LAYERS ETFE ETHYLENE TETRAFLUOROETHYLENE Able to withstand high temperature changes

• LIGHTWEIGHT Which will save the budget for making the structure to support the material • SAVE ENERGY Can reduce electricity consumption for lighting devices • SAVE MONEY repairs can be made quickly and conveniently. Which, when compared to using glass, will be faster and also save a lot of money

ISOMETRIC ETFE ROOF SYSTEM DETAIL A

DETAIL A

ETEF SKYLIGHT

STEEL WELDING JOINT

TEXLONⓇ

There is air which uses an air pump to put between the sheets.

C LIGHT LIP CHANNEL STEEL 60 x 30 x 10 x 1.6. mm [ 8.91 kg/m ]

STEEL PLATE JOINT WITH 7 KNOTS

C - CHANNEL STEEL 60 x 30 x 10 x 1.6. mm [ 8.91 kg/m ]

DETAIL B M5X120 NICKLE PLATED MEDIUM CARBON STEEL HEX FLANGE HEAD LONG BOLTS

STEEL PLATE Thickness 1.5 mm DETAIL B

BOLT AND PLATE M 5x120 nickle plated medium carbon steel hex flange head long bolts

STEEL PLATE WITH 2 KNOTS

58


ISOMETRIC TOP ROOF

ETEF SKYLIGHT

TEXLONⓇ

There is air which uses an air pump to put between the sheets.

RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm

I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]

RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm

C LIGHT LIP CHANNEL STEEL 60 x 30 x 10 x 1.6. mm[ 8.91 kg/m ]

59

LOAD TO MAIN COLUMN


SOLAR ROOF AREA 10 O

SCG Solar Roof Solutions Because there is a lot of space on the roof Therefore utilized to produce electricity and the oil pump is open for 24 hours. Electricity from solar roof is then produced for lighting.

60


3.50

1.70

0.30

0.60

1.40

0.20

0.20

1.70

0.30 0.50

1.20

0.40 5.40

I – BEAM STEEL

200 x 100 x 7 x 10 mm [ 15.60 kg/m ]

SEE DETAIL A

Joint with Light Transmission White Acrylic Sheet

I – BEAM STEEL

150 x 75 x 5.5 x 9.5 mm [ 10.26 kg/m ]

SEE DETAIL A

WHITE ACRYLIC SHEET

40% Light Transmission White Acrylic Sheet STEEL PLATE JOINT WITH 7 KNOTS

C – CHANNEL BEAM

200 x 80 x 6.5 mm [ 24.60 kg/m ]

ISOMETRIC SIGNPOST 61

STEEL PLATE JOINT WITH 7 KNOTS


MATERIAL ROOF FOR SOLAR PANAL

ETEF SKYLIGHT

SUMMARY I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]

386 m (67,936 kg)

RECTANGULAR PIPE MILD STEEL

743 m

ROUND TUBE – MILD STEEL เหล็กท่อกลม Día 193.70 x 3 mm

216 m

8000 x 4000 x 6 mm

ROOF STRUCTURE

STEEL PLATE FOR ETEF SKYIGHT

611.74 m

BOLT AND PLATE

BOLT 2,288 pcs.

FOR ETEF SKYIGHT

PLATE 130 pcs.

FLOOR ETEF SKYLIGHT TEXLONⓇ BRACING ROD AND TURN BUCKLE

264 m

I – BEAM STEEL

179.5 m (2,800.2 kg)

I – BEAM STEEL

86.4 m (886.46 kg)

200 x 100 x 7 x 10 mm [ 15.60 kg/m ]

SUMMARY STRUCTURE

1,904.8 m2

150 x 75 x 5.5 x 9.5 mm [ 10.26 kg/m ]

DIAGRAM 62


2

SPACETRUSS STEEL ROOF STRUCTURE

1

S T E E L C O LU M N STRUCTURE

CAR WASH ISOMETRIC 1

S T E E L C O LU M N STRUCTURE

62

2

SPACETRUSS STEEL ROOF STRUCTURE


1

S T E E L C O LU M N STRUCTURE

3.00

7.00

30

RECTANGULAR PIPE MILD STEEL

o

30

o

8000 x 4000 x 6 mm

FRONT ELEVATION

2 0.89

SPACE TRUSS STEEL ROOF STRUCTURE

12.50

1.00

11.50

ROUND TUBE – MILD STEEL เหล็กท่อกลม Día 193.70 x 3 mm

63


PERSPECTIVE GAS STATION 64


MEP SYSTEM งานระบบภายในโครงการ

66


MEP SYSTEM

งานระบบภายในโครงการ

FUEL

67

GAS NGV NOZZLE

NGV

ถังเก็บแก๊สเชื้อเพลิงบนดิน

ถังเก็บน้ามันเชื้อเพลิงใต้ดิน

FUEL NOZZLE

ตาแหน่งถังเก็บเชื้อเพลิง

FUEL

ถังเก็บความจุ 40,000 ลิตร จานวน 3 ถัง

ถังเก็บความจุ 30,000 ลิตร จานวน 2 ถัง

E20 DIESEL GASOHOL91

GASOLINE GASOHOL95

NGV

ถังเก็บก๊าซ NGV ความจุ 50,000 ลิตร จานวน 4 ถัง

NGV STORAGE TANK พร้อมท่อน้าลดอุณหภูมถ ิ ังแก๊ส


MEP SYSTEM

ตู้จ่ายน้ามัน 6 มือจ่าย MTP-HYCMD1687SK-GB6 FUEL

PUMP FLOW METER 293 CM.

FUEL DISPENSER

ตาแหน่งตู้จ่ายเชื้อเพลิง

ตู้จ่ายน้ามันเชื้อเพลิง

งานระบบภายในโครงการ

NOZZLE CONTROL TYPE WEIGHT

B NGV

NGV DISPENSER

ตู้จ่ายก๊าซ NGV

123 CM.

TYPE – OPTIONAL U102 AU102 BU102 C FLOW RATE – 0-55 TYPE – OPTIONAL U102 AU102 BU101 CD ACCURACY – 0.2% AUTO SHUT – OFF SOLENOLD VALE CONTROL TYPE 481 KG

53 CM.

ตู้จ่ายก๊าซ NGV 4 มือจ่าย BMP4000.OE /NGV NGV

CNG dispensers 1 to 4 filling hoses CNG = compressed natural gas (methane) height 1900mm free hanging hoses

A

68

STANDARD SPEED 30 KG/MIN

เครื่องเติมลมไนโตรเจนอัตโนมัติ G5 รุ่น E-1170-N2P จานวน 6 เครื่อง

131 CM.

FUEL

INFLATING

FLOW RATE

-

่ ้องการ 1100 ลิตร/นาที ปริมาณลมทีต แรงดันลมขาเข้า 217 PSI / 15 bar (สูงสุด) ่ ลิตได้ 228 ลิตร/นาที ปริมาณลมไนโตรเจนทีผ ที่แรงดัน 116 PSI ถังพั กลมไนโตรเจน 118 ลิตร ความบริสุทธิไ์ นโตรเจน 95-99% ขนาดตัวเครื่อง 73 x 62 x 131 cm. ขนาดถังพั กไนโตรเจน 40 x 43 x 110 cm.


MEP SYSTEM

งานระบบภายในโครงการ

PUMP FLOW METER 293 CM.

OIL DISPENSER

ตู้จ่ายน้ามัน 6 มือจ่าย MTP-HYCMD1687SK-GB6

NOZZLE CONTROL TYPE WEIGHT

123 CM.

iBUTTON

TAGS SOLUTIONS

TYPE – OPTIONAL U102 AU102 BU102 C FLOW RATE – 0-55

GAS STATION

ตู้จ่ายน้ามันเชื้อเพลิง

BUILDING EQUIPMENT

TYPE – OPTIONAL U102 AU102 BU101 CD ACCURACY – 0.2% AUTO SHUT – OFF SOLENOLD VALE CONTROL TYPE 481 KG

53 CM.

GIRAFFE

FUEL TAGGING ก า ร เ ติ ม น้า มั น ด้ ว ย ร ะ บ บ

iBUTTON iBUTTON

FEATURE ป้องกันการทุจริต

รองรับตู้จ่ายหลายผลิตภัณฑ์

รายงานเติมน้ามัน

ตรวจสอบการทางานของพนังงาน

69


FUEL MANAGEMENT ระบบขนส่งโครงการ

DISTRIBUTION CONTROL SYSTEM

FLEET CARD

เป็นบัตรครดิตที่ใช้เติมนา้ มันในสถานีน้ามัน หรือภายในกิจการระบบ ขนส่ง เพื่ อควบคุมการจ่ายน้ามัน โดยจะออกบัตรเฉพาะคนขับรถเท่านั้น

ADVANTAGE TOUCH SCREEN CONSOLE

FMS SOFTWARE GSM MODEM

MAIL ALERTS AND REPORTS

GIRAFFE

CARD BASED FUEL MANAGEMENT SYSTEM FOR GAS STATION AND OTHER DISPENSING SITE

GAS STATION

ระบบขนส่ง CARD BASE / FLEET CARD

เป็นการจ่ายน้ามันด้วยระบบเงินสินเชื่อในราคาเงินสด โดยมีระยะเวลาการชาระเงิน เป็นเครื่องมือตรวจสอบสิทธิแ ์ บบ REAL TIME เช่น

REPORTS DISPENSER CONTROLLER STORAGE TANKS

RFID TAG

-

ค่าใช้จ่าย การสรุปรอบบัญชี ตรวจสอบวงเงินคงเหลือ หรือจานวนลิตรคงเหลือในการเติมต่อคันจาก SALES SLIP

มีความปลอดภัย -

มีรหัส PIN มีการกาหนดวงเงิน หรือจานวนลิตรในการเติม ต่อครั้ง ต่อวัน ต่อสัปดาห์ หรือต่อเดือน ลดความเสี่ยงการสูญหายของน้ามันจากคนขับ

ลดภาระด้านเอกสาร

70


MEP SYSTEM

งานระบบโครงการ

ELECTRIC SYSTEM DISTRIBUTION BOARD

71

DUCT BANK

MAIN DISTRIBUTION BOARD

RING MAIN UNIT

EMERGENCY MAIN DISTRIBUTION BOARD

LOAD PANEL

TRANSFORMER

AUTOMATIC TRANSFER SYSTEM

สายไฟฟ้าแรงสูง

GENERATOR

สถานีย่อย กฟน.

EMERGENCY LOAD PANEL

สายไฟฟ้าแรงต่า


MEP SYSTEM

งานระบบโครงการ

SANITARY SYSTEM

72


MEP SYSTEM

งานระบบโครงการ

AIR CONDITION SYSTEM AHU

73

CONDENSING AIR CONDITION AREA


MEP SYSTEM

งานระบบโครงการ

F I R E E X T I N G U I S H I N G SYSTEM FIRE ALARM BELL FIRE ALARM BELL SMOKE DETECTOR ASSEMBLY POINT

DRY CHEMICAL EXTINGUISHERS

FOAM EXTINGUISHERS

74


MEP SYSTEM

งานระบบโครงการ

SOLAR SYSTEM SCG Solar Roof Solutions

75

Because there is a lot of space on the roof Therefore utilized to produce electricity and the oil pump is open for 24 hours. Electricity from solar roof is then produced for lighting.


CONSTRUCTION PROCESS กระบวนการก่อสร้าง

76


CONSTRUCTION

กระบวนการก่อสร้าง

MONTH

1

ติ ด ตั้ ง รั้ ว ชั่ ว คราว ก่ อ สร้ า งสานั ก งานชั่ ว คราว ปรั บ ระดั บ ดิ น ขุ ด ดิ น ปรั บ ระดั บ ทาโครงสร้ า งใต้ ดิ น รั บ ถั ง น้า มั น

77

MONTH

2

เริ่ ม ลงเสาเข็ ม , ฐานราก ติ ด ตั้ ง ถั ง น้า มั น ใต้ ดิ น


CONSTRUCTION

กระบวนการก่อสร้าง

MONTH

3-4

แล้ ว เสร็ จ งานฐานราก กลบดิ น ฝั ง เริ่ ม วางงานระบบ และงานสถาปั ต ยกรรม

MONTH

5

วางงานระบบประกอบอารต่ า ง ๆ เดิ น ท่ อ ไฟฟ้า ท่ อ ระบบสุ ข าภิ บ าล

78


DESIGN ARCHITECTURE

กระบวนการก่อสร้าง

MONTH

6

แล้ ว เสร็ จ งานพื้ น และผนั ง เริ่ ม งานมุ ง หลั ง คา งานตกแต่ ง ภายใน ทาสี และ งาน landscape

79

MONTH

7

แล้ ว เสร็ จ งานภายใน และ landscape งานเก็ บ ทาความสะอาด ส่ ง มอบอาคารแก่ เ จ้ า ของอาคาร


COST

ESTIMATE การประมาณราคาค่าก่อสร้าง

80


COST ESTIMATE การประมาณราคา

หมวด 1

2

3

4

5

รวม

ภารกิจ

มูลค่างาน

%

M1 M2 M3 M4 M5 M6 M7 duration (week) w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 100.00

เตรียมก่อก่อสร้าง งานรื้อถอนสิ่งก่อสร้างและตอต้นไม้ภายในพื้ นที่ งานดิน และงานถนนชัว ่ คราว ่ ่อสร้าง งานทารั้ว เชื่อมต่อระบบไฟฟ้า และประปาชั่วคราวรอบพื้ นทีก งานเตรียมพื้ นที่และ สานักงานภาคสนามสาหรับผู้ควบคุมงาน งานขุดดิน - ถมดิน - ปรับระดับดิน งานโครงสร้าง งานเสาเข็ม งานฐานราก งานโครงสร้าง คสล. ใต้ดิน งานคานคอดิน พื้ น และ เสา งานติดตัง ้ โครงสร้างเหล็กและหลังคา งานโครงสร้าง พิ เศษ งานสถาปัตยกรรม งานพื้ น ผนัง ประตู หน้าต่าง งานฝ้าเพดาน งานติดตัง ้ แผงบังแดด งานทาสี งานติดตัง ้ สุขภัณฑ์ งานระบบประกอบอาคาร งานระบบไฟฟ้า งานระบบสุขาภิบาล งานระบบปรับอากาศ งานระบบดับเพลิง งานระบบเก็บ และจ่ายน้ามัน ้ เพลิง งานระบบควบคุมไอน้ามันเชือ งานระบบเก็บ จ่าย และควบคุมก๊าซธรรมชาติ งานระบบรักษาความปลอดภัย งานระบบประกอบอาคารอื่นๆ งานปรับแต่งภูมท ิ ศ ั น์ และเก็บความสะอาด

2,420,000 2.48% 200,000 0.20% 500,000 0.51% 220,000 0.23% 1,500,000 1.54% 23,623,000 24.20% 1,395,000 1% 1,958,000 2% 5,000,000 5% 3,070,000 3% 3,500,000 4% 8,700,000 9% 13,181,000 13.51% 1,520,500 1.56% 1,350,000 1.38% 852,500 0.87% 8,000,000 8.20% 1,458,000 1.49% 47,625,000 48.80% 8,500,000 8.71% 4,750,000 4.87% 4,250,000 4.35% 4,625,000 4.74% 3,750,000 3.84% 450,000 0.46% 3,500,000 3.59% 2,800,000 2.87% 15,000,000 15.37% 10,750,000 11.01%

งานภูมิสถาปัตยกรรม

8,500,000

งานเก็บทาความสะอาด

2,250,000 2.31% 1 แผนงานประจา (%)

97,599,000

0.2 0.5 0.1 0.1 1

1

2 4 3 2 2 2

1 0.7 0.7

77.44

0.5 0.5 0.5 0.5 1.7 1.7 1.7 1.6 1.6 1.8 1.8 4.5 4.5 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.3 0.3 0.3

4 3 3 1 1

2

แผนงานสะสม (%)

8.2 1.5

41.16

10 10 7 8 4 2 4 3 3

8.71%

22.62

0.9 0.5 0.6 0.6 1

0.9 0.5 0.6 0.6

0.9 0.5 0.6 0.6

0.9 0.5 0.6 0.6

12.61

0.9 0.5 0.6 0.6

0.9 0.5 0.6 0.6

0.9 0.9 0.5 0.5 0.6 0.6 0.6 1 1 0.2 0.2 0.9 0.9 1 1 5.1 5.1

4.41

1 0.9 0.9 1 5.1 4.4 4.4

1.97 1

0.9 0.9 0.5 0.5

5

9

13

17

21

1.97

2.44

8.20

10.01

18.55

36.27

1.97

4.41

12.61

22.62

41.16

77.44

2.3 25 22.56 100.00

มูลค่าต่อเดือน (ล้านบาท)

1,920,000

2,384,500

8,003,500

9,765,125

18,103,113

35,401,929

22,020,833

มูลค่าสะสม (ล้านบาท)

1,920,000

4,304,500

12,308,000

22,073,125

40,176,238

75,578,167

97,599,000

มูลค่างานก่อสร้างสุทธิ 81

1 1 2 3

97,599,000 บาท

ใช้ระยะเวลาก่อสร้างทั้งหมด

6 เดือน กับ 14 วัน


COST ESTIMATE

การประมาณราคา

11

2.48

เตรียมการก่อสร้าง

CONSTRUCTION PREPARATION

24.2

2,420,000 บาท งานโครงสร้าง STRUCTURE

%

2.48 %

24.2 %

23,623,000 บาท

ค่ า ก่ อ สร้ า งสุ ท ธิ

งานสถาปัตยกรรม ARCHITECTURE

13.51 %

47,625,000 บาท

48.8

13.51 งานระบบประกอบอาคาร

SYSTEM AND MECHANICAL

48.8 %

10,750,000 บาท

มูลค่างานก่อสร้างสุทธิ

97,599,000 บาท

งานปรับแต่งภูมิทัศน์ LANDSCAPE

11 %

13,181,000 บาท 82


COST ESTIMATE

การประมาณราคา

มูลค่างานก่อสร้างสุทธิ 97,599,000 บาท อัตราค่าบริการวิชาชีพ คิดจากสมาคมสภาสถาปนิกสยาม งานประเภทที่ 5 สถานบริการน้ามัน

ค่ า บ ริ ก า ร วิ ช า ชี พ

ไม่เกิน 10,000,000

5.50

55,000,000

10,000,000 - 30,000,000

4.75

95,000,000

30,000,000 - 50,000,000

4.50

90,000,000

47,599,000 ที่เหลือ

4.00

190,396,000

รวมอัตราค่าบริการวิชาชีพ 4,303,960.00 บาท เห็นควรเสนอราคาค่าบริการวิชาชีพ 4,300,000 บาท คิดเป็น 4.00 % ของค่าก่อสร้างทั้งหมด

ก า ร แ บ่ ง ง ว ด แ ล ะ ค่ า บ ริ ก า ร งวดที่ 1

อัตราร้อยละ 5

ทาสัญญาว่าจ้าง และแนวคิดเบื้องต้น

งวดที่ 2

อัตราร้อยละ 15

ส่งมอบเอกสารการวางเค้าโครงการออกแบบ แบบร่างเบื้องต้น

งวดที่ 3

อัตราร้อยละ 15

นาเสนอแบบร่างขั้นสุดท้าย

งวดที่ 4

อัตราร้อยละ 30

ส่งแบบร่างก่อสร้างและยื่นขออนุญาต

งวดที่ 5

อัตราร้อยละ 20

เมื่อดาเนินการแล้วเสร็จร้อยละ 50

งวดที่ 6

อัตราร้อยละ 15

เมื่อดาเนการก่อสร้างแล้วเสร็จ

ค่าบริการวิชาชีพ 4,303,960.00 บาท

83

215,198 บาท

645,594

645,594

1,291,188

860,792

บาท

บาท

บาท

บาท

645,594 บาท


SUMMARY สรุปภาพรวมโครงการ

84


PEAK HOUR

SITE LOCATION BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND


X24

GAS NOZZLE

OIL NOZZLE

X6

X2

X4 PEAK HOUR

PARKING MOTORCYCLE / CAR / DISABLED / BUS / TRUCK

SHOP RENTAL SHOP

RESTAURANT AND CAFE

INFLATING POINT

CAR WASH

86

GARDEN

CAR CARE

PLAYGROUND

DRIVE THRU

ATM


BIBLIOGRAPHY บรรณานุกรม

87


BIBLIOGRAPHY ศึกษาเรื่องอุปกรณ์ป๊ มน ั ้ามัน

เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)

ศึกษาเรื่องงานระบบปั๊มน้ามันและอุปกรณ์

เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)

ศึกษาเรื่อง TEXLON® ETFE Roof System (วันสืบค้นข้อมูล

เข้าถึงได้จาก http://www.act.or.th/th/home/post.php?type=5&p=31 (วันสืบค้นข้อมูล 29 เมษายน 2563)

ศึกษาเรื่อง Texlon® ETFE system (วันสืบค้นข้อมูล

เข้าถึงได้จาก https://www.vector-foiltec.com/ (วันสืบค้นข้อมูล 29 เมษายน 2563)

ศึกษาเรื่อง Creative Knowledge

ศึกษาเรื่อง Gas station canopy

เข้าถึงได้จาก http://www.tcdc.or.th/articles/design-creativity ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )

เข้าถึงได้จาก https://cscanopy.com/services/gasstations/ ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )

ศึกษาเรื่อง ผังเมืองรวมจังหวัดอยุธยาฯ

ศึกษาเรื่อง Filing point

เข้าถึงได้จาก http://pvnweb.dpt.go.th/ayutthaya/index.php/201712-20-05-03-45 (วันสืบค้นข้อมูล 16 เมษายน 2563)

เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)

ศึกษาเรื่อง ประกาศกรมโยธาธิการและผังเมือง

ศึกษาเรื่อง ETFE Skylight

(วันสืบค้นข้อมูล

เข้าถึงได้จาก http://web.krisdika.go.th/data/law/law2/%A126/%A1262e-2554-a0001.htm (วันสืบค้นข้อมูล 29 เมษายน 2563)

เข้าถึงได้จาก http://www.me.com.sg/images/upload/ETFE_Brochure_2018_230418. pdf (วันสืบค้นข้อมูล 29 เมษายน 2563)

้ เพลิง ศึกษาเรื่อง กฎกระทรวง สถานีบริการนํามันเชือ

ศึกษาเรื่อง SCG Solar Roof Solutions

เข้าถึงได้จาก http://elaw.doeb.go.th/document_doeb/275_0001.pdf ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )

เข้าถึงได้จาก https://roofexpert.scgbuildingmaterials.com/solar ( วัน สืบค้นข้อมูล 1 พฤษภาคม 2563 )

้ เพลิง ศึกษาเรื่อง กฏหมาย - สถานีบริการน้ามันเชือ

ศึกษาเรื่อง ตู้จ่ายน้ามันอิเล็กทรอนิกส์

เข้าถึงได้จาก http://cac.pcd.go.th/index.php/ourservices/knowledgebasedlaw/56-cac-law-gas-station (วันสืบค้นข้อมูล 29 เมษายน 2563)

เข้าถึงได้จาก https://www.magnitudeplus.com/dispenser.html (วันสืบค้นข้อมูล 29 เมษายน 2563)

ศึกษาเรื่อง กรณีศึกษาปั้มนา้ มันตัวอย่าง

เข้าถึงได้จาก https://www.metalocus.es/es/noticias/cepsapresenta-su-nuevo-modelo-de-estaciones-de-servicio ( วัน สืบค้นข้อมูล 1 พฤษภาคม 2563 )

ศึกษาเรื่อง งานระบบการวางท่อน้ามัน เข้าถึงได้จาก http://www.48ms.co.th/index.php/services/item/5 ( วันสืบค้น ข้อมูล 1 พฤษภาคม 2563 )

88



THANK YOU


“

We are a creative platform community, A new prototype of sustainable living, Creating positive space using Biophilia.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.