RASOUL DARY
Architectural P o r t f o l i o
Concept Zone Diploma Project Zone Green
Zone
RASOUL DARYANAVARD
Persian: Native English: Advance Hungarian: Intermediate
Work Experience 2018
2018
Architect at
2017
Teacher Assistant & Consultant at
2016-17
Architect at
2016
Self-employed Architect / Egyéni vállalkozó
May–Sep. Bánáti + Hartvig Architect office Ltd. Budapest
Education ‘16– MSc. Advanced Urbanism (unfinished)
Feb. _ BME univercity -Public Building Department-KOZEP Budapest (Fall Semesters)
Bauhaus Univeristy Weimar
‘09 – ‘15
MSc. Architectural Engineering / MSc. okl. építészmérnök BME-Budapest University of Technology and Economics
May–Sep.
Képtér Architect office Ltd. BudapestwW
‘08 – ‘09 Diploma in mathemathics Avicenna International college/Budapest
Skills
May _
(BORD EpiteszStudio; SchM Studio; Kepter epitesz Iroda;
ArchiCAD 3dsmax InDesign AutoCAD ProJack Photoshop SketchUp Revit Illustrator Artlantis Rhino Model making
2015
Competition Architect at Zvi Hecker Architect office Ltd. Berlin-Germany
2015
March–June
Docum entary
travel
food
Couch surfing
Photo graphy
nat. geo.
individual work like :flat renovations...)
Budapest
July–Dec
Things I Enjoy
Volley ball
Construction Supervisor at
Oct. _ NasimEhsan Tower Ltd. Budapest
Driving Licence: B category
Egyéni vállalkozó
rasouldaryanavard@gmail.com _ https://issuu.com/rasouldary +3670 942 42 04
Cook ing
Intern Architect at
PAG Architect office Ltd. (Pracownia Architektury Głowacki) Wroclaw-Poland
Reference Bagi Zoltan – Principle Architect at Képtér Építésziroda Email: zbagi@kepter.hu - Mobile: +3620 445 2309
PHD Takas Lajos – Senior Architect Teacher at BME (Building Constructions Department) Email: ltakacs@epsz.bme.hu
Zvi Hecker – founder of Zvi Hecker architect Email: berlin@zvihecker.com Phone: +49 30 275 82 670 - www.zviheckeri.com
Villa Azzad
Zebegeny_1stYear@BME Autor: Janos Bito
Concept: A Single family house, the 1st design project ever, like an any other student I was excited too, did not know which principle ot follow; should it be “ less is more “ or “ less is Bore “. finally none, and the house became a special one. it is arranged in a single floor with an attach covered parking which later became an strong aesthetic point of my design and played an important rule in the project.
Gellert Train Station
1stYear@BME Space Composition- Autor: Oliver Sales
When architecture meets nature. Continuing the tradition of Frank Lloyd Wright, I believe organic design dose not have to be boring. High end design and environmental responsibility are not mutually exclusive, after all, in the (near) future all buildings will be following organic design and hopefully green! I believe this to be inevitable. Organic architecture describes a way of thinking about design that transcends the common, everyday buildings around us. It is not a “style” but rather an approach to solving design problems, in architecture, a “style“ is a set of repeating elements. A truly organic architecture invents a new solution based on the special conditions of each project.
WIX train station can be a good conceptual model of Compatibility of architecture and nature, the main idea came from the rocks, I tried to keep it as simple and as beautiful as nature itself.
Freehand Drawing 1st-4thYear@BME Autor:Gabor Nemes
Spa Center
Piliscsaba_2ndYear@BME Autor:Ferenc Makovenyi
Plans Concept
The concept is coming from a rock which has been stranded. The site is in the deepest point of the village therefore the landscaping is designed somehow to transfer this feeling to the visitors. Long, wide, open and curvy staircase,leading people to a closed, dark and deep space; this contradiction is what I like to have in my works more and more ... And the concept behind the free interior arrangement is coming from set of Caught bubbles!
Ground Floor
Upper Floor
South Elevation
Teleki Market
Budapest_2ndYear@BME Design Week_ Autor:Zoltan Schrammel
Team members : I & Amir hossein Sirjani
We created a market that reflects a new community in the neighborhood which it is temporarily permanent with the same existing function, based on two main axis to have three different access to the surrounding. A market, that is inspiring to the urban surroundings, to the participants .It acts as a community, data exchange, art and inspiration.
Karloy Music School
Budapest_3rdYear@BME Autor: Zolta nScherammel
Physical Model
Concept: This Complex full fills a serious needs of ‘Fot’ which is a small town on Budapest’s suburb. KMC is a building which contains a performance rooms, library and classrooms. It’s a school to graduate music lovers from beginners to professionals. WALK IN: Design is so that you can walk through the building, its transparent and the length of the whole mass seems shorter than the founction behind it. there are 4 pair of concrete walls with founctions in between.
ClassroomsConcrete roofSeperate Entrance-
1
2
1
2 2 3 3
4
4
-Staircase -Outdoor Performance Stage -Entrance to the building
The site is surrounded by small pitched roof houses , that’s why the concept is to split the mass to few parts and below you see the resultant which gives a harmony between the new building parts and the housing blocks.
4 3
4
1
1 2
Lobby- 3 -Library Buffet-Performance hall Clockroom-Teachers room Public utilities-Glass roof Glass roof and artifitual pool on top-
Rakospalota Sport Complex
Rakospalota_4thYear@BME Complex Studio _Autor:Zoltan Scherammel
Concept Obviously having a greater area with a huge function needs a different strategy than designing a small size public building. This complex is serving visitors, profession athletics and Amateurs. Concept is to divide the plot to 10m width ribs and place different rooms and functions under each ribs.
Plot
Divided to 10m wide ribs Ground Floor
Vertical divisions GSPublisherEngine 0.80.100.100
South East Section
GSPublisherEngine 0.80.100.100
South East Elevation
Using Stair as a gathering space
The stair is a moment to choreograph an experience and play with the views that open up as the visitor moves up each step. Stairs can snake through a building to guide one along a path, they can be elevated to a piece of roof terrace in the case of Rakospalata sport center. Stairs can be multifunction too as you see at the other end of this complex which is attached to the football field.
I
Orlay Dormitory Budapest_5thYear@BME MSc.Diploma Poject
On the bank of Bartok Bella street both sides are locked by block of houses and the only path where you can have a look throw these blocks are the streets ,thats totally normal in cities. but when I had a closer look to these blocks I found out that most of the houses are attached together with their own courtyard or with a common courtyard, but there was a single block of attached houses which was semi open due to any reason such as NON accessible, town regulation or lack of investors interest or even bombing during world wars!! This block is located between Orlay, Kemenes and Bartok Bela streets! here is the site I am chosing for designing a dormitory, why dorm? cause of lack of dorm for our school and its limitation and regulation in design procces!
GRAY Zone (Concept) #1 One of the proposals is to open one of the housing blocks which is not build so long ago and has a key role in my Greater urban proposal. Bartok bela 3-7 is a social housing block standing on pair of pillars with a commercial ground floor which can be removed and opened to the future park behind it! Aim of my propose is to bring people inside and relief the huge dead area which is locked by huge blocks all around it!
II
#3
Pedestarian - Walkable - Bences - Gathering space - Stone cover
Playground - Walkable - Bences - Games - Rest and relaxing - Gathering
#2
Holm Oak H until 45m D= 6-8 m
Laisure garden - Walkable - Bences - mid size trees - Grass
Acacia H until 20m D= 6-8 m
New dormitories
Cork Tree H until 17m D= 6-8 m
Park-Public
Aromatic garden - Walkable - Bences Poplar Tree - Grass/Violet H until 17m - flowers/Ment D= 6-8 m -Sand/Lavender
Oak Tree H until 45m D= 6-8 m Olive Tree H until 15m D= 16-20 m Paved zone - Walkable - Bences - Rest and relaxing - Gathering space
Parking-Public
Urban garden - Walkable - Bences - Gathering space - Stone cover
Almond Tree H until 10 D= 5-7 m Chestnut Tree H until 36m D= 6-8 m
GRAY Zone (Concept) #3 Other propose is to create a paved, green zone for public,vertical connections,playground, etc... Beside that it can be a nice gathering place for students having their common and individual activities (Sport or educational). There will be connections to Underground parking, trees, benches, green zones such as Aromatic, Leisure and Urban gardens.
GRAY Zone (Concept) #2 Right now the plot is used as a parking space for Gellert hotel, In sequence of my Concept plan, all vehicles should be moved under ground and the most top floor will be used as a green public space! Therefore there will be 2 underground parking levels which can for 250 cars and of course open for public! natural ventilated by using trees and open floors.
III
New dormitories : Complex of 3 block each 6 floors and each floor 10 rooms (single and double).
Ground floor
single room concept
General floor
Roof
Living Rest work
IV
+9.00
Security
1st Phase: Removal of topsoil 2nd Phase: Excava
3 levels
1: to level ; 2nd:to
level
level ; 3rd: to
3rd Phase: Concrete works in founda 4th Phase: Construc -situ pillars 5th Plase: Construc l This phase is done at the end, a of all 3 dormitory blocks! (posi is on the neighbouring plot which is a outdoor bar
R = 0.50
25 m
5th Phase 6.61
Doka KS XLIFE formwork of RC pillar 0.3
0.3
8.44 0.50
4th Phase
line of Seperate funda
basement concrete wall 25 cm thick
6.99
Doka KS XLIFE formwork of RC pillar
0.50
Concrete mixer 6.97
Doka KS XLIFE formwork of Shear walls
PAR KIN G
6.75
5.00
Fence (All around the site)
R
Doka KS XLIFE formwork of Shear walls
0.50
7.20
Concrete mixer
6.50
Scorpio 5RZ50 mobile concrete pump
= 25 m
7.17
Scorpio 5RZ50 mobile concrete pump
Doka KS XLIFE formwork of parking Wall
Balustrade around the diged site
3rd Phase Tie-Back Anchor
Pad fonda
2nd Phase
R = 25 m PAR KIN G
68.24
Balustrade
3.70
1.00 3.70
3.70
3.70
excavator
(around the diged site)
B truck
o
toile t dre ssin g o
B
sheet piling around the basement
+7.50
sheet piling around the basement
Water pipes and electric cables led 0.51.0 m high at the back of the containers.
future posi (for upper construc founda
Perimeter of the future sport hall
Legends Lightning Crane Axis Sepera Water Pipe Sewage Pipes Electricity Gas Pipe Reinforcement Balustrade
) p line of Seperate funda
truck 2.90
25.41
5.0
1.0
22.50
around the diged site 1.0
2.22
excavator
Perimeter of the exic building(pitched roof should be removed) Balustrade around the diged site
Fence
+7.50
(All around the site)
Security
Detailed Section
Construction Management Site plan GSPublisherEngine 0.0.100.100
22.51
stor age
Building line of the basement 1.00
Water meter
Transformer
V
3
6 45
4
15 15
65 65
45
14
15
55
25 25
4
+7,20
10
R4
+24,87 0,7 mm tanium zinc wall fastening with 5% inclina on impregnated mber board to the wall flashing with a thickness of 24 mm
8 wooden handrail
+24,24
0,7 mm tanium zinc wall fastening with 5% inclina on
25
55 12
05
+24,74
wooden handrail
impregnated mber board to the wall flashing with a thickness of 24 mm
25
R10
EPDM foil
25 25
steel handrail
4
galvanized grid against insect
1
+6,83
50/150mm galvanized steel strip with a thickness of 1,5 mm fastening to the thermal insulaon boards
fixa on of thermalinsulaon
15
15
20
15
7
Soil
175
steel L shape profile
175 95 305
30
25
62
105
13
Gravel
60
18
+5,00
Extruded thermal insulaon Austrotherm XPS foam
+19,22
205
glass baluster with steel frame
EPDM
9
+23,18
horisontal mullion of curtain wall
7
base concrete gap filled with 1cm EPS
25 cm RC loadbearing slab
115
25
1,00
Thermalinsulaon Austrotherm XPS 30
30
aluminium door
1
RC wall
25 25
R2
resin
05
6 stainless steel rail
stainless steel L shape element
05 05 12
1
25
Sound insulaon Rockwool Steprock ND
RC strip foundaon
25
40
XPS 19 cm RC landing
60
silicon
25
10
+16,80
6 40
Compacted soil
40
16
15 35
-7,09
fixa on of thermalinsulaon
RC strip foundaon
-7,02
25
60
35
R9
20
25
60
15
Synthec resin Self leveling mass Concrete screed PE foil technological layer Sound insulaon - Austroterm LT-2 PS foam installaon bitumenous sheet waterproofing layer Synthec fleece underlayer RC slab Gravel Soil
Diploma Project R2- underground wall
0,5cm 0,5 cm 8 cm 2 layer 3 cm 6 cm 1 layer 1 layer 15 cm 20 cm
Paint RC Wall Bituminous paint (grounding) Bituminous sheet Extruded PS thermal insulaon with glue Geotex le Drain Gravel Soil
30 cm 1 layer 12 cm 1 layer 8 mm 30 cm
10
-7,52
Plint,Parapet wall detaling with diffeent claddings, Curtail walls, Window, Foundation.
R3- undergroundd wall of parking
R4- ceramic floor
Paint RC Wall 30 cm PVC waterproofing layer Extruded PS thermal insulaon with glue 10 cm RC Wall 30 cm Paint
Ceramicles Glue Self leveling mass Concrete screed PE foil technological layer Sound insulaon - Austroterm LT-2 PS foam installaon RC slab
R5- parquee floor
0,5 cm 0,5 cm 0,5 cm 5,5 cm 1 layer 2,5 cm 2,5 cm 25 cm
Parquet PE foam Self leveling mass Concrete screed PE foil technological layer Sound insulaon - Austroterm LT-2 PS foam installaon RC slab
R6- resin floor
0,5 cm 0,3 cm 0,5 cm 6 cm 1 layer 2,5 cm 2,5 cm 25 cm
Synthec resin Self leveling mass Concrete screed PE foil technological layer Sound insulaon - Austroterm LT-2 PS foam installaon RC slab
R7- underground parking floor
0,5cm 0,5 cm 6 cm 1 layer 2,5 cm 2,5 cm 25 cm
Synthec resin Self leveling mass Concrete screed RC slab Gravel Soil
R8- terrace
0,5cm 0,5 cm 8 cm 15 cm 20 cm
Stone les Crushed stone Geotex drain sheet XPS foam Bituminous sheet Bituminous paint (grounding) Screed with 2% slope Rc slab
(having min. 12 details/detialed structural floor plans and sections for Diploma project is required).
30/40loadbearing beam
30
5
35 +3,08
-7,47
15
4 R1- underground floor
+16,43
15
5
5
+3,23
stainless steel horisontal rail
R9- Conrete facade cladding 3cm 5-10 cm 1 layer 2 cm 16 cm 2 layer min.4cm 25 cm
40
Loadbearing Slab
-7,47
305 30
05
resin
05
15
25 11
65
20
15
67
20
PE foil 1 layer
+3,63
Extruded thermal insulaon Austrotherm XPS foam
30 295
05
R4
19
20
11
16
20
12
12 15
-6,87 drain pipe
Gravel
+16,13
8 05 05
12 12
-6,67
7 20 15
15
concrete cladding
R.c screed
Loadbearing RC slab
R1
cement based bitumen glue
75
3
XPS foam
insect net
-7,02
95
+16,38
extruded PS foam
gravel
R13
+4,00
liquid bitumen
1
PVC waterproofing layer
+16,43
30
3
concrete panel
-6,67
2
12
8 mm drain sheet
RC wall
-6,67
2
30
gap filled with 1cm EPS
mber shader XPS foam
+16,80
12 25
2
25
Crushed stone
1
2 R7
7
+16,78
Stone flooring
Thick bitumen waterproofing
cement based bitumen glue
R4
horisontal mullion of curtain wall
R8
base concrete
resin
+19,40
18
5
-0,89
R3
R3
base concrete
Soil
RC slab
25
25
Thick bitumen waterproofing
gap filled with 1cm EPS
+6,22 concrete panel
25 25
Extruded thermal insulaon Austrotherm XPS
10
+20,03
Extruded thermal insulaon Austrotherm XPS foam
+6,21
Thick bitumen waterproofing
25
Stone flooring Crushed stone
stainless steel horisontal rail fixa on of thermalinsulaon
steel handrail
15
85
+24,02
6 gap filled with 1cm EPS
R1
85
20
stainless steel L profil
13
2 layers bitumenous waterproofing base concrete
10
20
steel rail
insect net mber shader
25
3
195
glass cladding
10
R11
+6,39 aluminium door
concrete cladding
Extruded thermal insulaon Austrotherm XPS foam
15 cm RC a ck wall Extruded thermal insulaon Austrotherm XPS foam
1
44 stainless steel horisontal rail
-0,02
50/150mm galvanized steel strip with a thickness of 1,5 mm fastening to the thermal insulaon boards
Extruded thermal insulaon Austrotherm XPS foam
IVANKAfine casng concrete panel stainless steel T profil
R12
Gravel
45
glass fiber mesh
stainless steel L shape element
insect net
4
R9
10cm extruded polistyren foam connected with glue
175 40
8
60
155
stainless steel T profil vercal frame
45
mber
25
horisontal mullion of curtain wall
17
cement based cover
25 25
15
1
25
Paint RC beam Rockwool thermal insulaon mechanical fixing Stainless Steel frame + Air IVANKA Fine-casng concretepanel
R10- Timber facade cladding 25 cm 15 cm 1,5 cm
Paint RC beam Rockwool thermal insulaon mechanical fixing Cement based cover Stainless Steel frame + Air Timber shadow
R11- Green Roof 25 cm 15 cm 1 cm 1,5 cm
Vegetaon and soil Synthec fleece Gravel Drain sheet XPS foam Bituminous sheet Synthec fleece Screed with 2% slope Rc slab
R12- Green Roof top of parking 30 cm 1 layer 10 cm 2 cm 16 cm 2 layer 1 lyer min.4cm 25 cm
Vegetaon and soil Synthec fleece Gravel Austrotherm XPS 30 Bituminous sheet Synthec fleece Screed with 2% slope Rc slab
30 cm 1 layer 10 cm 6 cm 2 layer 1 layer min.4cm 25 cm
DIPLOMA PROJECT
I
War Memorial
http://www.paglowacki.pl/index.php?/konkursy/izba-pamieci-przy-cmentarzu-wolskim/
Warsaw-2015 _ Intern@PAG Competition
1
3
2
Site plan and Section
1.The main entrance to the cemetery. 2.View to the monument. 3. designed path through the extended lake, view to the memorial pavillion and the monument in same time. 4. monument.
4
II
Concept: Always Designing Memorial buildings specially war memorial in this case with over 1oo,ooo dead or lost person requires high understanding of their history and situation. We liked it hidden, massive, bight but dark and finally Simple ;as simple as Walls. The concept is to use the landscape and hide a pavilion under a ramp(which was required for handicap people) and create a path by using of 100 memorial wall, there are unknown people but once when we figure out all names hopefully they will be placed on each of these walls. Walls are getting lost in the environment and slowly the buried in the lake which is again designed and been extended from the original lake there. At the opposite side of memorial same walls but less and shorter will be placed in order to give visitor same feeling and let them walk in same environment.
I
Education Pavillion Warsaw-2015 _ Intern@PAG Competition
Elevation
Sections
Plans
II
http://www.paglowacki.pl/index.php?/konkursy/pawilon-edukacyjny-w-warszawie/
Double facade: The facade contain of 2 layers (double facade) ,1st one is the glaized surface and 2nd one is the nest which gives the organic look to the pavilion; there is 60 cm space between them to be used for maintainings.
Concept: A key element of the ideological assumptions and the proposed concept is to respect the natural and landscape character. The mass is recognized by an organic shape inspiring from bird nest and use of sustainable faรงade material such as wood which will be continued outside the pavillion as well for landscaping for example pavement of the education path, benches and house of Animals.
I
TVP
Warsaw-2015 _ Intern@PAG Competition
1
3
2
4
1
Compact Form Continuing street frontage creating a dominant direction of building
2
Walls of the Street They underline the dynamic solids panoramic restaurant and studies-view from the east
3
Welcome Zone Emphasized functions(resturant and panoramic view) shifted to the front
4
Ephemeral Character of media is emphasized by open work facade made of steel panels
II
I
Lausanne University Library Extension Lausanne2015_Intern@ZviHecker Competition
Concept Since Alexandria books are collected to illuminate the human mind. Libraries are the depository of wisdom and intelligence, now open to all. The design intends to create an atmosphere and environment conducive to the understanding and assimilation of knowledge on all its various levels of interest. The design follow the structural geometry of the existing building to create a variation of spaces for different functions, reading rooms, openshelf spaces, storage, etc.
Relation with the existing building The tectonic rule which generated the Unitheque design by Cocchi is based on two grids, one composed by radial axis and one by concentric arches (radial axis are intersecting concentric arches). It seemed natural to extend this existing structural rule in order to guide and support the evolution of the extension. Consequently, the supporting walls typical of the lower levels and punctual vertical supports for the upper floors are organized according to the inherited geometry. The structure will be in concrete Slab Relation with the natural environment The location of the library is unique for its natural environment. The green of the wood surrounding the area and the beautiful view toward the lake on the south side are unique amenities that should be preserved and at the same time enjoyed by the visitors of the Unitheque. The new construction occupies a relative small amount of the assigned building plot. We took advantage of the possibility to use large underground surfaces for the storage, in order to increase density of the building, and so reduce its foot-print. The stairs-a-like rising profile of a building, with terraces and set-backs, mimics the ascending line of the natural slop of the terrain. The new volumes lay gently and naturally on the hill side. A visual connection toward the natural environment is constantly established from the inside the reading area.
II
-2
-1
0
1
2
3
III
I
Giessen University Campus Giessen,Germany2015_Intern@ZviHecker competition-2nd stage
Concept: The new building for the Department of Mechanical Engineering and Energy Technology consists of two separate buildings, which combine like a bow on the upper floors with a two-storey bridge. Recesses on the upper levels support this connection and open up the building towards the new campus space. By differentiating in the materiality and the game with unity and transparency a prominent university block is created, respecting the smallness of the master plan and enters through the differentiation of the heights in the two parts of the building as well as positioning of the common areas in a lively dialogue with the new campus space.
II
0
+1
+2
+3
II
Internal Covering 3rdYear@BME Autor:Zsuzsuna Fulup
Stair and Floor slab joint
Task: To design the Interior floor covering, cladding and suspended ceiling of an excicting project.
Suspended ceiling joint with load bearing wall
floor covering plan
Suspended ceiling level skiping
Suspended ceiling plan
Threshold
III Skeleton Frame Building 4thYear@BME Autor: Zoltan Hunyadi
Structural plan
Architectural Floor Plan
Foundation plan and Section
Task: To solve a 4 story high building from construction point of view. RC Skeleton frame and pad foundation was chosen as the main structure.
Section / Elevation
IV
Industrial Hall Building
5thYear@BME Autor: Zoltan Hunyadi
Architectural plan
Section
Task: To solve the structure of a Industrial hall building from the whole structure point of view , from cladding and small details to drainage system of the roof and internal dry walls system. Elevation
Structural plan
Roof plan
Projects
Kepter Epitesziroda _ Freelancer
TOLANY Architectural and Construction planing
B8 PROJECT Architectural and Construction planing
PACIFIC PARK Concept Design to Construction planing and Detailing
CSANGO 6/B Concept Design to Construction planing and Detailing
Projects
Kepter Epitesziroda _ Freelancer
ALLURE RESIDENCE BUDAPEST Construction planing and Detailing
BOSNYAK 14-18 Architectural planing
Projects (Rakoczi ut 78)
Freelancer-Renovation
- 2D Planing - 3D Renders - Regular Site visit - Technical drawings ( plumping; kitchen ) - Constracting (Demolition to finishing phases ... )
Projects (Rakoczi ut 78)
Freelancer-Renovation
Projects (Nagy ignac utca)
Freelancer-Renovation
Projects (Nagy ignac utca)
Freelancer-Renovation
Before and after (still under construction) - Floor changed to Ceramic tiles - Brick look at one of the walls - Suspended ceiling ( LED lighteninig)
Projects (boutique hotel)
0.5
0.1
4.25
1.6 A: 4.0 m2
furdo 2.25
0.1
0.1
2.5 ±0.00
1.1 1.8
0.9 2.1
0.9 1.8 2.35
3.25 0.1 0.25
0.65
0.5
3.2
±0.00
Szoba 2
Szoba 3
A: 25.5 m2
A: 16.5 m2
0.65
0.1
6.25
0.1
4.75
6.15
Sill 0.75
Sill 0.75
0.5
0.65
1.1 1.8
1.1 1.8
0.65
Sill 0.75
0.1 4.2
Sill 0.75
Sill 0.7
Sill 0.7 5
Sill 0.75
5
Sill 0.75
GSPublisherEngine 0.0.100.100
2.1
0.5
0.65
0.65 Sill 0.75
A: 4.5 m2
±0.00
A: 20.5 m2
2.0
0.3
furdo
5
Sill 0.75
Epitesztervezo: Bagi Zoltán E 01-4510 okl. építészmérnök, ügyvezető 1149 Budapest, Egressy út 31-33. B. ép. V/1.
0.10.7 2.1
3.95
0.2
2.55
+0.10 0.1
0.1 A: 26.0 m2 1.95 1.8
0.1
3.95
0.65
1.1 1.8
0.65
0.65
1.1 1.8
Sill 0.75 Sill 0.7 5
0.1 3.5
furdo A: 4.0 m2 2.3
1.1 1.8
1.1 1.8
Sill 0.75
0.1 2.4
0.7 0.12.1
+0.10 1.8
1.95 1.8
2.0 1.8
4.2
2.0 1.8
4.6
0.5
Szoba 5
1.0 1.8
0.1 3.2
2.0 1.8
0.1
0.1 1.7
Szoba 4 3.05
A: 3.5 m2 2.7
0.8 2.1
0.1
0.1
2.05
0.1
1.3
0.7 0.1 2.1
+0.10 1.6
0.1
furdo
0.1
A: 4.0 m2
±0.00
0.65
0.7 2.1 0.1
A: 10.5 m2 4.95
A: 19.5 m2
4.95
4.95
3.45
0.7 2.1 0.1
1.65
0.1
A: 12.5 m2
SZOBA
+0.10
3.95
A: 17.5 m2
1.5 2.1
Sill 0.75
4.1
Sill 0.75
2.0 1.8
A: 21.0 m2
0.5
0.5 A: 3.5 m2
+0.10
0.1
SZOBA SZOBA
4.95
5.2
1.5 2.1
NAPPALI A: 25.0 m2
SZOBA
0.1
furdo
0.5
0.65
SZOBA
0.45
0.85
2.0
butor
1.85
0.1
3.95
0.1
1.85
0.1 4.2
Suto
1.8
0.95 1.8
0.1 4.6
Szoba 1 A: 18.5 m2 Micro
4.95
0.1
Huto
2.0 1.8
1.75
1.65
0.1
0.1
0.65 0.9 2.1
0.9 2.1
2.2
0.8 1.8
0.5
±0.00
0.9 2.1
0.1
3.05
0.8 2.1
1.4 2.1
5
1.45
1.5 m2
A: +0.10
37.5 m2
0.65
1.25
4.6
0.9 2.1
0.65
0.65
5
0.65
1.1 1.8
0.5 1.8
0.1 A: 21.5 m2
0.65
4.8
±0.00
0.65
0.8 1.8
A: 5.0 m2
1.3
1.4
Sill 0.7 5
Szoba 6
0.5
0.9 2.1 0.65
1.5 2.1 0.65
1.5 2.1 0.1
0.9 2.1
4.3
2.0 0.75 2.1
A:
0.9 2.1 0.1
1.4 2.1
2.45
0.1 1.7
raktar
1.95 1.8
0.95
Moso konyha Recepcio +0.10
Sill 0.7
0.9 2.1
0.1 1.25
9.0 m2
0.1
0.75 2.1
±0.00
0.1
Sill 0.7
Sill 0.7
1.5 2.1
1.05
0.8 1.8
A: 3.5 m2
1.05
1.5
A: 8.5 m2
7.5 m2
A: 2.0 m2 1.65
furdo
0.1
6.6
0.1
Sill 0.75
0.65
0.1
1.25
A:
A:
0.75 2.1
A: 2.0 m2
0.1
0.7 2.1
0.15
±0.00
0.65
2.4
SZOBA
Sill 0.7
wc 1.1 1.8
0.1
KONYHA
Sill 0.7
0.1
2.95 1.5 m2 2.1
0.1 1.25
kOZLEKEDO
A: 13.5 m2
0.1
2 0.75 A: 1.5 m 2.1
0.75 2.1
A: 1.5 m2
MOSDO
A: 0.75 2.1
0.9
FURDO
3.65
A: 33.5 m2
kOZLEKEDO 0.75
0.1 2.6
4.75
Sill 0.75
3.4
SZOBA
0.8 1.8
0.7 2.1
0.5
2.5 m2
0.75 2.1 0.15
0.1
Sill 0.7 5
1.5 2.1
NAPPALI 0.9 2.1 0.1 1.5 2.1
2.45
1.0 1.8
0.75 2.1
1.0 1.8 0.75 2.1
RAKTAR
2.1 2.65
A: 2.0 m2
Sill 0.7
Sill 0.7
0.15 0.9 2.1
0.1
0.8 2.1
1.0 1.8
0.1
WC
1.5 2.1
+0.10
5.95
WC
0.8 1.8
0.65
A: 17.0 m2 0.65
A:
0.8 1.8
Szoba 7
0.5
1.0 1.8
0.5 1.8
Sill 0.7
0.9 2.1
0.15 1.8
±0.00
0.75 2.1
7.5 m2
1.95 1.8
0.8 2.1
Sill 0.7
0.9 2.1
Sill 0.7
0.1
4.05
3.6
Sill 0.7 0.5
4.65
A: 17.5
A:
m2
Sill 0.7
Sill 0.75
3.6
0.65
RAKTAR SZOBA
1.9
furdo
2.9
Sill 0.75
0.9 2.1 2.0 1.8
0.1 0.25 0.15
0.65
0.5
0.5
0.5
0.5
Freelancer-Renovation-under construction
0.1
Ugyvezeto: MK DARIUSH Kft. 1068 Bp. Kiraly utca 78. 1.em 32 Generaltervezo: Rasoul Daryanavard E.V. 1084 Bp. Fuveszkert utca 1. 1.em 4
Leptek Datum
1:100 2018.10.25
Telepuleskepi bejelentes Epitesztervezo: : Bagi Zoltán E 01-4510 Meglevo Allapot okl. építészmérnök, ügyvezető 1149 Budapest, Egressy út 31-33. B. ép. V/1. GSPublisherEngine 0.0.100.100
Sill 0.7
Ugyvezeto: MK DARIUSH Kft. 1068 Bp. Kiraly utca 78. 1.em 32 Generaltervezo: Rasoul Daryanavard E.V. 1084 Bp. Fuveszkert utca 1. 1.em 4
Leptek Datum
1:100 2018.10.15
Telepuleskepi bejelentes : Tervezet Allapot
Lonaly utca 46
1.92
konyha A: 6.90 m2
1.2 2.1
Lonyay utca 46 GSPublisherEngine 0.0.100.100
45
45
10 1.85
A: 34.39 m2 1.90
GSPublisherEngine 0.0.100.100
Current plan
2.0 2.0
lakas 3
1:50
cim
3.45 10 3.98 3.625
Scale 1:50
15
0.9 2.1
2.13
75
15
uj falok
1.55
1.91 10
1.80
2.43
75
1.795
3.595
8
15
Scale
1.90
1.54
1.99 1.80 8 1.20
0.9 2.1
1.21
wc A: 4.19 m2 120F-8P
55
1.3 2.1
75
15
2.69
5
5.525
8
8 1.50
75
1.55
5
1.30
Corridor A: 4.29 m2
m2
15
Current plan
2.0 2.0
8
A: 39.01 m2
DW
cim
5.525
lakas 2
8
2.215 wc A: 4.12 m2 65F-9P
0.6 2.1
0.6 2.1
A: 34.67
2.15
45
60
60 76
90
60
8 1.50
lakas 1
Bedroom A: 10.20 m2
75
0.15
3.85
1.30
1.60
A: 11.553 m2
1.500 2.100
0.15
1.500 2.100
1.500 1.500
1.3 2.0
2.22
A: 23.053 m2
Corridor
4.00
0.08
1.500 2.100
0.75
1.500 2.100
A: 1.103 m2
8
1.00
0.9 2.1
WC Szoba
0.6 2.1
8 2.10
1.2 2.1
konyha A: 9.50 m2
2.89
0.08
15
2.89
3.077 m2
75
1.500 1.500
A:
2.30
Bathroom
DW
2.80
0.9 2.1
Szoba
konyha A: 4.90 m2
8 1.97
75
8.780 m2
1.500 1.500
2.0 2.0
A: 20.014 m2
W
8
Szoba
2.20
W 90
8 1.500 2.100
A: 22.698 m2 1.500 1.500
8 2.57 wc A: 4.21 m2 95F-6P
0.75
0.08
A: 11.865 m2
4.85
Szoba
A:
5.53
8
0.75
Bathroom A: 9.700 m2
60 0.45
3.12 1.500 2.100
Szoba
8
0.08 4.68
3.45
0.08 2.25
2.47
0.08 2.00
0.60
0.60 0.15
60
60
Projects (Lonyay utca )
Freelancer-Renovation-under construction
3.25
Letters of Recommendation
Wrocław, 29.05.2015 Dr. Tomasz Głowacki Founder and Chief Architect At PAG Pracownia Architektury Glowacki ul. Kraszewskiego 12/9, 50-229 Wroclaw, Poland email: glowacki@paglowacki.pl
Letter of Recommendation for MSc. Architect engineer, Rasoul Daryanavard
I am writing in strong support of Mr. Daryanavard’s application for future career and studies. I have had the pleasure of knowing Mr. Daryanavard since March 2015, when he has started an Internship at my office. During this short period I have found him to be a talented, responsible young architect with technical skills and great overall knowledge of architecture. He actively participated in current architectural projects (construction and executive) and three international design contests in Warsaw: the educational pavilion on the Vistula River and the memory wall and the memory pavilion in The Warsaw Insurgents Cemetery and the new building of Polish Television. He has demonstrated great commitment and conscientiousness (while inventiveness) in the performance of tasks. It is worth noting that Mr. Daryanavard has a high technical knowledge in the field of construction solutions and at the same time high architectural and artistic sensitivity. He is completely fluent in current design software such as ArchiCad, AutoCAD, Photoshop, SketchUp, and equally good with manual skills of hand drawing. Mr. Daryanavard is a serene and, additionally, a friendly and very easy-going person capable of working by himself or in a group. I am absolutely convinced of high professional skill, talent and personal advantages of Mr.Rasoul Daryanavard therefore I am pleased to recommend him for the future studies. His decision to apply for the Advanced master studies “MAS ETH UD” is a great one as it gives him a chance to learn new concepts in Architecture and especially urban design which is to be his favorite major in Architecture, and I hope this studies further develops his skills. And of course wish him success in his future career either before or after his advanced master studies. Mr. Rasoul Daryanavard has flourished into a successful, outstanding young designer and I am confident that he will succeed in his endeavors. Last but not least, I fully support his job and studies application. Sincerely, Dr. Tomasz Głowacki