Figure 18 – Site 1 most curtailed day 11 October 2019 (non clear-sky, ~61% generation curtailed)
Figure 19 - Site 2 most curtailed day 4 February 2020 (clear-sky, ~33% generation curtailed)
6.2.2 BESS ‘tripping’ (anti-islanding and limits for sustained operation) Before presenting tripping (anti-islanding and limits for sustained operation) curtailment results of BESS from AGL VPP sites, it is important to emphasize the assumptions and challenges associated with this 40 | P a g e