UNANGI ARCHITECTS
GIRAFFE PETROLEUM (THAILAND) CO., LTD.
GASOLINE AND NGV SERVICE STATION BUILDING PROJECT MODEL ASIA ROAD, PHRA NAKHON SI AYUTTHAYA PROVINCE
Company Giraffe Petroleum (Thailand) Co., Ltd. Fuel distributor and petrol stations engine oil and natural gas, NGV as the project owner want to design the construction of a prototype NGV station and gas station on the Asia road Kilometer range at Bang Pahan District, Phra Nakhon Si Ayutthaya Province with a preliminary construction budget 100,000,000.00 (One hundred million baht only) (budget includes all necessary building equipment systems layout work around the area but not including mechanical equipment The interior furniture) in the 10-rai land size.
EXPAND ECOPHILIC BOUNDARY
GOAL IN PRAISE
SUSTAINNOVATION AS A FRAMEWORK
“
We are a creative platform community, A new prototype of sustainable living, Creating positive space using Biophilia.
”
WE BELIEVE BOOST STUDIO PRODUCTIVITY WITH BIOPHILIC DESIGN. WHERE CONTEMPORARY ATTITUDES TOWARDS GREEN SPACE ARE GEARED ALMOST ENTIRELY TOWARDS EITHER PRESERVING EXISTING NATURAL HABITATS OR IMPROVING BUILDING ENERGY PERFORMANCE, RECENT INTEREST IN THE BIOPHILIC HEALTH BENEFITS SUGGEST THE POSSIBILITY OF AN EXPANDED ROLE OF GREEN BUILDING INFRASTRUCTURE
CONTENT
PROJECT BACKGROUND ที่ ม าของโครงการ
SITE LOCATION ที่ ตั้ ง โครงการ
01
12
USER ANALYSIS
SITE ANALYSIS
วิ เ คราะห์ ผู้ ใ ช้ ง าน
วิ เ คราะห์ ที่ ตั้ ง โครงการ
03
15
AREA REQUIREMENT
CASE STUDY
พื้ นที่ ใ ช้ ส อยของโครงการ
ศึ ก ษาโรงการตั ว อย่ า ง
07
16
FUNCTION DIAGRAM
DESIGN CONCEPT
ความสั ม พั นธ์ ข องพื้ นที่ ใ ช้ ง าน
แนวความคิ ด การออกแบบ
09
24
CONCEPT DEVELOPMENT การพั ฒนารู ป แบบอาคาร
CONSTRUCTION PROCESS กระบวกการก่ อ สร้ า ง
26
76
ARCHITECTURE DESIGN
COST ESTIMATE
แบบทางสถาปั ต ยกรรม
การประมาณราคาค่ า ก่ อ สร้ า ง
28
80
STRUCTURE CONCEPT
SUMMARY
แบบทางโครงสร้ า ง
สรุ ป ภาพรวมโครงการ
54
84
MEP SYSTEM
BIBLIOGRAPHY
งานระบบของโครงการ
66
บรรณานุ ก รม
87
PROJECT BACKGROUND ที่มาของโครงการ
01
PROJECT BACKGROUND ที่มาของโครงการ
TERMS OF REFERENCE
GASOLINE AND NGV SERVICE STATION BUILDING PROJECT BY GIRAFFE PETROLEUM THAILAND CO., LTD.
PROJECT DESCRIPTION
BANG PA HAN, PHRA NAKHON SI AYUTTHAYA,THAILAND
DESIGN AND CONSTRUCT PROTOTYPE PETROL AND NATURAL GAS VEHICLE STATION
ANG THONG
SUPHANBURI
PETROL AND NGV PUMP PARKING AIR PUMP SPACE OIL CHANGING SPACE CONVENIENCE STORE PLAYGROUND APPOINTMENT PLACE PHOTOGRAPH SPACE TOILET
BUDGET ฿100,000,000
GIRAFFE
PROJECT REQUIREMENTS
GAS STATION
SITE LOCATION
02
USER ANALYSIS วิเคราะห์ผู้ใช้งาน
03
USER ANALYSIS วิเคราะห์ผู้ใช้งาน PROJECT USER ADMINISTRATIVE SECTION
MANAGER AND PERSONNEL : AMOUNT 4 PEOPLE MANAGER : 1 PEOPLE
PERSONNEL : AMOUNT 3 PEOPLE BUSINESS HOURS 09.00 – 18.00
TOTAL PERSONNEL
AMOUNT
STATION SECTION AND SHOP SECTION: AMOUNT 38 PEOPLE FUELING STAFF : 10 PEOPLE BUSINESS HOURS 24 HR
FINANCIAL OFFICER : 3 PEOPLE BUSINESS HOURS 08.00 – 18.00
GIRAFFE
42
SERVICE DEPARTMENT SECTION
GAS STATION
BUSINESS HOURS 09.00 – 18.00
CASHIER : 3 PEOPLE
BUSINESS HOURS 08.00 – 18.00
CLEANING AND MAINTENANCE STAFF : 6 PEOPLE BUSINESS HOURS 08.00 – 18.00
STORE CLERK : 6 PEOPLE
BUSINESS HOURS 08.00 – 20.00
FUELING AND CONVENIENCE STORE
CONVENIENCE STORE CLERK : 6 PEOPLE
BUSINESS HOURS 24 HR
BUSINESS HOURS 24 HR
06.00 – 14.00 N
CAR CARE
14.00 – 22.00 N
FINANCIAL OFFICER
22.00 – 06.00 N
STORE
CAR CARE : 4 PEOPLE
BUSINESS HOURS 08.00 – 20.00
04
USER ANALYSIS
วิเคราะห์ผู้ใช้งาน
TARGET CUSTOMER
LOCAL USER
GIRAFFE
GAS STATION
VILLAGERS AND VENDORS
CAR
BUS
MOTORCYCLE
CONVEYANCE
FUNCTIONAL AREA
TRAVELLERS TOURIST AND PEOPLE FROM OTHER PROVINCES
CAR
BUS
MOTORCYCLE
CONVEYANCE
FUNCTIONAL AREA
DRIVERS DRIVERS AND PUBLIC TRANSPORT
CAR
05
CONVEYANCE
BUS
TRUCK FUNCTIONAL AREA
USER ANALYSIS วิเคราะห์ผู้ใช้งาน
CALCULATION OF SUPPLY NOZZLES NUMBER OF VEHICLES CLASSIFIED BY FUEL TYPE
EXPECT AT LEAST
1,235
470,374 x 12 = 5,644,488 / 365 = 15,464 /DAY
1,549 138,340
ดีเซล
FROM THE POTENTIAL OF THE PROJECT EXPECT TO HAVE OF THE TOTAL NUMBER OF CAR USERS
329,250
เบนซิน
TOTAL 50,000
100,000
200,000
250,000
300,000
350,000
CAR
OIL
29%
NOZZLE
99.4 % NUMBER OF CARS
TOTAL
GAS NOZZLE
70.4 % ดีเซล
LPG
PEAK HOUR : TOTAL 6,185 / DAY = 6,185/24 = 258 PER HOUR FILLING UP THE OIL TAKES ABOUT 5 MINUTES. WITHIN 1 HOUR CAN FILL UP TO 12 CARS THEREFORE MUST HAVE 258/12 = 21
0.6%
4 7 0, 3 7 4
เบนซิน
/DAY
40%
GIRAFFE
PUBLIC TRANSPORT
150,000
6,185
0.6 % CNG
X6
OIL NOZZLE
-
DAY PER MONTH TO USE THE SERVICE
GAS STATION
LPG
1
X24 PEAK HOUR
X2
GAS NOZZLE
CNG
ส ถิ ติ จา น ว น ร ถ ต า ม ก ฎ ห ม า ย ว่ า ด้ ว ย ร ถ ย น ต์ จา แ น ก ต า ม ช นิ ด เ ชื้ อ เ พ ลิ ง สา นั ก ง า น ข น ส่ ง จั ง ห วั ด อ ยุ ธ ย า ณ วั น ที่ 3 1 มี น า ค ม 2 5 6 3
X4 PEAK HOUR
06
AREA
REQUIREMENT ความต้องการของโครงการ
07
AREA REQUIREMENT
พื้ นที่ใช้สอยของโครงการ GENERAL ANALYSIS
FILLING STATION DIPENSER FILLING STATION DISPENSER(OIL) FILLING STATION DISPENSER (NGV) CASHEIR TOTAL
SQM. SQM. SQM. SQM
480 2,062.5 700 480 2,542.5
SQM. SQM. SQM. SQM. SQM
CARPARK TRUCK CAR MOTORCYCLE BUS TOTAL
FUNCTION 1,2063.5
GIRAFFE
PUBLIC STORE CAFE’ PARK PLAYGROUND MEETING POINT TOILET ATM CANTEEN TOTAL
2200 360 1,600 1,600 240 622 16.5 712 7,350
SQM. SQM. SQM. SQM. SQM. SQM. SQM. SQM. SQM
322 125.5 311 758.5
SQM. SQM. SQM. SQM
GAS STATION
700 700 12 1,412
FUNCTION
total
SERVICE POINT CAR CARE INFLATING POINT OIL CHANGE POINT TOTAL
CIRCULATION 08
FUNCTION DIAGRAM
ความสัมพั นธ์ของพื้ นที่ใช้งาน
09
FUNCTION DIAGRAM ความสัมพั นธ์ของพื้ นที่ใช้งาน
GAS STATION
GIRAFFE 10
FUNCTION DIAGRAM
GIRAFFE
GAS STATION
ความสัมพั นธ์ของพื้ นที่ใช้งาน
11
ZONNING DIAGRAM
SITE LOCATION ที่ตง ั้ โครงการ
12
SITE LOCATION
ที่ตั้งโครงการ
650 m
GIRAFFE
GIRAFFE
GAS STATION
SURROUNDING
U-TURN
SITE 13
1. 40k m
NEARBY GAS STATION
SITE LOCATION
ที่ตั้งโครงการ
SITE EXISTING
SITE LOCATION
AREAS
TWO FLOOR BUILDING
GAS STATION
37,353 SQ.M. 23 – 1 - 38.5 RAI
BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND
MATERIAL : ZINC
MID LEVEL
GIRAFFE
PONDING FIELD
PATHWAY HIGHER LEVEL
POND LOWER LEVEL
TREE 196.00 M
14
SITE ANALYSIS วิเคราะห์ที่ตง ั้ โครงการ
15
SITE ANALYSIS
GENERAL ANALYSIS
วิเคราะห์ท่ต ี ั้งโครงการ SITE LOCATION BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND
GAS STATION
GIRAFFE 16
SITE ANALYSIS
GIRAFFE
GAS STATION
วิเคราะห์ที่ตั้งโครงการ
17
LAW AND REGULATION ่ ังหวัดพระนครศรีอยุธยา ผังเมืองรวมในท้องทีจ พ.ศ. ๒๕๕๔
SITE ANALYSIS
LAW AND REGULATION กฎกระทรวงสถานีบริการน้ามันเชื้อเพลิง
พ.ศ. ๒๕๕๔
ก
สถานีบริการน้ามันเชื้อเพลิงประเภท ก ได้แก่ สถานีบริการน้ามันเชื้อเพลิงที่ให้บริการแก่ ยานพาหนะ ่ ี่ติดเขตทางหลวง ถนนสาธารณะ หรือถนนส่วนบุคคลซึ่งมีขนาดความกว้าง ทางบก ซึ่งตั้งอยู่ในพื้ นทีท ตามที่ กรมธุรกิจพลังงานประกาศกาหนด และเก็บน้ามันเชื้อเพลิงไว้ในถังเก็บน้ามันเชื้อเพลิงใต้พ้ื นดิน
GAS STATION
GIRAFFE
OFFICE
FUEL STORAGE
อาคารบริการ
ตู้จ่ายน้ามันเชื้อเพลิง
FUEL DISPENSER
ENTRANCE
ตู้จ่ายน้ามันเชื้อเพลิง
ทางเข้าโครงการ
CAR WASH จุดบริการล้างรถ
18
CASE STUDIES
กรณีศึกษาโครงการตัวอย่าง
19
CASE STUDIES
กรณีศึกษาโครงการตัวอย่าง ARCHITECTURAL ด้านสถาปัตยกรรม
CEPSA SERVICE STATION SAFFRON BRANO CONSULTANTS + MALKA + PORTUS
Location Architects
: Adanero, Spain : Malka+Portus Arquitectos, Saffron Brand Consultants : Canopy 320 m² : 2011
- Improve the experience to be really service oriented - Reduce the cost of maintenance through using the latest technology - Create visual impact, represent Cepsa in a new and meaningful way
MAIN MATERIAL
GIRAFFE
Area Year
CONCEPT DESIGN
GAS STATION
PROJECT INFO.
Self Cleaning
Light Weight
ETFE Recyclable
20
CASE STUDIES
กรณีศึกษาโครงการตัวอย่าง ARCHITECTURAL ด้านสถาปัตยกรรม
GIRAFFE
GAS STATION
UNITED OIL GASOLINE STATION /
KANNER ARCHITECT
PROJECT INFO.
CONCEPT DESIGN
LOCATION : LOS ANGELES, UNITED STATES ARCHITECTS: KANNER ARCHITECTS AREA : 630.80 M² YEAR : 2009
WITH THE AUTOMOBILE AND TODAY’S MODERN ONE-STOP SHOPPING SPIRIT OF IMMEDIATE GRATIFICATION AND CONVENIENCE.
MAIN STRUCTURE
MAIN FUNCTION 12-Pump Station
Steel Mini Market Concrete Carwash 21
CASE STUDIES
กรณีศึกษาโครงการตัวอย่าง SUSTAINABLE ด้านความยั่งยืน
HELIOS HOUSE / JOHNSTON MARKLEE & ASSOCIATED
Location
A Cultural Laboratory that aspires to become a place of exchange, stimulation of dialogue and discussion around the problems related to the environmental issue.
: Los Angeles, United States Architects : Johnston Marklee &Associate Year : 2007
ECO SYSTEM
Collect Energy With Solar Panel
Reflective Metal Panel to reduce energy using
GIRAFFE
CONCEPT DESIGN
GAS STATION
PROJECT INFO.
Collect Water Into the Tank 22
CASE STUDIES
กรณีศึกษาโครงการตัวอย่าง STRUCTURAL ด้านโครงสร้าง
NP GAS SATTION /
MONEO-BROCK
GIRAFFE
GAS STATION
PROJECT INFO. Location Architects Area Year
: : : :
Madrid, Spain Moneo-Brock 345.00 m² 2007
CONCEPT DESIGN To captures the flow of movement through the curves on its canopy, on a clear statement towards landscape.
MAIN STRUCTURE
Steel 23
Timber
design concept
แนวคิดในการออกแบบ
24
CONCEPT
ILLUSION 360 DEGREE
NATURE
OF VIEWPOINT
ILLUSION HIDDEN
Gas station is a place that we use around. With the center part of the pump And there are buildings around the pump, so the filling point is the point where every part of the pump can see
RARE 45
MAIN STRUCTURE
VIEW
VIEW
VIEW
OF BUILDING
115
LEFT
RIGHT
VIEW OF FRONT AND RARE
225
315
FRONT
25
In nature, we often find many illusions hidden. Various parts in nature Some things are not always what they see. Must see all around in order to know its shape Which is a special thing hidden in nature
ANGLE OF VIEWPOINT
ISOMETRIC
VIEW OF RIGHT AND LEFT
VIEW OF 45 , 115 , 315 , 225 degree
SHOWS THAT THE VIEWS IN EACH DIRECTION THAT USERS SEE ARE NOT THE SAME IN ORDER TO GET A DIFFERENT EXPERIENCE
CONCEPT DEVELOP
การพั ฒนารู ป แบบอาคาร
26
CONCEPT WORK
ILLUSION MAIN STRUCTURE OF BUILDING
ISOMETRIC
27
design
architecture แบบทางสถาปัตยกรรม
28
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
ZONE B
ZONE A
PLAN 29
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
ROOF PLAN 30
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
RESTAURANT WC
PLAYGROUND
PARK
CAR CARE
SHOP ZONING DRIVE THRU ZONING
CAR WASH
CAR PARK
GAS STATION GIRAFFE OFFICE
OIL STATION LOADING AREA
31
ISOMATRIC DIAGRAM
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
CIRCULATION 32
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
LOADING AREA
GIRAFFE OFFICE CAR WASH PARKING
SECTION A
OIL FILLING POINT
CASHIER and MANAGEMENT
01 2
5
10
20
40
01 2
5
10
20
40
GAS FILLING POINT
CAR CARE PARKING
SECTION B 33
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
GIRAFFE OFFICE
CAR WASH
FILLING STATION
RETAIL MC DONALD
GARDEN
DRIVE THROUGH
01 2
SECTION C
RESTAURANT WC
GARDEN AND PLAYGROUND
5
10
20
40
SHOP AND RETAIL ATM AREA
MC
SECTION D 34
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
GIRAFFE BANNER
GAS STATION BANNER
MAIN LOGO MINI CASHIER AREA
SITTING AREA
MINI CASHIER AREA
4.10 2.50
GIRAFFE
2.20
GIRAFFE BANNER 2.90
5.20
GAS STATION MAIN LOGO SITTING AREA
35
GAS STATION BANNER
1.70
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
C
GAS STATION LABEL DETAIL PLAN
A
D
B
D
E
G
A
B
E
DETAIL
C
A
ALUMINIUM COMPOSITE : LIGHT GREY COLOR THICKNESS : 2.5 mm
B
ALUMINIUM COMPOSITE : DARK GREY COLOR THICKNESS : 2.5 mm
C
ALUMINIUM COMPOSITE : BLACK COLOR THICKNESS : 2.5 mm
D
TRANSLUCENT ACRYLIC : MAGENTA COLOR THICKNESS : 2 mm , LED inside
E
TRANSLUCENT ACRYLIC : MAGENTA COLOR THICKNESS : 1.5 mm , LED inside
F
TRANSLUCENT ACRYLIC : SMOKE GRAY COLOR THICKNESS : 1.5 mm, LED inside
G
LED LINE MAGENTA COLOR
F
G
ELEVATION
ELEVATION
ELEVATION
ELEVATION
A
C
B
D
36
37
PERSPECTIVE GAS STATION 38
PERSPECTIVE GIRAFFE OFFICE 39
PERSPECTIVE CAR WASH 40
PERSPECTIVE CAFE AREA 41
PERSPECTIVE CAR WASH 42
PERSPECTIVE CAFE AREA 43
PERSPECTIVE WC BUILDING 44
PERSPECTIVE COVERWAY TO RESTAURANT 45
PERSPECTIVE GARDEN 46
PERSPECTIVE PARK AND PLAYGROUND AREA 47
PERSPECTIVE RETAIL AND SHOP 48
PERSPECTIVE RESTAURANT 49
PERSPECTIVE CAFE AREA 50
PERSPECTIVE DRIVE THRU AREA 51
PERSPECTIVE ENTRANCE AREA
52
DESIGN ARCHITECTURE
แบบทางสถาปัตยกรรม
SERVICE SUMMARY FUEL DISPENSER จานวนตู้จ่ายเชื้อเพลิง
GIRAFFE
GAS STATION
OIL
GAS
CAR PARKING จานวนที่จอดรถ
MOTERCYCLE
CAR
DISABLE CAR
BUS
SHOP AND SERVICE จานวนร้านค้า และบริการ
RESTAURANT
SHOP
DRIVE THRU
INFLATING POINT
OTHERS CONVINENCE จานวนบริการอื่นๆ
53
TRUCK
CAR CARE
PARK
PLAYGROUND
ATM
CAR WASH
STRUCTURE CONCEPT แบบทางโครงสร้าง
54
55
ROUND TUBE – MILD STEEL เหล็กท่อกลม
SAE 1008 (Si less than 0.03)
COLOR
WALL THICKNESS
3.00 OUTSIDE DIAMETER
193.70
mm
mm
DETAIL JOINT ROUND TUBE – MILD STEEL
ISOMETRIC
Día 193.70 x 3 mm FRONT AND RARE COLUMN AXIS RELATION
STEEL PLATE Thickness 3 mm
LEFT ANT RIGHT
COLUMN AXIS RELATION
CONCRETE
COLUMN BASE TILT
10
WELDING JOINT
o
DEGREE
FRONT ELEVATION
SIDE ELEVATION
CONCRETE PILE
56
RECTANGULAR PIPE MILD STEEL เหล็กแป็บแบนขนาดพิ เศษ
A
B
AxB THICKNESS
I BEAM ,MILD
STEEL
เหล็กตัวไอ
TURN BUCKLE
CONNECTED BY WELDING
DIA 30 mm.
BRACING ROD RB 25 mm
ISOMETRIC ROOF STRUCTIRE 57
I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]
RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm
I–BEAM JOINT
TEXLON® ETFE 2 LAYERS ETFE ETHYLENE TETRAFLUOROETHYLENE Able to withstand high temperature changes
• LIGHTWEIGHT Which will save the budget for making the structure to support the material • SAVE ENERGY Can reduce electricity consumption for lighting devices • SAVE MONEY repairs can be made quickly and conveniently. Which, when compared to using glass, will be faster and also save a lot of money
ISOMETRIC ETFE ROOF SYSTEM DETAIL A
DETAIL A
ETEF SKYLIGHT
STEEL WELDING JOINT
TEXLONⓇ
There is air which uses an air pump to put between the sheets.
C LIGHT LIP CHANNEL STEEL 60 x 30 x 10 x 1.6. mm [ 8.91 kg/m ]
STEEL PLATE JOINT WITH 7 KNOTS
C - CHANNEL STEEL 60 x 30 x 10 x 1.6. mm [ 8.91 kg/m ]
DETAIL B M5X120 NICKLE PLATED MEDIUM CARBON STEEL HEX FLANGE HEAD LONG BOLTS
STEEL PLATE Thickness 1.5 mm DETAIL B
BOLT AND PLATE M 5x120 nickle plated medium carbon steel hex flange head long bolts
STEEL PLATE WITH 2 KNOTS
58
ISOMETRIC TOP ROOF
ETEF SKYLIGHT
TEXLONⓇ
There is air which uses an air pump to put between the sheets.
RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm
I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]
RECTANGULAR PIPE MILD STEEL 8000 x 4000 x 6 mm
C LIGHT LIP CHANNEL STEEL 60 x 30 x 10 x 1.6. mm[ 8.91 kg/m ]
59
LOAD TO MAIN COLUMN
SOLAR ROOF AREA 10 O
SCG Solar Roof Solutions Because there is a lot of space on the roof Therefore utilized to produce electricity and the oil pump is open for 24 hours. Electricity from solar roof is then produced for lighting.
60
3.50
1.70
0.30
0.60
1.40
0.20
0.20
1.70
0.30 0.50
1.20
0.40 5.40
I – BEAM STEEL
200 x 100 x 7 x 10 mm [ 15.60 kg/m ]
SEE DETAIL A
Joint with Light Transmission White Acrylic Sheet
I – BEAM STEEL
150 x 75 x 5.5 x 9.5 mm [ 10.26 kg/m ]
SEE DETAIL A
WHITE ACRYLIC SHEET
40% Light Transmission White Acrylic Sheet STEEL PLATE JOINT WITH 7 KNOTS
C – CHANNEL BEAM
200 x 80 x 6.5 mm [ 24.60 kg/m ]
ISOMETRIC SIGNPOST 61
STEEL PLATE JOINT WITH 7 KNOTS
MATERIAL ROOF FOR SOLAR PANAL
ETEF SKYLIGHT
SUMMARY I–BEAM ,MILD STEEL 600 x 190 x 16 x 35 mm [ 176 kg/m ]
386 m (67,936 kg)
RECTANGULAR PIPE MILD STEEL
743 m
ROUND TUBE – MILD STEEL เหล็กท่อกลม Día 193.70 x 3 mm
216 m
8000 x 4000 x 6 mm
ROOF STRUCTURE
STEEL PLATE FOR ETEF SKYIGHT
611.74 m
BOLT AND PLATE
BOLT 2,288 pcs.
FOR ETEF SKYIGHT
PLATE 130 pcs.
FLOOR ETEF SKYLIGHT TEXLONⓇ BRACING ROD AND TURN BUCKLE
264 m
I – BEAM STEEL
179.5 m (2,800.2 kg)
I – BEAM STEEL
86.4 m (886.46 kg)
200 x 100 x 7 x 10 mm [ 15.60 kg/m ]
SUMMARY STRUCTURE
1,904.8 m2
150 x 75 x 5.5 x 9.5 mm [ 10.26 kg/m ]
DIAGRAM 62
2
SPACETRUSS STEEL ROOF STRUCTURE
1
S T E E L C O LU M N STRUCTURE
CAR WASH ISOMETRIC 1
S T E E L C O LU M N STRUCTURE
62
2
SPACETRUSS STEEL ROOF STRUCTURE
1
S T E E L C O LU M N STRUCTURE
3.00
7.00
30
RECTANGULAR PIPE MILD STEEL
o
30
o
8000 x 4000 x 6 mm
FRONT ELEVATION
2 0.89
SPACE TRUSS STEEL ROOF STRUCTURE
12.50
1.00
11.50
ROUND TUBE – MILD STEEL เหล็กท่อกลม Día 193.70 x 3 mm
63
PERSPECTIVE GAS STATION 64
MEP SYSTEM งานระบบภายในโครงการ
66
MEP SYSTEM
งานระบบภายในโครงการ
FUEL
67
GAS NGV NOZZLE
NGV
ถังเก็บแก๊สเชื้อเพลิงบนดิน
ถังเก็บน้ามันเชื้อเพลิงใต้ดิน
FUEL NOZZLE
ตาแหน่งถังเก็บเชื้อเพลิง
FUEL
ถังเก็บความจุ 40,000 ลิตร จานวน 3 ถัง
ถังเก็บความจุ 30,000 ลิตร จานวน 2 ถัง
E20 DIESEL GASOHOL91
GASOLINE GASOHOL95
NGV
ถังเก็บก๊าซ NGV ความจุ 50,000 ลิตร จานวน 4 ถัง
NGV STORAGE TANK พร้อมท่อน้าลดอุณหภูมถ ิ ังแก๊ส
MEP SYSTEM
ตู้จ่ายน้ามัน 6 มือจ่าย MTP-HYCMD1687SK-GB6 FUEL
PUMP FLOW METER 293 CM.
FUEL DISPENSER
ตาแหน่งตู้จ่ายเชื้อเพลิง
ตู้จ่ายน้ามันเชื้อเพลิง
งานระบบภายในโครงการ
NOZZLE CONTROL TYPE WEIGHT
B NGV
NGV DISPENSER
ตู้จ่ายก๊าซ NGV
123 CM.
TYPE – OPTIONAL U102 AU102 BU102 C FLOW RATE – 0-55 TYPE – OPTIONAL U102 AU102 BU101 CD ACCURACY – 0.2% AUTO SHUT – OFF SOLENOLD VALE CONTROL TYPE 481 KG
53 CM.
ตู้จ่ายก๊าซ NGV 4 มือจ่าย BMP4000.OE /NGV NGV
CNG dispensers 1 to 4 filling hoses CNG = compressed natural gas (methane) height 1900mm free hanging hoses
A
68
STANDARD SPEED 30 KG/MIN
เครื่องเติมลมไนโตรเจนอัตโนมัติ G5 รุ่น E-1170-N2P จานวน 6 เครื่อง
131 CM.
FUEL
INFLATING
FLOW RATE
-
่ ้องการ 1100 ลิตร/นาที ปริมาณลมทีต แรงดันลมขาเข้า 217 PSI / 15 bar (สูงสุด) ่ ลิตได้ 228 ลิตร/นาที ปริมาณลมไนโตรเจนทีผ ที่แรงดัน 116 PSI ถังพั กลมไนโตรเจน 118 ลิตร ความบริสุทธิไ์ นโตรเจน 95-99% ขนาดตัวเครื่อง 73 x 62 x 131 cm. ขนาดถังพั กไนโตรเจน 40 x 43 x 110 cm.
MEP SYSTEM
งานระบบภายในโครงการ
PUMP FLOW METER 293 CM.
OIL DISPENSER
ตู้จ่ายน้ามัน 6 มือจ่าย MTP-HYCMD1687SK-GB6
NOZZLE CONTROL TYPE WEIGHT
123 CM.
iBUTTON
TAGS SOLUTIONS
TYPE – OPTIONAL U102 AU102 BU102 C FLOW RATE – 0-55
GAS STATION
ตู้จ่ายน้ามันเชื้อเพลิง
BUILDING EQUIPMENT
TYPE – OPTIONAL U102 AU102 BU101 CD ACCURACY – 0.2% AUTO SHUT – OFF SOLENOLD VALE CONTROL TYPE 481 KG
53 CM.
GIRAFFE
FUEL TAGGING ก า ร เ ติ ม น้า มั น ด้ ว ย ร ะ บ บ
iBUTTON iBUTTON
FEATURE ป้องกันการทุจริต
รองรับตู้จ่ายหลายผลิตภัณฑ์
รายงานเติมน้ามัน
ตรวจสอบการทางานของพนังงาน
69
FUEL MANAGEMENT ระบบขนส่งโครงการ
DISTRIBUTION CONTROL SYSTEM
FLEET CARD
เป็นบัตรครดิตที่ใช้เติมนา้ มันในสถานีน้ามัน หรือภายในกิจการระบบ ขนส่ง เพื่ อควบคุมการจ่ายน้ามัน โดยจะออกบัตรเฉพาะคนขับรถเท่านั้น
ADVANTAGE TOUCH SCREEN CONSOLE
FMS SOFTWARE GSM MODEM
MAIL ALERTS AND REPORTS
GIRAFFE
CARD BASED FUEL MANAGEMENT SYSTEM FOR GAS STATION AND OTHER DISPENSING SITE
GAS STATION
ระบบขนส่ง CARD BASE / FLEET CARD
เป็นการจ่ายน้ามันด้วยระบบเงินสินเชื่อในราคาเงินสด โดยมีระยะเวลาการชาระเงิน เป็นเครื่องมือตรวจสอบสิทธิแ ์ บบ REAL TIME เช่น
REPORTS DISPENSER CONTROLLER STORAGE TANKS
RFID TAG
-
ค่าใช้จ่าย การสรุปรอบบัญชี ตรวจสอบวงเงินคงเหลือ หรือจานวนลิตรคงเหลือในการเติมต่อคันจาก SALES SLIP
มีความปลอดภัย -
มีรหัส PIN มีการกาหนดวงเงิน หรือจานวนลิตรในการเติม ต่อครั้ง ต่อวัน ต่อสัปดาห์ หรือต่อเดือน ลดความเสี่ยงการสูญหายของน้ามันจากคนขับ
ลดภาระด้านเอกสาร
70
MEP SYSTEM
งานระบบโครงการ
ELECTRIC SYSTEM DISTRIBUTION BOARD
71
DUCT BANK
MAIN DISTRIBUTION BOARD
RING MAIN UNIT
EMERGENCY MAIN DISTRIBUTION BOARD
LOAD PANEL
TRANSFORMER
AUTOMATIC TRANSFER SYSTEM
สายไฟฟ้าแรงสูง
GENERATOR
สถานีย่อย กฟน.
EMERGENCY LOAD PANEL
สายไฟฟ้าแรงต่า
MEP SYSTEM
งานระบบโครงการ
SANITARY SYSTEM
72
MEP SYSTEM
งานระบบโครงการ
AIR CONDITION SYSTEM AHU
73
CONDENSING AIR CONDITION AREA
MEP SYSTEM
งานระบบโครงการ
F I R E E X T I N G U I S H I N G SYSTEM FIRE ALARM BELL FIRE ALARM BELL SMOKE DETECTOR ASSEMBLY POINT
DRY CHEMICAL EXTINGUISHERS
FOAM EXTINGUISHERS
74
MEP SYSTEM
งานระบบโครงการ
SOLAR SYSTEM SCG Solar Roof Solutions
75
Because there is a lot of space on the roof Therefore utilized to produce electricity and the oil pump is open for 24 hours. Electricity from solar roof is then produced for lighting.
CONSTRUCTION PROCESS กระบวนการก่อสร้าง
76
CONSTRUCTION
กระบวนการก่อสร้าง
MONTH
1
ติ ด ตั้ ง รั้ ว ชั่ ว คราว ก่ อ สร้ า งสานั ก งานชั่ ว คราว ปรั บ ระดั บ ดิ น ขุ ด ดิ น ปรั บ ระดั บ ทาโครงสร้ า งใต้ ดิ น รั บ ถั ง น้า มั น
77
MONTH
2
เริ่ ม ลงเสาเข็ ม , ฐานราก ติ ด ตั้ ง ถั ง น้า มั น ใต้ ดิ น
CONSTRUCTION
กระบวนการก่อสร้าง
MONTH
3-4
แล้ ว เสร็ จ งานฐานราก กลบดิ น ฝั ง เริ่ ม วางงานระบบ และงานสถาปั ต ยกรรม
MONTH
5
วางงานระบบประกอบอารต่ า ง ๆ เดิ น ท่ อ ไฟฟ้า ท่ อ ระบบสุ ข าภิ บ าล
78
DESIGN ARCHITECTURE
กระบวนการก่อสร้าง
MONTH
6
แล้ ว เสร็ จ งานพื้ น และผนั ง เริ่ ม งานมุ ง หลั ง คา งานตกแต่ ง ภายใน ทาสี และ งาน landscape
79
MONTH
7
แล้ ว เสร็ จ งานภายใน และ landscape งานเก็ บ ทาความสะอาด ส่ ง มอบอาคารแก่ เ จ้ า ของอาคาร
COST
ESTIMATE การประมาณราคาค่าก่อสร้าง
80
COST ESTIMATE การประมาณราคา
หมวด 1
2
3
4
5
รวม
ภารกิจ
มูลค่างาน
%
M1 M2 M3 M4 M5 M6 M7 duration (week) w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 w3 w4 w1 w2 100.00
เตรียมก่อก่อสร้าง งานรื้อถอนสิ่งก่อสร้างและตอต้นไม้ภายในพื้ นที่ งานดิน และงานถนนชัว ่ คราว ่ ่อสร้าง งานทารั้ว เชื่อมต่อระบบไฟฟ้า และประปาชั่วคราวรอบพื้ นทีก งานเตรียมพื้ นที่และ สานักงานภาคสนามสาหรับผู้ควบคุมงาน งานขุดดิน - ถมดิน - ปรับระดับดิน งานโครงสร้าง งานเสาเข็ม งานฐานราก งานโครงสร้าง คสล. ใต้ดิน งานคานคอดิน พื้ น และ เสา งานติดตัง ้ โครงสร้างเหล็กและหลังคา งานโครงสร้าง พิ เศษ งานสถาปัตยกรรม งานพื้ น ผนัง ประตู หน้าต่าง งานฝ้าเพดาน งานติดตัง ้ แผงบังแดด งานทาสี งานติดตัง ้ สุขภัณฑ์ งานระบบประกอบอาคาร งานระบบไฟฟ้า งานระบบสุขาภิบาล งานระบบปรับอากาศ งานระบบดับเพลิง งานระบบเก็บ และจ่ายน้ามัน ้ เพลิง งานระบบควบคุมไอน้ามันเชือ งานระบบเก็บ จ่าย และควบคุมก๊าซธรรมชาติ งานระบบรักษาความปลอดภัย งานระบบประกอบอาคารอื่นๆ งานปรับแต่งภูมท ิ ศ ั น์ และเก็บความสะอาด
2,420,000 2.48% 200,000 0.20% 500,000 0.51% 220,000 0.23% 1,500,000 1.54% 23,623,000 24.20% 1,395,000 1% 1,958,000 2% 5,000,000 5% 3,070,000 3% 3,500,000 4% 8,700,000 9% 13,181,000 13.51% 1,520,500 1.56% 1,350,000 1.38% 852,500 0.87% 8,000,000 8.20% 1,458,000 1.49% 47,625,000 48.80% 8,500,000 8.71% 4,750,000 4.87% 4,250,000 4.35% 4,625,000 4.74% 3,750,000 3.84% 450,000 0.46% 3,500,000 3.59% 2,800,000 2.87% 15,000,000 15.37% 10,750,000 11.01%
งานภูมิสถาปัตยกรรม
8,500,000
งานเก็บทาความสะอาด
2,250,000 2.31% 1 แผนงานประจา (%)
97,599,000
0.2 0.5 0.1 0.1 1
1
2 4 3 2 2 2
1 0.7 0.7
77.44
0.5 0.5 0.5 0.5 1.7 1.7 1.7 1.6 1.6 1.8 1.8 4.5 4.5 0.4 0.4 0.4 0.4 0.5 0.5 0.5 0.3 0.3 0.3
4 3 3 1 1
2
แผนงานสะสม (%)
8.2 1.5
41.16
10 10 7 8 4 2 4 3 3
8.71%
22.62
0.9 0.5 0.6 0.6 1
0.9 0.5 0.6 0.6
0.9 0.5 0.6 0.6
0.9 0.5 0.6 0.6
12.61
0.9 0.5 0.6 0.6
0.9 0.5 0.6 0.6
0.9 0.9 0.5 0.5 0.6 0.6 0.6 1 1 0.2 0.2 0.9 0.9 1 1 5.1 5.1
4.41
1 0.9 0.9 1 5.1 4.4 4.4
1.97 1
0.9 0.9 0.5 0.5
5
9
13
17
21
1.97
2.44
8.20
10.01
18.55
36.27
1.97
4.41
12.61
22.62
41.16
77.44
2.3 25 22.56 100.00
มูลค่าต่อเดือน (ล้านบาท)
1,920,000
2,384,500
8,003,500
9,765,125
18,103,113
35,401,929
22,020,833
มูลค่าสะสม (ล้านบาท)
1,920,000
4,304,500
12,308,000
22,073,125
40,176,238
75,578,167
97,599,000
มูลค่างานก่อสร้างสุทธิ 81
1 1 2 3
97,599,000 บาท
ใช้ระยะเวลาก่อสร้างทั้งหมด
6 เดือน กับ 14 วัน
COST ESTIMATE
การประมาณราคา
11
2.48
เตรียมการก่อสร้าง
CONSTRUCTION PREPARATION
24.2
2,420,000 บาท งานโครงสร้าง STRUCTURE
%
2.48 %
24.2 %
23,623,000 บาท
ค่ า ก่ อ สร้ า งสุ ท ธิ
งานสถาปัตยกรรม ARCHITECTURE
13.51 %
47,625,000 บาท
48.8
13.51 งานระบบประกอบอาคาร
SYSTEM AND MECHANICAL
48.8 %
10,750,000 บาท
มูลค่างานก่อสร้างสุทธิ
97,599,000 บาท
งานปรับแต่งภูมิทัศน์ LANDSCAPE
11 %
13,181,000 บาท 82
COST ESTIMATE
การประมาณราคา
มูลค่างานก่อสร้างสุทธิ 97,599,000 บาท อัตราค่าบริการวิชาชีพ คิดจากสมาคมสภาสถาปนิกสยาม งานประเภทที่ 5 สถานบริการน้ามัน
ค่ า บ ริ ก า ร วิ ช า ชี พ
ไม่เกิน 10,000,000
5.50
55,000,000
10,000,000 - 30,000,000
4.75
95,000,000
30,000,000 - 50,000,000
4.50
90,000,000
47,599,000 ที่เหลือ
4.00
190,396,000
รวมอัตราค่าบริการวิชาชีพ 4,303,960.00 บาท เห็นควรเสนอราคาค่าบริการวิชาชีพ 4,300,000 บาท คิดเป็น 4.00 % ของค่าก่อสร้างทั้งหมด
ก า ร แ บ่ ง ง ว ด แ ล ะ ค่ า บ ริ ก า ร งวดที่ 1
อัตราร้อยละ 5
ทาสัญญาว่าจ้าง และแนวคิดเบื้องต้น
งวดที่ 2
อัตราร้อยละ 15
ส่งมอบเอกสารการวางเค้าโครงการออกแบบ แบบร่างเบื้องต้น
งวดที่ 3
อัตราร้อยละ 15
นาเสนอแบบร่างขั้นสุดท้าย
งวดที่ 4
อัตราร้อยละ 30
ส่งแบบร่างก่อสร้างและยื่นขออนุญาต
งวดที่ 5
อัตราร้อยละ 20
เมื่อดาเนินการแล้วเสร็จร้อยละ 50
งวดที่ 6
อัตราร้อยละ 15
เมื่อดาเนการก่อสร้างแล้วเสร็จ
ค่าบริการวิชาชีพ 4,303,960.00 บาท
83
215,198 บาท
645,594
645,594
1,291,188
860,792
บาท
บาท
บาท
บาท
645,594 บาท
SUMMARY สรุปภาพรวมโครงการ
84
PEAK HOUR
SITE LOCATION BANG PA HAN, PHRA NAKHON SI AYUTTHAYA, THAILAND
X24
GAS NOZZLE
OIL NOZZLE
X6
X2
X4 PEAK HOUR
PARKING MOTORCYCLE / CAR / DISABLED / BUS / TRUCK
SHOP RENTAL SHOP
RESTAURANT AND CAFE
INFLATING POINT
CAR WASH
86
GARDEN
CAR CARE
PLAYGROUND
DRIVE THRU
ATM
BIBLIOGRAPHY บรรณานุกรม
87
BIBLIOGRAPHY ศึกษาเรื่องอุปกรณ์ป๊ มน ั ้ามัน
เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)
ศึกษาเรื่องงานระบบปั๊มน้ามันและอุปกรณ์
เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)
ศึกษาเรื่อง TEXLON® ETFE Roof System (วันสืบค้นข้อมูล
เข้าถึงได้จาก http://www.act.or.th/th/home/post.php?type=5&p=31 (วันสืบค้นข้อมูล 29 เมษายน 2563)
ศึกษาเรื่อง Texlon® ETFE system (วันสืบค้นข้อมูล
เข้าถึงได้จาก https://www.vector-foiltec.com/ (วันสืบค้นข้อมูล 29 เมษายน 2563)
ศึกษาเรื่อง Creative Knowledge
ศึกษาเรื่อง Gas station canopy
เข้าถึงได้จาก http://www.tcdc.or.th/articles/design-creativity ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )
เข้าถึงได้จาก https://cscanopy.com/services/gasstations/ ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )
ศึกษาเรื่อง ผังเมืองรวมจังหวัดอยุธยาฯ
ศึกษาเรื่อง Filing point
เข้าถึงได้จาก http://pvnweb.dpt.go.th/ayutthaya/index.php/201712-20-05-03-45 (วันสืบค้นข้อมูล 16 เมษายน 2563)
เข้าถึงได้จาก https://www.magnitudeplus.com/ 29 เมษายน 2563)
ศึกษาเรื่อง ประกาศกรมโยธาธิการและผังเมือง
ศึกษาเรื่อง ETFE Skylight
(วันสืบค้นข้อมูล
เข้าถึงได้จาก http://web.krisdika.go.th/data/law/law2/%A126/%A1262e-2554-a0001.htm (วันสืบค้นข้อมูล 29 เมษายน 2563)
เข้าถึงได้จาก http://www.me.com.sg/images/upload/ETFE_Brochure_2018_230418. pdf (วันสืบค้นข้อมูล 29 เมษายน 2563)
้ เพลิง ศึกษาเรื่อง กฎกระทรวง สถานีบริการนํามันเชือ
ศึกษาเรื่อง SCG Solar Roof Solutions
เข้าถึงได้จาก http://elaw.doeb.go.th/document_doeb/275_0001.pdf ( วันสืบค้นข้อมูล 1 พฤษภาคม 2563 )
เข้าถึงได้จาก https://roofexpert.scgbuildingmaterials.com/solar ( วัน สืบค้นข้อมูล 1 พฤษภาคม 2563 )
้ เพลิง ศึกษาเรื่อง กฏหมาย - สถานีบริการน้ามันเชือ
ศึกษาเรื่อง ตู้จ่ายน้ามันอิเล็กทรอนิกส์
เข้าถึงได้จาก http://cac.pcd.go.th/index.php/ourservices/knowledgebasedlaw/56-cac-law-gas-station (วันสืบค้นข้อมูล 29 เมษายน 2563)
เข้าถึงได้จาก https://www.magnitudeplus.com/dispenser.html (วันสืบค้นข้อมูล 29 เมษายน 2563)
ศึกษาเรื่อง กรณีศึกษาปั้มนา้ มันตัวอย่าง
เข้าถึงได้จาก https://www.metalocus.es/es/noticias/cepsapresenta-su-nuevo-modelo-de-estaciones-de-servicio ( วัน สืบค้นข้อมูล 1 พฤษภาคม 2563 )
ศึกษาเรื่อง งานระบบการวางท่อน้ามัน เข้าถึงได้จาก http://www.48ms.co.th/index.php/services/item/5 ( วันสืบค้น ข้อมูล 1 พฤษภาคม 2563 )
88
THANK YOU
“
We are a creative platform community, A new prototype of sustainable living, Creating positive space using Biophilia.