NAME : SONG POH NING STUDENT ID: 0331846 MODULE: ARC60808107032 Advanced Interior Architecture Design II
T A B L E
O F
C O N T E N T
1) PHASE 1
2-3
2) PHASE 2
4-5
3) PHASE 3
6-17
-drawings
19-21
P H A S E
1
n a r r a t i v e s i t e
a n a l y s i s
P H A S E
2
p r o g r a m m i n g
P H A S E d e s i g n
3
d e v e l o p m e n t
a x o n o m e t r i c
d r a w i n g s
NOTE: 6
5
4
3
2
1
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY, OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
81869 33223
15221
17458
10894
5068
B
3638
A B
5000
0.0000 0.0000 0.00000.0484
HEALTH CARE CANTEEN
FFL:-1000
FFL:-100MM
FF4
5000
C
UP
UP
FL:-3150MM
5592
E F
FF1
11036
63215
0.00000.0000
PROJECT:
FFL:+250
UP
DETAILING WORKING DRAWING ASSIGNMENT 3
FF3
FFL:+2380MM
INTERIOR CONSULTANT:
UP
YOUNG BLOOD CREATION
FF2
A
FFL:+800MM
11-2,3&3a, Jln Pju 5/3 Dataran Sunway, Kota Damansara, 47810 Petaling Jaya, Selangor
FFL:+150MM
EXIT
UP
5772
G
FF1
5000
D
FF2
A
STRUCTURAL ENGINEER:
5591
H
Suramas Perunding Sdn. Bhd.
I
Wisma YPR, Unit 2B, Tingkat 2, 2/87G, Off Jalan, Jalan Syed Putra, Taman Seputeh, 58000 Kuala Lumpur
5603
UP
K
COST CONSULTANT:
FFL:-250MM
5513
UP
LEGEND
5470
J
L
FFL:-100MM
FF1
FFL:-100MM
ENTRANCE
SYM FF1
B
FFP 1
FLOOR FINISHES PLAN SCALE 1:500
PKT Cost Management Services (M) Sdn Bhd
DESCRIPTION CONCRETE FLOORING WITH COATING C/W EPOXY FINISH TO BE SPECIALIST APPROVAL
FF2
900MM (W)X 900MM (L) WHITE TILES
FF3
GRASS
FF4
WHITE STONE FLOORING C/W CONCRETE FLOOR
Suite E-11-05, Wisma Sunrise, Plaza Mont' Kiara No. 2, Jalan Kiara, Mont' Kiara, 50480, Kuala Lumpur, WP Kuala Lumpur
DRAWING TITLE: DRAWN BY:
SPN
CHECKED BY: SCALE: DATE:
AS SHOWN 10 JUNE 2022
DRAWING NO. SPN_FFP_01
NOTE:
1700 200
250
250
250
700
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY, OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
50
731
SELECTED 50MM THK WOOD PANEL IN RED 0PAINT FINISHED
PROJECT: SELECTED FURNITURE GROMMENT 50 130
DETAILING WORKING DRAWING ASSIGNMENT 3 1584
STRUCTURAL ENGINEER: Suramas Perunding Sdn. Bhd.
DT
MEDICINE REFILL BOOTH DETAIL
Wisma YPR, Unit 2B, Tingkat 2, 2/87G, Off Jalan, Jalan Syed Putra, Taman Seputeh, 58000 Kuala Lumpur
4369
COST CONSULTANT:
SELECTED 6MM THK GLASS TUBE 200MM Ø
MFB
YOUNG BLOOD CREATION
11-2,3&3a, Jln Pju 5/3 Dataran Sunway, Kota Damansara, 47810 Petaling Jaya, Selangor
SELECTED STAINLESS STEEL IN CHROME FINISHED AS GLASS TUBE HOLDER
HOLLOW AS MASSAGE OIL CONTAINER
INTERIOR CONSULTANT:
PKT Cost Management Services (M) Sdn Bhd
Suite E-11-05, Wisma Sunrise, Plaza Mont' Kiara No. 2, Jalan Kiara, Mont' Kiara, 50480, Kuala Lumpur, WP Kuala Lumpur
852
SCALE 1:5
DRAWING TITLE: SETTING OUT PLAN- ZONE A
SELECTED 800MMØ X 900 MM(H) WOODEN COUNTER TOP IN GOLD PAINT FINISHED
DRAWN BY: 1023
90
CHECKED BY: SCALE: DATE:
MFB ELE
MS.NORJI
AS SHOWN 11 NOVEMBER 2020
DRAWING NO.
MEDICINE REFILL BOOTH ELEVATION SCALE 1:20
SPN
90
DWD_WD_SPN_ST_01
NOTE:
3700
25
1600
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY, OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
200
3700
2100 800
SELECTED 6MM THK YELLOW POLYCARBONATE C/W 25MM Ø STAINLESS STEEL FRAME PLAN EARTH-STRUCTURE PLAN 1
25
DT 1
PROJECT:
EARTH-STRUCTURE DETAIL1 SCALE 1:10
DETAILING WORKING DRAWING ASSIGNMENT 3
SCALE 1:50
INTERIOR CONSULTANT: YOUNG BLOOD CREATION
11-2,3&3a, Jln Pju 5/3 Dataran Sunway, Kota Damansara, 47810 Petaling Jaya, Selangor
STRUCTURAL ENGINEER:
570
Suramas Perunding Sdn. Bhd.
SELECTED 25MM THK WOODEN PANEL IN GREEN PAINT AS STAIRCASE TREAD
2110
SELECTED 30MM Ø HOLLOW STAINLESS STEEL IN GOLD PAINT FINISHED HANDRAIL C/W 12MM THK GLASS
5270
260
SELECTED25MM Ø HOLLOW STAINLESS STEEL IN BALCK PAINT FINISHED
ELE 1
EARTH-STRUCTURE ELEVATION SCALE 1:50
COST CONSULTANT:
25
PKT Cost Management Services (M) Sdn Bhd
Suite E-11-05, Wisma Sunrise, Plaza Mont' Kiara No. 2, Jalan Kiara, Mont' Kiara, 50480, Kuala Lumpur, WP Kuala Lumpur
DT 2
2590
Wisma YPR, Unit 2B, Tingkat 2, 2/87G, Off Jalan, Jalan Syed Putra, Taman Seputeh, 58000 Kuala Lumpur
EARTH-STRUCTURE DETAIL2 SCALE 1:10
SELECTED 20MM Ø HOLLOW STAINLESS STEEL IN GREEN PAINT FINISHED C/W 25MM THK WOODEN PANEL IN GREEN PAINT
DRAWING TITLE: SETTING OUT PLAN- ZONE A
DRAWN BY:
SPN
CHECKED BY: SCALE: DATE:
MS.NORJI
AS SHOWN 11 NOVEMBER 2020
DRAWING NO. DWD_WD_SPN_ST_01