Millions hear of Electrical Safety Register // page 6
connections THE MAGAZINE FOR NICEIC AND ELECSA REGISTERED CONTRACTORS
ADVICE P17
/
How a quality management system can make your business stand out
PAT TESTING P32
ÂŁ5.00
/
Despite recent changes, portable appliance testing offers opportunities for contractors
SPRING 2013 | ISSUE 185
UNDERFLOOR HEATING P36 Driven by energy efficiency, electric underfloor heating is finally coming of age
/
GROWING PLACES
Set up in 1935, Nantwich-based Gilks has expanded from a high street shop to a national contractor // page 28
01_ con_cover_spring_2013.FINAL.indd 1
08/04/2013 14:54
Lighting fitment failures are a nightmare. Fitting cheap, shoddy kit leaves customers frustrated - and you exposed. Origin Lighting changes everything. Revolutionising trade pricing and performance, Origin lets you ‘fit and forget’.
DIRECT MANUFACTURER PRICING
EXTENSIVE STOCKS FOR FAST DELIVERY
Being manufacturers means we’re in control, and our promise to you is that we will only use recognised high quality componentry in all of our fittings. Even better, there’s no middleman: we sell direct, ex-stock, to electrical contractors like you.
ORIGIN QUALITY PROMISE
ORIGIN TWO YEAR GUARANTEE
Installer trade prices with next day delivery UK-wide are just a click away.
FREE TECHNICAL ADVICE
Fit and forget with Origin. To open your account and claim your free welcome gift, call or click today.
t: 0808 161 7740 f: 0808 161 7741 e: sales@originlighting.co.uk improving environments
AMENITY CON.04.13.002.indd 1
COMMERCIAL
www.originlighting.co.uk EMERGENCY
INDUSTRIAL 09/04/2013 11:40
Spring 2013 | Issue 185
N
Contents Brave new world Certsure officially launched
4
18
Plugged in News Promotion of Electrical Safety Register reaches millions
6
Electrotechnical apprenticeships need funding reform, says ECA Book now for NICEIC Live South
7 7
Early bookers enjoy golf discount
8
32
Illustration: Cameron Law
28 Renewables news Green Deal advisors complete their first assessments
10
ESC news Calculator helps customers check for socket overloading 12 Switched On goes digital 13 Product news The latest testing products on the market
15
36
Live wire
Features
Advice 17 Implementing a quality management system can help your firm to stand out from the crowd, says Mo Ghaus
Cover story: contractor profile 28 Gilks occupies the same Nantwich premises where it started in 1935 but has changed in many other respects
Opinion 18 Contractors assessing LED products need to know exactly what they are looking for, warns Michael Dangoor
Under scrutiny 32 Portable appliance testing remains a lucrative market for contractors despite the government’s war on red tape
22
Regions 20 Adrian Holliday finds contractors in the north-east are controlling costs and sourcing new business
Fully charged
Insight 22 Cloud certification allows contractors to create, store and send certificates from wherever they are
Ask the experts 41 Some of the NICEIC technical helpline’s more frequently asked questions answered
Customer care 24 Care is needed when installing new technologies to ensure designs meet requirements, advises Philip Sanders
Technical Verification of a solar PV system
44 44
Connection of tap-off units of busbar trunking systems
49
Outdoor lighting installations
52
Uncommon conductor arrangements
56
Snags and solutions
60
Insight 27 The TrustMark badge is a sign of quality – and therefore a natural fit for registered contractors, says Liz Male Current affairs Pensioner discovers electricity
www.electricalsafetyregister.com
03_contents.FINAL.indd Sec1:3
66
Hot to trot 36 Electric underfloor heating is no longer expensive and inefficient – and that’s good news for contractors
»Cover illustration: Mike Poloway/UNP Connections Spring 2013
3
08/04/2013 14:55
Comment
N
EMMA CLANCY
First phase Brave new world Certsure – the joint venture between the ESC and the ECA – is now up and running, bringing several benefits to both NICEIC and ELECSA registered contractors
C
ertsure LLP – the official trading name of the new joint venture between the Electrical Safety Council (ESC) and the Electrical Contractors’ Association (ECA) – was officially launched on 1 April. Both our parent companies have been fantastic in helping create the joint venture, and I would like to personally thank Phil Buckle at ESC and Steve Bratt from the ECA for their help. Both the NICEIC and the ELECSA schemes will now be run by Certsure, and will be 50:50 owned and governed by the ESC and the ECA. Certsure will act as the sole registration, certification and assessment body for everyone under the NICEIC, ELECSA or ECA certification schemes. For the first 18 to 24 months, the registration scheme brands will run in parallel, so there will be no change to you or your business. You will continue to use the same customer service teams as before. However, as a registered contractor with one of the NICEIC or ELECSA schemes, or as a member of
Emma Clancy is chief executive officer, Certsure
the ECA, your business is now automatically listed at www.electricalsafetyregister.com. We expect to launch further benefits to everyone listed on the register over time. Certsure is an exciting development for the electrical industry. It is a partnership that will benefit the industry by giving us a stronger voice to government, stakeholders, consumers and contractors. We can collate efforts to raise awareness about safety and the need to use a registered contractor, and we can pool resources, knowledge and experience to provide a better service for our registered contractors. The first of these benefits to contractors is the creation of the Electrical Safety Register. We hope that by now you are seeing some of the work we have carried out to promote this to consumers and specifiers of electrical work (see page 8 for more details). So, welcome to everyone from ELECSA, who will be receiving Connections for the first time. I hope you enjoy reading and contributing to the magazine over time, and I look forward to working with you all in the future.
CONTACTS // CONNECTIONS Redactive Publishing Ltd, 17 Britton Street, London EC1M 5TP EDITORIAL General 020 7880 6200 Fax 020 7324 2791 Email nick.martindale@redactive.co.uk Editor Nick Martindale Technical editor Mike Clark Sub editors Victoria Burgher/ Clare Cronin Art director Mark Parry Art editor Adrian Taylor Picture researcher Akin Falope Publishing and business development director Aaron Nicholls ADVERTISING AND MARKETING Senior sales executive Darren Hale Sales executive Patrick Lynn Display 020 7880 6206 Fax 020 7880 7553 Email darren.hale@redactive.co.uk
4
Spring 2013 Connections
04_viewfromtop.FINAL.indd 4
PRODUCTION General production enquiries 020 7880 6240 Fax 020 7880 7691 Production manager Jane Easterman Deputy production executive Kieran Tobin Email kieran.tobin@redactive.co.uk SUBSCRIPTIONS Should you require your own copy of Connections or multiple copies for your staff, subscriptions are available by calling 020 8950 9117 CONTRIBUTIONS Connections welcomes ideas for contributions. Please email nick.martindale@ redactive.co.uk ISSN 2042-5732
© Redactive Publishing Ltd 2013 17 Britton Street, London EC1M 5TP. Registered No. 3156216. All rights reserved. This publication (and any part thereof) may not be reproduced, transmitted or stored in any print or electronic format (including but not limited to any online service, any database or any part of the internet) or in any other format in any media whatsoever, without the prior written permission of the publisher. Redactive Publishing Ltd accepts no liability for the accuracy of the contents or any opinions expressed herein. Printed by Wyndeham (Peterborough) Ltd. Paper by Denmaur Papers plc The paper mill that makes the text paper for this magazine states that it uses at least 80 per cent wood pulp from sustainable sources.
WWW.NICEIC.COM WWW.ELECSA.CO.UK ENQUIRIES Certsure 01582 539000 External affairs director Richard Pagett 01582 539020 richard.pagett@certsure.com Communications officer Paul Collins 01582 539148 paul.s.collins@certsure.com NICEIC Direct Mike Jackson 01582 539709 mike.jackson@certsure.com Twitter @ElecSafeReg Technical helpline 0870 013 0391 Customer services 0870 013 0382 Sales 0870 013 0458 Training 0870 013 0389
www.electricalsafetyregister.com
08/04/2013 14:56
CH LA A S BO NCE T OK TO !
Partner sponsor:
Technical Conference and Exhibition
Cost:
Electric Registe al Safety r Contra ctors
£29 (ex VAT)
S O U T H
Non Re
g
£49 (existered VAT)
16 May 2013 Epsom Downs Racecourse, Surrey, KT18 5LQ
New exhibitors include:
Highlights for 2013: ~ >eTa # W^dab ^U cTRW]XRP[ bT\X]Pab
~ 7T[_Ud[ QdbX]Tbb PSeXRT bT\X]Pab
~ ;XeT[h caPST TgWXQXcX^]
~ 3XbR^d]cb Ua^\ \P]h \P]dUPRcdaTab
~ 1aX]V h^da P__aT]cXRTb U^a UaTT
~ 3XbR^eTa ]Tf _a^SdRcb X] cWT ST\^ PaTP
Speakers include: Wayne Hemingway MBE
Kelvin Freeman
Designer and Chair for Building for Life
Associate Director, Atkins
Tony Cable
Darren Staniforth
Senior Events and Marketing Engineer, NICEIC
Technical Development Manager, NICEIC
BOOK NOW @ www.niceiclive.com or call us on 020 7324 2771 CON.04.13.005.indd 1
09/04/2013 09:59
News/Renewables news/ESC news/Product news
N
Plugged in Need-to-know industry news for electrical installers
Electrical Safety Register promoted A campaign to promote the Electrical Safety Register reached an audience of more than 32 million people following coverage on national television, radio and newspapers. The Electrical Safety Register, one of the first benefits of the partnership between the Electrical Safety Council (ESC) and the Electrical Contractors’ Association (ECA), contains details of more than 36,000 NICEIC- and ELECSA-registered contractors and ECA members. As part of the campaign, the ESC’s director general Phil Buckle and Electrical Safety Register spokesman Tony Cable appeared on BBC Breakfast news, highlighting the dangers caused by people carrying out DIY electrical work and stressing the importance of using a local, competent electrician listed on the Electrical Safety Register. Buckle also took part in a series of radio interviews, syndicated across 149 regional and national stations, urging people to visit www. electricalsafetyregister.com. “When the ESC and ECA announced they would be forming a partnership, one
directive was to promote electricians on the register to both the general public and specifiers of electrical work,” he said. “We will be working with the ECA to continue promoting the Electrical Safety Register to the public.” An advert for the Electrical Safety Register also appeared in the Mail on Sunday homes and improvement supplement in February, and further campaigns are planned. “By providing specifiers of work with such a great resource, we can encourage them to use a registered electrician,” added ECA CEO Steve Bratt. “The register will become the trusted resource for consumers looking to employ a competent electrical contractor, in a commercial or domestic setting.”
ASCERTIVA ‘GOOD FIRM TO WORK FOR’ Ascertiva Group, which helps fund the Electrical Safety Council, has become a Times Top 100 Best Company to Work For. The accolade is awarded on the views of employees, and on the policies and processes of employers. Andrew Selous, Conservative MP for South West Bedfordshire, said: “Congratulations to Ascertiva. It is a mark of recognition for all the great work they do, both inside and outside the office.” Last year, in addition to increasing company profits across the group, Ascertiva employees took part in volunteering days at Luton and Dunstable Hospital and helped create a nature reserve at Lower Watling School in Dunstable.
6
Spring 2013 Connections
06_07_news.FINAL.indd 6
CONTRACTOR FINED FOR MISUSE OF NICEIC LOGO An electrical contractor has been fined for fraudulently claiming to be registered with NICEIC, after using the logo on company stationery presented to a customer. Newport-based Lyndon Saunders, who trades under the name of Cain Solar Energy Division, pleaded guilty to eight counts of unauthorised use of a trade logo, including misuse of the NICEIC logo. He was fined £1,200 and ordered to pay a contribution towards prosecution costs. “We take misuse of our logo seriously and we welcome this latest prosecution,” said Certsure CEO Emma Clancy. NICEIC has stepped up its fight against firms incorrectly using its logo with a “wall of shame”. Contractors caught falsely claiming to be registered will be named and shamed on the NICEIC website and their details passed to Trading Standards.
OVERSEAS DRIVE FOR BELFAST CONTRACTOR Belfast-based NICEIC-Approved Contractor BI Electrical Services has created 26 local jobs as part of a growth drive into Asia Pacific and the Middle East. The expansion will be overseen by former NICEIC chief executive Jim Speirs, who has been appointed as a nonexecutive director for the business. “Both regions have fast-growing economies, and this is creating opportunities for electrical engineering,” said Speirs. The announcement was made by Northern Ireland’s enterprise minister Arlene Foster. “BI Electrical joins an increasing number of local companies that recognise the importance of looking beyond local markets,” she said. The 26 new jobs will be created at BI Electrical Service’s Mallusk facility, and the firm also plans to establish a three-year apprenticeship scheme.
www.electricalsafetyregister.com
08/04/2013 14:57
FREE POCKET GUIDE Inside this issue of Connections you will find Pocket Guide 30 – Notices at or near the origin of an installation in a building. A printable version of each pocket guide is available on the NICEIC website. Additional copies can be obtained by contacting the NICEIC customer service department on 0870 013 0382 or at customerservice@niceic.com
Book now for Epsom CERTSURE CEO JOINS TRUSTMARK BOARD Certsure CEO Emma Clancy (pictured) has agreed to serve on the board of TrustMark – the government-endorsed quality mark for tradespeople – as a trade director for a term of three years. “I am delighted to take up the role,” said Clancy. “The customer is at the heart of every professional business.” TrustMark’s board consists of three trade directors, three non-trade directors and an independent chairperson. Liz Male, chairman of TrustMark, added: “The TrustMark board has never been stronger and we have an excellent balance between trade and non-trade directors.” See Liz Male’s column on page 27.
NEW REQUIREMENT FOR QUALIFIED SUPERVISORS The Electrotechnical Assessment Specification Management Committee (EAS) has agreed to implement the new qualified supervisors’ technical competence requirements for anyone wanting to become a qualified supervisor, which came into effect from 6 April. There are different routes satisfying the requirements for registration as a qualified d supervisor, including on-site assessment, off-site assessment, a mixture of both, and d the gaining of appropriate qualifications. Anyone who already has a competency-based qualification, as outlined in the EAS document, will not need to have the new qualification if they apply to become a new qualified supervisor. In addition, anyone who has been working as a registered qualified supervisor within the two years preceding 6 April this year will be eligible to be proposed as a qualified supervisor for a new employer, without needing to demonstrate the new level of technical competence.
www.electricalsafetyregister.com
06_07_news.FINAL.indd 7
Contractors planning to attend NICEIC Live South are being urged to book now to avoid disappointment, with the event proving as popular as ever. This year’s exhibition and conference is taking place on 16 May, and is once again being held at Epsom Downs racecourse. As well as an exhibition, where attendees can meet suppliers and businesses including partner sponsor WF Senate, there will be a full conference programme. Speakers include social housing guru Wayne Hemingway; Kelvin Freeman, associate director of Atkins, who will talk about the electrical challenges of the Olympics; the Institution of Engineering and Technology’s technical regulations manager Mark Coles; and NICEIC’s own double act of Tony Cable and Darren Staniforth. “We are keen to keep improving the conference and exhibition and in response to attendee feedback have included more ‘back to electrical basics’ topics,” said Mark Smith, group head of marketing at Certsure. “To give
A packed house at NICEIC Live South something back to the industry, we have also decided to allow apprentices to attend free of charge, if accompanied by a paying ESR-registered contractor.” Tickets cost just £29 plus VAT for members of the Electrical Safety Register, with non-registrant tickets £49 plus VAT. Exhibition-only passes are available free of charge. For more information or to book a place, visit www.niceiclive.com Details have also been announced for the NICEIC Live North event, which will be held at Bolton Arena on 24 October.
‘Apprenticeship reform needed’ The Electrical Contractors’ Association (ECA) has called on the government to reform the way apprentices apprenticeships are financed in the elect electrotechnical industry. curren system of “The current apprenticeshi apprenticeship funding is prohibitive for employers and apprentic apprentices in our industry,” said Diane Johnson (pict (pictured), skills ambassa ambassador. “If it isn’t changed changed, it could discourag both discourage parties from taking part. “E “Employers fac face a dilemma wh when it comes
to delivering practical training to apprentices,” she added. “They often struggle to insure apprentices under the age of 19 to go on-site, but receive only 50 per cent of the funding for a 19-year-old apprentice that they get for one aged 16-18.” The ECA is recommending a delivery contract for apprentices which would provide full funding for level 3 apprentices up to the age of 24. “A more flexible approach to funding would allow employers more time to deliver the on-site training apprentices need,” said Johnson. “It would also allow young people who wish to study for a higher apprenticeship the funding to get the best possible start in the industry.”
Connections Spring 2013
7
08/04/2013 14:58
News/Renewables news/ESC news/Product news
N
Plugged in Early bookers enjoy a discount on golf The Building Industry Golf (BIG) tournament for 2013 is now open for bookings, and NICEIC and ELECSAregistered contractors can take advantage of an early-booking discount if they enter before 30 May. The BIG tournament features a pairs Matchplay and a pairs Stableford event, culminating in a grand final in October at the stunning Turnberry Resort in Ayrshire. The Matchplay Championship features three rounds in regions between June and August, with four weeks to play each round. In September, there will be four regional finals, from each of which the leading two pairs will qualify for the final. The pairs Stableford events will be staged at the following venues: • The Carrick on Loch Lomond, Dunbartonshire, 19 June • Marriott St Pierre, Chepstow, Monmouthshire, 25 June • Sand Martins Golf Club, Wokingham, Berkshire, 10 July • Moor Allerton Golf Club, Leeds, West Yorkshire, 12 July The price per pair includes coffee and bacon rolls on arrival, 18 holes of golf and
INDUSTRY // DIARY April 25-26 Elex Westpoint Arena, Exeter May 14-16 Safety & Health Expo NEC, Birmingham 16 NICEIC Live South Epsom Downs Racecourse, Surrey
Turnberry Resort will host the final a meal afterwards. The winning pair from each event will qualify for the final. There is an early-booking discount of £5 per pair for the Matchplay Championship, making the price £40 per pair including VAT. There is a £20 discount per pair for the Stableford event, making the price £100 per pair including VAT. Please enter the promotional code NIC13 on the website to receive your discount. The grand final will take place on 18 and 19 October, and qualifiers will enjoy two nights’ accommodation in the luxurious golf lodges at Turnberry and 36 holes of top-quality links golf. For more information, or to enter online, visit www.bigtournament.co.uk
16 Electrical Product Safety Conference Church House, Westminster June 5-6 Northern Ireland Electrical Trade Show Ramada Plaza Hotel, Belfast 12 Essential Install Live South Sandown Park, Surrey 17-20 Trading Standards Conference and Exhibition The Brighton Centre, Brighton 20-22 The Electric Event ICC, Birmingham
ELECTRICAL SAFETY REGISTER The Electrical Safety Council and Electrical Contractors’ Association have been working hard to promote the Electrical Safety Register (ESR) to consumers and specifiers, as part of the commitment made under the partnership between the two organisations. Recent campaigns include: The ESC’s director general Phil Buckle took part in a series of radio interviews to promote the benefits of using competent electricians as listed on the ESR Phil Buckle and Tony Cable also appeared on BBC Breakfast news, promoting ESR ESC exhibited at the Ideal Home show, promoting the need to use competent electricians Ads ran in the Mail on Sunday home improvements supplement, and twice in Metro A week long e-marketing campaign for ESR ran on Metro online, using banner ads
8
Spring 2013 Connections
08_news.FINAL.indd Sec2:8
www.electricalsafetyregister.com
08/04/2013 14:58
Fire Rated
THE LATEST IN LED
FIRE RATED TECHNOLOGY
True MR16 740 Lumen Halogen Replacement Dimmable Driver as Standard Supplied with Matt White Bezel 30, 60 and 90 Minute Fire Tested Twist-on, Twist-off Removable Bezel Options Intelligent LED Fire Rated Technology
CON.04.13.009.indd 1
09/04/2013 10:00
News/Renewables news/ESC news/Product news
N
Plugged in Green Deal advisors finish first projects NICEIC-registered Green Deal advisors have completed their first assessments under the government’s flagship energy efficiency programme. Green Deal assessments are independent evaluations to assess whether a property is eligible for installations under the scheme, and which measures would be most appropriate. The volume of assessments being undertaken will be an important bellwether as to the future success of Green Deal. More than 2,000 assessments have been undertaken since the scheme was launched at the end of January. “Green Deal advice is an exciting new area for electrical contracting businesses,” said Nick Wright, Green Deal project manager at NICEIC. “The nature of contracting is changing, with businesses becoming more multidisciplined and looking to create a turnkey solution for their customers – from energy efficiency advice through
to installation. NICEIC is strategically positioned to provide a full solution.” Green Deal advisors work on a pay-perclick basis, with the client being charged for each report they lodge. Green Deal advisors registered with NICEIC can use the Elmhurst Green Deal and ETECH Green Deal software. Only firms with the appropriate approval can operate as Green Deal advisors or installers. Certification for both these aspects can be obtained through NICEIC. For more information on the Green Deal, visit www.niceic.com
Community hub in Dorset wins upgrade The Brackenbury Centre in Portland has fought off stiff competition to win the ecomakeover award run by renewable energy specialist Puragen, as part of its Keeping It Local campaign. The Dorset business took top spot, ahead of second-placed Latham Hall in Penketh, Warrington, and will receive a renewables makeover including energysaving technologies worth £7,000. “The installation of these renewable technologies will have a positive effect on the centre’s energy bills for years to come,” said John Scott, managing director of Puragen. “We hope that this will help it to continue to offer its brilliant service to the community that it has managed to maintain over the past few years.”
ECA WARNING ON ENERGY REDUCTION SCHEME
SOLAR PV ‘BIBLE’ UPDATED TO HANDLE NEXT GENERATION The Electrical Contractors’ Association (ECA) has published the hard-copy version of the updated industry “bible” on solar photovoltaics, ensuring installers will be ready to work with the next generation of PV. Energy minister Greg Barker recently unveiled the new Guide to the Installation of Photovoltaic Systems, which has been updated in the wake of uptake by businesses and householders. The ECA was a core member of the microgeneration certification scheme (MCS) solar PV working group, which was tasked with revising the guide. “I pay tribute to those who have worked on this guide over the past few months,” said Barker. “It is the ‘go-to’ text for PV system installers, and its widespread use will improve the reliability of installations, increase customer confidence in PV and help consumers benefit from quality-focused engineering solutions.” The updated solar PV guide includes the latest in system design and installation techniques. It offers enhanced information on performance calculations, dead load and wind load requirements, and clarifies the requirements for RCDs and array frame earthing and bonding. The MIS 3002 standard, which covers PV installation, has also been updated to reflect its status as a key document for assessment. Contractors must start working to version 3.0 of the standard from 7 May. Electronic versions of the guide and the MIS 3002 standard can be found at www.microgenerationcertification.org. For hard copies of the guide, go to www.eca.co.uk
10
Spring 2013 Connections
10_renewablenews.FINAL.indd Sec2:10
The Electrical Contractors’ Association (ECA) has warned that the government’s proposed energy demand reduction initiative (EDR) must avoid the mistakes made with the feed-in tariffs (FITs). In its submission to the government’s consultation, the ECA said the scheme must be simple and properly subsidised. Paul Reeve (pictured), ECA head of business policy and practice, said: “The government cannot allow this to turn into yet another FITs fiasco. It must ensure that there is a guaranteed rate of return, or businesses won’t see the benefits.” Under the proposed EDR, businesses will receive an as-yet unspecified financial incentive for making energyefficient improvements to their premises. The ECA has recommended that lighting upgrades, along with building control systems, should be made a priority, as these will offer the greatest rate of return. The association is also urging the government to learn from the example of other countries, such as the energy-saving certificate scheme in France and the “prokilowatt” system in Switzerland.
www.electricalsafetyregister.com
08/04/2013 14:59
IDEAL LAN Testing Seminars
SignalTEK II
During April, May and June, IDEAL INDUSTRIES are running a series of 1/2 day LAN installation and testing seminars across the UK.
Confirms a link’s ability to run high speed applications ensuring optimum network performance and peace of mind.... • • • • •
Designed for contractors who are new to LAN installation or those who just want to learn more about testing, each seminar covers the following topics:✔ Overview of best installation practices ✔ Standards update (EIA/TIA, ISO & CENELEC)
Qualify the performance of 10/100/1000 Ethernet networks
✔ Testing networks to published standards (Cat 5e, etc.)
Isolate cable faults and connectivity issues
✔ Troubleshooting test failures and network problems
Troubleshoot copper and fibre networks through hubs and switches
✔ Management of test data
✔ Interpreting test data correctly ✔ Fibre testing ✔ Practical hands-on installation and testing session
Test and validate PoE/PoE+ Save and document test results
Scan to view product video
Interested? Simply contact us and we’ll confirm details of the venue closest to you. Hurry - spaces are limited!
www.idealindustries.co.uk To reserve your seminar place please call 01925 44 44 46 or email electrical.enquiries@idealnwd.com ©2013 IDEAL INDUSTRIES, Unit 3, Europa Court, Europa Boulevard, Westbrook, Warrington, WA5 7TN, England
CON.04.13.011.indd 1
Innovation with a Purpose.
09/04/2013 10:07
News/Renewables news/ESC news/Product news
N
Plugged in Calculator checks for socket overloading Electrical contractors can now make their customers aware of the problem of sockets being overloaded by uploading an online socket overload calculator to their websites. The ESC has developed the calculator to enable householders to check the electrical appliances in their homes, in response to concerns raised by fire and rescue services about electrical sockets being overloaded. The interactive calculator shows the power that is used by a range of typical household appliances, such as a television or hairdryer, and helps people to find out what is safe to plug into a four-way bar adaptor, and which combinations are potentially dangerous. It highlights the fact that the public should never plug into an extension lead or socket appliances that together exceed a current of 13 amperes or 3 kilowatts of energy. “Most people use extension leads in their homes to enable them to plug more appliances into one wall socket,” says Emma Apter, head of communications at the ESC. “But what many people don’t consider is that there is a limit to the amount of power that can be drawn from a single socket. When these sockets are
overloaded it creates a fire risk, and at worst could lead to house fires, severe injuries or even death.” The ESC is using the calculator to promote electrical safety as part of its appliance safety campaign. To use the ESC’s online calculator, go to www.esc.org.uk/overloadingsockets
More wiring questions answered The agreed answers to several new questions have been added to the industry guidance on the Wiring Regulations section of the ESC website. These include: • In a multicore flexible cable that includes a protective conductor coloured green-and-yellow (having the same csa [cross-sectional area] as the other
12
Spring 2013 Connections
12_13_esc_news.FINAL.indd 12
conductors), can the protective conductor be used as a live conductor if it is suitably overmarked at each end of the cable? • The external earth fault loop impedance at an installation is so high that it seems likely that there is a fault on the distribution system. Is it sufficient to install RCDs [residual-current devices] in the installation to enable the required disconnection times to be achieved? • Is it permissible to terminate cables with conductors having a rated operating temperature exceeding 70°C (such as with 90°C thermosetting insulation) in accessories having a maximum rated operating temperature of 70°C? For these and other commonly asked questions on applying BS 7671: 2008 as amended, visit www.esc.org.uk/forum
INDUSTRY EVENT PROMOTES CONSUMER SAFETY ISSUES The ESC industry summit, which recently took place in Westminster, brought together a range of key stakeholders to discuss consumer safety and the changing landscape of the electrical industry. The event focused on three significant developments: the changes to Part P and the ongoing review of the Building Regulations; what the Green Deal means for contractors; and how smart metering is likely to impact on the safety of electrical installations. Don Foster MP, minister of state for communities and local government (DCLG) – the department responsible for the review of the Building Regulations – launched the event by opening the discussion on Part P. This was followed by a panel discussion, which included Roberta Blackman-Woods, shadow minister for DCLG, and then an audience question-and-answer session (pictured). Responding to questions from the floor, the minister acknowledged concerns regarding the reduction in notifiable work and the issue of thirdparty certification. However, he stressed the overarching legal requirement for all electrical work to be safe, and noted that changes to Part P would be reviewed. He emphasised the need for a collaborative approach to raising consumer awareness of electrical safety and the need to use a registered electrician. Other presentations at the summit included Philip Arend, from Carillion, on its Green Deal partnership with Birmingham City Council, and Jaqui Russell, head of the Department of Energy and Climate Change’s RollOut smart metering implementation programme. The ESC’s technical director Mike Clark also spoke on the electrical safety issues arising from smart meter installations. “The ESC believes consumer protection is best served by working with industry, and that this becomes even more of an imperative during a period of significant change,” said Phil Buckle, director general of the ESC. “Establishing the industry summit allowed us to gather industry views to develop a green paper, or discussion document, which will be submitted to government departments.”
www.electricalsafetyregister.com
08/04/2013 15:00
The Electrical Safety Council: raising electrical safety awareness, made possible by funding from Certsure. To view the ESC’s Switched On magazine, visit www.esc.org.uk
Switching on to digital ESSENTIAL GUIDE PROVES POPULAR WITH USERS The ESC’s Essential Guide continues to show its worth as a regularly used reference resource. During 2012 it was accessed by 4,264 individual users and 3,657 individual company users. The Essential Guide is a searchable online resource that provides an easy-to-access source of relevant and authoritative information. Covering more than 350 topics, it can be searched in several ways, including by regulation number, topic number and keyword. Companies that are registered as either an Approved Contractor or a Domestic Installer with the NICEIC receive access to the Essential Guide as part of their benefits package. As well as electrical contractors and installers, users of the Essential Guide include building services consultants, local authorities, government and housing associations. The ESC recommends that all those involved in the design and installation of electrical systems in buildings consider a regular annual subscription to enable them to access the guide.
ELECTRICAL-INTAKE AREA LABELS WARN OF FIRE RISK The ESC has supplied millions of fire-warning labels to fire and rescue services and electricity-supply industry bodies throughout the UK, to raise awareness of the risk of fire in electricalintake areas. Four million labels have been supplied to several electricity-supply industry bodies – in collaboration with the Association of Meter Operators – for use, where appropriate, when electricity meters are replaced. A further 250,000 labels have been distributed to fire and rescue services. The ESC has supplied the labels free of charge to fire and rescue services but the supply industry bodies have funded most of the cost of providing theirs, with a small contribution being made from charitable funds in recognition of the industry’s assistance in raising awareness of the issue.
www.electricalsafetyregister.com
12_13_esc_news.FINAL.indd 13
The ESC has made it even easier to keep up with its latest news by introducing a digital, page-turning version of its quarterly magazine Switched On. The move follows a readership survey that found the majority of respondents favoured a digital version, with positive comments about sustainability, ease of access via smartphones and other devices, and the potential to link to further online content. However, there was also strong opinion in favour of retaining the current printed version from readers not having convenient access to computers or mobile devices, or who would find it difficult to print articles of interest. A significant proportion also expressed a preference for paper publications. Therefore the ESC will continue to distribute printed versions free of charge via the existing channels – as inserts in Professional Electrician and SELECT’s Cabletalk magazine, and to
those on the ESC’s direct mailing list – up to and including the autumn issue. With effect from the winter issue, paper copies will continue to be available on subscription only – by direct mail – at a price intended to cover the cost of printing and distribution. Digital versions of all issues can be found at www.esc.org.uk/switchedon
Safety campaign hits the spot The ESC’s product safety campaign has hit the headlines, with coverage on national TV, including ITV’s News at 10, BBC Breakfast and Daybreak, as well as the Sunday Times, the Telegraph and national and local radio. The campaign highlights the low level of public awareness around the recall of electrical products, with research revealing that around two million people had previously ignored a product recall and a million admitting to currently owning a recalled electrical item. To help people discover if they have “missed” an electrical product recall, the ESC has developed an online tool, at www.esc.org.uk/recall. Simply enter the model number, brand and description of goods, to discover if a product has been recalled and what to do next. In addition to its high-profile consumer campaign, the charity is also working with the industry to address the issue of product safety. The ESC’s third product
safety conference is being held in London on 16 May, with the theme of protecting consumers through a 360° approach. The event will focus on a review of recall processes and traceability, looking at how recalls are tracked within the supply chain and to the consumer. Speakers will include representatives from major retailers, manufacturers and trade associations, including Dyson, Bosch, AMDEA, Recall UK and the British Retail Consortium. For more information, please go to the ESC website.
Connections Spring 2013
13
08/04/2013 15:00
Certification Body Reg. No. 6017
Making the Green Deal a great deal for you
Green Deal
assessment for
£290 Quote Code GD290!
Great deal! We are offering NICEIC Registered Contractors the opportunity to become a Green Deal Installer for just £290!
Green Deal is now here! Take advantage of the growing opportunities and become a Green Deal Installer now.* The Green Deal improvements you will become certified for are as follows:
Approved Contractors
Domestic Installers
• Lighting Controls (Non-Domestic) • Light Fittings • Storage Heaters (Domestic and Non-Domestic)
• Light Fittings • Storage Heaters (Domestic)
Offer includes a Quality Management System Audit to PAS2030. On-site assessment will be conducted at your next annual visit.
For more information click or call
0843 290 3419 greendeal@niceic.com *This offer includes a quality management system audit to PAS2030. An on-site assessment will be included in your next annual visit. This offer certificates you for the Green Deal improvements specified only. Additional measures can be added onto your Green Deal package at a cost of £290 per half day visit required. If certification is not achieved, additional assessments will be charged at our usual costs. All prices exclude VAT. For a full list of available measures please visit www.niceic.com/contractor/green-deal
CON.04.13.014.indd 1
09/04/2013 12:08
News/Renewables news/ESC news/Product news
N
Plugged in FLEXIBLE FLUKE
TRACING HIDDEN DANGERS
< Apollo 600
The new AC current meter from Fluke includes a flexible measuring loop that can be used to take and store readings and wirelessly record results on a PC. The Fluke CNX i3000 iFlex AC wireless current module enables readings of up to 2500A around awkward-sized conductors, making wire access easier. It can store up to 65,000 sets of minimum, maximum and average readings and has a CAT IV 600V, CAT III 1000V safety rating. The kit can also be used as part of a wireless Fluke CNX 3000 measurement system, sending readings for display on a master device, allowing users to place modules in hazardous or awkward places and then watch and record the readings from a safe distance. The product comes complete with a Fluke iFlex i2500-10 flexible current probe, TL175 test leads, AC175 alligator clips and a magnetic hanging strap. A wireless PC adapter and software is an optional extra. www.fluke.co.uk
Martindale Electric has released a general purpose cable detector, designed to quickly and accurately trace cables hidden in walls or underground. The CD1000 can also locate fuses or breakers on live or dead circuits, and identify interruptions and open circuits in cables and electrical floor heating systems. It can also be used to trace metallic water and heating pipes. The product comes as a kit and includes a transmitter and receiver, which can also be used as a noncontact voltage indicator. Up to six different circuits can be tested at any one time. < CD1000 The device also includes an LED torch and a self-test facility, and is supplied with TL47 test leads with crocodile clips, earthing rod, 9V and 1.5V alkaline batteries, and a case with full instructions. www.martindale-electric.co.uk
THE APOLLO HAS LANDED Seaward has introduced the Apollo 600, a multipurpose portable appliance tester (PAT) designed to carry out point-to-point testing of fixed appliances, as recommended by the fourth edition of the Institution of Engineering and Technology code of practice. The device is designed primarily for risk-based portable appliance testing, but can also be used to carry out earth continuity and insulation tests on fixed appliances. Its ability to store inspection and test results means users can keep an accurate record of when equipment was tested and when further tests are due. The Apollo 600 also offers a range of electrical safety tests to enable all workplace appliances to be tested, and includes a built-in digital camera to enable visual evidence to be taken during inspections. www.apollo600.com See our PAT feature on page 32
WIHA TOOL WALLET < Fluke wireless current module
Wiha has unveiled a “Super Seven” electricians’ kit, featuring a range of commonly used VDE tools. The set includes six SlimFix screwdrivers and a pair of heavy-duty VDE diagonal cutters, housed in a wallet. The SlimFix screwdrivers provide access to deep screws, with the blade being 33 per cent narrower. The devices also offer 1000V VDE security, with the insulation directly moulded on to the blade itself. < Super Seven The 160mm diagonal cutters include Wiha’s DynamicJoint functionality, which the company claims can reduce the amount of force required by up to 40 per cent. www.brianhyde.co.uk
IPervoice...the award winning, market leader in IP video door entry systems iModo is the latest addition to the highly successful IPervoice range. Urmet has more IP based video door entry systems installed in the UK than any other manufacturer, U R M E T
I S
T H E
L A R G E S T
M A N U F A C T U R E R
O F
D O O R
15_product_news.FINAL.indd 15
Home automation compatible PoE Dual LAN ports
E N T R Y
...the first IP PoE 7” touchscreen with dual LAN ports. www.electricalsafetyregister.com
LAN, HAN, WiFi
S Y S T E M S
I N
E U R O P E
marketing@urmet.co.uk 01376 556010 www.urmet.co.uk Connections Spring 2013
15
08/04/2013 15:07
EV
The Future of EV Charging
WallPod EV : Commercial Charge
WallPod EV : HomeCharge
Classic 3000
EV : ChargeCheck (tester)
• Low-cost EV charging solutions • Europe’s largest range of electric vehicle charging stations • Ask your wholesaler / builders’ merchant for details
Charging at home . at work . at play Visit www.rolecserv.com to download full data sheets on every product
EV
CON.04.13.016.indd 1
t: ++44 (0) 1205 724754 rolec@rolecserv.co.uk www.rolecserv.com
WallPod
Power Solutions
EV
Accessories
One Company . Six Divisions . Thousands of Products
09/04/2013 10:09
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
QUALITY MANAGEMENT
Live wire Pole position Implementing quality management systems can help your firm to operate as efficiently as possible and ensure that it stands out from the crowd when pitching for business, says Mo Ghaus
I
n tough economic times every business needs to make sure it is working as efficiently and effectively as it possibly can. Implementing a quality management system is a way of looking at everything you do when working towards achieving this aim. Such systems have also been proven to both save businesses money and help them to become more resilient when times are tough.
ISO 9001
The world’s most popular quality management system is ISO 9001. This internationally recognised standard provides your company with a robust framework based on a set of common sense management principles. The aim is to ensure your business achieves customer satisfaction consistently, efficiently and profitably. ISO 9001 is a management tool that many businesses use as a guide for implementing a solid foundation and structure for their operations. This enables them to get organised so they can concentrate their energy on running and growing the business.
Illustration: Cameron Law
Route to certification Some firms prefer to go the extra step and choose an outside agency – a certification body – to verify the systems they have in place. Just as electrical contractors look for the NICEIC or ELECSA badge to give credence to the electrical work they provide, so firms trust the ISO 9001 logo as it marks out their organisation as one associated with quality and dependability. Many contractors are initially put off by the thought of gaining certification because of a fear that it will create more paperwork or bureaucracy. However, ISO 9001 only requires six procedures and gives the business lots of flexibility to demonstrate how it meets the standard. The process of gaining quality certification is also straightforward and, no matter what size your company, it will be relevant to the work you do. Certification can be achieved in just three simple steps: application, assessment and registration. It is similar to applying for NICEIC and ELECSA registration. Once you have contacted the certification body (such as NQA, the sister company to NICEIC), you fill out an application form outlining the areas of your business: type of work, number of employees, management structure and work location.
business. These include staff competence, customer satisfaction, working with suppliers and ensuring that completed work meets technical and legal standards. The assessor will also identify opportunities for improving the business, so it is not just a checking activity. Their job is to add value to your business, as well as to ensure it meets the technical requirements of the standard, which leads to certification.
Benefits
Audit
One contractor that has benefited from ISO 9001 certification is Barrett Bros Electrical Ltd, a family-run building and electrical services firm in Hither Green, South London. Established in 1970, it secured ISO 9001 certification in 1995 as a way of standing out from the competition. Today this proves a vital tool in securing work with local authorities. The firm has been re-certified for the past 17 years, undertaking annual check-ups and the three-yearly recertification process. The use of certification as a way of securing larger contracts – many tender contracts nowadays, particularly with local authorities, make it a mandatory requirement – is perhaps the main reason why contractors choose to go through the process. But a quality management system is also a positive investment that will save your business money, regardless of whether clients mandate it. Many of the processes undertaken to gain certification show you exactly where your costs are. It gives you control of your business activities by analysing what you are doing and improving the way that you do it, helping to save you money.
A booking will then be made for an independent assessor to come out and audit your place of work. Typically the assessor will look at the processes you have in place to manage the core activities of the
Mo Ghaus is head of NQA Find out more at www.nqa.com
www.electricalsafetyregister.com
17_busadvice.FINAL.indd Sec2:17
Connections Spring 2013
17
08/04/2013 15:09
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
LED STANDARDS If you have an opinion about an issue concerning the electrical industry, let us know. Email nick. martindale@redactive. co.uk
Live wire
Light relief The LED market is a minefield of misinformation for the unwary, which means contractors and specifiers need to know exactly what to look for when assessing products, says Michael Dangoor
W
ith traditional lighting technologies it’s fairly simple to determine whether you’re getting the best product and value, but with advancing LED technology – and terms such as “CRI” (colour rendering index) being thrown around – it’s much harder to know. When specifying LEDs, there are a few questions you must ask to determine quality and suitability of a product. It is important to differentiate between a datasheet and a test report. A datasheet should demonstrate all the technical parameters of a product, but it may sometimes be misleading or inaccurate, and cannot take into account batch variations in performance. A test report, however, is a true measure of performance for that tested product. Accurate information on a few technical parameters should give you a good portrayal of performance. Lumen output and power consumption figures show the total output of light, as well as allowing you to calculate efficiency (lumens per watt). These are vital
Michael Dangoor is technical director at Orlight
for determining Part L compliance. But one should be cautious that the light output or lumen figure is that of actual delivered light, not the value of the bare LED chip. Colour temperature should be observed since, on occasion, datasheets have shown light output for cooler colour temperatures because these values are higher. CRI and chip brand are important factors to determine the quality of light, with CRI values of Ra=80 or above seen as a benchmark standard for good performance. Furthermore, extensive guarantees and use of the chip-life value can be misleading. When manufacturers quote the chip life (such as 50,000 hours) as an overall estimate of the lifetime for the product they are completely overlooking the potential failure of any other component, including those within drivers. These parameters are essentially the benchmark for determining quality, but many in the industry cannot provide true data in test reports for their products. In light of this, Orlight has invested in scientific-grade test equipment to provide real data upon request, and we always provide the brand of chip used and even the model in some cases. If others in the industry followed suit it would make life much easier for specifiers.
If you are a small business or sole trader and would like to feature in In Focus, email editor@ niceicconnections.com » Stephen Barlow is general manager of Mr. Electric Cornwall and South Devon, and Aire Serv Cornwall
18
Spring 2013 Connections
18_opinion.FINAL.indd Sec1:18
What is the background to your business? I run the Mr. Electric franchise for Cornwall and South Devon, and the Aire Serv Cornwall franchise. These are operated by TEE Ltd, which is owned by my father and his business partner. I got involved about 15 years ago after leaving college. How do the two electrical businesses work? TEE tends to focus on the large commercial side and anything domestic or light commercial goes through Mr. Electric. We bought the Mr. Electric
franchise because we like the system: the guys wear smart uniforms and use mats and shoe covers so it’s very customer-oriented. Do the businesses complement each other? The domestic work helps drive cash flow because you normally do the work and then get paid, but you can build your business on other work. They do complement each other, but over the next few years we’ll probably combine them and become fully branded – running two sets of everything can be challenging.
How do you see the business developing? We’d like to get Mr. Electric to £2-3 million a year. There’s plenty of work out there, especially with the Green Deal coming up. We also have the add-on of the air-conditioning side of our business and we’re also looking at plumbing and heating. You have to offer customers more value for money and more services. What about outside work? I spend time with my partner and children and go to the gym, but there’s not much downtime!
Illustration: Cameron Law
IN FOCUS// STEPHEN BARLOW
www.electricalsafetyregister.com
09/04/2013 10:30
Commercial, Industrial & Domestic Circuit Protection Wylex, the one stop shop for domestic commercial & industrial circuit protection, have introduced a new range of MCCB Panelboards & Devices, featuring: • 39 brand new Panelboards • Incomer frame already fitted • Incomer Switch or MCCB module • Integral incoming metering facility • Outgoing circuit metering • Integral Surge protection facility • Integral Lightning protection facility • 65kA, 36kA & 25kA MCCBs
630 250 100
One Stop Shop
Electrium Sales Limited A Siemens Company Commercial Centre, Lakeside Plaza, Walkmill Lane, Bridgtown, Cannock WS11 0XE. Tel: 01543 455000 Fax: 01543 455001 www.electrium.co.uk Technical: 01543 438320 Fax: 01543 438321 eMail: wylex.technical@electrium.co.uk
CON.04.13.014.indd 1
09/04/2013 12:09
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
NORTH EAST
Live wire
Weathering the storm The north-east has been hit harder than most regions by the economic downturn. But contractors in the area are making ends meet by controlling costs and sourcing new business By Adrian Holliday
T
he UK economy still stubbornly refuses to take off. The pound is shrinking and public borrowing growing, despite the coalition’s attempts to rein it in. Unemployment in the north-east stood at 9.8 per cent in March: the highest in the country. So how are things on the ground? Liam Tickle is director of Tecal Ltd, based in Newcastle upon Tyne. He’s responsible for 16 staff and business is good. “My partner has a construction company with a lot of loyal investors locally and we’re benefiting from that,” he says. He makes sure he keeps overheads low, with minimal office staff and as many hands on the tools as possible. With this in mind, Tecal don’t lease vans – the firm currently has four – but buys ex-hire vehicles with around 90,000-plus miles on the clock. “Last time we paid £1,000 each for Renault Kangoos,” says Tickle. “It might mean £500 at MOT time, but that also includes a service.” And Labour costs are continually monitored too. “If a guy is working a Saturday between 8am-12pm but leaving at 11.50 that means packing up at 11.30,” he says. “That’s a frustration and those costs can soon mount up.” Another issue is a lack of work from the public sector. “We’re on all the right procurement databases, but we’re never selected,” he says. It’s a common complaint in the industry. But Tecal recently won a £1 million contract for a 250-bed student accommodation block – the result of
20
Spring 2013 Connections
20-21_regionalfocus.FINAL.indd 20
four years of discussion – which broke ground in February, although Tecal’s input will have to wait until mid-summer. NICEIC registration has helped: an out-of-the-blue call from a London customer through the NICEIC website resulted in a £250,000 contract to replace 10,000 fluorescent tubes with LEDs on sites across the region. Corporate and social responsibility was key – the contract was awarded partly on the use of local labour and independent suppliers. Diversity pays Mark Cummins, who runs One Stop Electrical Solutions in Redcar, says that, despite high local unemployment, business is good. “I’m doing very well. I sub-contract when I need to. I don’t do big builds, it’s more re-wires and smaller jobs.” There’s been a slight upturn in the rental property market as more landlords become familiar with their legal obligations. Driving this, he suspects, is an increase in affluent Southerners buying up cheaper property in the north to let out. Most of his work is private, and he’s careful with pricing too, unlike some of his competitors. “What some charge is
‘One builder said to us that they never need an overdraft because they use sub-contractors to finance their working capital’ www.electricalsafetyregister.com
08/04/2013 15:11
2,000: > Liam Tickle (third from left) and his team at Tecal in Newcastle upon Tyne
The number of jobs created, directly or indirectly, at Nissan’s compact car factory in Sunderland
Economic outlook North-east The north-east has closely tracked the fortunes of many brand names hit by the downturn’s economic gusts and squalls: the run on Northern Rock; considerable job losses at Nissan in Sunderland; and Direct Line – owner of Churchill and Green Flag – which recently closed its Teeside base. But things are improving: Northern Rock is now backed by Virgin, and Nissan hopes to up car production in 2013 to 500,000 vehicles a year. Last year it announced plans to take on an extra 400 staff to work on its new compact car, with a further 1,600 in the wider supply chain, underwritten by £9 million from the government’s regional growth fund. North Tyneside, too, was recently named as the top district for inward investment based on environment and infrastructure, following analysis of 335 local authority areas in England.
frightening,” he says. But, more generally, he’s optimistic, also noticing a slight upturn in newbuild construction. “If I get five or six jobs a day then I’m quite happy,” he adds. Diversity, he adds, is crucial; he had been plumbing in a WC when he spoke to Connections. Brute force John Turner of Electrical Services North East in Durham has seen the tougher side of the recession. In 2009, his company of 29 staff was exposed to a substantial loss from three local builders. He’d experienced nothing like it, despite being in operation since 1976. “We struggled on for about a year, but then we had no other option but to shut down and start all over again,” he says. “We are now back up to four employees, and a lot older and wiser. We don’t do any sub-contract work for builders. One builder even said to us that they never need an overdraft because they use sub-contractors to finance their working capital. It is limiting, but the old saying ‘turnover is vanity, and profit is sanity’ is very true.” Much of the company’s bread and butter now is testing and inspection work, which can lead to other problem-solving, and more work. Turner has steered clear of the photovoltaic market for now, although he believes the recession has flushed out those who saw PV work as easy money. “It’s taken the heat out of the market and left the people who should be there,” he says. Turner is looking to renew the company’s hazardous areas qualification related to natural gas-powered vehicles, brought www.electricalsafetyregister.com
20-21_regionalfocus.FINAL.indd 21
on by moves from Brussels to pull away from diesel fuel. “The locations where gas-powered vehicles are maintained will need tight environmental and health and safety controls, not to mention rigorous testing,” he says. “I understand that more emissions regulations from Brussels will make it more difficult for diesel engines to meet their requirements.” Staying competitive Finally, over in Hartlepool, Stephen McKay from S.M. Electrical Contractors is busy. That’s down to a variety of factors, including loyal clients and little exposure to the undercutting many other companies have experienced. The three-man operation has even benefited from increasing flexibility around how the public sector hires. “A lot of schools can now get in their own contractors, as long as they have the proper insurances,” he says, which has seen him take on jobs ranging from refurbishments to fire alarms and inspections. There’s still a fair amount of work from builders, but this is increasingly focused on housing extensions rather than newbuild. McKay, for the moment, is more or less booked up until mid-summer. But, despite the positive work environment, he says taking on an apprentice is a step too far in the current climate. “You have to pay out too much money,” he says. “I had an apprentice for a six-month trial, and he could have had a job. But he said he could earn more stacking shelves. But if he’d stayed for three years he could have been earning treble what he would earn doing that.” » Adrian Holliday is a freelance business journalist Connections Spring 2013
21
08/04/2013 15:11
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
CLOUD CERTIFICATION
Live wire
Taking the pain out of paperwork Cloud certification means electrical contractors can now create, store and send certificates from wherever they are, saving time and money
F
illing out forms can often take up a large part of any contractor’s day, but thanks to an innovation by NICEIC, the time spent on necessary paperwork is set to be reduced dramatically. NICEIC has teamed up with WhiteCloud Software to create a revolution in electrical certification. The new cloud certification system is designed to make the creating, storing and administration of electrical certificates a simpler, more streamlined process. While paperless form-filling is nothing new, the one major difference with the cloud system is that contractors do not need to install the software. They can simply log in with their NICEIC details to easily fill out all forms online. Additionally, because the system is cloud-based, it allows multiple users to work on a form from various locations. All forms are then automatically stored for up to five years. “The move to a cloud-based certification system is another innovative measure NICEIC is taking to ensure contractors have access to the most up-to-date technical software out there,” says Certsure’s commercial manager Mike Jackson. “Filling out the necessary paperwork can be a time-consuming job for many contractors, and we believe this new system will help save them both time and money.” With the new system, there are no joining fees or software costs. Updates are also free, and there are no licence costs per user. Firms simply log on to the site and register their details, and can then purchase certificates individually for just £1. Forms can then be completed either on-site or back in the office, and can be emailed or printed off for clients and personal record-keeping. Jobs can also be automatically notified to Building Control using the same information on the electrical installation certificate. “More work across all industries is now carried out online, simply because of the convenience it offers to people,” adds Jackson. “With access to the internet now so easy, contractors can be in contact with their office at any time of the day, meaning paperwork doesn’t have to be a task done at the
22
Spring 2013 Connections
22_23_cloud_FINAL.cc.indd 22
end of a hard working day. We have put a lot of work into developing this system, and we think contractors will really notice the benefits.” NICEIC is now at the final testing stage of its online certification and notification system, following positive feedback from the pilot programme. “The initial test programme was a success, and we are implementing final suggestions from users to improve overall functionality,” says Jackson. “We have had to delay the launch slightly to implement the recent changes to Part P, but we expect the system to be fully available in the next few weeks. We also hope to have an ELECSA-branded version up and running in the near future.” “We have carried out interviews and tests with a range of electrical contractors to ensure the new system has everything they need,” he adds. “We have spoken with both Domestic Installer and Approved Contractor scheme registrants, so the system can be tailored to meet each individual need.”
1. Main screen
www.electricalsafetyregister.com
08/04/2013 15:12
‘We have carried out interviews and tests with a range of electrical contractors to ensure the new system has everything they need’ 2. Creating a certificate
Key features • Free for all NICEIC and ELECSA contractors • No software to install • All of your certificates and jobs are held securely in your online account • Allows you to produce and issue certificates for just £1 each • Integrated with Building Control for electronic notification of your jobs • Accessible by everyone in your company, wherever they are, whatever the time • A range of certificates and forms available • Easy to use, with online help videos guiding you through every step • Allows you to complete and certify jobs instantly on-site, email right away or retrieve and print later
3. All information automatically transferred for BRCS notice
4. Final certificate
Cloud certification in action Stephen Clemens (pictured, left) runs Clem Electrics in Torbay, Devon. He has been using various software programs to fill out forms over the past five years, and has been trialling the new NICEIC system. He believes the time it can save contractors will be most beneficial. “Filling out EICRs was definitely easier, as the options available mean you can just tick or untick what you need rather than having to tick each individual box. In some cases, this could be up to 50 boxes,” he says. “Linking up to the BRCS (building notification) site also saves time, as it is now all in one place and means you don’t have to log in separately.”
www.electricalsafetyregister.com
22_23_cloud_FINAL.cc.indd 23
Connections Spring 2013
23
08/04/2013 15:12
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
EMERGING TECHNOLOGIES
Live wire In with the new Contractors are increasingly installing new technologies to meet customers’ electrical and energy needs. But care must be taken to ensure designs and installations meet requirements, advises Philip Sanders
T
he electrical industry has seen many contractors add to their more traditional range of work by venturing into advanced or alternative technologies, including renewable and energy-efficient products. Over the years, more and more innovative technologies have been adopted into mainstream electrical contracting, including solar photovoltaic power supply systems, heat pumps, advanced electric heating, voltage optimisation and energy-efficient lighting schemes. Specifiers, architects and consumers alike are all looking to take advantage of these technologies in the pursuit of more comfortable, controllable and energy-efficient installations. And government-backed incentives included within the microgeneration and Green Deal schemes make energy-efficient measures even more financially attractive. However, the design, construction and verification of such installations must be carefully considered. While being conversant with the relevant electrical safety requirements of BS 7671, electrical contractors may be less familiar with the requirements of the relevant technology-specific standards, Building Regulations or the installation requirements of the manufacturer. So it is essential that the relevant standards and instructions are referred to and, where appropriate, the manufacturer’s advice sought at the planning and design stage. Remember, technology-specific regulations are used to supplement and not replace the electrical safety requirements of BS 7671. No matter what technology is being used, the five essential steps for success are: Customer requirements Ask your customer to provide their requirements and talk through the available options, providing information such as product literature where possible. Without ruling out the more traditional methods, use your experience and knowledge of advanced or alternative technologies to provide your customer with guidance, be as factual as possible and include both the pros and cons of each option. Product selection Only select products that comply with the relevant standard and that are supplied by manufacturers who
24
Spring 2013 Connections
24_customercare.FINAL.indd Sec2:24
‘Technologyspecific regulations are used to supplement and not replace the electrical safety requirements of BS 7671’ Philip Sanders is NICEIC’s customer relations engineer
can assist you in meeting all the relevant requirements. In some instances your customer may wish to provide the products themselves and, where this is the case, the product must also be verified as being compliant with the relevant standard and the manufacturer’s instructions considered prior to commencing your design. Design This may be quite simple or more complex depending on the technology and size of installation, but it should always take into account the requirements of BS 7671, the manufacturer, and any other relevant regulations and/or scheme requirements. Where appropriate, the manufacturer’s advice should be sought directly to aid your design, and for larger installations you should consider a manufacturer’s site visit. Records of this information should be agreed with and provided to your customer, and copies should be kept for your records and for site personnel during construction. Construction To ensure all the relevant requirements are being addressed, your design should be referred to during construction. Where changes to the design are proposed, it is essential to verify that compliance with the relevant requirements will still be achieved. Any changes must be agreed with your customer and recorded.
» Details of the NICEIC microgeneration and Green Deal schemes and the opportunities that they can offer can be found at www. niceic.com/contractor/ microgeneration
Completion The completed installation should be verified against both your customer’s requirements and your design. An appropriate handover should be undertaken, which should include all the relevant documentation, including certification, operating instructions, maintenance information and relevant warranties. A “walk through” of the installed system, together with your customer and/ or end-user, should be undertaken and all user controls should be fully explained.
www.electricalsafetyregister.com
08/04/2013 15:13
New online certification! Be online, on site and on time... ...just like Delroy
Completing certificates and forms is now even easier with NICEIC’s new Online Certification System.
Notify jobs to Building Control in an instant! No software installation or licence fees! Only £1 per certificate – pay as you go!
• Free for all NICEIC Contractors - no software, licence or support costs • Instantly notify jobs to Building Control • Use on multiple platforms - PC, tablet and smartphone • All certificates included and updated when regulations change • Certificates securely stored online • Pay-as-you-go certificates
To find out more click or call
www.niceiconline.com
0843 290 3434
Available for all platforms including:
PC
Tablet
Smartphone
onlinecertification@niceic.com
CON.04.13.025.indd 1
09/04/2013 12:10
Introducing the
The heater that adapts to its environment It’s also up to 25% cheaper to run and uses up to 20% less energy than comparable static storage heaters Advances in insulation, technology and controllability mean the new Quantum space heater intuitively matches a user’s lifestyle and climate conditions, delivering just the right amount of heat, and it is expected that 97%* of this will come from off-peak energy. These running costs are almost unattainable by other direct acting electric systems. And to top it all, the Quantum space heater is cheap to install and maintenance free!
Benefits for you and your customers: sææSimple to install – with separate instructions for both installer and user sææDelivers heat when it is needed – not when it isn’t! sææMatches output to user lifestyle sææFully automatic, variable speed, low noise fan giving rapid warm-up sææSet and forget electronic controller holds room temperature to within 0.3°C sææReversible cable entry points sææSized to ensure the chassis covers previous ‘fixing marks’ of comparably sized storage heaters
See our short video here
quantumheating.co.uk
01489 773336
sææEasy to use controls and completely automatic once set up sææHas the backing of a market leader
*On a room by room basis
CON.04.13.026.indd 1
Dimplex – adapting to change.
09/04/2013 10:10
Advice/Opinion/Regions/Insight/Events/Case study/Customer care/Training
N
STANDARDS
Live wire Building trust The TrustMark badge helps reassure customers that they are choosing tradespeople with a reputation for quality work, making it a natural fit for registered contractors, says Liz Male
S
even years ago, a quality mark with government-endorsed standards was launched to tackle the menace of cowboy tradespeople and to signpost consumers to the good firms. Since then, TrustMark has provided consumers with a platform to find reliable, safe and competent tradespeople, and has become a strong source of support for consumers looking to have work carried out in their home. NICEIC and ECA are TrustMark scheme operators that have been great advocates for the scheme since the beginning. Many of their contractors are registered with the scheme. But there are still a considerable number of its registered contractors who are not reaping the benefits and creating a point of difference in this competitive domestic market. All electricians registered with the scheme are assessed on a regular basis to ensure high standards. By employing a TrustMark-registered electrician, consumers have assurance that the work will be carried out to a consistently high professional standard and will be done in the best way to ensure a safe job. Another key advantage of being TrustMark-registered is the recognition. It’s the only national “find a trader” scheme that operates to government-endorsed standards and that involves both industry and consumer interests in its governance and board. Many consumer organisations, including Citizens Advice, Trading Standards Institute, Age UK, the HomeOwners Alliance and the Office of Fair Trading (OFT), are signposting consumers to registered firms, which again ensures visibility of NICEIC electricians for anyone searching for a reputable local TrustMark business. The scheme now holds the largest database of vetted tradespeople in the UK, comprising more than 23,000 firms across the country. TrustMark electricians’ details were viewed more than 408,000 times in 2012 – an average of 34,000 per month. TrustMark standards – the “core criteria” at the heart of the scheme – cover competence, customer care and business practices, and haven’t changed much since 2006. However, in the past year or so, we have recognised that our standards need to be updated and reviewed, particularly with the advent of the new consumer protection legislation and the wholesale review of the consumer protection landscape in the UK last year. Working closely with the Department for Business, Innovation and Skills, we aim to create an updated set of
www.electricalsafetyregister.com
27_trustmark.FINAL.indd 27
‘The Electrical Safety Register is a great development in the industry that will provide guidance and support to homeowners wanting to hire professional registered electricians’ Liz Male is chairman of TrustMark
standards that are credible and pragmatic, stretching where they need to, but also achievable and capable of being enforced. We are looking to achieve greater parity between all the different standards required of the trades, making it less hassle for the industry and easier for the consumer to understand, and eliminating any grey areas. The standards will be brought more in line with the consumer protection legislation on issues such as coldcalling and doorstep-selling, in support of the campaign by Trading Standards, Citizens Advice, the OFT and Action Fraud. Among other changes, there will also be clearer responsibilities on firms that sub-contract work, and more monitoring and vetting of firms that want to join TrustMark. Another area we are committed to is the Green Deal, as we see it could create a positive opportunity for domestic, building-led growth in the economy. Our concern is to ensure any work that falls outside the Green Deal and Green Deal providers is carried out by competent tradesmen. Consequently, we have lobbied hard for the Green Deal code of practice to include clear advice to Green Deal providers that they must make sure any “ancillary works” are done by properly vetted and insured tradespeople, such as TrustMark-registered firms. To help us achieve these objectives, Emma Clancy, CEO of Certsure, recently joined our board as trade director. She will play a key role in the overall success of TrustMark, and will help us to continue to find better ways to improve the home repair, maintenance and improvement sector.
TrustMark has been a strong supporter of the Electrical Safety Register as a means of ensuring consumers can easily find local registered electricians whose work has been assessed and certified. “The Electrical Safety Register is a great development in the industry that will provide guidance and support to homeowners wanting to hire professional registered electricians,” says Liz Male, chairman of TrustMark. “Together, we must drive for higher standards, greater consumer empowerment and recognition of reputable firms, both now and in the future.”
Connections Spring 2013
27
08/04/2013 15:14
CONTRACTOR PROFILE // GILKS COMPANY: Gilks BASED: Nantwich, Cheshire FOUNDED: 1935 MAJOR PROJECTS: British Aerospace, Ministry of Defence, RNLI STAFF NUMBERS: 71 TURNOVER: £6.5 million
Mark
Hidden treasure Based just behind the high street in the Cheshire town of Nantwich, Gilks still operates from the same location it started up in back in 1935. But the business today is a very different beast By Nick Martindale
T
ucked away in the heart of the Cheshire town of Nantwich, squeezed between the main high street, a quaint, pedestrianised side street and a car park, lie the offices of Gilks electrical contractors. It turns out there is a good reason for this unlikely location; when the business was first set up in 1935 it originally owned the shop at the front, which sold white goods, while the electrical workshop – specialising at the time in rewires and domestic work – was based at the rear. Today, the company still operates out of the back part, while the front forms part of the current high street. The company was originally founded by George Gilks and ownership was later transferred to Mike Harthern in 1991. The current owner, Mark Beeston, joined the business in 1995 as an engineer from the local electricity board. Within two years he had been promoted to contracts director and then bought into the company as part of a management buyout. He became sole owner four years ago, buying out the only remaining shareholder. At the time, the business was turning over around £2.5 million a year, says Mark, but since then has expanded dramatically. At one stage it was turning over nearly £9 million; in today’s climate that figure is closer to £6.5 million. “It’s a 28
Spring 2013 Connections
28-30_contractor_profile.FINAL.indd 28
fantastic story for me,” he says. “I’ve only had two jobs in my life and we’ve taken more staff on and have grown into the shape we’re in today.” There are essentially two main sides to the business: undertaking design and build services – including building, plumbing and mechanical work, as well as electrical – on newbuild projects in education, medical, commercial and industrial spaces, and undertaking term contracts. The business works closely with a number of main building contractors, including companies such as Carillion Enterprise and Seddon Construction. “We have some good relationships, so if certain counties have a new school we’ll go in with the main contractors from the outset and do the design with them,” says Mark. The education sector remains strong at the moment, he says, while another recent supply of work has been the business’s
‘It’s well known that after every recession there is a big upturn in work so we’re trying to keep ourselves in good shape to respond to that’ www.electricalsafetyregister.com
08/04/2013 15:20
Mark Ashley David Leigh
Mark Beeston Peter Martin
Broadening the base An ongoing maintenance relationship with the Ministry of Defence – through Carillion Enterprise – has also been hugely productive. Some 15 years ago, Gilks began working at the RAF Valley site in Anglesey and today it looks after all mechanical www.electricalsafetyregister.com
28-30_contractor_profile.FINAL.indd 29
‘At one stage I would never have portrayed us as a national contractor, but we have become one because you have to go where the work is’ and electrical operations on the base, including relighting Sea-King helicopters and rewiring the runway. The business has developed a local presence too, and now operates a small office on the island, servicing local clients, including Anglesey Council and the RNLI. “We have an office off the camp to deal with private work in Wales, but we also have a set-up on the camp in a contractors’ compound,” explains Mark. The company also has a base on another military base at Fulwood Barracks, near Preston. As the company has grown, so too has its geographical coverage, taking on work from Scotland to the south of England. “At one stage I would never have portrayed us as a national contractor, but we have become one because you have to go where the work is,” he says. “We try and use our staff; we do supplement it with labour through other avenues such as agencies, but the ratio is always very high in favour Connections Spring 2013
Photography: Mike Poloway/UNP
involvement in a job to combine emergency services in a single control centre in Bury. Gilks also works directly with regular clients, including British Aerospace, where it is currently working on the wings for the new Airbus. “They’re very complex jobs,” says Mark. “When the wings are vertical they would be taller than the building so to put the wing in the floor folds up and then there’s a mezzanine floor that comes back up against the wing, and people can work on that.” The company also recently undertook the automated control wiring on the engine production line for the new Baby Bentley two-door car, at the car-maker’s site in Crewe. Nursing homes have also been a growth area for the business, as have crematoriums, including the Agecroft Crematorium in Salford. “Crematoriums are virtually prehistoric,” says Mark. “They’re not environmentally friendly and they’re inefficient because they’re burning things and not using any heat. It’s not a nice topic of conversation, but we’ve had a spell of fitting new crematoriums with heat recovery systems so they are much more environmentally friendly.”
29
08/04/2013 15:20
CONTRACTOR PROFILE // GILKS
1935: The year Gilks first started trading in Nantwich, selling electrical goods
of our own labour, to ensure a good standard. That’s why we carry quite a lot of operatives.” Gilks currently employs 71 people across its various sites, of which 49 are tools-based. Mark attributes much of the company’s recent success both to its dedicated team and investment in health and safety. The company was recently awarded the ISO 18001 David Leigh, contracts director, standard by NQA – in (left) with MD Mark Beeston addition to 14001 for environmental management and 9001 for quality management – and Mark believes this will eventually become a requirement for organisations looking to get on to preferred supplier lists. “There aren’t many organisations with ISO 18001, certainly not electrical contractors, but some of our major clients have it, and if they start using people who don’t have it this can dilute their own qualification,” he says. It’s hard to say exactly how much this helps with winning work, he says, but the business recently picked up a contract refurbishing National Grid sub-stations where safety was a primary factor. Tough times The business, however, has not been immune to the recession, and the commercial projects in particular are harder to find. “You only have to drive around to see there are many offices and spaces to let,” he says. “At one time we used to do a lot of industrial estate buildings, with a warehouse and an office attached, but there are so many vacant ones that the market has really been quashed.” The current landscape means that ensuring there is sufficient work to keep staff busy is a challenge. “We’re quite a stable employer and I’ve seen a lot of people get married, buy houses and have families,” he says. “Some companies do it differently; they just have a few key people and then hire and fire as the contracts come and go, but we have a bigger workforce to feed. It can be feast to famine and we work hard at that, with a lot of planning and forecasts, but it doesn’t come easy.”
‘There aren’t many electrical contractors with ISO18001, but some of our major clients have it, and if they use people who don’t this can dilute their own qualification’ 30
Spring 2013 Connections
28-30_contractor_profile.FINAL.indd 30
Margins are also very tight, he says; wages remained static for the past four years, but this year staff have had a small rise. And fuel prices are also biting. “The cost of operating has gone up and not in proportion to the value you can win tenders for, so it’s been tough,” he says. “But we’re still in a strong position financially and we’re investing in the right areas. It’s well known that after every recession there is a big upturn in work so we’re trying to keep ourselves in good shape to respond to that.” To this end, the company has just launched a new website, as well as investing in ISO 18001 and its NICEIC and Electrical Contractors’ Association (ECA) accreditations. Other strategies include focusing more on the maintenance side of the business. “It’s a good area to be in now because people are maintaining rather than renewing facilities,” he says. “So that side has grown for us, certainly in the MoD sector, and we’re trying to do more in the private sector as well.”
‘It’s not a nice topic of conversation, but we’ve had a spell of fitting new crematoriums with heat recovery systems so they are much more environmentally friendly’
One-stop shop In the longer term, the aim is to become a “one-stop shop” for organisations, meeting all building services installation and maintenance requirements. “That’s quite an attractive package,” says Mark. “People like to make just one phone call to get a problem solved, as long as they’re still getting value for money.” Gilks recently became Gas Safe-registered with this in mind, he adds. The plan for the future, however, is for steady and controlled growth. He’s reluctant to put a figure on how big the company could get, but believes it could cope with being a £10 million enterprise without having to relocate. Opening further satellite offices is also an option; the business has traditionally done well in Scotland, and Mark feels the use of technology makes it easier to operate such arrangements. For now, Mark – who is still only 47 – remains firmly committed to the business in which he has invested so much time, effort and money. But he also has a number of roles in the industry outside of Gilks – he is chair of the ECA’s West Midlands executive committee and sits on its national labour relations committee, as well as on the JIB national board – and can see a time where a younger generation becomes more involved in the running of Gilks. “Eventually I would like to see the younger guys carry the success of the company on into a new era,” he says. “But I’m certainly not running out of ideas just yet.” » Nick Martindale is editor of Connections www.electricalsafetyregister.com
08/04/2013 15:20
call us: 01709 385468 email us: marketing@cmd-ltd.com visit us: www.cmd-ltd.com follow us: @cmdltd
CON.04.13.031.indd 1
BS 5733
09/04/2013 10:12
PAT TESTING
Under
scrutiny Portable appliance testing has come under fire from the government’s war on unnecessary bureaucracy. But there remains a market for contractors, and it is one that can lead to bigger jobs
By David Adams
F
or some contractors the humble portable appliance test (PAT) is a breadand-butter service: a useful way to initiate and maintain client relationships and a steady, if unspectacular, source of income. For others, it can seem a less-than-lucrative distraction from core business, and a job best outsourced to someone else. But some PAT providers have been giving the industry a bad name, telling customers, falsely, that annual testing is a legal requirement. Others create problems by doing a bad job. After all, anyone who has completed a twoday course on PAT can start calling themselves a PAT provider. In May 2012 the Health and Safety Executive (HSE) published a revised version of its guidance leaflet INDG 236, Maintaining portable electric equipment in low-risk environments. The aim of the revision was to clarify legal requirements, and it formed part of the
government’s response to Professor Ragnar Löfstedt’s 2011 review of health and safety legislation. “Löfstedt found that PAT was an example of regulation being applied too widely and disproportionately, resulting in costly over-compliance,” says a spokesperson for the HSE. “Businesses were being misled by some providers, which over-interpreted what the law actually required.” The new version of INDG 236 is supposed to stop such “overinterpretation”. “You must maintain electrical equipment if it can cause danger, but the law
£30 million: The amount the government claims businesses spend each year on unnecessary regulations
‘Some employers will reduce testing, but the majority believe that in most cases the number of tests will continue as before’ 32
Spring 2013 Connections
32-34_PAT testing.FINAL.indd 32
www.electricalsafetyregister.com
08/04/2013 15:21
[Electricity at Work Regulations 1989] does not say how you must do this or how often,” says the text on page one. The leaflet advises dutyholders on determining appropriate levels of maintenance for each item, taking into account whether an item is used correctly, suitable for the job, used in a harsh or a low-risk environment, or double-insulated. It notes that not every item needs a PAT: sometimes a user check and visual inspection will do.
www.electricalsafetyregister.com
32-34_PAT testing.FINAL.indd 33
Case study: Andy Jull Electrical Andy Jull has more than 23 years’ experience as an electrician and in 2009 launched his company, Andrew Jull Electrical, based in Herne Bay, Kent. The company has three staff: Andy, his colleague Keith Skipton and an apprentice, Christopher Hart. Jull’s reason to offer PAT is straightforward. “With PAT testing, when you get into a place you can end up doing all their work,” he says. “We’re working for a factory near us in Ramsgate. We started doing PAT testing for them, and using the Megger [420 tester] machine we can do a full electrical asset list, too. We can see where the electrical equipment goes, and every year when we test we’ll find it all again. “Once I’ve done that kind of job, they often call me back for maintenance,” he adds. “So it’s not a money-making business for me; it’s more of a door-opener.”
‘As the price for PAT testing falls, the need for quicker, more efficient and cost-effective testing increases. This can sometimes be achieved only by specialists’ also reports no negative impact on his business. But he does feel the new guidance lacks clarity in places. He quotes the leaflet’s half-definition of low-risk environments: “Offices, shops, some parts of hotel and residential care homes.” Johnson asked the HSE to clarify which parts of hotels and residential care homes were referred to, but received a “very vague” response. “When pushed, it took a default stance
Photo: Lee Thompson
Mixed messages Unfortunately, when the leaflet was launched, employment minister Chris Grayling hailed it as a sign of the government’s commitment to cut the number of health and safety regulations – which he claimed cost UK businesses £30 million per year – by half. This message was reinforced by certain media outlets. “Petty health and safety rules that force firms to make checks on electric kettles and computers every year are to be swept away,” crowed the Daily Express. The danger, as several PAT providers and other observers pointed out, was that this message could drown out the one the HSE wanted to get across: that employers are responsible for assessing risks and determining testing frequency for portable appliances. PAT equipment manufacturer Seaward suggested in a statement that the changes in INDG 236 could “pose a significant challenge for the PAT sector”, but that providers should respond by moving from a cost-pertest model to offering comprehensive “advisory, testing and recordkeeping services”. Seaward, and rival manufacturer Megger, have each run seminars to explain the changes and advise PAT providers. “The impression I get is that some employers will reduce testing, but the majority believe that in most cases the number of tests will continue as before,” says Simon Wood, Megger’s UK wholesale and distribution sales manager. Ian Stevens, owner and director of PAT services provider PSW Services, says there’s been no discernible effect on his business. “There’s no such thing as bad publicity. If anything, we saw a slight increase in enquiries immediately afterwards.” Andrew Johnson, owner of PAT provider React, which conducts PAT on behalf of other electrical contractors and carries out tests for employers,
by saying every individual item should be risk-assessed,” he says. Connections put some of these concerns to the HSE. In a written statement, it replied that the organisation “promotes a proportionate, risk-based approach to the maintenance of portable electrical appliances and encourages businesses to do what the law requires and no more”. The HSE added that it plans to publish a refreshed version of HSG107 – Maintaining portable and transportable electrical equipment – in the coming months, re-emphasising the risk-based approach, and said no substantial amendments were planned for INDG 236. “We recognise, however,” the statement continued, “that there is still work to be done as businesses continue to report concerns and instances of over-zealous marketing and mis-selling by certain PAT providers.” One way the cowboys might be tackled is through creating a tougher Connections Spring 2013
33
08/04/2013 15:22
PAT TESTING
qualification for PAT providers. “We’d like to see some type of grading,” says Trevor Dyster, executive director at the Association for Professional Appliance Testing (APAT). “At the moment, there may be people who have retrained and taken PAT testing as a path into the industry. They should be encouraged to take broader electrical qualifications.” However, the HSE says it sees no need for a new, separate PAT qualification. Technological developments But at least whoever is doing the testing can now use better equipment. Smaller, lighter, battery-powered, Bluetooth and USB-enabled PAT testers are making testing quicker and more efficient. Bluetooth also helps testing equipment to link wirelessly with label printers and barcode scanners. “This allows the technician to get closer to the appliance under test, whereas previously a lot of time was spent locating a power source and powering up and down,” says Johnson at React. “The equipment also allows a wider range of tests, including testing of surge-protected adapters at lower voltages and testing RCD-protected appliances for trip-time compliance.” Dyster, meanwhile, highlights as a key advance increased memory power, which allows engineers to store more test data. Another trend is to build digital cameras into testers, as with Seaward’s Apollo 600. Photographs taken using the device can be tagged to individual items, sites, locations and test results. “Visual inspections are subjective, but here you have photographic evidence that is tagged to the asset, so you don’t have to match up photos from a camera or a smartphone,” says Amy Lyons, an applications engineer at Seaward. The Apollo 600 is also equipped with onboard risk assessment software and a retest calculation tool. It can be used for all electrical safety tests required by the Institution of Engineering and Technology (IET) for plug-in appliances, including point-to-point testing of fixed appliances as well as PAT; for a wider range of health and safety tests, including fire detection and alarm systems; and for emergency lighting. Meanwhile, Megger’s PAT 400 series now features a larger on-board memory to store tests and results, the capability for continuous operation and testing at lower power; and an enhanced user interface. 34
Spring 2013 Connections
32-34_PAT testing.FINAL.indd 34
Competition: Win a CalCard Contractors involved in portable appliance testing or any other form of testing, and in particular the tests required by BS 7671, need to ensure the test equipment they use is maintained, and that the accuracy and consistency of the test instruments used for certification and reporting purposes are verified on a regular basis. The CalCard is a resistance checkbox used to verify the correct readings of insulation and continuity resistance measuring test equipment, by providing a known source to measure the instruments against in order to ensure they are still functioning within specification. Any variance in the quick and simple daily check will allow contractors to determine if their test equipment needs recalibrating. NICEIC is giving away 10 CalCards to readers who can answer the following question: When is the date of this year’s NICEIC Live South event? The CalCard is also available for purchase at www.niceicdirect.com, priced at £23.99. To submit your entry, email Paul.s.collins@certsure.com with your answer, along with your name, address, telephone number and registration number. The closing date for entries is 31 May.
But who is using this equipment? With a relatively large number of companies offering PAT services in recent times, prices have been depressed in many areas, making it difficult to make money out of PAT, particularly on a cost-pertest basis. Dyster, for one, believes it’s now often more sensible for contractors to offer PAT as part of a broader safetytesting service package. Johnson believes no contractor can afford not to use the best new PAT equipment, and that this may entail outsourcing PAT to companies such as React. “As the price for PAT testing falls, the need for quicker, more efficient and cost-effective testing increases,” he says. “This higher output can sometimes be achieved only by specialists, as they carry out
testing 24/7. An electrician who dips in now and again is often at a disadvantage because he’s using older equipment.” Some may wish for increased regulation, or the introduction of new qualifications, but there’s no prospect of either at present. For now, they may be best advised to take advantage of the new technologies’ capabilities and make PAT part of a broader testing service package; or to outsource PAT to a trusted specialist while they focus on offering clients other services. PAT may be, as one contractor says, “a bit dull”, but there’s money to be made here – without resorting to sharp practice. » David Adams is a freelance business journalist
www.electricalsafetyregister.com
08/04/2013 15:23
You need to PROVE itâ&#x20AC;&#x2122;s safe!
VI-PD KIT
VI-PD Voltage Tester & Proving Unit Before doing any electrical work, it is essential to be sure the circuit is safe. Remember, nothing is more dangerous than trusting a defective voltage indicator to test for a dead circuit. Safe electrical work requires the use of a voltage indicator that has been proved with a proving unit. Voltage indicators should always be tested with a proving unit or known live source before and after use. N VI-13700 voltage indicator is GS38 compliant. Clear indication of a
live circuit, whether AC or DC N Tough moulded ABS construction with bright LED indication &
double insulated cable N Constructed with large finger guard & retractable, lockable prod
sheath for safe operation N PD440 proving unit tests voltage indicators up to 440V
ÂŁ135 from all good wholesalers www.mtester.info/vipdkit CON.04.13.035.indd 1
09/04/2013 10:14
UNDERFLOOR HEATING
Hot to trot Once regarded as expensive and inefficient, modern electric underfloor heating is anything but. That should be good news for electrical contractors, writes Rob Shepherd
Thermogroupâ&#x20AC;&#x2122;s Thermonet: magnified view and (bottom right) from a distance 36
Spring 2013 Connections
36_38_underfloor.FINAL.indd 36
www.electricalsafetyregister.com
08/04/2013 15:24
T
he origins of underfloor heating can be traced back to Roman times, when a “hypocaust” used the hot air generated from a fire in a void between a building’s living area and its foundations to heat the area above. Although modern electrical underfloor heating is far less labour-intensive, the principle of heating the surface area of a floor is exactly the same. Electrical underfloor heating has seen significant growth across Europe since the early 1990s. In certain countries it is now considered a mainstream technology which, as well as being highly efficient, also provides added value when looking to sell properties. “It is particularly popular in Scandinavian countries, where heating under tiled and wooden floors in lobbies, kitchens, bathrooms and conservatories is second nature,” says Jonathan Jones, marketing manager at Pentair. Kelly Butler, marketing director at the British Electrotechnical and Allied Manufacturers’ Association (BEAMA), is also a fan. “It is typically cheaper to install than water-based systems and requires little or no maintenance, as there are no moving parts such as water pumps, valves and actuators,” he says. “Also, as the electrical supply becomes smarter and greener, low energy-consuming, highly controllable solutions for heating are becoming ever more attractive.” Challenging convention When most of us think of a domestic heating system, one of the first items to spring to mind is a radiator. Fixed to walls the length and breadth of the nation, radiators have enjoyed a dominant position in the domestic heating sector for longer than most of us can remember. In recent times, however, the energy
www.electricalsafetyregister.com
36_38_underfloor.FINAL.indd 37
‘It is typically cheaper to install than water-based systems and requires little or no maintenance, as there are no moving parts such as water pumps, valves and actuators’ efficiency of radiators has been called Vent-Axia into question, and in this respect they come up short on several counts. Their primary failing is their positioning on walls, as any heat generated moves vertically until it reaches the ceiling, where it accumulates until such a time that there is enough of it to reach the people in the room and warm them up. Sizing it up An electrical underfloor heating Electrical underfloor heating can be system, on the other hand, delivers the perfect solution for newbuild, a comforting and even radiant heat refurbishment and renovation projects across the whole floor area with no cold – from older homes to large apartment spots, warming from the floor upwards. schemes and affordable housing. Homeowners are also increasingly “There is no restriction on the size of style-conscious, and this is another project or type of dwelling it is suitable reason for the system’s current for,” says Joan Pask, group marketing popularity. “By eliminating the need for manager at Warmup. “It is increasingly radiators, electric underfloor heating the number-one choice for newbuilds, gives people freedom to design a room, as the atmosphere inside low-energy with no obstacles,” says Stuart Bell, or airtight houses requires careful partner at Thermogroup. management, precise heat control and A range of formats are available, zoning, to avoid overheating.” designed to suit different types of floor Lee Nurse, marketing director at surface. Mat-based and loose-wire Vent-Axia, agrees. “Systems are now systems are perfect for installation available that include a thermostatic under ceramic, tile and natural stone, controller that monitors both the floor while foil systems are suitable for use and air temperature,” he says. “This with laminate, carpet, vinyl, engineered allows customers to gain maximum wood and other floating floors. control over their environment by The heat requirement of a room allowing them to set the thermostat at will depend on its size and heat loss characteristics, which can be calculated either the ideal floor or air temperature, depending on the room.” using the elemental method: individual Next-generation systems also feature calculations for heat loss through a factory-made hidden splice, which walls, ceilings, windows and the floor. means there is no need for a return Dividing the total heat loss by the floor conductor. Installation is simplified, area will give the heat requirement in since the end of the cable can be watts per square metre (W/m²). It is then placed wherever is most convenient. easy to specify the amount and type of matting, foil or wire required. Warm opportunity Controlling the energy used is In an industry where new revenueimportant, and this has traditionally generating opportunities are few been one of the criticisms levelled at and far between, the installation of electrical underfloor heating. “In the electrical underfloor heating should 1960s, when it was first introduced, prove a welcome addition to electrical insulation standards were poor and the contractors’ portfolios. “The systems controls not accurate, so running costs are designed for quick and easy were high,” says Steven Rooney, sales installation and should be connected director at Gaia Climate Solutions. “The by a qualified electrician,” says fact that these aspects of homes Rooney. “Most leading manufacturers have improved means that also offer total support, from project running costs are now far less quote to completion.” than people think.”
Connections Spring 2013
37
08/04/2013 15:24
UNDERFLOOR HEATING
o 5 C The amount electrical underfloor heating systems can be set lower than water-based heating systems to achieve the same comfort levels, according to a study by ASHRAE One company that has benefited from using this technology is Surrey-based Debatsford Developments. “I have seen an increase in demand due to the desire for greener houses,” says director Ian de Haan. “It also helps us work towards the requirements in the Code for Sustainable Homes and the Passivhaus standard.” Being able to install such technology could also open doors to other markets, as David Goose, managing director of Ambient Electrical, has found. “As the rentals market becomes increasingly buoyant, landlords are investing in underfloor heating to make their properties stand out, and savvy electrical contractors are tapping into this target audience,” he says. Given the simplicity of installing the systems, little or no additional training is required. Qualified electrical contractors will already be aware of the skills necessary. It is, though, important for contractors to be up to speed with the latest industry developments and legislation, says Pask at Warmup. “In particular, building regulations, and the levels of control that heating systems must be designed and installed to, should be implemented in order to ensure a minimum standard of quality.” When it comes to the installation itself, care is needed to ensure it is all performed correctly at the time, as modifications will not be easy to make or appreciated by customers. “Make sure to use the correct-sized system for the available floor space, and use the information in the installation manual,” warns Bell at Thermogroup. “Also, check that the heating system is working before, during and after installation.” The outlook for electrical underfloor heating is positive, and its ability to provide exceptional levels of energyefficient heating for all environments means it is fast becoming the solution of choice. Contractors who add it to their services could develop a lucrative sideline, hidden beneath the floor. » Rob Shepherd is a freelance business journalist who specialises in the electrical industry
38
Spring 2013 Connections
36_38_underfloor.FINAL.indd 38
Case study: Shore thing Overlooking the beautiful waters of Whitsand Bay at Downderry on Cornwall’s south coast, Celtic Shores is a development by TP Estates of 12 two-bedroom apartments and two three-bedroom penthouses. The luxury specification was enhanced with the installation of DEVI electrical underfloor heating throughout. The cables are located within a floor that comprises prefinished hardwood flooring on top of chipboard, timber battens and a mineral wood resilient layer, situated on a 165mm concrete floor. The Devireg 550 thermostats calculate when the heat must be turned on to reach the right temperature at the required time within each of the apartments. The system heats the voids between the joists, while insulation drives the heat upwards so it dissipates through the floor to give even coverage. “DEVI was chosen for Celtic Shores following our use of the product in previous developments, where it has proved to be an economical, clean and controllable form of heating,” says Barry Evans, development director at TP Estates.
Myth-buster: electrical underfloor heating “It’s not energy-efficient” Electrical underfloor heating can be set 5°C lower than water-based heating systems to achieve the same comfort levels, according to a study by ASHRAE “It’s only for bathrooms or kitchens” It can be used to heat the whole house or certain rooms – for example, just the ground floor, or a single room such as a conservatory “It will raise floor levels” It will not raise floor levels. Some leading systems use British Electrotechnical Approvals Board-approved ultra-thin heating elements, with wire only 1.6mm thick “Floors are uncomfortably hot” Floors are warm, but not hot. With its low operating temperature, electrical underfloor heating delivers a comforting heat across the whole floor area, with no cold spots “It’s difficult to control” An energy monitor thermostat offers accurate floor temperature control. Active energy management prompts users to choose the best temperature for each room “It’s expensive compared with other systems” It can use much less energy than warm-water heating when properly zoned and controlled, and is virtually maintenance-free Source: Warmup
www.electricalsafetyregister.com
08/04/2013 15:25
A Faster Butt Splice A Better Butt Splice
Innovation with a Purpose.
3X FASTER
NO MORE CRIMPING!
™
SpliceLine , the innovative alternative to traditional butt splices that does not require crimping, soldering or heat shrinking to create secure end-to-end connections... • • • • • •
Scan to view
product
video SpliceLine™ is available from your local electrical wholesaler in a variety of pack sizes!
Crimp-free, push-in butt splice Perfect for consumer unit changes Great for extending short wires 17th Edition compliant (BS 7671: 2008) Proven push-in connector technology 32A/450V rating
Fast, Safe, Reliable connections every time For more information or to receive a datasheet call 01925 44 44 46 or email electrical.enquiries@idealnwd.com
www.idealindustries.co.uk ©2013 IDEAL INDUSTRIES Unit 3, Europa Court, Europa Boulevard, Westbrook, Warrington, WA5 7TN
CONTROL AT YOUR
FINGERTIPS Wireless Touch Control Unit
Control of lights and electrical appliances Shutters, blinds and garage doors Ambient temperature information
call: 01827 63454
CON.04.13.039.indd 1
email: sales@scolmore.com
Course ref: Home Automation 0870 013 0458 Courses@niceic.com
visit: www.scolmore.com
10/04/2013 09:52
NICEIC Direct gives you more for less! Domestic Basic Lockout Kit
£29.90
NEW
4352
Domestic Deluxe Lockout Kit
£49.95
NEW
4353
Solar PV Installer book
offer £9.99
See our full range of offers at niceicdirect.com
Commercial Lockout Kit
£79.95 CalCard
£20.00
4374
Office Equipment
coming
soon
NEW
4354
NEW
4376
Part P Doctor
Snickers workwear 10% off
All Elecsa publications available
£16.99
4103
To find out more click or call
www.niceicdirect.com 0843 290 3442 *All prices exclude VAT. Offers end 30th June 2013 or while stocks last. Offers cannot be used in conjunction with each other
CON.04.13.040.indd 1
09/04/2013 12:10
Ask the experts/Technical
N
Fully Charged From the helpline
We continue with our series of answers to some of the more frequently asked questions put to the NICEIC Technical Helpline.
QUESTION
ANSWER
What is stroboscopic effect and what can cause it?
The stroboscopic effect is an optical illusion that causes a rotating or other cyclically moving object to appear stationary or be moving more slowly than it actually is, or in the opposite direction. This can introduce the risk of someone touching a dangerous moving object, such as the rotating chuck of a lathe, believing it to be safe to do so. The stroboscopic effect happens when the rotating (or other cyclically moving) object is lit by a source that gives off short, regular flashes of light at a rate similar to that at which the object rotates. Persistence of vision then causes the optical illusion. If, for example, the object is a rotating electric fan, and a flash arrives each time a fan blade passes a fixed position, the blades seem to stand still. If the flashes occur less frequently, the blades seem to move slowly in their actual direction of motion. If the flashes arrive more frequently, the blades seem to move backwards. A fluorescent or other discharge lamp operating directly from a 50 Hz a.c. supply flashes 100 times per second and can therefore cause the stroboscopic effect in some cases.
QUESTION
ANSWER
What can be done to avoid the stroboscopic effect?
The stroboscopic effect can be prevented or diminished by one or more of the following means: • Where fluorescent or other discharge lamps operating directly from the a.c. mains supply (such as switch-start fluorescent) are used: • spread the lamps over two or more phases of supply and make sure lighting fed from more than one phase is operating whenever the object is rotating, or • use luminaires having a lead-lag ballast (a ballast for a pair of fluorescent lamps, one operating on leading current and the other on lagging current) to diminish the stroboscopic effect. • Make use of fluorescent or other discharge lighting having high frequency controlgear. • Make use of lamps that give a continuous, non-flickering light output (such as lamps operating on smooth d.c.), either to light the whole area or as a local ‘task lighting’ placed, say, above the rotating blade of a sawbench.
www.electricalsafetyregister.com
41-42_askexperts.FINAL.indd 41
Connections Spring 2013
41
09/04/2013 09:34
Ask the experts/Technical
N
Fully charged
42
QUESTION
ANSWER
After an addition or alteration has been made to an existing installation, does BS 7671 require a periodic inspection and testing notice to be fixed at or near the origin of the installation?
Yes. An addition or alteration is subject to the requirements of Chapter 61 for initial verification (Regulation 610.4 refers), and on completion of the work carried out in accordance with Chapter 61, Regulation 514.12.1 requires a periodic inspection and testing notice to be fixed at or near the origin of the installation. The legend on the new periodic inspection and testing notice should identify the circuits to which it relates (the circuits involved in the alteration or addition).
QUESTION
ANSWER
How should the conductors of a 110 V reduced low voltage system forming part of an electrical installation be identified to show their polarity?
A reduced low voltage (RLV) system is one complying with Regulation Group 411.8. The nominal voltage does not exceed 110 V a.c. between line conductors (single-phase 55 V to earthed midpoint, three-phase 63.5 V to earthed neutral). Single-phase circuits usually have two line conductors. Three-phase circuits have three line conductors, and may or may not include a neutral. Regulation 514.3.1 requires the cores of cables to be identified by colour or by lettering and/or numbering. Table 51 of BS 7671 specifies the colours and lettering/ numbering to be used. Neutral conductors should be identified by the colour blue or the letter N. Protective conductors should be identified by the colour combination green-and-yellow. The two line conductors or a single-phase RLV circuit are not specifically addressed in Table 51. However, applying the principles of Table 51, one line conductor should be identified by the colour brown and the other by the colour black, or alternatively one line conductor should be identified by the alphanumeric L1 and the other by the alphanumeric L2. The three line conductors of a three-phase RLV circuit should be identified by the colours brown, black and grey, respectively, or by the alphanumerics L1, L2 and L3, respectively.
QUESTION
ANSWER
Is it permitted to install an electric floor or ceiling heating system without any form of temperature control/sensor?
In most cases no. The relevant requirements are given in Section 753 of BS 7671, and summarised below. It is necessary to prevent floor or ceiling heating systems in buildings from overheating. To prevent heating equipment exceeding a temperature of 80 °C, Regulation 753.424.3.1 requires one or more of the following measures to be applied in the zone where the heating units are installed: • Appropriate heating system design. • Installation of the heating system in accordance with appropriate manufacturer’s instructions. • Installation of temperature limiting devices. Where there is a possibility of skin or footwear coming into contact with a floor that has underfloor heating, Regulation 753.423 requires the surface temperature of the floor to be limited to a suitable value. The regulation gives an example value of 35°C. However, some manufacturers of underfloor heating units recommend a maximum surface temperature of around 25°C where skin or footwear might come into contact with the floor.
Spring 2013 Connections
41-42_askexperts.FINAL.indd 42
www.electricalsafetyregister.com
09/04/2013 09:34
FormFill Version 10 BS7671 Inspection and certification software
Print directly on to NICEIC Certificates Includes the latest BS7671:2008 Amendment 1 certificates including the new Electrical Installation Condition Report. Overprints NICEIC computer friendly stationery as well as producing Castline custom certificates to blank paper.
New iPhone app!
Visit www.castlinesystems.co.uk for details.
Also available: FormFill Android for Smartphones and Tablets running Google Android operating system.
CON.04.13.043.indd 1
09/04/2013 10:22
Ask the experts/Technical
N
Fully charged 44 49 52 56 60
The initial verification of a small-scale solar PV system – Part 1 Safe connection and disconnection of tap-off units of busbar trunking systems Outdoor lighting installations, highway power supplies and street furniture Uncommon conductor arrangements Snags and solutions: A practical guide to everyday electrical problems
The initial verification of a small-scale solar PV system – Part 1 This article is the first in a series dealing with the initial verification of grid-connected small-scale photovoltaic (PV) systems. It looks at the requirements relating to design, installation and initial verification. It also introduces the NICEIC Electrical Installation Certificate for Small-scale PV Systems and considers the procedures for conducting pre-installation checks and initial inspection. The second article in the series will look at the procedure for initial testing.
Part 1 Requirements, NICEIC PV Certificate, Pre-installation Checks and Initial Inspection Building Regulations and Planning In domestic premises in England and Wales, the work associated with the installation of a microgenerator is, to some extent, notifiable under Part P of the Building Regulations. Non-electrical aspects of the Building Regulations also apply. In Scotland, a Building Warrant may be required. The installation of a PV system may require planning permission. Therefore, before the work commences, it should be determined whether the proposed work is subject to these requirements or is considered ‘permitted development’, by consulting the local Planning Authority. ESQCR Requirements Regulation 22 of the Electricity Safety, Quality and Continuity Regulations 2002 (ESQCR) contains requirements concerning the installation and 44
Spring 2013 Connections
44_46_technical.FINAL.indd 44
operation of generators in parallel with the distributor’s network. These generally prohibit the connection of a generator without prior consent of the distributor, and are likely to preclude parallel operation of generators in domestic premises. However, ESQCR Regulation 22(2) gives an exemption for the parallel operation of generation rated up to a total of 16 A per phase (known as small-scale embedded generation or microgeneration), provided: • it has protection that will disconnect from the mains supply automatically in the event of the loss of that supply, • the installation complies with the edition of BS 7671 current at the time of installation, and • the installer notifies the distributor before or at the time of commissioning the generator. Engineering Recommendation G83/2, issued by the Energy Networks Association, gives a procedure to facilitate the connection of type-tested small-scale embedded generators (including grid-connected small-scale PV systems) in accordance with the requirements of the ESQCR. MCS Requirements For most customers, the reason for installing a PV system is to take advantage of the feed in tariffs (FITs). To be FIT-eligible, a PV system must be installed by an MCS installer (such as an NICEIC MCS Approved Installer), using equipment certificated by a UKAS accredited Certification Body where appropriate. MCS installers are assessed against the requirements of Microgeneration Installation Standard MIS 3002. MIS 3002 requires small-scale PV systems to be designed and installed in accordance with the MCS/ECA Guide to the Installation of Photovoltaic Systems. The MCS/ECA Guide requires that a PV system shall be inspected and tested in accordance with BS 7671, and that the d.c section shall also be inspected and tested in accordance with BS EN 62446, Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection. www.electricalsafetyregister.com
08/04/2013 15:29
NICEIC Electrical Installation Certificate for Small-scale PV Systems
Fig 1 EICPV, equivalent to four separate forms Either PVCB1
In accordance with BS 7671, BS EN 62446 and MCS guidance These certificates are for use only by MCS Approved Installers and Conforming Bodies enrolled with NICEIC.
Postcode
Name
Original
I/We, being the person(s) responsible for the design of the electrical installation (as indicated by my/our signature(s) below), particulars of which are described above, having exercised reasonable skill and care when carrying out the design, hereby CERTIFY that the design work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671 amended to (date) except for the departures, if any, detailed as follows:
I/we also CERTIFY that the solar PV system meets the requirements of Microgeneration Installation Standard MIS 3002. Name
An alteration
DESIGN
Date
(CAPITALS)
An addition
Extent of the installation covered by this certificate:
For the DESIGN of the installation
Signature
Date
(CAPITALS)
Details of departures from BS 7671, as amended (Regulations 120.3, 133.5):
The results of the initial verification reviewed by the Qualified Supervisor Signature
Trading title
New
Postcode
The extent of liability of the signatory/signatories is limited to the photovoltaic system described in section I of this certificate.
Signature
E. PARTICULARS OF THE MCS APPROVED INSTALLER
The installation is:
DETAILS OF THE INSTALLATION Address:
D. CONSTRUCTION AND INITIAL VERIFICATION I/we, being the person(s) responsible for the construction and initial verification of the photovoltaic system, including verification of any design work not carried out by me/us, (as indicated by my/our signature adjacent), particulars of which are described on page 3, having exercised reasonable skill and care when carrying out the construction, inspection and testing, hereby CERTIFY that the said work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671, BS EN 62446 and MCS guidance (as amended) except for the departures, if any, detailed as follows:
ICN3/
Issued in accordance with British Standard 7671 – Requirements for Electrical Installations by an Approved Contractor or Conforming Body enrolled with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable, LU5 5ZX
Client / Address:
C. DESIGN I/we, being the person(s) who carried out the design of the photovoltaic system (as indicated by my/our signature adjacent), particulars of which are described on page 3, having exercised reasonable skill and care when doing so, hereby CERTIFY that the said work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671, BS EN 62446 and MCS guidance (as amended) except for the departures, if any, detailed as follows: Details of departures from BS 7671, BS EN 62446 or MCS guidance (as amended):
Name
Date
(CAPITALS)
The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate. For the DESIGN of the installation: **( Where there is divided responsibility for the design ) Name Designer 1 ( CAPITALS) Name ** Designer 2 ( CAPITALS)
F. DETAILS OF THE ORGANISATION THAT CARRIED OUT THE DESIGN OF THE PHOTOVOLTAIC SYSTEM
Signature .................................................... Date
Organisation
Signature .................................................... Date
Address Address INSTALLER
CONSTRUCTION
Postcode Telephone No
NICEIC certificates are accountable documents. Unused certificates should be kept secure by the Qualified Supervisor.
This certificate is not valid if the serial number has been defaced or altered
ELECTRICAL INSTALLATION CERTIFICATE
DETAILS OF THE CLIENT
Original
Installation address
Details of departures from BS 7671, BS EN 62446 or MCS guidance (as amended)
Only the NICEIC MCS Approved Installer responsible for the installation and verification of the photovoltaic system is authorised to issue this certificate for the work.
PVCB1/
B. ADDRESS OF THE INSTALLATION
Client and address
or
(To the person ordering the work)
This certificate is not valid if the serial number has been defaced or altered
This certificate is an important and valuable document which should be retained for future reference
A. DETAILS OF THE CLIENT
(To the person ordering the work)
Electrical installation certificate for a small-scale photovoltaic system
I/We, being the person(s) responsible for the construction of the electrical installation (as indicated by my/our signature below), particulars of which are described above, having exercised reasonable skill and care when carrying out the construction, hereby CERTIFY that the construction work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671 amended to (date) except for the the departures, if any, detailed as follows:
Postcode
NICEIC Registration No (Essential information)
G. NEXT INSPECTION
§ Enter interval in terms of years, months or weeks, as appropriate
I RECOMMEND that the photovoltaic system is further inspected and tested after an interval of not more than
This certificate is based on the model forms shown in BS 7671 AND BS EN 62446.
Published by NICEIC, a part of the Ascertiva Group © Copyright The Electrical Safety Council (April 2012)
§
Please see the ‘Notes for Recipients’ on the reverse of this page.
Page 1
Details of departures from BS 7671, as amended (Regulations 120.3, 133.5):
PVCB1/1
The extent of liability of the signatory is limited to the work described above as the subject of this certificate. For the CONSTRUCTION of the installation: Name Signature .................................................... Date ( CAPITALS)
Constructor
INSPECTION AND TESTING I/We, being the person(s) responsible for the inspection and testing of the electrical installation (as indicated by my/our signatures below), particulars of which are described above, having exercised reasonable skill and care when carrying out the inspection and testing, hereby CERTIFY that the work for which I/we have been responsible is to the best of my/our knowledge and belief in accordance with BS 7671, amended to (date) except for the departures, if any, detailed as follows: Details of departures from BS 7671, as amended (Regulations 120.3, 133.5): The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate. Reviewed by For the INSPECTION AND TESTING of the installation:
Guidance on the completion of Certificates and Reports may be found in current NICEIC publications, details of which are available on www.niceicdirect.com.
Signature .................................................... Date Name ( CAPITALS)
Signature .................................................... Date Inspector
Name ( CAPITALS)
DESIGN, CONSTRUCTION, INSPECTION AND TESTING *
Qualified Supervisor † * This box to be completed only where the design, construction, inspection and testing have been the responsibility of one person.
I, being the person responsible for the design, construction, inspection and testing of the electrical installation (as indicat ed by my signature below), particulars of which are described above, having exercised reasonable skill and care when carrying out the design, construction, inspection and testing, hereby CERTIFY that the said work for which I have been responsible is to the best of my knowledge and belief in accordance with BS 7671, amended to (date) except for the departures, if any, detailed as follows: Details of departures from BS 7671, as amended (Regulations 120.3, 133.5): The extent of liability of the signatory is limited to the work described above as the subject of this certificate. For the DESIGN, the CONSTRUCTION and the INSPECTION AND TESTING of the installation.
Amd 1: 2011
Signature
Date
Name ( CAPITALS)
Reviewed by Date
Signature Name ( CAPITALS)
Qualified Supervisor ††
† Where the inspection and testing have been carried out by an Approved Contractor, the inspection and testing results are to be reviewed by the registered Qualified Supervisor. †† Where the design, the construction, and the inspection and testing have been the responsibility of one person, the inspection and testing results are to be reviewed by the registered Qualified Supervisor.
This certificate is based on the model forms shown in Appendix 6 of BS 7671
Page 1 of
Please see the ‘Notes for Recipients’ on the reverse of this page.
Published by NICEIC, a part of the Ascertiva Group © Copyright The Electrical Safety Council (July 2011)
ICN3/1
Due to the nature of the technology used in PV systems, some aspects of the inspection and testing given in BS EN 62446 differ markedly from the procedures for inspection and testing included in BS 7671. BS EN 62446 includes a model verification certificate, a model inspection report, and a model PV array test report.
This certificate is not valid if the serial number has been defaced or altered
This certificate is an important and valuable document which should be retained for future reference
PVCB1/
Electrical installation certificate for a small-scale photovoltaic system Issued in accordance with BS 7671 and BS EN 62446 by an MCS Approved Installer registered with NICEIC, Warwick House, Houghton Hall Park, Houghton Regis, Dunstable LU5 5ZXB
A. DETAILS OF THE CLIENT
B. ADDRESS OF THE INSTALLATION Installation address
Original
Client and address
Postcode
Postcode
C. DESIGN I/we, being the person(s) who carried out the design of the photovoltaic system (as indicated by my/our signature adjacent), particulars of which are described on page 3, having exercised reasonable skill and care when doing so, hereby CERTIFY that the said work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671, BS EN 62446 and MCS guidance (as amended) except for the departures, if any, detailed as follows: Details of departures from BS 7671, BS EN 62446 or MCS guidance (as amended):
The extent of liability of the signatory/signatories is limited to the photovoltaic system described in section I of this certificate. For the DESIGN of the installation
Name
Signature
Date
(CAPITALS)
D. CONSTRUCTION AND INITIAL VERIFICATION I/we, being the person(s) responsible for the construction and initial verification of the photovoltaic system, including verification of any design work not carried out by me/us, (as indicated by my/our signature adjacent), particulars of which are described on page 3, having exercised reasonable skill and care when carrying out the construction, inspection and testing, hereby CERTIFY that the said work for which I/we have been responsible is, to the best of my/our knowledge and belief, in accordance with BS 7671, BS EN 62446 and MCS guidance (as amended) except for the departures, if any, detailed as follows:
I/we also CERTIFY that the solar PV system meets the requirements of Microgeneration Installation Standard MIS 3002. Name
Signature
Signature
E. PARTICULARS OF THE MCS APPROVED INSTALLER Trading title
Date
(CAPITALS)
The results of the initial verification reviewed by the Qualified Supervisor
Details of departures from BS 7671, BS EN 62446 or MCS guidance (as amended)
Name
Date
(CAPITALS)
F. DETAILS OF THE ORGANISATION THAT CARRIED OUT THE DESIGN OF THE PHOTOVOLTAIC SYSTEM Organisation
Address Address INSTALLER
Postcode Telephone No
Postcode
NICEIC Registration No (Essential information)
This certificate is based on the model forms shown in BS 7671 AND BS EN 62446.
Published by NICEIC, a part of the Ascertiva Group © Copyright The Electrical Safety Council (April 2012)
G. NEXT INSPECTION
§ Enter interval in terms of years, months or weeks, as appropriate
I RECOMMEND that the photovoltaic system is further inspected and tested after an interval of not more than Please see the ‘Notes for Recipients’ on the reverse of this page.
§
Page 1 PVCB1/1
www.electricalsafetyregister.com
44_46_technical.FINAL.indd 45
(To the person ordering the work)
Fig 2 EICPV page 1
For a newly installed PV system, the installer could be in the position of having to complete four separate forms relating to verification. These are the BS 7671 Electrical Installation Certificate, the BS EN 62446 Verification Certificate, the BS EN 62446 Inspection Report and the BS EN 62446 PV Array Test Report. To reduce the burden on NICEIC MCS Approved Installers, NICEIC has produced the Electrical Installation Certificate for Small-Scale Photovoltaic Systems (EICPV). This incorporates the important features of all four of the above forms, as illustrated in Fig 1. Figures 3, 4 and 5 show pages 1, 2 and 3, respectively, of the EICPV. Page 1, which includes Sections A to G, is where the names and contact details of the Client, NICEIC MCS Approved Installer and any separate designer are recorded. Also to be recorded on Page 1 are any intended departures from the requirements of BS 7671 or BS EN 62446 or the MCS/ECA Guide, and the recommended interval to the first periodic inspection and test. The Designer and Installer should sign Sections C (Design) and D (Construction and Initial Verification), respectively, to confirm that their work has been carried out in accordance with the relevant requirements, except for any intended departures recorded on Page 1. Section H (Details of the Existing Electrical Installation), on Page 2 of the EICPV, is where the relevant technical details of the a.c. electrical installation to which the PV system is connected are recorded. These include (amongst other things) the type of system earthing (TN-S, TN-C-S, or TT), nominal voltage, number of phases, details of the equipment at the origin, sizes of main conductors, maximum demand, external earth fault loop impedance and maximum prospective earth fault current. This information is important not only for record purposes but also to help verify that the PV system is correctly designed in relation to the a.c. installation to which it is connected and does not impair the safety of that installation. For example, information about the a.c installation is needed in connection with the requirement of Regulation 132.16 of BS 7671 to check that the rating and condition of the existing equipment, including that of the distributor, will be adequate for the altered circumstances (the addition of the PV system) and that the earthing and bonding arrangements are adequate. Section I (Overview of PV System), on Page 2, is where details of the main components of Connections Spring 2013
45
08/04/2013 15:29
Ask the experts/Technical
N
Fully charged This certificate is not valid if the serial number has been defaced or altered
(To the person ordering the work)
Fig 3 EICPV page 2
PVCB1/
Electrical installation certificate for a small-scale photovoltaic system H. DETAILS OF EXISTING ELECTRICAL INSTALLATIONS Tick boxes andTick enter details, appropriate boxes and as enter details, as appropriate Nature of supply parameters Notes: (1) by enquiry (2) by enquiry or by measurement (3) where more
TN-C-S
1-phase (2-wire) 3-phase (3-wire)
TT
Other
TN-S
Means of earthing
V
Nominal frequency, f (1)
Hz
BS(EN)
Short-circuit capacity
kA
Uo (1)
V
External earth fault (2) loop impedance, Ze(1)
Ω
Type
Confirmation of polarity
✓
3-phase Prospective fault current, Ipf(2)(3)
kA
kA
Tick boxes and enter details, as appropriate
Details of installation earth electrode (where applicable) Type (eg rod(s), Location tape etc) Electrode resistance, RA
Installation earth electrode
Continuity/ Conductor mm2 connection csa verified Comments on existing installation relevant to the installation of PV system
Protective measure(s) measures for fault protection
Method of measurement
Ω
Earthing conductor
Measured Ze
Ω
Maximum demand (Load)
kVA/ Amps
✓
This Certificate relates to a New PV Installation
Conductor csa
Tick boxes and enter details, as appropriate
Delete as appropriate
No
The PV system is protected by a SPD Yes
Connected to Inverter number Manufacturer
Gas service
Structural steel
Other incoming service(s)
Connected to Inverter number Model number
No
A
Supply conductors material Supply conductors csa
mm2
RCD operating current, I n*
mA
RCD operating time (at I n) *
ms
* applicable only where an RCD is used as a main circuit-breaker
Model number
Details of generation meter Manufacturer Model number
Power rating
Serial number
Details of connections to consumers a.c. installation Connected at a) Main consumer unit using way number … Location of consumer unit
Location
Location
BS(EN)*
Rating
Short circuit capacity (kA)
Number of poles
In
BS(EN)*
Rating
Type§
Short circuit capacity (kA)
Number of poles
In
No of strings
†
† § Conventional RCD – Type AC, d.c. blocking RCD – Type B
(tick if applicable).
b) Auxiliary consumer unit
Pmax STC(module)
Device 2
*Circuit Breaker BS EN 60898, RCBO BS EN 61009-1, RCD BS EN 61008-1
V
Rated current, In
1
Details of Circuit Protection Device(s) Device 1 Manufacturer
Voltage rating
No of poles
No of strings
† Array 2 Location †
Type BS(EN)
2 †
Pmax STC(module)
Model number
Oil service
Details of inverter(s) Manufacturer
An alteration or addition to an existing PV Installation
The protective measure used by the DC components is double or reinforced insulation Yes Details of arrays Array 1 Location
Water service
mm2
Location (where not obvious)
✓
I. OVERVIEW OF PV INSTALLATION
No of modules
Main switch or circuit-breaker
Number of smoke alarms
Conductor material
A
Rated current
Main protective bonding conductors and bonding of extraneous-conductive-parts (✓) Continuity/ connection verified
Conductor material
No of modules
Nominal U (1) voltage(s)
Single-phase Prospective fault current, Ipf(2)(3)
Please state
PARTICULARS OF INSTILLATION AT THE ORIGIN AT THE ORIGIN PARTICULARS OF INSTALLATION
Distributor’s facility
Characteristics of primary supply overcurrent protective device(s)
than one supply, record the higher or highest values
Number of of Number sources supplies
1-phase (3-wire) 3-phase (4-wire)
Original
SUPPLY CHARACTERISTICS
Number and type of live conductors SUPPLY CHARACTERISTICS System type(s)
Type§
† Insert N/A (not applicable) where appropriate
Page 2
This certificate is based on the model forms shown in BS 7671 AND BS EN 62446. Published by NICEIC, a part of the Ascertiva Group © Copyright The Electrical Safety Council (April 2012) PVCB1/3
This certificate is not valid if the serial number has been defaced or altered
PVCB1/
Electrical installation certificate for a small-scale photovoltaic system J. SCHEDULE OF ITEMS INSPECTED Presence of fire barriers, suitable seals and protection against thermal effects.
Array frame correctly fixed and stable; roof fixings weatherproof.
23.
Presence of circuit protective conductor.
PV modules securely fixed to frame.
24.
Appropriate erection methods.
3.
Array frame and materials corrosion proof.
25.
Means of isolating the inverter have been provided on the a.c. side.
4.
Ventilation provided behind array to prevent overheating/fire risk.
26.
Routing of cables in prescribed zones.
5.
Cable entries weatherproof.
27.
Connection of conductors.
6.
String overcurrent protection devices are fitted in accordance with manufacturer’s instructions.
28.
Cables incorporate earthed armouring or sheath, or run in earthed wiring system, or otherwise, adequately protected against nails, screws and the like.
7.
Blocking diodes have a minimum reverse voltage of 2 x Voc STC.
29.
Proximity of non-electrical services and other influences.
8.
Where required, array frame protective equipotential bonding has been correctly installed and connected to earth.
30.
Overcurrent protective device in consumer unit complies with inverter manufacturers recommendations.
31.
Inverter protection settings conform to G83/2.
d.c. cables and connectors
9.
Cables and connectors rated for continuous d.c. operation.
32.
Additional protection by 30 mA RCD provided (where required).
10.
Cables and connectors suitable for maximum current and voltage. (Voc STC x 1.15 and Isc STC x I.25).
33.
11.
Where string overcurrent protection devices are not fitted, the string cables are sized to accommodate the maximum combined fault current.
If an RCD is installed to provide fault protection and there is not at least simple separation between the d.c. and a.c. sides of the PV system and the inverter is able to feed d.c. fault currents into the installation, the RCD is of Type B to IEC 62423.
34.
12.
Protective bonding conductors (where provided) are parallel to and bundled with d.c. cables.
Isolation and switching devices have been connected such that the PV installation is wired to the ‘load’ side, and the mains supply to the ‘source’ side.
36.
13.
String cables clearly identified for maintenance purposes.
Where the PV system connected to an auxiliary consumer unit, the selection and erection of the cables connecting this consumer unit to the mains supply and the method of connecting are satisfactory.
14.
String cables, array cables and d.c. main cables have been selected and erected so as to minimise the risk of earth faults and short-circuits.
Labelling and Information Sources
15.
Wiring loops have been kept as small as possible.
37.
16.
d.c. switch disconnector fitted to d.c. side of the inverter.
38.
All isolators are clearly labelled.
17.
Wiring systems and junction boxes have been selected and erected to withstand expected external influences, such as wind, ice formation, temperature and solar radiation.
39.
All d.c. junction boxes (PV generator and PV array boxes) are fitted with a warning label indicating that active parts inside the boxes are fed from a PV array and still may be live after isolation from inverter and public supply.
18.
Satisfactory connection of conductors.
19.
Cables securely supported.
a.c. Installation
Notes
22.
1.
Original
PV modules, fixings & associated protective devices
2.
40.
All circuits, protective devices, switches and terminals are suitably labelled.
Single line wiring diagram displayed on site.
41.
Dual supply warning labels are fitted at point of interconnection.
42.
Inverter protection settings and installer details are displayed on site.
20.
Selection of equipment and protective measures appropriate to external influences.
43.
Emergency shutdown procedures are displayed on site.
21.
Selection of conductors for current-carrying capacity and voltage drop.
44.
All signs and labels are suitably secured in place and durable.
1. Use ✔ to indicate that an inspection has been carried out and the result is satisfactory 2. Use N/A to indicate that the inspection is not applicable to a particular item 3. An entry must be made in every box.
This certificate is based on the model forms shown in BS 7671 AND BS EN 62446. Published by NICEIC, a part of the Ascertiva Group © Copyright The Electrical Safety Council (April 2012)
(To the person ordering the work)
Fig 4 EICPV page 3
the PV system, including the PV modules and inverter, should be recorded. Again, this information is important not only for record purposes but also for verifying that the PV system meets the relevant requirements of both BS EN 62446 and BS 7671. Both BS 7671 and BS EN 62446 require that inspection shall precede testing and should normally be undertaken prior to energizing the installation. BS EN 62446 also requires that the inspection and testing (and indeed the installation of the PV system itself) shall meet the relevant requirements of IEC 60364. IEC 60364 is an international standard for the safety of electrical installations. It forms the basis of the requirements of BS 7671. Consequently, where BS EN 62446 refers to IEC 60364-6 and IEC 60364-7-712, for example, the relevant requirements are reflected in Part 6 (Inspection and Testing) and Section 712 (Solar PV Power Supply Systems), respectively, of BS 7671. Section J (Schedule of Items Inspected), on Page 3 of the EICPV, combines the items to be inspected that are referred to in BS EN 62446 with those that are listed in the model Schedule of Inspections in Appendix 6 of BS 7671 that are applicable to PV systems. At appropriate stages in the erection process, and upon completion, a visual inspection of the items shown in Section J should be carried out. Although the list of items in Section J starts at the PV modules and works towards the intake position, the inspection may in practice be carried out in the most convenient order for the particular installation. The person carrying out the inspection should always bear in mind that the PV modules produce a voltage whenever they are exposed to daylight. To avoid receiving an electric shock the inspector should follow appropriate safe working practices. NICEIC MCS Approved Installers (PV) can purchase copies of the NICEIC Electrical Installation Certificate for a Small-scale Photovoltaic System from NICEIC Direct. Go to www.niceicdirect.com, contact sales@niceic.com or call 0870 013 0458.
Page 3 PVCB1/5
46
Spring 2013 Connections
44_46_technical.FINAL.indd 46
www.electricalsafetyregister.com
08/04/2013 15:29
s ox le a ob b F M ag ila W ava 33 57 ow N S B
Simple to use
Quick to Assemble
Safe & professional
Cables are connected in free space and then fitted into the Wagobox.
Versatile
The unique configurable cable gripper system can clamp multiple cables in seconds
BS EN 60670-22 certified the Wagobox system fully meets the requirements of 17th Ed. BS7671
Simply select the Wago terminals to suit your job. A Wagobox can be used with solid, flex and stranded cables and can support up to 24 connections.
Once the Wagobox is assembled it can be quickly fixed to a surface using itâ&#x20AC;&#x2122;s innovative mounting button feature.
CON.04.13.047.indd 1
Fast to fix
www.wagobox.com Tel. 01353 666011 Email. sales@wagobox.com
09/04/2013 10:24
63
%
of 16-24 year old women are more interested in learning a skilled trade rather than a profession.
Supporting Jobs for the Girls As part of its Jobs for the Girls campaign NICEIC is looking for electrical contracting firms who might be able to help provide opportunities for females looking to gain valuable on-site experience. The Jobs for the Girls campaign was set up in 2011 to try and encourage more women into the sector and address the gender imbalance that exists. It is estimated that only 1 in every 1000 electrical contractors is female. As part of this initiative NICEIC has now set up a notice board at its sister site www.jobsforthegirls.com which aims to put female contractors in touch with firms who might be able to offer some valuable work experience for those just starting out in the trade. If you have a vacancy or might be able to offer some valuable on the job training then send any information about your firm and the position available to: jftg@niceic.com
CON.04.13.048.indd 1
Encouraging women into the construction industry
10/04/2013 08:08
Ask the experts/Technical
N
Fully charged Safe connection and disconnection of tap-off units of busbar trunking systems In Issue 183 of Connections (Autumn 2012) we published an article on the safe connection and disconnection of tap-off units of busbar trunking systems conforming to BS EN 60439-2. However, in the latter part of 2012, BS EN 60439-2 was withdrawn and replaced by BS EN 61439-6: 2012. Whereas all new busbar trunking system products now being introduced should be in compliance with the new standard, BS EN 61439-6, there is currently no deadline for withdrawal of the manufacture of busbar trunking systems to BS EN 60439-2. It is therefore anticipated that some busbar trunking systems to BS EN 60439-2 will continue to be available for a period of time. Due to the important safety issues covered in the article in Issue 183 of Connections, that article is repeated below, but modified to take account of both busbar trunking systems conforming to the new standard, BS EN 61439-6: 2012, and those conforming to the old standard, BS EN 60439-2. At the end of the article, mention is also added of precautions necessary with busbar trunking systems that pre-date BS EN 61439-6 and BS EN 60439-2. Safe connection and disconnection of tap-off units of busbar trunking systems to BS EN 61439-6: 2012 or BS EN 60439-2 A question that often has to be addressed with a busbar trunking system is whether or not a tap-off unit can safely be connected to or disconnected from the system while the busbars are energised, thus removing the need to isolate live parts. This can be an important consideration where the busbar trunking feeds a multitude of items of current-using equipment where isolation of the busbars could result in major inconvenience or perhaps loss of production. Clearly, a busbar trunking system that does not have to be disconnected from the supply www.electricalsafetyregister.com
49_50_technical.FINAL.indd 49
in order for a tap-off unit to be connected to or disconnected from it affords greater flexibility to the user as to when such a connection or disconnection can be carried out. Product standard The current product standard covering the particular requirements for busbar trunking systems (busways) is BS EN 61439-6: 2012. This recently replaced BS EN 60439-2: 2000, which has now been withdrawn. However, it is anticipated that some busbar trunking systems to BS EN 60439-2: 2000 will continue to be available for a period of time. Both BS EN 61439-6 and BS EN 60439-2 apply to busbar trunking systems and their accessories for feeding and distributing electrical power in residential, retail, public, agricultural and industrial premises. The two standards also apply to busbar trunking systems designed to incorporate communication and/or control systems or intended to supply luminaires through tap-off units, although neither BS EN 61439-6 nor BS EN 60439-2 applies to supply track systems in accordance with IEC 60570 – Electrical supply track systems for luminaires. BS EN 61439-6 and BS EN 60439-2 embrace (among other things) busbar trunking systems with facilities for tap-off units at predetermined points, as well as for roller-type or brush-type tap-off units. Although both BS EN 61439-6 and BS EN 60439-2 permit a busbar trunking system to be designed with a facility for tap-off units to be safely connected to it without the busbar system being disconnected from the supply, such a facility is not necessary for conformity of the system with either BS EN 61439-6 or BS EN 60439-2. Manufacturer’s instructions As BS EN 61439-6 and BS EN 60439-2 make it optional whether a busbar trunking system is designed for ‘live’ connection of tap-off units to the busbars, it is important that in every case the manufacturer’s instructions are obtained and closely followed when it is intended to connect or disconnect a tap-off unit. In some cases manufacturers’ literature refers to the provision of ‘automatic safety shutters’ that are necessary for basic protection against electric shock wherever a tap-off unit is not present at a connection point. References to such shutters should not be construed as allowing live connection of tap-off units to the busbars. Similarly, there are sometimes references to a plug-in system that is fully shuttered. Again, such shutters are intended to prevent access Connections Spring 2013
49
08/04/2013 15:30
Ask the experts/Technical
N
Fully charged
Safe working procedures
Provision of instructions to the user
Care must be taken to ensure correct polarity when connecting a tap-off unit to a busbar trunking system to BS EN 60439-2, because the design of some systems, conforming to a version of BS EN 60439-2 dating from before Amendment A1: 2005 of that standard came into force, may not include arrangements to prevent reverse polarity connection of a tap-off unit. Amendment A1: 2005 of BS EN 60439-2 addressed that issue. In a busbar trunking system conforming to BS EN 61439-6 or to BS EN 60439-2: 2000 + A1: 2005, all tap-off units utilising a protective conductor and/ or a neutral conductor are required to be designed such that they cannot be connected incorrectly to any part of the busbar system. BS EN 61439-6 and BS EN 60439-2: 2000 + A1: 2005 also require that the protective conductor connection makes first and breaks last when connecting and disconnecting a tap-off unit to/from the busbar trunking system. A tap-off unit must not be connected to or disconnected from a busbar trunking system whilst the busbars are energised, unless the manufacturer has confirmed that the design of the system allows this, and the load has been switched off from the tap-off unit prior to carrying out this procedure.
Having installed a busbar trunking system, the electrical installer must ensure that the user is provided with a copy of the manufacturer’s installation and user’s instructions or, in their absence, the necessary instructions for the safe use and modification of the system. Where necessary, suitable warning notices must be fixed at all relevant points of the installed system.
Illustration courtesy of Eaton Electric Limited
to live busbar conductors when a tap-off unit is absent. References to them in the manufacturer’s literature should not be taken to suggest that live connections are permitted. Neither should references to internal flash barriers be taken to suggest that there is a preventative measure associated with making ‘live’ connections. It should be noted that even where a manufacturer agrees that their system has been designed to allow tap-off units to be connected to or disconnected from it without the need for isolation of the busbars, this may apply only for busbar trunking systems up to a particular current rating.
Even where a manufacturer has expressly agreed that their system has been designed to allow tap-off units to be connected to or disconnected from it without the need for isolation of the busbars, such ‘live connections’ must be treated as live working within the meaning of the Electricity at Work Regulations 1989 (see Regulation 14), and all necessary precautions must be taken with regard to the risks of electric shock, burns and explosion. ‘Live’ connection should therefore be considered to be the exception rather than common industry practice. The Health and Safety Executive has led investigations into a number of incidents involving serious dangers to persons resulting in severe injury, where connections have been made to energised busbars. The outgoing circuit of a tap-off unit must not be energised until it has been inspected and tested in accordance with Part 7 of BS 7671, to verify that the requirements of that standard have been met. The above procedures, which are necessary for compliance with health and safety legislation, do not fully eliminate risk. In all cases an assessment must be made of the risk in relation to any intended live working, and all necessary safety precautions must be taken to manage the risks identified by the assessment.
50
Spring 2013 Connections
49_50_technical.FINAL.indd 50
Busbar trunking systems pre-dating BS EN 61439-6 and BS EN 60439-2 Some busbar trunking systems that pre-date both BS EN 61439-6 and BS EN 60439-2 still exist and extreme care should be taken in connecting or disconnecting a tap-off unit with such systems. If the manufacturer’s instructions are not available, as is highly likely, a tap-off unit must not be connected to or disconnected from the busbar trunking whilst the busbars are energised; the busbars must be isolated. Care must also be taken to ensure correct polarity when connecting a tap-off unit to the busbar trunking system, as the design of the busbar trunking system may not include arrangements to prevent reverse polarity connection of a tap-off unit. www.electricalsafetyregister.com
08/04/2013 15:30
High Quality Outdoor Lighting
R
Lumena Lights Ltd.
6XSSOLHG 'LUHFW WR 4XDOLILHG (OHFWULFDO &RQWUDFWRUV
Large Selection of Quality Bollard Lights, Path Lighting & Floodlights
¶3DWKR · 3DWK /LJKW
4XDOLW\ /(' )ORRGOLJKWV LQFOXGLQJ Z RSWLRQ VXSSOLHG ZLWK D JURXQG VSLNH DV ZHOO DV WKH UREXVW Z Z Z ¶/X[RUD· /(' GHVLJQV 5*% 3,5 )ORRGOLJKWV DOVR VXSSOLHG
ell Photoc ZQ D ' LO W 'XVN YDLODEOH $ Q LR V 9HU /,*+7 '$5.
21
OFF
¶2YXV· PP 3DWK /LJKW
Call us or register online under â&#x20AC;&#x2DC;Trade Supplyâ&#x20AC;&#x2122; for
Tel: 01327 871161
1,&(,&
¶/LJKWKRXVH· 3UR %ROODUG
member discount of 30%
www.lumenalights.com
1R 0LQLPXP 2UGHU 4XDQWLW\ Â&#x2021; 1H[W 'D\ 'HOLYHU\ Â&#x2021; )UHH 'HOLYHU\ Â&#x2026; /XPHQD DOVR VXSSO\ D IXOO UDQJH RI :DOO OLJKWV 3,5 3KRWRFHOO /LJKWV )ORRGOLJKWV 6SRWOLJKWV ,Q *URXQG /LJKWLQJ /DPS 3RVWV Office & Showroom:
CON.04.13.051.indd 1
&HQWUH Â&#x2021; /RQJ 0DUFK Â&#x2021; 'DYHQWU\ Â&#x2021; 1RUWKDPSWRQVKLUH Â&#x2021; 11 15
09/04/2013 10:25
Ask the experts/Technical
N
Fully charged Protective measures against electric shock
Outdoor lighting installations, highway power supplies and street furniture Specific requirements for outdoor lighting, highway power supplies and street furniture installations first appeared in the IEE Wiring Regulations in 2002, in the Sixteenth Edition. This article looks at the current requirements for these installations, which are given in Section 559 of BS 7671: 2008 (incorporating Amendment No 1: 2011).
Measures that are not to be used Not surprisingly it is not permitted to use the protective measures of obstacles or placing out of reach, which are covered in Section 417. Furthermore, the conductors of any low voltage overhead line that are within 1.5 m of an item of street furniture are required to be provided with basic protection (by insulation or a barrier or enclosure), except where maintenance of the street furniture is restricted to skilled persons trained in work near bare overhead lines. Regulation 559.10.1 refers. Also not surprisingly, it is not permitted to use the protective measures of non-conducting location and earth-free local equipotential bonding, which are covered in Section 418. Automatic disconnection of supply
Scope The requirements for outdoor lighting installations apply to such installations for: • roads, parks, car parks, gardens, places open to the public, sporting areas, illumination of monuments and floodlighting, • places such as telephone kiosks, bus shelters, advertising panels and town plans, and • road signs. Not covered by the requirements are items of equipment owned by an electricity distributor, temporary festoon lighting, luminaires fixed to the outside of a building and supplied directly by the internal wiring of that building, and road traffic signal systems (such as traffic lights). Regulation 559.3 refers.
52
Spring 2013 Connections
52_54_technical.FINAL.indd 52
Where, as is usually the case, the protective measure of Automatic Disconnection of Supply is used, the requirements listed in Regulation Group 559.10.3 have to be met, the most significant ones of which are summarised below. Access doors. A door in street furniture, such as a lighting column, must not be used for the purposes of a barrier or enclosure for basic protection against electric shock (Regulation 559.10.3.1, indent (i) refers). This means that when the door is open (or removed), contact with live parts must be prevented either by insulation or by a barrier or enclosure. Any door at less than 2.5 m above ground level giving access to equipment must be locked with a key or require the use of a tool to open it (Regulation 559.10.3.1, indent (iii) refers). Enclosures. Access to the interior of an accessible enclosure containing live parts must be by the use of a tool or key (Regulation 559.10.3.1, indent (ii) refers). An exception is allowed where only skilled or instructed persons have access to the enclosure but, even then, one of the other means of preventing access to live parts required by Regulation 416.2.4 must be provided (interlocked isolation device or intermediate barrier). Access into luminaires. Access to the light source of a luminaire less than 2.8 m above ground level must be possible only by removing a barrier or enclosure that requires the use of a tool (Regulation 559.10.3.1, indent (iv) refers). Main bonding. There is a relaxation from the general requirement of Regulation 411.3.1.2 to main bond extraneous-conductive-parts, in that metallic structures such as fences (see Fig 1) www.electricalsafetyregister.com
08/04/2013 15:31
that are in the proximity of an outdoor lighting installation are not required to be connected to the main earthing terminal (Regulation 559.10.3.1, indent (v) refers). Additional protection by RCDs. Regulation 559.10.3.2 requires additional protection by an RCD (with residual operating current, IΔn , not exceeding 30 mA and an operating time not exceeding 40 m s at 5 IΔn) to be provided for lighting in telephone kiosks, bus shelters, town plans and similar locations. Disconnection times. Regulation 559.10.3.3 permits a disconnection time of up to 5 seconds for a distribution circuit supplying fixed equipment (such as lighting columns or distribution boards) used in highway power supplies in a TN or TT system. Although, in the case of a TT system, this is a relaxation to the general requirement of Regulation 411.3.2.4 for a disconnection time not exceeding 1 second, it should be appreciated that the relaxation applies only for highway locations. A highway is any way (other than a waterway) over which there is public passage, including the highway verge and any bridge under which, or tunnel through which, the highway passes (the Definitions in Part 2 of BS 7671 refers). Size of earthing conductor. Regulation 559.10.3.4 requires the earthing conductor of a street electrical fixture (such as a lighting column or highway distribution board) to have a copper equivalent cross-sectional area of not less than that of the supplier’s neutral conductor at that point or 6 mm2, whichever is the smaller. This requirement applies only where the street electrical fixture is supplied directly from the Fig 1 Metallic fence in the proximity of an outdoor lighting installation
www.electricalsafetyregister.com
52_54_technical.FINAL.indd 53
electricity distributor’s network – as it is only in these circumstances that the fixture will have an earthing conductor (defined in Part 2 of BS 7671 as ‘a protective conductor connecting the main earthing terminal of an installation to an earth electrode or other means of earthing’) – and, furthermore, the fixture uses an earthing facility provided by the distributor as the means of earthing for the installation. The reason behind the required minimum size of earthing conductor is that, in the event of a discontinuity occurring in the supplier’s neutral conductor, the earthing conductor may have to carry diverted neutral current returning to the distribution transformer via the metalwork of the street electrical fixture and the general mass of Earth. Earth electrode for circuits feeding more than one item of street furniture. In a TN-C-S (PME) system, Clause 8.5.2.3 of BS 7430: 2011, Code of practice for protective earthing of electrical installations, recommends that for a circuit feeding more than one item of street furniture (such as by looping using a cable with separate line, neutral and protective conductors), an earth electrode should be installed preferably both at the point of supply and at the last or penultimate unit. Fig 2 refers. By connecting the earth electrode to the distributor’s PME earthing facility (via the protective conductor of the circuit and the main earthing terminal and earthing conductor of the installation), the objective is to make the resistance to Earth of the distributor’s supply neutral (PEN) conductor at any point less than 20 Ω before any (other) circuit protective or bonding conductors of the installation are connected to it. Clause 8.5.2.3 recommends that if a single electrode produces a resistance of more than 20 Ω, other earth electrodes equally spaced along the circuit should be installed. Earthing of metallic access panels, covers or doors of street furniture. While exposed-conductive-parts of Class I street located equipment are required to be connected to the earthing terminal within the equipment, there is no requirement in Regulation Group 559.10 concerning the earthing of metallic access panels, covers or doors of such equipment. Generally, such an item is not considered to be an exposed-conductive-part (neither is it an extraneous-conductive-part) unless the access panel/door has electrical equipment fixed to it or the wiring is in contact with it. However, guidance provided in BS 7430: 2011, Code of practice for Earthing, recommends (in clause 8.5.1) that such decisions regarding the earthing of a metallic access door and other Connections Spring 2013
53
08/04/2013 15:31
Ask the experts/Technical
N
Fully charged Fig 2 Example of the use of earth electrodes for a circuit feeding more than one item of street furniture
Distributor’s P.M.E supply to pillar
Regulation 559.10.5.1 recommends that equipment should be suitable for operation: • with ambient temperature range between –40 ˚C (classification AA2) and +40 ˚C (classification AA4), and • when exposed to a relative humidity between 5% (classification AB2) and 100% (classification AB4). The same Regulation also calls for resistance to water sprays (classification AD3) and to small objects (classification AE2). However, these two factors are addressed by the requirement of Regulation 559.10.5.2 for a degree of protection to at least IP33, as mentioned above. Further information on classification of external influence is given in Appendix 5 of BS 7671. Devices for isolation and switching
Circuit supplying street lamps, using cables with separate line, neutral and protective conductor
structures should be based on the engineering judgement of the installation designer. Such a judgement should take into account the possibility of a reverse supply polarity occurring and for TN-C-S earthing systems, the possibility of losing the neutral connection. Double or reinforced insulation Double or reinforced insulation may be used as a protective measure for an outdoor lighting installation. However, where this measure is applied to the whole installation, Regulation 559.10.4 requires that no protective conductors are provided and that conductive parts of lighting columns are not intentionally connected to the earthing terminal. Where double or reinforced insulation is used as the sole protective measure for a whole installation or circuit, Regulation 412.1.3 requires it to be verified that the installation or circuit will be under effective supervision in normal use, so that no changes will be made that could impair the effectiveness of the protective measure (such as a connection to Earth).
Where equipment is connected to a TN system and the isolation and switching is carried out by instructed persons only, and provided suitable precautions are taken to prevent any equipment from being inadvertently or unintentionally energised, Regulation 559.10.6.1 permits a fuse carrier located within the equipment to be used for the purposes of isolation and switching the supply on load. However, where the equipment can only be isolated by the electricity distributor’s cut-out, the distributor’s permission must be obtained prior to using the cut-out fuse for this purpose. Inspection and testing Electrical supplies to street furniture should be regularly inspected and tested in accordance with the general requirements of Part 6 of BS 7671. Where there is a programmed inspection and testing procedure in place, the warning notices that are required to display the dates for periodic inspection and testing and RCD testing as required by Regulations 514.12.1 and 514.12.2 may be omitted (Regulation 559.10.7.1 refers). Guidance on completing certificates and condition reports for highways installations is provided in the NICEIC publication: Guide to Completing Specialised Certificates and Reports. Temporary supplies
External influences All electrical equipment must be capable of operating safely under the expected conditions of external influences. Any equipment forming part of the installation should, by construction and/or the manner of its installation, have a degree of protection of at least IP33 (Regulation 559.10.5.2 refers). 54
Spring 2013 Connections
52_54_technical.FINAL.indd 54
Where a temporary supply is taken from an item of street furniture it should be so arranged as not to adversely affect the permanent supply to that fixed equipment. A durable label is required by Regulation 559.10.1 and should be fitted externally to the temporary supply unit stating the maximum current to be supplied from that unit. www.electricalsafetyregister.com
08/04/2013 15:31
The all new Digi-Line range • Completely Re-Engineered • New Electronics and Components • Now MADE
IN BRITAIN
• Perfect replacement for night storage heaters - easy and fast installation using existing wiring • Can be used as independent room heating or as a complete central heating system
• Built in digital dual chrono-proportional thermostats optimise energy usage • Looks and works just like regular central heating • Rated 100% energy efficient • Radio frequency receivers built in for 4 zone RF central programmer (pictured left) • No pumps or moving parts • No maintenance or inspections required • Fully compatible with latest building regulations • Available in 20 different sizes in 500mm and 300mm heights • Thermostats accurate to +/-0.1°C
Tel: 0113 2746799 e.mail: info@electrorad.co.uk www.electrorad.co.uk
CON.04.13.055.indd 1
10/04/2013 08:09
Ask the experts/Technical
N
Fully charged Uncommon conductor arrangements One of the characteristics of the supply (or supplies) to an installation that BS 7671 requires to be assessed is the arrangement of the current-carrying conductors under normal operating conditions (Regulations 301.1 and 312 refer). Most low voltage a.c. supplies to installations in the UK are taken from a three-phase, 4-wire distribution network, and so the conductor arrangement is familiar. But contractors occasionally come across uncommon conductor arrangements, such as in a two-phase, 3-wire supply. This article considers the nature of such conductor arrangements and some of the implications for the contractor. We begin, though, by reviewing the more commonly-found conductor arrangements.
Common conductor arrangements
Single-phase, 3-wire supply In the single-phase, 3-wire supply the two line conductors generally have the same nominal line voltage to Earth (and neutral), U0, but there is no phase angle between these voltages, and hence the nominal voltage between lines (U) is zero. Figures 2 and 3 refer. A single-phase, 3-wire supply can be used to supply single-phase, two-wire loads (connected between line and neutral), and single-phase, 3-wire loads. The current in the neutral of a single-phase, 3-wire circuit is equal to the arithmetic sum of the two line conductor currents (assuming they are both at the same power factor). This means that the current in the neutral will exceed that in the line conductors, assuming they are both carrying current. Consequently, in most cases, it will be necessary to provide overcurrent detection for the neutral conductor (as well as for the line conductors). Regulation 431.2.1 refers. This detection should cause the disconnection of the line conductors but not necessarily of the neutral conductor. Two-phase, 3-wire supplies The three types of two-phase, 3-wire supply recognised by Chapter 31 are differentiated from one another by the phase angle between the two line voltages to Earth (and neutral), U0. This angle may be 180°, 90° or 120°, as shown in Fig 4.
In the domestic and small commercial setting, a single-phase, 2-wire supply taken from a three-phase, 4-wire distribution network is usually Fig 1 2-wire, 3-wire and 4-wire supplies taken from a three-phase, 4-wire network provided. In most cases the line voltage to Earth (and neutral), U0, is 230 V. For larger commercial and industrial installations a three-phase, 4-wire supply is usually provided. Each of the three line conductors has the same nominal line voltage to Earth, U0 (230 V in most cases), but there is a phase angle of 120° between these three voltages. This gives a nominal voltage between lines (U) of √(3 ) × U0, which equals Star 400 V where U0 is 230 V. point As illustrated in Fig 1, a three-phase, 4-wire supply can be used to serve three-phase loads (with or without neutral, as applicable), and also single-phase, 2-wire loads and, exceptionally, two-phase, 3-wire loads. Most single-phase loads are connected between line and neutral but some types of single-phase equipment (such as certain Secondary winding of welders and discharge luminaires) are designed to distributor’ transformer be connected between two line conductors so as to operate at the voltage between lines (U). Uncommon conductor arrangements Chapter 31 of BS 7671 recognises one type of single-phase, 3-wire supply and three types of two-phase, 3-wire supply, which are detailed below. 56
Spring 2013 Connections
56_58_technical.FINAL.indd 56
Single-phase 2-wire
L1
N
L2 L3
Two-phase 3-wire Three-phase 4-wire
www.electricalsafetyregister.com
08/04/2013 15:32
Fig 2 Single-phase, 3-wire supply
Fig 3 Phasor diagram of line-neutral voltages (single-phase, 3-wire supply)
L2
Single-phase 3-wire L1
U = 0V L1
N
devices might need to be capable of switching in excess of the typical voltage of 400 V. When filling in either an Electrical Installation Certificate (EIC) or an Electrical Installation Condition Report (EICR) typically the nominal voltage for this supply arrangement to be recorded would be 460 V/230 V.
L2 Phase angle 0º
Two-phase, 3-wire with phase angle 90° The two-phase, 3-wire conductor arrangement having a 90° phase angle is uncommon in the UK as a supply to an installation. It has been included in BS 7671 to align with international standards and is sometimes used for applications such as supplying two single-phase furnaces. Such a supply can be derived by a number of means. One of these is to use the ‘Scott-T transformer arrangement’ connected to a conventional three-phase supply. Assuming the desired line voltage to Earth (and neutral), U0 on the two-phase side is the same as the voltage between lines (U) on the three-phase side, the Scott-T transformer arrangement consists of two single-phase transformers – one being a centre-tapped 1:1 transformer and the other having an 86.6% tap – connected as shown in Fig 6. Were such an arrangement to have a three-phase supply of nominal voltage between lines 400 V
Two-phase, 3-wire with phase angle 180° The two-phase, 3-wire conductor arrangement having a 180° phase angle comes from a centre-tapped secondary winding of a single phase transformer, the centre-tap being connected to Earth. With this arrangement, two lines conductors and a neutral are supplied to the installation. In most cases such a supply will have a nominal line voltage to Earth (and neutral), U0, of 230 V and a nominal voltage between lines (U) of 460 V, as shown in Fig 5. Such supply arrangements may be found in remote locations, such as certain farms, churches and pumping stations, where it might be necessary to have both an increase in the available supply capacity and the opportunity to utilise larger motors for specific applications, like milking parlours. Careful consideration should be given to the rating of switchgear and the like, as ratings of Fig 4 The three types of two-phase, 3-wire supply
Phase angle 180º
www.electricalsafetyregister.com
56_58_technical.FINAL.indd 57
L1
L1
L1
N
L2
N
L2
N
L2
Phase angle 90º
Phase angle 120º
Connections Spring 2013
57
08/04/2013 15:32
Ask the experts/Technical
N
Fully charged Fig 5 Phasor diagram illustrating that the voltage between lines, U, is 2 × U0 (two-phase, 3-wire with phase angle 180°)
U = 460 V L2
180º
U0 = 230 V
L1
U0 = 230 V
Fig 6 Scott-T transformer arrangement
Two-phase, 3-wire with phase angle 120° L1
L1
Supply input
L2
nominal voltage to be recorded would depend on the actual transformer ratio used. The current in the neutral of a two-phase, 3-wire circuit supplied from the secondary and serving a balanced load would be equal to √2 times the current in each of the two line conductors of the circuit (assuming they are both at the same power factor). Consequently, it may be necessary to provide overcurrent detection for the neutral conductor (as well as for the line conductors). Regulation 431.2.1 refers.
86.6% tap
N
50% tap
(three-phase)
Supply output (two-phase)
L3 L2
Fig 7 Phasor diagram illustrating that secondary voltage between lines, U, is √2 × U0 (two-phase, 3-wire with phase angle 90°)
L1
The two-phase, 3-wire conductor arrangement having a 120° phase angle between line conductor voltages comes from a typical three-phase, 4-wire distribution network, with two lines and the neutral being supplied to the installation. In most cases such a supply will have a nominal line voltage to Earth (and neutral), U0, of 230 V, and a nominal voltage between lines (U) of 400 V, see Fig 8. Such supplies are commonly found in rural locations but may also be provided to larger domestic installations. When completing either an EIC or an EICR typically the nominal voltage to be recorded would be 400 V/230 V. In conclusion, although supplies to electrical installations typically fall into either the three-phase, 4-wire or single-phase, 2-wire arrangement, there are occasions where single-phase, 3-wire and two-phase, 3-wire supplies might be found, and the contractor should take care to determine the correct conductor arrangement, both when designing and when commissioning the installation.
Fig 8 Phasor diagram illustrating voltage between lines (two-phase, 3-wire with phase angle 120°)
U = 566 V
L3
U0 = 400 V
90º
U0 = 230 V
L2 120º
U0 = 230 V
120º
connected to its primary, the secondary would provide a two-phase supply of nominal line voltage to Earth (and neutral), U0, 400 V, and nominal voltage between lines, U, equal to √2 × 400 V = 566 V, as shown in Fig 7. When completing either an EIC or an EICR for this two-phase supply arrangement, the nominal voltage recorded would therefore be 566 V/400 V. However, this is only an example and the actual 58
Spring 2013 Connections
56_58_technical.FINAL.indd 58
L1
120º U0 = 230 V U = 400 V
L2
www.electricalsafetyregister.com
08/04/2013 15:33
20% off NICEIC Training Courses! Get a GREAT deal and new skills... ...just like Dave Keeping your training up-to-date or developing new skills is essential for any electrical contractor. Thatâ&#x20AC;&#x2122;s why weâ&#x20AC;&#x2122;re offering a 20% discount on our most popular courses.* *20% offer on selected courses only. All prices exclude VAT. Offer valid until 31st August 2013.
Book now! Click or call our dedicated training team
0843 290 3398
Working in partnership with
www.niceic.com Email courses@niceic.com for our latest prospectus
CON.04.13.059.indd 1
09/04/2013 12:11
Ask the experts/Technical
N
Fully charged Snags & Solutions A practical guide to everyday electrical problems
Conductors must be correctly identified Conductors must be correctly identified by colour or alphanumerically to avoid confusion when the installation is repaired, extended or modified at a later date.
Now updated to Amendment Snag 53 Where single-core cables are installed in trunking No 1 of BS 7671 or conduit, the green-and-yellow conductor must ‘Snags & Solutions’, NICEIC’s problem solving book, is now available in five parts, which cover many commonly-encountered electrical installation problems. All parts have been updated, where appropriate, to take account of the requirements of Amendment No 1 to BS 7671: 2008 (17th Edition of the IET Wiring Regulations), which was published on 1 July 2011 and came into full effect on 1 January 2012. Part 1 of Snags & Solutions addresses 53 problems relating to earthing and bonding. Part 2 covers 55 problems relating to wiring systems. Part 3 covers 52 problems relating to inspection and testing. Parts 4 and 5, which have recently been introduced, cover 50 problems relating to emergency lighting and 48 problems relating to domestic fire detection and alarm systems, respectively. The books are available from NICEIC Direct. To give an indication of the value of these books, a snag and solution is being covered in each issue of Connections. This issue addresses a snag from Part 2 – Wiring systems, relating to the correct identification of conductors.
only be used as a protective conductor. Using the conductor as a live conductor would create confusion in those who may need to maintain the system.
Solution If an additional live conductor is needed, then it should be run within the trunking or conduit and labelled accordingly. However, where a flexible multicore cable is installed, as for example occurs between a connection unit and an extract fan (of Class II construction) incorporating a timer, the protective conductor may be appropriately labelled and used as a live conductor.
L
SL
N
snags and solutions
A PRACTICAL GUIDE TO EVERYDAY ELECTRICAL PROBLEMS
Part 2
wiring systems 3rd Edition
Amd 1: 2011
60
Spring 2013 Connections
60_61technical.FINAL.indd 60
Amd 1: 2011
Amd 1: 2011
www.electricalsafetyregister.com
08/04/2013 15:33
Single-core cables that are coloured green-and-yellow throughout their length shall only be used as a protective conductor and shall not be overmarked at their terminations, except as permitted by Regulation 514.4.3. L
SL
N
L
SL
N
Regulation 514.4.2 (part of) The bi-coloured combination green-and-yellow shall be used exclusively for identification of a protective conductor and this combination shall not be used for any other purpose.
Meet the helpline
Justin Maltby-Smith, NICEIC senior operations engineer Industry experience: Ran his own electrical company, lecturer, consultant/ project manager Interests: Kung-Fu and kickboxing, black-belt instructor
Well, meet the technical helpline team: all industry professionals with vast experience in the electrical industry and some interests outside of the day job too!
Alan Turvey, NICEIC operations engineer Industry experience: Electrician, carrying out industrial, commercial, quarry and domestic installations, lecturer and deputy head of construction with further education college Interests: Walking, bonsai cultivation and restoration of classic bicycles
www.electricalsafetyregister.com
60_61technical.FINAL.indd 61
If you have ever telephoned our technical helpline you may wonder who the voices are on the other end of the line.
Stuart McHugh, senior technical helpline engineer Industry experience: More than 41 years in the electrical industry, including a six-year apprenticeship, industrial commercial domestic and street-lighting work Interests: Vintage aircraft, motoring
Clinton Thompson, NICEIC operations engineer Industry experience: Electrician (domestic and industrial), electrical engineer (food industry, high-volume production and heavy press industry), college tutor, training centre tutor Interests: Classic cars and bikes, music
Norman Bradshaw, NICEIC technical helpline engineer Industry experience: Electrician for 23 years, working as an Approved Contractor, assisting new electricians in gaining Part P registration and working in partnership with local building control departments Interests: Voluntary work, running
Duncan McFarlane NICEIC technical helpline engineer Industry experience: Time-served electrician, working on domestic, commercial, industrial and petrochemical installations. Electrical clerk of works, electrical surveyor, lecturer and NVQ assessor Interests: Travelling and motorcycling
Connections Spring 2013
61
08/04/2013 15:34
Exclusive Liability Insurance cover Get total cover and total peace of mind… ...just like Vaz NICEIC Insurance Services offer liability insurance created to meet the day-to-day needs of a registered contractor. As standard our liability policies include: • £2m Public and Products liability • £75k EICR / PAT Testing cover (Professional Indemnity) • £100k Efficacy cover (up to 15% of your turnover) • £50k Tax Investigation • Jury Service cover • Work up to 15 metres in height • Cover for bona fide sub-contractors (up to 25% of turnover)
om fr e * nc 7 ra .9 su £70
In See how much you could save, click or call
0843 290 3444 www.niceicinsurance.com
NICEIC Insurance Services is a trading name of Towergate Underwriting Group Limited, registered in England with company number 4043759. Registered address: Towergate House, Eclipse Park, Sittingbourne Road, Maidstone, Kent, ME14 3EN. VAT registration number: 447284724. Ascertiva are an Introducer Appointed Representative of Towergate Underwriting Group Limited. *Premium quoted is for NICEIC registered contractor, sole trader, £2m Public Liability, excludes hazardous locations and Northern Ireland. Premiums include Insurance Premium Tax. 11% of customers achieved a premium of £70.97 during 2012
CON.04.13.062.indd 1
09/04/2013 12:12
CATALOGUE PICKS!
Scan QR code with your smart phone to visit our site.
AVAILABLE TO CONTRACTORS ON THE
ONLY
16
£
ONLY
84
.99
£
.00
£
ONLY
49.99
Klauke VDE Torque Screwdriver This tool will help you to ensure you install electrical equipment to manufacturer instructions where specific torque settings are required.
Durofix 10.8V Li-ion Impact Driver with Accessories (102 Nm) The Part P Doctor - Part Three A really useful document for assessment purposes but more importantly it provides the technical data and design guidance you’ll need for most typical day-to-day work in dwellings. Probably the best domestic electrical book you will ever read. Available to All
Code 4103
Price £16.99
• • • • • • • •
10.8V Li-ion 1.3Ah battery powered 102 Nm 2200 rpm / 3000 bpm LED illumination 2 x 1.3Ah batteries + charger 15 min charge time Case + accessories (including screw /drill bits and spare bushes) Only 1.1 Kg
Available to All
Code 4627
Price Ex VAT £84.00
FROM ONLY
9
£ .99
Guide to the Installation of Photovoltaic Systems Since the launch of the Microgeneration Installation Scheme there have been significant improvements in technology and installation methods for solar PV. As a result, this Guide to the Installation of Photovoltaic Systems required extensive updating to reflect current products and installation techniques. • The new guide features over 120 pages of information for installers to ensure they are meeting the updated standards • This book is an essential buy for any Solar PV Installer to ensure standards are met at your next assessment visit Available to Electrical Safety Register All
Code 4374 4374
Price £9.99 £18.00
£
Available to All
Code 4340
ONLY
29
Price Ex VAT £49.99
ONLY
549.00
.80
£
This book will prove invaluable to electricians, electrical designers, installers, technicians, contractors, and plant engineers. Available to All
Code 4665
ONLY
Price £29.80
ONLY
16.85
.85
£
Amd 1: 2011
Snags and Solutions Part 4
Snags and Solutions Part 5
Snags and Solutions Part 4 contains guidance on the design, installation, inspecting, testing, commissioning and maintenance of emergency lighting systems within domestic and similar premises.
Snags and Solutions Part 5 contains guidance on the design, installation, inspecting, testing, commissioning and maintenance of fire alarm systems within domestic and similar premises.
Available to All
Available to All
Price £16.85
• Easy torque adjustment, 0.1Nm increments • Precise release when torque setting has been reached • Highly accurate to ISO 6789:2003 +/- 6%
This essential book fills the gap between software and manual calculations. It provides the reader with all the necessary tools to enable accurate calculations of circuit designs. Rather than complex equations, this book uses extensive worked examples to make understanding the calculations simpler.
Amd 1: 2011
Code 3738
This screwdriver has a high-quality adjustable, ergonomic torque handle and quick change VDE blade.
Electrical Installation Calculations for Compliance with BS 7671:2008
16
£
A termination that is too loose can lead to arcing and hotspots, too tight and you risk damaging the equipment.
Code 3739
Price £16.85
Fluke VT02 Visual IR Thermometer The VT02 Visual IR Thermometer combines the convenience of a spot thermometer with the visual advantage of a thermal imager, creating a brand new tool category – a troubleshooting camera with infrared heat map. • Hot and cold spot markers: available in visual, infrared and blended views • Temperature measurement range: -10 °C to +250 °C (14 °F to 482 °F) • Accuracy: ± 2 °C or 2 % (at 25 °C nominal, whichever is greater), as tested • Thermal and visual image blending: 0 to 100% blend, shown in 25% increments • Field of view: 20° x 20° • Storage medium: Up to 10,000 images stored on micro-SD card • Includes SmartView® analysis and reporting software
Available to All
Code 4719
Price Ex VAT £549.00
NEW CATALOGUE OUT NOW! EMAIL CATALOGUE@NICEIC.COM FOR YOUR FREE COPY
0843 290 3484 CON.04.13.063.indd 1
www.niceicdirect.com
09/04/2013 12:38
Product Focus Lewden Palazzoli
Fluke
Lewden Palazzoli has launched a guide and listing of circuit protection and control equipment for domestic, industrial and commercial applications. Containing the latest technological advances and design improvements, Lewden’s full range of consumer units, MCBs, RCDs, isolators, surge protection devices, control gear and much more are clearly listed. The catalogue also features technical data.
Until 30 June, Fluke has special promotions offering a Fluke 1654B Multifunction Installation Tester or a Fluke 6500 Portable Appliance Tester in money-saving kits. The Fluke 1654B/LIM EDITION includes free software and an earth spike kit. The Fluke 6500/BASIC KIT includes data management software, appliance PASS labels and an extension lead test adapter. These offers can be found at www.fluke.co.uk/Fluke-Specials
020 8539 0237 www.lewden.com sales@lewden.co.uk
020 7942 0700 industrial@uk.fluke.nl www.fluke.co.uk
Seaward
Wiha
Seaward’s latest electrical safety tester establishes a new approach to portable appliance testing. The innovative new Apollo 600 is equipped with onboard risk assessment tools to assist the user and ensure a proportionate response to the inspection and testing of electrical equipment. The new multi-purpose PAT tester combines electrical testing with sophisticated safety data collection and handling features, including an onboard digital camera.
Wiha has introduced a Super Seven electrician’s kit, featuring the German manufacturer’s best-selling VDE tools. Taking full advantage of Wiha’s revolutionary SlimFix and Dynamic joint technology, the Super Seven kit, distributed in the UK by Brian Hyde, comprises six VDE SlimFix screwdrivers, plus a pair of heavy duty VDE Diagonal Cutters, all neatly and safely stored in a sturdy zip-close wallet.
0191 586 3511 sales@seaward.co.uk
0121 704 2324 www.brianhyde.co.uk
EES Data
Marshall-Tufflex
EES Data produces a full suite of contract management software. All are Windows 7 touch screen-enabled and built on a number of core modules: full professional contract estimating, small works costing and billing, supplier and quotation request, purchase ordering, job cost financial monitoring, application for payment and stock control.
Cable management specialist MarshallTufflex has reinforced its market-leading position with its Series 507 Powertrack and fittings becoming the first system to achieve ASTA type test certification for short circuit testing to BS EN 61534-22:2009 Clauses 15.4,18.4.3.2, & 18.4.3.3. The testing regime was conducted by global specialist Intertek. Series 507 Powertrack comprises a comprehensive range of underfloor 63Amp powertrack.
01924 200103 www.ees-data.co.uk
ESP
64
marketing@marshall-tufflex.com marketing@kimbercoms.co.uk
Lewden Palazzoli
ESP has added to its growing CCTV range with PowerCat – a complete CCTV CAT5 cabling solution that overcomes the problems of restricted distance owing to voltage drop. The power hubs provide an innovative method of transferring video signal and providing camera power along a single Cat5e run – at up to 300M. They are available in 4, 8 and 16 channel variants and are supplied with the appropriate number of power video baluns for connection to the cameras, and BNC patch leads to transfer the video signals to the DVR.
Lewden Palazzoli has expanded its range of enclosures in different materials and designs within its large range of electrical products and power distribution solutions. The new products, described with full specification data in the company’s new “Circuit Protection” catalogue, feature cost-effective and practical features and benefits in a choice of stainless steel, steel, GRP, plastic and aluminium.
01527 515150 www.espuk.com info@espuk.com
020 8539 0237 www.lewden.com sales@lewden.co.uk
Spring 2013 Connections
64_65_product focus.FINAL.indd 64
www.electricalsafetyregister.com
08/04/2013 15:35
For great deals on products and services visit www.niceicdirect.com
Urmet Door-entry and access control specialist Urmet Domus announce the launch of their full IP touch-screen monitor, which has been specified and installed across London in high-volume and landmark residential buildings. The monitor, the first in a line of product launches planned by Urmet in 2013, is packed with valuable features and is now setting the benchmark in the door-entry sector. The product, designed mainly for largescale residential developments, is currently the only full IP PoE 7” touch-screen with dual LAN ports on the market.
Scan QR code with your smart phone to visit our site
Marshall Tufflex Domestic energy management specialist Marshall-Tufflex has launched an intelligent boiler control unit that can reduce boiler running costs by 20%, subject to boiler usage pattern. The Domestic Boiler Management unit, which is Energy Saving Trust Recommended and qualifies for the 5% VAT level if purchased direct from an installer, controls the firing cycle of gas, oil and LPG boilers, reducing unnecessary dry cycling.
marketing@urmet.co.uk www.urmet.co.uk.
marketing@marshall-tufflex.com marketing@kimbercoms.co.uk
Martindale
Danlers
Martindale Electric – pioneer in electrical safety – announces its new Professional CD1000 general purpose Cable Detector. The CD100 is designed to quickly and accurately trace cables in walls and underground, locate fuses/breakers on Live or Dead Circuits and locate interruptions and open circuits in cables and electrical floor heating systems. It can also be used to trace metallic water and heating pipes. Supplied as a complete kit, the CD1000, negates the need for any other electrical equipment when detecting cables. This saves valuable time and money.
Danlers have launched two Batten-mounted PIR occupancy switches capable of significant energy savings at low cost, ideal for switching lights off when not required. With energy savings of up to 50 per cent the payback period is kept to a minimum. These UK manufactured IP 53 rated controls can switch lighting loads of up to 10 amps and can be mounted onto the end of lighting battens. They detect movement of a warm body within their detection zones (either 5m or 10m variants) and include a photocell.
sales@martindale-electric.co.uk
01249 443377 sales@danlers.co.uk
Kidde Fyrnetics
Philips
With a growing choice of domestic smoke alarms, specifiers and installers need to be careful when selecting the right type. Wireless interlinking technology, using accessories such as Kidde’s Slick® Wireless Alarm Base, can eliminate disruptive wiring between mains alarms powered from an adjacent lighting circuit. But there will still be situations where simply installed battery alarms prove invaluable. Here, the quality of batteries is critical. Kidde’s innovative TEN-4 smoke alarm achieves all the relevant requirements. 01753 685148 www.smoke-alarms.co.uk kiddefyr@ukgateway.net
www.electricalsafetyregister.com
64_65_product focus.FINAL.indd 65
Part of Philips’ high-quality CoreLine LED family, the new CoreLine Downlight range can be used to replace conventional CFL downlights in general lighting applications. Whether for a new building or the renovation of an existing space, the range provides excellent quality of light as well as substantial energy and maintenance savings. Two versions are being launched: Mini 1100 lumens and Compact 2000 lumens, available in a choice of colour temperatures – 3000K and 4000 K.
01483 298677 www.philips.co.uk/lighting
Connections Spring 2013
65
08/04/2013 15:36
Current affairs
Don’t forget to send Current Affairs any pictures that have made you smile and let us know of any hidden talents or charity initiatives. Email nick.martindale@ redactive.co.uk
Reuters
CAUGHT ON CAMERA
Seeing the light at last A pensioner from County Londonderry in Northern Ireland is finally experiencing the benefits of electricity, after his house was connected to the National Grid for the first time. John McCarter (pictured), 78, had lived in the property at Downhill for almost 30 years, using candles and coal fires for light and heat. He would sit in his car in the evening to read. He had previously been involved in a successful battle to get the street connected to the grid, but his own house was not hooked up after his landlord refused to foot the bill. Despite the lack of heat and light, he refused to move out, saying he enjoyed the sea views, but now hopes to get a television.
This quarter’s collection of shoddy and dangerous discoveries includes: a fused incoming neutral supply and dodgy earth connection; highly dangerous undercupboard lighting; a domestic property with an unnecessary electricity board cut-out; and external lighting in the Canary Islands, complete with RCD protection. It continues with: an inappropriately placed bathroom socket; a consumer unit with different incoming and outgoing cabling; an unusual SWA connection at an open cabinet in a public place; and innovative use of an air-vent, among other horrors.
5
6
1
2
3 4
7
8
Thanks to: Paul Ray of Paul Ray Electrical Services in Hednesford /// Glen Handley from Glen Handley Electrical in Ashbourne /// Tony Morrison of AR Morrison Electrical Services in Halifax /// Chris Diaper of Chris Diaper Electrical in Kettering /// Bob Allum of Elite Electricians in Orpington /// Mark Reynolds of Essex-based M&S Designs /// Mike McKinley of Mike McKinley Electrical Services in Wetherby /// and Joel Fisher of Walsall firm Fusion Electrical.
Keep those shots coming in!
Essex squirrels in firing range Clubbing together Electricians are used to finding rodents causing problems in houses, as regularly testified in Caught on Camera. But at a property in Essex they did rather more than just electrocute themselves, and the offender was not a mouse but a squirrel. One inquisitive creature chewed through the cable of a fluorescent light in the garage of a Romford house, sparking an electrical fire that caused more than £20,000-worth of damage. The house belongs to former Tory councillor Alby Tebbutt, who heard about the fire while on his way to a funeral. He has now declared war on his unwelcome houseguests. “I put nuts out for the birds but the squirrels keep eating them,” he said. “Now they’ve set my house on fire, I’m going to shoot them all.”
66
Spring 2013 Connections
66_current_affairs.FINAL.indd 66
Electrical contractors, manufacturers and suppliers are wanted to compete in a charity golf event run by the Luton & District Electrical Society to raise money for the Road Victims Trust. The event is being organised by Paul Jones (pictured), managing director of Luton-based NICEIC Approved Contractor Instalec, whose own family has benefited from the charity’s support after his son was killed in a road accident. The tournament will be held at Mentmore Golf Club in Buckinghamshire on 16 May. Entry costs £240 for a team of four. This will be the sixth event Paul has run for the charity, and so far he’s raised around £18,000. For more details, email paulj@ 1ainstalec.co.uk www.electricalsafetyregister.com
09/04/2013 10:42
Have you seen it?
You have now! New Megger MFT1700 series, the shape of testing’s future. Now offering Q
2 and 3 wire non-tripping loop testing
Q
Loop and PFC displayed at the same time
Q
Phase sequence indication
Q
Rechargeable
Q
CAT IV 300 V safety rating
See the demo now by scanning the QR code on your smart phone or call 01304 502 101 or go to www.megger.com for full details The word ‘Megger’ is a registered trademark
CON.04.13.067.indd 1
Megger Limited Archcliffe Road Dover CT17 9EN UK T +44 (0) 1304 502 101 F +44 (0) 1304 207 342 E uksales@megger.com
09/04/2013 09:57
The Electrocorder range of electrical data recorders has been designed and manufactured in the UK to help you do your job better. Every model has been expertly calibrated to give the most accurate electrical diagnoses using constant sampling techniques, helping you to carry out comprehensive and reliable energy audits. Plus, with its simple design, free software and simple data transfer via USB to your laptop, the Electrocorder is such a low cost investment that it canâ&#x20AC;&#x2122;t fail to amp up your business.
ENERGY AUDITS VOLTAGE OPTIMISATION ACCURATE DATA & LOW INVESTMENT
E : sales@acksen.com W : www.acksen.com T : +44 (0)870 225 1790
CON.04.13.068.indd 1
09/04/2013 09:58