Architecture Portfolio 2018 Romain Hamard

Page 1

PORTFOLIO Archite c tu re / / 201 8 ROMAIN HAMARD


2/650 Malvern Road Prahran, VIC, 3181 T 04 91 09 40 70 E rhamard@gmail.com N French

ROMAIN HAMARD

Architect

As a 3 year experimented architect with passion for new technologies, I am ready to join your office in order to put to contribution my abilities and to explore new fields of architecture applications. I am convinced of the necessity to learn from and with people from all over the world. I am rigorous, curious and always have positive attitude in group work.

Skills

Modeling Autocad

Vector Works

Work Experiences _ 1/2

Freelance Architect from January 2015 to August 2017 2 yrs. 8 mo.

Architect in Auxau atelier d’architecture, Brussels, Belgium

Jan. 2015 Aug. 2017

Image treatement

- Managed multiple small and medium scale residential projets - Runned projets from conceptual research to execution detail and site meeting - Established quantities survey and financial supervision - Formed relashionships coordination decisions with clients, engineers and contractors - Made high level communication documents like drawings, collages and models - Organised events to promote the firm

1 yr. 8 mo.

3D printing service activity, Brussels, Belgium

Ilustrator

Dec. 2015 Aug. 2017

- Modelised and prepared 3D models ready to print - Printed high level detailed models - Interview by Dagoma compagny - Participated and worked for the creation of ULB (Brussels University) Fablab

24 hours

if-ideasforward, 24h competition in collaboration with Olivier Reuter

Revit Sketchup + Vray Model making

Photoshop Indesign Lightroom

Others

Feb. 2016

- Worked in collaboration with great time pressure - Developed a consistent answer to the competition program - Produced of highend graphical documents and text explication

Cura 3D printing

2 months

OISTAT Theater competition in collaboration with Olivier Reuter

Languages

Feb. 2015 Mar. 2015

Office suite

French

English

Hobbies

Cooking Crafting Photography Travel Drawing

- Researched about historical and cultural environment - Established concept - Produced of highend graphical documents and text explication

Internships 6 months

Intern in B+B Urbanism and Landscape, Amsterdam, The Netherlands

Jan. 2013 Jun. 2013

- Participated in landscape and urbanism design competition in The Netherlands, Austria and France - Designed photoshop collages, Autocad drawings, sketchup and traditional models - Translated documentations from and to french

2 months

Intern in Menuisery du Trèfle joinery, Montgeron, France

Jul. 2011 Aug. 2011

- Designed furnitures : sketches, working drawings with Autocad - Participated in client meetings


Work Experiences _ 2/2 Seasonal & Student jobs 4 months

Assistant cooker in L’étincelle restaurant, Brunoy, France

Jul. Aug. 2013 Jul. Aug. 2014

- Cooked and prepared completed meals - Cutted and adjust vegetable quantity for salads and other recipes - Did inventory of food, tools and furnitures

2 months

Runner in L’étincelle restaurant, Brunoy, France

Jul. 2012 Aug. 2012

- Cleaned tables and cooking area - Set tables - Served food and drinks

3 months

Summer remplacement in banking branch (Crédit Agricole), France

Jul. 2010 Jul. 2009 Aug. 2008

- Receptioned and served clients - Execute simple banking transactions - Saled banking products like credit card

Education 2012 - 2014

Master degree in Architecture, ULB, Brussels, Belgium

2009 - 2012

Bachelor degree in Architecture ULB, Brussels, Belgium

2008 - 2009

Histoty of Arts, University of Marne-la-Vallée, France

2007 - 2008

Preparatoty course for school art

2002 - 2007

High school Talma, Brunoy, France

Included one year exchange in Academy of Architecture, Amsterdam, The Netherlands Thesis : 3D printing : vector of new vernacular architecture ?

Sciences sector

Workshop 2012

Creation of a real size pavilion for architecture students One week of group conception and constuction

Referees Auxau

Cédric Callewaert & François Vliebergh Associated architects Web : www.auxau.com Email : mail@auxau.com Tel : +32 2 644 01 44



5

TX

BR

VN

6

12

18

5

6

20 12

SX 5

20

32

28

6 20

32 38

28 36 48

42 52

12 24

6 2432 42

12

24

28

36

34

42

28


TX

Theux // Julien

Brussels, Belgium, 2017 in collaboration with AUXAU Programme : Transformation of a traditional Brussels house Web : www.auxau.com/theux-2/ The owner of this house has a long story with it. In fact, it was bought by his grand parents in 1934, and he used to live, grow up and work there, in the family company. Now, it is the time for him to have his own children in this traditional Brussels house. It was built in 1905 with at first two succession rooms and three levels. In 1920, an extension added the third room for each level. Because of urbanism wich leads to really narrow and long houses. The main consequence is the lack of light in the middle spaces. Thus, the objective for the client and for us was to keep the house identity and to adapt it to modern life style. To do that, we used the constraints, and we transformed them into forces. The 1920 extension has a strange shape, so we used the in-between space generate by this extension and the party wall to create a new vertical circulation. This old narrow, outside and unused space become inside to be the main solution for architecture. The new stairs distribute rooms with any corridor. This solution maximises the width of this narrow house and bring light into the entire construction thanks to micro perforated metal and white color. Circulation in space is thought to be a ballad for light and inhabitants.

6



149

PC03

94

DEP

BE15 à démolir

CHN08

A

Nouvel escalier ferronerie

110

DEP

REVÊTEMENT DE SOL CARRELAGE TEGELVLOER REVÊTEMENT DE SOL PLANCHER AFWERKING PLANKENVLOER REVÊTEMENT DE SOL VINYLE VINYLBEVLOERING PORTE EXISTANTE BESTAANDE DEUR PORTE NOUVELLE NIEUWE DEUR CLOISON EXISTANTE BESTAANDE WAND CLOISON NOUVELLE NIEUWE WAND

136

CHN05

148

B

Dossier THEUX

FAUX PLAFOND VERLAAGD PLAFOND

NOUVEL ESCALIER NIEUW TRAP

PN04

MN 06

NIEUWE DAKVENSTER

HF

BE08 à FPL

247

A DEP

CHN07

Bureau / Bibliothèque Chambre d'amis Plancher existant

BE10 à démolir

EC EF

VH

BE07 à démolir

Vide

150

12 11 10 9

7

8

9

6

Nouvel escalier ferronerie

MN 07

5 3

4

1

2

5

8 7

4 2

3

6

1

57 DEP

REVÊTEMENT DE SOL CARRELAGE TEGELVLOER REVÊTEMENT DE SOL PLANCHER AFWERKING PLANKENVLOER REVÊTEMENT DE SOL VINYLE VINYLBEVLOERING PORTE EXISTANTE BESTAANDE DEUR PORTE NOUVELLE NIEUWE DEUR CLOISON EXISTANTE BESTAANDE WAND CLOISON NOUVELLE NIEUWE WAND MUR EXISTANT BESTAANDE MUUR MUR NOUVEAU NIEUWE MUUR

BAIE EXISTANTE BESTAANDE VENSTEROPENING BAIE NOUVELLE NIEUWE VENSTEROPENING Hauteur sous faux-plafond Hoogte onder verlaagd plafond Hauteur sous plafond Hoogte onder plafond

512

352

CHN04

A

BE05 à démolir

CHN

CHE

Dossier THEUX

Sallon Nouveau plancher 18 m2

Jardin Dalles béton à évacuer

B

RJ45 TV

FAUX MNPLAFOND 03 VERLAAGD PLAFOND

HAUTEUR FENETRE VENSTERHOOGTE

ISOLATION ISOLATIE CLOISON SCHEIDINGSWAND CH02 à MACONNERIE démolirMETSELWERK DEMOLITIONS SLOOP CHASSIS EXISTANT PE BESTAAND RAAM CHASSIS NOUVEAU PN NIEUW RAAM HAUTEUR ALLEGE CE HOOGTE BORSTWERING

CN

ME

NIEUWE DAKVENSTER

NOUVEL ESCALIER NIEUW TRAP

Niveau sol Grond niveau

BE02 à démolir

43 NOUVELLE 18 FENETRE DE TOITURE

EV

frigo

EU

MN

BE

BN

000 000

AL

HF

FPL

ESCN

FTN

285

0.00

BE04 à démolir

EF

87

PN01

MN 02

12

11

10

9

8

7

6

79

CE 04 à démolir

DEP

97

PE03 à évacuer

63

PE01 à évacuer

87

MN 01

MN 04

7

6

5

4

3

2

1

Porte vitrée récupérée

CE 01 à démolir

10

CE 02 à démolir

Escalier à décaper

115

CE 03 à démolir

BE03 à démolir

Cuisine Plancher existant 14 m2

Sonnerie + parlophone Bel + parlofoon

CH01 à

Télérupteur Teleruptor

PE02 à évacuer

LISTE DES APPAREILLAGES - LIJST VAN APPARATUUREN

LEGENDE ELECTRICITE LEGENDE ELEKTRICITEIT

TV

Tableau électrique Elektrisch bord Goulotte verticale Liggendee kabelgoot Prise simple à 30 cm au-dessus du sol fini, sauf indication contraire taques vloer, tenzij anders vermeld Enkelecontactdoos 30 cm boven afgewerkte Gaz Prise double Dubbele contactdoos Hotte Prise double placée horizontalement Dubbele contactdoos, horizontaal geplaast Prise téléphone, frigo, four, ... Aansluitdoos telefoon, koelkast, oven,… 80 90 Point lumineux lave Lichtaansluitpunt vaiselle ? Spots encastrés

S

Point lumineux en applique MICRO_ONDE Lichtaansluitpunt tegen wand FOUR TL Buislamp 60 214 Interrupteur simple unidirectionnel bipolaire à 110 cm au-dessus du sol fini sauf indication contraire BE01 à Enkele tweepolige schakelaar 1 richting op 110 cm boven afgewerkte démolir vloer, tenzij anders vermeld Ch Hotte

Interrupteur simple unidirectionnel bipolaire Enkele tweepolige schakelaar 1 richting

Interrupteur tridirectionnel Schakelaar 3 richtingen

Interrupteur bidirectionnel Schakelaar 2 richtingen

ECEF

29

mail@auxau.com www.auxau.com

143

4

3

2

1

BE09 à démolir

M

EU

115

0.00

ESCN

FTN

démolir 43NOUVELLE 36FENETRE DE 80TOITURE

EU EV

Niveau sol Grond niveau

SdB Carrelage sur

M

5 6 7 8

PE05 à évacuer

9

P04 à conserver

83

412

MN

HAUTEUR FENETRE VENSTERHOOGTE

ISOLATION 11 m2 ISOLATIE CH04 àCLOISON démolirSCHEIDINGSWAND MACONNERIE METSELWERK 433 DEMOLITIONS SLOOP CHASSIS EXISTANT PE CHE BESTAAND RAAM RJ45 CHASSIS NOUVEAU CHN PN NIEUW RAAM HAUTEUR ALLEGE AL CE HOOGTE BORSTWERING CN

BE

ME

MUR NOUVEAU NIEUWE MUUR

MUR EXISTANT BESTAANDE MUUR

BAIE EXISTANTE BESTAANDE VENSTEROPENING

BN 000 000

BAIE NOUVELLE NIEUWE VENSTEROPENING Hauteur sous faux-plafond Hoogte onder verlaagd plafond Hauteur sous plafond Hoogte onder plafond

EU

Sonnerie + parlophone Bel + parlofoon

75

Salle à manger Plancher existant

démolir avec minuterie M Télérupteur Teleruptor met tijdschakelaar TH Thermostat d'ambiance

Toutes les côtes sont données à titre indicatif. Ces côtes sont à vérifier sur place. 6 m2 Alle maatcijfers zijn indicatief. Deze maattcijfers moeten ter plekke worden gecontroleerd.

AUXAU

Av. de la Couronne 212 1050 Ixelles

TRANSFORMATION D'UNE MAISON UNIFAMILIALE 282 Rue de Theux, 19 - 1040 Etterbeek atelier d'architecture

Vestiaire Carrelage récupéré

MAITRE D'OUVRAGE: M. RUYKENS Julien

Date: 08 novembre 2016 Echelle: 1/50

DEP

412

287

7

8

9

6 5

1

2

3

4

PE08 à évacuer

82

CE 05 à démolir

150

EF EC

2

EF

EV

80

VH

WC

LISTE DES APPAREILLAGES - LIJST VAN APPARATUUREN chape lewis

LEGENDE ELECTRICITE LEGENDE ELEKTRICITEIT

EF

S

77

255

Vide BE14 à démolir

68

BE12 à démolir

10 9 8 7 6

TV

8 m Tableau électrique EC EU Elektrisch bord Goulotte verticale Liggendee kabelgoot Prise simple à 30 cm au-dessus du sol fini, sauf indication contraire Enkelecontactdoos 30 cm boven afgewerkte vloer, tenzij anders vermeld Prise double Dubbele contactdoos Prise double placée horizontalement Dubbele contactdoos, horizontaal geplaast Prise téléphone, frigo, four, ... PC01 Aansluitdoos telefoon, koelkast, oven,… Point lumineux Lichtaansluitpunt Spots encastrés

Hotte

Télérupteur 80 Teleruptor

379

Point lumineux en applique PN02 Lichtaansluitpunt tegen wand CN01 TL Buislamp VH Interrupteur simple unidirectionnel bipolaire à 110 cm au-dessus du sol fini Ch sauf indication contraire BE06 à Enkele tweepolige schakelaar 1 richting op 110 cm boven afgewerkte démolir MN 05 vloer, tenzij anders vermeld Interrupteur simple unidirectionnel bipolaire Enkele tweepolige schakelaar 1 richting

80

mail@auxau.com www.auxau.com

TV RJ45

Premier étage

CHN01

03

A

Execution plan _ Ground floor

24

SITUATION PROJETEE

Indice: A

2

140

12 m2

Chambre Plancher existant

115

1

VH2 VH 3 4 5 4 3 2 1

150 P05 à conserver

Interrupteur tridirectionnel Schakelaar 3 richtingen

Interrupteur bidirectionnel Schakelaar 2 richtingen

avec minuterie M Télérupteur PN03 Teleruptor met tijdschakelaar à PE04 à THCH03 Thermostat d'ambiance démolir évacuer Toutes les côtes sont données à titre indicatif. Ces côtes sont à vérifier sur place. Alle maatcijfers zijn indicatief. Deze maattcijfers moeten ter plekke worden gecontroleerd.

AUXAU

Av. de la Couronne 212 1050 Ixelles

Chambre Plancher existant 14 m2

TRANSFORMATION D'UNE MAISON UNIFAMILIALE Rue de Theux, 19 - 1040 Etterbeek atelier d'architecture

MAITRE D'OUVRAGE: M. RUYKENS Julien Date: 08 novembre 2016 Echelle: 1/50

10

2

CHN06

342

MN 09

80

PN07

EC EF

M M

5 6 7 8

PE07 à évacuer

9

2

148

B

30

EV

EU

EF

EV

80

VH

WC

105

CN02 PN05

BE13 à démolir

PC02

SdB Carrelage sur chape lewis 8 m2

169

MN 08

10

110

DEP

48

EU

401 PN06 BE11 à démolir PE06 à évacuer

379

Isolation phonique

DEP

CHN02

B

REVÊTEMENT DE SOL C TEGELVLOER REVÊTEMENT DE SOL P AFWERKING PLANKENV REVÊTEMENT DE SOL V VINYLBEVLOERING

PORTE EXISTANTE BESTAANDE DEUR PORTE NOUVELLE NIEUWE DEUR CLOISON EXISTANTE BESTAANDE WAND CLOISON NOUVELLE NIEUWE WAND

MUR EXISTANT BESTAANDE MUUR

MUR NOUVEAU NIEUWE MUUR

BAIE EXISTANTE BESTAANDE VENSTEROP

Hauteur sous plafond Hoogte onder plafond

Hauteur sous faux-plafond Hoogte onder verlaagd pla

BAIE NOUVELLE NIEUWE VENSTEROPENI

Tableau é Elektrisch Goulotte Liggende Prise sim Enkeleco Prise dou Dubbele Prise dou Dubbele Prise télé Aansluitd Point lum Lichtaans Spots en

LISTE DES AP

LEGENDE ELE LEGENDE ELE

TV

Point lum Lichtaans TL Buislamp Interrupte sauf indic Enkele tw vloer, ten

Interrupte Enkele tw

Interrupte Schakela

Interrupte Schakela

Ind

Rez-de-

SITUATION

Date: 08 nove Echelle: 1/50

MAITRE D'O

atelier d'architecture

AUXAU

TRANSFORMA Rue de Theux,

Toutes les côtes sont don Alle maatcijfers zijn indica

8

50

04

A

Eu

50 Chambre Plancher existant 14 m2

Deuxième étage

SITUATION PROJETEE

Indice: A

B

VIDEOPHONE

6

21

79

220

104

10

THERMOSTAT

35

403

24

EU

Hotte

RJ45 TV

CHN03

A

VIDEOPHONE

60

19

80

80

60

60

25

11 0 146 10 97

6

12

436

403

24

376

219

60

97

190

CH06 à démolir

CH05 à démolir

DEP

B

VIDEOPHONE

RJ45 TV

60 150 10 97

EC EF

VH

35 403 24 376

Ch

Execution plan _ Second floor

Execution plan _ First floor


1:50 model _ Model is a useful tool for the architect and his client, but also to communicate with engineer and contractor.

9


Circulation in spaces is a game in which several solutions are always possible.

10


Floors covering detail in-between concrete tiles and wood. In-between bathroom and bedroom.

11


BR

Belair // Laurent & Sandrine

Brussels, Belgium, 2017 in collaboration with AUXAU Programme : Fifties house transformation and extension Web : www.auxau.com/laurent-sandrine-2/

This house has been built in the fifties when Brussels experimented garden-cities in the suburb. It is a small, simple and efficient house with a nice garden. For this project it was a priority to respect the environment and the landscape of this garden-city. Only the ground floor has been transformed and extended. The intervention is invisible from the street. The extension is designed to be a succession of in-between spaces and to respect the original house structure. Thanks to a new central patio and the compressions between spaces, the outside/inside limit become confused. All spaces of the ground floor become a projection from inside to outside. The continued floor covering reinforces this sensation. During the construction phase, the original floor tiles have been discovered under several more recent layers. We kept and restored it. Some other details like doors has been restore the rediscovered the original characteristic of this house.

12


13


78 1179

C

241

A

59

4 161

B

110

241

12

10

250

SN

11

384

Treillis 8mm 150x150 supérieur Prévoir renforcement Voisin plus bas (talus)

320

Terrasse 17 m2

8

220

Chambre de visite 40x40 cm

9

Voisin plus bas/Vide

2

m E:5

6

35

33

133

PORTE EXISTAN BESTAANDE DE PORTE NOUVEL NIEUWE DEUR CLOISON EXIST BESTAANDE WA CLOISON NOUV NIEUWE WAND

211

181

7

71614

REVÊTEMENT D TEGELVLOER REVÊTEMENT D AFWERKING PL REVÊTEMENT D VINYLBEVLOER

441

MUR EXISTANT BESTAANDE MU

5 4

MUR NOUVEAU NIEUWE MUUR

SNE:3,1m2

BAIE EXISTANTE BESTAANDE VE

525

SNE:5,9m2

313

3 2 salon 29 m2

Coin lecture

108

BE03

LEGENDE LEGENDE

HPS:301

BE06

317

LISTE D

HPS:240

35

391 BE05

P4 IPE220

30

579

Hauteur sous fau Hoogte onder ve Hauteur sous pla Hoogte onder pl

20

SNE:1,9m2

P5 IPE180

342

283

122

1

BAIE NOUVELLE NIEUWE VENST

TV

salle à manger 28 m2

21

279

HPS:240

100

85

237

70

C2

EF

9

197

6

77

12

60

80

BE02

Toutes les côtes Alle maatcijfers

EU 228

75

RENOVA Parc résid

109

19

MAITRE

282 Citerne

HPS:222

Date: Echelle:

porte sécurisée

90

EU wc

EF

ECEF

EU

60

121

cuisine 12 m2

C

2

SNE:0,4m

EV SNE:0,2m2

Garage

ECEF

Vasque à récupérer Garage/Buanderie

110

EF

EU

90

334

95

9

76

190 Hall entrée 6m2

P1 IPE330

275

vestiaire 179

92

EV

357

19

C1

61412

552

BE01

EU

100

80

723

263

P2 HEA180

BE04

548

402

Patio Coin jeux

SNE:1,5m2

SNE:0,7m2

B

A 1068

Execution plan _ Ground floor

14


+ 9.38

REVÊTEMENT D TEGELVLOER REVÊTEMENT D AFWERKING PLA REVÊTEMENT D VINYLBEVLOERI

PORTE EXISTANT BESTAANDE DEU PORTE NOUVELL NIEUWE DEUR CLOISON EXISTA BESTAANDE WAN CLOISON NOUVE NIEUWE WAND

MUR EXISTANT BESTAANDE MUU MUR NOUVEAU NIEUWE MUUR

+ 7.04

BAIE EXISTANTE BESTAANDE VEN

BAIE NOUVELLE NIEUWE VENSTE

Hauteur sous fau Hoogte onder ver Hauteur sous plaf Hoogte onder pla

LEGENDE LEGENDE

+ 5.38

LISTE DE

+ 5.29

profil mitoyen n°26

TV

Nouveau complexe de toiture verte extensive - Substrat vulkaplus extensif 0/12 7-6cm - couche filtrante - Membrane d'étanchéité antiracine EPDM - Isolation eurothane BI 3 ép.14cm - Poutrains-claveaux + chape de compression + chape de pente

+ 3.48

P L T B I s E v I E

Foamglass intercallé pour continuité d'isolation

profil mitoyen n°26

+ 2.93

+ 2.76

T E G L P E P D P D P A P L S

I S

348

301

197

I S

Toutes les côtes s Alle maatcijfers z Nouvelles façades : - Bloc terre cuite portherm 14cm - Isolant EPS 032, ép. 14cm - Enduit minéral de finition - Teinte claire

+ 0.64

+ 0.00 Blocs de béton Isolant EPS 035 HD ép.10cm + enduit minéral de finition Géotextile filtrant Empierrement drainant Drain horizontal

Execution section _ AA

15

RENOVAT Parc résid

MAITRE

Date: Echelle: :


16


17


VN

Verdun // Triplets

Brussels, Belgium, 2017 in collaboration with AUXAU Programme : Winned competition for the construction of social houses. Web : www.auxau.com/verdun/ This project is the winning proposition of a competition organized by the city to build three little social houses. Like a fill in the gaps exercise, our proposition link what is before and what go after to create a consistent solution for the existing context. Our research was based on the archetypal house with the idea to maximise volume and qualities of living spaces, the result is three cheap and generous houses. The unique envelope expressed as a long roof allows a lot of input light for living spaces and a perfect stand for solar panels. Particular considerations have been taken for materials and their implementation. They have been selected both for their technical qualities and durability but also for their intrinsic aesthetic qualities (aspect, texture, hue, dimension) which will express itself naturally in the project.

18 Coupe perspective

20 Juin 2016 _ RF/15/PN/740 _ MISSION D’ÉTUDES PLURIDISCIPLINAIRES POUR LA CONSTRUCTION DE TROIS HABITATIONS UNIFAMILIALES


N

RU

E

DE

VE

RD

UN

ST RA

AT

N

P

P N°640

N°640

N°646 32.57

N°648 32.64

Plan d’implantation projeté _ 1/1000

19

20 J


ESQUISSE ESQUISSE ESQUISSE

Intégration Intégration Intégration au contexte au au contexte contexte

View from the street Typologie Typologie voisine Typologievoisine voisine

Respect deRespect Respect la typologie dedelalatypologie typologie

Zone de recul Zone Zone +dede projection recul recul+ +projection projection vers le jardin vers verslelejardin jardin

Habitabilité Habitabilité Habitabilité / Qualités // Qualités Qualités des espaces des des espaces espaces

Zone tampon Zone Zone + Agrandissement tampon tampon+ +Agrandissement Agrandissement vers le jadin vers verslelejadin jadin

Archetypal house

Buffer zone + Projection to the garden

Optimisation Optimisation Optimisation des volumes des desvolumes volumes

Volume optimisation

Des volumesDes Des simplent volumes volume a découpés audécoupés découpés sein de au l pour offrirpour des pouroffrir espace offri confort et confort le confort bien et êtr et

Maximisation Maximisation Maximisation de la lumière dedelala naturelle lumière lumièrenaturelle naturelle

Vue droiteVue Vue vers droite droite le paysage vers verslelepaysage paysage

20

Cette enveloppe Cette Cette env uni en difficultés, difficultés difficulté des ap naturelle de naturelle naturelle grande qu d des habitations des deshabitat habita aux en de manière abondante dedemanière manière ( est 2,5x plus est est importan 2,5x 2,5xplp


ESQUISSE ESQUISSE Intégration contexte Intégration au au contexte

Typologie voisine Typologie voisine

Respect de typologie la typologie Respect de la

de recul + projection le ja ZoneZone de recul + projection versvers le jardi

Habitabilité / Qualités espaces Habitabilité / Qualités desdes espaces

View from the garden tampon + Agrandissement le jadin ZoneZone tampon + Agrandissement versvers le jadin

Optimisation volumes Optimisation des des volumes

ue depuis le jardin

20 Juin 2016 _ RF/15/PN/740 _ MISSION D’ÉTUDES PLURIDISCIPLINAIRES P Des Des volu LA CONSTRUCTION DE TROIS HABITATIONS UNIFAMILIA déco découpés pour off AUXAU atelier d’architecture + Jean Gillis Ingénieur + pour COS conf confort

Page 21

Maximisation de lumière la lumière naturelle Maximisation de la naturelle

droite le paysage Vue Vue droite versvers le paysage

Natural light maximization

Enveloppe Enveloppe

Espace de vie Espace de vie

View to the existing landscape

Cett Cette diff difficul natu naturell des des habi de m de maniè est est 2,5x

Synthèse Synthèse

21

20 Juin _ RF/15/PN/740 _ MISSION D’ÉTUDES 20 Juin 20162016 _ RF/15/PN/740 _ MISSION D’ÉTUDES PLURP LA CONSTRUCTION DE TROIS HABITAT POURPOUR LA CONSTRUCTION DE TROIS HABITATION


Tuiles plates Couverture / Isolation

Blocs de béton

Un ma on qu po (a qu pr

La de pr Charpente

Blocs de béton peints

Chambre 3

Plancher en pin

17 m2

Chambre 2 12 m2

Salle de douche 2 m2

Blocs de terre cuite

WC Salle de bain 5 m2

Buanderie / Zone technique 3 m2

Carrelage 15 x 15

Chambre 1 15 m2

Terrasse 17 m2

Salon 22 m2

Chappe lissée

Vestiaire entrée / WC 7 m2

Cuisine / Salle à manger 28 m2

Multiplex

Zone de recul Cave 42 m2

Acier anodisé Superficie habitable : 153 m2 Terrasse : 17 m2 Cave : 42 m2

Axonométrie éclatée d’une maison

ex FA (o ou et pr un fi

es co di qu MU bé SO en

Ce l’ qu fa fu

Ce du ma fa

Ce ar de po so na te no un

20 Juin 2016 _ RF/15/PN/740 _ MISSION D’ÉTUDES PLURIDI LA CONSTRUCTION DE TROIS HABITATI AUXAU atelier d’architecture + Jean Gillis

Page 9

22

I


1. La zone tampon peut servir à Buffer zone allows both vehicle parking stationner un véhicule et garantit and protects inhabitants privacy. l’intimité des habitants.

2. volum espac A

Espa ce Exte couv rieu ert r

SAS En 4 m2trée

1

WC

A

B

Espa ce Exte couv rieu ert r SAS En 4 m2trée

WC Acce

ss

C

Espa ce Exte couv rieu ert r

SAS En 4 m2trée

WC Acce

ss

The cost construction les coûts, la 2.volumetry Toutpreserves en préservant and generates quality spaces. volumétrie des habitations Développement d’espaces de qualité génèrent des

zone tampon peut servir à ner un véhicule et garantit ité des habitants.

Cav

3. des

espaces de qualité.

Page 19

A

Esp ac Ext e couv eri eur ert

Cui

SAS En 4 m trée 2

11

1

sin

e

m2 Sal l Man e à ger 9 m 2

WC Acce

ss

B

Cave

Séj

Récu

péré

our

22

m2

Cite

rne

A Esp ac Ext e couv eri eur ert

Ter Cui

SAS En 4 m trée 2

19

sin

11

e Sal l Man e à ger 9 m 2

ss

C

2. Tout en préservant les coûts, la volumétrie des habitations génèrent des espaces de qualité.

Cave

Jar

ras

din

se

m2

Récu

péré

3

Sur f 59 ace m2

our

m2

Cite

rne

EP.

B

2

Jar

din

Cui 11

Ter

sin

e

19

m2

55

ras

se

Pri

vat

m2

if

m2

Sal l Man e à ger 9 m 2

WC Acce

ss

Cave

Séj

our

The proposes to stage propose the natural une mise en scène 3.projectLa projet des atouts du site. landscape advantagespaysagés of the site. Récu

péré

22

m2

C

Cite

rne

Ter 19

23

m2

Séj 22

Esp ac Ext e couv eri eur ert

SAS En 4 m trée 2

Pri

55

m2

WC Acce

EP.

ras

EP.

se

m2

Jar

din 55

Pri m2

vat

if

vat

if


B

Zone plantée

98 EP

Citerne (4,5m3)

509 EU

SNE

484

386 : 8 m2

D

C

Zone plantée

25

Terrasse 20 m2

190

487

Terrasse 20 m2

EV

80

SNE : 0,75 m2

Salon 20 m2

456

10 WC

154

386 :8 m2

Rangement

105

Salle à manger 14 m2

70

Sas d'entrée 2 m2

Rangement

n°640

29

Citerne (4,5m3)

SNE

60 131 Cuisine 10 m2

EU

Entrée maison 3 n°642 (131 m2)

CV

230

Zone plantée

98 EP

EU

SNE : 0,75 m2

80

SNE : 1,5 m2

46

A

500

Terrasse 20 m2

Salon 20 m2

456

10 WC

EV EU

410 132

190

25

386 : 8 m2

Rangement

105

Salle à manger 14 m2

70

Sas d'entrée 2 m2

EV

95 Zone de recul 16 m2

294

Sas non chauffé 7 m2

EP

294

SNE

60 131 Cuisine 10 m2

46 Rangement

40

Citerne (4,5m3)

EU

EU

SNE : 1,5 m2

Entrée maison 2 n°644 (131 m2) Trappe d'accès à la cave

CV

290 11

438 Boite aux lettres

Vers réseau d'égoux publblic

23.38 m

23.38 m

SNE : 0,75 m2

456

10

EV EU

410 132

88

541

27.30 m

EP98

Salon 20 m2

VH VH

105

Rangement

VH

Salle à manger 14 m2

70

80

EV

Zone 95 de recul 15 m2

296 77

Sas non chauffé 7 m2

C

340

D

62 130 Cuisine 10 m2

WC

Rangement

VH

Sas d'entrée 2 m2

Entrée maison 1 n°646 (131 m2)

CV

290 11

438 EP

Boite aux lettres

Vers réseau d'égoux publblic

29.16 m

26.05 m

49

VH

SNE : 1,5 m2

EU

407 133

165

Sas non chauffé 7 m2

40 508

270

VH

EV EU

77de recul Zone 15 m2

274 11

EP

Boite aux lettres

B

26.57 m

26.25 m

24

Detailed pre-project _ Section CC

290 Vers réseau d'égoux publblic

28.40 m

46

509 502

438

514 502

40 482

Mitoyen n°640

n°648

A

Detailed pre-project _ Ground floor te avec sous-sol

504

32.73 m


VH

SNE : 0,75 m2

266

Rangement

EU VH VH

10

SNE : 0,75 m2

266

Rangement

102

Sdb 5 m2

WC

167 180

10

10

Sdb 5 m2

WC

SNE : 0,75 m2

266

Rangement

102

167 180

10

C

Vide sur salon

SNE : 0,75 m2

Coin bureau 3 m2

180

D

26.57 m

26.57 m

B

Chambre 9 m2

Vide sur salon

SNE : 0,75 m2

Coin bureau 3 m2

180

80

Ch. + Boiler(45l)

95 Gr.V. Buanderie Techniques 2 m2

EV EU

10

A

Chambre 9 m2

Vide sur salon

SNE : 0,75 m2

Coin bureau 3 m2

180

80

Ch. + Boiler(45l)

95 Gr.V. Buanderie Techniques 2 m2

EV EU

29 Chambre 9 m2

VH

EU

Sdb 5 m2

167 180

Mur mitoyen: - Bloc terre cuite 14 cm - Isolation acoustique 2 cm - Bloc terre cuite 14 cm

- Chappe lissée - Isolation 12 cm - Radier en béton fibré sans vide ventilé

494 486 486

340 102

Sdd 2 m2

80 Rangement

80

25

Detailed pre-project _ Section DD

D

EU

WC VH

160

- Plancher - OSB 18mm vissée - Gîtes 8x23 + isolation - Finition

230

60 Gr.V.

Buanderie 115 Techniques 2 m2

VH

Ch. + Boiler(45l)

Sdd 2 m2

10

10 30

177 SNE : 0,75 m2

- Chappe lisée - Dalle béton coulé sur place

Cornière 80x80x6

10

310

340

180

10 80 10

VH

EV

10

80 10 80 Rangement

80

200 Chambre parentale 18 m2

368

VH EV EU EU

EU

180

80 10

10

10

160

Sdd 2 m2

451

310 SNE : 0,75 m2

10 90 10

10 90 10

80 Rangement

80

200 Chambre parentale 14 m2

C

25

VH

180

10 450

177

310 SNE : 0,75 m2

B

294

VH

A

Chambre parentale 17 m2

368

200

10

Detailed pre-project _ First floor

32.73 m

- Tuiles de terre cuite - Contre lattage - Panneau Unidek Aero Passif (U:0,11)

29.16 m

23.38 m

23.38 m


1:200 model 3D printing

32.73 m

32.73 m

439

32.58 m

231

27.30 m 26.80 m

26.25 m

23.20 m

644

24.43 m

642 270

646

23.75 m

23.38 m

Detailed pre-project _ Front facade 26

156

28.40 m


1:100 model 3D printing

32.73 m

32.58 m

Panneaux photovoltaiques (3 x 1,67m2)

Panneaux photovoltaiques (3 x 1,67m2)

663

556

Panneaux photovoltaiques (3 x 1,67m2)

435

20

32.73 m

28.23 m

28.67 m 26.05 m

277

289

25.76 m

195

27.10 m

23.38 m

Detailed pre-project _ Back facade 27


SX

Sterckx // Gilles

Brussels, Belgium, 2017 in collaboration with AUXAU Programme : Transformation and arrangement of apartment Web : www.auxau.com/gilles/ The project takes place in a small and full of light apartment. The client, a young, Belgian filmmaker, wanted a large living with one bedroom and some contradictions: - An open space with office area not completely independent but not completely in the living space - A guest room which can disappear when nobody use it and which respect a complete privacy for both the resident and the guest. The solution was found in one unique multiuse furniture which cross the apartment and make the space open and flexible. In one point, the furniture is the entrance door, in another it become the kitchen, the TV console or storages...The end part can be open to define the guest house and reveal a folding bed. During the construction phase, the discovery of a concrete ceiling (from this level the wood structure has been changed further to a past fire), has STERCKX adapted the project. We kept and cleaned this unexpected ceiling, and D'UN we APPARTEMENT TRANSFORMATION Situation : 1 rue Sterckx, Saint-Gilles decided to show the electric system. Maitre d’ouvrage : Laurent Scheid ESQUISSE Echelle 1/100

First proposition

Propositon 1 : fermĂŠ

28


29


657 177

480 40

60

40

64,2

40

60

80

1,8

80

41,2

1,8

61,8

PORTE EX BESTAAN PORTE NO NIEUWE D CLOISON BESTAAN CLOISON NIEUWE W

MUR EXIS BESTAAN

MUR NOU NIEUWE

36

BAIE EXIS BESTAAN

BAIE NOU NIEUWE V

40

60

40

64,2

Hauteur s Hoogte on Hauteur s Hoogte on

LEGE LEGE

45

80

Hotte

20

1,8

1,8 75,6

60

LIST

38,2

PLATINE 1,8

132,6

1,8

39

1,8 53,4

1,8

305

REVÊTEM TEGELVL REVÊTEM AFWERKI REVÊTEM VINYLBEV

60

60

40

160

LV

80

DVD

46

60

40

60

AMPLI

Toutes les Alle maatc

8

8 1,8

54,4

1,8

Pblle

1,8

Frigo

79

T

60

60

40

46

59

40

60

RENO Rue S

MAIT

Fond niche télé : MDF Peint noir Niche télé : Multiplex naturel peint noir mate Tranches naturelles Porte placard : MDF peint blanc

Niche cuisine : Multiplex bouleau noir mate (Vanca) Portes placard : MDF peint blanc Reste mobilier : Multiplex bouleau naturel peint blanc Tranches naturelles

Face : Multiplex naturel peint blanc Tranches naturelles

Niche entrée: Multiplex bouleau noir mate (Vanca)

Date: Eche

Contour porte peint noir Porte placard : Multiplex bouleau noir mate (Vanca)

AU

SC à 212 av

30


31


657 35

177

480 40

60

40

60

40

64,2

40

60

114

80

40

45

64,2

38,2

PLATINE 1,8

132,6

1,8

39

1,8

60

160

60

40

46

60

40

60

60

40

46

59

40

60

AMPLI

60

Niche cuisine : Multiplex bouleau noir mate (Vanca)

Fond niche télé : MDF Peint noir

Elévation meuble côté cuisine Cuisine sur base modules IKEA

LV

80

DVD

8

8 1,8

69

54,4

1,8

Pblle

1,8

Frigo

79

53,4

305

1,8

60

312

Hotte

20

344

80

75,6

240

1,8

1,8

36

1,8

80

41,2

1,8

61,8

Niche télé : Multiplex naturel peint noir mate Tranches naturelles Porte placard : MDF peint blanc

Niche entrée: Multiplex bouleau noir mate (Vanca) Contour porte peint noir

Portes placard : MDF peint blanc Reste mobilier : Multiplex bouleau naturel peint blanc Tranches naturelles

Porte placard : Multiplex bouleau noir mate (Vanca)

Face : Multiplex naturel peint blanc Tranches naturelles

A

310

8

50

305

297

54

81

46,4

10

25

170

41

40

Multiplex naturel peint blanc Tranches naturelles

Elévation meuble côté bureau

A

Coupe AA dans structure lit mural (Wall Bed King) Dimensions lit : 140x200

Porte lit mural : MDF peint blanc

32


33


OISTAT Competition // Up & Down

Berlin, Germany, 2015 in collaboration with Olivier Reuter Programme : Floating theater

«The OISTAT Theatre Architecture Competition is an international ideas competition, aimed at students and emerging architecture practitioners, and is organised by the Architecture Commission of OISTAT (International Organisation of Scenographers, The­atre Architects and Technicians).» Holzmarkt is known as a region of Berlin where a no man’s land still exists between the vestige of the wall and the Spree and where a new kind of wall could appear, a wall of buildings and private spaces. To protect the Holzmarket and other “alternative” spaces in Berlin, a theater as a continuity of public space seems the best solution. Having an open public area that is accessible all day long and to anyone is the key to a successful theater. By multiplying the open scenes on this area, people are then free to see or do performances. This free expression space is exactly what Holzmarkt needs. The site’s existing energy is indeed expressed in a new way and the feeling to possess the place is improved. Furthermore, the theater provides points of view of the surrounding. In the meanwhile, the light structure does not block the riverbank view. The interior stage is entirely dedicated to improvisation battle where the public needs to be close and can easily being a part of the show.

Presently, the river is a limit

Spatial conitnuity of the riverbank into the water because of the theater

34


View clearance and open spaces to keep it light

Punctuated path between the scenes for a varied program and entertainments

35


With its multiple tiers and relations with the Spree River, the With its multiple tiers and relations with the Spree river, the projec project is design to improve the is design to improve the site and become a free expression space. site and become a free expression space. The footbridge can fold during The footbridge can fold during displacement. displacement.

The inner theater is design for improvisation battles and to maximise intimity between spectators and artists. For acoustic, reflective elements above the scene bring sound all around the audience and absorbent pannels behind tiers prevent echoes. The inner theater is design for improvisation battles and to maximise intimity between spectators and artists . For acoustic, reflective elements above the scene bring sound all around the audience and absorbent pannels behind tiers prevent echoes.

Backstages are accessible fromand Backstages are accessible from inner theater exterior theater space. inner and exterior space.

1

2

3

4

The floating theater allows different point of view and relations wi water : 1. Forgotten water ; 2. Direct relation ; 3. Protected relation 4. Dominated water.

Floating concrete is a low cost Floating concrete is a low cost and efficient support and efficient support for the for our theater. theater.

36


First floor

Ground floor

Basement 37


Competition // Mariahilferstrasse

Vienna, Austria, 2013 Competition // Mariahilferstrasse Programme : Public space, Surface area : 41 600 sqm Competition // Mariahilferstrasse Vienna, Austria, 2013

Programme : Public Vienna, Austria, 2013space, Surface area : 41 600 sqm B+B area and: 41Orso-Pitro Web : bplusb.nl/en/work/mariahilferstrasse/ Programme : PublicBureau space, Surface 600 sqm won the international design competition for the won redevelopment the competition Vienna most important shopping area; Bureau B+B and Orso-Pitro the internationalofdesign for the B+B redevelopment thewon Vienna most important shopping Bureau and Orso-Pitro the international competition the ofMariahilferstrasse. Bydesign closing thearea; street for traffic, the area has been the Mariahilferstrasse. the street traffic, theshopping area has been for the redevelopmentByof closing the Vienna mostforimportant area; adapted forthepedestrians andis placed bicycles.theA way for bus is placed in the adapted for pedestriansByand bicycles. A way busthe the Mariahilferstrasse. closing street for for traffic, area hasinbeen middle. middle. for pedestrians adapted and bicycles. A way for bus is placed in the The Mariahilferstrasse will be paved in a one levelwill pavement, including middle. The Mariahilferstrasse be paved in a one level pavement, including discreet guiding lines for the different user groups. Urban furniture The Mariahilferstrasse will be paved in a one level pavement, including discreet guiding lines for the different user groups. Urban furniture provides guiding areas forlines meeting anddifferent recreationuser in groups. the street.Urban furniture discreet for the provides for inmeeting provides areas for meeting andareas recreation the street.and recreation in the street. My main contribution on this project was to design furniture and to produce My main illustrations. contribution this project was to design furniture and towas to design furniture and to Myonmain contribution on this project produce illustrations.

produce illustrations.

32 32

38


3.1

3.1 a

a’

b

b’

a

a’

b

b’

section aa’

section bb’

Furniture execution detail

section aa’ scale 1/20

39


Competition // Mariahilferstrasse Vienna, Austria, 2013 Programme : Public space, Surface area : 41 600 sqm

Bureau B+B and Orso-Pitro won the international design competition for the redevelopment of the Vienna most important shopping area; the Mariahilferstrasse. By closing the street for traffic, the area has been adapted for pedestrians and bicycles. A way for bus is placed in the middle. The Mariahilferstrasse will be paved in a one level pavement, including discreet guiding lines for the different user groups. Urban furniture provides areas for meeting and recreation in the street. My main contribution on this project was to design furniture and to produce illustrations.

32

40


The project was completed in 2015

41


Library 4.0 //// Continuous Continuous Space Space Library 4.0 Amsterdam, The Netherlands, 2013 Amsterdam, :The Netherlands, 2013: 3600 sqm Programme Library, Surface area Programme : Library, Surface area : 3600 sqm

Library 4.0 should be an addition to the quick and excessive information Library 4.0 should an addition excessive consumption on thebeInternet. Firsttoofthe all,quick it is aand physical spaceinformation and should consumption on the Internet. First of all, it is a physical space and should be designed as such. Experience will be its first reason. This experience be designed Experience its firstThe reason. This experienceof should allow as in asuch. specific space thewill user’bes choice: choice of itinerary, should allow in a specific space the user’ s choice: The choice of itinerary, of appropriation, of contemplation...But also the option to travel through one appropriation, of contemplation...But the option to travel through one continuous space in which no choicealso is definitive. continuous space in which no choice is definitive. This continuous space is among other possible thanks to the modern techThis continuous space slipping is amongthe other possible thanks to nologies which allow strict classification of the the modern current techlibranologies which allow slipping the strict classification of the current libraries. Books will be inserted in to the architecture all through the entire ries. Books will favour be inserted in to the ofarchitecture all through entire space and thus the sensation the continuous space.the A simply space andwith thusourfavour the sensation of the continuous space.and A simply research smartphone or computer can give a rapid precise research with our smartphone or computer can give a rapid and precise location of one specific book. location of one specific book. However looking for quick searches, for efficiency is not the goal of the However4.0;looking for quick searches, for and efficiency is notbethemore goalefficient of the library the Internet already provides will always library 4.0;specific the Internet andone willis always more efficient to answer needs.already On theprovides contrary, lookingbefor inefficiency. to answer specific needs. On the contrary, one is looking for inefficiency. Indeed, thanks to the absence of traditional organisation, so less functional Indeed, thanks to the absence of traditional less functional efficiency and thanks to proposition of theorganisation, continuous sospace the library efficiency and thanks to proposition of the continuous space the 4.0 favours architectural experience, meeting and unpremeditatedlibrary finds. 4.0 favours architectural experience, andrandom unpremeditated Finally, the library 4.0 should allow lossmeeting of control, events andfinds. thus Finally, the library 4.0 should allow loss of control, random events and thus it allows sharing and reflection. it allows sharing and reflection.

6 6

42


43


ChurchChurch interiorinterior Church interior

44


Extension interiorinterior Expansion Expansion interior

9

45

9


1:50 model

10

46


+ 11.5 m.

+ 5.5 m.

Ground floor

47


Turia TuriaMemorial Memorial////Hyphen Hyphen Turia Memorial // Hyphen Valencia, Valencia,Spain, Spain,2013 2013

Programme : Landscape design,Surface Surfacearea area: :400 400000 000sqm sqm Programme : Landscape Valencia, Spain, 2013 design, Programme : Landscape design, Surface area : 400 000 sqm Historically,Valencia Valenciadeveloped developedaround arounditsitsriver, river, the the Turia. Turia. The The city Historically, Historically, Valencia developed around its river, The the Thes port city turnedto tothethesea seaduring during industrial revolution. The Turia. Valencia’ turned thetheindustrial revolution. Valencia’ turned to the sea during the industrial revolution. The Valencia’ s port developedexcessively excessivelyduring duringthis thismoment. moment.ItItwill willlittle little by by little little imprideveloped developed excessively during this moment. It will little by little imprison the inhabitant area and pollute the Turia water. son the inhabitant area and pollute the Turia water. son the inhabitant area and pollute the Turia water. Ourobjective objectiveis istotoinsert insertthetheproject projectinto intothe thecontinuity continuity ofof the the Turia Turia Our Our objective is toitinsert thethesea. project into the continuity of thethanks Turia Parkand andto toconnect connect itwith withthe sea.This This connection possible thanks Park connection isispossible Park and to connect it with the sea. This connection is possible thanks existingmark markofofthetheunused unusedF1F1circuit. circuit. to tothetheexisting to the existing mark of the unused F1 circuit. orderto toadd addvalue valuetotothetheTuria Turiawater waterand andtotopermit permitfuture future urbanisaurbanisaIn In order In to add Turia water andistoused. permit tionorder around the value circuit,toathe lagooning system Thefuture waste urbanisastabilization around the circuit, a lagooning system is used. The waste stabilization ponds aroundisthe circuit, a lagooning is used.toThe stabilizaplaced in the middle ofsystem the F1 circuit givewaste it a particular tion ponds is placed in the middle of the F1 circuit to give it a particular tion ponds is placed in the middle of the F1 circuit to give it a particular atmosphere. The circuit walk is punctuated by little installations. atmosphere. The circuit walk is punctuated by little installations. atmosphere. The circuit walk is punctuated by little installations. The memory of the site creates the lost link between inhabitants and TheThememory of the site creates the lost link between inhabitants and water.memory of the site creates the lost link between inhabitants and water. water.

28 28

48

48


49

49


plan LagooningLagooning plan Lagooning plan

Water Theater - normal condition Water Theater - normal condition

50

50


WaterWater TheaterTheater - flooding condition - flooding condition Water Theater - flooding condition

51

51

31 31

31


Sketching

Living models, short poses

42

52


53


Romain Hamard _ 04 91 09 40 70 _ rhamard@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.