Logbook 6

Page 1

SITE 1-­‐450smith street ( apartment Harris HMJ) GLOSSARY: Post tension cable-­‐cables, composed of steel wire inserted in to a plas<c sheath are subsequently tensioned and grouted aBer the concrete is poured. Allows thinner slabs and allow greater span lengths between the support columns Bored pier-­‐used when the ground condi<ons are considered to be good. constructed with circular augers and filled with concrete and steel and reinforcement. Par1 walls-­‐ wall that are between two separate proper<es. the wall requires insulated material covered with fireproof plasterboards.

STRUCTURAL CONCEPT & STYSTEM ü  Concrete slab structure ü  Design construc<on ü  Post tension cable* ü  Metal bracing (to hold to pre-­‐cast concretes together) ü  Bored pier founda<on* approx. 16m deep CONSTRUCTION SYSTEM & PROCESS ü  Tower crane located in the center of the construc<on to maximize efficiency. ü  The floors are built level by level ü  Metal bracing and <mber table are used to form the frame structure ü  In situ concrete is pour on top of the steel flooring system (which holds the concrete together un<l it hardens ü  Par< walls* are constructed in between individual property MATERIAL ü  concrete: -­‐ Pre-­‐cas<ng concrete -­‐ In-­‐situ concrete ü  Plaster board: -­‐ Fire resistant plaster board (red/pink in colour) -­‐Water resistant plaster board (blue in colour) -­‐ Normal plaster board (grey in colour) ü  Insulator: -­‐ Thick insulator -­‐ Thin insulator ü  Gas pipe: -­‐ The end of the pipe are made out of rubbery material, In emergency fire events the hole closes preven<ng the gas from leaking


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.