pa th da m
ou tle t
we tla nd
alk bo ard w
We Str st ee t
rip bu aria ffe n r
to Devereux Lake
150’
EAST / WEST SECTION OF DEVEREUX WETLAND BOARDWALK DEVEREUX MEADOWS PARK LAR 503 Design Development Studio
CAPIT AL BL VD
269’
251’ D St ortc re h et
Pe St ac re e et
NORTH / SOUTH LONGITUDINAL PROFILE OF PIGEON HOUSE BRANCH (EXISTING)
DEVEREUX MEADOWS CONTEXT MAP PHASE 1 LIMIT OF WORK PEACE ST CAPITAL BLVD
DEVEREUX MEADOWS PARK LAR 503 Design Development Studio
DEVEREUX MEADOWS PARK &
CITY OF RALEIGH PARKS
tin.cans.and.twine@email.com |919| 818 7389
RLA SEAL
_______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ _______________ NOTES & REVISIONS
PEACE ST
0.4 Miles
CAROL RTH INA O N
N
EXPERIMENTAL STORMWATER CONTROL FACILITY PHASE 1
DEVEREUX MEADOWS PARK 400 West Peace Street Raleigh, NC 27603
240’
SITE ANALYSIS & CONSULTATION | DESIGN SERVICES TIMBER FRAME | LANDSCAPE CARPENTRY | BRIDGE | TRAIL
L1.0 SITE PLAN L2.0 EXISTING CONDITIONS PLAN L3.0 TREE PROTECTION & EROSION CONTROL L3.1 TREE PROTECTION & EROSION CONTROL DETAILS L4.0 DEMOLITION PLAN L5.0 GRADING PLAN L6.0 MATERIALS PLAN L7.0 LAYOUT PLAN L8.0 CONSTRUCTION DETAILS L8.1 CONSTRUCTION DETAILS L8.2 CONSTRUCTION DETAILS L9.0 PLANTING PLAN L9.1 PLANTING SCHEDULE
C OBB DESIGN BUILD
DRAWING INDEX
295’