Building the Future Together
17
KJ RESTORATION AND RENOVATION
18
KJ RESTORATION AND RENOVATION
RENOVATED SANCTUARY
19
RAMAZ EXPANSION
EXPANDED PLAY ROOF NEW GYMNASIUM
NEW CLASSROOMS
ENLARGED LOBBY
20
KJ RESTORATION AND RENOVATION
RENOVATED SANCTUARY
21
LOWER LEVEL – Chapel
RENOVATED CHAPEL • Double-height Chapel • Beautiful designed and versatile space • Double-seating capacity
22
LOWER LEVEL – Library
MODERNIZED AND ENLARGED LIBRARY • Expanded Library • Updated technology • Versatile design for both KJ and Ramaz community usage
23
LOWER LEVEL – Stairwells
IMPROVED STAIRWELLS • Safe handrails and grating • Improved rise to run
24
1ST FLOOR – Lobby
ENLARGED LOBBY • • • •
Additional square footage Improved traffic flow Gracious entrance and gathering space New glass façade allows for natural daylight
25
1ST FLOOR – Multi-purpose Room
NEW MULTI-PURPOSE ROOM • Additional space for stroller storage on Shabbat and holidays
26
1ST FLOOR – Foyer
RENOVATED FOYER
• Welcoming entrance into the expanded Social Hall • Easier flow from Sanctuary to Social Hall
27
1ST FLOOR – Social Hall
RENOVATED SOCIAL HALL, DINING HALL & KITCHEN • Beautifully designed space • Larger than current Auditorium • Designed for a variety of Synagogue and School events/celebrations • Large industrial kitchen facility • New school dining hall
28
2ND FLOOR – Sanctuary
RENOVATED SANCTUARY • Complete restoration, including arc and historic finishes • New and improved/safer egress • More accessible entrance to the Auditorium
29
2ND FLOOR – Stairwell RENOVATED STAIRWELL FROM WOMEN’S BALCONY
• New entrance to Auditorium • New and improved/safer stairwell from women’s balcony • Comfortable and code compliant rise to run
30
2ND FLOOR – Renovated KJ Offices
RENOVATED OFFICES • Improved KJ offices, with additional office space on 3rd floor
31
3RD FLOOR – New KJ Offices
NEW OFFICE SPACE • Additional office space for KJ
32
4TH FLOOR – Sanctuary Balcony
RENOVATED BALCONY • Newly designed women’s balcony for safety and comfort • Improved and safer egress in case of emergency
33
RAMAZ EXPANSION
EXPANDED PLAY ROOF NEW GYMNASIUM
NEW CLASSROOMS
ENLARGED LOBBY
34
1ST FLOOR – Lobby
ENLARGED LOBBY • Expanded space • Improved traffic flow for ECC and Lower School students/parents • Better access for strollers
35
1ST FLOOR – Multi-purpose Room
NEW MULTI-PURPOSE ROOM • Additional space for gathering and educational instruction
36
3RD FLOOR – New Specialty Classrooms
NEW CLASSROOMS • Dedicated, specialty classrooms for Art, Music and Science • Modernized equipment
37
6TH FLOOR – New Classrooms and Offices NEW CLASSROOMS & OFFICES • 4 new classrooms plus expanded existing classroom space • Allows an additional section for each grade level (Kindergarten – 4th grade)
38
8TH FLOOR – New Gymnasium NEW GYMNASIUM • Double-height space with natural light
39
8TH FLOOR – New Movement Room
NEW MOVEMENT ROOM • Additional exercise space • Early childhood recreation center
40
ROOF – New Roof Play Area
EXPANDED PLAY AREAS • Additional rooftop space for recess and event space • Additional sukkah
41
CONSTRUCTION SCHEDULE FALL 2014 OPEN FOR HIGH HOLIDAYS & SCHOOL YEAR
21 Months KJ
KJ Construction: Sept. 2012 – May 2014
June – Sept. 2014
RAMAZ Ramaz Construction: April–Aug. 2013
5 Months
NO CONSTRUCTION Sept. 2013 – March 2014
7 Months
Ramaz Construction: April–Sept. 2014
6 Months 42
43