ritayan rath portfolio 2022
DOHALIVE
VOID
URBAN VOID
VOID
VOID The proposed extensive and intensive service provision delivered by these “urban voids” is key to the city’s future development. “Urban voids” will constitute the green backbone of the new urban vision, a varying scale series of walkways, hardscapes, open public spaces, cycle paths, circulation routes ( for collective and private pedestrian traffic) , new services provision centres for the local and wider communities, neighbourhood programmes and so on. The backbone structure confirms the overall strategy of the development plan whose underlying objective is to create greater service density that will in turn raise the overall quality of the user’s life.
PROFESSIONAL PROJECT
DOHALIVE
Type D Bed Room
The hotel rooms are juxtaposed facing towards the open glassfacade, that allows natural day-light to the organic interiors. The lack of strong corners and curvilinear walls gives a dynamic and fluid personality to the space, embracing a contemporary lifestyle.
TYPE-C_ENERGY ROOM L6-24
TYPE-A_AURA ROOM L6-23
TYPE-A_AURA ROOM L6-22
+33.00 m FFL +32.90 m SSL
+33.00 m FFL +32.90 m SSL
+33.00 m FFL +32.90 m SSL
TYPE-B_MODE ROOM L6-25 +33.00 m FFL +32.90 m SSL
Type A, B and C Bed Room Layout
PROFESSIONAL PROJECT
DOHALIVE
View of the Entrance Lounge
PROFESSIONAL PROJECT
Ingelheim Rathaus
Ingelheim, Deutschland Public Building, Renovation and Modernization
GEZ. LAGEPLAN / PIKTO C F I K
B H
3
TH1
4
M 3
A
N
TH2
G D
E
C
A
W
F
TH3
E D
N
H
1
2
I K
B
4
S
4
G
1
2
OK FFB EG = +/- 0,00 = + 98,05 m ü. NN
15°
2%
DA 20 OK RiBa+13,09 +13,05 +13,00
Sparren NH C24, 10/20, a= 62,5
B in
Siehe Detail se DA 15 63 ,2 4/2 5
1,81
Ach
OG03.036 Büro BD L 45/100
20 4 18 2,00
en
73
alk
+9,77
+9,70
STB Stüze Neu
+9,54 +9,25
45
20 4 18
1,7825
45
1,81
MTP Architekten, Frankfurt (2020-2022)
UKUZ +9,25
1,8725
15
+8,05
18 +7,25
+7,25 OG02.034c WC 1,44
Firm -
Ingelheim, Germany
gb
Fusspfette, NH C24, 12/8, OK= + 12,83 Ringbalken, StB, C 25/30, 20/25, OK=+12,75, UK=+12,50
7
Location -
WD E 10/10 OK=UK Rähmholz
3,09 Rin
ANSCHLUß SIEHE PLAN 4014_01_5_SN_ARC_SNHH_349
Status-Under-Construction
UK RiBa +12,49
1,44
Ingelheim Rathaus
25
25mm GK Dampfbremse
636
Achse Andruckleiste +13,33
+6,45
+6,29 UKUZ +6,00
20 4 4,845
16 16
+4,00
1,415
OG01.034 Büro
+3,20
+3,04 +2,75
UKUZ +2,75
+2,75
60 20
16 +1,95 24 16
4,755
2,64
Contribution - LPH 5 Detail Design, Architectural Details, Fenster sockel detail, Sparrenaufdoppelungen Detail, Deckenspiegel, Leuchteplanung, Dachdetail, Sparrenplan, Wand-und Bodendurchbruchplan, Baustelleneinrichtungsplan.
15
1,835
+6,00
Team Work - (Ritayan Rath + RHI team)
EG00.036 Büro +0,14 -0,03
-0,10
-0,27
-0,35 -0,28
-0,68 -1,09 UKUZ -0,90
Softwares used Vectorworks
-1,12
Sprung Rohbau in Achse 62
D
UKUZ -1,65
UKUZ -1,65
OK FUN -4,00
UK FUN -4,50 UK FUN -4,70 Zeichnungsgrenze
UK FUN -5,00
1,25
1,25
37
36
88
89
UK FUN -5,20
OK FUN -6,17
1,25
35 N 90
G
UK FUN -5,33
1,25
1,25
34
33
91
92
1,25
1,25
1,25
1,25
1,25
UK FUN -6,67
32
31
30
29
28
27
93
94
95
96
97
98
G
A
Sprung im Fassade
Sprung im Fassade
+0,14
-0,03 -0,27
-1,09
B
INGELHEIM RATHAUS
H
73
72
71
70
B 1,25
1,25
615
635
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
Wand nicht im Fotos (nur blech) _FK20210618
485 305
125
68
2,32
68
68
23
68
68
365
365
9
5 F90
365
63
15
UK FD +12,42
UK RD UK FD
SM
OK FFB +9,75 OK RFB +9,70 LH ca. 2,00 m BD 20/30
Sprung UK FD
2,54
1,01 2,135
63
125125 1,01 2,135
KB FEU DN 160 Achse VK RD
15
97
1,34 STB Aufkantung!!!
F90 A+M
+14,07 +12,80 +9,75 +9,70 Schwelle aus Foto _FK091121 Möglich abbruch?
1,90
575 5
1,25
16,85
21,25
+11,42 OK Mittelpfette
79
50
SM
30 10 23
16
F90
OG03.002-T11 T90- 2-
175
5
1,01
24
WA B 20/18/30 UK +12,57 3 3 mit MW schließen
Höhenangabe!
KB S DN 100 Achse
WD E 10/10 OK=UK Rähmholz WD E 5/12 M OK= +10,49
17,94m
3,61
3,51 2,00BRH 75 3,26
99
12
3,51
STB-Stütze 24/24 C25/30 175 24
Höhenangabe!
49 12
OG03.034 F 01 2ZL1AL TYP 301
12
OG03.032 Büro NRF 15,89m² LH U 16,42m BD 25/25
3xKB K DN 100 Achse 2xBD KB H 24 DN 60 KB S DN 170
2
OG03.032 F 01 2ZL1AL TYP 301
24
3,57
49
3,51 2,00BRH 75 3,26
24
12
Höhenangabe!
Fusspfette und STB Aufkantung Abbruch
Achse M
WD E 5/12 StB-Stütze 24/ 24 OK= +10,49 C25/30
3,54
3,51
WD L 110/30 OK=
WD L 77/30 OK=
STB Neu Riba 24/25 C25/30 OK 13,00-13,09
3,51 2,00 BRH 75 3,26
OG03.032-T01 - 1-
BD B 20/40
F90
DD KB S M DN 150 2xBD KB H Sprung OK FFB WD E 10/10 DN 60 OK=
OG03.035 F 01 2ZL1AL TYP 301
24
SM
24
2,48
2,135 Bestand Riba StB C25/30 24/25 OK 10,262-12,716 Wandscheibe NHC24 OG03.034 Ständer, Schwelle, BD L/K 33/98 Riegel 8/10 a≤62,5 Büro (Flur/ Speicher) F90 NRF 16,35m² LH U
27
10
1,075
5
90
Knauf W628 B.de S09
16
OK FFB +9,75 OK RFB +9,70
Bestand Riba 24/12,50 UK= +11,875
SM
135 20 125
325 16
135 175
1,25 1,25 1,25
97
BD 20/20
OK FFB OK RFB
45
295 625 625 625 625
24
96
98
+9,75 +9,70
WA B 30/18/30 6 23 UK +12,14
20
Stütze S235 HQ 60-4
20
A
95
+13,87 +12,52 +9,75 +9,70
BD B 25/25 23 2xBD KB L DN 350
195 23
Ausbau Stütze Pfeiler 2xWD L 30/30 S235 MW 24/24 OK= +12,67 HQ 60-4
WD E 20/40 1,02 OK= UK Rähmholz KB S DN 100 Achse +12,67 5 3,49 2xWD L 45/30 OK=UK Rähmholz
OK FFB +9,75 OK RFB +9,70
3,60
49
1,25
UK FirstPfette UK Pfette
Stütze NH C24 10/16 OG03.034-T01 Pfoster - 110/10
von +12,80 bis +12,93 von +12,74 bis +12,80
125
12
94
18
6,04
OK FFB OK RFB
91
1,01 2,135
5,12
LH ca. 2,00 m
UK Sparren +12,75
OK FirstPfette OK Pfette
2xBD KB S DN 150
5
2xBD KB H DN 60
LH ca. 1,00 m
10
24
1,17
So. Strg
2,53
UK RD UK FD
Fusspfette 12/8 2xBD KB H NH C24 DN 60
STB-Stütze 24/24 STB-Ringbalken C25/30 20/25 C25/30
93
115
18 STG 18/28
1,01 2,135
NA 100
1,25
24
Firstpfetten 16/16 NH C24 Ausbau OK +14,00 Pfeiler Brüstungpfette MW 24/24 16/18 NH C24 OK +13,35
WDSEDN 10/10 KB 100 Sprung UK FD OK=UK Rähmholz Achse 3,75 WD E 5/12 OK= +10,49
40
2xWD L 30/30 OK= +12,67 UK RD von +12,88 bis +13,97 UK FD +12,29
28,63
92
1,25
1,44
Sprung UK FD
3,67 2xWD L 45/30 OK=UK Rähmholz +12,285 UK FD
OG03.035 Büro (Flur/ Speicher) NRF 17,24m² LH U 17,03m
1,25
2,24
6
30
OG03.050-T01 StützeS235 HQ 60-4 - 1-
Stütze 10/16 NH C24
WD E 20/40 OK Pfette 16/18 OK +13,00 OK=UK Rähmholz
UK FD +12,285
3,51
24 18
Höhenangabe! UKD -0,13 bezogen auf Geschossdecke oder Treppenhaus
12
1,055
F90 A+M
12
2,26
12
3,51 2,00 BRH 75 3,26
2,26
12
2,26
125
3,61
24
12
12
3
3
625
45
1,785
175 45 1,381 50
OG03.036 F 01 2ZL1AL TYP 301
24
24
2,14
2,26 1,00 BRH 1,75
18
18
1,67
WD E 50/15
15
22
tte 10/20 UK +13,87 2/28 UK +12,52
1,57 3,555
125
Höhenangabe!
F90
2,36
24
11 81 14 1,325 BRH 80
OK FFB OK RFB 1,53
2,26 1,00 BRH 1,75 7,505
,345
+9,75 +9,70
24 BD KB S DN 150
OG03.041 Treppenhaus 2 NRF 5,47m² LH 11,17m U 96 15
5
+11,75
2,14
10
SB
STB-Stütze 24/ 24 C25/30
125
UK RD +12,54
UK Sparren +14,00 ca.
Oberlichter 7x Typ125, 1x Typ126 siehe Dachgeschoss
F90
OK FFB OK RFB
STB-Stütze 24/ 24 C25/30
24 18
OG03.041-T01 - 1-RS F90 A+M
OG03.043-T01 T30- 1-RS 8,825
VK RD 6,43
OK Mittelpfette
OG03.038 F 01 TYP 211
VK RD 96
3,75 KB S DN 100 M Achse ? 2xBD KB H DN 60
WD E 5/12 OK= +10,49
RA 100
4,70
2,55
OG03.036 Büro (Flur/ Speicher) NRF 17,24m² LH U 17,03m
2%
OG03.041 F 01 TYP 156
1,01 145 2,125
2xBD KB H DN 60
2,50
BD/DD KB S DN 200
1,135
UK Sparren +14,00 ca.
F90 24
OG03.040 Flur (Archiv) NRF 12,99m² LH U 22,59m
24
BD 35/35
Höhenangabe!
24
18 4 20
8 12 4 18
OG03.040 F 02 TYP 135
5 1,37
4,89 3,50
24
24
Wandscheibe NH C24 Ständer, Schwelle, Riegel 8/10 a≤62,5
Ausbau Pfeiler MW 24/24
2,32 OG03.051-T01 F90 T30- 1-RS
Höhenangabe!
KB S DN 100 Achse ?
Fusspfette und STB Aufkantung Abbruch
3,67
2xWD L 45/30 OK=UK Rähmholz 1,01 2,135
10,42m
2,50 StB-Stütze 24/ 24 C25/30
36 15 5
Pfoster 10/10
F90
783
4
LH U
2,38 KB K DN 100 Achse ?
145
855
1,83
12
1,51
125
1,01 2,135
24
1,30
12,33
2,295
14
5
5
BD B 24/116
OG03.037b-T01 BD KB S - 1- Höhenangabe! DN 100 KB L DN 200 2xBD KB H Achse DN 60 BD/DD KB S OG03.037b DN 150 WC-B (Flur/ Speicher)WD E 50/15 NRF 6,52m² OK=UK Rähmholz
WD E 50/15 OK=UK Rähmholz
HY
6
6
OG03.042-T01 T30- 1-RS
115
12
BD 20/20
STB-Stütze Bestand
2,72
14
Höhenangabe!
BD/DD E 20/80
Höhenangabe!
WD E 50/15 OK=UK Rähmholz 2,34
F90
F90
2xBD KB H DN 60
1,01 2,135
OG03.038 EDV Server (Flur/ Speicher) NRF 22,15m² LH U 19,42m
5
BD L 25/110
1,33
3,55
2x Ringanker 24/25 Bestand UK = 11,875 UK = +13,62
Tür Symbol?
F90
2,44
2,565
OG03.044-T01 T30- 1-RS
24
3
WD E 20/40 Ausbau OK=UK Rähmholz Pfeiler MW 24/24
4 18 20
3
OG03.037a Vorraum WC (Flur/ Speicher) 3 NRF 3,58m² 3 2,42 LH U 7,85m
1,01 2,135 1,055 15
24
Kopfplatte St 16/10/15 Fußplatte St 15/8/105
3,75WD E 50/15 OK=UK Rähmholz
16
13 2,045
16
Ausbau Stütze Pfeiler S235 MW 24/24 HQ 60-4
45
Stütze NH C24 10/16
31 24
1,30
2xWD E 50/15 OK= 1,30
OG03.049-T01 - 1-
13
OK FFB +9,75 OK RFB +9,70
14,285
125
WD E 50/15 OK=UK Rähmholz
OG03.033a 1,75 Flur (Büro) NRF 33,35m² Kopf-/ LH Fußplatte U 39,16m OG03.036-T01 Stütze OG03.035-T01 - 1- 1Gelenk S235 5x Oberlichter Typ215, siehe Dachgeschoss Pfette HQ 60-4
2,26 2,125
WD E 50/15 OK= +12,71 Wand Neu MW 1,51/2,175 2,23 BD E 50/20
3,75 Gelenk Pfette
29
625
155
50
Stütze S235 HQ 60-4
Mittelpfette BSH GL 24 h 16/24 UK +12,34
von +12,88 bis +13,97 von +12,84 bis +12,90
OG03.038-T01 Ausbau T30- 1-RS Pfeiler MW 24/24
Stütze S235 HQ 60-4
WD E 50/15 OK=UK Rähmholz
F90 A+M
Aufzug 1,10 x 2,10
1,205
1,01 2,135
2 23
35
2,54
OG03.050 Büro NRF 13,86m² LH U 15,30m
23
OG03.051 Lager 3,56 (Putzraum) NRF 5,28m² LH U 11,52m von +9,98 bis +12,88 von +10,47 bis +12,73
15
Wandscheibe NH C24 Ständer, Schwelle,10/10 Riegel 8/10 a≤62,5
OK STB Aufkantung +10,00 OK UZ +9,77
F90
3,51
855
46
UK RD UK FD
+8,145 OK FFB +8,075 OK RFB
15
4,665
LH ca. 1,00 m
+11,165 +10,955
75
5
75 23
Brandwand
WD E 5/12 M OK= +10,49
UZ Stb 24/45 UK +10,895
OK Fusspfette +10,14
Knauf W628 B.de S09
10
18 15
46
16
16 29
So. Strg
3
STB Aufkantung B Sparren NH C24 8/20, a=68
F90
OG03.049 Büro NRF 14,50m² LH U 15,26m
125
OG03.048-T01 - 1-
4
VK RD
Fusspfette Neu 12/14
OG03.001 F 01 TYP 140
24
3,15 3,58
Brandwand
4
1,14
2
Sturz Stb 49/25 UK +11,875
63
7
BD 15/15
625
2,65
1,01 2,135
10
Verkleidung des Daches innenseitig F90A
2,65
625
2,553
1,175
BD 15/15 2,83
29
50
Sprung UK FD
F90
UK RD UK FD
1,25
18 18 15
45
10
10
13 475
18 15
395
22 15
45
125
F90
585
OG03.044 L 01 TYP 134
OG03.043 Registratur (Archiv) NRF 27,22m² LH U 29,25m
1,01 2,135
OG03.048 von +12,83 bis +12,91 von +12,77 bis +12,83Büro NRF 14,55m² LH U 15,70m
1,275
775 1,94 BRH 100
OG03.050 F 01 2xBD KB H 2ZL1AL TYP 124 DN 60
Estrich ein schneiden 3,795 WD E 10/10M OK=UK Rähmholz BD 25/25
625
Stütze C25/30 Neu 24/24
2x Ringbalken StB, Bestand Anschluss an Stütze
125
BD KB S DN 150
125
1,25
1,275
BS 15/450/5
STB Aufkantung!!!
46
STB Aufkantung B
24
115 125
46
+12,42 UK FD WD E 50/15 OK=UK Rähmholz
Fusspfette B 8/10
1,56
3,24
4,885 115
11
5
WD E 10/10 OK=UK Rähmholz
OK FFB +9,75 OK RFB +9,70
Stütze S235 HQ 60-4
24
WD E 50/15 StB-Stütze OK=12,71 Bestand
Sparren 8/16
1,25
2,83
UK RD UK FD
Stütze S235 HQ 60-4
1,885
OK FFB +9,75 = +107,80 ü.NN OK RFB +9,70 24
1,25 33,735
1,25 1,25 1,25
26,13
50
16
UK RD von +12,88 bis +13,97 UK FD +12,50
STB Aufkantung!!!
1,25
46
4,64
LH ca. 2,00 m
HEA 180
OG03.044 Gesundheit (Archiv) NRF 10,29m² LH U 14,67m
98
99
3,515 M
3,75 OG03.047-T01 - 1-
16
Gelenk WD E 50/15 Pfette OK= +12,71
BD 25/25
96
97
125
1,835
OG03.039 Flur (Büro) NRF 11,79m² Abbruch Ringanker LH 5 U 16,29m Stb 11 /25 50 10 UK +11,875 F90
Schwelle
15
5 185
3,75
20
OG03.039-T01 - 2-
16 29
Stütze S235 HQ 60-4
WD E 50/15 OK=12,71
HEA 180
30
RA 100
WD E 5/12 Randpfette Gaube 16/16 OK Rohbau Brüstung +10,75OK= +10,49 NH C24
1,01 138 2,135
16
50
1,35
95
2,478
2,50E 50/15 WD OK=UK Rähmholz 2,836
OG03.046-T01 - 1-
Stütze 10/16 NH C24
4,88
STB Aufkantung B
VK RD
Fusspfette B 10/8
1,54 22
85
125
29
1,25 50
BD KB S DN 150
18
RA 100 BD KB S DN 150 2xBD KB H DN 60
625
1,328
50
2,065
5,13
OK STB Aufkantung +10,00 OK UZ + 9,77 1,25 495
OG03.047 Büro NRF 14,55m² LH U 15,70m
UK Sparren +12,90 UK FD +12,50
1,01 2,135
So. Strg
2,50
45
OK Fusspfette +10,08
2,83
1,00
OG03.049 F 01 2ZL1AL TYP 315
BD KB S DN 150
775 1,94 BRH 100 2,35
125
2,75 1,94 BRH 100
575
18
3,80
1,25 1,25
18 15
OG03.046 Büro NRF 24,61m² LH U 20,70m
24
85
1,745 OG03.045 F 01 2ZL1AL TYP 153
3,70
WD E 5/12 OK= +10,49 WD E 10/10 OK=UK Rähmholz 46
1,00
625
46
855
5
2,652
365
163
3,195
1,655 1,85 BRH 75
Türöffnungen 30
2xBD KB H DN 60
3,955
365
1,00
OG03.048 F 01 2ZL1AL TYP 315
NA 100
16
M 2,41 M 5 Gaubenwand NH C24 WD E 5/12 OSB3 Beplankung OK= +10,49 Höhenangabe! Stiel 8/16, a = 62,5 WD E 10/10 Horizontale Rippen, NH C24, 16/8 OK=UK Rähmholz Schwelle, NH C24, 16/16 46 2,83 46 46
3,605
UK FD +12,162
10
LH ca. 1,00 m
Firstpfette 12/8 NH C24
14
Sparren NH C24 8/20, a=68
2,75 1,94 BRH 100 3,625
125
2,75 1,94 BRH 100
NA 100
10
5
1,00
2,75 1,94 BRH 100 3,625
1,00
45
RA 100
16
OG03.045 Teeküche (Büro/ Flur) NRF 13,39m² LH U 15,52m
11
2xBD KB H DN 60
18 15
Fusspfette Neu 12/14
92
1,25
775
2xBD KB H DN 60
2,651
M
G
A
1,25
3,535
125
OG03.047 F 01 2ZL1AL TYP 315
Fusspfette 12/14 (12/8) NH C24
STB Aufkantung!!!
91
1,25
62
23
1,00
2,75 1,94 BRH 100
3,94
4,115
BD/DD KB S DN 150 WD E 50/15 OK=UK Rähmholz Mittelpfette OK 12,985 GL 24 h 16/24 cm
Konsole Auflager Mittelpfette UPE 180 OK UPE= u. OKFF 4x FAZ II 12/20 M BD 25/25
3,40
1,01 2,135
OG03.046 F 02 2ZL1AL TYP 315
2xBD KB H DN 60
94
1,00
4,745
5 175
OG03.045 F 02 2ZL1AL TYP 115
2xBD KB H DN 60
19
OG03.039-T02 - 1-
155
3,75 M
475 85
22
125
Wandscheibe NH C24 Ständer, Schwelle, Riegel 8/10 a≤62,5
3,39
Stützen 12
2,75 1,94 BRH 100 3,625
RA 100
2xBD KB H DN 60 18 15
VK RD
395 625
1,09 125
625
2,255
625
20
LH ca. 2,00 m
13 1,885 2,135 1,885
BD S 20/10
2,57
24
24
24
1,345
9 365
Bauteilfuge
93
1,00
2,75 1,94 BRH 100
OG03.046 F 01 TYP 124
BD KB S DN 150 Schwelle min. 20cm über Achse 82 überstehen lassen (Lastverteilung)
885
9,995
1,00
STB Aufkantung!!!
24
Türen
Achsen Stüzen
N
775 1,94 BRH 100
VK RD
625
24
8
16
16 1,86
1,915 1,85 BRH 75 1,86 14 3,43
1,25 1,25 1,25
90
1,175
2,75 1,94 BRH 100 6,10
10
STB Aufkantung B
88
N
68 14
3,63
7 1,25
68
3,63
VK RD
89
1,00
16
68
24
25 Holz-/ Stahlstützen
87
775 1,94 BRH 100
LH ca. 1,00 m
635 1,25
M 86 M
68
1,30
Sparren NH C24 8/20, a=68
625
3,98
3,98 3,47
7,605
1,885
68
24
24
40
11
3,555
4
OK Fusspfette +10,14
24
45
18
24 18
18
41 G L
1,25
20,485
3,445
8
1,65
1,025 16
1,025 1,65
2,50
16
24
OK STB Aufkantung +10,00 OK UZ + 9,77
18 18 Wandscheibe
Innenmaß + Fassade
18
18
575 13
2,50
2,505 2,50
Öffnungsmaß + Rohbaumaß
615
G
1,25
20,15
3,865
Fassadenmaß
H
1,25
F90
3,975
Teilmaß Außenkante
K
1,25
27,68
Gesamtmaß
J
1,25
63
H
18
1,25
64
65
8
635
66
3,94
615
67
165
1,25
68
Bestand Riba 24/12,50 UK= +12,00 1,885 25 24
30
Achsenmaß
69
2,635
R
74
505
75
115 265 25
76
50
77
1,10
Q
78
235
79
4,25
P
80
54
81
24 18 24
82
18 24
83
Bauteilfuge
O
Sprung OK RFB
84
Brandwand
3,155
3,15
Innenmaß + Fassade-Rohbau
85
12
3,51
INGELHEIM RATHAUS 1,25
Achsenmaß Teilmaß Außenkante
95
Fassadenmaß
95
1,25
1,25
1,25
18 95
628
18 23
635
1,25
1,25
1,25
615
635
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
2,212 1,105
75 23
5,28
2,42
2,40
2,22
STB Decke
28
2,385
2,45
2,42
5,28
3,83
2,42
2,22
2,33
5,28
3,308
DG01.001 F 01 TYP 141
1,25
18 23
UZ Stb 24/45 UK +12,50
75
20 STG 1625/30
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
UK RD UK FD
68
68
Fusspfette Neu 12/14
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
63
60
17
3,31
23
18
75
6,115
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
68
369
2,38 50 ÜFFB EG 13,28
18
12
2,32 50 ÜFFB EG 13,28
2% Bitumenbahn 2lagig, besplittet
1,462
2,019
24 133
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
625
133 24 253
2,26
24
625
625
24
3,51
24
3,51
24
3,51
115
F90
1,625 1,01
24 40
UK WAT +15,125
165
625
2,25 1,215
625
625133
24 16
OK Fusspfette +13,33 OK STB Aufkantung +13,25 OK UZ + 13,02
2,01
49
2,01
6,01 24
2,26
24
3,51
24 16
2,10
F90 Beplankung
21,795
1,25 1,25 12
12
A
13,665
11,985
1,25
OK Fusspfette +13,33 OK STB Aufkantung +13,25 OK UZ + 13,02
1,25
12
3,75
1,25 26,13
97 1,25
12 1,755
625
16,85
98 3,75
99
12
1,25
12
1,07 BRH 3,05
1,755 1,07 BRH 3,05
625
96
100 1,25 1,25
102
1,25 2,38
1,755 1,07 BRH 3,05
103
104
E
12
1,25
1,755 1,07 BRH 3,05 12
,81 5
101
103 OG03.042 F 07 TYP 125
625
Terrasse 2OG.
95
3,75
1,755 1,07 BRH 3,05
Mittelpfette 22/26 OK=+12,80
OG03.042 F 05 TYP 125
1,25
625
10
OG03.042 F 06 TYP 125
BD KB S DN 150
625
94
1,755 1,07 BRH 3,05
OG03.042 F 02 TYP 125 OG03.042 F 03 TYP 125 OG03.042 F 04 TYP 125
1,25
99
625
93
1,755 1,07 BRH 3,05
OG03.042 F 01 TYP 125
1,25 1,25 1,25
26,135 1,25 1,25
98
625
92
2,52
94
96
625
45
Terrasse 3OG.
1,25
2,38
95
91
24
4,82 7,585
625
6,49
2,26
OG03.040 F 01 TYP 126
1,25
93
625
18
5,67
6,83
3,51
1,25
1,25
92
5,67
11,708
24
1,90
2,26
1,13
24
16
Attika Fertigbau OK= +13,515Rohbau OK= +13,35
Sieh Detail DA 10
24 1,25
91
1,25
Abbruch 4 STG 20/23
375 625
18,39 2,14
24
24
BD KB S DN 150
BD KB S DN 150
4,02
18,09
G
OK Wand +14,34
Auflasserpfette nach angaben Statiker
20
1,25
N
625
OK FFB + 12,98 OK RFB +12,74
6,02
2,81
2,26 1,30 BRH 1,45
Terrasse DG
2S 15 TG. /33
3,074
23
4,82
24
UK RD UK FD
4,09
12
2,26 1,30 BRH 1,45
201 20
Wand
2,38 50 ÜFFB EG 13,28
4,885
1,25
12
Wand
2,38 50 ÜFFB EG 13,28
Sparren 10/20, a= 62,5
1,25
12
OK Wand +14,34
OG03.033a F 01 TYP 215
STB Neu Riba 24/25, C25/30 OK +13,00 - +13,09
7,605
2,32 50 ÜFFB EG 13,28
1,32
4,65
OG03.033a F 02 TYP 215 18,03
Bestand Riba StB, C25/30 24/25 OK +10,262 - +12,716
OG03.033a F 03 TYP 215
Wand
OG03.033a F 04 TYP 215
Fusspfette, NH C24,12/8, OK= 12,83 STB-Ringbalken, C25/30, 20/25, OK= 12,75 STB Stutze C25/30, 24/24, OK= 12,75
33,715
1,14 2,10
ÜZ Stb OK +13,35 OG03.033a F 05 TYP 215
18 30 15
1,25
24
VK Rohbaudecke
M
24
24
125
17 24
55
27
1,25
24
24 25
68
1,99
1,99
68
F90
DG01.002 F 01 TYP 127
DG01.017 F 01 TYP 127
245 26
68
5,95
Decke neu
M
F90 A+M
STB Neu Riba 24/25, C25/30 OK +13,00 - +13,09
68
23
2,32
So. Strg
Bestand Riba StB, C25/30 24/25 OK +10,262 - +12,716
68
F90 A+M
Oberlicht Typ126, siehe Dauchaufsicht
ÜZ Stb 24/125 UK+15,236
125
Sparren 10/20, a= 62,5
68
Wand/UZ Sprung + 15,835 Knick +15,777
F90 A+M
F90
DG01.001-T01 T30- 2-RS
105
68
89
1,25
2 D
505
DG01.003-T01 T30- 1-RS
WEISS
155
68
2x Ringanker 24/25 Bestand UK = 11,875 UK = +13,62
1,25
1,01 2,135
Mittelpfette 26/30 OK +15,93
= +111,05 ü.NN+13,00 OK FFB +12,95 OK RFB 3,64
24
2,01
68
3,10 IPE 160 UK +16,31
135
WD neu 76/62
F90
105
68
88
104
2,235
24 681
Decke Sprung UK +16,985
2,115
68
24
Abbruch Überfahrt
185
68
Aufzug 1,10 x 2,10
125
68
n 68
10,40
102
23
von ca.+17,15 bis ca. +15,60 UK RD +15,50 UK FD
1,12
2,51
2,61
4,65
16 24 369
spe
1,845
101
75
BD KB S DN 220
Bereich mit photovoltaik anlage gemäss angaben firma Gedea
2,425
dri
1,86
1,965
2,73
1,25
Bereich mit photovoltaik anlage gemäss angaben firma Gedea
Win
87
100
2,265
20
615
40
Mittelpfette, BSH GL 24 h, 16/24 OK +12,95
635
Mittelpfette, BSH GL 24 h, 16/24 OK +12,95
Firstpfette, NH C24, 16/16, OK= 14,00 Pfette, 16/18, OK= 12,93
97
DG01.001 Treppenhaus 1 NRF 32,49m² LH 40,90m U
24
23
2,885
18
Brandwand 2,635
Betonsteindeckung 30° (Frankfurter Pfanne)
UK RD UK FD OK FFB +13,80 OK RFB +13,75
18
40
M 86 M
SM
Wand
Sparren 20/20
Sparren 8/20, a= 62,5
7,565
4,23
Sparren 8/20, a= 62,5
Sparren 8/20, a= 68
n ris pe W
ind
Sparren 8/20, a= 68
30° Betonsteindeckung (Frankfurter Pfanne)
2% Bitumenbahn 2lagig, besplittet
Wand OG3
A
SB
75
63
24
63
75
63
75
63
165
63
165
63
1,73
73
52 1,31
2,395
63
2,28
75
50
13
24
10,025
60
Sparren 20/20
2,50 1,885
7,58
3,66
Mittelpfette, BSH GL 24 h, 16/24 OK +12,95
A
von ca. +13,35 bis ca. +15,55 -
OK FFB +11,395 OK RFB +11,325
369
16 245
54
68
2,885
45
68
45
16
68
F90 A+M
68
SM
30 68
1,495
68
115
68
1,10
68
1,04 115 233
68
G
G
BD KB S DN 150
115
681
1,10
68
Brandwand
68
925
5,04
45
68
Fusspfette Neu 12/14
20
20
68
30 16
16 24 369
L
G
125
STB Decke
UZ Stb 24/45 UK +12,50
18 305
2,50
2,50
5,30
3,89
16 24
H
G
3,568
1,25
3,308
F90 Beplankung
K
90
1,25
1,17
8,38
30
20,285
3,91
Abbruch
N
1,25
7,595
75
1,25
27,48
Fassadenmaß
G 41
1,25
STB Decke
615
3,887
2,50
1,25
1,813
1,25
Gesamtmaß Teilmaß Außenkante
1,25
3,175
3,175
28
Achsenmaß
J
1,25
18
Öffnungsmaß + Rohbaumaß Innenmaß + Fassade
1,25
INGELHEIM RATHAUS 86 J
K
41
2,50
2,50
40
1,885
615
635
90
G
G
A
M
87
88
89
N
91
92
93
94
39
38
37
36
35
34
33
32
31
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
Firsthöhe Bestand +17,78 = +115,83 NN
3,25
3,25
3,25
1,81
Firsthöhe Bestand +17,05 = +115,10 NN
+15,777
1,44
UKRD Aufzug +15,90 8
Firsthöhe Bestand +14,53 = +112,58 NN
151
25
1,1 5°
a=
H nN rre4.OG03.014 Foyer
3,08
68
+12,42
90
16
2,535
2,125 5
STB Stüze Neu
29
45
UKUZ +9,25
20 4 18
1,7825
45
1,8725
15
18
+7,25
+6,45 21
51 80
+6,29 +6,00
UKUZ +6,00
115
3,04
Füllholz 16/17 UKUZ OK Pfette 16/18 +2,75 =+2,75 + 12,93
4,845
15
16 16
+4,00
OG01.034 Büro
21
+3,20
Neu Ringbalken in Achse 63, StB, C 25/30 24/25 UK= von +12,763 bis +12,843
+3,04 +2,75
UKUZ +2,75
OG02.002a
OG02.033
36
3,3488
29 16 5
21
2,64
28
10
OK FUN -4,00
2,0175
45
2,5225
OG02.035
45
OG02.032
3,25
UK FUN -3,70
63 125
+9,25 UK UZ UKUZ +9,25 +9,25
2,00
29
16
5
5
2,125
2,125
2,535
18
4.OG02.015 4.OG02.015 Dachterrasse Dachterrasse
25 82
82
3,04
267
115 2,125
8 41 8
1,885 2,39
+9,25
20 4 18
1,7825 1,8725
15
18
UK FUN -4,50
+7,25 +7,25 OG02.034c
15
4.OG02.014 +7,30 Foyer
2,35
2,045
18 18
+9,54
+9,54
+9,25
3,04
20 20
+9,25
2,75
20
UKUZ UKUZ +9,25 +9,25
115
4,46
51 27 16 2 5
+9,25
+9,25
2,72 2,64
68+2,75 a =125 215
18
2,57
2,75
+9,54 UKUZ +9,25 UK FUN -3,00
+9,25
63
Schacht +7,15
0,
/2 ,8
Sp
4,64
+8,99
OK FF +7,52 = 105,57 NN
+3,04
+13,24
4,64
+12,92 +12,95
+9,52 +9,47 +9,14 20
/25
41
24
UG ca. -4,30
Schacht +7,80
+14,53
11
+13,00
3,05
8
559 12
+12,50 1,98
8
115
16 24
53
5,89
+9,14 OK FF +8,72 = +106,77 NN
18 20 1,95
12
24
20 4
2,125
1,95
OK WEG +9,18 = +107,23 NN 70
43
7
1,57
3,
63
1,25
1,28
25
1,00
80
18 24 75
+6,00
115
1,12
25 20
1,64
+10,75
+9,70
16 5
1,885
10
87 75
30
75 35
12 14 14
Luftraum
65
OK FFB -1,05 = +97,00 NN
70
2,78
1,95
OK FFB EG00 ±0,00 = +98,05 NN
e6
+9,77
OG02.034c WC
125
1,18
16 80
3,06
824 8
2,885
+2,75
2,125
10
165 UKUZ
Ac
4 +13,35 C2 Achse Andruckleiste +13,33 NH 24 Brüstungs-1,885 +13,19 63 80 60 20 16 en pfette OK RiBa +13,09 2% OK RiBa+13,09 +13,05 arr WD E 50/15 NH C24,16/18 UK= +13,00 24 +12,65 +13,15 1,885 125 4,755 24 16 Sparren NH C24, 10/20, a= 62,5 Fusspfette, NH C24, 12/8, OK= + 12,83 AchseOK= 60 + 13,28 Mittelpfette Füllholz 16/17 Ringbalken, StB, C 25/30, 20/25, UK +12,50 BSH GL24h 25mm 3 KB K Ø 100 200 GK Dampfbremse +12,79 450 450 OK Pfette 16/18 400 300 300 16/24 UK= +12,62 3 KB K Ø 100 +0,75 +12,72 +0,70 +12,30 = + 12,93 WD L 110/30 +12,50 EG00.058 OK= + 12,95 WD L WD L Achse +12,67 UK RiBa EG00.034WD E 50/15 WD L 160/30 UKUZ +12,50 OK= +12,76 WD L 77/30 EG00.036 UK RiBa 110/28 5cm Promat 4 +0,40 Lager / Fundbüro Flur Büro +12,40 +12,39 OK= +12,78 UK= 30/30 +12,50 +12,4963 KB S Ø 170 Achse +12,61 OK= +12,71 WD L 40/30 Achse UK FD +12,25 WD L 30/30 +12,285Achse +12,705Achse 60 UK= +12,609 Achse +12,47 +12,49 Ab KB UK= S Ø 170 UKUZ +12,10 +0,00 bru Achse 60 -0,10 -0,10 +12,56 Achse 60 +0,25 Achse +12,63 chB +12,10 Sturz 49/25 Sturz 49/25 UK Riba D esa ta 90 16 1,84 16 1,65 3,09 20 4 18 chn OK FUN -0,40 UK= +11,875 UK= +11,875 12,50/11,50 dR 4.OG03.014 ing +11.875 -0,28 -0,28 b R Foyer alk Drainage Bestand ineg n b Stütze Stütze ainlk DN 100 OK FUN -1,05 A enc NH C24 NH C24 hBs OG03.002 ein6 OG03.032 10/16 10/16 A3c, +10,55 Flur UK FUN -1,05 Besprechung h5s5 e, 26 43/2 OG03.033a , 25 OG03.036 4/2 Flur 5 Büro Stütze Stütze 1,57 12 571 175 1,885 2,50 125 4,755 20 22 S235 S235 BD L STB Stüze +9,77+9,77 +9,75 QH 60-4 QH 60-4 45/100 +9,70 +9,75 +9,70 +9,68 +9,67 Neu 15
20 18
75
29 16 20 43
17
1,11
15
33
33 20 28 16
12
2,286
50 1,88
45
2,00
1,02
30°
5
7 43
2,74
3,25
12
4 18
5°
Achse Andruckleiste +13,36
1,435
UKUZ +6,00
1,885
Firstpfette NH C24 OK Rohbau 16/16, OK= + 14,00 Bestand+14,34
+3,00
15
2,0175 2,5225
OG02.035 WC-B
2,39
8 OG01.031 Flur
+3,25
+3,04
B in
+9,54
2,125
29 16 5
OG01.053 +15,236 Büro
en
+9,25
5
1,91
80 OK +15,78 125 63
+3,20
63
+15,97
OK +15,56
+15,64 4,34 +15,42
+3,20
BD L 45/100
+9,25
125
+6,00
75
3,67
+4,00 +15,45
UKUZ +6,00
OK +16,085
+15,777
45 +15,63
G
alk
hs
+6,29
+17,135
115
15
1,885
OG02.033 Flur
2,125
2,75
11,20
4,52
16
185 217
2,00
+15,93 4 20 60 16 Mittelpfette 26/30
gb
+6,55 OK Terrasse
+6,00
90
+6,00
Rin
3,04
2,75
31
50
1,45
UKUZ +6,00
UKUZ +9,25
+9,25
4.OG02.015 Dachterrasse
+17,47 +6,50 +104,52 +6,45 +6,50
OK RiBa+13,09 +13,05 +13,00 Fusspfette, NH C24, 12/8, OK= + 12,83 Ringbalken, StB, C 25/30, 20/25, UK +12,50
OG03.036 Büro
Stütze S235 QH 60-4
2,39
+17,78
OG02.056 Büro
482
2,75 75 7 43
4.OG02.014 Foyer
+5,79
18 30
2%
25mm GK Dampfbremse 3 KB K Ø 100 WD L 110/30 Achse +12,67 UK RiBa OK= +12,76 WD L 77/30 +12,49 Achse +12,61 OK= +12,71 Achse Ab KB S Ø 170 bru +12,56 Achse +12,63 ch Da 3,09 20 ch
16
2,00
UKUZ +9,25
125
+6,29
OK FFB OG01 +3,25 = +101,30 NN
1,65
+9,54
4,25
OK FF +6,64 = 104,69 NN +104,54 Brandsperre
UKRD Aufzug +15,90
WD E 50/15 OK= +12,784 +12,285Achse +12,705
Stütze NH C24 10/16
OG03.033a Flur
Stütze BD L S235 35/70 QH 60-4
+9,25
+9,14
+7,25
Schacht +7,15
+4,83
450 300
16
+9,25
Stütze NH C24 10/16
63
+4,75
450 300
2,75
Gaubenwand NH C24 OSB3 Beplankung Stiel 8/16, a = 62,5cm Horizontale Rippen, NH C24, 16/8 Schwelle, NH C24, 16/16 +9,75 +9,75+9,70 +9,67
18 4 20
+6,48 OK WEG +6,48
OK RiBa +13,09
Sparren NH C24, 10/20, a= 62,5 200 400
80
UKUZ +9,25
OK FF +7,52 = 105,57 NN
OK FFB OG02 +6,50 = 104,55 NN
+13,19
Sturz 49/25 1,84 UK= +11,875 16
2,045
OG03.049 Büro
+9,54 +9,47
7,63 +12,50
Schacht +7,80
Achse Andruckleiste +13,33
21
2,67
6S
+10,75
+10,15
+8,99
3,25
8 41 8
0,
8/2
29 16 5
313 275
567 50
C2
Neu Ringbalken in Achse 63, StB, C 25/30 24/25 UK= von +12,763 bis +12,843
8
pa
Fusspfette NH C24, 12/14 OK= + 10,14
21 25 288
+9,14
3,13 WILHELM-LEUSCHNER-STRASSE
3,25
16
43
16 3 24 13 11
4,
1,59
3,36
25 7 43
20
OK WEG +9,18 = +107,23 NN
WD E 50/15 +12,72 UK= +12,595
Randpfette NHC24 16/16 OK +12,845 +12,39 UK +12,685
2,221
4,78
3,12
2,96
+12,92 Sparren NH C24, 8/20, a= 62,5
+10,75
65
2%
+13,09
Luftraum
OK FFB OG03 +9,75 = +107,80 NN
68 a= 0, 8/2 4, C2 Brüstungs+13,24 NH n e pfette arr NH C24,16/18 Sp OK= + 13,28 Mittelpfette Füllholz 16/17 BSH GL24h OK Pfette 16/18 16/24 = + 12,93 OK= + 12,95 WD L 5cm Promat 30/30 WD L 30/30
8
Füllholzer 16/16,5 OK= + 12,99
41
1,29
70 15
Achse Andruckleiste +13,36
10
9
47
1,33
1,33 9
OK FFB DG01 +12,94 = +111,05 NN
+14,53
30°
Firstpfette NH C24 16/16, OK= + 14,00
8
1,1
43
L
5°
50
G
1,1
2,75
H
-0,35
INGELHEIM RATHAUS
13
35
+14,53
OK First
Pultfirststein
75
K
30°
Fensterbank Aluminium
Aluminium Blech
22
1
3
Flachdach-Aufbau v.o.n.u.: Bitumenbahn 2lagig, besplittet 22 mm OSB3-Beplanung 60/80 m Lattung für Hinterlüftung Unterspannbahn Sparren, NH C24, 8/ 20 20 cm Zwischensparrendämmung Mineralwolle, nichtbrennbar, MLG 035 18 mm OSB3- Beplankung (aussteifende Scheibe gemäß Statik) Dampfsperre
Kabelkanal 66 x 170 30°
Sockelleiste
32
16
Teppichboden
5
23
Heizkörper 157 x 300
+9,70
57
+13,28 OK +13,18 Brütungspfette
Sperrschicht
+9,75
+13,33 Achse Andruckleiste
Flüllholz NH C24 16/17
15
+10,00
25
168
7
3
+12,93 OK Pfette
2
4 4
12 10
4 4
VKStütze
20 8
12
mtp architekten gmbh wilhelm-kobelt-straße
1
8
20
8
20
DATUM
GK-Wand 16 cm Unterkonstruktion 2xCW Profil 50 mm VKGK-Wand
06.12.2021_ vm
Modernisierung und Erweiterung BAUVORHABEN Rathaus Ingelheim
UK abgehängte Decke
abgehängte Decke v.o.n.u.: Abhänger Installationsraum Unterkonstruktion 2x 12,5 mm Gipskartonbeplankung
HKStütze 08
08 25 25
WD L 30x30
Wandaufbau v.a.n.i: Natursteinplatte 4cm Hinterlüftung 4 cm Dämmung 10 cm StB Wand (Sturz) 4
2
Kopfplatte B1 160x100x15
5
6 125
175
25 25 HKGK-Wand
5
20
29
Pfette NH C24 16/18
Stütze S 235 QH 60-4
2% Gefälle
2
17
2
Fusspfette NH C24 12/14
6
+10,14
Brüstungspfette NH C24 16/18 2 3
1,00
+10,15
Firstpfette NH C24 16/16
20
Fliesengitter Drainlet-Notablauf DN70
Kniestock/ Gaubenwand v.a.n.i.: OSB3-Platte für Feuchte geeignet Dampfsperre Zwischendämmung 16cm Vertikale Pfosten, NH C24, 8x16 Horizontale Pfosten, NH C24, 8x16 Dampfsperre Gipskartonbeplankung 2x12,5
16
3 15 3
8
1
25
33
245 25
Zuluft-Nachströmung Aeromat DS2 250 x 100 x L
16
10 15 7 3 15
3
+14,00 OK Firstpfette
18 40
Alu-Fensterbank
17
275
Metallfassade v.a.n.i.: Metall Aluminium Hinterlüftung Wärmedämmung 13 cm Dampfsperre Firstpfette NH C24, 16/16 12,5/ 25 mm Unterkonstruktion 2x 12,5 mm Gipskartonbeplankung
Führungsschiene Raffstore
+10,75 10
12
18
16
55
39
47
15
5
40
Pultdach v.o.n.u.: Betonsteindeckung (Frankfurter Pfanne) Lattung und Konterlattung 30x50mm Unterspannbahn Zwischendämmung 20 cm, (Mineralwolle, nicht brennbar MLG 035) Sparren NH C24 8/20 cm OSB3-Platte (für Feuchte geeignet) Dampfsperre
11
1 4 4
Pultdach v.o.n.u.: Betonsteindeckung (Frankfurter Pfanne) Lattung und Konterlattung 30x50mm Unterspannbahn Zwischendämmung 20 cm Sparren NH C24 8/20 cm Dampfsperre 25/40 mm Unterkonstruktion 2x 12,5 mm Gipskartonbeplankung
12
24 24
37 68
DT_ARC_03
3
39 M 86 25 13 16 25 13 8 8 8 0 16 25
Schattennut
27.10.2021_
Modernisierung und Erweiterung
INGELHEIM RATHAUS Schnitt I-I
Schnitt K-K
15 17 7 11
2,00
1,46
18
505
16
2,055
17 24
1,885
26
1,885
24
1,885
24
bis
12
+11,85
Riba 12,50/11,50 UK= +11,875
147
24 20
266 714
2663 7137
80 25 1,30
18 30
Bestand Riba StB 24/25
1,45
DG01.001 TH1
Wand MW d=24
OG03.002-T11 T90- 2-
OK UZ +13,35
+13,00 +13,15
21 16
+12,74
+12,79
+12,30
+12,58
75
33 21 16 5
+12,95
+12,25
+12,10
Ringbalken 24/12,50 UK= +11,875
UK UZ +11,85
OG03.002 Flur +10,20
+9,52
+9,33
+9,25
16 7
+9,49 +9,54
+9,68
+9,70
+9,52
+9,54 +9,33
+9,25
+9,25
2,26
16
2,16
30
2,125 19 16
16 7
+7,00 +6,80 +6,60 +6,24
+6,27
OG01.002a Foyer
+6,29 +6,08
+6,00
+6,00 12
30
2,16
16
2,26
IPE 400
UZ/ÜZ Stb 24/125 UK +6,00
24
+6,00
OK Brüstung Neu +4,25 OG01.031 Besprechung
+2,75
+2,75
16 7
27 16
+3,70
+3,70
+3,25
+3,18
+3,18
+3,00 +2,75
625
+3,02
+3,00 +2,75
625 27
27 16 7
6,50
+3,18
+2,75
+6,45
+6,50
+6,29
+3,25
+2,64
546
+6,50
2,125
OG01.030-T05 T90- 1-
OG01.031 Besprechung
2,01
Wand MW d=24
1,885
2,75
24
+6,00
+6,00
+6,43
625 27
+5,89
181
+6,29
+6,08
365 OG02.032 Warten
+6,43
+6,24
HEA 450
3,75
1,13
2,90
+6,50
+6,50
OG02.002a Flur
27 16 7
10 649
+7,00 +6,80 +6,60
2,75
Wand MW d=24 OG02.032 Warten
2,90
2,00
+9,25
+9,75 +9,49
19 16
+9,68
625 27
80
+9,70
27 16 7
+9,75
+9,70
+10,20
+10,05
+10,05
+9,14
11
17
24
375
UZ 24/61,50 UK= +12,125
sta
+9,75
2,00
15
2,90
K
,O
/25
24
17
2,125
RiB
25 29 16 5
+12,25
,71
2,50
25 20 1,653
a,
nd
+12,79
+12,58
UK UZ +12,10
6
Be
+13,00
+12,95 +12,74
UK FD +12,50
2
7
11
1,559 DG01.001 TH1
+13,15
+12,30
6
1,44
Bemassung Prüfen FK20210917
1,50
17 24
21
OK RiBa +13,09 Sparren NH C24, 10/20, a= 62,5
,2 10
20
+13,35
2%
UK RiBa +12,49
1,00
1,30
2,055
201
OK RiBa +13,00
85
20
+13,09
505
DG01.001-T01 T30- 2-RS
16
1,45
505
1,50
899
20
11
25 80 25
25 1,30
1,30
+15,75
OK Rohbau Bestand+14,34
+14,53
2,105
17
10/12 80
OK Rohbau Bestand+16,00
+15,968
10/12
87
4637 2663
266 714
266 1,764
Bestand Riba StB 24/25
1,31
575
17
14
10
10
14
Firsthöhe Bestand +17,78 = +115,83 NN
24
26
255 16
2017 7 11
UZ Stb 24/45 UK +2,73
+2,75
UZ Stb 24/45 UK +2,73
+2,75
UZ Stb 24/45 UK +2,73
+2,13 Sprung UZ In Achse 53 Noch in Bearbeitung FK20210917
2,125
EG00.002 Empfang
14
-0,14
15
16
Mit Statiker Prüfen Abbruch _FK 20210917
+0,00
35
26
14
16
+0,00 16
-0,14
14
EG00.005 Flur
EG00.004-T02 T90- 2-RS
2,265
EG00.002 Foyer
2,75
Wand MW d=24
-0,55 Pos. Stuze Prüfen FK20210917
3,7995
Mit Statiker Prüfen Abbruch _FK 20210917
3,20
3,80
3,7995
Mit schalpläne Prüfen _FK 20210917
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
30
31
32
33
34
35
36
37
38
39
95
94
93
92
91
N
89
88
87
M
90
86
635
615
40
1,885
2,50
18
18
18
18
-4,10
2,50
1,885
41 L
G
615
635
41 H
H
G
1,25
40 L
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
1,25
39
38
37
36
35
34
33
32
31
30
29
28
M
87
88
89
N
91
92
93
94
95
96
97
86
90
INGELHEIM RATHAUS 1,77 5,05 1,22
85
3,48
3,83
7,56
3,02
3,10
4,33
61
1,02
3,93 1,46
3,86
1,58
1,19
3,31
5,92
Firsthöhe Bestand +17,78 = +115,83 NN +17,78
+17,78
+17,78
1,7
72
2,19
+16,25
+16,25
+16,25
+16,09
69
+16,25
1,195
+15,58
4,38
+15,89
+14,48
+14,48
1,85
1,212
2,46
+15,28
Traufhöhe = H
1,50
1,77
+16,22
38
2,09
1,53
Firsthöhe TPH Süd +16,24 = +114,29 NN
3,53
1,3
+14,48
68
1,583 +13,83
OK FFB DG01 +13,00 = +111,05 NN
+12,79
+12,79
+12,79
+12,95 10 STG 163/30
10 STG 163/30
94
+11,31 +11,10
+11,33
+11,31
587
1,25
1,25
519
+13,39
10 STG 163/30
+11,10
+11,10
968
6,17
10 STG 163/30
+12,79
967
1,85
+12,95
56
2,32
376 +12,95
1,40
+13,40
2,32 93
+9,68 10 STG 163/30
+8,06 10 STG 163/30
+6,43
+7,85
+8,06
+8,06 10 STG 163/30
+7,85
+7,85
+6,43
+6,29 +6,27
+6,22
+9,47
1,85
10 STG 163/30
1,40
+9,47
+6,43 10 STG 163/30 10 STG 163/30
+4,81 10 STG 163/30
+4,60
+4,81
+6,22
1,85
ANSCHLUß SIEHE PLAN 4014_01_5_FA_ARC_FANW_365
2,32 93
H = 10,15 H = 14,48 OK FFB OG02 +6,50 = 104,55 NN
+9,52
56
+9,68
+9,47
56
+9,68
1,40
OK FFB OG03 +9,75 = +107,80 NN
+4,81 +4,60
+4,60
10 STG 163/30
+3,02
+2,95
1,40
+3,18
+2,95
+3,18
26 STG 165/30
26 STG 165/30
+2,95
O
1,85
+1,36
+1,36
93
+1,36
12 STG 16.6/30
56
8,28
+3,18
4,32
2,32
OK FFB OG01 +3,25 = +101,30 NN
+1,16
+1,16
+1,16
1,40
1,84
OK Weg -0,06
Feurwehr zufahrt
-1,19
-1,19
-1,19
-1,07
56
Rampe -1,07
46
1,05
OK FFB EG00 -1,05 = +97,00 NN
OK KD +0,77
Rückkühler
OK FFB EG00 ±0,00 = +98,05 NN
OK Pflaster -1,07
-1,19
1,19
5
UK BoPla -1,34 = +96,71 NN
Kanal
UK Fun Bestand -1,84
UK Fun Treppe Best UK Fun -2,71 = +95,34 NN
UK Magererbeton -2,98
OK RFB -4,60 OK BoPla -5,00 = +93,05 NN
OK Fun Bestand -5,00 Zeichnungsgrenze
Zeichnungsgrenze
Zeichnungsgrenze
UK FUN -5,95
Zeichnungsgrenze
OK Fun -6,25 = +91,80 NN
Zeichnungsgrenze
UK FUN -5,16
UK BoPla -5,15 = +93,20 NN
UK KS Bestand -6,05
Leitungsverlauf prüfen
UK Fun Bestand -7,10
UK Fun -8,10 = +89,95 NN
UK KS Bestand -8,30
The dynamic facade of Porsche consists of 4 transitioning panels in each row, represented in Red, Yellow and Orange color, helps to get natural light and makes a visual connection between interior and exterior. The opening in the aluminium facade widens as we go down from the apex of the building to the entrance. The bottom of each row is connected with red LED lights to signify the entrance.
Space for LED Aluminium Sheet
Exploded Isometric View of a Facade Panel
Aluminium Sheet
45.0
°
Glass Panels R1000
45.0
17.2°
300 cm
300 cm
°
10
° .6
2° 17.
X 300
Structural Members
cm
cm
Sectional View of a Facade Panel
PROFESSIONAL PROJECT
View of Porsche Center Hangzhou, China
PROFESSIONAL PROJECT
Lighting Plan
Reflected Ceiling Plan (RCL)
Lincontro Italian Restaurant Main Bar/ Pizza Counter Details
The juxtaposition of the wooden boxes one on top of each other with metallic columns to support is the primary language used to produce the vernacular and rusty effect to the ambience of the restaurant. In the gap between the boxes of Under-arm counter is highlighted with LED line to show the mix of metal and wood.
Exploded isometric view of the pizza counter showing the material specification
PROFESSIONAL PROJECT
Juice Bar Details
Lincontro Italian Restaurant Waiter Station Details
The stacking of wooden boxes in waiter station creates two major spaces: Interior & Exterior. The former has various ways of accesing as the shutters has different directions of opening whereas the later has an open envelop of steel columns.
Plan
PROFESSIONAL PROJECT
PROFESSIONAL PROJECT
Haus Leicht
PROFESSIONAL PROJECT
ROYAL CARIBBEAN | ICON | DECEMBER 5TH 2019 OVERLOOK PODS
AQUADOME - OVERLOOK AREA OVERVIEW FRONTAL 6 SEATER PODS
PLAN: Deck 15, Deck 16 Three 6-seater pods and two 8-seater pods are arranged facing the vast ocean. It acts as a transition between the theatre and the Ocean.
6 SEATER PODS
8 SEATER PODS
Each pod can be classified into: Interior Arc and Exterior Wrap. The interior arc is an open oval loop allowing the movement to enter, be seated and relax on a comfortable sofa, embraced by a floating table. and exit. The wrap is composed of two layers: Solid segmented face that holds and lifts the pods to different levels and Coral surface which covers each pod bringing it to the aquatic family.
ENTRANCE TO PODS
UPPER BAR 3DELUXE
PLAN: Deck 15
PLAN: Deck 16
19_1205_RCI_ICON_AquAdOme_OveRlOOk_POds 3deluxe \ design systems d.s. GmbH, Wiesbaden, Germany © 2019
PROFESSIONAL PROJECT
OVERLOOK PODS
View of the 8-seater high pod
PROFESSIONAL PROJECT