Western Visayas COVID-19 Regional Recovery Plan

Page 60

Vulnerability of ICT field personnel to COVID-19. There were not enough PPEs (facemasks, face shields, gloves) and sanitation and hygienic materials for field workers. At work, worktables were spaced to ensure physical distancing.

Public Works At the early stage of the ECQ, there was moratorium in the implementation of road and bridge projects with about 24 percent of the total number of projects put on hold. With the easing of quarantine restrictions, implementation of some public works projects resumed. The following are the major projects completed as of March 2020: 

Concreting of 2-lane local road connecting the towns of Balasan and Carles in Iloilo. This will benefit travellers along Barangays Camambugan and Sulong in Balasan, especially farmers and fisherfolks in northern Iloilo;

Re-blocking and repair of 2.18-kilometer road along Binalbagan-Isabela Road in Negros Occidental, which connects agricultural areas to markets;

Construction of 2 flood control structures along Jalaur River for protection of residents of Barangays Tabucan, Barotac Nuevo and Poblacion, Passi City in Iloilo;

Construction of Bacolod City’s Regional Evacuation Center (REC) with maximum capacity of 30 families or 150 individuals. Eight (8) buildings were constructed with accommodation, office, infirmary, laundry and drying area, separate toilet and bath for male and female, pump room, generator room, and materials recovery facility. The REC has its own cistern tank and drainage system.

For areas covered by GCQ, the following essential public and private construction projects are allowed to be implemented despite the risks of COVID-19: sewerage projects, water services facilities projects, digital works, health facilities, priority projects and other similar construction projects related to basic human needs such as but not limited to food production, agriculture, shelter necessary to address housing backlog, energy and communication, among others. Border restrictions hindered movement of construction personnel and materials. Despite guidelines issued to ensure continuity of public works projects, border restrictions imposed by LGUs limit movement of construction personnel and materials. DPWH has instructed no suspension of public works contracts since DBM did not issue any directive to such effect. Guidelines were issued by DPWH for contractors, including manpower and equipment requirement, for continued implementation of infrastructure projects during ECQ. To facilitate ease of mobility of construction workers, the list of contractors, workers and vehicles were submitted by the DPWH to guide border patrols in clearing workers and vehicles at the borders. DPWH resources and personnel were utilized to support COVID-19 frontliners. On top of its regular functions, DPWH provided support to frontliners during the quarantine period. A total of 45 sanitation tents (handwashing and footbaths) for disinfection and sanitation were installed. Daily disinfection/decontamination were conducted for all convergence areas, Western Visayas COVID-19 Regional Recovery Plan  Assessment of the Effect of COVID-19 in Region VI  47


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Policy and Legislative Reforms

2min
pages 136-138

Policy and Legislative Reforms

1min
page 132

Strategies

12min
pages 127-131

Figure 31. Thematic Logic Model for Infrastructure and Transport

2min
page 126

Infrastructure and Transport

1min
page 124

Policy and Legislative Reforms

2min
page 123

Strategies for Social Protection and Housing Services

9min
pages 119-122

Figure 28. Thematic Logic Model for Industry and Services

2min
page 103

Strategies for Education and Training

9min
pages 115-118

Policy and Legislative Reforms

1min
page 109

Policy and Legislative Reforms

2min
page 96

Industry and Services

2min
page 82

Social

2min
page 79

Agriculture and Fishery

2min
page 81

Defining the New Normal

2min
page 77

Figure 25. Rehabilitation and Recovery Framework for COVID-19

1min
page 73

Poverty and Vulnerability Reduction

2min
page 70

Gender and Social Inclusivity

2min
pages 71-72

Governance

2min
page 63

Water Supply

2min
page 62

Public Works

2min
page 60

Land transport

2min
page 57

Figure 21. Airport Revenues Generated, in Million PhP and

2min
pages 55-56

Airports

2min
page 54

Table 7. Inbound and Outbound Passengers, March 2019 and March 2020

1min
page 53

Table 6. Inbound and Outbound Shipcalls, March 2019 and March 2020

2min
page 52

Figure 20. Port Revenues Generated, March 2019 and March 2020

1min
page 51

Figure 19. Number of Cooperatives and Beneficiaries Assisted by the CDA

1min
page 49

Financial Services

2min
page 41

Science and Technology

2min
page 40

Higher Education

4min
pages 43-44

Industry and Services

2min
page 32

Figure 9. Treatment Facilities per Province/HUC

4min
pages 28-29

Table 2. Impacts on Selected Health Indicators, First Quarter 2019 and First Quarter 2020

2min
page 26

Figure 3. Cumulative Confirmed Cases, Deaths and Recoveries of COVID-19 in Region VI

1min
page 19

Figure 8. Distribution of COVID-19 Quarantine Facilities in Western Visayas

1min
page 27

Figure 5. Status of COVID-19 Testing Laboratories in Region VI, June 2020

1min
page 21

Health

2min
page 25

Figure 10. Direct Losses from Unsold Agricultural Produce, By Region, in PhP

1min
page 31

Figure 2. Comparative Heat Map of COVID-19 in Region VI in May 8 and June 29

1min
page 18
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.