CV + Sample Portfolio

Page 1

R. KHALIL

SELECTED WORKS 2015-2018 2017 - 2020

PORTFOLIO SELECTED WORKS //ARCHITECTURE 2015-2018 PORTFOLIO R. KHALIL

1

1



PERSONAL DETAIL

Ramez Khalil Egyptian Arabic (Fluent) English (Fluent) French (Beginner) CONTACT DETAILS

E-mail ramezhkh@gmail.com Mobile No. +44(0)7463779823 Address Flat 129, Metro Cenral Heights 119 Newington Causeway London, SE1 6BB EDUCATION //2020

Registered as an Architect with the ARB

WORK EXPERIENCE //2018-20

Part II Placement at Squire & Partners, London where I mostly worked on several large feasibility and concept design projects in the UK and abroad, most notably, Ghadan21 in Abu Dhabi, and Stockley House in London. I also worked on a couple of construction stage projects, namely Rolling Stock Yard and 13 Fitzroy St, both in London.

//2019-20

//2016-17

Architecture Postgraduate Diploma Professional Practice University of Westminster Part III

Part I Placement at KSS Design Group, London where I worked on the Al Rayan, Qatar 2022 world cup stadium in Doha, as well as, the refurbishment of the Wimbeldon no.1 court, both at BIM 300.

//2016-2018

Master of Architecture (MArch) Cardiff University

Part II

//2013-15

Bachelor of Arts in Architecture (BA Hons) Newcastle University

Also I helped in introducing the practice to Virtual Reality software in addition to formalising the workflow for its usage, and creating a webpage to showcase this new capability.

Part I //2015-16

//2010-13

Bachelor of Science in Architectural Engineering (BSc) The American University in Cairo (AUC) SOFTWARE SKILLS

Part I Placement at Robin Partington & Partners (RPP), London where I worked on the Merchant Square Masterplan, as well as, the main tower of the scheme 1 Merchant Square. //2014

Revit

7yr Exp

Photoshop

Internship at Al Watan Al Araby, Dubai, UAE. I helped in 7yr Exp the Design of the El Souk Shopping District in Dubai.

AutoCAD

7yr Exp

InDesign

5yr Exp //2012-13

3Ds Max

1yr Exp

Illustrator

2yr Exp Part time intern at ArchiLab, Cairo, Egypt. There I helped

Rhino

1yr Exp

Vray

3yr Exp Complex, Dubai, UAE. As well as helping, with the

Sketchup

3 yr Exp

Enscape

5yr Exp Di Janiero Olympic City.

in the research and Presentation Design for the Mahraja Design of ArchiLab’s entry in the competition for the Rio

//CURRICULUM-VITAE

Name Nationality Languages

ARCHITECT

//CURRICULUMVITAE

3


//GRANGETOWN CENTRE //ROLLING STOCKCOMMUNITY YARD

01 02 ROLLING STOCK YARD GRANGETOWN COMMUNITY CENTRE

46

//2018-20 //2017 //MArch Project //PartYear1 II Placement //Cardiff University //Squire & Partners

A new development as a response multito its The main design ideadesigned is to create a contemporary circular non-directional industrial setting, providing 57,500 sqft of workspace for creative small faith chapel space with the rest of the functions of the community to medium sized businesses. The concept draws on the area centre revolving around it as a design metaphor to how central religion/ north of King’s Cross St Pancras, historically characterised by the spirituality is to the various diverse communities of Grangetown. machinations of transport, freight and industry, and now an emerging The design aims to use the distinctive curvilinear swirled shape creative quarter. created by the effect of revolving the building elements around the fulcrum of the chapel to carve out an outdoor shape for I wasusers, involved in theas, project duringan workstages 4 & 5. My in the the as well to create inviting funnel like role entrance project was the design and detailing of the reception interiors packto the complex which would draw pedestrians in off the street. age, and to produce some marketing VR visualisations from the Revit model, which I was tasked to look after and maintain. A sample of this work is in the opposite page. Also, the VR visualisations could be accessed by clicking the VR goggles icon at the top of this page.

CLICK ME!


5

//ROLLING STOCK YARD


02 GHADAN21

//2019-20 //Part II Placement //Squire & Partners

Ghadan 21 is a vital project that celebrates Abu Dhabi’s unique habitat and enriches access to natural sites through a vast landscape masterplan inspired by the journey from the desert to the sea.

//GHADAN21

The main aim of the scheme was to make the streetscape as pedestrian-friendly as possible via the use of architectural and landscape environmental interventions all along the Sheikh Rashid Bin Saeed Street, one of the city’s main transportation arteries.

6

I was involved in the project from workstages 0 to 3. My role included the design, 3D modelling and production of presentation images and detailed drawings for the climatic interventions located at the various pedestrianised zones in the scheme. A sample of this work is in the opposite page.


400

100

4

100

6

90mm Primary Structural Frame encapsulated in roofing buildup

2998

3598

5mm Thick Stainless Steel Sheets with a Polished Mirror Finish

100mm ⌀ CHS with a Polished Mirror Finish

Stone Paving

5

L12 - Section 1 : 25

100

3

L12 - Reflected Ceiling Plan

1

1 : 50 5mm Thick Stainless Steel Sheets with a Polished Mirror Finish 90mm Primary Structural Frame encapsulated in roofing buildup

100

5 90 5

5

5

90

5

90mm Primary Structural Frame encapsulated in roofing buildup

400

600

5mm Thick Stainless Steel Sheets with a Polished Mirror Finish

100mm ⌀ CHS with a Polished Mirror Finish

100 9183

4

L12 - Section - Callout 1

L12 - Section - Callout 3

6

1 : 10

1 : 10

8390

500

4483 100

3901

Fixing detail (TBA with structural engineer)

3100

3598

100mm ⌀ CHS with a Polished Mirror Finish

2200x1100mm RC Base

L12 - Elevation

2

5

1 : 50

L12 - Section - Callout 2

L12 - AXO

7

1 : 10

KEY PLAN

CLIENT

PROJECT TITLE

Ghadan 21

BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE.

PO Box 41670 202, Al Jahili Tower Corniche Road Markaziyah East Abu Dhabi UAE

DO NOT SCALE FROM THIS DRAWING

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW. DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING BEFORE WORK COMMENCES: • THE CDM DESIGN ISSUES REGISTER • THE BDP RISK SERIES OF DRAWINGS • THE PROJECT CDM RISK REGISTER

NOTES

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

Author

Checker

DRAWN

CHECKED

SQP JOB NUMBER

19027 DRAWING TITLE

L12 Water Junction Shading

Squire and Partners LLP The Department Store 248 Ferndale Road, London SW9 8FR T: 020 7278 5555

T +971 [0]2 627 6033 www.bdp.com

info@squireandpartners.com www.squireandpartners.com

DATE

SCALE

@ A1

As indicated

DATE FIRST ISSUED

DRAWING No.

GAR-SQP-J50-XX-DT-A-400017

REVISION

Bench

2o Fall

6

120180

611

311

180mm Steel Frame

3120

3731

305mm Steel Column

GRC Textured stepped panels

Sculptural Precast Bench (To Match GRC Finish)

L18 - Reflected Ceiling Plan

Stone Paving

Feature Recessed Floor Uplighter

7

450

Bench

1 : 50

50

1.1

5

3

L18 - Section

180mm Steel Frame

1 : 25 305mm Steel Column

Feature Recessed Floor Uplighter

50

30

30

30mm Thick GRC Textured Stepped Panels

180

30 x 30mm Continuous Shadow Gap

305 30

Fixing detail (TBA with structural engineer)

450mm RC Base

1.2

L18 - Plan 1 : 50

6

L18 - Section - Callout 3 1 : 10

2o Fall

16109 11118

281

5

L18 - Section - Callout 2 1 : 10

VARIES 30 Precast Bench (To Match GRC Finish)

420

3450

3731

30

30

450

30mm Shadow Gap With Recessed Feature Lighting

2

L18 - Elevation

7

1 : 50

L18 - Section - Callout 4

8

1 : 10

KEY PLAN

L18 - AXO

CLIENT

PROJECT TITLE

Ghadan 21

BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE.

PO Box 41670 202, Al Jahili Tower Corniche Road Markaziyah East Abu Dhabi UAE

DO NOT SCALE FROM THIS DRAWING

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW. DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING BEFORE WORK COMMENCES: • THE CDM DESIGN ISSUES REGISTER • THE BDP RISK SERIES OF DRAWINGS • THE PROJECT CDM RISK REGISTER

NOTES

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

Author

Checker

DRAWN

CHECKED

SQP JOB NUMBER

19027 DRAWING TITLE

L18 Desert Shading

T +971 [0]2 627 6033 www.bdp.com DATE

Squire and Partners LLP The Department Store 248 Ferndale Road, London SW9 8FR T: 020 7278 5555 info@squireandpartners.com www.squireandpartners.com

SCALE

@ A1

As indicated

DATE FIRST ISSUED

DRAWING No.

GAR-SQP-250-XX-DT-A-400025

REVISION

GRC Timber effect feature canopy with pattern to be agreed

3

L13 Elevation 1 : 50

GRC Timber effect feature canopy with pattern to be agreed

L13 Plan

1

1 : 50

20mm diameter steel rods to stiffen canopy

6

4

4

L13 Section 1 - Connection Detail

6

1 : 10

L13 Section 1 - Edge Detail 1 : 10

100 15 70 15 3x 100mm Diameter Metal Posts (Finish TBA)

30mm Shadow Gap

5030

Fixing detail (TBA with structural engineer)

450

Stone Paving 450mm RC Raft Foundation

5

2

L13 Section 1

5

1 : 20

L13 Section 1 - Foundation Detail

7

1 : 10

KEY PLAN

L13 Axo

CLIENT

PROJECT TITLE

Ghadan 21

BUILDING DESIGN PARTNERSHIP SHALL HAVE NO RESPONSIBILITY FOR ANY USE MADE OF THIS DOCUMENT OTHER THAN FOR THAT WHICH IT WAS PREPARED AND ISSUED. ALL DIMENSIONS SHOULD BE CHECKED ON SITE.

ANY DRAWING ERRORS OR DIVERGENCIES SHOULD BE BROUGHT TO THE ATTENTION OF BUILDING DESIGN PARTNERSHIP AT THE ADDRESS SHOWN BELOW. DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE FOLLOWING BEFORE WORK COMMENCES: • THE CDM DESIGN ISSUES REGISTER • THE BDP RISK SERIES OF DRAWINGS • THE PROJECT CDM RISK REGISTER

NOTES

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

DRAWN

CHECKED

DATE

REVISION

DESCRIPTION

Author

Checker

DRAWN

CHECKED

T +971 [0]2 627 6033 www.bdp.com DATE

SQP JOB NUMBER

19027 DRAWING TITLE

L13 Acacia Tree Shading

Squire and Partners LLP The Department Store 248 Ferndale Road, London SW9 8FR T: 020 7278 5555 info@squireandpartners.com www.squireandpartners.com

SCALE

@ A1

As indicated

DATE FIRST ISSUED

DRAWING No.

GAR-SQP-J60-XX-DT-A-400018

REVISION

//GHADAN21

PO Box 41670 202, Al Jahili Tower Corniche Road Markaziyah East Abu Dhabi UAE

DO NOT SCALE FROM THIS DRAWING

7


//GRANGETOWN COMMUNITY CENTRE //60 SLOANE AVENUE

03 02 60 SLOANE AVENUE GRANGETOWN COMMUNITY CENTRE

86

//2018-19 //2017 //MArch Project //PartYear1 II Placement //Cardiff University //Squire & Partners

In this scheme the idea brief was refurbish the interior of the 19th century The main design is toto create a circular non-directional multilisted office building, in addition to designing a 2 floor to be faith chapel space with the rest of the functions of extension, the community used as a photography studio, and a members-only roof bar. centre revolving around it as a metaphor to how central religion/ spirituality is to the various diverse communities of Grangetown. My role in theaims project was the the design and curvilinear modelling of the roof bar, The design to use distinctive swirled shape and to produce some visualisations and VR views from the Revit model created by the effect of revolving the building elements around along with drawings diagrams for the presentations the fulcrum of the and chapel to carve outproject an outdoor shapeand for client meetings. the users, as well as, to create an inviting funnel like entrance to the complex which would draw pedestrians in off the street. A sample of this work is in the opposite page. Also, the VR visualisations could be accessed by clicking the VR goggles icon at the top of this page.

CLICK ME!


9

//60 SLOANE AVENUE


//WIMBLEDON COURT NO1 //60 SLOANE AVENUE

04 10 WIMBELDON COURT NO1 NO.1 WIMBLEDON

22 10

//2016-17 //Part I Placement //KSS

KSS was appointment by The All England Lawn Tennis Club (AELTC) covers a full range of architectural and design services for the redevelopment of No.1 Court at Wimbledon. The scope of work includes new hospitality and support facilities together with a fixed and retractable roof covering both the playing arena and spectator seating, giving the potential for uninterrupted championship tournament play. The contemporary façade properly respects Wimbledon’s unique heritage, and the new facilities will further enhance the quality of the spectator experience, thereby supporting AELTC’s aim of maintaining Wimbledon’s status as the premier Grand Slam event in world tennis.


Figured dimensions only are to be tak are in millimeters unless otherwise sta checked on site prior to works comme reported to KSS. Do not scale this dra REVISIONS REV

DATE

DESCRIPTION

C01 02.08.17 JOINERY DETAIL -WIP

GENERAL NOTES AND LEGEND OPAL PERSPEX DIFFUSER J11 SET IN FRONT OF LEDS TO SHIELD BULBS FROM REFLECTING ONTO INTERNAL SURFACES WITHIN BOTTLE DISPLAY. NO LED LAMPS TO BE VISIBLE REFLECTED ON INTERNAL FINISHES. BACK BAR BOTTLE DISPLAY TO BE FINISHED J02A TO ALL EXTERNAL SIDES AND J02B TO FRONT FACE.

3480 BAR WIDTH

75 600

950

40

350

BACK COUNTER

50

FRONT OF BAR (J04) LIQUID METAL LACQUER. PANEL JOINS TO BE WITH KSS

1. FRONT BAR TO HAVE MINIMAL AND EQUAL. JOINS TO BE AGREE

TECHNICAL STONE COUNTER (J03) WITH 50mm DOWNSTAND

STAINLESS STEEL FINISH TO BACK COUNTERTOPS STAINLESS STEEL INTERNAL UPSTAND TECHNICAL STONE COUNTER TOP SLAB ENDS (J03)

J04 LIQUID LACQUER METAL FRONT PANEL

5

50 mm DOWNSTAND TO COUNTER (J03) TECHNICAL STONE

6. ANY VISIBLE SOCKETS TO BE S

5

DETAIL ILLUMINATED FRONT PANEL DETAIL

POWDER COATED MILD STEEL BOX SECTION FRAME WORK FOR SERVICES AND POWER ETC

UNDERCOUNTER FRIDGE AS PER CATERING CONSULTANT DRAWINGS

1:5

STEEL FRAME & CARCASS INDICATIVE

J04 LIQUID LACQUER METAL FRONT PANEL

6

STAINLESS STEEL SKIRTING

3. ALL AV EQUIPMENT TO BE LOC CONSULTANT TO CONFIRM SIZE, REQUIRED POWER AND DATA SU

5. ILLUMINATED FRONT BAR - 50 PROTOTYPE REQUIRED PRIOR T THE RIGHT QUANTITY OF LED LIG THE CORRECT LIGHTING LEVELS

LED LINEAR RIBBON LIGHTING

FRONT OF BAR (J04) LIQUID METAL LACQUER

FRONT AND BACK BAR INTERNAL CARCASS, CUPBOARDS AND SHELVES TO BE FINISHED J06A WITH FINISH J06B TO EXPOSED EDGES.

2. CATERING OPERATOR TO CON QUANTITY, POSITION AND REQU WATER SUPPLIES.

4. BOTTLE DISPLAY - 50mm LONG PROTOTYPE REQUIRED PRIOR T LED LIGHTS ARE NOT VISIBLE ON SURFACE OF BOTTLE DISPLAY A LIGHTING LEVELS ARE ACHIEVED

LED LINEAR RIBBON LIGHTING

STEPPED OPAL PERSPEX BOTTLE DISPLAY J11. REMOVABLE TO ACCESS LED LINEAR RIBBON LIGHTING WITHIN. INTERNAL BACK SUPPORT PANEL TO BE PAINTED J12.

MIRROR SKIRTING (J07)

SKIRTING (J07) MIRROR

100

1100

75

725

BACK BAR BOTTLE DISPLAY TO BE FINISHED J02A TO ALL EXTERNAL SIDES AND J02B TO FRONT FACE. BAR COUNTER TOP (J03) TECHNICAL STONE

145

BACK COUNTER HEIGHT

75

BOTTLE DISPLAY HEIGHT 130

BAR BOTTLE DISPLAY INTERIOR (J01) - FLUTED GLASS

75

75

725

BOTTLE DISPLAY

BOTTLE DISPLAY

50 OVERHANG TO SLAB END IN LINE WITH COUNTER ABOVE

100

1100

BAR ACCESS

50

EQ

BAR HEIGHT

725

BACK BOTTLE DISPLAY 2025

50

TECHNICAL STONE UPRIGHTS WITH BULLNOSE EDGES (J03)

HEIGHT TO TOP OF BOTTLE DISPLAY

FRONT OF BAR (J04) LIQUID METAL LACQUER

BOTTLE DISPLAY WIDTH

75

EQ

50

360

1800

360

NOTES:

STEEL FRAME & CARCASS INDICATIVE

LED LINEAR RIBBON LIGHTING, MOUNTED ON A SOFTWOOD FRAME PAINTED TO MATCH THE INTERNAL FINISH OF THE BOTTLE DISPLAY. POWER SUPPLY TO BE CONCEALED BY CHASING THE CABLE THROUGH THE INTERNAL CARCASE OF THE BOTTLE DISPLAY AND CHASED THROUGH WALL.

100mm J07 SKIRTING

MIRROR SKIRTING (J07)

2

ELEVATION BAR - SIDE

3

1 : 20

ELEVATION BAR - FRONT

4

1 : 20

SECTION 1

1 : 20

6

DETAIL SKIRTING DETAIL

1:5

4 23-01-DR-A-37-0001

1800 BOTTLE DISPLAY ABOVE COUNTER

BAR BOTTLE DISPLAY INTERIOR(J01) FLUTED GLASS

BACK BAR COUNTER

BACK BAR BOTTLE DISPLAY TO BE FINISHED J02A TO ALL EXTERNAL SIDES AND J02B TO FRONT FACE.

600

400

(J05) STAINLESS STEEL BACK BAR COUNTER WITH UPSTAND

STAINLESS STEEL UPSTAND

700

CATERING SIDE FLOOR FINISH (FFVL02) VINYL

BAR ACCESS TILED FINISH CONTINUE TO THE EDGE OF THE TECHNICAL STONE UPSTANDS

LINE REPRESENTS CHANGE IN LEVEL

UPSTAND TO ALIGN WITH TOP OF BACK COUNTER UPSTAND

2

ALL WORKING SURFACES TO BE STAINLESS STEEL STAINLESS STEEL UPSTAND TO ALIGN WITH TOP OF BACK COUNTER UPSTAND FRONT AND BACK BAR INTERNAL CARCASE, CUPBOARDS AND SHELVES TO BE FINISHED J06A WITH FINISH J06B TO EXPOSED EDGES.

23-01-DR-A-37-0001

BACK BAR BOTTLE DISPLAY TO BE FINISHED J02A TO ALL EXTERNAL SIDES AND J02B TO FRONT FACE

STEPPED OPAL PERSPEX BOTTLE DISPLAY REMOVABLE TO ACCESS LIGHT FITTING WITHIN INTERNAL BACK SUPPORT PANEL TO BE PAINTED. ALL WORKING COUNTERS TO BE FINISHED WITH (J05) STAINLESS STEEL 50mm STAINLESS STEEL UPSTAND

135. 00°

BAR TO BE FINISHED WITH (J03) TECHNICAL STONE, ALL JOINS TO BE AGREED WITH KSS

650 LINE OF WORKTOP UNDER COUNTER

BAR COUNTER TOP (J03) TECHNICAL STONE THE COUNTER IS TO BE RETURNED DOWN WITH BULNOSE EDGES TO FORM SIDE PANELS

PORCELAN FLOOR TILE (FFTL01) TO START FROM THE EDGE OF BAR SKIRTING

SOP

TRANSITION TRIM REQUIRED (TILE TO CARPET)

LAMINATE TO MATCH THE TECHNICAL STONE

DASHED GREY LINE - DRAWING NO:1360008D, GRAHAM BARRIE

MIRROR SKIRTING (J07) TILED FINISH (FFTL01) AROUND BAR TO CONTINUE TO THE EDGE OF THE TECHNICAL STONE UPSTANDS/ FLOOR FINISH ON THE CATERING SIDE OF BAR -VINYL (FFVL02)

DASHED RED LINE REPRESENTS BAR SKIRTING TILES TO BE SET TO ALIGN WITH SKIRTING

//WIMBLEDON COURT NO1 //60 SLOANE AVENUE

39

0

m

m

FINAL SLAB END POSITION TO BE AGREED WITH KSS

R

Lond Kent KSS

CLIENT

BUCKINGHAM GROU LTD

PROJECT

FRONT OF BAR (J04) LIQUID METAL LACQUER.PANELS JOINS TO BE AGREED WITH KSS

AMEX PREMIER LEAG UPGRADE WORKS DRAWING TITLE

3

p

SOUTH EAST BAR &

in

BAR SETTING OUT -

23-01-DR-A-37-0001

wo rk

All rights reserved. KSS asserts its rights under the Copyright, Designs and Patents Act 1988. (Unless otherwise agreed in writing).

mm R 790

00° 135.

DRAWING DATA & REFERENCE Scale

1

PLAN BAR LOUNGE

1 : 20

7

3D VIEW BAR - SE LOUNGE

Sheet Format

As indicated @ A1 File Ref

17784-ARCH Master 17.rvt Status

Project Ref.

Originator

Zone

Level

17784-KSS-23-01

23 11


//MERCHANT SQUARE //60 SLOANE AVENUE

05 09 MERCHANT SQUARE

20 12

//2015-16 //Part I Placement //Part //RPP

The four new buildings by RPP share a common basement and a new landscaped public Garden Square. The buildings are: 1 Merchant Square, a graceful 42 storey mixed use tower comprising 90 key boutique hotel, 222 residential apartments and a skybar. 2 Merchant Square, a spectacular 16 storey office building with panoramic views addressing the garden square and the A40, an important arterial route into London. 3 Merchant Square, a 21 story mixed tenure residential building providing 201 apartments with retail. Due to be completed summer 2014 6 Merchant Square, a 16 story mixed tenure residential building providing 119 apartments and retail. Merchant Square lies at the heart of a vibrant community, with amenity spaces for residents, workers and visitors alike, a place where cafes, restaurants and bars encourage you to linger.


21 13

//MERCHANT SQUARE //60 SLOANE AVENUE


06 04 TA’ETROUTE NOUR10 500 REFURBISHMENT

//2019-20 //2017 //Competition Winner //Freelance //S+RK

//500 ROUTE 10 //TA’ET NOUR

Ta’etthe Nour is an goal award-winning project on we the With client’s to maximisemixed-use the site’s urban potential in mind outskirts of the Assiut governorate in Egypt. The project is designed as created a brief that proposes a renovation to the existing building. a humanitarian response to the needs of the residents of an informal The new scheme introduces a new architectural language that built under high power lines the village of Al issettlement both contemporary andvoltage cost effective, butnear at the same time Izayah; who have developed serious health problems resulting from poses a minimal structural impact on the existing building. With their prolonged exposure to these power lines. As a result, this design the new and bold design, we are aiming to improve the building’s proposes to move the residents to an empty land at a safe enough presence and establish a new landmark, for the surrounding locale. distance from the power lines.

14 10

The project was designed by myself and Simona Kuneva in collaboration with ArchiLAB, a local architecture practice. The project has since featured in several architectural publications, including archdaily, and has been awarded the following awards: The Architecture Masterprize, The GFDA, and the World Design Award.

CLICK ME!


15

//TA’ET NOUR


//500 //500ROUTE ROUTE10 10 REFURBISHMENT

07 04 500 ROUTE 10 REFURBISHMENT

10 16 10

With the the client’s client’s goal goal to to maximise maximise the the site’s site’s potential potential in in mind mind we we With created a a brief brief that that proposes proposes a a renovation renovation to to the the existing existing building. building. created The new new scheme scheme introduces introduces a a new new architectural architectural language language that that The is both both contemporary contemporary and and cost cost effective, effective, but but at at the the same same time time is poses a a minimal minimal structural structural impact impact on on the the existing existing building. building. With With poses the new new and and bold bold design, design, we we are are aiming aiming to to improve improve the the building’s building’s the presence and and establish establish a a new new landmark, landmark, for for the the surrounding surrounding locale. locale. presence

//2017 //2017 //Freelance //Freelance //S+RK //S+RK CLICK ME!


11 17

//500 ROUTE 10 REFURBISHMENT


//500 ROUTE 10 //GRANGETOWN COMMUNITY CENTRE

08 02 04 GRANGETOWN 500 ROUTE 10 COMMUNITY CENTRE REFURBISHMENT

6 18 10

//2017 //2017 //MArch Year1 Project //Freelance //Cardiff University //S+RK

The main design goal idea to is to create a circular non-directional multiWith the client’s maximise the site’s potential in mind we faith chapel space the rest of the functions the community created a brief that with proposes a renovation to theofexisting building. centre revolving it as a to how central religion/ The new schemearound introduces a metaphor new architectural language that is to the various diverse communities isspirituality both contemporary and cost effective, but at of theGrangetown. same time The design aims structural to use the distinctive curvilinear swirled shape poses a minimal impact on the existing building. With created by the effect of we revolving the building elements around the new and bold design, are aiming to improve the building’s the fulcrum the chapel carve out shape for presence andofestablish a newtolandmark, for an the outdoor surrounding locale. the users, as well as, to create an inviting funnel like entrance to the complex which would draw pedestrians in off the street.

CLICK ME!


7 19

//GRANGETOWN COMMUNITY CENTRE


09 01 02 SHADOW CRAFT GRANGETOWN 04 COMMUNITY 500 ROUTE 10 CENTRE

//2018 //2017 Thesis Project //MArch Year1 //Cardiff University //2017 CLICK ME! //Freelance //S+RK

//500 ROUTE 10 //GRANGETOWN //SHADOW CRAFTCOMMUNITY CENTRE

REFURBISHMENT

4 6 20

The thesis main attempts design idea is tothe create a circular non-directional multiMy to use ethereal and dynamic properties of faith chapel with thelanguage rest of the of thetranslucency community shadow in anspace architectural offunctions transparency, centre revolving around as ainto metaphor toand howemotional central religion/ and reveal that draws the itusers a physical journey spirituality is design. to the diversethe communities ofthat Grangetown. through This addressed insite’s a project a With the the client’s goalvarious to is maximise potential in creates mind we The design aims to use the concrete curvilinear swirled shape dialogue the robust and steel roofscape, created abetween brief that proposes adistinctive renovation to the green existing building. created the effect of revolving building elements and the by light glass pavilions housed underneath, with their around timber The new scheme introduces a newthe architectural language that the fulcrum of the chapel to carve an outdoor shape for slowly revealing the to theout usersbut as they venture deeper isscreens both contemporary andinteriors cost effective, at the same time the users, as wellstructural as, The to create inviting funnel like entrance within the architecture. curvilinear form of existing the roof is achieved by poses a minimal impactanon the building. With to the complex would draw pedestrians in off street. using the landscape around the Grade I listed St. George-in-the-East the new and boldwhich design, we are aiming to improve thethe building’s as a fabricand thatestablish extends below highwayfor and thelocale. Grade presence a newthe landmark, theembraces surrounding II listed Tobacco Docks, creating a positive relationship between the two historic buildings, while responding to the site’s topography.


5 21

//SHADOW CRAFT


26


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.