Rakospalata Sport Complex

Page 1

ARCHITECTURE PORTFOLIO

RASOUL DARY . Rakospalata Sport Complex Comprehensive Design Studio2ol2


CONTENTS COVER LETTER RESUME 3

2

DESIGN WORK RĂ KOSPALATA Sport Complex On this issue, you will find detailed plan and Descriptions about the mentioned project of mine.


OBJECTIVE

EDUCATION

Architects design and implement complex plans as a prerequisite for construction projects. Once a design is passed, an architect is responsible for overseeing that the construction work is done appropriately. That is what I found important in this field; if I can invent a good construction solution, I can defiantly build anything. I also believe buildings are built to serve people it should not be other way!

RASOUL DARYANAVARD Budapest University of Technology and Economics 1085 Berkocsis street 23 – Budapest – Hun. (temporary)

BME Budapest University of technology and Economics

(faculty of architectural engineering) Master of science Expected graduation date: July 2014 http://www.bme.hu/

Avicenna International College-Budapest HU http://www.avicenna.hu/ Tuba International High school-Shiraz IR

’08 – Present

’07 – ‘08

’04 – ‘07

SCHOOL EXPERIENCE

-Experiment different materials (both building & modeling) -Residential courses working on family house and multi-story building, -Getting on with public building design after learning the theory behind it -Then comes the urban design in small size as a park to oversize complex project. -It follows by two-tandem semester working on a building from all points of view (design, structural, building service Eng. and construction management).

WORK EXPERIENCE

Project Manager at Sepideh Daman Co. (Intern position) Daily inspect of the project (residential complex) Inductor between contractors and mother company General Manager at Mirmohana Shipping Co. (Family owned company) Port registration for the ships and Clearance Crew Visa applications and office works

January13 February13 2months June12 August12 3months

matching the shipment and destinations AREA OF INTEREST

Sustainable Architecture - Organic Design Construction Detailing - Landscape Design Mediterranean Architecture and design Construction Planning and Site Layout - solar energies and green buildings

PROFESSIONAL SKILLS

Adobe Photoshop-AutoCAD-Lumion-Artlantis Studio (Intermediate) ArchiCAD-SketchUp-Microsoft Office-Physical Modeling-Hand Drafting-Sketching (Advanced)

FREE TIME ACTIVITIES

Listening Music -Cooking -Painting -Playing Volleyball -Visiting Exhibitions and book shops Reading books and magazines – Travelling

REFERENCES

Schrammel Zoltan – Senior Architect SchM Studio –– Teacher at BME (Public Building Design Department) Email: z.schrammel@gmail.com Mobile: +3630 253 9113 Takas Lajos – Senior Architect Teacher at BME PHD (Building Constructions Department) Email: ltakacs@epsz.bme.hu

e : rasouldaryanavard@yahoo.com c : +36 70 977 1242



COMPREHENSIVE DESIGN STUDIO 1 & 2 Comprehensive design studio is the last design course Before the diploma project which completes in two Semesters, during the1st semester the building had to be Designed according to the chosen program and the Prepared urban concept. While making studies team -Work is preferred included a common built model of The whole area. The chosen function (pre-prepared by students, than fixed and issued by consultants) had to be developed up to a scale of 1:100 during the first semester. Second semester the same project is to continue more inclusive, and analyst the project from different point of view included building construction ,building materials and construction management.

BUDAPEST

Rákospalata Sport Complex RÁKOSPALATA-BUDAPEST DATE SPRING 2012 DURATION 12 WEEKS CONSULTANT GYULA GRÉDICS SITE

UNDERGROUND PARKING



Ralospalata Sport Complex: On the “downtown” of the district which it is bordered By the railway and some main streets (Illyés Gy. út, Régi Fóti út, Fő út). It has neither special character, Nor uniform urban tissue, but nearly all important Institutes are located here (town hall, Catholic Church , police station, stadium, post office, primary and Secondary schools, etc. In the center of the district are several urban planning Problems, that has to be solved. The new concepts should Be fitted several new buildings, first of all public facilities. One of these plots is the one in front of the football field, There is an empty land with almost 8000 sq., one side it’s Faced to“szocs aron” street and from the opposite side Building should be faced to the field. The main architectural task is to create a live context Between the building and it’s “townscape” environment. The usage serves the regeneration of the unity of body/mind /soul for each member of the society (young/old; single/ Families; healthy/disabled; men/women etc.)

GROUND FLOOR


FIRST FLOOR










RASOUL DARY. PORTFOLIO

@Rasoul DARY E: rasouldaryanavard@yahoo.com C: +3670 977 1242


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.