Status
350
2370
1015
EQ
EQ
EQ
EQ
EQ
EQ
Design Development UNIT 4 - STYLE GUIDE
1015
General Notes 5mm SHADOWLINE
TV01
TV01 A.S. PL01
PL01
PL01
PL01
PL01
PL01
TV01
5
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
350
A.S. PL01
TV01
PT01
E-108
TV01
TV01
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
PL01
760
A.S.
PL01 PL01
PL01
PL01
PL01
PL01
PL01
PL01 TV01
PL03
PL01 PL03
KICKER
PL01
PL01
EQ
EQ
80
80
PL01
KICKER
OVEN
595 20
700 295 20 295
E-106
MICROWAVE
PL01
456
PL01
20
PL01
409
20 40
TILE SETOUT
80
TL04
20
E-104
ST01
20
ST01
TL04
2020
E-102
130 40
700
E-105
FRIDGE SPACE
20
30
F.S.
CONCEALED RANGEHOOD TO BE CENTRED ABOVE COOKTOP
2400
5
TV01
THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT. ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
795
30
F.S.
PT01
795
PL01
295
5
ALLOWANCE BEHIND CABINETS & PENETRATION INTO CEILING FOR OVEN + MICROWAVE VENTILATION
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM. SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION. ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT. CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
60 600
EQ
600
1
EQ
EQ
EQ
508
2120
508
EQ
EQ
1015
3000
600
415
OVEN
BROOM
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED.
1015
ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE. CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS.
KITCHEN - ELEVATION 01 1 : 20
ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE.
1015
3000
ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION.
1015
EQ
NOTE:
EQ
A01.02
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES. ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
ISLAND BENCHTOP CANNOT EXCEED 3000mm TO ACHIEVE SINGLE PIECE OF STONE WITH NO JOINTS
5
CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION.
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE.
ST02
FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE.
970
E-102 A01.02
2
3
A01.02
NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
600
E101.1
Rev. A
350
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
1100
6 A01.01
A01.02
EQ
4
EQ
ST01
ST01
E-101
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
E-102
350
350
600
750
E-104
1620
1
Client
MICHAEL BARAKAT
Project 415
600
BROOM
OVEN
EQ
1015
EQ
1015
223 PLANTEAU RD, BILGOLA PLATEAU
2720
Drawing Title
UNIT 4 KITCHEN
2
KITCHEN - FLOOR PLAN 1 : 20
Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A01.01
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE General Notes 20
20
80 60
30 60 WD02
PL03
60 270
60
580
850
WD02
PL02
FIXED PANEL
FIXED PANEL
KICKER SET BACK 60mm
KICKER SET BACK 60mm
60
60
60
60
1
2
KITCHEN - ELEVATION 02 1 : 20
WD02
580
850
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
A01.02
PL03
970
DETAIL
1
60 30
ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
900
WD02
WD02
600
PL02
WD02
JOINERY SET BACK 20mm
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
80 60
WD02
JOINERY SET BACK 20mm
120 40
ST02
WD02
600
900
120 40
ST02
THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT.
270 60
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM.
60
SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION. ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT.
970
3
CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
KITCHEN - ELEVATION 03
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED.
1 : 20
ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE. CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS. ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE. ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION.
PL01
WD02
WD02
30 PL02
WD02 PL03
350
PL01
2880
TL04
PL01
PL03
60
FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE.
5
NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
KITCHEN - ELEVATION 05
Rev. A
1 : 20
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
PL01
80
A.S.
ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
760
20 40
ST01
ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES.
3000
2400
700 E-102
CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION.
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE.
30
PT01
60
900
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
30
PT01
NOTE:
600
350
80 60
1270
120 40
ST02
KICKER
60 EQ
600 ST02
E-102
PL02
PL02 A.S.
20 40
1620
PL02
PL02
BIN
DW
E-103
E-107
KITCHEN - ELEVATION 04
PL02 A.S.
WD02
PL03
1 : 20
60
420
600
420
420
3000
6
KITCHEN - ELEVATION 06 1 : 20
Client 760
PL02 A.S.
80
WD02
4
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
600
420
900
EQ
MICHAEL BARAKAT
Project
223 PLANTEAU RD, BILGOLA PLATEAU
60
Drawing Title
UNIT 4 KITCHEN Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A01.02
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE 100 60 10
660
10 60
General Notes
150
THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT.
60 10
TV01
ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
A.S. TL03
TV01
1000
A.S.
930
TV01
E-406
TL03
E-405
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
A.S. E-414
900
20
PL01
220 10 60
PL02
230
TV01
60 10 150
TL02
PL02
660
10 60
TL02 TO SHOWER
EQ
EQ
800
800
2200
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM. SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION. ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT. CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
200
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED.
500 100
SHOWER SCREEN
ST01
10
220
230
TV01
E-405 E301.1
SHOWER HEAD
120 20
540
ST01
E-404
2000
300
SOAP DISH
E-404
1100
300
E-411
10 120
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E 1000
NOTE:
2400
A.S.
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
900
1910
ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE.
2600 CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS.
1
BATHROOM ELEVATION - 01
2
1 : 20
BATHROOM ELEVATION - 02
ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE.
1 : 20
ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION. CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION.
150
500 ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES.
450 100
ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
E-302
TL03
E-412
Issue Revision A
2000 E-408
SHOWER SHELF
1100
MIXER
1100
900
E-406
TL03
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
E301.1
290
TILE INSERT STRIP DRAIN
720
900
SHOWER OPENING
GLAZING
Drw. Appvd. Date MQ EH 31/5/19
2400
800
TL02
900
E-405
800
TL01
E-413
EQ
E301.1
EQ
E-409
Rev. A EQ
EQ
3
TL02
E-405
SHOWER SCREEN
ST01
NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
2200
2
2600
A02.01
FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE.
SHOWER HEAD
1 4
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE.
E-404
800
E-411
900
900
720
290
EQ
EQ
Client
MICHAEL BARAKAT
2600
1910
Project
223 PLANTEAU RD, BILGOLA PLATEAU
0
BATHROOM - FLOOR PLAN 1 : 20
3
BATHROOM ELEVATION - 03 1 : 20
4
BATHROOM ELEVATION - 04
Drawing Title
UNIT 4 BATHROOM
1 : 20 Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A02.01
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE General Notes THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT. ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
TL05
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
E-604
2400 ST03
SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION.
900 660
660
700
600
TL05
500
SPOUT 1020
1
2
1 : 20
CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION. EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED.
349
W.C. - ELEVATION 01
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM.
ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT.
E-405
900
ST03
150
E-404
240
E-301
300
150 150
E-404
E-412
240
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
2400
TL03
NOTE:
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
E-604
ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE.
W.C. - ELEVATION 02 1 : 20
CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS. ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE. ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION. CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION. ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES. ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
650
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE. FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE. NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
TL03
TL03
600
Rev. A
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
500 E-411
E-301
E-411 E-405
240 150
ST03
E-301
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
700
498 TL01
E-301 E-412
100
E-301
349
EQ
3
1000
E-302
HAND TOWEL
2
660
A02.02
1020
4
ST03 E-404
900
1
E-412
422
EQ
150
E-404
Client
650
MICHAEL BARAKAT
500
HAND TOWEL
EQ
EQ
Project
223 PLANTEAU RD, BILGOLA PLATEAU
0
W.C. - FLOOR PLAN 1 : 20
3
W.C. - ELEVATION 03 1 : 20
4
W.C. - ELEVATION 04
Drawing Title
UNIT 4 W.C.
1 : 20 Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A02.02
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE General Notes
5
THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT. ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
A.S.
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
PL01
895
GYPROCK WALL
A.S.
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
PT01
ST01
E-202
600
PT01
40
2400
2400
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM. SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION.
80
A.S.
PT03
PT03
PL01
780
ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT.
PL01
80
NOTE:
60 1910
600
1
LAUNDRY - ELEVATION 02
2
1 : 20
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED. ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE.
1600
LAUNDRY - ELEVATION 01
CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
1 : 20
CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS. ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE. ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION. CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION. ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES.
1310
ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
EQ
EQ
EQ
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE.
350 1310
FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE.
5mm SHADOWLINE
5
600
A.S.
4
A03.01
A.S.
PL01
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
A.S.
2 PL01
TL01
895
E-605
1
Rev. A
A.S.
900
E-203
PT01
NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
PL01
PL01
3
1600
600 40 780
EQ
80
PL01
EQ
1800
20 40 A.S.
760
E-202
E-202
80
E-605
E-202
2400
600 ST01
E-201
350
300
ST01
HANGING ROD
TL06 HANGING ROD
ST01
A.S.
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
PL01
PL01
PL01
PL01
PT03
Client
60 1910
605
350
350
MICHAEL BARAKAT
605 600
1000
1910 1600
0
LAUNDRY - FLOOR PLAN 1 : 20
3
LAUNDRY - ELEVATION 03 1 : 20
4
LAUNDRY - ELEVATION 04
Project
223 PLANTEAU RD, BILGOLA PLATEAU Drawing Title
UNIT 04 LAUNDRY
1 : 20 Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A03.01
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE General Notes THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT.
E-603
E-603
E-603
NOTE:
1100
E-603
2400
ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED.
PL02
PL02
EQ
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT. ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM.
PL02
PL01
EQ
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION.
80
PL02
ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
EQ
ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT.
EQ
CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
1910
1
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED.
ROBE (DOORS) - ELEVATION 01 1 : 20
CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS.
EQ
20 300
100 20 300
ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE.
ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE.
20
PT01
PL02
ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION.
PL02
2400
CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION. ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES.
ST01
900
1010
E-603
E-603
E-603
E-603
ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA.
F.S.
FINISHES: REFER TO INTERIOR FINISHES SCHEDULE. FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE. NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
PL01
EQ 500
E-603
1100
PL01
EQ
PL01
PL02
E-603
EQ
PL02
PL02
750
PL02
390 20 200 20 40
477.5
PL02
F.S.
80
477.5
955
PL02
F.S.
2400
20
KICKER
80 223.3 223.3 223.3 150
990
400
2400
SHOE RACK
PL02
EQ
370
990
A.S.
PL02
80
A.S.
EQ
370
F.S.
EQ
EQ
EQ
EQ
Rev. A
EQ
500
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
1910 2730
1
ROBE (NO DOORS) - ELEVATION 01 1 : 20
STUDY - ELEVATION 04
4
1 : 20
6
LINEN CUPBOARD - ELEVATION 06 1 : 20
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
600
A04.01
600
4
Client 600
ST01
MICHAEL BARAKAT
80mm CUTOUT IN DESKTOP FOR CABLE TO GPO BELOW
6
Project
A04.01
1
EQ
A04.01
EQ
EQ
EQ
EQ
223 PLANTEAU RD, BILGOLA PLATEAU
EQ
Drawing Title EQ
EQ
EQ
EQ
EQ
EQ
UNIT 4 ROBE, STUDY & LINEN JOINERY
2730
Drawn
1910
Date
0
ROBE - FLOOR PLAN 1 : 20
3
STUDY - FLOOR PLAN 1 : 20
5
LINEN CUPBOARD - FLOOR PLAN 1 : 20
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A04.01
1 : 20
BT069
A
Status
Design Development UNIT 4 - STYLE GUIDE General Notes THE FOLLOWING NOTES TO BE READ IN CONJUNCTION WITH ALL ARCHITECTURAL AND ENGINEERING DRAWINGS AND SCHEDULES RELATING TO THIS PROJECT.
3 A04.02
ALL DIMENSIONS ARE IN MILLIMETERS (MM) UNLESS OTHERWISE STATED. ALL DIMENSIONS TO BE CHECKED ON SITE, WRITTEN DIMENSIONS ONLY TO BE USED. DO NOT SCALE FROM DRAWING.
PL02
PL02
BB01
225
PL02
397
FIRE PLACE
20
BB01
EQ
EQ
EQ
320
997
320
477 MIN. OPENING DEPTH
1428
1637
SHOP DRAWINGS TO BE SUBMITTED TO BAXTER + THRUM FOR APPROVAL PRIOR TO CONSTRUCTION AND FABRICATION. ALL MEASUREMENTS ARE SUBJECT TO SITE MEASUREMENT. CONTRACTORS MUST VERIFY AND CHECK ALL SITE CONDITIONS, DIMENSIONS AND CEILING HEIGHTS BEFORE COMMENCING ANY WORK ON SITE OR PREPARING ANY SHOP DRAWINGS. ANY DISCREPENCIES ARE TO BE REFERRED IMMEDIATELY TO BAXTER + THRUM FOR CO-ORDINATION.
BB01
OPENING HEIGHT
397
370 20 40
ST01
1085
BB01
2700
BB01
2700
2700
BB01
ALL DRAWINGS MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT PRIOR PERMISSION FROM BAXTER + THRUM.
2078
BB01
BB01
THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE ALL SERVICES AND UTILITIES PRIOR TO COMMENCEMENT.
225
PT01
2078
EXHAUST PIPE TO TOP VENTILATION
550
EQUIPMENT AND APPLIANCES SHOWN DOTTED ARE INDICATIVE ONLY, REFER TO EQUIPMENT SCHEDULE FOR SPECIFICATIONS ON EQUIPMENT TO BE PROVIDED. ALL SHOP DRAWINGS TO BE SUBMITTED FOR INSPECTION BEFORE MANUFACTURE. CONFIRM ALL DIMENSIONS PRIOR TO CONSTRUCTION OF JOINERY UNITS. IN THE EVENT OF A DISCREPANCY BETWEEN SITE DIMENSIONS AND DRAWING DIMENSIONS JOINER MUST NOTIFY DESIGNER FOR INSTRUCTIONS. ALL WORK SHALL COMPLY WITH RELEVANT AUTHORITY REQUIREMENTS AND AUSTRALIAN STANDARDS CODE FOR THAT TRADE. ALL MATERIALS AND FITTINGS TO BE FIXED IN STRICT ACCORDANCE WITH THE MANUFACTURERS SPECIFICATION.
LIVING ROOM JOINERY - ELEVATION
2
1 : 20
3
LIVING ROOM FIRE PLACE - SECTION 1 : 20
CONTRACTOR TO CO-ORDINATE BETWEEN TRADES. CONTRACTOR TO CONFIRM SELECTED APPLIANCES IN THE FF&E SCHEDULE FIT NEATLY INTO RECESS PROVIDED, INCLUDING ALLOWANCE FOR SERVICE CONNECTION. ENSURE A FLUSH TRANSITION BETWEEN DIFFERENT FLOOR FINISHES. ALL WET AREAS TO BE CONSTRUCTED IN ACCORDANCE WITH BCA. FINISHES: REFER TO INTERIOR FINISHES SCHEDULE. FITTINGS: REFER TO FURNITURE, FIXTURES AND EQUIPMENT SCHEDULE. NO CHANGE TO THE DESIGN OR SUBMISSION TO ANY PRODUCT WITHOUT BAXTER + THRUM APPROVAL IN WRITING.
3065
1637
Rev. A
Issue Revision A
Drw. Appvd. Date MQ EH 31/5/19
1428
3 A04.02
A04.02
NOTE:
OPENING DEPTH
477 MIN.
550
2
ST01
ALL DIMENSIONS TO BE CHECKED ON SITE PRIOR TO MANUFACTURE OF JOINERY & INSTALLATION OF FF&E
ABN: 77 995 334 095 studio@baxterandthrum.com baxterandthrum.com PO box 389 Narrabeen 2101
Client 81
1275
81
MICHAEL BARAKAT
OPENING WIDTH
Project
223 PLANTEAU RD, BILGOLA PLATEAU
1
LIVING ROOM JOINERY - FLOOR PLAN
Drawing Title
UNIT 4 LIVING ROOM JOINERY
1 : 20 Drawn Date
Checked
MQ
31/5/19
Drawing No.
EH
Scale @ A1
Project No. Revision
A04.02
1 : 20
BT069
A