Infrastructure Documentation Sample

Page 1

DETAIL DESIGN 30 JAN 2010

A1

1/500

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION Platform Floor Plan General Layout Plan MMMP-DD-DWG-CWK-STAT-K&A-55-305

01


IS

AX K C A TR

IS

AX K C A R T

DETAIL DESIGN 30 JAN 2010

A1

1/125

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION Platform Floor Plan Between Mz2-22 To Mz2-29 MMMP-DD-DWG-CWK-STAT-K&A-55-309

01


DETAIL DESIGN 30 JAN 2010

A1

1/500

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION ELEVATIONS 1 & 2 General MMMP-DD-DWG-CWK-STAT-K&A-55-321

01


DETAIL DESIGN 30 JAN 2010

A1

1/125

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION ELEVATION 2 Between Mz2-29 To Mz2-22 MMMP-DD-DWG-CWK-STAT-K&A-55-326

01


Mz2-22

Mz2-23

Mz2-24

Mz2-25

Mz2-26

Mz2-27

Mz2-28

DETAIL DESIGN 30 JAN 2010

A1

1/125

Mz2-29

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION Section C-C Between Mz2-22 To Mz2-29 MMMP-DD-DWG-CWK-STAT-K&A-55-341

01


DETAIL DESIGN 30 JAN 2010

A1

1/50

AL MASHAAER AL MUGADDASSAH CIVIL WORK ARCHI & FINISHES MUZDALIFAH-2 STATION ELEVATOR 8 PLANS MMMP-DD-DWG-CWK-STAT-K&A-55-394

01


1

FIRE DOOR HYDRAULIC NICHE

2

01

3

4

01

A8231

5a

5

6

A8235

8

9

10

11

12

A8232

06 8402

FFL + 3069.151 FSL + 3069.151

7

01

C 4 HOUR FIRE RATED EXPANSION JOINT

6500

RL + 3069.177

RL + 3068.936

01

RL + 3069.184

870

14000 13000

FALL

TUNNEL ROAD

REFER TO MECHANICAL ENGINEERS DRAWINGS FOR DETAILS OF TUNNEL, FIRE DOORS

TUNNEL FIRE DOOR

RL + 3069.298

RL + 3069.057

01

RL + 3068.967

A8250

EGRESS TUNNEL BELOW SHOWN DASHED

FALL

CABLE ENCLOSURE

COF

11kv SWITCHROOM

A8235

01

COF

12100 12100

COF

01 8455

BATTERY COF

FIRE UP STAIR 3 INT FH

COF

01 8456

DIESEL GENERATOR ROOM

988 4730

FFL + 3069.206 FSL + 3069.206

CORRIDOR

COF

COF

2380

15160

FHR

A8251

ESCAPE PATHWAY 4730

UP

2035

INT FH

COF

01

UP

17770

DIESEL FUEL TANK BELOW 3500

2 HOUR FIRE RATED 1042 OPERABLE HATCH ABOVE SHOWN DASHED

COF

FALL RL + 3069.104

OPENING AS PER VENDOR REQUIREMENTS

COF

CORRIDOR

2230

FFL + 3069.356 FSL + 3069.356

FIRE STAIR 2

LV SWITCHGEAR ROOM

11kv/415v TRANSFORMER ROOM

A8251

15090

FFL + 3069.356 FSL + 3069.356

FIRE ESCAPE CORRIDOR COF

FIRE ESCAPE CORRIDOR

4725

01

4445

METAL LOUVERS WITH 2 HOUR FIRE RATED DAMPER 7075

5755

FH

7075

7040

RL + 3069.173

GRATED DRAIN CONNECT TO ECO0SOL PIT RL + 3069.122

3405

6170

RAMP

RL + 3069.212

UPS

9190

A8231

RL + 3069.254

3440

FIRE DOOR HYDRAULIC NICHE

01

RAMP

7075

FFL + 3069.402 FSL + 3069.402

RL + 3069.289

ELEC PIT

2230

4 HOUR FIRE RATED EXPANSION JOINT

RAMP

RL + 3069.316

ELEC PIT

UP

RL + 3069.339

FH

KERB

7075

RL + 3069.453

ELEC PIT RAMP

UP

06 8402

4700

6500

TUNNEL ROAD

26100

B

RL + 3068.846

EGRESS TUNNEL BELOW SHOWN DASHED

SETOUT POINT CH 9116.775

A8250

KERB

RL + 3069.063

COF

FHR

COF

FFL + 3069.111 FSL + 3069.111 COF

A RL + 3069.356

6000

6000

6000

4900

1100

6200

RL + 3069.207

5900

6000

6100

23909

4900

5100

8000

47930

RL + 3069.117

EGRESS TUNNEL PLANT BELOW SHOWN DASHED

71930

1. 2. 3. 4.

ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 5. FOR FLOOR FINISH REFER TO FINISHES SCHEDULE. 6. FOR WALL FINISHES REFER TO THE "WALL SETOUT PLAN" AND "WALL TYPES" DRAWINGS AS WELL AS FINISHING SCHEDULES. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES.

01 8252

9183.475

9175.475

9170.375

9165.475

9159.375

9147.475

A8232

FFL + 3069.417 FINISHED FLOOR LEVEL FSL + 3069.417 FINISHED STRUCTURAL LEVEL FH

TUNNEL FIRE HYDRANT FHR

FIRE HOSE REEL

INT FH

01

INTERNAL FIRE HYDRATE

NPVB REDESIGN ISSUE (BUILDING RELOCATED)

MQ

RD

PA

08.03.19

H

FINAL DETAIL DESIGN ISSUE

NeGu

BaJe

MiKa

18.05.18

G

FINAL DETAIL DESIGN ISSUE

RP

BD

MK

20.08.13

F

DETAILED DESIGN ISSUE

BD

RP

MK

PRELIMINARY ISSUE

ED

BK

MK

27.06.13

D

REVISED TENDER ISSUE

0

0

0

16.09.11

ORIG

CHR

GROUND FLOOR PLAN SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING

CLIENT

APV

DATE

Design Package

CONSULTANT

TITLE

Border Roads Organisation SMEC INTERNATIONAL PTY LTD

23.07.13

E

Revision

01

LEGEND

I

No

9140.175

9135.275

9129.275

9123.275

NOTES

9117.275

01 8253

9153.375

SEPTIC TANK BELOW SHOWN DASHED

Creates, Connects, Cares...

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

Design Check

T.CLINE

08.03.2019

NORTH PORTAL VENTILATION BUILDING GROUND FLOOR LAYOUT PLAN

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

5061071-ARC-A-8108

Rev

I


1

2

01

3

4

5a

01

A8231

6

7

01

A8235

8

9

10

WT-10 FR-120

270

200

2000 200

200

WT-10 FR-120

270

WT-10 FR-120

R (A) 18000

2300

2100

P6

2300

SETOUT POINT CH 9116.775

900

533 852 1457 4530

1329

01

P5 P6

8359

8933

MOBILE 01 8455

WT-10 FR-120

6000

4900

500

9135.275

9129.275

9123.275

9117.275

A

52 200

6000

1374

6000

P8

10

C) R ( SETOUT POINT RADIUS "A"

820 750 270 D02 3.3.1

2880

WT-10 FR-120

SETOUT POINT RADIUS "C"

FIRE STAIR 2

WT-16 -

2647

1415

2297

2832

D12 3.3.2 WT-15 -

1600

01 8456

WT-10 FR-120

D12 3.3.9

WT-16 -

WT-16 -

P2 WT-11 FR-120

ML-02 3.3.1

WT-16 -

1125

WC

WT-17 FR-120 D03 3.3.13

WT-12 FR-120

NOTE: PROVIDE INSULATION TO CAVITY

60 60

AIR LOCK D06 3.3.10

2830

1000

1215 D03 3.3.11

WT-10 FR-120

WT-18 -

3200

D06 3.3.12

FIRE D02 STAIR 3 3.3.8

130

ML-02 3.3.1

WT-06 -

1600

WT-16 -

WT-10 FR-120

WT-10 FR-120

HOUSING FOR DUCT

WT-12 FR-120

WT-10 FR-120

270 270 WT-15 -

1790

130

60

369 293 2341 2417 2113

KITCHEN

2833 2975

1078 3441

1231

WT-19 FR-120

WT-06 -

WT-12 FR-120

01 A8251

WT-16 -

WT-12 FR-120

7250

200 WT-16 -

WT-11 FR-120

0 13

D12 3.3.3

WT-16 -

WT-12 FR-120

NOTE: PROVIDE INSULATION TO CAVITY

WT-15 -

P7

WT-17 P4 FR-120

CONTROL EQUIPMENT ROOM

12100

A8251

WT-12 FR-120

270

60

WT-12 FR-120

200

01

0

1000

5820

D12 3.3.4

D02 3.3.14

4950

A8235

R (B)

2100

WT-10 FR-120

P9

200

A8231

RADIO

WT-12 FR-120

NOTE: PROVIDE INSULATION TO CAVITY

P3

4061

STORAGE & FIRE SERVICES ROOM

01

SETOUT POINT RADIUS "B"

900

5500

01

4515

1350

CORRIDOR

WT-16 -

100

2119 3505

2746

D02 3.3.5

500

2165

1797

1185

P1

80

200

WT-11 FR-120

1759

D2 3.3.6

WT-10 FR-120

200

WT-10 FR-120

936

P6

3694

3577

4151

WT-10 FR-120

2514

WT-10 FR-120

5791 5932

6542

P10

1129

3365

FAN HOUSE

2227

WT-10 FR-120

A8250

138 1524

5968

13000

STORAGE

7250

01

500

WT-10 FR-120

CONTROL ROOM

2100

2900

WATER TANK

D02 3.3.7

5820

2000

500

WT-10 FR-120

WT-10 FR-120

B

12

100

608

A8250

11

A8232

500

C

5

W-05 3.3.1

NOTES 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. 2. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. 3. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 4. FOR FLOOR FINISH REFER TO THE "LAYOUT PLAN" AND FINISHES SCHEDULE. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES.

1100

LEGEND

PE

WALL PENETRATIONS NO

P1 P2 P3 P4 P5 P6 P7 P8 P9 P10

WINDOW TAG WXX - LOUVER TYPE A - BUILDING NUMBER B - FLOOR LEVEL C - WINDOW NO.FOR EACH ROOM WALL PENETRATION TO SUIT ELECTRICAL EQUIPMENT

SIZE

HEIGHT ABOVE FFL

200 x 200mm 300 x 300mm 250 x 250mm 250 x 250mm 3000 x 7000mm 3000 x 3000mm 1200 X 1200mm 1200 X 300 1200 X 300 250 x 250mm

4000mm 4000mm 4000mm 4000mm 500mm 500mm 500mm TBC TBC 4000mm

01 A8232

01

FIRST FLOOR - WALL SETOUT PLAN

CLIENT

NPVB REDESIGN ISSUE (BUILDING RELOCATED)

MQ

RD

PA

08.03.19

E

FINAL DETAIL DESIGN ISSUE

RP

RD

MK

20.08.13

D

DETAILED DESIGN ISSUE

RP

BD

MK

23.07.13

C

PRELIMINARY ISSUE

0

0

0

11.07.11

B

REVISED TENDER ISSUE

0

0

0

21.04.11

No

Revision

ORIG

CHR

APV

DATE

SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING CONSULTANT

SMEC INTERNATIONAL PTY LTD Creates, Connects, Cares...

DATE

Design Package

TITLE

Border Roads Organisation

BRO

9183.475

LOUVER TAG ML-XX - LOUVER TYPE A - BUILDING NUMBER B - FLOOR LEVEL C - LOUVER NO.FOR EACH ROOM

F

8000

9175.475

DOOR TAG DXX - DOOR LEAF TYPE A - BUILDING NUMBER B - FLOOR LEVEL C - DOOR NO.FOR EACH ROOM

5100

9170.375

DXX A.B.C

W XX A.B.C

4900

9165.475

XX - FIRE RATING REFER TO SPECS.

6100

9159.375

FR-XX

6000

9153.375

XX - ACOUSTIC RATING REFER TO ACOUSTIC REPORT AS PER SPECS.

5900

9147.475

STC-XX -

ML-XX A.B.C

9140.175

WT-XX -

WALL TYPE TAG XX - WALL TYPE NUMBERING REFER TO WALL TYPE SCHEDULE AS PER SPECS.

6200

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

Design Check

T.CLINE

08.03.2019

NORTH PORTAL VENTILATION BUILDING FIRST FLOOR WALL SETOUT PLAN

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8127

F


C

B

A

200mm GLASSWOOL THERMAL INSULATION FITTED ALONG THE CEILING AND AROUND INVERTED BEAMS WITH A MINIMUM R-VALUE OF 4.2 TO ACHIEVE A TOTAL R-VALUE OF 4.8

ROOF SHEETING STEEL TRUSS TO ENGINEERING DETAILS

U/S BEAM SFL. 3082.006 HOUSING FOR DUCT

LINE OF COLUMN BEYOND

CONCRETE BLADES

CUT THROUGH CONCRETE BLADE

LINE OF COLUMN BEYOND

6300

RCC TIE BEAM

STORAGE & FIRE SERVICES ROOM 3075.806

FIRST FLOOR LEVEL FSL. 3075.706

PLENUM

D15 3.1.17

RL. 3069.055

DUCT

EGRESS TUNNEL

PAVEMENT DRAIN PIPE

KERB

LINE OF TRENCHES BEYOND SHOWN DASHED

3066.221

11kv/415v TRANSFORMER ROOM

ELECTRIC TRENCH

FIRE CORRIDOR ESCAPE CORRIDOR

EGRESS TUNNEL BEYOND SHOWN DASHED

MIZZANINE LEVEL FSL. 3071.856

CONCRETE BARRIER

2500

TUNNEL ROAD

KERB

PROTECTIVE FC SHEET ON WATERPROOF MEMBRANE TO ENTIRE FACE OF PORTAL BUILDING

3850

5450 CLEAR

LINE OF CONCRETE BEAM

ROAD

50mm THICK PCC LINED WITH GRATING

6350

100mm HIGH CONCRETE HOB TO DOORWAY

3000

D02 3.3.5

GROUND FLOOR LEVEL FSL. 3069.356 EGRESS TUNNEL 3066.626

D17 3.1.20

TUNNEL CENTRELINE

01 A8163

01 NOTES

SECTION AT GRID 7 SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING

1. 2. 3. 4.

ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 5. FOR FLOOR FINISH REFER TO FINISHES SCHEDULE. 6. FOR WALL FINISHES REFER TO THE "WALL SETOUT PLAN" AND "WALL TYPES" DRAWINGS AS WELL AS FINISHING SCHEDULES. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES. 6. FOR TRUSS DETAILS AND EXACT SUPPORT LOCATIONS REFER TO STRUCTURAL DRAWING 5061071-ST-9296. 7. FOR LEVELS OUTSIDE THE BUILDING, EMBANKMENT AND GROUND TREATMENT, REFER TO GEOTECHNICAL DRAWINGS.

Design Package

CLIENT

CONSULTANT

TITLE

Border Roads Organisation SMEC INTERNATIONAL PTY LTD Creates, Connects, Cares... A No

NPVB REDESIGN ISSUE (BUILDING RELOCATED) Revision

MQ ORIG

RD

PA CHR

08.03.19 APV

DATE

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

NORTH PORTAL VENTILATION BUILDING SECTION AT GRID 7

Design Check

T.CLINE

08.03.2019

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8232

A


12

11

10

9

8

7

6

5

5a

4

3

2

1

ROOF SHEETING CLADDING SHEETS TO MATCH ROOF SHEETING STEEL TRUSS TO ENGINEERING DETAILS CLADDING SHEETS TO MATCH ROOF SHEETING

200mm GLASSWOOL THERMAL INSULATION FITTED ALONG THE CEILING AND AROUND INVERTED BEAMS WITH A MINIMUM R-VALUE OF 4.2 TO ACHIEVE A TOTAL R-VALUE OF 4.8

03 -

U/S BEAM SFL. 3081.971

STEEL TRUSS TO ENGINEERING DETAILS

CONCRETE BLADES CONCRETE STRUCTURE TO ENGINEERING DETAIL

302

305

ROOF SHEETING

STEEL BRACING TO ENGINEERING DETAILS

DRAINAGE CELLS WITH GEOFABRIC ON PROTECTIVE FC SHEET ON WATERPROOF MEMBRANE SHOWN DASHED

2 HOUR FIRE RATED OPERABLE HATCH P4

6265

CAGE LADDER STEEL TRUSS TO ENGINEERING DETAILS

D02 3.3.14

P1

CUT THROUGH CONCRETE BLADE

HOUSING FOR DUCT

D02 3.3.5

STORAGE

PROVIDE 100mm WIDE JOINT WITH 50mm WIDE 4 HOUR FIRE RATED SEALANT THAT CAN EXPAND MIN 200% ALLOWING FOR 50mm JOINT MOVEMENT AND 15mm VERTICAL MOVEMENT OF TUNNEL

P5

100mm HIGH CONCRETE HOB TO DOORWAY

CLADDING SHEETS TO MATCH ROOF SHEETING

FIRST FLOOR LEVEL FSL. 3075.706

6350

200mm GLASSWOOL THERMAL INSULATION FITTED ALONG THE CEILING AND AROUND INVERTED BEAMS WITH A MINIMUM R-VALUE OF 4.2 TO ACHIEVE A TOTAL R-VALUE OF 4.8

04 -

PROVIDE SEALANT CAPABLE TO WITHSTAND JOINT MOVEMENT OF 50mm. SUPPORT SEALANT WITH EXTRUDED POLYSTYRENE WEDGE BELOW. RD2 3.1.16

D13 3.1.13

D15 3.1.17

D16 3.1.15

TUNNEL ROAD

D18 3.1.19

ROADWAY SHOWN HATCHED

1215 OPENING LENGTH

150

FIRE RATED ROOFING ACCESS HATCH

FIXING WALL BRACKET

205

THERMAL INSULATION

EGRESS TUNNEL

01

LONG SECTION SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING

SAFETY HOOP

22095

-

900 OPENING WIDTH FIRE RATED ROOFING ACCESS HATCH 205

THERMAL INSULATION

2410

1220 TYP.

RUNGS

RUNGS 610

1. 2. 3. 4.

SAFETY HOOP

813

02 -

02

FIRE RATED ACCESS HATCH DETAIL

03

SCALE - 1:20

NORTH PORTAL VENTILATION BUILDING CLIENT

CAGED LADDER END DETAILS SCALE - 1:20

CONSULTANT

TITLE

MQ

RD

PA

08.03.19

B

REVISION AS MARKED

NeGu

JaPr

NeGU

04.09.18

A

DETAILED DRAWING

NeGu

BaJe

MiKa

16.05.18

Revision

ORIG

CHR

SMEC INTERNATIONAL PTY LTD

APV

DATE

Creates, Connects, Cares...

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

CAGED LADDER START DETAILS

04

NORTH PORTAL VENTILATION BUILDING

Border Roads Organisation NPVB REDESIGN ISSUE (BUILDING RELOCATED)

100

169

305 TYP.

1220

ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 5. FOR FLOOR FINISH REFER TO FINISHES SCHEDULE. 6. FOR WALL FINISHES REFER TO THE "WALL SETOUT PLAN" AND "WALL TYPES" DRAWINGS AS WELL AS FINISHING SCHEDULES. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES.

1082

711

305 TYP.

600

SAFETY HOOP

NOTES

LINE OF CONCRETE ARCHWAY TO STRUCTURAL ENGINEERS DETAILS

PROVIDE SEALANT CAPABLE TO WITHSTAND JOINT MOVEMENT OF 50mm. SUPPORT SEALANT WITH EXTRUDED POLYSTYRENE WEDGE BELOW.

FALL

02

No

D18 3.1.27

GROUND FLOOR RL 3069.356 GROUND FLOOR RL 3069.206

DT01 8403

DT02 8403

LINE OF CONCRETE COLUMN BEYOND SHOWN DASHED

D15 3.1.1

3066.164

C

P6

FAN HOUSE

SCALE - 1:20

Design Package

NORTH PORTAL VENTILATION BUILDING NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

NORTH PORTAL VENTILATION BUILDING SECTION ALONG CONTROL LINE

Design Check

T.CLINE

08.03.2019

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8250

C


A

2050

A

03 -

120

03 -

120

WT-10 FR-120

2335

7320

04 -

ROAD

04

04

-

-

3140

13040 P1

04

EGRESS TUNNEL PLANT FFL + 3064.762 FSL +3064.762 3165

WT-10 FR-120

LINE CONCRETE BARRIER

WT-10 FR-120

D20 3.1.21 ML-01 3.1.2

135

7300

STEEL STAIR WITH GRATED TREADS/LANDING

WT-10 -

24 23 22 21 20 19 18 17 16 15 14 13 12 11

ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 5. FOR FLOOR FINISH REFER TO FINISHES SCHEDULE. 6. FOR WALL FINISHES REFER TO THE "WALL SETOUT PLAN" AND "WALL TYPES" DRAWINGS AS WELL AS FINISHING SCHEDULES. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES.

220

9

10

940

220

940

2340

03

-

11

9

10

-

11

TUNNEL FIRE HYDRANT

1200 x 1200mm

EGRESS TUNNEL PLANT - GROUND FLOOR PLAN

02

SCALE - 1:50

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

NORTH PORTAL VENTILATION BUILDING

HEIGHT ABOVE FFL TBA

9

HANDRAIL

TOP OF CONCRETE HOB FSL. 3064.725

7

660

EGRESS TUNNEL PLANT 1200

EMBANKMENT BEYOND SHOWN DASHED 6

5

4

CONCRETE HOB

FALL

FSL +3064.612

SLOPING SCREED 3

2

120

1 FSL +3064.725

EGRESS TUNNEL

970

BUILDING FOOTINGS

FSL +3064.762

20

EGRESS TUNNEL PLANT FLOOR FSL. 3064.762

EGRESS TUNNEL PLANT P1

05 FSL +3064.762 250

8

11

ROAD

EGRESS TUNNEL PLANT CEILING FSL. 3068.762

2130

CONCRETE WALL 9

ROAD

4000

10

KERB

23 24

1400

LANDING FSL. 3066.625

13

15

18

21

50mm THICK PCC LINED WITH GRATING

4000

11

12

14

16

17

19

20

22

10

CONCRETE BARRIER

1200

2660

KURB LEVEL FSL. 3069.285

1900

EGRESS TUNNEL PLANT - @ FSL. 3064.762

4000

SIZE

01

PROVIDE 150mm HOB AT STAIR LOCATION

24 RISERS @ 190mm 4560

FALL

940

03

WALL PENETRATIONS

P1

16 15 14 13 12 11

2340

FFL + 3069.417 FINISHED FLOOR LEVEL FSL + 3069.417 FINISHED STRUCTURAL LEVEL

NO

1500

1500

940

LEGEND FH

1 2 3 4 5 6 7 8 9 10

520

1. 2. 3. 4.

CONCRETE HOB

520

NOTES

1 2 3 4 5 6 7 8 9 10

LINE OF SLAB EDGE ABOVE SHOWN DASHED

WT-10 -

LINE OF HANDRAIL

2570

2570

LINE OF HANDRAIL

7353

LINE OF SLAB EDGE

1835

RL + 3069.133

STEEL STAIR WITH GRATED TREADS/LANDING

-

WT-10 FR-120

BOTTOM OF BUILDING FOOTINGS FSL. 3064.512

EGRESS TUNNEL PLANT - CROSS SECTION

03

04

EGRESS TUNNEL PLANT - LONGITUDINAL SECTION SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING CLIENT

CONSULTANT

TITLE

Border Roads Organisation SMEC INTERNATIONAL PTY LTD Creates, Connects, Cares... A No

NPVB REDESIGN ISSUE (BUILDING RELOCATED) Revision

MQ ORIG

RD

PA CHR

08.03.19 APV

DATE

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Design Package

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

NORTH PORTAL VENTILATION BUILDING EGRESS TUNNEL PLANT DETAILS

Design Check

T.CLINE

08.03.2019

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8252

A


ROOF SHEETING TOP HAT AS PER ENGINEERING

A

PFC RAFTER AS PER ENGINEERING METAL SHEET CLADDING

34720

13710

21010

02

TOP HAT AS PER ENGINEERING

BOTTOM OF UPPER ROOF RAFTER SFL. 3071.063

GUARD RAIL

-

20°

RL + 3069.117

GUARD RAIL

SHS WALL AS PER ENGINEERING

-

04

RAMP LEVEL @ PARKING FSL. 3069.117

UPPER ROOF

-

03

LOWER ROOF

TOP HAT AS PER ENGINEERING

MIN. 2400

50mm THICK PCC LINED WITH GRATING

03

METAL SHEET CLADDING

SHS WALL AS PER ENGINEERING

RETAINING WALL AS PER ENGINEERING

-

04 02

-

-

4000

LINED OF RAMP BELOW SHOWN DASHED

1

2

3

4

5a

5

6

7

8

EGRESS TUNNEL RAMP - LAYOUT

01

EGRESS TUNNEL RAMP CROSS SECTION

02

SCALE - 1:100

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

NORTH PORTAL VENTILATION BUILDING ROOF SHEETING TOP HAT AS PER ENGINEERING

ROOF SHEETING

SHS AS PER ENGINEERING

2400

FSL +3069.117

3093

3255

RAMP LEVEL @ PARKING FSL. 3069.117

1000

METAL SHEET CLADDING

05 -

D17 3.1.20

EGRESS TUNNEL RAMP FLOOR FSL. 3066.024

FSL +3066.024 DOOR LEAF IN OPEN POSITION SHOWN DASHED

RAMP 1:14 SLOPE

DOOR AND FRAME

EGRESS TUNNEL RAMP SECTION 3

03

2100

SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING

TOP HAT AS PER ENGINEERING

ROOF SHEETING

PFC AS PER ENGINEERING

SHS AS PER ENGINEERING BOTTOM OF UPPER ROOF RAFTER SFL. 3071.063

EGRESS TUNNEL RAMP FLOOR FSL. 3066.024

1017

FSL +3066.024

111

1946

1555

GRATED DRAIN WITH DRAIN PIPE OUTLET AT THE EMBANKMENT

NOTES 1. 2. 3. 4.

ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226. PROVIDE 2HOUR FIRE SEPARATION IN TRENCHES BETWEEN COMPARTMENTS TYPICALLY 5. FOR FLOOR FINISH REFER TO FINISHES SCHEDULE. 6. FOR WALL FINISHES REFER TO THE "WALL SETOUT PLAN" AND "WALL TYPES" DRAWINGS AS WELL AS FINISHING SCHEDULES. 5. FOR CEILING FINISHES REFER TO "REFLECTED CEILING PLAN" AND FINISHING SCHEDULES. 6. FOR EXACT EGRESS TUNNEL ROOFING DETAILS REFER TO STRUCTURAL DRAWINGS.

EGRESS TUNNEL RAMP SECTION 4

04

RAMP 1:14 SLOPE

2790

D17 3.1.20

1940

3093

4189

RAMP LEVEL @ PARKING FSL. 3069.117

1000

2400

BOTTOM OF LOWER ROOF RAFTER SFL. 3070.213

1640

05

SCALE - 1:100

NORTH PORTAL VENTILATION BUILDING

PROVIDE LOCALISED SCREED OVER EGRESS TUNNEL TO CREATE RAMP AND LANDING

EGRESS TUNNEL DOOR SCALE - 1:20

NORTH PORTAL VENTILATION BUILDING

LEGEND FFL + 3069.417 FINISHED FLOOR LEVEL FSL + 3069.417 FINISHED STRUCTURAL LEVEL

Design Package

CLIENT

CONSULTANT

TITLE

Border Roads Organisation SMEC INTERNATIONAL PTY LTD Creates, Connects, Cares... A No

NPVB REDESIGN ISSUE (BUILDING RELOCATED) Revision

MQ ORIG

RD

PA CHR

08.03.19 APV

DATE

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

NORTH PORTAL VENTILATION BUILDING EGRESS TUNNEL RAMP DETAILS

Design Check

T.CLINE

08.03.2019

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8253

A


3530

3025

2380

20 19 18 17 16 15 COF

COF

275

9

-

COF

1880 26

27 25

02

FIRE STAIR 3 - MEZZANINE FLOOR PLAN

05

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

1050

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

11

2475

50

8

7

31

53 51

LANDING FSL. 3078.686

52

LANDING FSL. 3076.526 39

38

32

33

34

35

TOP OF LANDING FIRST FLOOR FFL. 3075.806

37 36

FIRST FLOOR FSL. 3075.706 05 8455

23

22

12

13

21

20

19

18

LANDING FSL. 3073.831

17

16

14

15

MEZZANINE FSL. 3071.856 LANDING FSL. 3071.142

6

5

4

3

2

1

GROUND FLOOR FSL. 3069.356

COF 275 25 24 23 22

280 1050

9

CABLE ENCLOSURE

1880

2380

24

29

30

FIRE STAIR 3 - WATER TANK LEVEL 10

9

28

B

1000

B

49

54

04

1000

825

44

46

48

40

47 48 49 50 51 52

-

42

41

43

45

47

55

3600 20 RISERS @ 180mm

LINE OF HANDRAIL

1050

04

825

56 55 54 53 COF

56

3950 22 RISERS @ 180mm

275

LINE OF HANDRAIL

1880

NORTH PORTAL VENTILATION BUILDING

2500 14 RISERS @ 179mm

UP

1050 280 1050

500L WATER TANK

INT FH

LANDING FSL. 3079.406

SCALE - 1:50

3530

3300

275 10 9 8 7 6

FIRE STAIR 3 - LANDING @ FSL. 3078.686

720

NORTH PORTAL VENTILATION BUILDING

11 12 13 14

9

04

SCALE - 1:50

1050

FIRE STAIR 3 - GROUND FLOOR PLAN

1330

FIRE STAIR 3

500L WATER TANK

2160

1330

B

01

2380

-

COF

280

B

B

04

720

9

41 42 43 44 45 46 47 48 49 50 51 52

1975

9

275

1975

-

56 55 54 53

714

1100

04

INT FH

COF 275

1786

LINE OF HANDRAIL

1050

285

LINE OF HANDRAIL

1050

2380

5 4 3 2 1

2380

COF

825

280

UP

1150

CABLE ENCLOSURE

3805

40 39 38 37 COF

275

26 27 28 29 30 31 32 33 34 35 36 LINE OF INT HANDRAIL FH

COF

1330

FSL +3068.006

04 -

2750

FIRE STAIR 3 - SECTION

06

SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

B

03

FIRE STAIR 3 - FIRST FLOOR PLAN SCALE - 1:50

NORTH PORTAL VENTILATION BUILDING

NOTES 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED. 2. ALL LEVELS ARE IN m UNLESS OTHERWISE SPECIFIED. 3. ROAD LEVEL AT THE NPVB SETOUT POINT IS + 3069.226.

Design Package

H

NPVB REDESIGN ISSUE (BUILDING RELOCATED)

MQ

RD

PA

08.03.19

G

DETAILED DRAWING

NeGu

JaPr

MiKa

04.09.18

F

FINAL DETAIL DESIGN ISSUE

NeGu

BaJe

MiKa

18.05.18

E

DETAILED DESIGN ISSUE

RD

RP

MK

DETAILED DESIGN ISSUE

RP

RD

MK

23.07.13

C

FINAL TENDER ISSUE

0

0

0

11.07.11

Revision

ORIG

CHR

CONSULTANT

APV

DATE

TITLE

Border Roads Organisation SMEC INTERNATIONAL PTY LTD

20.08.13

D

No

CLIENT

Creates, Connects, Cares...

BRO

DATE

5th Floor, DLF Building No. 8 Tower C, DLF Cyber City, Phase-II Gurgaon - 122002 (Haryana) Tel: 91124-4376017 Fax: 91124-4376018 Email: smec@vsnl.com Website: www.smec.com.au

NAME

DATE

Client

BORDER ROADS ORGANISATION

Drawn

M.QANDIEL

08.03.2019

Project

ROHTANG TUNNEL, HIMACHAL PRADESH

Drafting Check

R.REYNOLDS

08.03.2019

Title

Designer

R.DUNLOP

08.03.2019

NORTH PORTAL VENTILATION BUILDING FIRE STAIR FS3 DETAILS

Design Check

T.CLINE

08.03.2019

Project Manager

R.DUNLOP

08.03.2019

Project Director

P.AGRAWAL

08.03.2019

Original Size Drawing Status

A1

DETAILED DESIGN

Drawing No.

Rev

5061071-ARC-A-8456

H