R PORTFOLIO 2015
RAWAN HASAN
Wasfi
URBAN & ARCHITECTURE PORTFOLIO 2016
0
Jordan University of Science & Technology City Planning & Design Department 00962-2-7201000 EXT.26746
1
Urban & Architecture Portfolio
Rawan Hasan 2
206-489-6043 10016 NE 120th LN, F 302, Kirkland, WA rawan.urp@gmail.com linkedin/rawan-wasfi-hasan-47996b3b
Rawan Hasan
RAWAN
3
4
CONTENTS
CONTENTS 5
• Software's Work Sample • Free Hand Work Sample
7
Urban Design 8
Jerash Industrial Tourism Park 9
10
Introduction Jerash industrial tourism park is a proposal for a development project aims to enhance the quality of life in Jerash city specially in the Unaibeh town. Taking the advantage of the Roman Acropolis historic city tourism activity near by, the project was able of putting the town Unaibeh on the tourism map using the industrial tourism approach.
Location The site locates 31.5km To the North of Amman, 36.2 km To the South of Irbid. It is located on a Land of 229,101.8 sq.m (22.9 hectares) of Jerash Governorate Lands, the site have 40 meters level difference, average 1010 m above see level.
The project aimed to raise the quality of life in Jerash through : • Creating a project that offers jobs for the community. • Using the town natural resources, and the community’s handmade crafts. • Creating a market for the production • Attract the tourism to the project and let them involve.
Proposed Program: 1-For industrial uses, 45-50%, 3 zones : • Food industry 20% • Garment industry 10% • Conventional crafts 15- 20% 2- Expo zone 15% 2-Circulations, routes, parking, landscaping 20%. 3- Facilities including: park, office buildings & utilities up to 10%. Center :The main Open space including : Facilities: water tank(landmark), landscaped areas, pedestrian routes, mosque, shops, worker’s center, restaurants, management office, banks Platform: continue of the Open area which ends with the valley view.
Zoning and Circulation Pedestrian Movement
A : Food Industries B : Conventional Industries C : Garment industry D : EXPOs Zone G: fuel station, security & civil center E : Purification Plant F: Research Center
The Tourism Tours Clear Pedestrian Paths that gives clear access to the park’s center and platform that gathered the whole activities.
Vehicular Movement
Vehicular Path As mentioned in site analysis chapter , the site has only one possible entrance, clear path for vehicle were designed so all blocks can be serviced.
Proposed Master Plan Final layout showing; masses, pedestrian and landscaping, circulation and parking details. Processes and concept development Through The proposed layout orientation was mainly according to : Sun, Wind & Topography Conditions and parcel areas
Proposed Land use Land Occupation Percentages: 1-For industrial zone and with Expo , 60-65% of the plot area is built on. 2-Circulations, routes, parking areas, landscaped, and loading & unloading are to occupy up to 20% of the plot area. 3- Facilities including: park, office buildings & utilities up to 10%.
Fuel station Entrance
Exit
17
19
Regeneration Of Irbid City Center 20
Introduction The project is part of urban design 1 studio, The project aims to study the city center of Irbid city & dedicate the main problems. & them making a regeneration & rehabilitation of the city center.
Locational Maps
Physical Analysis “CITY CENTER�
Church Irbid Municipality
Regeneration Of Irbid City Center
21
Physical Analysis “PROJECT SITE�
Pedestrian Distribution
The buildings that have historical value in the site date ago more than century.
Sky Line Analysis
Regeneration Of Irbid City Center
Parking Distribution
22
Urban Conditions
Land use
Building Age
Building Height
Building Quality
Regeneration Of Irbid City Center
23
Elevations
Solid & Void Regeneration Of Irbid City Center
24
Concept Respect the historic characteristic of the site of the city center, making it more livable, human scale & reviving the concept of the traditional arabic souq .
concept of the traditional arabic souq, group of buildings gathered around a courtyard or plaza.
Regeneration Of Irbid City Center
25
26
Concept “Affecting Factors”
Regeneration Of Irbid City Center
27
Interventions
Regeneration Of Irbid City Center
28
Proposed Site Plan
Regeneration Of Irbid City Center
29
Ground floor Plan
Regeneration Of Irbid City Center
30
3D SHOTS Regeneration Of Irbid City Center
31
3D SHOTS Regeneration Of Irbid City Center
32
33
Neighborhood Design 34
Requirements & Statistics
Neighborhood Design – Al-Sareeh
Zoning
35
Circulation
Neighborhood Design – Al-Sareeh
36
Multi Family houses
Center Zone Category C Houses (500m2)
Multi Family Parking's
Pedestrian pathways
Plaza & Amphitheatre
Primary School
Neighborhood Mosque
Shops
37
Proposed Layout
38
39
3D shots
40
Urban Planning 41
Prediction of Urban Growth of Al-Husn Town 42
Introduction This project is part of Urban Planning studio 2, It aims to understand the urban fabric of a town, to analyze the urban situation & spot light over the main problems that the urban region face. Study the urban spatial structure & the population growth, then predict the future growth & where this growth is turned to.
Master Plan Analysis
Land Use Compression of official & Actual condition
Fill & Infill
As a Result of the Analysis of fill & infill according to density : And by applying the Formula : Pt = P0 ( 1 + r)
Al-husn Town will be fill with (100 person/hectare) density in
Prediction of Al-Husn Urban Growth
2083.
43
Master Plan Analysis Road Hierarchy
Housing Categories
Analysis Via Income
Prediction of Al-Husn Urban Growth
44
Sample of Studies Houses Density
Population Pyramid Al Husn is the second largest population gathering in Irbid city ,just after the main city with a population of 24,698 in 2013.
Population Density
Household Distribution 22 person/hectare.
Prediction of Al-Husn Urban Growth
45
Demographic & Social Studies Houses Ownership
Ethics Study
Houses Vacancy
Houses Types
Non-Jordanian Distribution
Prediction of Al-Husn Urban Growth
Statistical Blocks used in the study
Education Distribution
46
Urban Spatial Structure
Linkage Theory
Analysis of Urban Spatial Structure integrates 3 theories in a single unit (finding lost space) by Roger Trancik: • • •
Radial Roads from the origin place of al-husn.
Figure Ground Theory Linkage Theory Place Theory
Main Streets (Irbid Amman) & (Petrol street) Center of al-husn (the origin CBD)
Place Theory The beginning of settlement in al-husn area started within the range of the three main nodes and landmarks
Figure Ground Theory Organic
Grid
Prediction of Al-Husn Urban Growth
47
Projection studies of 2033 After analyzing the current situation of Master plan, fill infill and Demographic studies, I calculated the population growth using the Formula:
Pt = P0 ( 1 + r) Pt : Population of target year. P0 : Population of base year. r : growth year. n : number of years (Pt-P0) Growth rate is 2.2 approved by the counting department ,population growth from 2013 till 2033 will be : P0(2013)= 24698 r= 2.2 n= 20 Pt(2033)= 38168
Prediction of Al-Husn Urban Growth
48
Urban Growth Studies
Urban Expansion of 2033 the future expectations about the urban expansion is a subjective issue depends on many factors, one of the best ways to predict it is using:
GAM : Goals Achieving Matrix “4 Factors� VETO Pixels
Services
Prediction of Al-Husn Urban Growth
Land Prices
Density
Congestions
49
Urban Expansion “GAM Results” • • • •
• • •
grid (200 *200 for each pixel) . name each pixel by a letter & a number . vote (veto) for the pixels with almost 100% fill area. select 4 factors that it would have the strongest impact on population expansion. Give each factor weight. Then score the pixels within the factor maps. Calculate the final scores by multiply scores by weights. Veto fill areas 75 – 100 already have high fill 50 – 75 Most likely to expand 25 – 50 expansion expected to be less 00 – 25 expansion is not expected
Prediction of Al-Husn Urban Growth
50
51
Urban Revival of Al- Sareeh Town 52
Introduction This project is part of Urban Planning studio 3, It aims to understand the urban fabric of a town, to analyze the urban situation & spot light over the main problems that the urban region face. Propose a concept for a revival of the town after the analysis work. After making SWOT Analysis to the existing Master Plan: 1- No clear road hierarchy . 2- open spaces concentered in new developments ,while old town suffer from the lack of greenery / open spaces . 3- Main commercial spine , depriving new developments from needed services .
1. Improving Road Network 2. Neighborhood centers 3. Population Intensification 4.
Revival of Al- Sareeh Town
53
1. Improving Road Network
The main concept is Reviving Al-Sareeh Town by developing road network & public transportation facilities : -Suggest new road network layout -Establishing bus station connecting Al-Sareeh with nearby towns. -Suggest micro buses service
Revival of Al- Sareeh Town
54
2. Neighborhood centers
By suggesting new road network layout, clear edges appears distinguishing main 5 areas, which we’re going to develop it as neighborhods : -Create neighborhood centers -Improve neighborhood services
Revival of Al- Sareeh Town
55
3. Population Intensification
Existing Housing Category
Proposed Housing Category
-By prohibiting expansion outer the boundaries of the planned area. -Down zoning some parts of the town to maximize population densities.
Revival of Al- Sareeh Town
56
4. Strengthen Al-Sareeh Economy By Improving agriculture, manufacture & investments through : by Improving agriculture, manufacture & investments through : -Encourage agricultural facilities for farmers -Prohibit urban expansion over agricultural lands by law & buffering the area .
-Encourage investments in agricultural sector . -Open a central agricultural market, for marketing products.
-Establish a factory for food production. -Open a center for agricultural awareness. -Wider the stream & use it in collecting water for irrigation uses -Openinig ‘central agricultural market’ for marketing agricultural products.
Revival of Al- Sareeh Town
The administrational area of Al-sareeh
57
Conceptual Layout Revival of Al- Sareeh Town
58
5. New Neighborhood suggestion After studying the population projection & where the urban growth is turned to, 3 possible locations for neighborhood were suggested:
After studying the 3 alternatives, scenario 2 was the most favorable one, most suitable shape, area, available infrastructure
Revival of Al- Sareeh Town
59
5. New Neighborhood suggestion
Revival of Al- Sareeh Town
60
Architecture 61
JUST Faculty Club 62
Introduction The project was part of architectural Design studio 2, we were asked to design a club for faculty members of JUST to be used by for them for meetings & as a cultural, sport Club to their families. The concept came from JUST The masses lines are taken from the location of JUST as it’s lighthouse that guides the other buildings.
JUST Faculty Club
63
JUST Faculty Club
64
3D SHOTS JUST Faculty Club
65
66
Project Drawings
Site Plan JUST Faculty Club
Grou 67
und Floor Plan JUST Faculty Club
First Floor Plan 68
Project Drawings
Section A - A
Section B - B JUST Faculty Club
69
Southern Elevation
Northern Elevation
East Elevation JUST Faculty Club
70
KFC Restaurant 71
KFC Restaurant
72
Introduction The project was part of architectural Design studio 2, we were asked to design a fast food restaurant that follow to a brand, that’s when I picked KFC.
The project won a competition held in JUST as one of the best 7 projects across architectural design 2 studio students. The concept came from a bridge suppose to link students of JUST with the restaurant. The bridge orient the mass in some degree & entered into it . The masses was so simple, the main concept was in the oriented mass, the circulation of vehicles & the drive through.
KFC Restaurant
73
Site Plan
KFC Restaurant
74
A
B
Ground Floor Plan
B
A
KFC Restaurant
75
A
B
First Floor Plan
B
A
KFC Restaurant
76
Elevations
Southern West Elevation
Northern East Elevation KFC Restaurant
77
Sections
Section A - A
Section B - B KFC Restaurant
78
Vacation House My first Design Project, in the first year, to design a vacation house for a tennis Player, small areas with simple functions, manual drawings & a simple form.
79
80
Project Drawings
Site Plan
Ground Floor Plan
Vacation House
Isometric 81
Project Drawings
Section B - B
Vacation House
Section A - A 82
Landscape 83
Irbid Community Park 84
85
Introduction The project was part of Landscape course in college, we were asked to design A Community Park on this site of Irbid City.
Park Master Plan Irbid Community Park
Park Zoning 86
please find the attached files
Sketches Irbid Community Park
87
Shots Irbid Community Park
Sections 88
Software’s Work Sample
89
Villa Project 3D Max 90
Introduction The project was part of computer aided design course in college, where we learned to use auto cad 2D & 3D then we learned to use 3Dmax for rendering.
Villa Project
91
The project was my first experience with software's, first
AutoCAD experience as well as 3Ds & Rendering.
Villa Project
92
93
3D shots
94
95
PHOTOSHOP Poster’s Design
96
Free Hand Work Sample
97
98
Free Hand
99
Free Hand
100
THANK YOU! 101