Jan – Mar
Phase 1
Phase 2
1. Preliminary ME CCA Efforts Report 2. First DRAFT ME SiP
Initial Engagement • Complete Internal Scoping • Meet with Stakeholders • Form Executive Steering Committee • Analyze ME CCA Efforts • Begin ME SIP • Assess HEAT Utility
Climate Change Data Collection • Conduct HEAT Demo for IP & PSCD Senior Leadership • Hold Stakeholder/Mission Partner Seminar • Conduct Adaption Planning Workshops: - Energy (Electric & Fuel) - Transportation - Telecommunications - Water/Wastewater • Conduct Capstone Facilitated Discussion
Oct – Apr 1. RRAP Final Report 2. Prototype CCA Planning Template 3. HEAT adapted for field use
Phase 3 Final Analysis & Documentation • Analyze and Incorporate Results from Workshops & Facilitated Discussion into DRAFT RRAP Report • Develop Preliminary Results Out-Brief for Mission Partners & Stakeholders
Apr – Sep 1. Results from Adaptation Workshops 2. Results from Capstone Facilitated Discussion 3. Final ME SiP