PORTFOLIO A M B O T A N G
SELECTED WORKS • 2016-202 2
R I Z A L
VOL 1 06.2022
[ experienced ] graduate architect Email : rizalambotang@gmail.com LinkedIn : https://www.linkedin.com/in/rizalambotang/ Mobile : +61 467 893 404
I am highly influenced by research and performative architecture. I am inspired by the work of NOX Studio (Lars Spuybroek) and Heatherwick that explore dynamic digital form finding techniques and material innovations into possibilities for construction and new spatial experience.
Graduate architect
My design strength lies with my ability to couple contextual elements with dynamic form-finding approach using digital tools. I hope to bring fresh design ideas and strong technical know-how to a firm that values loyalty, innovation and human capital.
Participations
Through my work experience to date had humbled me to be sensitive to contemporary issues of climate change and its impact on built environment and social housing.
education Master of Architecture (March) - Distinction The University of Melbourne Bachelor of Environment - Architecture HONS (B.Env) The University of Melbourne Graduate Diploma - Computing - Distinction Monash University , Melbourne Bachelor of Science - Aero. Eng. (BSc.) - Deans List Rensselaer Polytechnice Institute, Troy NY USA
academic awards
resume
Graduate Bursary Award 2017 The University of Melbourne Dean’s Honour Award 2014,2016 The University of Melbourne Elenor Edna Norris Bequest Fund 2013 The University of Melbourne
Brandrick Architects - Echuca/Melbourne Jan 2020 - present
Achievements
technical skills
Drafting
Vectorwork Autocad Revit
- all phases of design and completed construction/ tender drawings for Swan Hill Art Gallery (>$10mil)
3D Modelling Vectorwork Rhino3D Sketchup
- various phases of design and completed design documentation of commercial and public buildings in various locations in country Victoria. Buildings are of various typologies which include :
Rendering/Arch. Visualization Lumion/Twinmotion Enscape (VR) Vray+Chaos Vantage
- Benalla Visitor Information Centre redevelopment - Robinvale Aquatic Leisure Centre extension - CFA Irymple Country Fire station - Deniliquin Town Hall redevelopment - CSV Regional Court DDA Infrastructure program (Castlemaine/Robinvale/Kerang)
Graphic/Layout Adobe Creative Suite
- and completed social housing upgrade projects (to date over 5 projects) for HomesVictoria. Projects involved scoping and costing, tender documentation, tender evaluation and contract administration including site visits/inspections and coordination with builders/contractors. - residential and commercial design phases including schematic design, design development, construction documentation and contract administration.
Parametric/environmental/analysis Grasshopper Ladybug (environmental) Karamba
skills Townplanning /DA Construction drawings Construction detailing Architectural visualization/VR Working knowledge in BCA/Australian standard Design coordination (design meeting and IFC/BIM workflow) Presentation & Public speaking Mentoring Written & Oral communication Multisiciplinary problem solving Desktop support & troubleshooting
Ad van ced
professional
Int er m edi ate
profile
Ba sic
rizal ambotang
content
rizal ambotang
Ret Ke Shahar | cities of sand Academic
Melbourne based graduate architect and computation designer. I see architecture as an expression of oneselves (people) with their relationship with the surrouding through means of form, proportions and material responding to culture, language and fundamental need for shelter maybe it be for one, unit of family or many.
308 Exhibition | Academic
commercial tower
Ludiville | reimagining the city of homo luden Academic
the Collective Common | the co-housing multi-residential prototype
Academic
Construction Details | various projects Professional
Architectural Visualization | various projects Professional
the Tale of a Traveller | Academic/personal
photography essay & poetry
Isometric - Masterplan of sample fragment
main street - parade route desert bound primary circulations desert bound
city streets
6
1 2 1
1
1
3
2 1
5
2
4 1
2 2
1
2
01
2
SHOWGROUND desert bound
RET KE SHAHAR
1
herders settlement
4
camel show preparation area
2
trade ground/auction
5
main festival ground
the city of sand
3
show ground
6
markets
desert bound
SPECULATIVE PUBLIC SPACE
Spatial typology
” What if we reject holding an event in the same place year after year, what if instead it is brought to the shifting sand dunes from which the very soul of the event originated? What would a festival look like without a fixed location, without a fixed form, and without fixed pathways to travel upon’’
Taking the Pushkar Camel Fair as a case study, the objective for the project is to create a new annual livestock fair for the camel herders of Rajasthan to preserve its culture through architecture. In this new fair the traditional camel herders of Rajasthan will not only participate in the usual trade of camel stock, but will also participate in specific rituals that generate an iterative, layered, moving architecture that would provide an ever-evolving site for future fairs. By holding the fair in the same, established location every year the relationships that has been built over centuries between camel, herder and environment is slowly worn away. Releasing the fair’s architecture from a fixed location refocuses the true ideals of the fair as one of the bond between man and beast and the arduous journeys that both must take to continue thriving together.
Year: 2016, Studio A Groupwork , Role : Parametric design , 3D modeling. digital/robotic fabrication High Distinction
“MAIN STREET” Camel Parade 2 camels side-by-side Spectators on either
AUCTION HALL Camel pageantry - dancing Camel Auction 100 prize camels 200 spectators and herders
HABITATION Camel & herders rest area Casual trading Grooming Up to 15 camels Up to 3 herders/family200 spectators and herders
SHOWGROUND Camel grand parade Camel racing Up to 300 camels 500 spectators and herders
The University of Melbourne
6
7
To emulate the natural process of sedimentation the layering technique couple with the biocementation of sand as solidification approach was chosen. The biological activity is initiated within the target zone through augmentation of microbes onto the surface by means of spraying the bacteria solution to catalyse the precipitation of calcite and binds the sand together.
D I G I T A L
N A T U R A L
E R O S I O N
P R O C E S S
P R O C E S S
view to arena
8
(Image) Bird’s eye view of the festival area - point cloud representation
Typical floor
NORTH LOBBY
Core shear walls Perimeter columns Primary Band Beam Band Beam Edge beam Mega columns
Mega diagonals
EXPLODED AXON TYPICAL FLOOR SLAB STRUCTURAL SYSTEM
02
308 Exhibition St. Commercial tower design
round hollow section - web member steel node connector , threaded joint
steel column
The massing of the tower was conceived from the abstraction of the Moreton Bay Fig tree located the nearby Carlton Garden. Strong bold expressed structural lines of the mega columns and diagonals represent the heavy and exposed roots merging into a singular wide trunk that stretches upwards to form multiple branches which merges into the apex of the building, the crown.
Starting with the built form control for Melbourne CBD, a parametric script is used to generate an initial massing that comply to the regulation and design aspiration. The criteria imposed on the optimisation algorithm are building heights, setbacks and leasing depth. A multiobjective “evolutionary algorithm” produced the final massing form that fulfil the criteria set above.
While the primary massing reflects the heavy structural expressionism, the north and west podiums counter this effect through a lighter high-tech curved space frame glass-over-podium surrounding the northern and western sides of the building.The major access points are located at these podiums catering for the major circulation paths of La Trobe and Exhibition Street.
The design achieved an average efficiency of 80.4 % throughout the floorplates while maximizing NLA and GFA (with overall average NLA 1974.3 m2 and GFA 2454.3 m2) with a range of leasing depth from 10(sky rise) to14m. We have also allocated 25% (51 meters) of the top portion of the massing volume to an integrated sculptural crown.
1
HOT PRESSED STEEL BALL NODE FOR RETICULATED SPACE FRAME STRUCTURE
round steel hollow sections bolted to concrete column welded steel brackets concrete column
2
ROUND STEEL HOLLOW SECTIONS ON CONCRETE COLUMN
round steel hollow sections
IFC Laminated glass unit
Year: 2017, Applied Construction Groupwork , Role : Parametric design , 3D modeling. assigned construction detailing High Distinction The University of Melbourne
10
3
ROUND STEEL HOLLOW SECTIONS POINT FIX TO CURTAIN WALL IFC
PODIUM STRUCTURAL STRUCTURAL ELEMENTS
11
10 MM MIN
ANCHOR BRACKET LIQUID FIRE RATED SEALANT
40 15
TO CONCRETE EDGE BEAM METAL BACK PAN
SS ANGLE ANCHOR TO EDGE BEAM
145
ENVIRONMENTAL CONTROL S-KA 16/20
NOT TO SCALE
UNEQUAL ANGLE 150 X 90 X 9 MM
150
BATT INSULATION
SPANDREL PANEL HORIZONTAL METAL HANGERS ALU MULLION
CONSTRUCTION DRAWING OVERVIEW
PIN JOINT SS HEADER ISOMETRIC VIEW - FIN HEADER
30
S -K A 1 6/20
S-KA 16/20
UNEQUAL ANGLE 150 X M10 90 X 9EXPANSION MM BOLT M10 EXPANSION BOLT
S-KA 16/20
280
S-KA 16/20
LAMINATED GLASS FIN
BOLTED TO EDGE BEAM
MINERAL WOOL FIRESTOP BATT 60 MINS
355
5MM ROD SUSPENSION CLIP
M12 EXPANSION BOLTS
220
PILKINGTON SS PIN JOINT
4 MM ALUCOBOND FIN HEADER SPANDREL PANEL
BAFFLE HANGER
103
800
25
INSITU REINFORCED CONCRETE EDGE BEAM
ANCHOR BRACKET TO CONCRETE EDGE BEAM
ARMSTRONG METALWORK BAFFLES
EMBEDDED INSERT
ARMSTRONG UNIGRID CHANNEL
SILICONE JOINT SEALANT
EDGE COLUMN BEHIND WEST PODIUM
METAL BACK PAN 335
UNEQUAL ANGLE 150 X 90 X 9 MM
NOT TO SCALE
S-KA 16/20
150
400
HORIZONTAL ALU MULLION BOLTED TO EDGE BEAM
FIBER GASKET
ISOMETRIC VIEW - FIN HEADER
30
S -K A 1 6/20
S-KA 16/20
M10 EXPANSION BOLT
7 5
S-KA 16/20
DETAILS - GLASS FIN HEADER, SPANDREL , SUSPENDED CEILING & PODIUM FLOOR 8
01
25
A4.1 PILKINGTON SS PIN JOINT
103
ARMSTRONG METALWORK BAFFLES
355
SCALE 1: 10 @A2
FIN HEADER
M12 EXPANSION BOLTS
EMBEDDED INSERT
ISOMETRIC SILICONE JOINT VIEW - POINT FIX FITTING TO FIN
ARMSTRONG UNIGRID CHANNEL
SECTION C-C'
NOT TO SCALE
SEALANT
EDGE COLUMN BEHIND FIBER GASKET
6
PILKINGTON OPTIFLOAT 335 CLEAR R39 400 SAFETY GLASS 1500 X 2300 X 12 MM
CC'
SILICONE JOINT SEALANT FPR WEATHERPROOFING
10-12 NOMINAL
10
SILICONE WEATHERPROOF JOINT SEALANT
ISOMETRIC VIEW - POINT FIX FITTING TO FIN PODIUM TOP-HUNG WEATHERSHIELD
4
SECTION C-C'
NOT TO SCALE
2 PILKINGTON OPTIFLOAT CLEAR R39 SAFETY GLASS LAMINATED GLASS FIN 1500 X 2300 X 12 MM
10
10-12 NOMINAL
2.
400
SILICONE JOINT SEALANT FPR WEATHERPROOFING
Reinforced concrete column
CENTERLINE
CC'
SILICONE JOINT SEALANT FPR WEATHERPROOFING
SS custom made spider fittings and struts
CENTERLINE
3000 x 1600 x 3 layers laminated Pilkington SILICONE JOINT SEALANT planar glass unit FPR WEATHERPROOFING ELEVATION VIEW INTERIOR 4. Horizontal steel mast tube, galvanised and GLASS MULLION/FIN powder coated CLAMPED BETWEEN
130
10 24
SILICONE WEATHERPROOF JOINT SEALANT
1.
3
PILKINGTON 905J TO STRUCTURAL FIN POINT FIX
130
POINT FIX
SCALE 1: 10 @A2
130
PILKINGTON 905J TO STRUCTURAL DETAILS - GLASS FIN HEADER, SPANDRELFIN , SUSPENDED CEILING & PODIUM FLOOR
01 A4.1
130
GLASS FIN SHOE EXTERIOR
130
3.
CENTERLINE
LAMINATED FIN SILICONEGLASS SEALANT 10 24
50 X 50 ALU. GLAZING CHANNEL
50 X 50 ALU. GLAZING CHANNEL
80
56
POLISHED CONCRETE HIGH GLOSS 3000 GRIT INTERIOR FLOOR FINISH
MERO © KK-Ball node to roof space frame structure
Ø40 FIBER GASKET 905J ROD ASSY ST/STL
55
56
905J ROD ASSY ST/STL
ANCHOR BOLTS M12 EXPANSION
25 X 25 MM WELDED WIRE 2MM SHIMS TO ADJUST TO GALVANISED MESH REINFORCEMENT PER ASSURFACE 3958 VARIATIONS
905J BODY ASSY ST/STL
IN-SITU REINFORCE CONCRETE FLOOR SLAB 200MM 65
NEOPRENE GUIDES
POINT FIX FITTINGS TO STRUCTURAL GLASS FIN DETAILS
905 EMBEDDED ATTACHMENT
IN-SITU REINFORCED CONCRETE Ø50 10 BAND BEAM 600MM
IN-SITU REINFORCE CONCRETE FLOOR SLAB 200MM
SHIMS TO ADJUST TO SURFACE VARIATIONS
02 A4.1
7.
55
UNBONDED SCREED 40-80 MM NOMINAL NEOPRENE GUIDES ARDEX A38
UB steel welded to SHS beams
LAMINATED STRUCTURAL
60
25 X 25 MM WELDED WIRE 2MM GALVANISED MESH REINFORCEMENT PER AS 3958
LAMINATED STRUCTURAL GLASS FIN 400 X 7100 X 19 MM
6.
BOLTS GLASS FIN 400 X 7100 X 19 MM 8.ANCHOR Round hollow section steel member, M12 EXPANSION galvanised & powder coated Ø40 FIBER GASKET
28
20
40-80 MM NOMINAL ARDEX A38
ELEVATION VIEW
INTERIOR FLOOR FINISH
GLASS MULLION/FIN CLAMPED BETWEEN SS ANGLES
80
GRANITE TILES ADELAIDE BLACK 600X300X20MM UNBONDED SCREED EXTERIOR FLOOR FINISH ARDEX WPM300 MOISTURE BARRIER + ARDEX WPM155 UNDERTILE MEMBRANE
SHS steel beam with welded bracked to 130 POLISHED CONCRETE space frame roof structure HIGH GLOSS 3000 GRIT
INTERIOR 28
ARDEX WPM300 MOISTURE BARRIER + ARDEX WPM155 UNDERTILE MEMBRANE
5.
GLASS FIN SHOE 20
SILICONE SEALANT
400
60
GRANITE TILES ADELAIDE BLACK EXTERIOR 600X300X20MM EXTERIOR FLOOR FINISH
CENTERLINE
SS ANGLES
IN-SITU REINFORCED CONCRETE BAND BEAM 600MM
905J BODY ASSY ST/STL
65 Ø50
905 EMBEDDED ATTACHMENT
10
SILICONE JOINT SEALANT FOR WEATHERPROOFING
PLAN VIEW
SILICONE JOINT SEALANT FOR WEATHERPROOFING
PLAN VIEW
SCALE 1: 5 @A2
POINT FIX FITTINGS TO STRUCTURAL GLASS FIN DETAILS
02 A4.1
SCALE 1: 5 @A2 PILKINGTON PLANAR LAMINATED GLASS
PILKINGTON PLANAR & HEAT SOAKED TOUGHENED LAMINATED GLASS OUTER LAYER WITH FRIT PATTERN TOUGHENED & HEAT SOAKED 3 X 10MM OUTER LAYER WITH FRIT PATTERN 3 X 10MM
STEEL TUBE MAST
STEEL TUBE MAST
SPIDER FITTING
JOINT SEALANT
SS SPIDER FITTING PUNCHED THROUGH PERFORATED LAMINATED GLASS
SS STRUT
A4.1
STEEL TUBE HORIZONTAL MAST
POINT -FIXED BOLTED GLAZING SYSTEM
GASKET DETAIL (SECTION)FIBER - TOP HUNG WEATHERSHIELD POINT FIXED BOLTED GLASS CURTAIN WALL
ISOMETRIC VIEW NOT TO SCALE
POINT -FIXED BOLTED GLAZING SYSTEM
SCALE 1: 10DETAIL @A2
03 A4.1
(SECTION) - TOP HUNG WEATHERSHIELD POINT FIXED BOLTED GLASS CURTAIN WALL
ISOMETRIC VIEW NOT TO SCALE
N/A SCALE 1: 10 @A2
SUBJECT
TUTORIAL
GROUP MEMBER :
SITE ADDRESS
SCALES
DRAWING No.
ABPL90118 APPLIED ARCHITECTURAL TECHNOLOGY SEMESTER 1, 2017
TUTORIAL 17 ROBERT DEMELIS
RIZAL AMBOTANG 641233
308 EXHIBITION STREET, MELBOURNE
SECTION DETAILS 1:5 & 1:10 ISOMETRIC DRAWINGS NO SCALE
A5.1
SUBJECT
TUTORIAL
GROUP MEMBER :
SITE ADDRESS
SCALES
DRAWING No.
ABPL90118 APPLIED ARCHITECTURAL TECHNOLOGY SEMESTER 1, 2017
TUTORIAL 17 ROBERT DEMELIS
RIZAL AMBOTANG 641233
308 EXHIBITION STREET, MELBOURNE
SECTION DETAILS 1:5 & 1:10 ISOMETRIC DRAWINGS NO SCALE
A5.1
12
Image Title
SILICONE WEATHERPROOF JOINT SEALANT
STEEL TUBE HORIZONTAL MAST
COLD ROLLED BA FINISH FIBER GASKET STEEL MEMBER 180 UB 175
03
SS SPIDER FITTING PUNCHED THROUGH PERFORATED LAMINATED GLASS
SILICONE WEATHERPROOF JOINT SEALANT
Ø80
COLD ROLLED BA FINISH STEEL MEMBER 180 UB 175
SS BRACING CABLES
STEEL ANCHOR TUBE PUNCHED THROUGH PERFORATED LAMINATED GLASS
STEEL ANCHOR TUBE PUNCHED THROUGH PERFORATED LAMINATED GLASS
Ø80
SS STRUT
SILICONE WEATHERPROOF JOINT SEALANT
SILICONE WEATHERPROOF JOINT SEALANT
Ø104
00 INAL Ø1
WEATHERPROOF SILICONE JOINT SEALANT WEATHERPROOF SILICONE
Ø104
M - 12 NO Ø100 10
SS CUSTOM MADE SS CUSTOM MADE SPIDER FITTING
Ø100 MINAL - 12 NO Ø100 10
STEEL TUBE ANCHOR STEEL TUBE ANCHOR BOLTED THROUGH GLASS PERFORATIONS BOLTED THROUGH GLASS PERFORATIONS TO STEEL MEMBER AT NODE POINTS AT NODE POINTS TO STEEL MEMBER
SS BRACING CABLES
SILICONE JOINT SEALANT SILICONE JOINT SEALANT
1:100 @A4
13
CONSTRUCTION DRAWING OVERVIEW
FLEXIBLE SILICONE GASKET
BONDED SCREED ARDEX A 38 NOMINAL THICKNESS 40MM
HORIZONTAL ALU MULLION BOLTED TO EDGE BEAM
POLISHED CONCRETE HIPERFLOOR PREMIUM FINISH 10 MM MIN
LIQUID FIRE RATED SEALANT
Carpet flooring
11.
Plenum air-conditiong vents
12.
Automatic integrated venetian blind daylighting and shading control
13.
8
10
14.
Double glaze window low-e glass with argon-filled blind cavity Alu mullion
145
10.
280
Concrete floor slab
5MM ROD SUSPENSION CLIP BAFFLE HANGER
5MM ROD SUSPENSION CLIP
4 MM ALUCOBOND
SPANDREL PANEL ANCHOR BRACKET TO CONCRETE EDGE BEAM
220
9.
60 MINS
4 MMREINFORCED ALUCOBOND INSITU SPANDREL PANEL CONCRETE EDGE BEAM
BAFFLE HANGER
ANCHOR BRACKET TO CONCRETE EDGE BEAM METAL BACK PAN METAL BACK PAN
M10 EXPANSION BOLT M10 EXPANSION BOLT
UNEQUAL ANGLE
UNEQUAL ANGLE 150 X 90 X 9 MM 150 X 90 X 9 MM
HORIZONTAL ALU MULLION HORIZONTAL ALU MULLION BOLTED TOEDGE EDGE BEAM BOLTED TO BEAM
S-KA 16/20
S-KA 16/20
S-KA 16/20
25
PILKINGTON SS PIN JOINT
PILKINGTON FIN SS HEADER PIN JOINT FIN HEADER
25
103
ARMSTRONG UNIGRID CHANNEL
M12 EXPANSION BOLTS
335 400
335
Alucobond spandrel panel
A4.1
01
N/A SCALE 1: 10 @A2 DETAILS - GLASS
A4.1
SCALE 1: 10 @A2
FIN HEADER, SPANDREL , SUSPENDED CEILING & PODIUM FLOOR
4
Screed on weatherproof membrane
3.
Ground floor slab
4.
Polished concrete finish - interior floor slab
5.
Concrete ground floor slab
6.
Suspended baffle ceiling system
SILICONE SEALANT
7.
Services tray and eletrical cabling
50 X 50 ALU. GLAZING CHANNEL
8.
HVAC ducting with air-conditioning outlets
9.
Polished concrete finish - interior floor slab
400
CENTERLINE
130
GLASS FIN SHOE
LAMINATED GLASS FIN
EXTERIOR
GRANITE TILES ADELAIDE BLACK 600X300X20MM EXTERIOR FLOOR FINISH
ELEVATION VIEW
INTERIOR 10 24
400
GLASS FIN SHOE EXTERIOR
SILICONE SEALANT ARDEX WPM300 MOISTURE BARRIER + ARDEX WPM155 UNDERTILE MEMBRANE
GLASS MULLION/FIN CLAMPED BETWEEN SS ANGLES POLISHED CONCRETE HIGH GLOSS 3000 GRIT INTERIOR INTERIOR FLOOR FINISH
GLASS MULLION/FIN CLAMPED BETWEEN SS ANGLES
56
UNBONDED SCREED TILES GRANITE 40-80 MM NOMINALBLACK ADELAIDE ARDEX A38
ARDEXREINFORCEMENT WPM300 MOISTURE + PER ASBARRIER 3958 ARDEX WPM155 UNDERTILE MEMBRANE
13. Pilkington point fix attachments
GALVANISED MESH
ANCHOR BOLTS M12 EXPANSION
POLISHED CONCRETE HIGH GLOSS 3000 GRIT INTERIOR FLOOR FINISH 55
600X300X20MM EXTERIOR FLOOR 25 X 25 MM WELDED WIRE 2MMFINISH
20
12. 1500 x 2300 Pilkington safety glass
NEOPRENE GUIDES
Image Title 65 Ø50
SHIMS TO ADJUST TO SURFACE VARIATIONS
02 A4.1
25 X 25 MM WELDED WIRE 2MM GALVANISED MESH POINT FIX FITTINGS REINFORCEMENT PER AS 3958 TO
10
IN-SITU REINFORCE CONCRETE FLOOR SLAB 200MM
56
UNBONDED SCREED 40-80 MM NOMINAL ARDEX A38
ANCHOR BOLTS M12 EXPANSION
IN-SITU REINFORCED CONCRETE BAND BEAM 600MM
PLAN VIEW
STRUCTURAL GLASS FIN DETAILS
NEOPRENE GUIDES SCALE 1: 5 @A2 IN-SITU REINFORCE CONCRETE FLOOR SLAB 200MM
SHIMS TO ADJUST TO SURFACE VARIATIONS PILKINGTON PLANAR LAMINATED GLASS TOUGHENED & HEAT SOAKED OUTER LAYER WITH FRIT PATTERN 3 X 10MM
IN-SITU REINFORCED CONCRETE BAND BEAM 600MM
STEEL TUBE
TO STEEL MEMBER AT NODE POINTS
SS CUSTOM MADE SPIDER FITTING
PILKINGTON PLANAR WEATHERPROOF SILICONE JOINT SEALANTGLASS LAMINATED TOUGHENED & HEAT SOAKED SS BRACING OUTER LAYER WITH FRIT PATTERN CABLES 3 X 10MM
Ø104
15 Ø
SS STRUT
Ø100 MINAL - 12 NO Ø100 10
POINT FIX FITTINGS TO STRUCTURAL GLASS FIN DETAILS MAST 02 STEEL TUBE ANCHOR A4.1 N/A SCALE 1: 5 @A2 BOLTED THROUGH GLASS PERFORATIONS
14
CENTERL
50 X 50 ALU. GLAZING CHANNEL
60
2
3
CENTERLINE
130 10 24
11. Alucobond spandrel panels 1
10-12 NOMINAL
80
10. Laminated structural glass fin
10
2.
SILICONE WEATHERPROOF
JOINT LAMINATED GLASS FINSEALANT
28
4
Granite tiles - Adelaide black
28
5
PILKINGTON 905J TO STRUCTURAL FIN POINT FIX
1.
20
7 6
130
SILICONE WEATHERPROOF 1500 X 2300 X 12 MM JOINT SEALANT
60
8
10-12 NOMINAL
10
SAFETY GLASS
9
ISOMETRIC CC'
PILKINGTON 905J TO STRUCTURAL PILKINGTON OPTIFLOATFIN CLEAR R39 POINT FIX
10
NOT TO SCALE
SECTION C-C'
PILKINGTON OPTIFLOAT CLEAR R39 SAFETY GLASS 1500 X 2300 X 12 MM
PODIUM SHOP FRONT CURTAIN WALL
ISOMETRIC VIEW - POINT FIX FITTIN
SECTION C-C'
55
16.
DETAILS - GLASS FIN HEADER, SPANDREL , SUSPENDED CEILING & PODIUM FLOOR
01
80
Cladding hangers with insulation and firestop
130
3
11
ARMSTRONG UNIGRID CHANNEL
EDGE COLUMN BEHIND
130
15.
5
12
ARMSTRONG METALWORK BAFFLES
400
6
13
103
ARMSTRONG METALWORK BAFFLES
M12 EXPANSION BOLTS
TYPICAL UNITISED FACADE
13
16
NOT TO SCALE
EDGE COLUMN BEHIND 7
12
ISO
ISOMETRIC VIEW - FIN HEAD
S-KA 16/20
11
15
800
Concrete band beam
40 15
Raised floor system with cabling void
8.
145
7.
S-KA 16/20
Services tray
MINERAL WOOL INSITU REINFORCED FIRESTOP CONCRETE EDGEBATT BEAM
S -K A 1 6/20
Suspended ceiling system with acoustic ceiling pads
6.
S -K A 1 6/20
5.
BATT INSULATION MINERAL WOOL
FIRESTOP BATT SPANDREL PANEL 60 MINS METAL HANGERS
S-KA 16/20
9
HVAC ducting with ventilation inlet
UNEQUAL ANGLE
S-KA 16/20
3
2
1
4
4.
BATT INSULATION 150 X 90 X 9PANEL MM SPANDREL METAL HANGERS M10 EXPANSION BOLT
30
5
Concrete edge beam
150
6
3.
M10 EXPANSION BOLT
280
7
Steel catwork, galvanised, 800mm clearence
220
11
2.
30
12
Single glaze embedded solar PV
150
13
1.
S-KA 16/20
14
8
355
9 10
UNEQUAL ANGLE 150 X 90 X 9 MM
POINT -FIXED BOLTED GLAZING
POLYTHENE WATERPROOF MEMBRANE
POLISHED CONCRETE HIPERFLOOR PREMIUM FINISH 10 MM MIN
HORIZONTAL ALU MULLION BOLTED TO EDGE BEAM LIQUID FIRE RATED SEALANT
355
TYPICAL UNITISED DOUBLE SKIN FACADE
POLYTHENE WATERPROOF MEMBRANE
40 15
BONDED SCREED ARDEX A 38 NOMINAL THICKNESS 40MM
FLEXIBLE SILICONE GASKET
POINT -FIXE
800
ENVELOPE COMPONENTS
CONTEXTUAL RELATIONSHIP
CHATEAUX DE CHAMBORD
LUDIVILLE
N 100
200M
03
LUDIVILLE reimagining the city of homo luden SPECULATIVE ARCHITECTURE Ludiville is a critical interpretation of the work of Constant Nieuwenhuys’s New Babylon (Constant and Stamps 2016) and the Situationist Movement (Stracey 2014) to establish a city of play .The Situationist anticapitalist ideas set the scene for an architecture of desire built to realize the utopian society of “Homo Luden” (Constant and Wigley 1998). Château de Chambord in Loire Valley, the site for this project, is a reminder of a nostalgic utopia and a symbol of bourgeois society, the project is responding to. The
project investigates the role of architecture in New Babylon, Ludiville is loosely arranged the futile pursuits of play and the production into sectors that correspond to the French of space that encourages ludic urges. philosopher, Roger Caillois four ludic archetypes : Agon, Mimicry, Ilinx and Alea. The project explored the ideas of Carl Theodore Sorensen’s terrain vagues and junk Ludiville’s flexible spaces adapts to the playgrounds as ludic spaces that encourages changing water levels at various times of the child-like adventure. Through its generative year. It’s generative form creates environment form, Ludiville creates a utopia that adopted detached from the real world with different Aldo Van Eyck’ city of playground where ambiances and atmosphere that encourages public space are characterised by non- exploration and play. hierarchical composition using interstitial spaces. True to Constant Niewwenhuys’s
GENESIS OF A CITY
FORM FINDING
Year: 2018, Studio Thesis High Distinction The University of Melbourne
16
DERIVE
CHAMBORD NATIONAL DOMAIN
MOONSCAPE ALPHAMAP
CELLULAR AUTOMATA ALGORITHM
VOXEL TRANSFORMATION
SMOOTHING TRANSFORMATION
17
MASTER PLAN - LUDIC PLAY MODE
sector As a technique of form making, a height map of a moonscape is used to drive the terrain vague as an initial condition to Conway’s Game of Life algorithm. Iterative form making exercise generates design possibilites and experimentation to produce the desired effect. The terrain vague was modelled using Aldo Van Eyck’s city as playground concept characterised by non-hierarchical compoistion using interstitial spaces.
18
sector
ALEA CHANCE
AGON -
Suppressing the consumerism of public spaces. Remove social alienation by promoting active social interaction.
Space for contest and showmanship.
COMPETITION
sector
ILINX VERTIGO Ever changing spaces and landscape to create different spaces and situations. Detaching the sense of place. Organic EXPERIENCE of the city through walking and getting lost.
sector
MIMICRY Space and places for performances (acting) and virtual play or alternate reality (VR and AR)
19
S2 S4 5
ARENA +22m l03 performance hall central promenade
mirador
stadia
S1 SECTOR 02
SECTOR 01
AGON - COMPETITION
ARENA MAIN PIER - MARINA FORMAL ENTRANCE
ALEA - CHANCE
OUTDOOR GARDEN RESTAURANTS/BARS (5) habitation - hotel/hostel permanent installation spaces miradors
mirador
SPATIAL FUNCTIONS
S4
SECTOR 04
+19m l02
permanent installations
section A-A’ promenade
AR hall
junk art jardin
AR gallery
promenade
+24m +21m +18m
shops/cafes
+15m
main lobby
+12m
restaurant
+9m
rooms +5m water level
S4
+6m +3m
hotel lobby
water gallery (indoor)
water gallery (outdoor)
Labyrinth hall
VR PODS
water level
10m
rooms
+16m l01
restaurants
Sector 3
1:400
SECTOR 02 - THE ARENA
water gallery
section b-b’ THE STADIA ENTRANCE LOBBYACCESS & VERTICAL TRANSPORT ENTRANCE PIER
water gallery
+24m
SECTOR 03 SECTOR 02
main pier motel pier
LIFT CORES CENTRAL PIER & ACCESS RAMP
+21m +18m +15m +12m
hotel pier
+9m
+5m water level
+6m +3m
water level
+10m water level
SECTOR 04
10m
BAY OF SITUATION
1:400
WEST PIER & RAMP
SECTOR 01
ARTIST SETTLEMENT CORE TO RESIDENTIAL COMPLEX
Sector 4
20
Sector 2
21
04
the Collective Common co-housing multi-residential prototype MULTIRESIDENTIAL HOUSING
C
ollective common was conceived as a hybrid prototype multi-residential development, it combines the traditional terrace/row house typology common in Melbourne with typical urban dwelling of apartment living. The development builds upon the idea of co-housing where the development retains individual private home ownership while fostering community relationship and sense of neighbourhood through shared spaces and multiuse common facilities. Port Melbourne is demographically inclined towards young professionals, growing young families and independent elderly citizens. These groups typically have different housing and social requirements which creates fractured housing options in the market.In consequence, this creates social isolation and decrease affordability as developers generalised these requirements to fit a larger spectrum of buyers.
Year: 2017, STUDIO E Distinction The University of Melbourne
22
23
ELEVATION ALONG INGLES STREET
24
SECTION B-B’ - LONGITUDINAL SECTION THROUGH GARDEN COURT
25
ROOF PLAN TYPICAL PLANS
FIRST FLOOR
GROUND FLOOR
AA’
BB’
SECTION CUT 15M
SECTIONAL PERSPECTIVE A-A’
6
5
5
INGLES STREET
INGLES STREET 3
0
5
10 5
3
4
1
2
0
PRIVATE POS (PRIVATE OPEN SPACE) 1
26
FRONTYARD
2
INTERNAL COURTYARD
5
10
PUBLIC SHARED 3
BALCONIES
4
BACK YARD
5
PARKLET
COMMUNAL 5
TRANSITIONAL SPACES
6
TERRACE & ROOFTOP VEGE’ GARDEN
27
05
CONSTRUCTION DETAILS PROFESSIONAL WORK
Year: 2020-2022 BRANDRICK ARCHITECTS Echuca/Melbourne
*drawings are not to scale Year: 2020-2021 Swan Hill Art Gallery - Tender Drawing Role : Constructiion drawing for tender, coordination and architectural visualization and virtual reality development
28
29
*drawings are not to scale Year: 2020-2021 Benalla Visitor Centre Redevelopment - Construction Drawing Role : Design Development phase, Constructiion drawing for tender, coordination
30
31
01
ARCHITECTURAL VISUALIZATION PROFESSIONAL/ACADEMIC WORK
Year: 2021 Exterior render Swan Hill Art Gallery
32
33
Swan Hill Art Gallery Interior render 2020 Enscape
Swan Hill Art Gallery Interior render 2020 Enscape
Bright Unit Development Exterior render 2022 Lumion
Bendigo Townhouses Interior render 2022 Lumion
34
35
Benalla Rural City Council City strreetscape Exterior render 2022
Flexible urban modelling The University of Melbourne Exterior render 2018 Image Title
36
37
photography & poetry
The Tale of a Traveller
I : the Longing Mom said “you go to another land find another city better than mine” I am still searching, for it takes time In my existence these words chime I have yet to find the city of mine. I soar sky high, free as the wind takes me As I said good bye, flying away with glee This shore welcomes me with open arms,
vignette series
photography & poetry are part of a studio submission
photography & poetry
Enticed by the glittering flickers of charms in the darkness of the night, it looks so calm promise riches tropes, landed full of hopes drained and weary, I mope it feels right in this dead of the night.
The Tale of a Traveller
photography & poetry
The Tale of a Traveller
II : the Escape
cont. In the restricted frame of view, In the restricted frame of view, with strings of headlights approaching and red taillights departing, vex with constant honking, screeching and clacking, with no means to tame. Beleaguered soul and senses inflamed.
With all these crazy rhythms, look for freedom for I’m beaten take these memories as I don’t need them. Itchy eyes drawn to the green patch, down the broad valley, crosses different alleys fronted by red bricks, colours mismatch. An adventure’s about to hatch
They walk in black and robes attired, work ward and homeward. Expressionless…. with life muted and soul looted. Ants with no mother but they all walk together
From the strident trains, outbound. The hound growling his bitter wound. Echoes from above the ground, cast un welcome shield around, the small green oasis is almost drowned.
In between the thunderous whine. One brief moment rare like wine, the heaven is aligned to this patch of green shrine. The Eucalyptus smells divine, with the rustle of its leaves entwined.
This green turf is what is left of the wharf, it was. The wood pylons aligned like a wall, among the trees they stand tall, as sign this land is not for all. The river was heaven in time past. Sepia coloured sluggish flow, small ripples, left by ploughs. There were mists with shadows cast. Birrarrung was the dreaming path. As clouds and clouds embrace. Flows of breeze waft this space, gently soothes this worried face. The gust distorts the hollow noises as focus echoes of own voices. Rest in grace of this heaven for brief of time worries are lessen.
© RIZ AL AMBOTANG | 202 2
thank you.