Connections June

Page 1

NICEIC Live proves a hit with contractors // page 8

connections THE NICEIC MAGAZINE FOR APPROVED ELECTRICAL CONTRACTORS & DOMESTIC INSTALLERS £5.00 TWITTER: @OFFICIALNICEIC SUMMER 2011 | ISSUE 178

ADVICE P19 How to win more business by putting together the perfect tender

/

2021 VISION P34 Incisive research into how the electrical industry will look in a decade’s time

/

COMMERCIAL VEHICLES P42 Navigating your way through the options that can keep your business mobile

/

MAKE SOME NOISE Get noticed and get your firm to stand out from the crowd

MERSEY BEAT How A&B Engineering’s electrical division has thrived with the rebirth of Liverpool

// page 30

con_cover_summer_2011.1.vb.indd 1

14/6/11 12:46:08


D E S S I M

T S LA ?

S R E D OR u o y n a h Later t t? h g u o h t al u s u r u Have yo ers i l p p u s l a c i r t c e el ? e m i t d calle e v a h t ’ n You do ! t u o h t i to go w

U O Y N E H W

NIC.06.11.IFC.indd 1

T E R O M E TL T I L A D E NE

R E D R O R U PLACE YO 8.00PM Y B E N I L N R O E V I L E D L L ’ E W D N A , E T I S N O TO YOU Y A D T X E N ! E N I L N O US N I O J ! E IM

16/6/11 12:55:48


Summer 2011 | Issue 178

N

Contents First phase A leading vision

26

4

20

Plugged in News NICEIC Live rated huge success New TechTalk events planned

8 8

MPs support campaign New-look EEIBA embraces change

9 9

Government told to listen to contractors New shirt deal hits the target

11

Search is on for new apprentices NICEIC diary and promotions

13 13

ESC news Poor installation led to fatal fire Give your views on Part P

14 15

Product news Connector with a twist

34 Illustrations: Cameron Law

11

17

38

Live wire

42

Features

Advice 19 It’s crucial to master the tendering process, says Karen Douglas

Cover story: contractor profile 30 Liverpool’s A&B Engineering comes of age as the city flourishes

Opinion Hard-wired alarms will benefit contractors, says Gerald Jones

20

Having 2021 vision 34 NICEIC/ECA research on the future of the industry highlights the role of contractors in the sustainability agenda

Training NICEIC’s provision reviewed

21

Regions 22 Faced with continuing tough conditions, many electrical contractors in the West Midlands are having to diversify to survive Customer care Play by the NICEIC mark rules

24

Events The first NICEIC Live event at Epsom Downs was much more than a trade show

26

Current affairs Blast from the past

66

Fully charged Ask the experts 47 Some of the NICEIC technical helpline’s more frequently asked questions answered

Lost opportunity 38 Don’t miss out on the chance to work in security and alarm installation Wheels of fortune 42 How to make the right choice of commercial vehicle for your business NICEIC Live proves a hit with contractors // page 8

Technical Differences between extra-low voltage systems Hybrid ring/radial final circuits

connections

50

THE NICEIC MAGAZINE FOR APPROVED ELECTRICAL CONTRACTORS & DOMESTIC INSTALLERS £5.00 TWITTER: @OFFICIALNICEIC SUMMER 2011 | ISSUE 178

ADVICE P19 How to win more business by putting together the perfect tender

50

03_contents.5.vb.indd Sec1:3

2021 VISION P34 Incisive research into how the electrical industry will look in a decade’s time

/

/

COMMERCIAL VEHICLES P42 Navigating your way through the options that can keep your business mobile

MAKE SOME NOISE

52

Get noticed and get your firm to stand out from the crowd

The Electrical Installation Condition Report

54

RCD testing

60

Snags and solutions

62

»Cover photo: Richard Hanson

MERSEY BEAT How A&B Engineering’s electrical division has thrived with the rebirth of Liverpool

// page 30

con_cover_summer_2011.1.vb.indd 1

www.niceic.com

/

14/6/11 12:46:08

NICEIC Connections Summer 2011

3

16/6/11 08:30:10


Comment

N

EMMA McCARTHY

First phase A leading vision Research from NICEIC and the ECA charting the future of the industry over the next decade will provide a vital planning tool for contractors

I

t is in turbulent times such as these that leadership really counts. In the current economic crisis, many electrical contractors are understandably unable to plan past the short term, so a decade away seems like a very long time from now. The two leading organisations in the industry – NICEIC and the Electrical Contractors’ Association (ECA) – have decided to help. I believe we have both displayed the leadership required in such an environment and have jointly funded a comprehensive research document entitled 2021 Vision: The Future of the Electrical Contracting Industry. The document is free of charge and will be available on our respective websites towards the end of July. 2021 Vision identifies the likely scenarios that will shape our industry over the next 10 years. It highlights the character and structure of the wider construction industry, sustainability, the economic outlook, client and main contractor requirements, the range of work that is likely to be undertaken, the knowledge and skills

Emma McCarthy is chief executive officer, NICEIC

that may be required and key product development and installation trends. We hope it will provide a platform for all contractors to plan for the future and, although there are several threats, there are also opportunities that provide a great deal of hope. For more information see our feature on page 34. In order to meet the demands of the future, it’s vital contractors remain up to date with the latest trends and products in the marketplace so it was pleasing to see more than 500 attending the inaugural NICEIC Live event in May. The day was a great success and will hopefully be the first of many. For more information see our review on page 26. Finally, you will notice this issue of Connections features a new design. As well as keeping the magazine’s look and feel fresh, we hope this will make it easier for you to find your way around the magazine through clearly defined sections. Significantly, too, it places you – the contractor – at the heart of the magazine, as can be seen with our cover feature profiling Liverpool business A&B Engineering on page 30. We hope you like it.

CONTACTS // CONNECTIONS Redactive Publishing Ltd, 17 Britton Street, London EC1M 5TP EDITORIAL General 020 7880 6200 Fax 020 7324 2791 Email editor@niceicconnections.com

PRODUCTION Production manager Jane Easterman Deputy production executive Kieran Tobin

Editor Nick Martindale Technical editor Mike Clark Sub editor Victoria Burgher Art director Mark Parry Art editor Adrian Taylor Picture researcher Akin Falope Publishing and business development director Aaron Nicholls

General 020 7880 6240 Fax 020 7880 7691 Email kieran.tobin@redactive.co.uk

ADVERTISING AND MARKETING Sales manager Jim Folley Senior sales executive Mark Palmer Sales executive Darren Hale Display 020 7882 6206 Fax 020 7880 7553 Email advertising@ niceicconnections.com

SUBSCRIPTIONS Should you require your own copy of Connections or multiple copies for your staff, subscriptions are available by calling 020 8950 9117 CONTRIBUTIONS Connections welcomes ideas for contributions. Please email nick.martindale@ niceicconnections.com

© Redactive Publishing Ltd 2011 17 Britton Street, London EC1M 5TP. Registered No. 3156216. All rights reserved. This publication (and any part thereof) may not be reproduced, transmitted or stored in any print or electronic format (including but not limited to any online service, any database or any part of the internet) or in any other format in any media whatsoever, without the prior written permission of the publisher. Redactive Publishing Ltd accepts no liability for the accuracy of the contents or any opinions expressed herein. Printed by St Ives (Peterborough) Ltd. Paper by Denmaur Papers plc The paper mill that makes the text paper for this magazine states that it uses at least 80 per cent wood pulp from sustainable sources.

WWW.NICEIC.COM NICEIC ENQUIRIES External affairs director Richard Pagett 01582 539020 richard.pagett@ascertiva.com Communications officer Paul Collins 01582 539148 paul.s.collins@ascertiva.com NICEIC Direct Mike Jackson 01582 539709 mike.jackson@ascertiva.com Twitter @officialNICEIC Technical helpline 0870 013 0391 Customer services 0870 013 0382 Sales 0870 013 0458 Training 0870 013 0389

4

Summer 2011 NICEIC Connections

04_viewfromtop.4.vb.indd 4

www.niceic.com

14/6/11 16:39:33


Interieur Dewaide - © Liesbet Goetschalckx

Niko Home Control

Live it, love it 1LNR +RPH &RQWURO LV WKH À UVW HOHFWULFDO LQVWDOODWLRQ WKDW DOORZV IDPLOLHV WR DFWLYHO\ VDYH HQHUJ\ 7KH HFR GLVSOD\ VKRZV KRZ PXFK HQHUJ\ LV XVHG DW DQ\ JLYHQ WLPH DQG WKH LQVWDOODWLRQ FRPSRQHQWV UHTXLUH RQO\ WKH PLQLPXP DPRXQW RI HQHUJ\ +RPH RZQHUV RSHUDWH WKH LQVWDOODWLRQ FHQWUDOO\ DFWLYHO\ VDYH HQHUJ\ DQG OLYH VDIHU DQG PRUH FRPIRUWDEO\ :LWK 1LNR·V LQQRYDWLYH VROXWLRQV KRPH RZQHUV JHW DQ LQVWDOODWLRQ ZLWK PD[LPXP XVHU IULHQGOLQHVV DQG Á H[LELOLW\ 7RGD\ WKH HFRQRPLFDO XVH RI HQHUJ\ LV H[WUHPHO\ LPSRUWDQW IRU ERWK WKH SRFNHW DQG WKH HQYLURQPHQW DQG WKDW PDNHV WKLV LQVWDOODWLRQ TXLWH XQLTXH 7KH FRQWUROV IRU 1LNR +RPH &RQWURO DUH DYDLODEOH LQ HYHU\ 1LNR GHVLJQ $QG WKH 1LNR +RPH &RQWURO WRXFK VFUHHQ PDNHV DQ H[FHOOHQW DGGLWLRQ ,QWHUHVWHG" 2XU H[SHULHQFHG WHDP ZLOO EH KDSS\ WR SURYLGH WKH VXSSRUW \RX QHHG IRU WKH GHYHORSPHQW RI \RXU SURMHFW

1LNR 8. /WG %ODFN +RUVH %DUQV )DQFRWW 7RGGLQJWRQ %HGIRUVKLUH /8 +7 7HO )D[ LQIR#QLNRXN FRP www.nikouk.com

NIC.06.11.005.indd 5

3$

www.nikohomecontrol.co.uk

16/6/11 16:52:24


NIC.06.11.006-007.indd 6

16/6/11 16:53:16


NIC.06.11.006-007.indd 7

16/6/11 16:53:23


News/ESC news/Product news

N

Plugged in Need-to-know industry news for electrical installers New dates for regional TechTalks

NICEIC Live rated a huge success by all More than 500 electrical contractors packed out Epsom Downs racecourse in May for the inaugural NICEIC Live event. Visitors were able to attend a wide range of seminars to get up to speed with the latest technical information and new markets such as renewable energy, as well as hearing from leading names including motoring journalist Quentin Willson and ChocBox founder Peter Moule. The event was given a resounding thumbs-up from those who made the journey. “It is good to take time out and learn more,” said Simon Senior of Croydon-based Senior Electrical Services. “It’s an investment for the future. The workshops were very useful and I can take what I learned today straight into my job.” Alistair Martin from ASM Property Solutions in Middlesex said: “The industry needs these events. We need to know what is going on and to keep up

with the latest developments so we can pass this on to customers.” As well as the packed seminar programme, contractors were also able to see the latest products and services from a wide range of exhibitors. These included partner sponsors Philips and home automation specialist Niko, which was on hand to offer visitors a demonstration of its new Home Control system on its £1 million “Nikobus”. Stephen Calder, sales director of Niko UK, said: “We were delighted with the event – it was very well organised and a great success for us. We were thrilled to introduce our new Niko Home Control system to so many people from such a well targeted audience.” “This was something new for us and the industry as a whole,” said NICEIC’s certification director Alan Wells. “The response was just fantastic.” E See our full review of NICEIC Live on page 26

SPEIRS TAKES UP INTERNATIONAL POST Jim Speirs, chairman of the Ascertiva Group, which includes the NICEIC brand, has been appointed board director and chairman of the technical committee of the International Federation for the Safety of Electricity Users (FISUEL). The body is the worldwide organisation for electrical safety and works to harmonise installation standards at an international level. “I’m absolutely delighted to take on these roles for FISUEL,” he said. “The organisation is committed, as NICEIC is, to electrical safety and maintaining the very highest standards.“

8

Summer 2011 NICEIC Connections

08_11_news.4.vb.indd 8

NICEIC has announced a schedule for the next round of TechTalks, which kick off in October and run through to April 2012. Tony Cable, NICEIC’s senior marketing and events engineer, will be on hand at the events to discuss technical issues, supported by technical training developer Darren Staniforth. Contractors will also be able to speak to NICEIC staff about its products and services, and have the chance to purchase books and DVDs at discounted prices. “TechTalks are a fantastic way for registered contractors to get up-to-date information about a number of hot topics,” said Cable. “We have made sure we visit as many regions as possible and can guarantee that attending a TechTalk will be time very well spent.” The schedule starts with events in London (4 October) and Portsmouth (25 October) with further dates planned for Newmarket (1 November), Wigan (23 November) and York (24 November). Further TechTalks are planned for Cardiff on 6 December and Birmingham, Derry, Plymouth, Sunderland and Livingston early next year. Dates have still to be confirmed so keep an eye on www.niceic.com for more information.

APPRENTICE AWARD An apprentice from an NICEIC Approved Contractor in mid-Wales has won the title of Sparks electrical apprentice of the year 2011. Chris Randall, of Electrical Estimates in Aberystwyth, was presented with his award by NICEIC’s Tony Cable following a two-day event at Swindon College in May.

www.niceic.com

16/6/11 08:57:45


CALLING ALL TALENTED YOUNG WOMEN NICEIC is urging registered female contractors to apply for the title of IET young woman engineer of the year. The title is designed to recognise excellence within the engineering industry and the winning candidate will be a high achiever, a problem solver, a team player and a professional in every aspect of her work. The award is open to any female contractor under the age of 30 and the ceremony will take place on Thursday 1 December at IET London, Savoy Place. The closing date for applications is 29 July. Visit the IET’s website at www.theiet.org

ONLINE COURSE NOTCHES UP 1,000 CUSTOMERS An electrical contractor from Kent has become the 1,000th customer to sign up for NICEIC’s online 17th edition training course. Les Keetch, 61, of Power Distribute, received the 2392-10 blended course – which costs £495 – free of charge to recognise the landmark number. “I find e-learning a lot easier because it allows you to learn at your own pace and you can go back and check things if you are not too sure,” he said. The e-learning option has been developed in partnership with Virtual College. “This partnership is just one example of the work we are doing to make training easier and accessible for all contractors,” said Alan Wells, NICEIC certification director.

MPs show support for campaign The equalities minister Lynne Featherstone (below right) has become the latest high-profile MP to back NICEIC’s Jobs for the Girls campaign. “The government is committed to extending opportunity and that’s why I am really pleased to be able to support NICEIC in its efforts to attract more women into the electrical industry,” said Featherstone, Liberal Democrat MP for Hornsey Wood, who is also a former director of an electrical business. “Campaigns like Jobs for the Girls are vital for challenging outdated stereotypes and ensuring women know the career opportunities in this sector.” The initiative has been welcomed by MPs across the political spectrum,

with South Bedfordshire Conservative MP Andrew Selous (below left) lending support and Labour’s Chi Onwurah, MP for Newcastle Central, expressing an interest in the campaign. Emma McCarthy, NICEIC chief executive officer, said: “Our Jobs for the Girls initiative has really struck a chord with people inside and outside the industry. The support keeps on growing and it has become a real talking point with everyone I meet. We will continue to push the campaign and hope more women will come forward to even the balance in an industry currently short on skills.” www.niceic.com/contractor/jobs-for-the-girls

Book now for first amendment course NICEIC is staging a series of workshops to give contractors an early understanding of the upcoming first amendment to the 17th edition of the wiring regulations. The one-day workshops take place at various locations across the country and those who book now will receive a place on the course, a free DVD on safe isolation procedures and a copy of the IET Wiring Regulations 17th edition BS 7671:2008, incorporating amendment No1 2011, all for just £155. “The first amendment has significant consequences for everyone involved in the design, erection and verification of electrical wiring systems,” said Alan Wells, NICEIC certification director. “These workshops will give attendees everything they need to know so they can go about their work confidently and in the knowledge that it will comply with future regulations.” E To book your place visit www.niceicdirect.com

www.niceic.com

08_11_news.4.vb.indd 9

New-look EEIBA embraces 21st century challenges The electrical industry charity EEIBA has relaunched with a vision of becoming fit for the challenges of the 21st century. A presentation to mark the occasion took place in London in June and was attended by key industry figures and the trade press, with a keynote speech by Nick Hewer, star of BBC’s The Apprentice. The decision to relaunch the charity comes after extensive research into how it was perceived by the industry and in recognition of the importance of its work in the current climate.

“A number of changes have already been introduced, all aimed at delivering better levels of service for the industry in the 21st century,” said EEIBA president Ian Humphreys. “Improvements include outsourcing the finance function to reduce overheads by 50 per cent and reducing IT and admin expenditure to save 60 per cent.” As a result, the amount of funding available for beneficiaries has increased by 40 per cent over the past two years, he added.

NICEIC Connections Summer 2011

9

15/6/11 08:38:23


DISCOUNT

*

VOUCHER

HOLIDAY

Available with special promotional Brother P-touch labelling machines:

PT-7100VP £50 50 PT-7500VP £100 00 PT-7600VP £150 50 HOLIDAY DISCOUNT* UNT*

VOUCHER ER

Visit www.brother.co.uk/electrician

*T&Cs apply, see website. Offer valid until 30/09/12 Model availability varies by country. While stocks last.

NIC.06.11.010.indd 10

16/6/11 16:57:16


News/ESC news/Product news

N

Plugged in NICEIC has urged the government to listen to the views of contractors as it debates the future of Part P of the Building Regulations. Part P is currently under review by the Department for Communities and Local Government (DCLG) following the change of government last year. “NICEIC is lobbying for Part P to be amended sensibly, with focus particularly on maintaining confidence in the legislation and enforcing compliance by non-registered contractors,” said Emma McCarthy, chief executive officer of NICEIC. “Our great concern is that the electrical contracting industry will be left in 2013, as we believe was the case in 2005, with an imperfect regulation, with little enforcement support from local authorities and very little publicity from government,” she said. The message follows extensive research of NICEIC’s registered contractors, which revealed that 85 per cent were in favour of retaining and improving Part P and 90 per cent believed all installers carrying out electrical work under the Building

iStockphoto

Government told to listen to contractors

Regulations should be required to register as competent persons. “Registered contractors quite rightly want to see Part P amended for the better, and naturally have very little regard for DIY electrical work,” said McCarthy. “Electrical installation work should be left to the acknowledged experts. The industry’s voice must be heard, otherwise there is a danger the it will be left with a shell of a regulation and the householder not knowing where to turn for a safe job.”

NEWS BITES ACT NOW ON MCB RECALL Electrium is urging all contractors that have yet to carry out remedial work following its MCB recall notice last year to do so immediately. The affected MCBs (6A, 10A and 16A only) were supplied from April 2009 to February 2010 and affect a small number of devices sold under the Wylex, Crabtree and Volex brands. Electrium also manufactures devices for Newlec, Alto, Sector & Steeple brands and these are also included in the recall. The company has put in place a free-of-charge replacement service and is requesting contractors yet to act to call 0844 556 4787 as soon as possible. For details on products affected visit www.mcbexchange.co.uk/electrium

FOLLOW US ON TWITTER More than 500 followers are now tracking NICEIC on social networking site Twitter. For all the latest news, views and offers just sign up and follow @officialNICEIC

LOOK BEHIND THE SCENES Have you ever wondered what goes on at NICEIC’s headquarters in Dunstable? The NICEIC website now contains a short film outlining the work carried out by staff at Warwick House to keep more than 25,000 registered electricians happy. You can view the video by logging onto the website and clicking on the NICEIC TV section under contractors.

FREE POCKET GUIDES Inside this issue of Connections you will find Pocket Guide 24 – Smoke and heat alarms in new or materially altered dwellings: Grade D, Category LD2. A printable version of each pocket guide is available on the NICEIC website. Additional copies can be obtained by contacting customer services on 0870 013 0382 or at customerservice@niceic.com

New shirt deal hits the target NICEIC has renewed its sponsorship of Luton Town Football Club for the upcoming 2011-12 season. The home and away shirts will continue to carry NICEIC’s “Nice One” slogan, along with the website details. The sponsorship brings great exposure for the organisation and its message for consumers to only use registered electricians – Luton Town FC has an average of almost 6,000 fans at every home game; a 40ft NICEIC advertising hoarding is displayed at the Kenilworth Road ground; and it receives local newspaper coverage and television exposure on satellite channel Premier Sports. The Hatters also featured on Sky

www.niceic.com

08_11_news.4.vb.indd 11

GET SET FOR HOME CONTROL Sports several times last year as they made a good run in the FA Cup. “We are delighted to be renewing our sponsorship of Luton Town FC,” said NICEIC chief executive officer Emma McCarthy. “We have enjoyed a fantastic relationship over the past two seasons and our support ensures the NICEIC logo is seen by tens of thousands of would-be specifiers.”

Niko is offering contractors free training on how to install and programme its Home Control system, which was launched in the UK at the recent NICEIC Live show. The product will be available from August and contractors interested in taking part in a one-day training programme at Niko’s headquarters in Toddington, Bedfordshire, should email info@nikouk.com

NICEIC Connections Summer 2011

11

15/6/11 08:38:33


0 ve 20 Sa £ er ov

microgeneration certification scheme

Register with NICEIC MCS for Solar PV from only £400 + VAT Increase your business opportunities with MCS Registration from NICEIC For a limited period existing NICEIC customers who apply for MCS for solar PV will receive a discount of over £200*. Email our team of advisors today mcsspecial@niceic.com or call 0843 290 3449. NICEIC will complete both your MCS and Approved Contractor/Domestic Installer Scheme visits in one day where possible. Discount will be applied to applications received by 31st July 2011*. *Terms & conditions apply, email our advisors mcsspecial@niceic.com for further information.

mcsspecial@niceic.com 0843 290 3449

www.niceic.com

NICEIC – the route to MCS certification. Be part of it now!

NIC.06.11.012.indd 12

16/6/11 16:58:48


News/ESC news/Product news

N

Plugged in Search is on for new apprentices NICEIC is on the lookout for the next young crop of budding apprentices looking to make a way in the electrical contracting industry. The organisation set up the Apprentice Academy in partnership with Bedford College last year as part of its aim to assist more youngsters to become electricians and is now looking to recruit the second wave of applicants keen to benefit from the best training possible. “The academy was set up with the intention to plug the skills gap of the future and provide young electricians with the confidence and assurance to go into the industry with the best knowledge around,” said NICEIC chief executive officer Emma McCarthy. NICEIC is particularly keen to hear from young women who may be considering a career as an electrician, with recent research suggesting women aged 16-19 would be more interested in learning a trade than pursuing an academic career. “The programme includes six or seven additional modules compared with

NICEIC // DIARY JULY 6 UK Energy Exhibition Barbican, London 6-7 Renewables 2011 Bloomsbury Hotel, London 28-29 Electric Car Exhibition Kingston upon Thames

traditional courses, including training on solar photovoltaic installations, which will be vital to electricians over the next few years,” added Jeff Welch, course manager at Bedford College. Anyone wishing to apply must already be in full-time employment and able to attend Bedford College. NICEIC will help to cover the cost of the apprentice’s salary by subsidising their wage by up to £2,000 per academic year, with all other costs associated with the student’s learning covered by the partnership with Bedford College. E For more information about sending your apprentice on the course, along with details about subsidised funding, email darren.staniforth@niceic.com

SEPTEMBER 16-18 NICEIC Golf Classic Final Archerfields Links, Scotland OCTOBER 4 NICEIC TechTalk London* Upton Park, London 11-12 Energy Solutions London Olympia 11-12 Plug-In Electric Vehicle Infrastructure Europe Frankfurt, Germany 25 NICEIC TechTalk South* Fratton Park, Portsmouth * Dates subject to change

NICEIC // PROMOTIONS NICEIC is constantly working to raise public awareness of the need to use registered electricians and to promote its Domestic Installers and Approved Contractors. Recent campaigns include: Don’t play games with safety summer 2011 Editorial campaign urging homeowners to call in a professional if they are thinking about tackling risky DIY electrical jobs in their home /// DIY SOS summer 2011 A team of NICEIC Approved Contractors filmed for upcoming episode of this primetime BBC show /// Advertising campaign summer 2011 Adverts in Thomson local directories and consumer lifestyle magazines /// Blue Square Premier play-off final May 2011 As well as sponsoring the shirts of Luton Town, NICEIC also took out a one-page advert in the programme highlighting the need to always choose an NICEIC-registered electrician /// Twitter launch summer 2011 Launch of Twitter feed @OFFICIALNICEIC to spread the word about only using registered electricians /// Bank holiday dos and don’ts April 2011 Campaign warning homeowners using the bank holiday period to do some home improvements about the potential risks involved in carrying out any electrical work and the need to call in a professional /// Jobs for the Girls spring 2011 Campaign to encourage more female contractors into the industry, featured in national press and radio interviews /// IET Awards spring 2011 Sponsorship of Young Woman Engineer of the Year Award /// Apprentice Academy spring 2011 NICEIC’s new apprentice academy aims to address skills shortages in the industry /// Botched Jobs spring 2011 Research revealing families waste £100 million a year calling in professionals to put right failed DIY projects /// Linda Barker spring 2011 The home improvement expert appeared in the national press and at the Ideal Homes Show, stressing the need for consumers to call in a competent person from an accredited body such as NICEIC /// Wall of Shame winter 2010 Website dedicated to naming and shaming rogue contractors who misuse the NICEIC logo /// Caution This Christmas winter 2010 NICEIC-backed press campaign urging homeowners to be cautious when installing festive lights /// Buy with Confidence winter 2010 Campaign with Trading Standards to support and promote businesses that demonstrate high standards of trading and commitment to customer care /// Advertising campaign winter 2010 Adverts appeared in a range of home lifestyle magazines, reaching in excess of 1.3 million people /// Watchdog November 2010 Appearance by Tony Cable on BBC’s flagship consumer show warning against the dangers of employing rogue tradespeople /// Cowboy Trap October 2010 Appearance by Tony Cable on BBC show, commenting on a substandard electrical installation /// MOT your electrics autumn 2010 Campaign to encourage householders to bring in a professional to service their electrics.

www.niceic.com

13_news.3.vb.indd Sec1:13

NICEIC Connections Summer 2011

13

15/6/11 08:38:56


News/ESC news/Product news

N

Plugged in

PA

Condition reports to replace PIRs

Poor installation led to fatal care home fire An inquiry into an electrical fire at the Rosepark Care Home in Lanarkshire that claimed the lives of 14 elderly residents in January 2004 has found that poor electrical installation and maintenance were contributing factors. The inquiry determined that the fire was caused by an earth fault occurring as the result of abrasion at the point where a cable supplying two commercial washing machines passed through a knockout at the back of a metal-enclosed electrical distribution board, located in a cupboard in a corridor. It also made a series of observations around reasonable precautions that could have prevented the accident. These included the fitting of a grommet to protect the cable against abrasion or

damage over time, the installation of the cable in such a manner that the sheath was protecting the insulated conductors as they passed through the knockout, and the distribution board being inspected and tested in accordance with BS 7671 on a number of occasions. The ESC is working with the Fire and Rescue Service and the electrical supply industry to introduce a new label to warn householders and others not to store combustible materials near electrical equipment. The fatal accident inquiry – the longest in Scottish legal history – published its findings in April. In terms of the numbers of lives lost, it was the most significant fire in the UK since the King’s Cross fire in 1987. The fire also left four people injured.

THE ESC WANTS YOU Would you like to help shape the important campaigns and initiatives at the heart of the council’s work to raise awareness of electrical safety? The ESC is governed by a board of trustees and is on the lookout for potential new recruits. The board is responsible for setting the strategic goals of the charity, to ensure that it fulfils its consumer safety mission, adheres to principles of good governance and remains true to its values. The council is inviting those with a passion for electrical safety to register an interest in becoming a trustee, should a vacancy arise. E Interested parties should respond to the ESC’s company secretary Judith O’Connell at judith.oconnell@esc.org.uk

14

Summer 2011 NICEIC Connections

14_15_esc_news.3.vb.indd 14

Electrical installation condition reports (EICRs) are to replace periodic inspection reports (PIRs) in the forthcoming amendment to BS 7671 (17th edition). The move is designed to make it easier for householders to understand the system and to enable contractors to report more clearly and comprehensively on the condition of electrical installations. The new model forms, based on the ESC’s proposals, are being included in appendix 6 of BS 7671:2008 incorporating the first amendment. The new system includes three c classification codes f each recorded for o observation, as follows: • Code C1: Danger present, risk of injury, immediate remedial action required; • Code C2: Potentially dangerous, urgent remedial action required; • Code C3: Improvement recommended. The condition of an electrical installation must be reported to be “unsatisfactory” if any observation is classified as C1 or C2. There is no longer a separate code for “requires further investigation” – it will be possible to indicate separately against each observation if this is necessary. There is also no equivalent to the existing recommendation code 4, used when equipment does not comply with BS 7671:2008.

ESC WORKING WITH SCOTTISH CONTRACTORS The ESC has teamed up with the Scottish Electrical Charitable Training Trust (SECTT) to provide free lockout kits to electrical trainees north of the border. Lockout kits implement safe isolation practices when working on electrical installations, potentially saving lives. The ESC and SECTT are dedicated to supporting the electrical industry and believe that providing lockout kits to new electricians is a great way to promote good safety practices from the start of their careers. The kits are being distributed to 800 electrical students at colleges in Scotland.

www.niceic.com

15/6/11 08:39:52


The Electrical Safety Council: raising electrical safety awareness, made possible by funding from NICEIC Keeping you up to date with news from NICEIC’s parent charity

REGISTER NOW FOR OFFLINE ESC GUIDE The ESC’s The Essential Guide is now accessible online only, which means users need to be connected to the internet whenever using it. Last year, the council asked whether there was any interest in subscribing to an enhanced version of the online version of the guide that could also be used on mobile devices offline when internet access is not available. Only about 50 users registered such an interest, which meant it was not economically viable for the council to develop an offline version. However, now that the standard CD version is no longer available, the council is again reviewing users’ needs. To register your interest in subscribing to an enhanced, offline version of the guide, please go to www.esc.org.uk/ industry/essential-guide

Give your views on Part P The ESC is chairing a working group to develop an industry-wide contribution to the government’s review of Part P, ahead of the issuing of a consultation document by the Department for Communities and Local Government (DCLG) later this year. The group met in April, primarily to address the question of how Part P can be made more effective and reduce both costs and bureaucracy while maintaining a reasonable standard of safety. The group, which includes NICEIC alongside other Part P scheme operators and industry bodies, agreed an outline

response to the DCLG and a number of related actions. These included the need for scheme operators to pool information about the number of notifications taking place under each work category, and to look into gathering data on electrical work notified direct to Building Control. The group also agreed to invite members of Part P competent person self-certification schemes to give their views on the operation of Part P through an online survey. To take part in the survey, visit the industry section of the ESC’s website at www.esc.org.uk.

The council is updating its Best Practice Guide (BPG) 3 Connecting a microgeneration system to a domestic and similar electrical installation (in parallel with the mains supply) and BPG 4 P Periodic inspection reporting – recommendation codes for d domestic and similar electrical i installations in light of the imminent p publication of the first amendment t the 17th edition. to The revision of BPG 3 a also takes into account m microgeneration certification sscheme requirements relating t feed-in tariffs and updated to information on legal areas such as planning permission and building regulations, as well as energy-metering arrangements. BPG 4 is to be renamed Electrical installation condition reporting: classification codes for domestic and similar installations to reflect changes to the model forms being introduced in appendix 6 of the first amendment. A wide range of examples of the new classification code system are included. Both revised guides will soon be available to download free from the industry section at www.esc.org.uk.

www.niceic.com

14_15_esc_news.3.vb.indd 15

Photolibrary

ESC revises Best Practice Guides

‘Qualified’ status needs clarity A ruling made by the High Court of Justice in Northern Ireland over a contractual dispute concerning the meaning of the expression “qualified electrician” in contractual documents could have widespread implications for contractors. In finding for the defendant that a requirement in a contract that

an electrical operative should be “qualified” must involve some objective standard, the judge said that “in the absence of government intervention it falls to the industry to set a common standard that will secure recognition” for “qualified electricians”. The ESC has since proposed that the electrotechnical assessment specification (EAS) management committee takes the lead in developing and publishing such an objective standard that will secure recognition in future contractual arrangements.

NICEIC Connections Summer 2011

15

15/6/11 08:40:01


LIFE SUPPORT for energy efficient and sustainable homes Heart

Lungs

Highly efficient heat exchanger up to 9l% Easy to maintain filters

Top quality, highly efficient fan motor keeps things running smoothly

Brain

Electronics balance, monitor and control air flow levels perfectly

Airways

Arteries

Fully adjustable boost settings increase capacity when required

Full range of matched ducting for optimum performance Ports accept l00 or l25mm ducting with no adaptors

N

EW Tito Ventil n’s ‘Dome Traini ation Insta stic ng’ no ll w ava ation CALL ilable FOR D ETA

Wil ven l your sys tilat be f tem ion fun ully ctio Call nin ‘Ve our c g? ntil ons at ul

ILS

Tel: 01206 713800

ion t Hea ants fo r lth Che a ck’

www.titon.co.uk/hrv

NIC.06.11.016.indd 16

16/6/11 17:01:12


News/ESC news/Product news

N < An addition to MK’s Masterseal Plus range

Plugged in

TESTING ROUND-UP

MIDDLE GROUND FROM MK ELECTRIC MK Electric has added the Shield to its Masterseal Plus range, designed for installation in small-to-medium sized commercial premises. The product is designed for applications where a degree of ingress protection is required, but where this falls short of the high specification required by IP66-rated products. The device, which is rated to IP56, provides complete protection against contact, and MK Electric says it reduces dust ingress to such a degree that it would not interfere with the operation of equipment. Water projected in powerful jets will also not cause damage, it says. The sockets are available in grey, white or with a clear cover and have been designed for use in places such as small business units, workshops, restaurant kitchens and in domestic premises. www.mkelectric.co.uk

Seaward has released its Solar Installation PV100 product, which it claims is the first dedicated multi-function tester for use when installing solar panels. The handheld device carries out all electrical tests required by IEC 62446 on grid-connected PV systems and automatically obtains all required measurements with confirmation of whether these are within acceptable boundaries. www.seaward.co.uk Megger, meanwhile, has launched the PS1410 phase sequence indicator, allowing contractors to check the rotation of three-phase supplies to help prevent the costly damage that can arise from incorrect connection. The product can also reveal missing phases and is suitable for use on all parts of LV installations, even those close to the source of supply. The devices require no batteries, instead drawing power from the supply under test. www.megger.com The latest VT2 and VT3 non-contact voltage detectors from Martindale Electric have been designed to eliminate the risk of working on live circuits by checking for the presence of AC voltage at outlets, switches, electrical panels, wires and cables. Both can detect voltage between 200V and 1,000V, while the VT3 can also identify magnetic fields produced by sensors, relays, solenoids and transformers. www. martindale-electric.co.uk

Ideal Industries’ Twister PRO >

CONNECTOR WITH A TWIST The new Twister PRO from Ideal Industries is a reusable connector featuring an advanced spring mechanism that it claims makes for a fast, secure and easy connection that will not relax over time. The twist-on connector can be used on multiple wire combinations and on both stranded and solid wires, and features SureGrip technology to make it easier to hold. It is suitable for conductors between 0.52 to 8.0mm2. Ideal Industries claims it makes installation quicker and easier than traditional wiring connectors, saving contractors time and money. Twist-on connectors are common in the US, but have so far failed to catch on in the UK, despite the advantages over more conventional connectors. www.idealindustries.co.uk

< Carlo Gavazzi’s compact energy meter

EASY ENERGY MONITORING NEWEY’S TRUNKING JUST GOT NEWER Time-pressed contractors will be interested in the new range of cable trunking from electrical wholesaler Newey & Eyre. The retailer’s own-label brand now includes a faster-fitting lid as well as screwdriver-operated diecast turnbuckles for easier cover fixing. The return-edge trunking system is manufactured from pre-galvanised steel, which Newey & Eyre says makes for a stronger and more durable finish, and is available in 3m lengths. The trunking, which is also compatible with the previous Newlec system, comes complete with an extensive range of bends, intersections and accessories, including a variety of lid cover positions. www.neweysonline.co.uk < Cable trunking

www.niceic.com

17_product_news.3.vb.indd 17

Carlo Gavazzi has introduced a new version of its EM21-72 compact energy meter, which it says is the simplest way to introduce an energy-monitoring system into an older building or existing installation. The device’s self-power supply means it can be installed without having to modify or disconnect existing wiring, and it also features automatic phase detection with a wrong-phase-sequence warning facility. The monitor features a detachable display that can be mounted on a panel or a DIN rail without the need for further adaptors or external accessories. The EM21-72R is available in three ranges covering currents up to 250A and allows for active and reactive energy measurement. www.carlogavazzi.co.uk

NICEIC Connections Summer 2011

17

14/6/11 16:29:47


TWISTER®

Wire Connectors

Tough, durable thermoplastic shell

Wire Connectors with a Modern Twist Twister® wire connectors from IDEAL make reliable, safe connections. A unique square wire spring bites into the conductors on the first 360° turn ensuring a secure connection that will not relax over time. Fully compliant with EN 60998-1:2004, Twister® connectors meet UK & European safety standards and are suitable for use with a broad range of solid and stranded wire sizes. Rated up to 57 Amps and with IP 55 WeatherProof™ connectors also available, modern Twister® connectors are a fast, dependable, tool-free solution to your wire connection needs.

Live action, square wire spring ensures reliable connections

Compact, sweptwing design provides a high degree of torque

For more information or details on how to order please call 01925 444446 or email uksales@idealnwd.com

Deep threaded skirt accepts broad wire range

www.idealindustries.co.uk Innovation with a Purpose. NIC.06.11.008.indd 8

©2011 IDEAL INDUSTRIES, Unit 3, Europa Court, Europa Boulevard, Westbrook, Warrington, WA5 7TN, England

17/6/11 10:02:05


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

TENDERS

Live wire Successful tendering The tendering process is seen as a necessary evil for many electrical businesses, but mastering this can lead to lucrative contracts and long-term relationships, says Karen Douglas

T

he tendering process has become even more competitive over the past couple of years, so to be able to compete it’s essential that companies are organised, skilled and knowledgeable. Following some basic principles can help you to reap rewards.

Identify opportunities

Tendering is a mixture of successful business development, efficient sourcing and luck. Devote time to getting to know and understand your existing clients and their requirements, as well as building relationships with new and prospective clients, including their procurement team. It’s important to understand clients’ current contracting situations and what work is likely to be available and when. Being in the buyer’s mind when they are writing tender documentation could significantly increase your chance of success. If you are searching for public sector opportunities on a larger scale you will find all high-value opportunities advertised in OJEU (the Official Journal of the European Union). You can become more efficient in your sourcing by subscribing to a tender-tracker service. This will take the time to understand your business needs and will source the most relevant opportunities.

should state how the requirement will be met, and include the benefits and value of the solution. Ensure you understand how each question will be evaluated and how many marks are allocated because this will help you to identify which sections are deemed most important. Ensure you substantiate claims with facts and provide demonstrable evidence. Make sure you know what is important to the buyer. This is where relationship-building comes into its own. If there is a question about environmental credentials and sustainability and you know they have awards or standards for this ensure that you meet or exceed those in the answer.

Learn from experience Obtain feedback at the end of the process, whether you are successful or not. This will ensure you capture what worked and what didn’t for the future. There are also opportunities to be had by asking the buyer if there are likely to be other tenders in the near future. This can form the start of an excellent relationship or identify key learning needs for the team.

Be ready for action Organise a bid team who are knowledgeable about the business and the tendering process. Understand the requirements of the tender by thoroughly reading all of the necessary documents and then create a bid strategy. This should involve creating a project plan, including key milestones and delegated responsibilities. Included in this should be regular reviews, co-ordinated questioning and filtering of replies and the organisation of key shared documents so you are all working from the same template. Allow time towards the end for review and amendment and, if possible, include an external person in the review who can run a fresh eye over the tender. Finally, ensure there is time to collate, print and bind (if required) your tender and then courier it or submit it electronically. Remember to always follow instructions to the letter and never miss the deadline because nothing will be accepted after this time.

The right answers Answering the questions in a tender document takes some practice. To ensure top marks the answer must confirm or exceed compliance and

www.niceic.com

19_20_busadvice-opinion.6.vb.indd Sec2:19

Karen Douglas is head of learning and development at Tenders Direct

NICEIC Connections Summer 2011

19

14/6/11 16:20:22


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

ALARM INSTALLATION If you have an opinion about an issue concerning the electrical industry, let us know. Email editor@ niceic connections .com

Live wire Action stations Contractors stand to benefit from the growing trend towards hard-wired smoke and heat alarms, says Gerald Jones

H

ard-wired smoke and heat alarms are mandatory in new homes in the UK and should, of course, be fitted by professional electrical contractors. But current trends are increasing opportunities for installing more. Minimum requirements for smoke and heat alarms in the home are governed by Building Regulations based on the code of practice BS 5839-6: 2004. The code recommends category LD2 for new, and also many existing, dwellings. This means smoke or heat alarms in living rooms and a heat alarm in every kitchen, as well as smoke alarms in circulation areas. Although different regulations apply around the UK, there is a trend towards bringing them into line with the code. Until recently, in Scotland, only smoke alarms in circulation areas were required. But the latest guidance now requires more smoke alarms to effectively meet category LD2 as well. The same approach was adopted some time ago in Northern Ireland and the Republic of Ireland.

Gerald Jones is business manager, professional and fire brigade channels, at Kidde Fyrnetics

But in England and Wales, Part B still requires just smoke alarms in corridors, with heat alarms in kitchens only where not separated off by a door. In BS 5839-6 this constitutes category LD3 which, as the code of practice points out, “might not prevent the death or serious injury of occupants in the room where the fire originates”. Electrical contractors should be recommending more alarms, in line with LD2. Hard-wired alarms are a requirement of the Housing (Scotland) Act 2006 in rented housing, and the code also recommends category LD2 for many existing homes. Another opportunity is carbon monoxide alarms. The Northern Ireland Executive has announced these will become mandatory in all dwellings where a combustion appliance is to be installed or replaced, while Building Regulations in England and Wales also call for them, albeit only to fixed solid fuel heating appliances at this stage. There is a strong argument for electrical contractors to recommend hard-wired CO alarms in all homes.

IN FOCUS// COLIN TOKLEY If you are a small business or sole trader and would like to feature in In Focus, email editor@ niceicconnections.com »Colin Tokley is the owner of CP Tokley based in Colchester

Can you tell me a bit about your business? I started it in 1987 after working for a large electrical company. There’s myself and one full-time employee and we mainly work on defence contracts and school work. Recently there’s been more domestic just to keep things going. What kind of work do you take on? I don’t really go in for contracts because the qualifications to get those contracts are so onerous and expensive for a small company. I prefer to work directly with clients if

20

Summer 2011 NICEIC Connections

19_20_busadvice-opinion.6.vb.indd Sec2:20

possible. At the moment we’re doing a lot of pubs, installing fire alarm systems. Which areas do you cover? The best part of East Anglia, but by and large we tend to work around Colchester. What’s the hardest part of running a business? The bureaucracy. Every big company says they’re in favour of small firms getting contracts but the mechanics of it make you lose the will to live. What are your plans for the next few years? I’d like to convert it into a

limited company and grow the business. It probably won’t get much bigger, but provided I can sleep at night, put food on the table and have a social life I’m not too worried. I’m past the period of trying to get kudos and plaudits. What about outside work? I’m into Motown and soul music, photography, walks and architecture. I do yoga to keep supple – I’m 56 and I still have to go up in a loft or under floorboards. I don’t want to retire at 65 and play golf. I still like to see the lights come on when I’ve wired something up.

www.niceic.com

14/6/11 16:20:31


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

STANDARDS REVIEW

Live wire Raising the bar NICEIC has recently conducted a review of its training provision in the light of new national occupational standards and the growing demand for emerging technologies, says Darren Staniforth

N

ICEIC Training has reviewed its training material on a number of courses to ensure the information is in line with the newly created national occupational standards (NOS) set by the sector skills councils, SummitSkills and Construction Skills. This means that every course aligned with an NOS delivers a certain level of skill and/or knowledge. In terms of electrical work, SummitSkills compiles the requirements from working group meetings involving employers and education outlets from across the industry and confirms the NOS includes the correct requirements and skills. SummitSkills also produces standards for some of the new environmental technologies such as solar photovoltaic. Non-electrical environmental technologies such as solar thermal will fall under the remit of Construction Skills. Construction Skills will compile the standards that involve construction trades and environmental technologies that fall directly within the construction sector. With these new standards in mind, NICEIC Training has just completed a review of its own photovoltaic course. We carried out a gap analysis to understand how our own course stood up against others and on completion it was clear to see that it wasn’t too far away from what SummitSkills wanted from this particular course. Where gaps did exist, we have been able to fix and develop solutions easily. We have now launched an updated photovoltaic course, and straightaway are able to offer clients and students a course in line with the new standards. This means that someone completing a photovoltaic course direct with NICEIC Training will be delivered

Darren Staniforth is technical training developer at NICEIC

» Further information on NICEIC’s training courses can be found at www.niceic.com/ training, by emailing traininginfo@niceic.com or calling 0870 013 0389

material and assessed to the same standards as any other photovoltaic course offered by any of the other major awarding bodies such as City & Guilds or EAL. NICEIC Training will now be working hard to ensure that all of our courses align to those standards. It’s important NICEIC can offer courses that are recognised nationally so candidates choosing to complete their learning with NICEIC Training can be confident the material being delivered is to a level established by the industry’s sector skills council. This will allow the candidate to reach a nationally recognised level of skill, knowledge and achievement. The method of delivery is also something that NICEIC has reviewed recently. We understand the majority of individuals within the engineering sector learn better practically. Using this information, we are now ensuring our courses deploy a large amount of practical learning throughout their duration. The recent review of courses means NICEIC Training is now able to offer nationally recognised courses, using methods that meet candidates’ needs and provide a better platform to succeed. NICEIC Training is also working hard to help contractors overcome the barriers to learning, such as the costs involved in taking time off work and for travel. For instance, we have developed online courses that allow candidates to access their leaning at a time to suit them. One of the newly completed courses is our online course on the first amendment to the 17th edition of the wiring regulations. This will allow any individual the opportunity to complete a continuous professional development accredited course from the comfort of their own home or office with little or no effect on their working week.

‘Someone completing a photovoltaic course direct with NICEIC Training will be delivered material and assessed to the same standards as any other course offered by a major awarding body’ www.niceic.com

21_24_training-customercare.2.vb.indd Sec1:21

NICEIC Connections Summer 2011

21

14/6/11 16:21:42


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

WEST MIDLANDS

Live wire

Diversify and grow Conditions for electrical contractors in the West Midlands remain tough and many are moving into new areas to keep their business afloat By Adrian Holliday

T

he West Midlands is a highly diverse area, with a strong mix of industry twinned with a predominantly service-based economy, particularly in many rural areas. It is strong in both manufacturing and rubber – there’s Dunlop Tyres near Castle Bromwich, ATS Euromaster in Aston and Jaguar Land Rover in Solihull. But it also has a high concentration of public sector jobs, and around one in four people living in the rural West Midlands are thought to be exposed to the cuts that are hitting the public sector. Despite all this, the electrical contracting industry seems to be bearing up. But it involves a certain approach. Take Anthony Willis, operations director for Midland Technical Solutions based in Walsall. Midland had a turnover of £1.2 million last year and employs 14 engineers. His solution to survival is simple: specialise. “We really haven’t been affected by the recession that much,” he explains. “We’re a little bespoke. We’re mainly commercial and industrial and we work in a variety of areas; refurbishment, agri-business, food and banks. But we’ve taken a step into quite a specialist area – data installation – and have chosen the sectors we feel are the most profitable, with the least risk of not getting paid.” This means it’s easy for Midland to stand out more, as well as ensuring it works in a sector that is slightly less cut-throat. “There is still competition,” Willis says. “You’ve still

22

Summer 2011 NICEIC Connections

22_23_regionalfocus.8.vb.indd 22

got to show value every time. With every contract I’ve got people want a reduction in rates from last year. It’s still very aggressive, but the opportunities are there.” Ninety per cent of the work is private sector, he adds, so Midland is relatively unscathed by the government’s budget cuts. One area that is increasingly robust is health and safety. Companies simply can’t afford to not invest in this area, Willis says, because they know they’re going to be audited. “Insurance companies are driving much of the demand in traceability and ISO 14001 standards,” he says. “But a lot of the time it’s the clients attempting to be more efficient and competitive themselves. They’re going for more automation.” Cool work Specialisation has also paid off for Stewart Starkey, who runs Starkey Electrical in Halesowen, south-west Birmingham. He employs four people and last year turned over £175,000. His chosen field is LED lighting, and he’s busy – he’s only had three or four quiet weeks in the past two years.

‘You’ve still got to show value every time. With every contract I’ve got people who want a reduction in rates from last year’ www.niceic.com

14/6/11 16:22:44


>Anthony Willis, operations director for Midland Technical Solutions in Walsall

9.5 per cent: The level of unemployment in the West Midlands, equating to some 255,000 people

Economic outlook West Midlands Recovery is a word that is highly piecemeal in this part of the UK. The area will gain from the 21 new enterprise zones announced by the government in the recent Budget, which should bring tax incentives and more freedom from planning restrictions to help boost employment and investment levels. But it is a slog. Recent figures from the Office for National Statistics in May revealed that 9.5 per cent of people – some 255,000 – in the West Midlands are out of work, although they also showed this had fallen by 4,000 since April. There are other glimmers of hope, too. A brand new £100 million John Lewis store is planned in Birmingham, which will dominate much of the new shopping centre above the revised New Street station. That, at least, should bring some good news for contractors.

Not so long ago he was working at the Solihull Land Rover plant, building up his business in his spare time. But when his redundancy package came through, he was off. “Initially I was looking at domestic clients,” he says, but he steadily branched into the commercial sector, working for a range of clients including Morrisons and Tesco. Last year refrigeration and logistics company Oakland International was added to Starkey’s client list when he carried out a large LED-lit cold-room installation. “LED lighting is still expensive and often trial and error,” he says. Starkey was two days away from placing an £80,000 order from China when the trial lights he’d had for months began to blow. “If one went, they’d take a row out with them,” he recalls. Starkey doesn’t invest too much cash in marketing. Much of his business is word of mouth. He’s wary of sub-contracting work; he likes to handle the meet-and-greet himself. “If another company is doing that, you don’t get the credit,” he says. Meanwhile he remains relatively upbeat, although he’s well aware that business confidence remains fragile. Plug and play Certainly the domestic market remains fragile for Gurd Ubhi of Ubitec Electrical & Security in Birmingham. Much of his work is now commercial maintenance; he’s taken on two new apprentices and contracts are generally looking solid. He’s operated out of the Birmingham area for 20 years and, importantly, his own clients are doing nicely themselves. “If you don’t give your clients a reason to leave you then you should be alright,” he says. www.niceic.com

22_23_regionalfocus.8.vb.indd 23

Well, perhaps. But work can still dry up overnight if you hit a bad patch. And some bad patches can go on and on. Simon Jarvis is the contracts manager for J.A.Gaunt, based in Oldbury. The business has been trading for 40 years and is a well-established, medium-sized name in the area, with an annual turnover of £550,000 and 16 employees. But Jarvis has never experienced such a prolonged downturn. Trade standards have dropped, he says, and the firm seems to be turning out plastic plug-and-play installations with depressing regularity. In the past, says Jarvis, when quoting a job you would win on efficiency and existing relationships. “We recently lost a project worth £105,000 by just 1 per cent,” he says. “In the past you would be up against three to four other contractors. We are now finding they are getting quotes from 30-plus contractors.” Some jobs and quotes have been cut so close to the bone that contractors will go below cost to win, he says, then hope to build up the job once on site; a policy Jarvis steers well clear of. “Clients are aware that work is short and want more and more for the same cost, all-in,” he says. On the positive side, jobs from manufacturing and domestic are picking up, says Jarvis. But this medium-sized contractor remains vulnerable to new start-ups that aren’t VAT-registered, making them 20 per cent cheaper straight off. The message from the West Midlands, then, is that if you want to survive and flourish in a prolonged recession you need to specialise. And be lucky. » Adrian Holliday is a freelance business journalist NICEIC Connections Summer 2011

23

14/6/11 16:22:53


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

NICEIC MARKS

Live wire Play by the rules NICEIC registration is a valuable asset that is open to both deliberate abuse and unwitting breaches of the rules. Contractors should make sure they are aware of the most common pitfalls, says Philip Sanders

R

egistration with NICEIC indicates the level of professionalism within your business and provides confidence to customers and specifiers that work is performed by competent persons and complies with the relevant safety standards. A business can maximise the advantage that NICEIC registration brings through the use of both the NICEIC registration and certification marks. The registration mark can be used on items such as stationery, literature and notices, while the certification mark can also be used on items such as vehicles, signs and clothing. It is important, however, to remember that there are some conditions and restrictions on the use of these marks. This is to ensure that the meaning and value of the mark or logo is easily recognisable and understood by customers and specifiers alike. Further guidance on the correct use of the marks is provided in the document Making Your Mark, which is available to download from the NICEIC BRCS website. Because of the value that NICEIC registration holds, we are unfortunately seeing an increasing number of businesses falsely advertised as being registered with NICEIC. They are using the NICEIC mark or logo on their websites, vans and paperwork to mislead those hiring them into believing they are registered. This form of misuse is taken very seriously by NICEIC and known offenders are contacted and instructed to immediately cease the misuse. In addition, where offenders fail to respond, they are reported to Trading Standards and their details placed on the “wall of shame” on the NICEIC website. However, even registered contractors can sometimes become unwittingly involved in misuse or similar issues. For instance, this can happen through the incorrect use of NICEIC forms or marks, or through non-compliance with registration or enrolment rules, commonly with matters such as the sub-contracting of work. Although some of the rules surrounding these issues may initially appear to be unnecessary, the objective is always to protect the value associated with being an NICEIC contractor and to protect the business from unforeseen liabilities that may be presented at a later date.

24

Summer 2011 NICEIC Connections

21_24_training-customercare.2.vb.indd Sec2:24

‘NICEIC forms should only be issued for the type of work for which the business has been assessed and registered’ Philip Sanders is NICEIC’s customer relations engineer

» If nothing else, remember this: • Always ensure you are using the correct NICEIC logo in the right place; • Always keep NICEIC certificates and reports safe and secure; • Always ensure your customer is aware of any sub-letting of work; • Always ensure a sub-contractor is suitably certified for the type of work undertaken.

Misuse of NICEIC forms An unused pad of NICEIC certificates may not initially appear to be of great value. It is, however, vital to protect your registered business against unforeseen misuse by safeguarding forms from loss or theft. Any lockable cabinet or desk drawer will suffice, with the key being retained by the qualified supervisor. Unfortunately, fraudulent use of NICEIC forms does occur so remember to notify NICEIC in writing immediately if you discover any loss or theft. In addition, NICEIC forms such as installation certificates should only be issued for electrical work carried out by the issuing installer, from the registered trading address and with the registered trading title. Remember, NICEIC forms should only be issued for the type of work for which the business has been assessed and registered. This is particularly relevant to Domestic Installers and Approved Contractors with defined approval. If the work undertaken is outside of the scope of NICEIC registration, a non-NICEIC form will need to be issued. Sub-contracting work An NICEIC-registered contractor may wish to sub-let work for various reasons – where a sudden increase of workload is encountered, for example. However, there may be an increased exposure to certain risks with this type of arrangement, because work is not undertaken directly by your business. For example, the quality of the sub-contracted work may not meet the standard expected by your business or customer. To protect our contractors from any unnecessary exposure to this risk, there are specific NICEIC rules that cover such an arrangement. These are summarised below, but can be reviewed in their entirety in the rules for registration relating to enrolment, available to download from the NICEIC website. The person ordering the work must always be informed that sub-letting is to take place and the sub-contractor must hold a current certificate issued by a certification body accredited by UKAS to EN45011, covering the range of work to be undertaken. This includes domestic work, which must only be undertaken by a sub-contractor who is registered under the NICEIC Domestic Installer scheme or an equivalent approved Building Regulations electrical self-certification scheme. Finally, it is important to remember that full responsibility for the work always remains with the NICEIC-registered contractor and that it may be subject to an inspection during an assessment.

www.niceic.com

14/6/11 16:21:52


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

Live wire History lesson The first amendment to the 17th edition of the Wiring Regulations is just the latest in a series of updates since the first edition came out in 1882

T

here is a well worn joke within the electrical contracting industry that if you ask 100 qualified electricians to solve a problem you are likely to get 100 differing opinions. There is probably a good reason why so many trained professionals can come up with so many answers, but when it comes to ensuring safety, having conflicting opinions is just not an option. The electrical standards procedure was designed to take away the potential for choice and lay down a set of guidelines that all trained electricians must follow. Currently in the UK we use the standard BS 7671 Requirements for Electrical Installations as the base guideline for all electrical work and engineers look to comply with BS 7671:2008 (17th edition). July 1 sees the publication of the first amendment to the 17th edition and with it a set of new guidelines to follow, which will come into force from 1 January 2012. Incorporating new standards into their work is nothing new for electricians. The first-ever edition of the Electrical Regulations was issued in 1882, entitled Rules and Regulations for the Prevention of Fire Risks Arising from Electric Lighting, and contained only 21 regulations – six of which were on the dynamo machine. With thanks to the Institution of Engineering and Technology, we have been able to reproduce the original document here (above right). It was just four pages long and seems a bit lightweight when compared with the weighty 400-plus pages of today’s wiring regulations. Interestingly, however, regulation 17 states the importance of testing the wires used; something that is still emphasized today, but is perhaps better known as insulation resistance testing.

‘The first-ever edition of the Electrical Regulations was issued in 1882 and contained only 21 regulations – six of which were on the dynamo machine’

www.niceic.com

25_wiring regulations.5.at.indd Sec1:25

> The first set of electrical regulations, published in 1882

As the years progressed and technology evolved, the wiring regulations were regularly updated or amended. In 1966 the 14th edition was published and was reprinted seven times, before the 15th edition emerged some 15 years later. This was in turn reprinted five times – as was the 16th – and we now have the first amendment to the 17th. In all, there have been some 22 books in 45 years; each one with alterations and new regulations. For many electricians the constant changing and updating of the regulations can be confusing. For example, when the 15th edition was issued in 1981 a new term – “local supplementary bonding” – was introduced. In 1991 the 16th edition was issued and the requirement for supplementary bonding changed, mainly to special locations only. In 2008 the 17th edition was issued and, providing certain conditions were met, the requirement for supplementary bonding in a bathroom was no more. But in such a fast-moving industry, where new products and technologies are being launched every day, updating regulations has become vital to ensure best practice. Ultimately the regulations are in place to protect and enhance the safety of customers and to ensure professional electricians and electrical engineers stay on top of their game when it comes to implementing them.

BS 7671: First amendment Among the expected amendments to the 17th edition are: • The inclusion of a new electrical installation condition report, replacing the periodic inspection report • New sections in part 7 relating to medical locations and the operation or maintenance of gangways • A new section in chapter 53 that deals with the installation of surge protection devices • Modifications to chapter 44 in relation to voltage and electromagnetic disturbances • Changes to chapters 51 and 52 NICEIC is offering contractors a series of special one-day training workshops at various venues across the country that will cover all the expected changes. Those who book now can take advantage of a special early-bird deal that will include a place on the workshop, a free DVD (safe isolation procedures) and a copy of the IET Wiring Regulations 17th edition BS 7671:2008 incorporating amendment No 1 2011, all for the special price of £155. For more information and to book visit www.niceicdirect.com.

NICEIC Connections Summer 2011

25

14/6/11 16:23:44


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

NICEIC LIVE

Live wire

So much more than a trade show The first-ever NICEIC Live event allowed contractors to boost their technical knowledge, find out about new business opportunities and meet a wide range of suppliers

By Nick Martindale

I

t promised to be one of the must-attend events in the electrical industry calendar and the inaugural NICEIC Live certainly did not disappoint. More than 500 electrical contractors packed out Epsom Downs racecourse in May, with attendees hearing from high-profile speakers and keeping up to speed with the latest technical developments, as well as being able to meet a wide range of suppliers and try out the latest kit for themselves. NICEIC CEO Emma McCarthy opened the event and introduced motoring journalist and former Top Gear presenter Quentin Willson as the headline speaker. Willson spoke of his own experience of running an electric vehicle for a year and urged contractors to become part of this revolution by running their own electric vehicles and taking advantage of the new business opportunities involved with installing charging points in public places. “Electric vehicles are viable and usable and consumers will need to look for alternative transport because the price of fuel isn’t going to come down,” said Willson.

26

Summer 2011 NICEIC Connections

26_29_niceiclive.7.vb.indd 26

Currently vehicles are limited to a maximum of around 100 miles before they need charging, he said, but he predicted battery life would improve by around 10 per cent a year until vehicles were capable of running for the same distance as is possible on a tank of petrol today. Vans are particularly well suited to running on electricity because they can accommodate larger batteries, said Willson. “They are perfect if you have a small route of less than 100 miles a day,” he added. “If you don’t have to do those long motorway drives they’re ideal.”

‘It was amazing to see Epsom covered in a sea of vans. There was a real buzz about the place and the contractors displayed a real enthusiasm for more knowledge’ www.niceic.com

14/6/11 12:48:03


> Speakers, delegates and the ‘Nikobus’ at the first NICEIC Live event

Photography: Sam Kesteven

Partner sponsors

‘This was something new for us and the industry as a whole. It was great to see so many people from various sides of the industry come together for such a special day’

Of most interest to contractors, however, would be the business opportunities derived from the emergence of electric vehicles as viable options for consumers. “Experts say that 10 per cent of cars in the UK could be powered by electricity by 2020,” said Willson. “That’s going to create a huge opportunity for electricians with the demand for charging points in towns, rural areas and at home. “It is important to realise this is happening,” he said. “Start thinking about how you can get a piece of the action. People are going to need to charge these cars and it is going to have to be easy and convenient. That is where you come in.” Contractors could also use the cost-saving benefits of electric vehicles as a selling point for renewable installations, he suggested. “People could have charging stations at home powered by wind or solar energy,” he added. “There is a market there and the potential is huge.” www.niceic.com

26_29_niceiclive.7.vb.indd 27

NICEIC Connections Summer 2011

27

14/6/11 12:48:32


Advice/Opinion/Regions/Training/Customer care/Insight/Case study/Events

N

NICEIC LIVE

Photography: Sam Kesteven

Live wire

Other big-name speakers included ITV News economics editor Daisy McAndrew, who spoke about the UK’s economic recovery; Chocbox founder Peter Moule, who discussed how he built up his business with the help of the BBC’s Dragons’ Den; and former minister of trade Sir Richard Needham, who stressed the need for all businesses to constantly innovate. “Every bit of the business has to be creative,” said Needham. “You need to think about what your diamonds are and consider how you could do things differently.” On the technical side, contractors heard from NICEIC’s Steve Davies, who spoke about renewables; the Electrical Safety Council’s Gary Gundry on RCDs; and NICEIC’s Darren Staniforth, who discussed smart metering. Other notable speakers included Steve Calder, sales director at Niko, on home automation, and Robin Earl, business development manager at Dehn UK, who brought

‘Visitors could enjoy a bite to eat and a range of drinks on the £1 million Nikobus while learning about the new Niko Home Control system’ 28

Summer 2011 NICEIC Connections

26_29_niceiclive.7.vb.indd 28

contractors up to date on surge protection devices. Staniforth also combined with NICEIC’s Tony Cable to inform attendees about new amendments to BS 7671 and electrical installation condition reports, while Cable also hosted a session discussing the top 10 questions received by the technical helpline. Outside of the conference rooms, the exhibition was thriving as contractors met a range of potential suppliers, as well as enjoying a complimentary ice-cream. Exhibitors included Brother, Clik, Danlers, Dehn, Electrocorder, Fluke, Ideal Industries, Martindale Electric, Lenox Tools, Megger, Metrel, Milwaukee, Peugeot, partner sponsor Philips Lighting, Phoenix Contact, Sprue Safety Systems, SWA, Wago and Wylex. ElectricFix also supported the event as a partner sponsor. The star of the show, however, was the £1 million “Nikobus”, where visitors could enjoy a bite to eat and a range of drinks while learning about the new Niko Home Control system – an installer-friendly device that enables homeowners to control their energy consumption and cut bills by up to 15 per cent. Delegates were able to try out the system for themselves and witness how it can be installed into existing wiring setups as a result of its unique printed circuit board concept. The device, which was officially launched at the event and will be available from August, clearly made an impression on Willson. “What a great system; the concept is superb,” he said. “I’d love to have it in my house.”

www.niceic.com

14/6/11 12:49:52


> Speakers and delegates enjoyed the scenic setting of Epsom Downs racecourse for the NICEIC Live event

What the attendees thought “I went to a TechTalk last year and this has even more information. The talk on PIRs was very interesting. The industry needs these events. We need to know what is going on and the latest developments so we can pass these on to the customer.” Alistair Martin, ASM Property Solutions, Middlesex “It was good to see Quentin Willson showing his support. I enjoyed seeing the latest technology and tools on the market because at work you just carry on using what you are used to and you can become a bit blinkered. I will definitely be buying some of the products I was shown today.” Mark Herbert, Belmont Group, Herne Bay, Kent

The day was rounded off by NICEIC’s certification director Alan Wells, who presented a series of awards and prizes to various competition winners, including iPads donated by partner sponsor Niko. “This was something new for us and the industry as a whole,” said Wells. “The response was just fantastic. It was great to see so many people from various sides of the industry coming together for such a special day. “There was something for everyone to enjoy or learn from, and we hope it is the first of many such days to come.” “It was amazing to see Epsom covered in a sea of vans,” added Willson. “There was a real buzz about the place and the contractors displayed a real enthusiasm for more knowledge.” » See our feature on commercial vehicles on page 42 » Nick Martindale is editor of Connections

‘I enjoyed seeing the latest tools because at work you just carry on with what you’re used to. I’ll definitely be buying some of the products I was shown today’ www.niceic.com

26_29_niceiclive.7.vb.indd 29

“A great, fun and lively event. The space is perfect and the venue was stunning. Not just a trade show, but an education.” Rob Alger, Brother “The talk on periodic inspections was excellent and something I needed to know more about. The industry needs these sorts of events and it is helpful to have all the suppliers and sellers in one place.” Paul Whitter, Mountjoys, Isle of Wight “There was a good atmosphere around the stands and the variety of talks gave it a different edge to other events. We came to learn more about the technical side and today has definitely answered a few questions.” Kraig Parish, Electrotest Services, Cannock “It has been great. It is good to take time out and learn a bit more. It’s an investment for the future. The workshops were very useful and I can take what I learned today straight into my job. It was good ‘hands-on’ material.” Simon Senior, Senior Electrical Services, Croydon

NICEIC Connections Summer 2011

29

14/6/11 15:15:47


CONTRACTOR PROFILE // A&B ENGINEERING COMPANY: A&B Engineering BASED: Old Swan, Liverpool FOUNDED: 1974 MAJOR PROJECTS: One Park West, Beetham Tower and West Tower Building STAFF NUMBERS: 120 TURNOVER: £11 million in 2010

Coming of age The electrical services division of Liverpool-based A&B Engineering has enjoyed a period of rapid growth as the city itself has flourished By Nick Martindale

L

iverpool is a city on the up. As with many parts of the UK, it has been hit by the recession, but this has been sandwiched between huge regeneration projects in the wake of winning the title of European capital of culture for 2008, and massively ambitious plans to redevelop the waterfronts on both sides of the River Mersey. Its emergence as one of the UK’s fastest growing cities has been mirrored by – and has in no small part contributed to – the growth of the electrical services division of A&B Engineering. “We’re the biggest privately owned electrical company in Liverpool; there are no national companies here,” says Ian Cooper, the company’s estimating director. “A few years ago, when Liverpool won the capital of culture, some larger competitors did open offices in the city, but they have all gone now.” In recent years, the company has worked on a vast range of projects, including most of the flagship buildings that now dominate the city’s skyline. The biggest of these was the One Park West residential apartments, which form the centrepiece of the Liverpool One redevelopment, where the electrical side alone was worth some £4.5 million. Others include the Beetham Tower, West Tower Building and the spectacular lighting on the outside of the University of Liverpool.

30

Summer 2011 NICEIC Connections

30_32_contractor_profile.2.vb.indd 30

Norman Kennedy

Much of the company’s success has come on the back of relationships with the mechanical services sector and several main contractors, says managing director Andy Stanley. “We have been very lucky to have been given the opportunity by Carillion, more than anyone, to have worked on many prestigious projects,” he says. “That gave us the pedigree to move forward and also work with the likes of Laing O’Rourke, Bam Construction, Mansell and Morgan Sindall. Around 95 per cent of our work is through main contractors and we probably get 80 per cent through seven or eight main companies,” says Andy. Other notable projects the business has worked on over the past decade include big-name hotels such as the Radisson Blu in Manchester and what is now the Marriott in Liverpool’s city centre, a range of retail and commercial work at the Albert Dock, the Roy Castle Cancer Research Centre, Alder Hey Children’s Hospital and Clatterbridge Centre for Onocology. It has also worked at a wide range of football stadia and training complexes across the north-west, including Liverpool and Everton football clubs, and on both Liverpool’s John Lennon Airport and Manchester Airport. “The largest job we did at Manchester Airport was the new outward bound control where we relocated the existing

‘It was a massive risk. We all had young families – I was 28 – and we all put our houses on the line’ www.niceic.com

14/6/11 12:51:37


» If you would like your company to be considered for a profile in Connections, please email editor@ niceicconnections.com

Andy Stanley

£4.5 million: The value of the electrical contract for Liverpool’s One Park West residential development passport control area and turned that space into more airside retail,” recalls Andy. “It was a live airport throughout the whole construction period and we had to install new lifts and escalators in the check-in area and build a new passport control and baggage-scanning area on the first floor. It was a tough job with tight timescales and a contract value of £2 million.” A work in progress The idea of taking on such projects was little more than a pipe dream when Ian and Andy joined in 1992 and 1996 respectively. In those days the company focused mainly on small-scale school and college work, with a bit of domestic thrown in as well. “It was anything they could get their hands on,” says Ian. “In 1995 we were turning over about £4 million and over the past three years it’s been anywhere between £11 million and £13 million. That’s how much the business has grown.” The company was set up in 1974 to provide an electrical service to a plumbing and heating business founded by Frank Alefounder and Arthur Bagott (the A&B) that was originally started in the early 1960s. “It was initially headed up by Jim Winthorpe, who was taken on to carry out any mechanical wiring required, such as for boiler houses, and that’s how it all www.niceic.com

30_32_contractor_profile.2.vb.indd 31

Paul Kennils

Photography: Richard Hanson

Ian Cooper

started,” says Andy. “The mechanical business as it is today was then incorporated in 1978.” The plumbing and heating business has long since faded away, but both the electrical and mechanical divisions of A&B Engineering still occupy the original premises in the Old Swan area of the city, buying up neighbouring properties as it grew. “We looked at relocating to new purpose-built premises about three years ago, but unfortunately the developer we were looking to buy from ceased trading just as we were about to make our initial payment,” recalls Andy. “We have ended up staying where we are. We originally occupied number 11 Derby Lane and then we expanded into numbers 9 and 13, and now number 15. It gives us plenty of space for future development.” The decision to bring in the likes of Andy and Ian was all part of a longer-term succession plan and exit strategy by the company’s former management. Along with Joe Carroll, Norman Kennedy and Paul Kennils, they bought a combined 49 per cent share of the business in 1998 and then purchased the remaining stake over a four-year period, which was completed in 2008. “It was a massive risk,” concedes Andy. “We all had young families – I was 28 – and we all put our houses on the line.” The ownership structure has changed again recently, with Joe taking early retirement in February this year and three more long-serving members of staff – John O’Brien, Richard Lofthouse and Kevin Burns – buying his share between them. Growing up The plan was always to grow the business, but at a steady and sustainable pace, says Andy. “We’ve been very careful; we’ve never operated with an overdraft and we’re always in NICEIC Connections Summer 2011

31

14/6/11 12:51:49


CONTRACTOR PROFILE // A&B ENGINEERING

£25,000: The amount of money

Photography: Richard Hanson

raised for children’s hospice Claire House since 2008

> Managing director Andy Stanley

> The A&B team has completed many endurance events to raise money for charity

the black,” he says. “We’ve grown relatively fast, but always at a manageable rate. We have ensured that the jobs we take on have been profitable and that money has been reinvested into the business.” Today, the business directly employs 120 people, including 18 office-based staff, and draws on a trusted supply chain of sub-contractors to cope with peaks in demand. Despite the company’s growth, it has managed to retain a family ethos. Norman joined as an apprentice – the company still tries to take on four a year – and his son is an apprentice at the firm; Ian’s nephew joined as an apprentice in 2010, while contracts engineer Brian Carroll is the son of former director Joe. Two of Richard’s sons also work for the company. “It’s very much a family business and we look after our own, definitely,” says Andy. “A lot of people who work for us live within a 10-mile radius.” Like every electrical contractor, A&B Engineering has inevitably been affected by the downturn. “It’s very difficult at the moment,” says Andy. “Two years ago we’d be tendering against four or five people and now we’re against anything upwards of 15. A massive part of us still being a success is our partners – the main contractors we’ve been working with for a long time. Without that it would be a lot harder.” The government’s decision to shelve the Building Schools for the Future project was a big disappointment, admits Andy. “But the flip side is that schools have only been carrying out the minimum of maintenance required because they thought they were getting a new school,” he says. “Now they know they’re not, they’ve got to spend money on their existing schools. If you look at it long and hard enough you’ll see a way of turning most situations to your advantage.”

‘Existing schools have only been carrying out the minimum of maintenance. Now they’re not getting a new school, they’ve got to spend money’ 32

Summer 2011 NICEIC Connections

30_32_contractor_profile.2.vb.indd 32

Feeling the pain The business has had plenty to keep it occupied, however, through its efforts to support Wirral-based children’s hospice Claire House, a residential centre for terminally ill children that relies entirely on charitable donations. “We were introduced to Claire House by one of the senior people at Carillion, which supported it as their nominated charity, and it has now ended up being ours too,” says Andy. “We would attend charity nights and see and hear these heart-rending stories. We’d see how others had become involved and thought it was something we could do too.” A&B Engineering first put a team into the Three Peaks challenge in 2008, and has been on a mission to go one better every year, culminating in the “2011 year of pain”; a series of 12 events taking part throughout the year, including the infamous Iron Man challenge in Lanzarote in May and the Scotland Coast To Coast event in September. “It’s no good saying ‘I’m walking 10 miles round the park’ because no one’s interested,” says Andy. “They’ve got to think ‘I wouldn’t do that!’” Already plans are afoot for future projects, including the notorious Marathon Des Sables in 2013 and an attempt on Mount Kilimanjaro the following year. In all, Andy estimates the company has raised around £25,000 for the charity. “We cover the cost of entry so all funds raised go to Claire House,” he says. “But the challenge is to get bigger and better each year to keep the interest going and the donations coming in.” In the boardroom, too, Andy has his sights set on growth. “Over the next two years we’re looking to stay at the level we’re at now and then to expand from there,” he says. “In five years the business will be a lot bigger and I would hope to be turning over between £15 million and £18 million.” The company regularly receives approaches from other organisations with a view to taking it over, but any such enquiries have been firmly rebuffed. “It’s a young team,” says Andy. “There’s no one here thinking of an exit yet. I’ve only just turned 41 and Ian’s about to turn 40. If we were 55 it might be different, but as it stands today there’s still a lot to do before we reach that stage. It’s early days for us.” » Nick Martindale is editor of Connections www.niceic.com

14/6/11 12:51:57


Get your hands on NICEIC’s official certification software today!

r ou il: m r y E ma .co E Fo , e re FRtrial twa y of da liks 14 c ic@ ce ni

Best in the business

LC A C LE B ! A W C O N T U O

“The reduction in admin time meant that the software had paid for itself in the first few months. It is easy to use and integrates with the NICEIC webshop to get additional certificates. With each update the product just gets better & better!” Chris Jamieson CPJ Electrics, Wokingham

Ideal for Approved Contractors and Domestic Installers needing to complete their certificates. s .EW 6ERIlCATION WILL CHECK YOUR CERTIlCATE FOR ERRORS

s 3AVE CERTIlCATES AS TEMPLATES

s 0RINT YOUR .)#%)# CERTIlCATES STRAIGHT ONTO PLAIN PAPER

s &REE CONTINUATION SHEETS WITHIN THE SOFTWARE

s $IGITAL SIGNATURES

s !DD YOUR OWN LOGO TO CERTIlCATES

s %MAIL CERTIlCATES AS A 0$&

s .EW $ISTRIBUTION BOARD DESIGNER

s )MPORT AND EXPORT CERTIlCATES TO AND FROM SITE

s .EW #IRCUIT CREATION WIZARD

4O lND OUT MORE CLICK OR CALL

www.niceic.com

0843 218 4486 NIC.06.11.033.indd 33

is proud to be an NICEIC Partner

17/6/11 10:44:14


INDUSTRY FUTURE

Having

2021 vision

Change is in the air for the electrical industry over the next 10 years – and it has a distinctly green tinge. The government’s sustainability agenda offers electrical contractors huge opportunities to upskill and diversify to support this drive for energy efficiency

95 per cent: of contractors surveyed felt the Green Deal provided an opportunity for the industry 34

Summer 2011 NICEIC Connections

34_36 vision2021.5.vb.indd 34

www.niceic.com

14/6/11 16:24:17


‘The government’s stringent targets for carbon reduction mean we all have a part to play to make sustainability work for the UK’

W

hen recession struck in 2008 electrical contractors were particularly hard hit as commercial building projects dried up and the domestic market slowed dramatically. At a time when contractors were understandably turning their attention to short-term planning, NICEIC and the Electrical Contractors’ Association (ECA) joined forces to produce a research document that will help the electrical contracting industry plan for the medium and long term. The resulting document, 2021 Vision: The Future of the Electrical Contracting Industry, will help forward-thinking contractors pinpoint where they should be putting their efforts and energy to secure long-term sustainability. The research process began at the beginning of 2008 when ECA and NICEIC gathered a group of key opinion-formers from across the industry to discuss the current shape of the electrical contracting industry. Out of this, certain themes and areas of focus emerged as areas of concern or opportunity for the industry. These areas were then brought into focus by the industry as a whole when, in March 2011, 1,000 NICEIC registrants and ECA members completed an online survey giving their views on the current state of the industry – as well as their hopes and fears for the future. Of the respondents, 73 per cent worked for firms with between one and seven employees and 64 per cent for firms that had been active in the industry for up to 20 years. These responses are central to the report 2021 Vision: The Future of the Electrical Contracting Industry, which will be presented to the media and available to download from www.niceic.com towards the end of July. The future’s green 2021 Vision identifies the likely scenarios that will shape the industry over the next 10 years. It highlights the character and

500,000: number of homes that will be upgraded a year in the UK under the Green Deal www.niceic.com

34_36 vision2021.5.vb.indd 35

structure of the wider construction industry, the economic outlook, the impact of legislation and other external factors, key product development and installation trends and, as a result, the knowledge and skills that will be required by those working in the industry. Let’s look ahead to 2021 to try and visualise the way we will live and work in 10 years’ time. By 2021 the sustainable agenda will be inextricably linked to everything that we do in the UK. The government’s stringent targets for carbon reduction mean we all have a part to play – both in our homes and our working lives – to make sustainability work for the UK. This in turn will lead to a more environmentally savvy and demanding client. For the UK energy consumer (both domestic and commercial), there will be a move away from the traditionally relied upon energy sources of gas and oil, and there will be increasing demand for electricity and renewable energy – the latter in particular – as electricity prices will continue to rise. Smart meters will be fitted in all UK homes by 2020, enabling householders to manage the energy used in their homes and allowing a smart grid to be developed. High-tech electrical systems will be more common in homes and broadband speeds will increase. People’s working lives will change too – there will be a shift away from the business park model towards increased homeworking and shared offices using hotdesking and shared meeting room space. These buildings will need to provide low-cost energy from renewable sources. Inside the offices new technologies such as light walls that provide simulated natural sunshine will be used instead of lamps and strip lighting. There will be a trend towards refurbishing existing buildings rather than replacing them, as well as a public demand for energy-efficient systems to be retro-fitted to homes and commercial buildings. When newbuilds are commissioned, modular construction methods will be increasingly common – with a consequent move away from traditional wiring installations and the development of plug-and-play systems. Feed-in tariffs and the Green Deal will provide opportunities for the general public to capitalise on incentives from the government to pump-prime the road to renewable energy. What should the contractor do? There is no doubt that sustainability will be a major driver in the construction industry in the 10 years to 2021. This is partly about reducing carbon emissions, but also about ensuring the UK is more energy efficient in response to the increasing price of oil and shortfalls in UK energy output. The contractors’ survey demonstrates overwhelmingly that the move towards a sustainable future is a huge opportunity for the electrical industry. Renewable energy, new technologies and energy-efficient products and installations will change the industry significantly, but will also provide opportunities for businesses of all sizes (see charts, page 36). NICEIC Connections Summer 2011

iStockphoto

By Emma McCarthy

35

14/6/11 16:25:50


INDUSTRY FUTURE

One of the biggest opportunities for smaller contractors is the Green Deal, which will launch in 2012. The Green Deal aims to make existing homes and small businesses more energy efficient through loan incentives that will be paid for through savings on energy bills. The Green Deal also applies to the introduction of low-carbon measures to new homes. It will provide opportunities to the contractor installing the renewable technologies, as well as to contractors who wish to become Green Deal advisors – providing evaluation and advice services. The Green Deal will lead to the upgrading of 500,000 homes a year in the UK, and 95 per cent of contractors surveyed felt it provided an opportunity for the industry. With new technologies and products comes the need for new skills and training. The increasing use of smart meters and systems, the energy management of appliances and the use of renewable energy will change what is required of the electrical contractor. The need for the traditional electrician who can install and maintain onsite cabling and electrical equipment will not change – but the role of that electrician will. Skills and training One of the findings of the survey highlighted the possibility that the role of the electrical contractor will be split into three tiers. As it was succinctly put by one of the respondents to the survey: “There will be installers, there will be people to connect and there will be people to test and commission – these will be three separate jobs.” At the top level will be the energy advisor. These people will need both project management skills to help clients run their buildings and systems as efficiently as possible and technical installation skills, and will also need to understand the sustainable implications of products and their lifetime cost. The skills of the traditional electrical contractor will still be essential. They will have the same core skills but, as touched on later, will require a greater

57 per cent: of those surveyed see the crossover of trades requiring multi-skilling as a threat 36

Summer 2011 NICEIC Connections

34_36 vision2021.5.vb.indd 36

How do you think the electrical industry will be different in 10 years’ time?

What do you consider to be the main opportunity for your business?

Increase in new technologies (including intelligent building systems, controls and smart meters)

New technology (including intelligent building systems, controls and smart meters) 9.1%

12.9%

Energy saving and energy-efficient products and installations

More energy saving and energy-efficient products and installations 13.6%

13%

More legislation and regulation (good and bad)

PV and solar 15.9%

13.5%

Move towards renewable energy

Renewable energy 19.5%

‘There will be installers, people to connect and people to test and commission. These will be three separate jobs.’ knowledge and understanding of other trades. Working alongside the traditional electrical contractor onsite will be the lower skilled installer. Legislation and the plug-and-play nature of components of a system will see de-skilling continue. This is obviously a significant threat to the trade, and 92 per cent of contractors surveyed viewed this as a threat. But with foresight and vision we hope the electrical contractor will focus on the vast opportunities available to them – rather than this area of threat. Upgrading of existing buildings will see the need for new skills relating to the installation of new technologies such as solar panels and heat pumps. There will also be the need to change existing systems to lower energy consumption and cost of operation. During the recession people have taken early retirement or have moved out of the industry. This, coupled with the need to upskill the existing workforce, means there will be a skills gap in the UK electrical contracting industry for a short period. The government has, however, recognised

19.8%

this will be an issue and has announced measures to co-fund courses, in particular apprenticeships, that will help trades to develop the skills needed to deliver a sustainable future for the UK. Many new technologies require installers to be multi-skilled, combining tasks that have traditionally been the responsibility of a number of different skilled workers in the electrical, plumbing and roofing industries. If the electrical trade doesn’t upskill its workforce to become multi-skilled there is a danger that the other industries will make inroads into this work. More than half (57 per cent) of those surveyed see the crossover of trades requiring multi-skilling as a threat. This snapshot of the agenda behind, and findings of, 2021 Vision should provide food for thought for electrical contractors of all sizes. The move to a sustainable future provides many opportunities for the electrical contracting industry that far outweigh any potential threats. Traditional firms that provide clients with a great service and are reliable will remain the bedrock of our industry, but they have to be willing to adapt. The firms that succeed in this greener future will be those that embrace the change, learn new skills and develop their areas of expertise. 2021 Vision is for the industry – use it and learn from it – it’s an exciting future and we at NICEIC and our partners at ECA look forward to helping you get there. » Emma McCarthy is CEO of NICEIC www.niceic.com

14/6/11 16:25:56


WIRING ACCESSORIES BURSTING WITH NEW PRODUCTS

For more information:

call: 01827 63454

email: sales@scolmore.com

visit: www.scolmore.com

NEW Test to BS7671 17th Edition wiring regulations with the new Fluke 1654B Multifunction Installation Tester zero adapter

The complete tester for advanced users The new Fluke 1650B Series builds on the rugged reputation of the earlier 1650 series, only it is re-designed to meet your need for more productive test tools. s Dual display shows PEFC/PSC and loop impedance results in parallel s Fast high-current loop test s Variable RCD current mode for customised settings s PASS/FAIL indication for RCD tests s Zero adapter for easy test lead compensation s Loop and line resistance-mH resolution s Test smooth dc sensitive RCDs (Type B) s Extended memory s Extended documentation mode

Fluke: the most complete range of test tools With everything from infrared thermometers like the Fluke 62 to the Fluke 1507/1503 insulation testers, the Fluke range gives you the right tool for every application. And the range keeps improving, to ensure that electricians and contractors have the widest choice of test tools.

www.fluke.co.uk/1650B Fast loop measurement Saves up to 50% time!

Lightweight

Rugged

Weighs less than 1.3kg

withstands a drop from 1m

0207 942 0700

Fluke. Keeping your world up and running.速

NIC.06.11.037.indd 37

16/6/11 17:14:30


SECURITY SYSTEMS

Electrical contractors could be missing out on the chance to develop their business by overlooking the security and alarm-installation market By Steve Rogerson

W

hen times are tough it makes sense to look for new markets, and installing security systems should seem a logical move for many electrical contractors feeling the pinch in their traditional areas of expertise. But the growing demand for alarm systems that are monitored and guarantee a police response, combined with the perceived complexity of networked CCTV and access control systems, is putting many electrical contractors off moving into that field. In fact, even some of those who list security and alarm systems among their competences often sub-contract out all but the basic wiring work. Take Derby-based electrical contractor Trentham Holdings, which lists security systems as a skill on its NICEIC entry. “If

38

Summer 2011 NICEIC Connections

38_40 security feature.5.vb.indd 38

I get any security work, I sub-contract it out,” says Richard Jackson, a contractor at the company. “I’m too busy to do alarm work so I send it to an alarm firm.” It is a similar story for NICEIC-registered Lowe Electrical Contractors from Leicester, which concentrates on school and college installations, but again tends to contract out any security systems work. “We’ll do the first fixes on large buildings, such as installing the cables between a keypad and panel and to the detectors and door contacts,” says Jon Lowe, managing director. “But we will employ a sub-contractor for the final installation. They also review the cables we put in.” At present, the company has no plans to build up this side of the business. “It really is a different field and mindset,” says Lowe, “especially as I can sub-contract it out.” Another Leicester-based NICEIC contractor – Kneller & Kneller – does some basic alarm installations, but tends to stay away from the more specialist work. “We can fit domestic alarms,” says director Steph Kneller. “We use Citadel alarms. But there is not a lot of work in that area because most people go to specialist alarm companies. We may do a couple a year.” Similar skillset This is something of a pity, because the security industry is potentially big business and, although there are hoops to leap through and skills to learn, there is plenty of help available. www.niceic.com

14/6/11 16:26:49


iStockphoto

Take access control system company TDSI, for example. “The main concerns of contractors are ease of installation and being able to get it up as quick as possible,” says TDSI’s product manager Duncan Gooch. “Our products are geared to help make this easy.” Most of the work involves applying basic electrical installation principles and sometimes linking that into a computer network, says Gooch. The cables have to meet certain specifications, but the company supplies those anyway, along with training and technical support. “Our product support includes on-site training,” he says. “For a basic installation, we do a one-day course on how to install an access control system. There are also additional modules on software configuration and integration into CCTV systems.” While most of the company’s customers tend to be alarm specialists, Gooch says more electrical contractors are moving into this field since there is a close match between the skills required to install security systems and those already practised by contractors. “We will support them in installing these systems,” says Gooch. “The main thing is to make sure they use the correct cable and install it correctly, and that is all covered in the training course.”

26 per cent: The proportion of security professionals reporting an increased budget for installing access control systems in 2011 www.niceic.com

38_40 security feature.5.vb.indd 39

Regulatory requirements One emerging area is the demand for monitored alarms that guarantee a police response; something insurance companies are increasingly insistent on. This is a more regulated area and only two bodies – the National Security Inspectorate (NSI) and the Security Systems & Alarms Inspection Board (SSAIB) – can assess organisations in this field, says Paul Phillips, technical officer with the British Security Industry Association. “You have to pass strict vetting controls on who you can bring on board,” says Peter Stanton, CCTV product manager for security company ADT. “They will come out and inspect systems that you have installed. The police also require you to be a member of one of these bodies if you want a police response.” David Profit, technical manager for the SSAIB, points out that contractors must also gain approval from the Association of Chief Police Officers, the organisation that issues the unique reference number needed for a monitored alarm. “One thing that is necessary is to be security screened,” says Profit. “There are companies that will do this.” Knowledge of the relevant British and European standards is also advisable, he adds. The SSAIB is the newer of the two regulatory organisations and is probably a better bet for individual electrical contractors looking for approval because it was set up specifically to deal with smaller companies. “When we started, there was only the NSI,” says Profit. “There was nothing for smaller companies. We now have 1,400 companies and we cover anyone from a sole trader to some huge companies.” The organisation carries out regular inspections of installations by its members and also acts as an arbiter if a customer is unhappy with an installation. NICEIC Connections Summer 2011

39

14/6/11 16:26:58


SECURITY SYSTEMS

Profit’s advice for anyone considering moving into this area is to get in touch to find out exactly what is required of them and what equipment they will need. “We will go through that with them and it doesn’t cost them anything,” says Profit. “We will see what they have and where they work from and go through the criteria with them. We must also see some jobs they have installed themselves to get an idea of their workmanship.” Ease of installation The trend towards ethernet-based access control systems using the basic TCP/IP internet protocol rather than RS485 serial connections means installation is no longer the challenge it once was because systems can be connected to existing local and wide area networks. “You don’t need to install a separate network,” says Gooch. “You can plug them into the existing IP infrastructure that is already there for the office.” Another trend is towards the use of biometrics and smart cards for access control. “Smart cards are gaining popularity because you can write more information on to them to make them more secure,” says Gooch. “Information can be locked on them that can only be read by a specific reader. Plus the same card can be used for other applications such as cashless transactions.” The use of fingerprint readers is growing because there is no need for an individual to carry credentials, while facial recognition readers are still fairly new, but are likely to become more prevalent in the future. “This is an emerging technology,” says Gooch, “but it is a lot more secure than fingerprints. Both are very easy to install. Iris readers are also quite popular and are used at airports now, but we will see facial recognition replacing those. Some people are nervous about iris scanners because they are worried about eye damage. There isn’t anything to worry about, but because some people are worried they are looking at facial recognition.”

12 per cent: The amount of security professionals likely to install a biometric access control system in the next 12 months 40

Summer 2011 NICEIC Connections

38_40 security feature.5.vb.indd 40

Need to know: Market potential Research conducted by consultancy firm Frost & Sullivan among attendees at the IFSEC security show in Birmingham in May provided an interesting snapshot of the potential of the security and alarm-installation market for electrical contractors. Over a quarter (26 per cent) of those surveyed said their budget for installing access control systems would increase over the coming year, with 8 per cent estimating it would rise by 20 per cent or more. Forty-five per cent said it would stay roughly the same and just 15 per cent were expecting a reduction in resources. The research also revealed a growing interest in biometric systems, with 17 per cent of attendees saying they already used such technology and 12 per cent saying they were likely to install it in the next 12 months. A further 59 per cent said they were aware of biometrics, but currently had no plans to use it. There is also a growing interest in using access control for time and attendance purposes as well as for ensuring security, with 29 per cent expressing an interest in this.

> Manufacturers provide training on security system installation While some of these systems may look more complex, installation of them is not and manufacturers will often provide the necessary training. Security equipment maker Texecom gives contactors a half-day training course to bring them up to speed with its equipment. “We do get contractors coming to us because the nature of things is that everyone wants to have a piece of someone else’s cake,” says John Hill, customer services manager. “They will have no trouble with the cabling side, but will need training for the programmable control panels.” There are also specialist training companies such as Tavcom that electrical contractors can use. “We can offer training to an electrical contractor who wants to move over to the security side,” says Tavcom director Kevin Matthew. “Most of our courses are around CCTV and access control.” Here, the foundation course lasts for three days, with a CCTV course taking five days. The company also offers diplomas that can be taken on a

‘We do the first fixes on large buildings, such as installing the cables between a keypad and panel and to the detectors and door contacts. But we employ a sub-contractor to do the final installation’ modular basis over 12 to 18 months and which will give a BTEC qualification at the end. Although training is not a formal requirement to install security and intruder alarms outside of those that guarantee a police response, companies wanting to be taken seriously in this area will be expected to demonstrate their credentials in terms of qualifications, regulatory approval and demonstrable experience. Moving into a new area is not a shortcut to a fast buck, but something that requires genuine commitment and investment in both time and money. But for those that take it seriously, it could prove to be a highly rewarding decision. » Steve Rogerson is a freelance journalist specialising in the electrical industry www.niceic.com

14/6/11 16:27:06


Best in the business

Tools, Testers, Books and DVDs - NICEIC Direct has everything you need! Testers, Testers, Testers...

Books and DVDs

There’s a great range of test equipment at www.niceicdirect.com

Tools

“Get your free catalogue!” Get your hands on a copy of our new and improved catalogue for access to everything you need! From Tools to Training and Label Printers to Literature. Order your copy today by emailing: catalogue@niceic.com.

To find out more click or call

www.niceicdirect.com

0843 290 3436 NIC.06.11.041.indd 41

16/6/11 17:15:17


COMMERCIAL VEHICLES

Wheelsof Electrical contractors have a wide range of issues to consider when choosing the right commercial vehicles for their business By Rob Shepherd

T 30 minutes: The amount of time required for an 80 per cent charge for an electric vehicle using a fast-charging station 42

Summer 2011 NICEIC Connections

42_44 company vehicles.3.vb.indd 42

he cost of fuel seems to be something of a national preoccupation at the moment. According to the AA’s figures for May 2011, the average price of a litre of unleaded petrol stood at 136.9p, while diesel cost 141.5p. Compare this with just a year ago, when drivers were paying 116p and 117p respectively, and it’s not hard to see why it’s causing concern. This only adds to the dilemma for electrical contractors when selecting a vehicle. With such a vast array of top quality commercial vehicles available today, being able to differentiate their features and benefits would even prove a challenge for Messrs Clarkson, Hammond and May. With all the main manufacturers producing commercial vehicles, there is a wide range available, each with impressive specifications. Making the wrong decision can be costly when selecting a new vehicle, so it’s important to choose wisely. So how can a contractor select the van that is most suitable for their needs? Looking at how and where a vehicle is used is the first thing to do. This includes working out how many people a vehicle will need to carry and how far, what it needs to transport and therefore the cargo space required, and who will be driving it. www.niceic.com

14/6/11 12:53:02


fortune If, for instance, it will be doing a low number of miles in a town or city then a smaller engine will be more suitable and will save a considerable amount of money on fuel. It’s also worth spending a little time estimating the monthly mileage for the vehicle to roughly calculate how much fuel will cost. Jon Goodman, managing director of Peugeot UK, firmly believes that choosing a fuel-efficient vehicle is the best way to save money. “Fuel efficiency determines a vehicle’s CO2 emissions, and hence the tax an owner will pay,” he says. “It also determines how much an owner or driver will pay at the fuel pumps, regardless of the advertised price of a litre. Peugeot’s message has been a clear one for a number of years: choose the most fuel-efficient vehicle you can for your driving needs.” The price is right Being able to afford the outright purchase of a new commercial vehicle is beyond the means of many electrical contractors, with many finding that leasing a vehicle is a far more suitable option (see box, page 44, for the main options). The fixed monthly payments make budgeting far simpler and the inclusion of maintenance and repairs in the lease contract alleviates many headaches. At the end of the term the vehicle is returned to the leasing company and the contractor can opt to take out another contract. Another option is to effectively buy a vehicle on either a contract or lease purchase basis, whereby the contractor pays a series of monthly amounts before making a final “balloon” payment at the end of the tenure. In this case the contractor is liable for all maintenance and depreciation in www.niceic.com

42_44 company vehicles.3.vb.indd 43

the value of the vehicle, but does retain ownership at the end of the term. Commercial vehicle leasing and financing is becoming increasingly popular in the UK. John Lewis, chief executive of the British Vehicle Rental and Leasing Association (BVRLA), says his members forecast a continuing growth in demand in 2011, particularly for vans. “Many of them are investing in new vehicles and there is no danger of the market not having enough capacity,” he says. In order to continue to provide value to its Approved Contractors, last year NICEIC announced a partnership with Peugeot to introduce a discount vehicle leasing scheme, available exclusively to NICEIC contractors. The scheme features highly competitive rates that would not be available to contractors on an individual basis. Another trend, particularly for larger companies, is to outsource all fleet vehicle requirements to a third-party specialist. “Fleet management is set to grow as more organisations decide they haven’t got the expertise or inclination to manage their fleets in-house,” suggests Lewis. Electric dreams With fuel efficiency a major concern for contractors of all sizes, electric vehicles could become an option for some. Examples include the Renault Kangoo Van ZE; the world’s first fully electric light commercial vehicle produced by a volume manufacturer. It is already attracting significant interest from public and private organisations alike, seeking to promote the “greener” side of their operations while saving operating costs. NICEIC Connections Summer 2011

43

14/6/11 12:53:07


COMMERCIAL VEHICLES

“Renault will be the first manufacturer to offer a complete range of electric vehicles,” says Darren Payne, director of fleet and commercial vehicle operations at Renault UK. The Ford Transit Connect Electric is also being tested in the UK for an imminent launch. “Not only is this an ideal vehicle for eco-conscious fleet operators, it is an important part of Ford’s future,” says Derrick Kuzak, Ford group vice-president, global product development. Despite the excitement and high hopes for the commercial electric vehicle sector, however, some remain unconvinced, citing the short distances they can travel before needing to be recharged as a potential problem. This issue is being addressed by a number of schemes to install more charging points in town centres, service stations and hotel car parks, which in itself offers a potentially lucrative new line of business for electrical contractors through partnerships with energy companies or local councils and builders. Although charging takes around eight hours through a standard domestic point, it can take as little as half an hour for an 80 per cent charge through a fast-charging station. That said, there aren’t many contractors who will be able to spare even that amount of time to park up and charge their vehicle in the middle of a busy day, so for now it seems the new models may only be viable options for contractors whose work is confined to their immediate locality. The growth in the electric vehicle sector, however, is indicative of the many changes affecting the world of commercial vehicles. As a major investment, electrical contractors need to thoroughly investigate what’s on offer to find the best solution to their needs. Finding the right model and package is no easy matter, but getting the right match could give years of hassle-free transport, as well as helping to create the right reputation with customers. After all, would you hire someone who turned up in a rusty old banger? » Rob Shepherd is a freelance journalist specialising in the electrical industry

136.9 P: The average UK price of a litre of unleaded petrol in May 2011 44

Summer 2011 NICEIC Connections

42_44 company vehicles.3.vb.indd 44

Need to know: Route finder The main options for individuals or businesses looking to lease or purchase a company vehicle – other than outright purchase – are as follows: • Contract hire: the most common option, with vehicles leased to companies in return for an initial fee and a fixed monthly charge. Residual value and maintenance risk remain with the lessor and cars are returned at the end of the hire period; • Finance lease: companies either pay the entire cost of the vehicle, including interest, over an agreed period, or lower monthly rental payments with a final payment based on the anticipated resale value. This allows for a fixed cost, but the lessee takes on administration and operating risk. Companies can continue to operate the vehicle for a nominal fee at the end of the lease, but at no stage do they own it; • Lease purchase: companies agree to buy the vehicle through a series of monthly instalments, based on the deposit paid, the contract period and the sale price. This allows them to spread the cost of the vehicle, but means they retain ownership and the risk around the residual value of the vehicle; • Contract purchase: companies agree to buy the vehicle through a series of monthly instalments. These include interest charges and usually fees for additional services such as maintenance. There is often a final “balloon” payment equivalent to the vehicle’s residual value. Sources: The British Vehicle Rental and Leasing Association/Arval

Case study

Out with the old, in with the new NICEIC Approved Contractor William Dyer Electrical has more than 20 years’ experience designing, maintaining and installing electrical projects for a wide customer base. It recently upgraded its fleet of vehicles with a view to making longer-term cost savings and ultimately improving on its bottom line. The desire to adopt a company–wide energy-efficient strategy led the company to replace its existing fleet with 14 Citroën Berlingo LX HDI 75 vehicles and a > William Dyer welcomes his deal with Citroën Berlingo Multispace VTR HDI91. “Our previous vehicles were over five years old and were uneconomical to use and maintain,” says managing director William Dyer. “The Berlingos offer a projected saving of £8,000-£12,000 in the first year alone.” As part of the deal, the new vehicles come with satellite navigation and trackers as standard, which reduces the company’s insurance premium and helps personnel find site locations quickly and easily. “In addition to this, the new vehicles have an extra passenger seat, which means fewer vans on large sites, saving on fuel and parking charges,” adds Dyer. The new fleet of low-emission vehicles runs on diesel, but Dyer believes the day of the mainstream electric vehicle is not far away. “We embrace all new technologies and look forward to electric commercial vehicles being a viable option,” he says. The company also believes that this investment sends out a positive message to its customers. “This will set us apart from our competitors by demonstrating that we are a forward-thinking company,” he says. www.niceic.com

14/6/11 12:53:13


k oo tB en dm en m tA

f of 4! % £6 20 ly on

1s w No

Best in the business

Make sure you and your business are the first in the know! 17th Edition First Amendment explained These one day training workshops will cover: s #HANGE FROM 0)2 TO %LECTRICAL )NSTALLATION #ONDITION 2EPORT %)#2 s 3ELECTION AND ERECTION OF WIRING SYSTEMS s -EASURES AGAINST ELECTROMAGNETIC DISTURBANCES s 0ROTECTION AGAINST ELECTRIC SHOCK s $EVICES FOR PROTECTION AGAINST OVERVOLTAGE s /PERATING OR MAINTENANCE GANGWAYS s -EDICAL LOCATIONS 7ORKSHOP PLUS "OOK a 6!4 "3 "OOK ONLY Workshop only .)#%)# 2EGISTERED

a INC 6!4 a 6!4

7ORKSHOP ONLY 0UBLIC a 6!4 0RICES INCLUDE DISCOUNT

4O ORDER AN ADVANCE COPY OF THE PUBLICATION OR TO BOOK A WORKSHOP CONTACT .)#%)# 4RAINING

0843 290 3424 OR EMAIL traininginfo@niceic.com

RGET

DON’T FO NIC.06.11.045.indd 45

ALOGUE! T A C E E R F OR YOUR F K S A O T

20/6/11 11:58:37


Exclusive Insurance cover for NICEIC Registered Contractors NICEIC Insurance Services offer the ONLY insurance policy created to NICEIC Standards. Our basic cover includes... s 0UBLIC ,IABILITY COVER a M s FREE )NCIDENTAL 0)2 0!4 4ESTING COVER s FREE )NCIDENTAL %FlCACY COVER

s FREE 4AX )NVESTIGATION AND *URY 3ERVICE COVER To ďŹ nd out more click or call

www.niceicinsurance.com

0845 601 2376

*cover provided up to 10% of your time/turnover **cover provided up to 15% of your time/turnover NICEIC Insurance Services is a trading name of Towergate Underwriting Group Limited, registered in England with company number 4043759. Registered address: Towergate House, Eclipse Park, Sittingbourne Road, Maidstone, Kent, ME14 3EN. VAT registration number: 447284724. NICEIC is a trading name of Ascertiva Group Limited who are an Introducer Appointed Representative of Towergate Underwriting Group Limited.

NIC.06.11.046.indd 46

16/6/11 17:16:50


Ask the experts/Technical

N

Fully Charged From the helpline

We continue with our series of answers to some of the more frequently asked questions put to the NICEIC Technical Helpline. QUESTION

ANSWER

I have been asked to carry out the electrical installation for a conservatory attached to a house. The conservatory has a dwarf insulated cavity wall 650 mm high. Access to the cavity from above will be possible until the sills are fitted.

It is not generally good practice to install thermoplastic insulated and sheathed cables within a cavity wall, because: • the cables might suffer damage while being drawn into the cavity • the cable might ‘bridge’ between the inner and outer leaves of cavity, potentially allowing a means for water to be carried to the inner leaf • it is not usually possible to provide support for the cable (of particular concern where long vertical drops exist) • if placed in contact with expanded polystyrene insulation, the thermoplastic sheathing and insulation of the cables might suffer deterioration • the cables could overheat as a result of retention of heat caused by the presence of thermal insulation. Addressing the above concerns specifically in relation to the dwarf wall for the conservatory: • If there is a reasonable degree of access to the cavity from above, the likelihood of the cables suffering damage during installation should be low, as the installer can see potential sources of damage, such as mortar protruding between courses, wall ties and the like, and can either remove or avoid potentially damaging obstructions as appropriate. • Cables can be installed such that they are between the insulation and the inner leaf of the wall throughout the complete length of their run. • If the horizontal distance between the socket-outlets is sufficiently short, it will not be necessary to provide additional cable supports. Where the distance between socket-outlets is such that additional cable supports are needed, the cables could be installed relatively high within the cavity and be fixed by cable clips. • Except for expanded polystyrene, most commonly employed materials used in the manufacture of thermal insulation do not have a detrimental effect on thermoplastic cable sheathing. Where the thermal insulation is not made from polystyrene, it can usually be assumed that it will not cause the cables to degrade prematurely. However, in cases of doubt, the advice of the manufacturer should be obtained and followed. • Placing the insulated and sheathed cables between the inner leaf and the thermal insulation can be considered to be installation method 102 as described in Table 4A2 in Appendix 4 of BS 7671. This allows the conductors to be appropriately sized, in terms of their corrected current-carrying capacity, based on Table 4D5 of Appendix 4. So, although cables should not generally be installed in the cavity of a brick or blockwork wall, they may be installed in the cavity of a dwarf wall of a conservatory provided all the risks of so doing are fully addressed.

1

Can I install the thermoplastic (PVC) insulated and sheathed wiring for the socket-outlets on this wall inside the cavity?

www.niceic.com

47_48_askexperts.2.vb.indd 47

NICEIC Connections Summer 2011

47

14/6/11 15:17:21


Ask the experts/Technical

N

Fully charged

48

QUESTION

ANSWER

2 I’m carrying out an installation in a building where the length of the final circuits makes it necessary to use cables of larger cross-sectional area than is needed for current-carrying capacity reasons, due to voltage drop considerations. I’m sure this will cause me problems with terminating the conductors at accessories. How can this situation be addressed?

Ideally an installation should be subdivided into load centres, where necessary, with distribution boards supplied by distribution circuits (sub-mains) located throughout the building such that no final circuit is excessively long. Where this is not the case, it will usually be possible to treat the part of the circuit between the distribution board and the first accessory in a similar way to a distribution circuit, by increasing the cable size in that part of the circuit to reduce the voltage drop. This may require the installation of a suitably rated joint box before the first accessory, beyond which the conductor size may be reduced for the remainder of the circuit. If there are a number of final circuits likely to have voltage drop problems, it would be worth considering the installation of a distribution circuit to supply a distribution board located close to that part of the installation served by those final circuits.

QUESTION

ANSWER

3 Is it permitted to vary the size of the conductor in a circuit to suit varying conditions along the route?

Yes. It is permitted to vary conductor cross-sectional area, or indeed the type of wiring system, within the length of a circuit, provided all conductors, including those having the smallest cross-sectional area or which are so installed that their effective current-carrying capacity has been reduced, are adequately protected against overcurrent. The following are examples of situations that might warrant the use of different conductor cross-sectional areas within a circuit: • To overcome the effects of voltage drop (see Question 2 above). • Where wiring is partially or fully surrounded by thermal insulation for part of the circuit length, such as in a loft space. The issue of current-carrying capacity for cables installed in thermal insulation is covered in Regulation 523.7 (or Regulation 523.9 of BS 7671: 2008 incorporating Amendment 1). • Where the wiring in part of the length of a circuit is exposed to a higher temperature than in other parts, such as for the final connection to an immersion heater. • For convenience, as might be the case where the majority of a domestic lighting circuit has been wired using 1.5 mm² conductors but where the switch drops between two-way switches have been wired using 1 mm² in order to minimise the overall cable size so that it can be easily concealed within the fabric of the building.

QUESTION

ANSWER

4 I’m trying, without much success, to terminate two 2.5 mm² stranded conductors into the same terminal of a ceiling rose. Can I cut out some of the strands to reduce the conductor cross-sectional area?

No. It would be unacceptable to reduce the conductor cross-sectional area by removing strands, which is contrary to the requirements of Regulation 526.1, regarding durable electrical continuity and mechanical strength of electrical connections, and Regulation 526.2, regarding selection of suitable means of connection. A number of solutions are available to allow for the satisfactory termination of the larger conductors sometimes employed in a lighting circuit. For example: • Some manufacturers offer ceiling roses and other accessories with terminals that can accommodate larger conductors, including in some cases up to two 4 mm² conductors. • The lighting scheme may be arranged around a number of wiring centres or marshalling boxes – again available from a number of manufacturers, such that it is unnecessary to have more than one cable being terminated at each ceiling rose or lampholder. It should be noted that, with certain exceptions, Regulation 526.3 requires every joint and connection to be readily accessible for inspection, testing and maintenance.

Summer 2011 NICEIC Connections

47_48_askexperts.2.vb.indd 48

www.niceic.com

14/6/11 13:01:35


y us g op ct rin rc pe atu s! ou os fe rse for y Pr u

ow co com t n W eic. ou E @nic N es rs ou lc ai Em

Best in the business

With classroom and online learning – there’s a course for everyone!

NICEIC Training is better than ever! As well as offering a wide range of training at all levels including domestic, renewables, commercial and industrial courses, you can now combine the best of the classroom with the ease of online learning for some of our City & Guilds courses!

NIC.06.11.049.indd 49

All of our down-to-earth and friendly lecturers are trained qualified electricians. They really understand you, your industry and how to get the best from you. To find out more click or call www.niceic.com traininginfo@niceic.com

0843 290 3445 16/6/11 17:17:44


Ask the experts/Technical

N

Fully charged 50 52 54 60 62

Differences between extra-low voltage systems Hybrid ring/radial final circuits The Electrical Installation Condition Report RCD testing for a lighting circuit with no circuit protective conductor snags and solutions: A practical guide to everyday electrical problems

Differences between extra-low voltage systems BS 7671 recognises three types of extra-low voltage (ELV) system: SELV (Separated Extra-Low Voltage), PELV (Protective Extra-Low Voltage) and FELV (Functional Extra-Low Voltage). This article looks at the differences between SELV, PELV and FELV and at the main requirements of BS 7671 where each of them is used. Extra-low voltage is defined in Part 2 of BS 7671 as a nominal voltage not exceeding 50 V a.c. rms or 120 V ripple-free d.c., whether between conductors or to Earth.

SELV A SELV system is an extra-low voltage system electrically separated from Earth and from other systems. To this end the live parts of a SELV system must have: • basic insulation between live parts and other SELV or PELV circuits, • basic insulation between live parts and Earth, and • protective separation from live parts of any other systems by means of double or reinforced insulation, or basic insulation and protective screening for the highest voltage present. (Regulation 414.4.1 refers). The conductors of each SELV circuit must be separated from the insulated conductors of other circuits by one of four arrangements listed in Regulation 414.4.2, such as physical separation or the enclosure of SELV circuit insulated conductors in a non-metallic sheath or non-metallic enclosure. It will be seen from Fig 1 that no exposed-conductive-part of the SELV system is connected to Earth or to an exposed-conductive-part of another system or to a protective conductor of any system. (Regulation 414.4.4 refers). Also, as required by Regulation 414.3, the step-down transformer in Fig 1 is of the safety isolating type, which gives protective separation (equivalent to double or reinforced insulation) between the primary and secondary windings. PELV

Fig 1 Example of a SELV circuit supplied by a safety isolating transformer Exposed-conductive-part of a SELV system not to be connected to any other conductive parts fety isolating ansformer

Overcurrent protective device

Exposedconductive-part

A PELV system meets all the requirements for a SELV system except those relating to electrical separation from Earth. In the example of a PELV system in Fig 2, both a live conductor of the PELV circuit and an exposed-conductive-part (the metal case) of the ELV current-using equipment are earthed by being connected to the earthed protective conductor of the circuit supplying the transformer primary, as permitted by Regulation 414.4.1. Requirements for SELV and PELV

SELV system

An exposed-conductive-part of a SELV system must not be connected to:

50

Earth,

an exposed-conductive-part of another system,

a protective conductor of any system.

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 50

SELV and PELV are recognised by BS 7671 as protective measures giving both basic protection and fault protection against electric shock. A SELV or PELV system must be supplied from a safety isolating transformer or a source providing equivalent safety (such as a motor generator set with suitable isolation from the higher voltage circuit), or a battery or other source independent of the higher voltage circuit, or an electronic device meeting specified requirements. Regulation 414.3 gives the requirements for these sources.

www.niceic.com

14/6/11 15:19:25


Any mobile source for a SELV or PELV system that is supplied at low voltage, such as a portable safety isolating transformer for a handlamp, must be selected and erected to meet the requirements for protection by the use of double or reinforced insulation in accordance with Section 412 (Regulation 414.3 refers). This is intended to give extra protection against the effects of possible damage to the equipment when being moved about. A socket-outlet or luminaire supporting coupler in a SELV or PELV system must not have a protective conductor contact and must be suitable only for use with a plug that is dimensionally incompatible with those used for other systems at the same premises (Regulation 414.4.3 refers).

Fig 2 Example of a PELV circuit supplied by a safety isolating transformer

FELV Unlike in a SELV or PELV system, the extra-low voltage in a FELV system is used for functional purposes only; it is not relied upon to contribute to protection against electric shock. A FELV system (see Fig 3) is part of the protective measure of Automatic Disconnection of Supply (ADS), covered by Section 411 of BS 7671. The source of supply for the FELV system must be either a double-wound transformer that provides at least simple separation, or a source that meets the requirements of Regulation 414.3 for a SELV or PELV system (Regulation 411.7.4 refers). It is not permitted to use an autotransformer as the source (although this was permitted by the 16th Edition and earlier of the Wiring Regulations). Basic protection against electric shock in the FELV system is provided by basic insulation rated to suit the nominal voltage of the primary circuit (generally by the use of mains voltage grade wiring) or by barriers and enclosures (Regulation 411.7.2 refers). Fault protection is provided by connecting the exposed-conductive-parts of the FELV system to the earthed protective conductor of the primary of the source, the circuit supplying the primary being subject to protection by Automatic Disconnection of Supply (Regulation 411.7.3 refers). A live conductor of the FELV system may also be connected to the protective conductor of the primary of the source. Socket-outlets and luminaire supporting couplers in a FELV system must have a protective conductor contact and must use a plug that is not dimensionally compatible with those used in any other system at the same premises (Regulation 411.7.5 refers). An example of where a FELV system might be used is a motor control circuit.

www.niceic.com

50_63_technical.2.vb.indd 51

Fig 3 Example of a FELV circuit supplied by a double-wound transformer

FELV circuit connected to Earth

Double-wound transfer Protective device

Protective device

FELV current-using equipment

LV source

FELV circuit

FELV live part may be connected to cpc of primary source

NICEIC Connections Summer 2011

51

14/6/11 15:19:46


Ask the experts/Technical

N

Fully charged

T

Hybrid ring/radial final circuits NICEIC is sometimes asked whether a ring final circuit has to be supplied directly from a protective device in the distribution board or consumer unit, or whether it is permitted to supply the two ends of the ring via a dedicated radial circuit cable, as shown in Fig. 1, thereby forming a hybrid ring/radial circuit.

his question can arise where, for example, the contractor wishes to make use of a redundant radial circuit cable previously installed for another purpose (such as a cooker circuit) to supply a ring final circuit, or where a Periodic Inspection of an existing installation reveals such an arrangement. The same question may also arise where the contractor wishes to control a ring final circuit by means of a switch for functional purposes, or possibly by means of a contactor, controlled by an emergency stop push button (such as in a teaching situation), the supply being brought to the switch or contactor via a dedicated radial circuit cable. The answer is that it is permissible to form a hybrid ring/radial circuit, even though BS 7671 defines a ring final circuit as ‘A final circuit arranged in the form of a ring and connected to a single point of supply’. For such a hybrid

Fig 1 Typical ring final circuit supplied via a radial circuit cable, forming a hybrid ring/radial circuit

Ring circuit cable (installed rating 20 A min) Ring final circuit

Junction box (or possibly double-pole switch or contactor) rated at 30/32 A min Cable connected to 30/32 A overcurrent protective device in consumer unit

Radial circuit cable (installed rating 30/32 A min)

L OUT

N OUT

Consumer unit

52

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 52

www.niceic.com

14/6/11 15:21:14


circuit, the ‘single point of supply’ is the point at which the two ends of the ring part of the circuit are connected to the radial part (that is, at the joint box, switch or contactor in the example in Fig 1). A hybrid ring/radial final circuit must be arranged to meet all the relevant requirements of BS 7671, the main ones of which are summarised below. Protection against electric shock As for any other final circuit, the requirements of Chapter 41 for electric shock protection have to be met, including those of Section 411 for earth fault loop impedance (Zs) and, where applicable, RCD additional protection of the socket-outlets (IΔn ≤ 30 mA) in accordance with Regulation 411.3.3. Also, if any part of the circuit cable is concealed in a wall or partition, it must be provided with additional protection by an RCD (IΔn ≤ 30 mA) where required by Regulations 522.6.7 or 522.6.8 (numbers changed to 522.6.102 and 522.6.103, respectively, by Amendment 1 (2011) to BS 7671: 2008). Cable sizing with regard to normal load and overload The current-carrying capacity (Iz) of the cable in the radial part of the circuit must be not less than 30 A or 32 A, to match the circuit overcurrent protective device rating (In) of 30 A or 32 A. Where the protective device is a semi-enclosed (rewireable) fuse, Iz must be not less than In divided by 0.725. Regulation 433.1.3 refers (number changed to 433.1.101 by Amendment 1 (2011) to BS 7671: 2008). The ring part of the circuit must meet the same overload protection requirements as for any other ring final circuit. The usual way to comply with these requirements is to comply with Regulation 433.1.5 (number changed to 433.1.103 by Amendment 1 (2011) to BS 7671: 2008). Despite the non-conventional form of a hybrid ring/ radial circuit, the total load current (Ib) to be supplied by the circuit, making due allowance for any diversity, must still be no greater than the 30 A or 32 A rating of the circuit protective device. Thus, for example, the floor area served by the circuit should be no greater than would be the case if an ordinary ring final circuit having the same protective device rating was installed instead of the hybrid circuit. Accessibility of connections As is required for all electrical connections, the connections between the radial and ring parts of the circuit (in the junction box, switch or contactor in Fig 1) must be arranged to be accessible throughout the life of the installation for inspection, testing and maintenance. The only exception is where a connection method excused from this requirement by Regulation 526.3 is used.

www.niceic.com

50_63_technical.2.vb.indd 53

Voltage drop Account must be taken of the voltage drops in both the radial and ring parts of the circuit. These voltage drops added together make up the total voltage drop in the circuit. This may mean, for example, that the maximum allowable length of the ring part of the circuit will be less than that for a ring final circuit connected directly to the distribution board. Protective conductor in the ring part of the circuit Except where the circuit protective conductor in the ring part of the circuit is formed by a metal covering (such as a metallic cable sheath) or enclosure (such as metal conduit) containing all the conductors of the ring, the protective conductor must be run in the form of a ring, as required by Regulation 543.2.9. Both ends of the protective conductor ring must be connected to the earthing terminal at the origin of the ring (that is, the junction box, switch or contactor in Fig 1). Earthing for equipment having high protective conductor currents If the circuit is intended to supply one or more items of equipment where it is known or reasonably to be expected that the total protective conductor current is likely to exceed 10 mA, the circuit will require a high integrity protective conductor connection in accordance with Regulation Group 543.7. In the radial part of the circuit this will necessitate the use of a 10 mm2 circuit protective conductor in accordance with Regulation 543.7.1.3(i), or one of the three arrangements (a), (b) and (c) listed in Regulation 543.7.2.1 (ii), for example. In the ring part of the circuit, the requirement for a high integrity protective conductor connection will be met automatically provided the circuit protective conductive in that part is run in the form of a ring (Regulation 543.7.2.1(i) refers), as referred in the previous item of this article. Use of a standard circuit might be easier It will be appreciated from this article that the use of a hybrid ring/radial circuit arrangement can involve significant design effort. As an alternative, for household and similar installations, installers should consider the use of the standard ring or radial socket-outlet circuit arrangements shown in Appendix 15 of BS 7671, for which tables of maximum cable length are given in the NICEIC Domestic Electrical Installation Guide.

NICEIC Connections Summer 2011

53

14/6/11 13:07:58


Ask the experts/Technical

N

Fully charged The Electrical Installation Condition Report Amendment 1 to BS 7671: 2008 (IET Wiring Regulations 17th Edition), released in July, includes a number of changes to the model forms that are used for periodic inspection reporting, which are contained in Appendix 6. Not the least of the changes is that the Periodic Inspection Report form has been given the new name of ‘Electrical Installation Condition Report’. Another significant change is that the model Schedule of Inspections is designated as being for use only for domestic and similar installations with a supply rating of 100 A or less. Fig 1 On page 1

SECTION A. DETAILS OF THE CLIENT / PERSON ORDERING THE REPORT Name .......................................................................................................................................................................................................................... Address ...................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................... SECTION B. REASON FOR PRODUCING THIS REPORT .................................................................................................................................... ..................................................................................................................................................................................................................................... Date(s) on which inspection and testing was carried out ........................................................................................................................................... SECTION C. DETAILS OF THE INSTALLATION WHICH IS THE SUBJECT OF THIS REPORT Occupier ..................................................................................................................................................................................................................... Address ...................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................... Description of premises (tick as appropriate) Domestic Commercial Industrial Other (include brief description) ................................................................................................... Estimated age of wiring system ……………..years Evidence of additions / alterations Yes No Not apparent If yes, estimate age …………….years Installation records available? (Reg 621.1) Yes No Date of last inspection …………………………. (date) SECTION D. EXTENT AND LIMITATIONS OF INSPECTION AND TESTING Extent of the electrical installation covered by this report ..................................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................... Agreed limitations including the reasons (see Regulation 634.2) .............................................................................................................................. ..................................................................................................................................................................................................................................... Agreed with: ............................................................................................................................................................................................................... Operational limitations including the reasons (see page no..............) ....................................................................................................................... ..................................................................................................................................................................................................................................... The inspection and testing detailed in this report and accompanying schedules have been carried out in accordance with BS 7671: 2008 (IET Wiring Regulations) as amended to ………………………………….. It should be noted that cables concealed within trunking and conduits, under floors, in roof spaces, and generally within the fabric of the building or underground, have not been inspected unless specifically agreed between the client and inspector prior to the inspection. SECTION E. SUMMARY OF THE CONDITION OF THE INSTALLATION General condition of the installation (in terms of electrical safety) ............................................................................................................................ ..................................................................................................................................................................................................................................... ..................................................................................................................................................................................................................................... Overall assessment of the installation in terms of its suitability for continued use SATISFACTORY / UNSATISFACTORY* (Delete as appropriate) *An unsatisfactory assessment indicates that dangerous (Code C1) and/or potentially dangerous (Code C2) conditions have been identified. SECTION F. RECOMMENDATIONS Where the overall assessment of the suitability of the installation for continued use above is stated as UNSATISFACTORY, I / we recommend that any observations classified as ‘Danger present’ (Code C1) or ‘Potentially dangerous’ (Code C2) are acted upon as a matter of urgency. Investigation without delay is recommended for observations identified as ‘Requiring further investigation’. Observations classified as ‘Improvement recommended’ (Code C3) should be given due consideration. Subject to the necessary remedial action being taken, I / we recommend that the installation is further inspected and tested by …………..…(date) SECTION G. DECLARATION I/We, being the person(s) responsible for the inspection and testing of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, having exercised reasonable skill and care when carrying out the inspection and testing, hereby declare that the information in this report, including the observations and the attached schedules, provides an accurate assessment of the condition of the electrical installation taking into account the stated extent and limitations in section D of this report. Report authorised for issue by: Inspected and tested by: Name (Capitals) ............................................................................... Name (Capitals) ............................................................................... Signature ......................................................................................... Signature .......................................................................................... For/on behalf of ................................................................................ For/on behalf of ................................................................................ Position ............................................................................................ Position ............................................................................................ Address ............................................................................................ Address ............................................................................................ Date ................................................................................................. Date .................................................................................................. SECTION H. SCHEDULE(S) …………schedule(s) of inspection and ……...schedule(s) of test results are attached. The attached schedule(s) are part of this document and this report is valid only when they are attached to it.

54

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 54

T

his article discusses the reasoning behind the changes to the model forms and how these changes will affect both the persons compiling Electrical Installation Condition Reports and the customers who receive them. Background

About two and a half years ago, a working group was set up by JPEL/64, the UK national committee responsible for the technical content of BS 7671, to look into improving the model Periodic Inspection Report form and associated schedules of inspection and testing given in Appendix 6 of BS 7671. This was seen by all concerned as part of a greater overall strategy to improve the current, extremely variable (in terms of quality and consistency) standard of periodic inspection reporting. Other parts of the strategy, which will be implemented in due course by the electrical installation industry and associated bodies, will include the provision of guidance materials and training packages. These measures are seen as necessary because persons carrying out periodic inspection reporting need to have a higher level of knowledge and experience than is needed for those carrying out electrical installation work or the initial verification of such work. The changes The significant changes to the model forms used for periodic inspection and testing are mentioned below. The name of the report form An early decision was to change the name of the model report form to more accurately reflect its purpose, which is to determine, so far as is reasonably practicable, whether the installation is in a satisfactory condition for continued service (Regulation 621.1 refers). It was also thought that changing the name to Electrical Installation Condition Report would communicate the purpose of the report more clearly to the majority of recipients of such reports, who are generally not conversant with the requirements of BS 7671. The first two pages The first two pages of the current 17th Edition Periodic Inspection Report provide a summary of factors pertinent to the installation being inspected and to the inspection process.

www.niceic.com

14/6/11 15:21:25


Page 1 contains details of the client, the installation, the extent of the installation covered by the report, and the limitations placed on the inspection. The same page also contains the inspector’s recommendation as to when the installation should next be subjected to a periodic inspection, and the details and signature of the person who carried out the inspection and the person who authorised the report for issue. Page 2 contains details relating to the electricity supply and earthing arrangements for the installation, and information on the bonding and main protective equipment within the installation. The same page also contains a summary of the inspection, including an overall assessment of whether or not the installation remains satisfactory for continued, safe use, and details of the schedules of inspection and testing attached as part of the report. The working group of JPEL/64 concluded that the above two pages were generally suitable for purpose and that the requirements for completion of these pages by the person compiling the report were relatively self-explanatory. Nevertheless, a number of changes were introduced to these pages and to other parts of the report, as covered below. See Fig 1 (left): On page 1 A Details of the client / person ordering the report B Reason for producing this report C Details of the installation which is the subject of

this report D Extent and limitations of inspection and testing E Summary of the condition of the installation F Recommendations G Declaration (in terms of accuracy of the assessment

of condition) H Schedule(s) (attached to report)

As can be seen from the above description, the overall summary of the inspection, and the recommendations of the person carrying out the inspection, have now been moved to Page 1. Putting such key information on the front page was seen as being beneficial to the person receiving the report.

Fig 2 On page 2

SECTION I. SUPPLY CHARACTERISTICS AND EARTHING ARRANGEMENTS Earthing Number and Type of Live Nature of Supply Parameters Supply Protective Device Arrangements Conductors TN-C a.c. d.c. Nominal voltage, U / U0.(1) .........................V BS (EN) ............................. TN-S 1-phase, 2-wire 2-wire Nominal frequency, f.(1) .............................Hz Type ................................... 3-wire TT-C-S 2 phase, 3-wire Prospective fault current, Ipf(2) ...................kA TT 3 phase, 3-wire Rated current ..................... A External loop impedance Ze(2) ............................. : IT 3 phase, 4-wire Note: (1) by enquiry Confirmation of supply polarity (2) by enquiry or by measurement Other sources of supply (as detailed on attached schedule) SECTION J. PARTICULARS OF INSTALLATION REFERRED TO IN THIS REPORT Means of Earthing Details of Installation Earth Electrode (Where Applicable) Type ........................................................................................................................................................................... Distributor’s facility Installation earth Location ...................................................................................................................................................................... electrode Resistance to Earth .................: Main Protective Conductors Connection / continuity verified Earthing conductor Material …............................ csa ........................mm2 Main protective bonding Connection / continuity verified Material ……......................... csa ........................mm2 conductors To incoming water service To incoming gas service To incoming oil service To structural steel To lightning protection To other incoming service(s) Specify .......................................................................................................... Main switch / Switch-fuse / Circuit-breaker / RCD If RCD main switch Location ...................................................... Current rating ..................................... A Rated residual operating current (I'n) ..................... mA ..................................................................... Fuse / device rating or setting ............ A Rated time delay ..................................................... ms BS(EN) ....................................................... Voltage rating ..................................... V Measured operating time(at I'n) ............................. ms No of poles ................................................. SECTION K. OBSERVATIONS Referring to the attached schedules of inspection and test results, and subject to the limitations specified at the Extent and Limitations of the Inspection and testing section No remedial action is required . The following observations are made (see below): CLASSIFICATION FURTHER OBSERVATION(S) CODE

INVESTIGATION REQUIRED (YES / NO)

.............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... .............................................................................................................................................................. ............................... ............................... One of the following codes, as appropriate, has been allocated to each of the observations made above to indicate to the person(s) responsible for the installation the degree of urgency for remedial action. C1 – Danger present. Risk of injury. Immediate remedial action required C2 – Potentially dangerous - urgent remedial action required C3 – Improvement recommended

See Fig 2 (right): On page 2 I

Supply characteristics and earthing arrangements Particulars of installation referred to in this report (including: Main protective conductors, and Main switch / switch-fuse / circuit-breaker / RCD) K Observations J

In recognition of the ever increasing presence of more than one source of supply to (or within) an installation, an entry is now required in Section I, on page 2 of the report form, regarding any sources of supply additional to the main supply, such as generators. The details of such sources are required to be provided in a separate schedule included as part of the overall report.

www.niceic.com

50_63_technical.2.vb.indd 55

NICEIC Connections Summer 2011

55

14/6/11 13:08:18


Ask the experts/Technical

N

Fully charged Fig 3 Extract from the Schedule of Inspections

OUTCOMES

Acceptable condition

9

Unacceptable condition

State C1, or C2,

Improvement State C3 recommended

Not verified NV

Limitation Lim

Not applicable N/A

OUTCOME

ITEM NO

(Use codes above. Provide additional comment where appropriate. C1/C2 and C3 coded items to be recorded in section K of the Condition Report)

DESCRIPTION

1.0 1.1 1.2 1.3 1.4 1.5 1.6

DISTRIBUTOR’S / SUPPLY INTAKE EQUIPMENT Service cable condition Condition of service head Condition of tails - Distributor Condition of tails - Consumer Condition of metering equipment Condition of isolator (where present)

2.0

PRESENCE OF ADEQUATE ARRANGEMENTS FOR - OTHER SOURCES SUCH AS MICROGENERATORS (551.6; 551.7)

Such details are essential to permit the effectiveness of the protective measures of the installation to be confirmed for the various arrangements of supply sources. For example, the circuits of an installation must be able to meet the appropriate disconnection times required by Chapter 41 regardless of which of the possible sources (including sources acting separately or in parallel) they are connected to at any particular time. An entry is also now required in Section J, on page 2, regarding the verification of connection and continuity of the main protective conductors of the installation.

Further investigation required?

(Y or N)

Code 1 – Requires urgent attention, or Code 2 – Requires improvement, or Code 3 – Requires further investigation, or Code 4 – Does not comply with current

edition of BS 7671 Amendment 1 will see the introduction of the following classification codes: C1 – Danger present – Risk of injury. Immediate remedial

action required C2 – Potentially dangerous – Urgent remedial action

A new report coding system

required C3 – Improvement recommended

Also on Page 2 of the report form, Section K is concerned with the observations of the person carrying out the inspection and testing. Section K differs from the corresponding section of the current 17th Edition Periodic Inspection Report form in a number of ways. Although the person carrying out the inspection and testing still records observations, the system of codes associated with the observations has been changed significantly. Under the old system, an observation was identified as being:

56

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 56

If any observation warrants a Code C1 or C2, an overall assessment of ‘unsatisfactory’ should be made for the installation by the person preparing the report. Looking at Regulation 634.2, it can be seen that it is not necessary to record a non-compliance with the requirements of the regulations unless it may give rise to danger or potential danger. As a result, the Code 4 from the old coding system has been discontinued.

www.niceic.com

14/6/11 15:21:37


It was recognised, however, that the person producing the report may need to recommend that further investigation should be carried out in relation to an observation. This would generally be because the inspection had revealed a potential deficiency that might reasonably be thought to indicate danger or potential danger but which could not be fully identified due to the agreed extent or limitations of the inspection. As a result, a column has been included in the model report form to allow a recommendation for further investigation to be shown against any observation noted in the report. The Electrical Safety Council is currently revising its Best Practice Guide 4 Periodic inspection reporting to provide guidance on reporting on the condition of an electrical installation and the application of the new classification code system. The Schedule of Inspections

The model Schedule of Inspections, which as just mentioned is for use on domestic and similar installations only, contains sections for: Distributor’s / supply intake equipment Presence of adequate arrangements for other sources

such as microgenerators Earthing / bonding arrangements Consumer units / distribution boards Final circuits Locations containing a bath or shower Other special installations or locations

To assist the person carrying out the inspection to focus on the relevant requirement(s) of BS 7671, the model Schedule of Inspections gives the regulation number(s) relating to each inspection item of the schedule. See Fig 3 (left): Extract from the Schedule of Inspections

It was accepted in the working group that the current Schedule of Inspections contained in BS 7671: 2008 was suitable enough to use when commenting on a new installation, but less so for commenting and reporting on an existing installation. Part of the problem stemmed from this schedule having originally been devised for use with the Electrical Installation Certificate, where the person(s) filling in the schedule would be expected to be in a position to obtain all of the necessary information, such as the particular protective measures employed and details of the installed equipment. This, however, is frequently not the case for a periodic inspection. As a result, the working group decided to adopt what they perceived as a logical ‘checklist’ sequence that could be followed when carrying out an inspection of an electrical installation. It was also considered that the list would provide a useful aide memoire to ensure that important aspects of an installation are not overlooked when an inspection is being carried out. It was decided to limit the use of the model Schedule of Inspections so that it would apply only to domestic and similar installations having a supply capacity not exceeding 100 A. This is reflected in the title of the schedule as it appears in Appendix 6. However, a note beneath the title points out that the schedule is suitable for many types of smaller installation, not exclusively domestic. For larger, more complex installations, the working group decided to include not a model Schedule of Inspections but a detailed list of examples of items that should be considered when carrying out a periodic inspection. This list is given at the end of Appendix 6.

www.niceic.com

50_63_technical.2.vb.indd 57

Given that the vast majority of domestic and similar installations employ the protective measure of Automatic Disconnection of Supply (ADS), it was decided to give this measure prominence in the model Schedule of Inspections. The person carrying out the inspection is prompted to look into a number of aspects relating to the: earthing and bonding arrangements for the installation consumer unit(s) or distribution board(s) and the

switching and protective devices, including the presence of required warning notices and labelling final circuit arrangements and methods of installation the installation arrangements within a location containing a bath or shower. No space has been allocated in the schedule for types of special installation or location other than a location containing a bath or shower. Where any of these are encountered, it is for the person carrying out the inspection to produce a suitable report or schedule in order to describe any pertinent details to the person who ordered the inspection. After much discussion it was agreed that the arrangement of the form should be such that it encouraged the person carrying out the inspection to start by looking at the general condition of the equipment owned by the distributor and/or meter operator, located on the premises. The intention here is to allow comments to be made where clear risks exist from, for example, instances of damage making access to live parts possible or where obvious signs of significant overheating on (say) cables or equipment can be seen. Where such problems are observed, the person carrying out the inspection should note these on the report and recommend that the person ordering the inspection contacts the relevant organisation regarding the observed deficiencies.

NICEIC Connections Summer 2011

57

14/6/11 13:08:43


Ask the experts/Technical

N

Fully charged Fig 4 Schedule of Test Results

12

13

14

15

16

17

18

Remarks (continue on a separate sheet if necessary)

RCD (ms)

19

20

Test button operation

Live-E

11

Zs

@ 5I'n

Live-Live

10

(:)

@ I'n

R2

9

(R1 + R2)*

8

r2 (cpc)

7

Insulation Resistance (M:)

r1 (line)

6

Continuity (:) (R1 + R2) or R2

rn (neutral)

5

Live (mm2)

4

cpc (mm2)

Conductor details

Breaking capacity (kA) Reference Method

3

Rating (A)

BS (EN)

2

type

Circuit number 1

Ring final circuit continuity (:)

Polarity

Test results

Overcurrent device

Circuit Description

Details of test instruments used (state serial and/or asset numbers) Continuity ............................................................................................................. Insulation resistance ............................................................................................ Earth fault loop impedance .................................................................................. RCD ...................................................................................................................... Earth electrode resistance ...................................................................................

Details of circuits and/or installed equipment vulnerable to damage when testing ............................................................ ................................................................................................... ................................................................................................... ................................................................................................... ...................................................................................................

DB reference no ........................................................... Location ........................................................................ Zs at DB ( ) ................................................................. Ipf at DB (kA) ................................................................. Correct supply polarity confirmed Phase sequence confirmed (where appropriate) Tested by: Name (Capitals)................................................................. Signature............................ Date ...................................... Circuit details

21

22

* Where there are no spurs connected to a ring final circuit this value is also the (R1 + R2) of the circuit.

The Schedule of Test Results The schedule of test results contained in BS 7671: 2008 was considered, for the most part, to be suitable for purpose. However, a point that needed to be addressed was that the schedule did not recognise the requirement of Regulation 612.12 to confirm that the phase sequence has been maintained in a multi-phase installation. A further point was that the schedule did not include a facility to record the results obtained during the various stages of ring final circuit conductor continuity testing. This latter deficiency has been remedied by the inclusion of columns for the end-to-end resistances of the line, neutral and circuit protective conductors, (r1), (rn) and (r2) respectively.

58

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 58

Columns have also been provided for recording the five times the rated residual operating current (5 IΔn) test result for RCDs installed to provide additional protection and the outcome of the operation of the RCD’s integral test button. See Fig 4 (above): Schedule of Test Results

NICEIC Electrical Installation Condition Reports Work is currently underway by NICEIC to produce its own separate forms of generic Electrical Installation Condition Report and Domestic Electrical Installation Condition Report. These will be for use by NICEIC Approved Contractors and Registered Domestic Installers as permitted within their terms of enrolment. An NICEIC Schedule of Inspections and Schedule of Test results will also be available for use with each of these condition report forms.

www.niceic.com

14/6/11 15:21:50


NEW

The most advanced solar PV installation tester is the safest and easiest too. Seaward’s new Solar PV installation tester does more than combine all test functions into one easy to use, hand-held device. It also defines a major advance in PV testing safety. Because Solar PV arrays can generate hazardous levels of DC electricity, as soon as they are exposed to light, they are treated with extreme caution by electricians. So you’ll be pleased to know, the Solar PV100 rules out exposure to live conductors, using plugs which connect easily to all standard PV modules and arrays. Why in the world would you test with anything else?

www.seawardsolar.com

SOLAR From Seaward

Are you reading someone else’s copy? Would you like to order extra copies?

NICEIC Live proves a hit with contractors // page 8

connections THE NICEIC MAGAZINE FOR APPROVED ELECTRICAL CONTRACTORS & DOMESTIC INSTALLERS £5.00 TWITTER: @OFFICIALNICEIC SUMMER 2011 | ISSUE 178

Subscribe now

ADVICE P19 How to win more business by putting together the perfect tender

/

2021 VISION P34 Incisive research into how the electrical industry will look in a decade’s time

/

/

COMMERCIAL VEHICLES P42 Navigating your way through the options that can keep your business mobile

MAKE SOME NOISE Get noticed and get your firm to stand out from the crowd

for just £20 for one year or £34 for two years

Call: 020 8950 9117 or email: connections@alliance-media.co.uk please quote code Summer11

MERSEY BEAT How A&B Engineering’s electrical division has thrived with the rebirth of Liverpool

// page 30

con_cover_summer_2011.1.vb.indd 1

14/6/11 12:46:08

connections NIC.06.11.059.indd 59

16/6/11 17:18:27


Ask the experts/Technical

N

Fully charged RCD testing for a lighting circuit with no circuit protective conductor A question sometimes put to NICEIC is how to verify the operation of an RCD protecting a lighting circuit that has no protective conductor.

Fig 1 Example of testing an RCD where the RCD protects only lighting circuits having no cpc

Lighting point

T

he 13th Edition, and earlier, of the IEE Wiring Regulations did not require a circuit protective conductor (cpc) to be run to each point and accessory of a final circuit, as is the current requirement in the final paragraph of Regulation 411.3.1.1 of BS 7671. It is therefore not uncommon to find lighting circuits that do not have a cpc during periodic inspection or where additions or alterations are required in homes built and wired to those earlier regulations. This article looks at how to verify the operation of an RCD protecting a lighting circuit with no cpc. This may be necessary where, for example, the consumer unit has been replaced in accordance with the guidance given in Best Practice Guide No 1 – Replacing a consumer unit in domestic premises where lighting circuits have no protective conductor (published by The Electrical Safety Council and available as a free download from www.esc.org.uk). Two cases are considered in this article: where the RCD protects only lighting circuits having no cpc, and where the RCD protects not only lighting circuits having no cpc but also one or more circuits that do have a cpc.

Requirement to test an RCD

Light switch

Each RCD installed should be tested to confirm that the relevant requirements of BS 7671 have been met. The procedure comprises two parts, namely: simulating an appropriate condition using an RCD test instrument (Regulation 612.8.1 and 612.10 refer), and testing the operation of the device by means of its integral test button (Regulation 612.13.1 refers). Where to connect the RCD test instrument

72 m s P-E P-N

60

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 60

The objective of the procedure referred to above is to test the effectiveness of the RCD itself, rather than the circuit or the earthing arrangements, which are tested by other means. Therefore, the RCD test instrument may be connected at any convenient point or accessory in a circuit supplied through the RCD, or at the load terminals of the RCD itself. Where an RCD protects only lighting circuits that have no cpc, the RCD test instrument should be connected at the load terminals of the RCD. This method is shown in Fig 1, in which the RCD is shown housed in the consumer unit.

www.niceic.com

14/6/11 15:22:11


Where an RCD protects lighting circuits having no cpc and also one or more circuits that do have a cpc, the test instrument may be connected at a point or accessory in one of the circuits that has a cpc. An example of this is shown in Fig 2, in which the test instrument is connected to a socket-outlet that has an earthing contact connected to the cpc, the circuit being protected by the RCD. Connecting the instrument at a point or accessory has the advantage of avoiding having to work inside the consumer unit while it is live.

Fig 2 Example of testing an RCD that protects not only a lighting circuit having no cpc but also a socket-outlet circuit

Further information on RCD testing Further information relating to testing of RCDs, such as information on safe working practices, values of test current that should be used and acceptable test results, can be found in the NICEIC book Inspection, testing and certification. Information on safe isolation procedures can be found in Best Practice Guide No 2 – Guidance on the management of electrical safety and safe isolation of low voltage installations (published by The Electrical Safety Council and available as a free download from www.esc.org.uk).

Meet the helpline Justin Maltby-Smith, NICEIC senior operations engineer Industry experience: Ran his own electrical company, lecturer, consultant/project manager Interests: Kung-Fu and kickboxing, black-belt instructor

www.niceic.com

50_63_technical.2.vb.indd 61

72 ms P-E

P-N

If you have ever telephoned our technical helpline you may wonder who the voices are on the other end of the line. Well, meet the technical helpline team: all industry professionals with vast experience in the electrical industry and some interests outside of the day job too!

Alan Turvey, NICEIC operations engineer Industry experience: Electrician, carrying out industrial, commercial, quarry and domestic installations, lecturer and deputy head of construction with further education college Interests: Walking, bonsai cultivation and restoration of classic bicycles

Stuart McHugh, senior technical helpline engineer Industry experience: More than 41 years in the electrical industry, including a six-year apprenticeship, industrial commercial domestic and street-lighting work Interests: Vintage aircraft, motoring (owns an MGBGT sports car)

Clinton Thompson, NICEIC operations engineer Industry experience: Electrician (domestic and industrial), electrical engineer (food industry, high-volume production and heavy press industry), college tutor, training centre tutor Interests: Classic cars and bikes (owns a Royal Enfield Bullet), music (plays guitar in a small group)

John O’Neill, NICEIC operations engineer Industry experience: Owned and operated a large electrical systems integrator, electrical consultant, lecturer in electrical installations and NVQ assessor, experienced in a wide range of installation types and market sectors having spent more than 38 years in the electrical industry Interests: Sports, books and travel

NICEIC Connections Summer 2011

61

14/6/11 15:23:51


Ask the experts/Technical

N

Fully charged Snags & Solutions A practical guide to everyday electrical problems ‘Snags & Solutions’, NICEIC’s problem solving book, is now available in three parts, which cover many commonly-encountered electrical installation problems. All parts take account of the requirements of BS 7671: 2008 (17th Edition of the IEE Wiring Regulations), where appropriate. Part 1 addresses 53 problems relating to earthing and bonding, Part 2 covers 55 problems relating to wiring systems, and Part 3 covers 52 problems relating to inspection and testing. The books are available from NICEIC Direct. To give an indication of the value of these books, a snag and solution is being covered in each issue of Connections. This issue addresses a snag from Part 3 – Inspection and Testing, relating to where steel conduit that does not have an internal circuit protective conductor is found during the periodic inspection and testing of an existing installation.

snags and solutions

snags and solutions A PRACTICAL GUIDE TO EVERYDAY ELECTRICAL PROBLEMS

A PRACTICAL GUIDE TO EVERYDAY ELECTRICAL PROBLEMS

Part 3 Part 2

wiring systems

inspection and testing

2nd Edition

COMPLIES WITH

62

Summer 2011 NICEIC Connections

50_63_technical.2.vb.indd 62

Steel conduit systems Metal conduit systems in older installations are often found to have no internal circuit protective conductor (cpc) installed.

Snag 35 It is a common misconception that where a metal conduit system does not have an internal cpc, the installation is a potential danger. This has been known to result in the incorrect recommendation code to be recorded on a Periodic Inspection Report on the installation concerned, and the installation being judged to be in unsatisfactory condition.

Solution Where no internal cpc is installed in a metal conduit system, the metal conduit system may have been specifically selected by the installation designer to serve as the cpc. Regulations 543.2.2 (indent vi) and 543.2.5 permit metal conduit to serve as a protective conductor for the associated circuit(s). However, Regulation 543.2.5 requires such conduit to satisfy the requirements of indents (i) and (ii) of Regulation 543.2.4, for electrical continuity and cross-sectional area (csa). Furthermore, where a metal conduit system does serve as the cpc, its suitability for continued use for the purpose should be checked by inspection and testing, in accordance with Chapter 62 of BS 7671.

www.niceic.com

14/6/11 15:24:52


The conduit system should, where practicable, be inspected along its length to check for corrosion or loose joints that could impair electrical continuity or reduce the csa to such a degree that the conduit may not safely carry the prospective fault current. Where the conduit system is buried in the building fabric, removal of accessories and cover plates will provide inspection points. Where access to the conduit is difficult, further indication of the likely condition of the conduit system could be provided by considering the building construction, the environment and checking any exposed structural steel for corrosion. Following inspection, the conduit should be tested for electrical continuity throughout its length. In addition to the tests for continuity, the earth fault loop impedance of the circuits reliant on the conduit as their protective conductor should be measured to determine whether they meet the requirements of BS 7671 for fault protection.

Fig 1 Conduit system testing

Regulation 543.2.2 (part of) A protective conductor may consist of one or more of the following: (vi) A metal conduit, metallic cable management system or other enclosure or electrically continuous support system for conductors. Regulation 543.2.4 (part of) Where a metal enclosure or frame of a low voltage switchgear or controlgear assembly or busbar trunking system is used as a protective conductor, it shall satisfy the following three requirements: (i) Its electrical continuity shall be assured, either by construction or by suitable connection, in such a way as to be protected against mechanical, chemical or electrochemical deterioration (ii) Its cross-sectional area shall be at least equal to that resulting from the application of Regulation 543.1, or verified by test in accordance with BS EN 60439-1 Regulation 543.2.5 The metal covering including the sheath (bare or insulated) of a cable, in particular the sheath of a mineral insulated cable, trunking and ducting for electrical purposes and metal conduit, may be used as a protective conductor for the associated circuit, if it satisfies both requirements of items (i) and (ii) of Regulation 543.2.4.

www.niceic.com

50_63_technical.NEW.vb.indd 63

Regulation 621.2 Periodic inspection comprising of a detailed examination of the installation shall be carried out without dismantling, or with partial dismantling as required, supplemented by appropriate tests from Chapter 61 to show that the requirements for disconnection times, as set out in Chapter 41 for protective devices, are complied with, to provide for: (i) safety of persons and livestock against the effects of electric shock and burns (ii) protection against damage to property by fire and heat arising from an installation defect (iii) confirmation that the installation is not damaged or deteriorated so as to impair safety (iv) the identification of installation defects and departures from the requirements of these Regulations that may give rise to danger.

NICEIC Connections Summer 2011

63

15/6/11 08:53:26


Product Focus Seaward

Marshall-Tufflex

The new Seaward Solar Installation PV100 is the first dedicated multi-function electrical tester for those involved in solar panel installation. The new tester is capable of carrying out all electrical tests required by IEC 62446 on grid connected PV systems and eliminates the need for multiple test instruments for PV panel electrical installation and connection. With the push of a single button the new combination tester carries out the required sequence of electrical tests in a safe and controlled manner, avoiding the risk of contact with exposed live DC conductors.

The all-new Cable Management Catalogue from Marshall-Tufflex represents the industry’s definitive and most user-friendly guide to trunking systems and prefabricated/ modular wiring solutions. The 308-page catalogue, which is available in hard copies or as an online e-catalogue, covers all MarshallTufflex cable management solutions, from the established such as Sterling Profile to new systems (including Twin165) and its bespoke specialised applications service. Product selection is swift and straightforward, with the catalogue split into colour-coded sections covering each product range.

0191 586 3511 www.seawardsolar.com

0843 218 9952 www.newcatalogue.co.uk

Aico For busy contractors on the move, Aico has launched a new iPhone App – Handyfacts – covering all the key information you need when fitting fire, smoke and carbon monoxide (CO) alarms. The new iPhone App is an ideal memory refresher when onsite and is easy to use, with direct links from the contents page to the relevant sections, an email enquiry facility so you can contact Aico directly and a link to Aico’s new website. The Handyfacts App also covers which alarm types to use in different areas of a property, explains siting requirements with clear diagrams and also gives details on wiring and accessories.

Now available from Martindale Electric is the new SB13 Safebreak Socket Test Adapter, a “must have” accessory for electricians who carry out electrical installation testing. Eliminating the need to remove the wall socket faceplate, the compact and robust SB13 enables electricians to safely and quickly make tests at wall socket outlets. Providing good connection to the wiring installation using standard 4mm test probes, R2 and R1 and R2 measurements are quickly identified, saving electricians valuable time and money. Suitable for use with any meter having industry standard 4mm plugs, the SB13 from Martindale Electric speeds up periodic 17th edition testing and Part P testing of electrical installations.

www.aico.co.uk

01923 441717 sales@martindale-electric.co.uk

EES Data

Senate Electrical

EES Data produces a full suite of contract management software. All are Windows 7 touch screen-enabled and built on a number of core modules: full professional contract estimating, small works costing and billing, supplier and quotation request, purchase ordering, job cost financial monitoring, application for payment and stock control.

Senate Electrical has launched a new 168-page Buyer’s Guide – its largest yet – designed to provide customers with details of its extensive product ranges and pricing. The newly designed Buyer’s Guide features a fresh modern design, clear product images and a brief key product description. Using colour coding to clearly identify the different sections, which include wiring, cable, lighting, test and inspection, data networking and switchgear and circuit protection, to name but a few, the new Buyer’s Guide is exceptionally easy to use, whether in the office or out on site. It will be produced monthly in both print and as an online flip-book, providing customers with an up-to-date price list and the latest industry news, such as changes to regulations, and special offers and promotions.

01924 200103 www.ees-data.co.uk

64

Martindale Electric

Summer 2011 NICEIC Connections

64_65_product focus.NEW2.vb.indd 64

www.senate.co.uk

www.niceic.com

15/6/11 09:16:31


For great deals on products and services visit www.niceicdirect.com

Static Systems A new detachable smoke detector for use within secure hospitals and psychiatric units has been launched by fire alarm specialist Static Systems Group (SSG). Aimed predominantly for use in areas where care of at-risk patients is provided, the unit utilises a standard multi-criteria type detector with a purpose-designed mounting base to provide anti-ligature protection to ensure the safety of occupants. For flexibility, the new device has been designed with interlocking plates that can be fixed onto either a standard ceiling-mounted BESA back box or an anti-ligature box for wall mounting.

Stanley Tools A worker is nothing without his tools – and with a heavy duty 1200 denier fabric exterior, the Xtreme Open Tote provides the long-lasting durability to keep its contents in top condition. A rigid and waterproof plastic base ensures that a professional’s tools of the trade are safe and secure even on damp, uneven and soiled surfaces. With a stainless steel bar handle and a padded shoulder strap, the Xtreme Open Tote is ideal for the pro on the move. And the tote also comes with Velcro straps, which are ideal for securing a full-size 600mm level. Multiple use tool compartments and a semi-rigid construction also means the tote maintains its shape and allows easy access. With a separate specialist compartment with separate strap, the Xtreme Open Tote also provides secure storage for saws. The FatMax Xtreme Open Tote retails from £54.99.

01902 895551 www.staticsystems.co.uk

www.stanleytools.co.uk

Eaton

Electricfix

Eaton’s new integrated PV Switch & Surge Unit has been designed to make the installation of solar photovoltaic (PV) systems faster and easier and more cost effective. These innovative units were developed in conjunction with Solarcentury, the UK’s most experienced solar company. For the first time, the unit provides DC and AC isolators with surge suppression components in a single, easy-to-fit assembly. To ensure safe operation and allow for convenient maintenance, all solar PV installations must include a DC isolator that can switch the power coming from the PV array.

Electricfix has launched its new catalogue that now features an extended range of electrical products. From big brand names to specialist products that are only available at Electricfix, the catalogue is packed full of the essentials every electrician needs and is available now. The new catalogue includes a range of LAP switches and sockets exclusively available at Electricfix. The range of conduit and trunking available from Electricfix has also been extended. Electricfix offers low fixed prices and industry-leading availability. Electricians can access the range from over 100 trade only counters throughout the UK and benefit from an Express Collection service.

0161 655 8900 www.eaton.com

Click Scolmore Two brand new product directories have been launched by Click Scolmore which, for the first time, sees the product ranges separated into two distinct categories – Wiring Accessories and Lighting. Testimony to the rapid growth of the business and in particular the development of the lighting side of the business, the new “Big Book” Lighting and Wiring Accessories catalogues showcase the company’s entire product offering and include a number of brand new additions within each of the categories. 01827 63454 www.scolmore.com

www.niceic.com

64_65_product focus.1.vb.indd 65

0808 172 7000 www.electricfix.com

Martindale Electric If you’re looking for an entry level PAT tester that’s fast, compact and easy to use, the HandyPAT 500 from Martindale Electric should easily suit your tool box and your pocket. Many electricians today are routinely offering PAT testing as one of their range of services. Martindale’s HandyPAT 500 is a quality product able to quickly and safely test any electrical appliance and get you swiftly established in the lucrative PAT market. The HandyPAT 500 is designed to perform basic safety checks in accordance with the IEE Code of Practice (3rd Edition) and, being lightweight and compact, is ideal for getting the job done quickly. 01923 441717 sales@martindale-electric.co.uk

NICEIC Connections Summer 2011

65

17/6/11 13:41:18


Current affairs Blast from the past When a car ploughed through the front of Bedford-based retailer Tavistock Sound and Vision it seemed like a freak one-off event. But it transpired that an almost identical incident had taken place 76 years previously when a driver reversed into the shop, then an electrical business called Gollings and Ayres, which sold light fittings and other electrical goods. The son of the owner of the 1936 store heard about the recent crash and showed a snap of the old shop to current manager Peter Dimmick. What’s that they say about things happening in threes?

Don’t forget to send Current Affairs any pictures that have made you smile and let us know of any hidden talents or charity initiatives. Email editor@ niceicconnections.com

CAUGHT ON CAMERA This quarter’s batch of electrical misdemeanours features (1-4): the rather frazzled culprits behind a lighting failure; a consumer unit with a 6mm cable at the bottom of the RCD feeding a shower; electrics hidden in a kitchen behind a flushed-in sound system; and an unconventional wiring method used in a travel iron put forward for a PAT. It continues with (5-9) a three-phase main supply, just yards from a busy London street, left completely uncovered in a staircase used as a storeroom; a set of light switches that had been plastered over in a kitchen; an uncovered socket supplied from an existing immersion heater circuit used to power a shower; a dubious location for a consumer unit in a refurbished flat; and a vending machine cup doubling up as a replacement live terminal cover perilously close to the metal lid of a distribution board at a commercial premises.

2 1 4

3

7

5 6

Geoff Robinson

Special thanks go to Dave Cherriman of Blair Installations in Portslade /// Graham Foster of North Hertfordshire Homes in Letchworth /// Chris Smith of Leicester firm C.D.Smith /// Carl Ansell from Carl Ansell Maintenance & Electrics in Devon /// Paul O’Connor of Hamcrown in Morden /// Paul Knight of Horley-based Knightlights /// Steve Dalby of Ashfield Electrical Services in Mansfield /// Steve Ennis, contracts manager at Jersey-based Midland Engineering & Contracting /// and Phil Blair of Leicester-based Advanced Electrical Installations.

66

9 8

Keep those shots coming in!

Fit for nothing

Pedal power

We’re all familiar with the kind of hair-brained ideas that come out of Europe, but the latest idea from across the Channel might leave contractors rather hot under the collar. EU chiefs have given their backing to a three-year project known as Cycle Logistics, designed to cut levels of urban traffic by encouraging greater use of bicycles – and have tradespeople firmly in their sights. Presumably it’s perfectly acceptable for contractors to have to make several trips a job and return to their base every time they need something slightly unusual. There’d be no money in it, but it would certainly keep you fit.

Oxfordshire Approved Contractor GA Electrical raised more than £2,200 for charity by taking part in a gruelling bike ride in May. Eight people from the business took part in either a 30 or 60-mile course and all managed to complete the distance in less than four hours, with donations split between Against Breast Cancer and local charity CHOKO. “Everyone had a great day and found the bike ride really enjoyable, despite having very tired legs by the end of it,” said Carl Vink, managing director (pictured third from left).

Summer 2011 NICEIC Connections

66_current_affairs.2.vb.indd 66

www.niceic.com

15/6/11 08:54:15


Have you seen it?

You have now! New Megger MFT1700 series, the shape of testing’s future. Now offering Q

2-wire non-tripping loop testing

Q

Loop and PFC displayed at the same time

Q

Phase sequence indication

Q

3-pole earth testing

Q

CAT IV 300 V safety rating

Now you have seen it call 01304 502 101 or go to www.megger.com for full details

Megger Limited Archcliffe Road Dover CT17 9EN UK T +44 (0) 1304 502 101 F +44 (0) 1304 207 342 E uksales@megger.com

The word ‘Megger’ is a registered trademark

NIC.06.11.IBC.indd 1

16/6/11 15:55:55


NIC.06.11.OBC.indd 1

16/6/11 15:56:53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.