PHASE
Initial Engagement
PHASE
Climate Change Data Collection
PHASE
Final Analysis & Documentation
Jan ↓ Mar
• Complete Internal Scoping • Meet with Stakeholders • Form Executive Steering Committee • Analyze ME CCA Efforts • Begin ME SIP • Assess HEAT Utility
• Conduct HEAT Demo for IP & PSCD Senior Leadership • Hold Stakeholder/Mission Partner Seminar • Conduct Adaption Planning Workshops: - Energy (Electric & Fuel) - Transportation - Telecommunications - Water/Wastewater • Conduct Capstone Facilitated Discussion
Apr ↓ Sep
• Analyze and Incorporate Results from Workshops & Facilitated Discussion into DRAFT RRAP Report • Develop Preliminary Results Out-Brief for Mission Partners & Stakeholders
1. Preliminary ME CCA Efforts Report 2. First DRAFT ME SiP
1. Results from Adaptation Workshops 2. Results from Capstone Facilitated Discussion 3. Final ME SiP
Oct ↓ Apr
1. RRAP Final Report 2. Prototype CCA Planning Template 3. HEAT adapted for field use