8 minute read

The Wait is Nearly Over

The judging is done and dusted and the finalists for the Offsite Awards 2022 have been announced. With an incredible mix of projects and cutting-edge technology on offer – here is a reminder of what is in the running for a prestigious Award.

1

2022

All roads now lead to the presentation ceremony at the Coventry Building Society Arena on 20 September where the Awards will be co-located with Offsite Expo 2022. Offsite technology is changing the contemporary built environment – driving forward projects using prefabrication and factory-based methods, products, systems and disciplines. Examples of these and what can be achieved will rewarded across 25 categories.

Covering every aspect of the offsite industry from timber, steel, precast concrete, hybrid and modular technology, MEP to engineering and installation, and ensuring that all aspects of the offsite building process is celebrated – the Awards recognise the design and technology that makes these inspiring projects possible.

This year saw over 200 entries. This year’s judges had the tough job of shortlisting entries into each category and were overwhelmed with the high standard and variety within every category. Typical judge’s comments included: “A beautifully executed project. The entire project team were collaborative and embraced the benefits of digital workflow and offsite technology and manufacture, delivering project excellence.”

2 3

The Offsite Construction Awards are set to take place on 20 September at the Coventry Building Society Arena. The ceremony event is always a fun, relaxed and enjoyable evening of celebrations and of course a highprofile networking opportunity. Here you can find the projects and people that have been picked out as outstanding and potentially ‘best in class’ for 2022 by our judges. All the finalists are of the highest quality but who do you think will win?

Join our finalists, judges and sponsors as they come together over drinks and light bites to celebrate the winners and highly commended at the eighth annual Offsite Awards.

Tickets are just £95 + VAT and include: access to the awards ceremony, complimentary drinks reception, a selection of bowl-food. If you would like to book tickets to attend the 2022 Offsite Awards visit: www.offsiteawards.co.uk/attend

Images:

01. Commercial Project of the Year 2021: Reds10 -

Parkside: Imperial War Museums' Staff Offices 02. Retail/Leisure Project of the Year 2021:

Hewitt Studios - Morgan Experience Centre 03. Best Use of Concrete Technology 2021:

PCE - Warwick Interdisciplinary Biomedical

Research Building

THE 2022 OFFSITE AWARDS FINALISTS ARE...

Best Use of Concrete Technology

Chapman Taylor: Manchester Goods Yard Masonry Frame Systems: The MFS I-Form SolutionTM

Nuspan Flooring: Various Projects PCE: Assembly Building C PCE: Lodge Road - St John's Wood

Best Use of Hybrid Technology

B&K Structures, Heyne Tillett Steel

& Studio RHE: The Gramophone Works

Bowmer + Kirkland & Innovaré:

Thames Park School In Grays British Offsite: Abbey Quay PCE: Assembly Building C

WB Timber Innovations, Jessop &

Cook Architects, PYC: Bullingdon Community Centre

Best Use of Hybrid Technology 2021 Winner

Best Use of MEP & Pod Technology

Alternative Heat: 222NR. DfMA Fully Integrated MEP Prefabricated Utility Cupboards - Elephant Park ID Systems: Wallyford Stormwater Pumping Station NG Bailey: The Forge

SES Engineering Services:

33 Charterhouse Street

Tilbury Douglas Engineering:

Walsall Manor Hospital Urgent and Emergency Care Centre

Best Use of MEP & POD Technology 2021 Winner Best Use of Steel Technology 2021 Winner

Best Use of Steel Technology

British Offsite: Edinburgh Way

Broadland Housing Association,

Sigmat & R G Carter: Canary Quay Collida: Collida Living Prototype Homes, BRE Innovation Park EOS Framing: Edgar Wood Academy – Pre-Assembled Frames EOS Framing: Portsmouth International Port - Thrubuild® Loadbearing System EOS Framing: Sky House – Thrubuild® Loadbearing System Frameclad: Gledhow Lane Fusion Steel Framing: Holburne Park

Vision Modular Systems & MJH Structural Engineers:

Lewisham Exchange Zed Pods: Zero-Carbon Housing Development

Best Use of Volumetric Technology

Algeco: Mcdonald’s Market Drayton Bailey Partnership: Timebridge Community Centre Beattie Passive: Net Zero Volumetric Modular Homes for Waverley Borough Council

Hawkins\Brown Architects &

Premier Modular: TEDI-London – The First Phase of a Highly Innovative New Modular Campus for R&D at Canada Water

JTP & Tide Construction & Vision

Modular: Lewisham Exchange

Legal & General Modular Homes:

Portholme Reds10: Dinton Activity Centre Stelling Properties: Sparkford House - Unilife VOLUMETRICTM: Haringey Zed Pods: Zero-Carbon Housing Development in Partnership with Bromley Council

Best Use of Timber Technology

Adam Knibb Architects: Tarn Moor Beattie Passive: Beattie Passive Patented Timber Frame Build System Greencore Construction: Springfield Meadows Mid Group: The Black & White Building Paramount Structures: Fuggles Pocket Shedkm: Mansion House SIP Build UK: Police Treatment Centre SIP Build UK: Sustainable Self Build Dwelling Wiehag GmbH: Eton College ESAC

BIM/Digital Construction Award

Bailey Partnership: Timebridge Community Centre COLAB: The DfMA Toolkit Explore Manufacturing: The Factory Mid Group: New Model Compliance Review (MCR) Initiative PCE: Ynomia

Commercial Project of the Year 2021 Winner

Commercial Project of the Year

B&K Structures, Engenuiti

& Whitby Wood: Greenwich Design District (C2, C3 & D2)

B&K Structures, Heyne Tillett Steel

& Studio RHE: The Gramophone Works Bailey Partnership: Timebridge Community Centre

Commercial Project of the Year cont'd

Chapman Taylor: Manchester Goods Yard EOS Framing: Portsmouth International Port - Thrubuild® Loadbearing System Kier Construction: 10 Lewis Cubitt Square Mid Group: The Black & White Building PCE: Assembly Building C Reds10: Dinton Activity Centre

Education Project of the Year

B&K Structures, Engenuiti

& Stora Enso: UCL Pearl

Engenuiti, KLH & David Miller

Architects: Crosfields Senior School Building

Hawkins\Brown Architects

& Premier Modular: TEDI-London – An Innovative and Highly Sustainable Modular Campus at Canada Water

Innovaré Systems & Bowmer

& Kirkland: Thames Park Secondary School McAvoy: The Cavendish School

Healthcare Project of the Year

Darwin Group: Airedale All Electric ICU and Inpatient Building MTX Contracts: John Radcliffe Hospital - 5 Storey Critical Care Building Rockpanel/Darwin Group: Cardiff Hospital (Lakeside Wing of The University Hospital of Wales) Stride Treglown: NHS Nightingale Hospital Exeter

Wernick Group & Faithful + Gould:

Queen Alexandra Hospital Specialist Ward Extension

Healthcare Project of the Year 2021 Winner

Health & Safety Award

Explore Manufacturing:

The Energy Project M-AR Offsite: Centrepoint, Lugard Road

NG Bailey

Infrastructure Project of the Year

EOS Framing: Portsmouth International Port - Thrubuild® Loadbearing System EWR Alliance: East West Rail 2 - Bletchley Flyover Kier: HMP Five Wells

Infrastructure Project of the Year 2021 Winner

International Project of the Year

AEDAS Homes: Gaetana Residential Development in Madrid Alternative Heat: Critical Cooling DfMA Distribution System - Frankfurt Data Centre Casas Inhaus: Modular Villa in Mallorca EVO-MEP: Centre For National Resilience, Melbourne and Brisbane Australia NEVO: 75 Collective Bathrooms for Logistic Center In Oviedo

Private Housing Project of the Year

Adam Knibb Architects: Tarn Moor British Offsite: Victoria Central Citu: Climate Innovation District EOS Framing: Sky House – Thrubuild® Loadbearing System Frame Build UK: Waterford Wick Residential Development | Net Zero Carbon Homes Greencore Construction: Springfield Meadows

Legal & General Modular Homes:

Bonnington

Nuspan Flooring, Roofspace Solutions, Lovell, Borough Council

of King's Lynn & West Norfolk: Nar Ouse Regeneration Area MMC Trial PSP: MMC Zero Carbon Affordable Family Homes in Kent Shedkm: Inholm

Product Innovation Award

Akustak®: Akustak® (Acoustic Modular Wall System) Eekowall: Eekowall Offsite Partition System EOS Framing: Pre-Assembled Frames Gripple: Fast Trak By Gripple

HLM Architects & Laing O'Rourke:

Product-Based Building Solution (PBBS) Demonstrator NG Bailey: P-DfMA Kit Of Parts Offsite Supplies: The Patented Window Bracket Seismic Consortium: Seismic – A New Platform for Construction Tenmat: Tenmat Masonry Support Bracket Cover Plate MSC and VFB Plus Fire Barrier System for Wall Cavities VOLUMETRICTM: MODULHAUS Duo the Next Generation

Product Innovation Award 2021 Winner

Retail\ Leisure Project of the Year

Algeco: Mcdonald’s Carbon Net Zero Restauarant Explore Manufacturing: St James Quarter McAvoy: Timebridge Community Centre

Social Housing Project of the Year

Beattie Passive: Cwrt Canna for Newydd Housing Association

Broadland Housing Association,

Sigmat & R G Carter: Canary Quay

Boutique Modern & Aspiration

Homes: The Foundry CoreHaus: Thorpe Thewles M-AR Offsite: Bushell Way Mid Group: The Boatyard Paramount Structures: Tre Ifans Shedkm: Greenwich Builds Batch 1A VOLUMETRICTM: Haringey Zed Pods: Zero-Carbon Housing Development in Partnership with Bromley Council

Social Housing Project of the Year 2021 Winner Building Performance Pioneer 2021 Winner

Building Performance Pioneer

Barratt Developments:

Barratt Developments’ Zed House at The University of Salford Beattie Passive: Passivhaus Plus Net Zero Relocatable Homes for Cardiff Council Collida: Collida Living Prototype Homes, BRE Innovation Park

Engenuiti, KLH UK & ECD Architects:

Thornhill Primary School Greencore Construction: Springfield Meadows

Architect of the Year

Adam Knibb Architects: Tarn Moor Alec French Architects: The Innovation Hub, BBSP HTA Design & Hawkins\Brown: The COLAB DfMA Toolkit & Client MMC Roadmap Stride Treglown: Thames Park School Studio RHE: The Gramophone Works

Architect of the Year 2021 Winner

Client of the Year

Broadland Housing Association:

Canary Quay Croydon Council: Timebridge Community Centre McDonald's: McDonald’s Market Drayton The University of Salford: Barratt Developments’ Zed House at The University of Salford

Contractor of the Year

Beattie Passive: Passivhaus Plus Net Zero Relocatable Homes for Cardiff Council Bouygues UK: The Riverside Masonry Frame Systems: Masonry Frame Systems Mid-Group: Greatfields School Zed Pods: Zero-Carbon Housing Development in Partnership with Bromley Council

Engineer of the Year

Curtins: Manchester Goods Yard Dice Consulting Engineers: Various Projects Engenuiti: Crosfields Senior School Building MJH Structural Engineers: Lewisham Exchange Paramount Structures: Falcon House

Installer of the Year

Lift And Locate: Anerley Town Hall Wiehag GmbH: Eton College ESAC

Offsite Pioneer

Akerlof Beattie Passive

Graeme Brady: NG Bailey Lanre Gbolade: The COLAB DfMA Toolkit & Client MMC Roadmap Seismic Consortium: Seismic – A New Platform for Construction

Project/Construction Manager of the Year

Andrew Caley - Hawker Construction:

Garvestone Primary School

Joanne Flaherty – Bouygues UK:

The Riverside Neil Smithers – MTX: John Radcliffe Hospital - 5 Storey Critical Care Building

2022 Sponsors include:

mpba

modular & portable building association

MODULAR SYSTEMS UK LTD

This article is from: