Year : 2018

Status: Awaiting Construction

Advertisement

Rebel Base Collective

The brief called for the extension to the existing main and back house. Key to the brief was adding character to the previously blunt east elevation while respecting its existing geometry. The new design also includes the addition of a mezzanine floor level to the main house. The existing kitchen is extended giving more counter space, storage space and a new kitchen island adjacent to the new dining room. Windows on the eastern façade of the 44 square meter dining room allow natural light into the room. A new glass enclosed entrance sits between a 37 square meter lounge and an existing TV room. The designed main bedroom has an en-suite, study and walk-in closet. An outdoor bathroom sits between the main house extension and the cottage. The addition of the dining room and lounge allow for the extension of the existing garage and a new 19 square meter store room. The existing concrete staircase is retained, refurbished and structurally reinforced to create a new entrance from the newly extended garage to the TV room on the ground floor. Alternatively, from the basement, the family can use the new concrete ramps In the new design, the small backhouse is extended into a separate cottage.

Duties :

1. Preparing documentation for submission to heritage council.

2. Preparing presentations for Client.

3. Client meetings and site visits under buildings to be load protected.

4. Designing the new cottage.

5. Designing the new kitchen layout.

6. Detailing and modelling project in Revit.

7. Preparing drawings for council submission.

Invert level of 460mm under GL pipes from UPVC to be 50mm.

& open ventilation pipes from UPVC to be 110mm.

WVV to be 110mm. Resealable traps to all fittings to be fully accessible. Any sanitary fixture connected to a soil/waste pipe exceeding 3 meters must have an antisiphon trap (avt).

Traps for all showers (bt).

Soil pipes exceeding 6 meters in length to be vented. Gradient of drains to be min. 1:60 and max. 1:40.

All drain pipes concealed in ducts, must have external entrance/holes for re's, covered with removable fibre cement panels, or as indicated on plan.

Geyser installation to comply with SANS 0254.

Area

No Part XA Required