Western Visayas COVID-19 Regional Recovery Plan

Page 126

3. 100% of contractors, subcontractors, concessionaires comply with health protocol and safety measures imposed in the New Normal 4. Actual demand within the level of dependable capacity of 622.3MW for Panay and 190.5MW for Negros Occidental 5. 16 water bodies monitored 6. 1 groundwater assessment conducted in Negros Occidental Figure 31. Thematic Logic Model for Infrastructure and Transport

Reliable, affordable and adequate infrastructure and transport systems supportive of the New Normal activities

Ensure safe, secure, efficient transport support to passengers and cargoes

Provide stable and efficient internet and mobile services to adequately respond to the increased demand under the New Normal situation

Provide safe working environment in the implementation of public works including energy and water sector

Ensure the immediate and efficient resumption of port and airport operations upon the lifting of community quarantines. Ensure smooth interzonal and intrazonal movement of people and goods Establish crisis communication management system among exporters, importers, and the government to ensure seamless movement of cargoes. Redesign facilities in ports, airports and bus terminals to ensure physical distancing and observance of quarantine protocols Establish stricter protocols in airports, ports and bus terminals to include handling of persons suspected of having infectious diseases. Provide schedules of trips and timetables of public conveyances (buses and jeepneys) in strategic areas. Expedite components of the PUV Modernization Program on Regulatory Reform and Industry Consolidation. Need to review route plans and development traffic management plans.

Fast-track the implementation of programs for ICT-enabled government to ensure greater public reach and safer, protected and reliable ICT

Ensure the immediate resumption of programs and projects that will further improve the connectivity of the region to other areas of the country

Upgrade the existing internet connections of up to 100Mbps plan of the LGUs

Ensure the unhampered movement of materials and backliners/workforce in providing construction and response services

Implement online (integrated) systems for LGUs frontline services Support educational and entrepreneurial learnings through online training/webinars Provide special reduced internet rates for students and faculty to support the promotion of digital and alternative learning Strengthen infrastructure and regulation of online financial services

Expand passenger areas in ports, airports and bus terminals to comply with requirements for the New Normal distancing Observance of relevant executive orders, department orders, memorandum circulars and guidelines on the New Normal Implement austerity measures to lessen operational costs Revisit the project designs of infrastructure projects (school buildings, evacuation centers, hospitals) to respond to requirements of the New Normal Continuously monitor sufficiency of power and water supply to ensure uninterrupted supply in the region Ensure sustainability of water supply for domestic, agricultural and commercial and health purposes

Western Visayas COVID-19 Regional Recovery Plan  Thematic Strategies to Mitigate Losses  113


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Policy and Legislative Reforms

2min
pages 136-138

Policy and Legislative Reforms

1min
page 132

Strategies

12min
pages 127-131

Figure 31. Thematic Logic Model for Infrastructure and Transport

2min
page 126

Infrastructure and Transport

1min
page 124

Policy and Legislative Reforms

2min
page 123

Strategies for Social Protection and Housing Services

9min
pages 119-122

Figure 28. Thematic Logic Model for Industry and Services

2min
page 103

Strategies for Education and Training

9min
pages 115-118

Policy and Legislative Reforms

1min
page 109

Policy and Legislative Reforms

2min
page 96

Industry and Services

2min
page 82

Social

2min
page 79

Agriculture and Fishery

2min
page 81

Defining the New Normal

2min
page 77

Figure 25. Rehabilitation and Recovery Framework for COVID-19

1min
page 73

Poverty and Vulnerability Reduction

2min
page 70

Gender and Social Inclusivity

2min
pages 71-72

Governance

2min
page 63

Water Supply

2min
page 62

Public Works

2min
page 60

Land transport

2min
page 57

Figure 21. Airport Revenues Generated, in Million PhP and

2min
pages 55-56

Airports

2min
page 54

Table 7. Inbound and Outbound Passengers, March 2019 and March 2020

1min
page 53

Table 6. Inbound and Outbound Shipcalls, March 2019 and March 2020

2min
page 52

Figure 20. Port Revenues Generated, March 2019 and March 2020

1min
page 51

Figure 19. Number of Cooperatives and Beneficiaries Assisted by the CDA

1min
page 49

Financial Services

2min
page 41

Science and Technology

2min
page 40

Higher Education

4min
pages 43-44

Industry and Services

2min
page 32

Figure 9. Treatment Facilities per Province/HUC

4min
pages 28-29

Table 2. Impacts on Selected Health Indicators, First Quarter 2019 and First Quarter 2020

2min
page 26

Figure 3. Cumulative Confirmed Cases, Deaths and Recoveries of COVID-19 in Region VI

1min
page 19

Figure 8. Distribution of COVID-19 Quarantine Facilities in Western Visayas

1min
page 27

Figure 5. Status of COVID-19 Testing Laboratories in Region VI, June 2020

1min
page 21

Health

2min
page 25

Figure 10. Direct Losses from Unsold Agricultural Produce, By Region, in PhP

1min
page 31

Figure 2. Comparative Heat Map of COVID-19 in Region VI in May 8 and June 29

1min
page 18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.