2146(1.+1
3+0) .+
CONTENT SD
DD
CD
Streetscape Master Plan
Irvington Streetscape Master Plan
1
Commercial Real Estate Design
Cooper Street Apartment Complexs Design
5
Private Residential Design
491 East 165th Street Courtyard Design
7
Parking Lot Entrance Design
Publishing Clean House Entrance Design
8
Waterfront Design
Taiyuan CBD Waterfront Design
9
Other Works
1. Granada Highlands Apartment Complexs Design 2. 256 Second Ave Marriot Hotel Landscape Design 5KLQR *,6 6NHWFK
Qing Li Email: qzl0004@auburn.edu Cell Phone: 6464092891
Metro North Train Station
Recreation Center
Aquaduct Monument
Irvington Streetscape Master Plan Irvington, NY, 2014
Matthiessen Park
IUYLQJWRQ LV DQ DIĂ€XHQW VXEXUEDQ YLOODJH LQ WKH WRZQ RI *UHHQEXUJK LQ :HVWFKHV-
Broadway St.
Ast
or
Stre
et N .
Hudson River
Main Street
Ast
or
Stre
et S .
Public Library
Commercial Spaces
Irvington High School
Residential Spaces
Bus Stop
ter County, New York,This project is to provide a written and illustrated Master Plan document to act as a reference and guide to facilitate strategic and coordinated capital improvements to Main Street including recommendations to: • Improve street crossings • Improve pedestrian environment ‡ 3URYLGH WUDI¿F FDOPLQJ • Highlight the Village’s historic quality • Foster social interaction • Recommend street furniture, sidewalk and street tree improvements • Welcome visitors and improve commerce ‡ ,PSURYH DFFHVVLELOLW\ DQG ZD\ ¿QGLQJ • Improve connections to transportation and linkages surrounding community • Rethink stormwater management
Site Context
Aqueduct Trail
Existing Topography and Furniture
Existing Circulation
S
M
B B
M
$ $
E
E
S
E
S
Dead End
7UDIÂżF 7ZR :D\
Street Barrier
7UDIÂżF 2QH :D\
Posted, No-U Turn Driveway
Safty and Loading Zone Transit Stop
E
Trash Can (5)
$
ATM (2)
3%-5% Slope
Private Road
Metal Bench (3)
M
Mail Storage (3)
5%-8.33% Slope
Emergency Access
Concrete and Wood Bench (10)
S
Concrete and Wood Bench (10)
>8.33% Slope
Blind Turn
Wood Bench (1) B
Bike Rack (2)
Monument (7)
1
Steetscape Master Plan
Site Improvement 1: Establish Healthy Street Trees Option 1: Small trees or large shrubs in containers
Option 2: Street trees in 5’X10’ tree pits
Street Trees Recommendations:
Viburnum plicatum v. tomentosum
Cercis canadensis Little Woody
Hamamelis x intermedia Jelena
Magnolia stellata
Japanese Zelkova
American Hornbeam
Princeton Elm
2
Turkish Filbert
Steetscape Master Plan
Site Improvement 2: Improve Crosswalks and Intersections Improve Crosswalks Survey Question 2: Color and Texture if the Crosswalk
35%
65%
Existing Crosswalk
Improve Intersections
Proposed Crosswalk
Update sidewalk corners to bring Irvington into compliance with Americans with Disabilities Act of 1984.
White lines with textured brick-red color crossing.
White lines with textured dark gray color crossing.
• High visibility cross walks with ADA compliant bed ramps. • Distinctive pavers, space for tables and chairs. • Sidewalk extension with seating and bioswale. • Distinctive scoring pattern to indicate driveway crossing. Proposed Intersection
Existing Intersection
3
Steetscape Master Plan
Site Improvement 3: Provide Potential Social Spaces / Mini Parks/Gateway Aqueduct Trail Intersection
Bus Stop
Gateway
Potential Social Spaces
Gateway
Existing Condition
Recreation Center
Existing Condition
School Sitting Area
Existing Condition
Existing Condition
Proposed Bus Stop Proposed Gateway
Proposed Recreation Center Mini Park
Proposed Art Park
4
Steetscape Master Plan
Cooper Street Apartment Complexs Design Waltham, MA, 2014-2015
LLQFROQ SURSHUW\ FRPSDQ\ SODQQLQJ WR EXLOG D IRXU DQG 多YH VWRU\ residential attached structures with an attached parking garage at c Commercial District, which is part of the Riverfront Overlay District, and this location allows multifamily development under a special permit from the City Council. We are going to provide survey, planning, design, engineering and permitting services toward the development of this property. Site Plan Riverfront Sections
Riverfront Research and Study
Riverfront Section Locus
5
Commercial Real Estate Design
Construction Documentation
6
Commercial Real Estate Design
Storage Shed W Recycle Bins
Sythetic Turf
491 East 165th Street Courtyard Design
PARKING (4 STALLS)
Open Air Storage Shelter
0.00 0.0
- 5.00
10
Secure Slide Gate PARKING (4 STALLS)
10
25 0 25'-0"
41 6 41'-6"
- 10.00
0.00 0.0
Bronx, NY, 2013
13'-7" 13 7
Mid Level
9
30' 7" 30'-7" 30 7
Fixed Benches
Parking (4) Spaces
113'-6" 3 6
- 5.00
Level Analysis
TKLV SURMHFW LV DLP WR DVVLVW WKH 1HZ <RUN 6WDWH 2I¿FH RI
Street Level + 0.00 -
26 0 26'-0"
Cellar Level
41 5 41'-5"
8
Mid Level
LINE OF BUILDING D ABOVE
15 5 15'-5"
41 6 41'-6"
- 10.00
- 5.00
Lower Level -
50' 0 0"
10.00
7
13'-7" 13 7
Portable Tables and Chairs
Street Level Balcony
LEGEND PROPERTY LINE
30' 7 30'-7" 30 7"
113'-6" 3 6
6
PERMEABLE PRECAST PAVING PRCAST PAVING ASPHALT PAVING
PARKING (4 STALLS)
CONCRETE PAVEMENT
0.00 0.0
5
SYNTHETIC TURF BIOFOLD SWING B GATE
- 5.00
SWING GATE - 10.00
41 6 41'-6"
26 0 26'-0"
FENCE/BARRIER RAIL ON CONCRETE CURB
Function Analysis
4
EXISTING WALL
The basic concept is based on the existing site conditions, usLQJ PXOWLSOH OHYHO DQG ODQGVFDSH IXUQLWXUHV WR GH¿QH WKH FRXUWyard space and functions.
41 5 41'-5"
13'-7" 13 7
BENCH TABLE AND CHAIRS
Walking Area
REFUSE/ RECYLING BIN 15 5 15'-5"
Recreation Area
113'-6" 3 6
STREET TREE WITH GUARD
30' 7 30'-7" 30 7"
C'
LINE OF BUILDING D ABOVE
3
C
Mental Health to improve the life of the people who live in this apartment building,
BOLLARD LIGHT
Planting Area Parking Area
EVERGREEN TREES/SHRUBS
2
STREET TREES
Bike Rack
26 0 26'-0"
FLOWERING TREES
50'-0" 50 0 0
GROUND COVER/ PERENNIALS P
41 5 41'-5"
Sitting Area
Storage Area
SHRUBS 15 5 15'-5"
LINE OF BUILDING D ABOVE
Sitting Area
50' 0 0"
Site Layout Plan Sections
Details P
PERMEABLE PAVING DETAIL
S
SYTHETIC TURF
Hanover Permeable Paver filed with 1/4""-3/8" open graded stone (AASHTO #8 or #9); fill 12" from top
2" of 1/4""-3/8" open graded stone (AASHTO #8 or #9) 4" of 3/4"-1" open graded stone no fines (AASHTO #57)
12" of 1 12"-3" open graded stone no fines (AASHTO #1)
Perforated Pipe
Garage
Storage Area
Street Level Sitting Area
Recreational Area
C
Compacted Subgrade
45• •Herringbone
CONCRETE PAVEMENT DETAIL BENCH DETAIL 1829 72"
651 25 1/2"
914 36"
-+ 0.00
- 5.00 -10.00 LOWER LEVEL CELLAR
STREET LEVEL PLAZA
903 35 1/2" 488 19 1/4"
MID LEVEL PLAZA 651 25 3/4"
Section A-A’
CAST ALUMINUM DIVIDER
3/4" [19] END FRAME Ø1 1/2" [38] STEEL TUBE
GLIDE
PLANTING DETAIL
L
Section C-C’
654 25 3/4"
450 17 3/4"
BOLLARD W/SHIELDED LIGHT SOURCE DETAIL
7
Courtyard Design
Publishing Clean House Entrance New Hyde Park, NY, 2014
Complex Building
PXEOLVKLQJ FOHDQ KRXVH SURSRVHG WR EXLOG DQRWKHU RI多FH LQ Context Map Low Planting Bed Low Planting Bed and Shading Trees
this complex building, which is located at the building corner near the parking lot entrance. This project is to initially provide the conceptual design of the parking lot entrance, to show the client the basic idea of setting up a welcome environment of the parking lot entrance.
Outdoor Tables and Chairs Benches
Marc us A ve.
Water Feature Entrance
1
1 Water Feature Section
Entrance Perspective
2 2 Entrance Section
8
Parking Lot Entrance Design
Context Map
Design Concept
Taiyuan CBD Waterfront Design Blue Ribbon
water connection
Taiyuan, China, 2012
Central Business District of southern Taiyuan City is located
⌫
adjacent to the Fen Riverm which is the “mother river” of Taiyuan city, and it is also the secondary branch of the Yellow River, this special location determined that it is destinied to be the key link between Fen River andthe southern Taiyuan city, and at the meantime, this linear green space is corresponding to the historic places which are on the other side of the Fen River.
Red Ribbon
activity connection
Site Area
Fen River
The Main function of this CBD green space is that it is aimed to activate the vitality of the business life of southern Taiyua city and to enrich people’s social life.
Green Ribbon
ecology connection
Master Plan
3
7 5
10
6
8
4 1
9
2
N
Perspectives ( Left Top: Sunken Plaza; Left Botton: Convention Center Plaza; Right: Wetland Garden ) 1. Geo Plaza 6. Linear Garden
2. Tourism Center 7. Financial Plaza
3. Convention Center Plaza 8. Wetland Garden
4. Sunken Plaza 9. Festival Garden
5. Land Bridge
10. Island
9
Waterfront Design
Convention Center
Paving and Planter Design Paving Design
3
2
2
2
1
3
2
1
2
3
2
1
Paving Pattern Option 1
1 Marina Plaza
2 Tree Bosque
3 Convention Center Entrance Axis
Paving Pattern Option 2
Paving Pattern Option 3
Planter Design
Concept Diagrams Convention Center
Convention Center Pedestrian Circulation Routes
Sitting Area Activities Area Recreational Area
Planter Plan
Perspectives Movable Planter Modeling and Rendering
Fation Show Event
Planter Section
Exhibition Promotion Movable Post Rolling
Movable Post
Movable Planter Tent Fair
Night View with LED Light
Movable Planter Rolling
10
Movable Post
Waterfront Design
Granada Highlands Apartment Complexs Design
256 Second Ave Marriot Hotel Landscape Design
PAD-MOUNTED TRANSFORMER DUMPSTER FENCE ENCLOSURE W/GATES LIGHTPOLE (TYP.)
5'
22'
88 T 25'
+ TC 88.7 BC 88.2
TC 89.3 BC 88.8 +
276'
89
LOADING AREA 12' x 70'
C
C
C
C
C
C
+
88
87
85
91 90
82
83
89
78
76
C
77
(75.40) +
C
81
80
76
= 124'
84
20'
SPACES @ 8'X17'
9'X17' WITH 2
86
@ 8'x15' = 192'
24 SPACES
12 SPACES@
89
LOBBY ENTRANCE
1 STORY BUILDING
90
TW 92.0 BW 90.4 89
90
+
90.2 +
90.1 +
90
89
79'
SF
93 92 91 90
88
10
SP
AC
ES
@
9'x 17' =
@
9'x
17'
171'
95
SP AC ES
= 90
TC BC 95.1 + 94.6
'
92
LINES AND DIMENSIONS ARE PARALLEL OR PERPENDICULAR TO THE LINES FROM WHICH THEY MEASURED UNLESS OTHERWISE INDICATED.
91
L NOTES:
90
19
13'
00+
+ 90.2
+ TC BC 90.7 90.2
E AR
= 5,0
+ 90.5 +
+ 90
AG
EA
90.0
FFE: 90.50
87
OR
89.8
+
20'
86
ST
+
+
+
+
90.2
TC/BC 90.4
TC 91.1 BC 90.6
90
13'
BC 89.5 +
+
+ 90.9 85
25'
FD OW
6 STORY BUILDING WITH PARTIAL BASEMENT
TC/BC 90.5 90.4 + +
TC 90.4 BC 89.9 TC 90.8 ++ TW 92.0 BC 90.3 + + + 90 89 88
+
1 STORY BUILDING
SN
90
90.5 +
+
13'
+
+ 90.3
TW 92.0
85
= 11
7'
LANDSCAPE WALL
90.2
90 TC/BC 90.4
89
78
80 84
17'
86
LOBBY ENTRANCE
= 63
'
9'x
83
@
85
ES
9'x
17'
AC
BS 89.2
TC 90.4 BC 89.9
+
82
SP
@
81
ES
TS 90.4 + + + 90
TW 92.0 + TC 90.8 BC 90.3
+TC 91.1 BC 90.6
2 HC SPACES 2 SPACES @ 9'x18'+ =42' WITH AISLE @ 8'x18'
AC
STAIR TOWER
83
7 SP 13
20'
@ 8'x18' + 3 HC SPACES 1 SPACE @ 9'x18' 5'= 43' WITH 2 AISLES @
84
6 STORY BUILDING WITH PARTIAL BASEMENT
STAIR TOWER
80
81'
82
9'x 17' =
79
@
+
77
9 SP AC ES
C
C
C
C
C
C
C
C
C
C
90.0
C
C
C
89
C
88
C
88
5'
25 '
T
C
C
93 20'
ENSIONS OF PARKING SPACES AND DRIVEWAY ARE FROM FACE OF CURB TO FACE OF B.
94
93
13'
ENSIONS FROM BUILDING ARE FROM FACE OF BUILDING TO PROPERTY LINES.
LANDSCAPE WALL
TC BC 95.3 + 94.8
96
94 LIGHTPOLE (TYP.)
95
TC BC 94.1 93.6 +
LANDSCAPE WALL
TC BC 94.9 94.4 +
97
13'
98
EXISTING CONTOUR PROPOSED 1 FOOT CONTOUR
PAD-MOUNTED TRANSFORMER DUMPSTER FENCE ENCLOSURE W/GATES AR
HQ HQ
AR
LIGHTPOLE (TYP.)
AR
AR
HQ HQ
AR HJ
AR
GROUND COVER
AR
88 88
88
HQ AC
89
AC
C
NEW 2" GAS SERVICE & METER
88
87
86
85
84
89
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
MIXED BED HC, VG, AP
C
GROUND COVER
MIXED BED HC, VG, AP
HOTEL ENTRANCE SIGN
VD
MIXED BED HC, VG, AP
AC
MIXED BED HC, VG, AP
AC
89
78
77
HQ AC
76
INFILTRATION FIELD #2
LOADING AREA 12' x 70'
AC
91 90
83
82
81
80
76
INFILTRATION FIELD #1
KL
T
T
AR
KL
C
C
HQ AC
89
77
KL
HQ
90
84
78
80
CK
GROUND COVER
AR
CK
85
STAIR TOWER
KL CK CK
86
83
6 STORY BUILDING WITH PARTIAL BASEMENT
CK
82
79
90
HQ
90
LAWN
80
81
VD KL
83
82
AR
84
LOBBY ENTRANCE
85 HQ AC
AR
KL HQ
1 STORY BUILDING
90 85
90
90
86
89 88
KL AC
CH
87
90 PROP. HYDRANT
MIXED BED HC, VG, AP
AC VD HQ
89
6" DICL HYDRANT LATERAL
AR
93 92 91 90
88
22.5째 90 BENDS
89
90
45째 BENDS
LS
LANDSCAPE WALL
89
INFILTRATION FIELD #3
LS LAWN
HJ
VD
45째 BENDS
8"x6"x8" TEE
AR
90
8"x6" REDUCER
KL CH
95
91
6" DICL FIRE PROTECTION SERVICE TO BUILDING
92
AR LS
94
93
LANDSCAPE WALL
CH
94
93
UTILITY CONSTRUCTION NOTES
4" DICL DOMESTIC WATER SERVICE
MS AR GROUND COVER
95
LANDSCAPE WALL
96
LIGHTPOLE (TYP.)
MS
CH
97
98 AR
11
MS
Other Works
Rhino Modeling and Rendering
12
Other Works
GIS Mapping
Sketches
13
Other works