HEALTH AND SAFETY |

41

Measuring health and safety Dr Michelle O’Sullivan, Principal Strategy Implementation Manager – Health and Wellbeing at RSSB explains the importance of data in health

O

nce upon a time, wrong side failures on our railway were a hidden pocket of risk. The same can be said of occupational road driving risk and accidents in yards, depots and sidings. The way we shone light on those areas, bringing them to the forefront of our safety thinking, was by developing key performance indicators (KPIs). Now this is happening for health and wellbeing too. As our industry has matured in its thinking, interest in health and wellbeing data systems has grown. Many companies, quite naturally, started developing or improving their own. However, this can create problems of fragmentation – there might be a bit of useful data in this company, a bit in that one, all using different languages, algorithms and analysis tools. British Rail learned the folly of fragmentation in the 80s, when there were small collections of wrong side failure data here and there, but no clear picture of the whole situation. The result, arguably, was the Clapham accident of 1988, in which 35 people were killed when a green signal should have been showing red. Now all that is set to change, with a cross-industry health data system rapidly taking shape. For the first time, companies will be able to 100 access a shared system with a dashboard. This will help to: • Identify health risks in 95 the industry. • Assess which health risks 75 are a priority. • Make the business case for health interventions. • Track if interventions 25 have worked. • Benchmark against other 5 companies with similar workforce profiles. 0

Once this dataset is fully flowing, RSSB will be able to do one of the things it does best – plot nationwide trends to raise awareness of rising risk and encourage the sharing of knowledge, ideas and best practice (all in line with Leading Health and Safety on Britain’s Railway). Given the events of the last year, now perhaps more than ever monitoring these widerreaching trends is vital. Indeed, the data capabilities possible with the new system will allow rapid risk assessments to be undertaken, which could help us respond to a health crisis like Covid-19 in the future. Imagine if you could find, with the click of a button, how many members of staff had underlying health conditions, how many fell absent, and how many might do? Not only can it allow us to protect staff, it can help us keep the railway running. Using a common language and having a clear direction of improvement can also facilitate audit processes – including ORR health inspections. As well as a health and safety case for this work, there is also a sound business one. The cost of impaired health is estimated to be £889 million to the rail industry every year. Having an accurate cross-industry dashboard can help focus investment where it is most needed to beat this cost down – and it’s estimated the sector will make annual savings of £10 million on costs relating to impaired workforce health. T1239 is the first of three phases on our road to this ideal. It features health data KPIs, platform user requirements and likely costs. Phase 2 will see the development and testing of the prototype with the pilot user community. Phase 3 will see the roll out and adoption

of the system by rail sector organisations from 2022. The DfT and ORR both support this workstream. They see it as a key driver in building a healthier, more effective workforce – which it is. To put it simply, though, at the end of the day, if you can’t measure it, you can’t manage it. The Rail Minister, Chris Heaton-Harris, has positioned this as a longterm cost-saving initiative for industry, highlighting that it ‘provides a basis for improving the quality of reporting and the availability of data whilst potentially reducing cost burdens. It will assist the industry in making effective decisions to protect workers

and help the UK railways to continue to be one of the safest in the world’. Companies can start reporting against the KPIs for free, right now. Companies wishing to take part in Phase 2 will need to budget approximately £5,000 to £15,000 for development costs, depending on the systems in operation and the selected reporting mechanism. Sixteen companies have already signed up. Want to be one of them? Contact Noodhir.Sobun@RSSB. CO.UK for more details. Dr Michelle O’Sullivan is Principal Strategy Implementation Manager – Health and Wellbeing at RSSB Rail Professional


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Interview Peter Lindley, Managing Director at SigTech Rail Consultancy Ltd

6min
pages 12-13

Business Profiles

19min
pages 93-101

People

1min
pages 102-104

Digital Safety and Security

2min
pages 91-92

Rail Professional Interview

9min
pages 88-90

Bridges and Tunnels

3min
pages 86-87

Bridges and Tunnels

5min
pages 84-85

Tunnelling

6min
pages 81-83

Tunnelling

5min
pages 77-80

Tunnelling

5min
pages 74-76

Bridges

5min
pages 67-70

Bridges

5min
pages 71-73

Bridges

5min
pages 64-66

Geotechnical

7min
pages 62-63

Legal

23min
pages 47-59

Stations

7min
pages 43-46

Safety Culture

10min
pages 37-40

Sustainability

7min
pages 35-36

Viewpoint

8min
pages 29-30

Skills

6min
pages 31-34

News

10min
pages 8-11

Health and Safety

3min
pages 41-42
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.