KJ/Ramaz Expansion Plans (rev. July 2012)

Page 1

Building the Future Together

17


KJ RESTORATION AND RENOVATION

18


KJ RESTORATION AND RENOVATION

RENOVATED SANCTUARY

19


RAMAZ EXPANSION

EXPANDED PLAY ROOF NEW GYMNASIUM

NEW CLASSROOMS

ENLARGED LOBBY

20


KJ RESTORATION AND RENOVATION

RENOVATED SANCTUARY

21


LOWER LEVEL – Chapel

RENOVATED CHAPEL • Double-height Chapel • Beautiful designed and versatile space • Double-seating capacity

22


LOWER LEVEL – Library

MODERNIZED AND ENLARGED LIBRARY • Expanded Library • Updated technology • Versatile design for both KJ and Ramaz community usage

23


LOWER LEVEL – Stairwells

IMPROVED STAIRWELLS • Safe handrails and grating • Improved rise to run

24


1ST FLOOR – Lobby

ENLARGED LOBBY • • • •

Additional square footage Improved traffic flow Gracious entrance and gathering space New glass façade allows for natural daylight

25


1ST FLOOR – Multi-purpose Room

NEW MULTI-PURPOSE ROOM • Additional space for stroller storage on Shabbat and holidays

26


1ST FLOOR – Foyer

RENOVATED FOYER

• Welcoming entrance into the expanded Social Hall • Easier flow from Sanctuary to Social Hall

27


1ST FLOOR – Social Hall

RENOVATED SOCIAL HALL, DINING HALL & KITCHEN • Beautifully designed space • Larger than current Auditorium • Designed for a variety of Synagogue and School events/celebrations • Large industrial kitchen facility • New school dining hall

28


2ND FLOOR – Sanctuary

RENOVATED SANCTUARY • Complete restoration, including arc and historic finishes • New and improved/safer egress • More accessible entrance to the Auditorium

29


2ND FLOOR – Stairwell RENOVATED STAIRWELL FROM WOMEN’S BALCONY

• New entrance to Auditorium • New and improved/safer stairwell from women’s balcony • Comfortable and code compliant rise to run

30


2ND FLOOR – Renovated KJ Offices

RENOVATED OFFICES • Improved KJ offices, with additional office space on 3rd floor

31


3RD FLOOR – New KJ Offices

NEW OFFICE SPACE • Additional office space for KJ

32


4TH FLOOR – Sanctuary Balcony

RENOVATED BALCONY • Newly designed women’s balcony for safety and comfort • Improved and safer egress in case of emergency

33


RAMAZ EXPANSION

EXPANDED PLAY ROOF NEW GYMNASIUM

NEW CLASSROOMS

ENLARGED LOBBY

34


1ST FLOOR – Lobby

ENLARGED LOBBY • Expanded space • Improved traffic flow for ECC and Lower School students/parents • Better access for strollers

35


1ST FLOOR – Multi-purpose Room

NEW MULTI-PURPOSE ROOM • Additional space for gathering and educational instruction

36


3RD FLOOR – New Specialty Classrooms

NEW CLASSROOMS • Dedicated, specialty classrooms for Art, Music and Science • Modernized equipment

37


6TH FLOOR – New Classrooms and Offices NEW CLASSROOMS & OFFICES • 4 new classrooms plus expanded existing classroom space • Allows an additional section for each grade level (Kindergarten – 4th grade)

38


8TH FLOOR – New Gymnasium NEW GYMNASIUM • Double-height space with natural light

39


8TH FLOOR – New Movement Room

NEW MOVEMENT ROOM • Additional exercise space • Early childhood recreation center

40


ROOF – New Roof Play Area

EXPANDED PLAY AREAS • Additional rooftop space for recess and event space • Additional sukkah

41


CONSTRUCTION SCHEDULE FALL 2014 OPEN FOR HIGH HOLIDAYS & SCHOOL YEAR

21 Months KJ

KJ Construction: Sept. 2012 – May 2014

June – Sept. 2014

RAMAZ Ramaz Construction: April–Aug. 2013

5 Months

NO CONSTRUCTION Sept. 2013 – March 2014

7 Months

Ramaz Construction: April–Sept. 2014

6 Months 42