National Geographic Office Construction Document Set By Rea Laudat

Page 1

PROJECT SITE DATA PROJECT ADDRESS: 43 GRAHAM STREET SAN FRANCISCO, CA 94129 YEAR BUILT: 2016 EXPECTED COMPLETION: 2017 BUILDING AREA: 20,000 SQFT NEIGHBORHOOD: PRESIDIO HEIGHTS ZONING CLASSICATION: COMMERCIAL SCOPE OF PROJECT: NEW CONSTRUCTION COMPLETE INTERIOR DESIGN OF COMMERCIAL PUBLIC AND OFFICES

STORM WATER QUALITY NOTES THIS PROJECT SHALL COMPLY WITH ALL REQUIREMENTS OF THE STATE PERMIT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP OF ALL SILT AND MUD ON ADJACENT STREET(S) DUE TO CONSTRUCTION VEHICLES OR ANY OTHER CONSTRUCTION ACTIVITY AT THE END OF EACH WORK DAY OR AFTER A STORM EVENT THAT CAUSES A BREECH IN INSTALLED CONSTRUCTION BMP'S WHICH MAY COMPROMISE SOTMR WATER QUALITY WITHIN ANY STREET (S). A STABILIZED CONSTRUCTION EXIT MAY BE REQUIRED TO PREVENT COSNTRUCTION VEHICLES OR EQUIPEMTN FROM TRACKING MUD OR SILT ONTO THE STREET.

HEALTH DEPARTMENT NOTES 1. THE FOOD FACILITY IS DISTRIBUTED BY AND PERMITTED BY THE CITY OF SAN FRANCISCO. 2. ALCOHOLIC BEVERAGES WILL BE SERVED AT THIS FACILITY. 3. THIS FOOD FACILITY IS NOT FULL SERVICE. 4. ALL OPENABLE WINDOWS, VENT OPENINGS MUST BE PROVIDED W/TIGHT FITTING SCREENS OF MIN. 16 MESH TO THE INCH. 5. ALL PLUMBING, ELETRICAL & GAS LINES SHALL BE CONCEALED WITHIN THE BLDG. STRUCTURE, ALL LINES NOT CONCEALED TO BE SECURED 6" OFF FLOOR & 3/4 FROM WALLS USING OFFSET BRACKETS. 6. EACH HAND SINK IS TO HAVE A COMBINATION FAUCET CAPABLE OF SUPPLYING WARM WATER FOR MIN, OF 10 SECONDS - SINK IS TO BE SUPPLIED W/HOT & COLD RUNNING WATER UNDER PRESSURE AND MUST HAVE A WALL MOUNTED SINGLE SERVICE TOWEL AND SOAP DISPENSER. 7. PRIOR TO INSTALLATION, A SAMPLE OF CEILING TILE IS TO BE SUBMITTED TO ENVIRONMENTAL HEALTH FOR APPROVAL.

DESIGNER INFORMATION

VICINITY MAP

SITE MAP

www.autodesk.com/revit

ABBREVIATIONS ABOVE FLOOR FINISH ACRYLIC CABINET CARPET CEILING CERAMIC TILE CLEAR COAT CHECK COLUMN CONCRETE CONFERENCE CORRIDOR DEPTH ELEVATOR ROOM EQUAL FLOOR GLASS GYPSUM BOARD HEIGHT JANITOR METAL NATIONAL GEOGRAPHIC NOT TO SCALE OFFICE ON CENTER PAINT PANTRY & SUPPLIES RESTROOM SECURITY SENIOR EDITOR & SENIOR WEB EDITOR SQUARE FEET STAINLESS STEEL TELEPHONE/DATA THICK TYPICAL WALL COVERING WIDTH WOOD

SHEET INDEX AFF ACR CAB CPT CLG CT CLR CCH COL CC CONF COR D ER EQ FLR GLS GYP BD H JAN MTL NAT GEO NTS OFF OC PT P&S RSM SEC SE&SWE SF SS TD THK TYP WC W WD

A101 A102 A103 A104 A105 A106 A107 A108 A109 A110 A111 A112 A113 A114 A115 A116

-

COVER SHEET SITE PLAN EGRESS LEVEL 1 EGRESS LEVEL 2 FLOOR PLAN LEVEL 1 FLOOR PLAN LEVEL 2 FURNITURE FLOOR PLAN LEVEL 1 FIURNITURE FLOOR PLAN LEVEL 2 FINISH PLAN LEVEL 1 FINISH PLAN LEVEL 2 CEILING PLAN LEVEL 1 CEILING PLAN LEVEL 2 ADA ROOM/ FLOOR PLAN ENLARGE INTERIOR ELEVATION DETAILS ROOM FINISH SCHEDULE

No.

Description

NORTH ARROW

Room name 101 150 SF

ROOM NUMBER & SQUARE FT

NATIONAL GEOGRAPHIC 1

DETAIL

A116

OFFICE DESIGN

Name Elevation

LEVEL

COVER SHEET Project Number 1

SIM

WALL SECTION/ELEVATION

Project Number

Date

12/01/16

A101

INTERIOR ARCHITECT: REA LAUDAT EMAIL: laudat.rea@gmail.com PHONE NUMBER: +1 4152974288/+44 07950509167 CLIENT: NATIONAL GEOGRAPHIC

Date

SYMBOLS

Drawn By Symbols 1/4" = 1'-0"

R.L

Checked By

S.S & S.Z

A101 Scale

1/4" = 1'-0"

12/1/2016 5:43:56 PM

1. ALL WORK SHALL COMPLY WITH THE APPLICABLE CODES, AMENDMENTS, RULES, REGULATIONS ORDINANCES, LAWS, ORDERES APPROVAL, ETC THAT ARE REQUIRED BY PUBLIC AUTHORITIES. IN THE EVENT OF CONFLICT, WORK SHALL COMPLY WITH THE MOST STRIGENT REQUIREMENTS. REQUIREMENTS INCLUDE, BUT ARE NOT LIMITED TO, THE CURRENT APPLICABLE EDITIONS OR PUBLICATIONS OF THE FOLLOWING: A. INTERNATION BUILDING CODE, 2012 (CALIFORNIA BUILDING AMENDMENTS 2010) B. UNIFORM MECHANICAL CODE (U.M.C), 2012 C. NATIONAL ELECTRIC CODE (N.E.C.), 2011 D. UNIFORM PLUMBING CODE (U.P.C), 2009 E. INTERNATIONAL FIRE CODE (I.F.C), 2009 F. AMERICANS WITH DISABILITIES ACT (A.D.A) G. STATE AND LOCAL MUNICIPAL ORDINANCES AND AMENDMENTS TO THE CODES. 2. THE GENERAL CONTRACTOR (GC) SHALL REVIEW ALL DOCUMENTS AND VERIFY ALL DIMENSIOSN AND FIELD CONDITIONS AND SHALL CONFIRM WORK IS BUILDABLE AS SHOWN. ANY CONFLICTS OR OMISSIONS, ETC. SHALL BE IMMEDIATELY REPORTED TO ARCHITECT AND OWNER IN WRITING, FOR CLARIFICATION PRIOR TO THE PERFORMANCE OF ANY WORK IN QUESTION, THE GC SHALL BE RESPONSIBLE FOR CORRECTION OF ALL WORK, AS DIRECTED BY ARCHITECT, FOR WHICH THE ARCHITECT WAS NOT NOTIFIED IN ADVANCE. 3. ALL DIMENSIONS TO BE TAKEN FROM NUMERIC DESIGNATION ONLY. DIMENSIONS ARE NOT TO BE SCALED OFF OF DRAWINGS. 4. IN CASE OF CONFLICT BETWEEN ARCHITECT'S AND ENGINEER'S DRAWINGS IN LOCATION MATERIALS/EQUIPMENT, THE ARCHITET AND OWNER SHALL BE NOTIFIED IMMEDIATELY FOR CLARIFICATION. 5. WORK AREAS ARE TO REMAIN SECURE AND LOCKABLE DURING CONSTRUCTION. GC SHALL COORDINATE WITH OWNER TO ENSURE SECURITY. FINAL CLEANING INCLUDES, BUT IS NOT LIMITED TO, CLEANING OF ALL GLASS, GLOSSY SURFACES, FLOORS, DOORS, FRAMES, AND WALL BASE. 6. SUBSTITUTIONS, REVISIONS, OR CHANGES SHALL BE SUBMITTED TO ARCHITECT AND OWNER (IN CONFORMANCE WITH SPECIFIED PROCEDURES) PRIOR TO PURCHASE, FABRICATION, OR INSTALLATION. 7. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED PER MANUFACTURER'S INSTRUCTIONS. IN THE CASE OF DIFFERENCE BETWEEN THE MANUFACTURER;S AND THE CONTRACT DOCUMENTS, THE GC SHALL NOTIFY THE ARCHITECT AND OWNER BEFORE PROCEEDING. 8. GC IS TO ASSUME THE SOLE RESPONSIBILITY FOR JOB SITE CONDITIONS INCLUDING, SAFETY OF PERSONS AND PROPERTY DURING THE DURATION OF THE PROJECT. 9. GC SHALL HAVE FULL-TIME REPRESENTATIVES PRESENT IN THE BUILDING AT ALL TIMES WHILE CONSTRUCTION ACTIVITIES ARE UNDERWAY ON-SITE. 10. LEVEL 1 AND 2 HAVE AUTOMATIC FIRE SPRINKLERS.

43 GRAHAM STREET SAN FRANCISCO, CA 94129

GENERAL NOTES


A

B

C

Loading Dock

D

E

www.autodesk.com/revit

1

43 GRAHAM STREET SAN FRANCISCO, CA 94129

Exit

Storage RM 31 32 SF

Coffee shop 20 886 SF

Store 21 521 SF

FEC

2

ELEC PANEL

Male RSM 23 171 SF

TELECOM

ELEV

GFI

FEC

Exit UP

STAIR A

Female RSM 24 179 SF

Exhibit 19 2922 SF

No.

Description

Date

GFI

FEC

GFI

3 11' - 0"

Exit STAIR B

Lobby 18 1056 SF

UP

NATIONAL GEOGRAPHIC 3

FEC

OFFICE DESIGN EGRESS LEVEL 1

N

Project Number 88' - 7"

Distance between exits

Project Number

Date

12/01/16

Drawn By

R.L

Checked By

S.S & S.Z

95' - 11 1/2"

A102

Longest diagonal

EXIT AREA DISTRIBUTION

Scale

CIRCULATION PATH EGRESS LEGEND 3/16" = 1'-0"

1

1st EGRESS PLAN 3/16" = 1'-0"

3/16" = 1'-0"

12/1/2016 5:44:00 PM

4


A

B

D

E www.autodesk.com/revit

1

43 GRAHAM STREET SAN FRANCISCO, CA 94129

Private office 1 10 145 SF Open office 17 1316 SF

Studio 1 475 SF

Private office 2 9 135 SF

FEC

FEC

Female RM 15 47 SF ELEC PANEL

Copy & Print RM 13 72 SF

TELECOM

ELEV

FEC

FEC

Staff RM 12 541 SF

Exit

Andy_f

Reception 16 407 SF

2

Private office 3 8 143 SF

Private office 4 7 145 SF

No.

Andy_f

STAIR A DN

Description

Date

Janitor closet 11 54 SF

Male RM 14 64 SF

FEC

3

74' - 2"

Distance between exits

STAIR B

DN

Small meeting room 2 462 SF

Exit

Conference room 3 514 SF Private office 7 4 145 SF

Private office 6 5 142 SF

Private office 5 6 145 SF

NATIONAL GEOGRAPHIC OFFICE DESIGN 4

95' - 11 1/2"

Project Number

Date

Longest diagonal EXIT AREA

12/01/16

Drawn By

R.L

Checked By

S.S & S.Z

DISTRIBUTION

A103

CIRCULATION PATH EGRESS LEGEND 3/16" = 1'-0"

1

2nd EGRESS PLAN 3/16" = 1'-0"

Scale

3/16" = 1'-0"

12/1/2016 5:44:05 PM

N

EGRESS LEVEL 2 Project Number


A

B

C

D

E www.autodesk.com/revit

Loading dock

1' - 9"

19' - 11"

43 GRAHAM STREET SAN FRANCISCO, CA 94129

14' - 10 1/2"

7' - 5" 8' - 6 1/2"

A114

8' - 4"

Coffee shop 20 886 SF

17' - 11 1/2"

23' - 1"

1

7' - 10 1/2"

13' - 7 1/2"

Store North West Elevation 1-a

6' - 10 1/2"

1 5' - 5 1/2"

Store 21 521 SF

20' - 9 1/2"

8' - 3" 8' - 7"

5' - 5"

2

8' - 6 1/2"

OVERHEAD WOODEN SLATS

A116

3'

0' - 2"

9"

Male RSM 23 171 SF 6' - 10 1/2"

4' - 1 1/2"

8' - 9"

Janitors closet 28 47 SF

3' - 0" TC

8' - 9"

20' - 7"

6' - 10"

ELEV

4' - 0 1/2"

5' - 3 1/2"

EQ

12' - 8"

ø 5' - 0"

10' - 5"

A114

2

6' - 5"

7' - 8"

3' - 0"

- 10 1/2" Store 19' North East Elevation 24-a

3' - 0" 7' - 8"

8' - 11 1/2"

EQ

17' - 3 1/2"

3 6

BR North East 1 Elevation 9 - a

3' - 0"

A113 -

A113

2' - 6"

STAIR A A113

2 Female RSM A113 24 A113

3' - 8"

179 SF

4 BR South West Elevation 11 - a

1' - 8"

No.

9' - 1"

Lobby South 5' - 9 1/2" East Elevation 1-a

3

16' - 1 1/2"

6' - 10 1/2"

4' - 10"

1' - 9"

STAIR B

3

UP

22' - 8 1/2"

9' - 6 1/2" 3

3' - 0"

4 Lobby South 9' -West 3 1/2" Elevation 3- a

5' - 5"

13' - 7 1/2"

NATIONAL GEOGRAPHIC

9' - 1 1/2" 9' - 7 1/2"

5' - 7"

1' - 6"

1

4' - 3"

A114

6' - 4 1/2"

2' - 6 1/2"

1' - 9"

Date

11' - 0" 2' - 1 1/2"

8' - 5"

6' - 0"

Lobby 18 1056 SF

16' - 6 1/2"

6' - 7"

A114 1' - 7 1/2"

Description

5

5' - 5"

19' - 1 1/2"

11' - 6 1/2"

1' - 10 1/2"

Exhibit 19 2922 SF

3' - 0"

BR South East Elevation 12 - a

10' - 1"

3' - 0"

UP

7' - 5 1/2"

BR North West Elevation -a BR North 10 West Copy 1 10 - a Elevation

68' - 2"

ELEC PANEL

OFFICE DESIGN

A116

4

FLOOR PLAN LEVEL 1

19'Lobby - 2" Tunnel North East 5 Elevation 2 - a

N

OVER HEAD WOODEN SLATS A114

Project Number

Project Number

Date

12/01/16

Drawn By 99' - 8"

R.L

Checked By

S.S & S.Z

A104 Scale 1

1st FLOOR PLAN 3/16" = 1'-0"

3/16" = 1'-0"

12/1/2016 5:44:07 PM

1' - 11"

3 A116


www.autodesk.com/revit

B

C

D

E

43 GRAHAM STREET SAN FRANCISCO, CA 94129

15' - 9 1/2"

59' - 0 1/2"

Private office 1 10 145 SF

15' - 4"

7' - 7"

Open office 17 1316 SF 9' - 1 1/2"

7' - 10"

20' - 10"

22' - 4"

Studio 1 475 SF

10' - 1 1/2"

7' - 5"

1 24' - 5 1/2"

Private office 2 9 135 SF

4 6'

A116

-4 1/2 "

2' - 9"

1' - 10"

2' - 3 1/2"

Staff RM 12 541 SF

1' - 6" EQ EQ 6' - 4 1/2"

24' - 8 1/2" 12' - 10"

4' - 5 1/2"DN

Male RM 14 64 SF

4 Breakroom 7' - 3" South west Elevation 6 - a

7' - 3"

5' - 3 1/2"

8' - 2 1/2"

5' - 8"

7' - 2"

34' - 2"

9' - 9"

3 3' - 11"

NATIONAL GEOGRAPHIC

11' - 0 1/2"

Private office 7 4 145 SF

Private office 6 5 142 SF

Private office 5 6 145 SF

OFFICE DESIGN FLOOR PLAN LEVEL 2 Project Number

33' - 9"

Conference room 3 514 SF

2nd FLOOR PLAN 3/16" = 1'-0"

Janitor closet 11 54 SF

DN

Small meeting room 2 462 SF

25' - 4"

1

13' - 1"

15' - 9 1/2"

20' - 0 1/2"

21' - 1"

5' - 11

"

5' - 3"

14' - 5 1/2"

Date

11' - 8 1/2" 12' - 7 1/2" A 115

7' - 5 1/2"

24' - 0"

8' - 4 1/2"

Private office 4 7 145 SF

Corridor space 27 871 SF

Description

5' - 3"

9' - 8"

22' - 1"

No.

A 115

13' - 5 1/2"

Reception 16 407 SF

3

2

9' - 9"

6' - 2 1/2"

Telecom Room 25 24 SF

3' - 3" A 115

9' - 0 1/2"

8' - 9"

12' - 10"

Copy & Print RM 13 72 SF

Private office 3 8 143 SF

8' - 6"

25' - 11"

24' - 5"

11' - 9 1/2" A 115

8' - 9"

Reception North West Elevation 1 - a

Reception North East 1 Elevation 7 - a

2

2' - 9"

Female RM 15 47 SF

3' - 10"

10' - 2 1/2" Breakroom North West Elevation 5 - a

7' - 8"

Project Number

Date 9' - 9"

9' - 8 1/2"

9' - 9 1/2"

12/01/16

Drawn By

4

R.L

Checked By

S.S & S.Z

A105 Scale

3/16" = 1'-0"

12/1/2016 5:44:09 PM

A


OC

Ottoman chair

NB

Nelson Bench

Custom Bench w: 3'0 x L: 7'3

PR

Potrero415 table

LF

Less Than Five

www.autodesk.com/revit

A

B

C

D

E

43 GRAHAM STREET SAN FRANCISCO, CA 94129

CB

Loading dock

1 BC

PT

Bar chair

CT BC

PR

Potrero table

Coffee shop 20 886 SF

LF

EC

Store 21 521 SF

Esme chair

PT OVERHEAD WOODEN SLATS

CT

Cafe table

FEC

2 FURNITURE LEGEND 1/4" = 1'-0"

Janitors closet 28 47 SF

TELECOM

No. ELEV

Description

Date

Male RSM 23 171 SF

ELEC PANEL

FEC

UP

FEC

STAIR A

Exhibit 19 2922 SF

Female RSM 24 179 SF

OC

3 NB

NATIONAL GEOGRAPHIC STAIR B

CB

OFFICE DESIGN

UP

EC

Lobby 18 1056 SF

FURNITURE FLOOR PLAN Level 1 Project Number

Project Number

Date

12/01/16

Drawn By

R.L

Checked By

OVER HEAD WOODEN SLATS

1

1st FURNITURE FLOOR PLAN 3/16" = 1'-0"

N

4

S.S & S.Z

A106 Scale

As indicated

12/1/2016 5:44:11 PM

3

FEC


Madison Sofa

PR

MD

M

Mobility desk single

Stix - table

Esme chair CT

cafe table

SP

Swoop Plywood chair

ST

Square coffee table

AC

Andy Chair

LS

www.autodesk.com/revit

Last minute stool

FURNITURE LEGEND 2 1/4" = 1'-0"

A

B

C

D

43 GRAHAM STREET SAN FRANCISCO, CA 94129

Mobility desk pro twin

E

Private office 2 9 135 SF

EC

Private office 1 10 145 SF LC

EC

PT

MS

PT

1

PT

Open office 17 1316 SF MS

M ST

MD

LC

LS

EC

Studio 1 475 SF

FEC

Reception 16 407 SF

Area rug

ELEC PANEL

Telecom Room 25 24 SF

SP

2

EC

PT

Private office 3 8 143 SF

Copy & Print RM 13 72 SF

No.

Description

Date

PR FEC MS

ST

Private office 4 7 145 SF

LC AC

Corridor space 27 871 SF

Andy_f

ST

Staff RM 12 541 SF

EC

ELEV

FEC

LC

FEC

Female RM 15 47 SF

EC TELECOM

SP Andy_f

STAIR A

Janitor closet 11 54 SF

DN

MS

Male RM 14 64 SF

3

FEC

NATIONAL GEOGRAPHIC OFFICE DESIGN

STAIR B AC DN

Small meeting room 2 462 SF

ST

FURNITURE FLOOR PLAN LEVEL 2 Private office 7 4 145 SF

Private office 6 5 142 LC SF

Private office 5 6 145 SF

Project Number

LC

PT PT

PT

EC

PT

EC

LC

2nd FURNITURE FLOOR PLAN 1 3/16" = 1'-0"

12/01/16

Drawn By

R.L

PT

Checked By EC

S.S & S.Z

A107

4

N

Conference room 3 514 SF

EC

Project Number

Date

EC

Scale

As indicated

12/1/2016 5:44:29 PM

MT

Less than five chair

Potrero415 table ST

EC

LC

PT

PT

Potrero415 round table

Mobility desk Actiu

LC

MS


www.autodesk.com/revit

A

B

C

D

E

43 GRAHAM STREET SAN FRANCISCO, CA 94129

Loading dock 1

Coffee shop 20 886 SF

Store 21 521 SF

OVERHEAD WOODEN SLATS

2 No. Janitors closet 28 47 SF

Description

Date

Male RSM 23 171 SF

TELECOM

ELEV

GFI

ELEC PANEL

Exhibit 19 2922 SF

STAIR A

Female RSM 24 179 SF

GFI

UP

P1

Custom mural 1

P2

Custom mural 2

P3

Paint three (used through out U.O.N)

P4

Custom mural 3

P5

Custom mural 4

P6

GFI

P7

3

P1

11' - 0"

Custom mural 5 Custom mural 6

AURA INTERIOR PAINT LEGEND 1/4" = 1'-0"

NATIONAL GEOGRAPHIC

STAIR B

Lobby 18 1056 SF

Concrete, Concrete solutions

OFFICE DESIGN

Porsalin tile, Daltile

FINISH PLAN LEVEL 1 Project Number

3

Carpet 1, Bentley Mills Wonderlust Carpet 2, Bentley Mills Hyperspace

P2

OVER HEAD WOODEN SLATS

1

1st FINISHING PLAN 3/16" = 1'-0"

N

4

12/01/16

Drawn By

R.L

Checked By

Carpet 3, Bentley Mills Underground FLOOR COVERINGS 1/4" = 1'-0"

Project Number

Date

S.S & S.Z

A108 Scale

As indicated

12/1/2016 5:44:39 PM

UP


www.autodesk.com/revit

B

C

D

E

43 GRAHAM STREET SAN FRANCISCO, CA 94129

A

1 Private office 1 10 145 SF

P7

Open office 17 1316 SF

Studio 1 475 SF Carpet 2

Private office 2 9 135 SF

Concrete Concrete

Carpet 1

TELECOM

ELEC PANEL

Female RM 15 47 SF

ELEV

Tile 1

Telecom Room 25 24 SF

Reception 16 407 SF

No.

Staff RM 12 541 SF

Corridor space 27 871 SF

Private office 4 7 145 SF

STAIR A

Male RM 14 64 SF

Custom mural 1 Custom mural 2

P3

Paint three (used through out U.O.N)

P4

Custom mural 3

P5

Custom mural 4

P7

3

FEC P4

P1 P2

P6

Janitor closet 11 54 SF

DN

Custom mural 5

AURA INTERIOR PAINT LEGEND 1/4" = 1'-0"

NATIONAL GEOGRAPHIC

STAIR B

Concrete

OFFICE DESIGN

Concrete, Concrete solutions

DN

Small meeting room 2 462 SF

Date

Custom mural 6

Concr ete Carpet 3

Description

Carpet 1

Carpet 3

Private office 7 4 145 SF P6

Private office 6 5 142 SF

Private office 5 6 145 SF

FINISH PLAN LEVEL 2

Porsalin tile, Daltile

Project Number Carpet 1, Bentley Mills Wonderlust

P5

Project Number

Date

12/01/16

Drawn By Carpet 2, Bentley Mills Hyperspace

Conference room 3 514 SF

N

4

1

2nd FINISHING PLAN 3/16" = 1'-0"

S.S & S.Z

A109

Carpet 3, Bentley Mills Underground FLOOR COVERINGS 1/4" = 1'-0"

R.L

Checked By

Scale

As indicated

12/1/2016 5:44:50 PM

Area rug

2

Private office 3 8 143 SF

Copy & Print RM 13 72 SF


Track light

Recessed light www.autodesk.com/revit

Strip light wall wash Strip pendant light 48" Strip pendant light 96" Pendant light

6' - 0"

C

D

E

6' - 0"

Gyp Board ceiling

Gyp Board ceiling 4' - 5 1/2"

Exit light with standby battery

2' - 8 1/2"

1 6' - 11 1/2"

HVAC system return

6' - 9 1/2"

Storage RM 31 1' - 10 1/2" 32 SF

HVAC system supply

2' - 3"

Smoke detector

10' - 7"

20' - 11"

Coffee shop 20 886 SF

Emergency light

Store 21 521 SF

Lighting Legend 1 1/4" = 1'-0"

12' - 8"

4' - 4"

SD

6' - 0"

10' - 5" 4' - 11"

4' - 2" SD

SD

2 2' - 8"

Male RSM 23 171 SF

3' - 6 1/2"

Janitors closet 28 47 SF

2' - 1"

Female RSM 24 179 SF SD

0' - 0" 2' - 3"

8' - 0"

SD

No.

Description

Date

SD

6' - 0"

Exhibit 19 2922 SF

3' - 4"

Gyp Board ceiling

SD

7' - 3 1/2" 10' - 3"

7' - 8 1/2"

SD

3

1' - 0"

SD

1' - 9"

NATIONAL GEOGRAPHIC

Gyp Board ceiling 1' - 10"

Lobby 18 1056 SF

14' - 3 1/2"

5' - 6 1/2"

OFFICE DESIGN

SD

6' - 0"

SD

CEILING PLAN LEVEL 1 SD

6' - 0"

14' - 8"

Project Number

Project Number

Date

12/01/16

4' - 4"

Drawn By

1' - 7"

SD

4

6' - 0"

6' - 0"

Lights under counter top see detail 1

Wooden slats LED Strip floor lighting see detail 2

Scale ACT ceiling

1ST FLOOR 1 3/16" = 1'-0"

S.S & S.Z

A110

2' - 3" 6' - 0"

R.L

Checked By

As indicated

12/1/2016 5:44:56 PM

SD

B

2' - 10 1/2"

Sprinkler

43 GRAHAM STREET SAN FRANCISCO, CA 94129

A

Troffer light


Track light

Recessed light www.autodesk.com/revit Strip light wall wash Strip pendant light 48" Strip pendant light 96" Pendant light

B

C

D

E

43 GRAHAM STREET SAN FRANCISCO, CA 94129

A

Troffer light Sprinkler Smoke detector

2' - 3 1/2"

HVAC system supply 3' - 7"

1 Private office 1 10 145 SF

HVAC system return Exit light with standby battery Emergency light

Lighting Legend 1 1/4" = 1'-0"

SD

Open office 17 1316 SF

Studio 1 475 SF

Private office 2 9 135 SF

SD

2' SD

7' - 8"

3' - 6"

4' - 2"

"

6' - 0"

-3

SD

1'

1' - 7"

Female RM 15 Copy & Print RM 47 SF 13 1' - 4" 72 SF 3' - 2" 3' - 1" SD

GYP board dropped ceiling

2 SD

6' - 0"

3' - 0"

"

4' - 6 1/2"

-6

3' - 4 1/2"

5' - 10"

SD

No.

Private office 3 8 143 SF

Date

SD

3' - 1"

5' - 7"

Private office 4 7 145 SF 3' - 4 1/2"

7' - 6"

1' - 11 1/2" 8' - 0"

2' - 4"

SD

SD

5' - 11"

Corridor space 27 871 SF

3' - 11 1/2"

1' - 9 1/2"

3' - 7"

3' - 2 1/2"

1' - 1

6' - 0"

Male RM 14 64 SF

2' - 5"

Janitor closet 11 54 SF

4' - 8 1/2"

3' - 4 1/2"

3

NATIONAL GEOGRAPHIC

SD

OFFICE DESIGN

SD

CEILING PLAN LEVEL 2

2' - 5 1/2"

Small meeting room 2 462 SF

Conference room 3 514 SF

12' - 7"

5' - 0"

3' - 10 1/2"

Private office 7 4 145 SF

Private office 6 5 142 SF

8' - 0"

SD

ACT ceiling 2x2

Wooden slats

GYP board ceiling

12/01/16

Drawn By

R.L

Checked By

S.S & S.Z

A111

4

LED strip light above both seating

Project Number

Date

6' - 0" 3' - 8"

SD

Project Number

Private office 5 6 145 SF

Scale

As indicated

12/1/2016 5:45:00 PM

SD

4' - 7 1/2"

1' - 4 1/2"

SD

SD

1' - 6 1/2"

2' - 5"

1' - 7" 3' - 2"

SD

1/2"

1' - 5 1/2"

Staff RM 12 541 SF

15' - 8"

2' - 0"

1' - 8"

6' - 0"

2' - 2 1/2"

4' - 2"

7' - 5 1/2"

1' - 1"

3' - 9 1/2"

Telecom Room 25 24 SF

5' - 5 1/2"

SD

2ND FLOOR 1 3/16" = 1'-0"

Description

SD

Reception 16 407 SF

6' - 10 1/2"

SD


www.autodesk.com/revit Outlet floor duplex double GFI

GFI Power outlet Switch

43 GRAHAM STREET SAN FRANCISCO, CA 94129

Single power outlet Comunications data outlet Power Data Plan 1/4" = 1'-0"

A

B

C

D

E

1 Private office 1 10 145 SF Open office 17 1316 SF

Studio 1 475 SF

No.

Description

Date

2

3

Private office 2 9 135 SF 2

3 2

FEC

2

FEC

2

ELEV

Telecom Room 25 24 SF

Area rug

2

Private office 3 8 143 SF

Copy & Print RM 13 72 SF

2

FEC

Staff RM 12 541 SF

Andy_f

Reception 16 407 SF

Female RM 15 47 SF

ELEC PANEL TELECOM

3

GFI

3

FEC

NATIONAL GEOGRAPHIC OFFICE DESIGN

Private office 4 7 145 SF

Corridor space 27 871 SF

POWER DATA PLAN 2

DN

Male RM 14 64 SF

Project Number

Janitor closet 11 54 SF

3

FEC

Project Number

Date

12/01/16

Drawn By

R.L

Checked By

A112

STAIR B

Scale

1

2nd POWER DATA PLAN 3/16" = 1'-0"

S.S & S.Z

As indicated

12/1/2016 5:55:31 PM

Andy_f

STAIR A


3' - 4"

1' - 6"

6' - 10 1/2"

1' - 6"

RECESSED LIGHT

3' - 0"

COUNTER TOP

www.autodesk.com/revit

1' - 6"

10' - 0"

9' - 6"

10' - 7"

WOODEN SLAT

3' - 0"

3' - 0"

HANDRAIL

HANDRAIL

1ST FLOOR -0' - 0 1/2" BASE BOARD

ADA BATHROOM 2 1/2" = 1'-0"

TOILET

BR North West Elevation 10 - a 3 1/2" = 1'-0"

RECESSED LIGHT

0' - 1"

RECESSED LIGHT

43 GRAHAM STREET SAN FRANCISCO, CA 94129

3' - 0"

0' - 6"

2' - 4"

CONCRETE FLOORING

WOODEN SLAT

EXIT SIGN

No.

7' - 0"

8' - 6 1/2"

10' - 0"

9' - 6"

10' - 0"

DOOR

Description

Date

0' - 6"

3' - 0"

HANDRAIL

1ST FLOOR -0' - 0 1/2"

BR North West Elevation 10 - a Copy 1 6 1/2" = 1'-0"

BASE BOARD WOODEN SLAT

1ST FLOOR -0' - 0 1/2"

TOILET

BR South West Elevation 11 - a 4 1/2" = 1'-0"

BASE BOARD POWER OUTLET

RECESSED LIGHT

RECESSED LIGHT

PORCELAIN TILE

NATIONAL GEOGRAPHIC EXIT SIGN

EXIT SIGN

OFFICE DESIGN

BR North East Elevation 9 - a 1/2" = 1'-0"

BASE BOARD

TOILET

7' - 0 1/2"

1' - 4 1/2"

2' - 8"

BASE BOARD

SINK 5

R.L

Checked By 2' - 1"

4' - 2 1/2"

0' - 7 1/2"

12/01/16

Drawn By

1ST FLOOR -0' - 0 1/2"

COUNTER

Project Number

Date

BR South East Elevation 12 - a 1/2" = 1'-0"

S.S & S.Z

A113

POWER OUTLET

1ST FLOOR -0' - 0 1/2" Scale

1/2" = 1'-0"

12/1/2016 5:45:08 PM

TOILET 1

Project Number SINK FAUCET

3' - 1 1/2"

2' - 1"

2' - 4" 0' - 6"

3' - 0"

0' - 2"

FAUCET

ADA RM/ FL PN ENLARGE

POWER OUTLET

8' - 6 1/2"

DOOR MIRROR

3' - 2"

10' - 0"

SINK


B WD SLAT

STORE SIGN/ LOGO

0' - 8 1/2"0' - 2" 1' - 6 1/2"

1' - 2 1/2"

5' - 9"

NATIONAL GEOGRAPHIC

TRACK LIGHTING WINDOW STORE CUPBOARD, PAINT FINISH

WINDOW 10' - 3"

1' - 0"

8' - 4" 1' - 0" 2' - 0"

3' - 0"

BOOKCASE

1ST FLOOR -0' - 0 1/2"

43 GRAHAM STREET SAN FRANCISCO, CA 94129

1ST FLOOR -0' - 0 1/2"

3' - 0"

2' - 0"

0' - 2"

GLASS WINDOW Store North East Elevation 4 - a 1/4" = 1'-0"

1

TUNNEL TRIM

EXHIBITION

RECESSED LIGHT COLUMN

1ST FLOOR -0' - 0 1/2" BASEBOARD

Lobby South East Elevation 1 - a 1/4" = 1'-0"

4

Date

BACK REST

2' - 0"

0' - 4"

BASEBOARD

OTTOMAN

WOOD SEATING

Lobby South West Elevation 3 - a 1/4" = 1'-0"

NATIONAL GEOGRAPHIC 0' - 3"

0' - 2"

OFFICE DESIGN

WOOD SLAT

INTERIOR ELEVATIONS 11' - 0"

3

Description

2' - 0"

10' - 3"

3' - 3"

3' - 8"

3' - 10"

2' - 7"

6' - 1 1/2"

5' - 7 1/2"

5' - 1 1/2"

7' - 3 1/2"

6' - 7 1/2"

HAND PAINTING 1

8' - 3"

WINDOW

1ST FLOOR -0' - 0 1/2"

No.

WINDOW

COLUMN

3' - 0"

1' - 2"

2' - 0 1/2"

EXHIBIT SIGN

WORLD MAP

1' - 6"

PANEL LIGHTING

0' - 3 1/2"

PENDENT LIGHT CONCRETE FEATURE

Store North West Elevation 1 - a 1/4" = 1'-0"

2' - 0 1/2"

2

WOOD SLAT

Project Number

Project Number

Date

12/01/16

Drawn By

1ST FLOOR -0' - 0 1/2"

Lobby Tunnel North East Elevation 2 - a 1/4" = 1'-0"

S.S & S.Z

A114

19' - 2"

5

R.L

Checked By

Scale

1/4" = 1'-0"

12/1/2016 5:45:10 PM

4' - 4 1/2"

SHELVING COLOUMN

CHECK OUT/ COUNTER TOP CONCRETE WD SLAT

0' - 6 1/2"

8' - 8 1/2"

6' - 11 1/2"

4' - 6"

8' - 5"

11' - 0"

www.autodesk.com/revit DOOR


www.autodesk.com/revit

0' - 8"

6' - 11"

DROPPED CEILING RECESSED LIGHT

WOODEN SLAT

DROPPPED CEILING

DROPPPED BRACKET

43 GRAHAM STREET SAN FRANCISCO, CA 94129

COLUMN

1' - 6"

STRIP PENDANT LIGHT

8' - 3"

SOFA COFFEE CHAIR TABLE Reception North West Elevation 1 - a 2 1/4" = 1'-0"

Reception North East Elevation 7 - a 1/4" = 1'-0"

1

10' - 0"

11' - 0"

POWER OUTLET

COLUMN

2' - 7"

DESK

WINDOW

2' - 0"

LOGO AND SIGN

COLUMN 9' - 0 1/2"

2ND FLOOR 14' - 2"

1' - 2 1/2"

2' - 7"

3' - 10"

5' - 3 1/2"

LIGHT SWITCH

NATIONAL GEOGRAPHIC

POWER OUTLET

2ND FLOOR 14' - 2" DESK CHAIR

BASE BOARD

No.

6' - 9"

0' - 2"

Description

Date

6' - 5"

RECESSED LIGHT

0 Roof 27' - 1" IF YOU'RE WALKING DOWN THE RIGHT PATH AND YOU'RE WILLING TO KEEP WALKING, EVENTUALLY YOU'LL MAKE PROGRESS.

STENCIL PAINT FINISH

− BARACK OBAMA

RECESSED LIGHT

CUPBOARD

1' - 6"

EXIT SIGN POWER OUTLET

2ND FLOOR 14' - 2" CUPBOARD

HANDLE

BANCKET

BASEBOARD

COUNTER TOP Breakroom North West Elevation 5 - a 1/4" = 1'-0"

WD BOTH

BASEBOARD

2' - 11"

Breakroom South west Elevation 6 - a 1/4" = 1'-0"

OFFICE DESIGN

2ND FLOOR 14' - 2"

0' - 6" 24' - 8 1/2"

4

NATIONAL GEOGRAPHIC

TABLE CUSHION

STEEL SUPPORT BRACKET

INTERIOR ELEVATIONS - b Project Number

Project Number

Date

12/01/16

Drawn By

R.L

Checked By

S.S & S.Z

A 115 Scale

1/4" = 1'-0"

12/1/2016 5:46:24 PM

7' - 5 1/2"

PORCELAIN TILE

4' - 3"

1' - 4"

LIGHT SWITCH 3' - 0 1/2"

2' - 8 1/2"

6' - 0"

SINK FAUCET

3

PAINT FINISH

EXIT SIGN


DETAIL 1

DETAIL 2

DETAIL 3 2' - 4 1/2"

1' - 1"

0' - 6"

INSULATION

PORCELAIN COUNTER TOP

WALL STUD

0' - 7 1/2"

STAINLESS STEEL HANDEL

PINE HEART WD SLAT

FIRE SHEILD GYP BOARD

2' - 9 1/2"

0' - 3 1/2"

3' - 4 1/2"

SCREW WD STUD WD CABINET DOOR

LUCEPLAN SPOT LIGHT METAL PLATE

CONCRETE FLOOR

WD SHELF FIRE SHEILD GYP BOARD

1

Detail 1hr fire rated wall 3" = 1'-0"

43 GRAHAM STREET SAN FRANCISCO, CA 94129

WHITE PAINT

www.autodesk.com/revit

WOOD TUNEL TO FLOOR

1ST FLOOR -0' - 0 1/2"

A104

A104

3 N.T.S

0' - 3"

2

Detail Cabinet 1 1/2" = 1'-0"

A104

DETAIL 4 No.

Description

Date

CONTRETE FLOORING

METAL FLR TRANSITION

CARPET FLOORING FOAM MEMBRANE

NATIONAL GEOGRAPHIC PLYWOOD SUB FLOORING

OFFICE DESIGN DETAILS Project Number

Project Number

Date

12/01/16

Drawn By

R.L

Checked By FLOOR TRANSITION 4

A 116

A105

N.T.S

FLOOR TRANSITION MEETS ADA DOES NOT STICK OUT MORE THAN 1/2 AN INCHE

S.S & S.Z

Scale

As indicated

12/1/2016 5:46:28 PM

CONTRETE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.