Perkins&Will Bay Area Work

Page 1

Our Studio
San Francisco

Introduction ― 4

Selected Projects ― 8

Contents
Front Cover: Building 50, South San Francisco, CA Left: The Edge, South San Francisco, CA
4
We’re creative thinkers with a passion for design and a compassion for communities. 5
― Introduction
6

Perkins and Will is known and respected in the region for excellent design, project delivery, and innovation in transit-oriented development, planning, and urban design. Long-term client relationships and repeat assignments have been hallmarks of our individual and collective efforts. Research-focused and inventive, we re-imagine how space can be used to foster stronger ties between communities, the built environment, and nature. Sustainable design and the use of healthy building materials are fundamental to our process. Our 85-person office prides ourselves in our deeply rooted community of designers who have been working in the San Francisco Bay Area for 20+ years.

Planet Positive Firm of the Year, 2022

Metropolis #2

Architecture Firm, 2022

Architectural Record and Interior Design Magazine

Areas of Practice

Branded Environments

Civic and Cultural

Corporate and Commercial

Corporate Interiors

Health

Higher Education

Hospitality

K-12

Landscape Architecture

Planning and Strategies

Science and Technology

Sports, Recreation, and

Entertainment

Transportation

Urban Design

Our San Francisco Studio

LEED Platinum-Certified Fitwel Certified
We believe that design has the power to make the world a better, more beautiful place.
Education
7
8

― Selected Projects

Design that supports the human body, mind, and spirit.
9

The James R. Herman Cruise Terminal at Pier

27

San Francisco, California

Client: Port of San Francisco

Size: 65,000 square feet plus 2 acres

Completion Date: 2013

Sustainability: LEED Gold ®

Awards:

Outstanding Airports & Ports Project, ASCE Region

9, 2016; ASCE San Francisco, Award Outstanding Airports & Ports Project, 2015

Partners:

Pfau Long Architecture (now Perkins and Will) was the design architect and KMD was the Executive Architect

Cruise Ship pulls into Pier 27 for
a visit ― WHAT IT IS
A new, modern cruise ship terminal and public waterfront space
11
12
The James R. Herman Cruise Terminal at Pier 27

― WHAT MAKES IT COOL A state-of-the-art sustainable Cruise Ship Terminal, the second floor is designed to easily convert into a for rent space for the City to generate additional revenue.

View of the terminal and activated waterfront space
13

Building 12

San Francisco, California

Client: Brookfield Development

Size: 230,000 square fee

Completion Date: 2021

Sustainability: LEED Gold

― WHAT IT IS

Renovation of an historic building at Pier 70 into a combined market hall and office spaces.

14
15
16
“This is an inspiring location, reflective of San Francisco’s history of ingenuity, that will once again be a major source of economic, civic and cultural value to the city.”
Building 12 at Pier 70 17
― MARK FARRELL, FORMER MAYOR OF SAN FRANCISCO

SFO Consolidated Administration Campus

San Francisco, California

Client: SFO

Size: 135,000 square feet

Completion Date: 2018

Sustainability: LEED Gold ®

18
Completed by Perkins&Will as Executive Architect in association with Mark Cavagnero Associates as Design Architect.

― WHAT IT IS New administration building consolidates four distinct employee groups under one roof.

19

Bay Area Metro Center

San Francisco, California

Client: Metropolitan Transportation Commission

Size: 525,000 square feet

Completion Date: 2016

Sustainability: LEED Gold ®

Awards:

ENR California Best Project, Northern California

Award, Renovation/Restoration Category, 2016

Building Design+Construction, Silver Reconstruction Award, 2016

San Francisco Business Times, Real Estate Deals of the Year, Renovation Category, 2017

← Top floor terrace overlooking the Bay Bridge
has become a favorite lunchtime spot for staff ― WHAT IT IS
Transformation of a 1940’s-era Army warehouse into a headquarters for multiple government agencies.
21
Bay Area Metro Center 22

― WHAT MAKES IT COOL

A three-story cut-out makes room for a ginko tree to grow.

← Flexible work environments promote interagency collaboration.
23

1 De Haro

San Francisco, California

Client: SKS Partners

Size: 130,000 square feet

Completion Date: 2020

Sustainability: LEED Gold ® Goal

― WHAT IT IS New maker space building combined with office space in the Dogpatch.

At street level, roll up doors and storefronts bring light manufacturing to the street and surrounding neighborhood.

― WHAT MAKES
COOL
IT
1 De Haro 26
1 De Haro utilizes mass timber, making it lighter, more sustainable, and more beautiful than a steel or concrete building.

The McClintock Building

San Francisco, California

Client: SKS Partners

Size: 100,108 square feet

Completion Date: 2017

Sustainability: LEED Gold ®

― WHAT IT IS

of an old dress-making warehouse into a new PDR mixed-use facility.

Transformation

29
30
― WHAT MAKES IT COOL
The original Art Deco building was built in 1939 for the Jessica McClintock dress manufacturing headquarters.
↑ The operable greenhouse roof brings natural light and air into the center atrium of the McClintock Building, creating a confortable social and work center The McClintock Building

Buildings O & M

San Francisco, California

Client: Build Inc.

Size: 51,837 square feet

Completion Date: 2018

Sustainability: GreenPoint Rated Gold

Awards:

Best of the Year Multi Family Company, Interior

Design 2018

― WHAT IT IS
32
Achieved through a unique collaboration between two architectural firms, the result is two distinct, yet complementary buildings that reflect a true urban block.
33
34

― WHAT MAKES IT COOL

Buildings O&M activate the neighborhood with contextual design elements and public amenities, contributing to a pleasant and walkable neighborhood feel.

Buildings O & M 35

New Work Environments

South San Francisco, California

Client: Confidential

Size: 3,000-10,000 square feet

Completion Date: 2018

― WHAT IT IS
36
Our interiors studio integrated into a team of workplace strategists to create a series of new work environments.
37
― WHAT MAKES IT COOL
New Work Environments 38
Testing and deploying new strategies, each project influenced the next.
39

Chase Center Office Towers

San Francisco, California

Client: Golden State Warriors

Size: 438,000 square feet

Completion Date: September 2019

WHAT IT IS
40
Mixed-use office and retail building on the site of the new Golden State Warriors’s arena.
41
Chase Center Office Towers 42

― WHAT MAKES IT COOL

The tear-drop shaped tower complements the event center’s curvilinear aesthetic without mimicking it.

43

100 Hooper

San Francisco, California

Client: Kilroy Realty

Size: 438,000 square feet

Completion Date: October 2018

Sustainability: LEED Gold ®

44
― WHAT IT IS A mixed use office building designed to encourage manaufacturing companies and provide office space to a variety of market sectors.
45
46
100 Hooper

The ground floor will host a variety of new businesses at affordable rents, while the upper three stories will be market rate office space.

― WHAT MAKES IT COOL
47

Building 50

South San Francisco, California

Client: Confidential

Completion Date: 2020

48
― WHAT IT IS Core and shell for a new building on a confidential client’s large campus in South San Francisco.
49
Building 50 50

WHAT MAKES IT COOL

Visitors and employees will get a glimpse at the inner workings of the manufacturing side of the business.

51

Potrero Power Station

San Francisco, California

Client: Associate Capital

Size: 21 acres

Completion Date: Ongoing

― WHAT IT IS
52
The development will bring 2,600 new residential units, organized into multiple buildings and offered at various levels of affordability.
53
― WHAT MAKES IT COOL
The Power Station once generated one-third of San Francisco’s power and delivered it to residents across the city.
Potrero Power Station

Mission Rock

San Francisco, California

Client: San Francisco Giants

Size: 28 acres

Completion Date: Ongoing

Awards: Urban Design Merit Award, AIA California

Council, 2011; Urban Design Merit Award, AIA San Francisco, 2010

― WHAT IT IS

Mission Rock will be a new mixedused neighborhood consisting of 8 acres of new public open space, approximately 1,500 new rental homes with 40% affordable to low and middle income families, and small retail shops and cafes.

56
57

Mission Rock was an actual rock formation in San Francisco Bay, an obstacle to watercraft navigating the coastline immediately east of the site in the 1800’s.

― WHAT MAKES IT COOL
58
Mission Rock
59
We believe that design has the power to make the world a better, more beautiful place.

That’s why clients and communities on nearly every continent partner with us to design healthy, happy places in which to live, learn, work, play, and heal. We’re passionate about human-centered design, and committed to creating a positive impact in people’s lives through sustainability, resilience, well-being, diversity, inclusion, and research. In fact, Fast Company named us one of the World’s Most Innovative Companies in Architecture. Our global team of 2,700 creatives and critical thinkers provides integrated services in architecture, interior design, landscape architecture, and more. Our partners include Danish architects Schmidt Hammer Lassen; retail strategy and design consultancy Portland; sustainable transportation planning consultancy Nelson\Nygaard; and luxury hospitality design firm Pierre-Yves Rochon (PYR).

For more information, contact:

ariane.fehrenkamp@perkinswill.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.