3 minute read

Mobile Change House

Year : 2022

Status: Conceptual Design

Advertisement

Aindustries

Notes

Wilo Booster Pump: Q max=8m /h H max= 42m 230v single phase, frequency= 50Hz. Istalled to manufacturer's specifications

Boundary Wall Note: Clearview fencing 76 x 12.7(Mesh opening) Wiretech. Horizontal wire 2mm. Vertical wire 3mm.

Finish: Powder coated. Installed to manufacturer's

50mm dia W.P for:

SHR (Showers) B (Baths)

WHB (Wash Hand Basins) S (Sink)

100mm dia S.P for:

OVS (Overhead Vent Stacks)

WC (Water Closets)

Sewer Lines

Boundary Line

North

SANS 10400-AZ4 : COMPLIANCE WITH NBR WALLS [SANS 10400-K:2011] The wall designs comply with:

DRAINAGE

All drainage to comply with SANS 10400 Part P

All drain pipes to be min. 1m away from building.

RE's & IE's to all changes in direction and junctions, or at max. 25m with marked covers at surface level.

Drains under buildings to be load protected.

Min. Invert level of 460mm under GL

Waste pipes from UPVC to be 50mm.

Soil & open ventilation pipes from UPVC to be 110mm. 2 WVV to be 110mm.

Resealable traps to all fittings to be fully accessible. Any sanitary fixture connected to a soil/waste pipe exceeding 3 meters must have an antisiphon trap (avt).

Traps for all showers (bt).

Soil pipes exceeding 6 meters in length to be vented.

Gradient of drains to be min. 1:60 and max. 1:40.

All drain pipes concealed in ducts, must have external entrance/holes for re's, covered with removable fibre cement panels, or as indicated on plan.

Geyser installation to comply with SANS 0254.

PART XA: HOT WATER SUPPLY

All hot water supply shall comply with SANS 10400 Part XA

All calculations to comply with TABLES

2 and 5 of SANS 10252-1:2004

Solar water heating systems shall comply with SANS 1037, SANS 10106, SANS 10254 and SANS 10252-1

Requirements for water installations in buildings shall be in accordance with SANS 10252-1 And SANS 10254

Hot water service pipes shall be insulated as below:

Internal diameter of pipe (mm) <= 80 =

R1,0

Internal diameter of pipe (mm) > 80 =

R1,5

Area Schedule

in fire ANNEX A K 1-5 Deemed-to-satisfy ANNEX B Design of lintels

ROOFS [SANS 10400-L:2011] The roof designs comply with:

4.2 Coverings

4.2.1 General

4.2.2 Roof coverings-pitched roofs

4.2.2.3 Sheeted roofs

4.3.2 Gutters and downpipes

4.4.1 Softwood timber construction

4.4.1.3 Rafter beams

4.4.1.5 Battens and purlins

4.4.1.6 Ceiling assembly

4.5 Fire resistance & combustibility SANS 10400-XA Section 4.4.5 - ROOF ASSEMBLIES

EXTERNAL FINISHES

Type, texture and colour of external walls, doors, windows and roofs shall comply with the local Zoning Scheme Regulations, or the latest applicable version of local Aesthetic Guidelines.

CONSERVANCY TANK shall be constructed in accordance with the detailed requirements listed in Section 4.8.2 and 3 and those imposed by local Municipality..

These drawings and the depicted design is and remains the intellectual property of the architect

The architect accepts no responsibility for errors resulting from misinterpretation of the drawings. Any errors, discrepancies or omissions found on the drawings are to be reported to the architect immediately. Any and all measurements mus be checked against the drawings on site before any work commences.

The contractor must report any discrepancies between the existing building, the specified Bill of Quantities and the drawings to the architect or project leader before the work commences. All relevant details, levels and dimensions to be checked and confirmed on site prior to commencement of work.

All drawings to be read together with the Engineer's drawings. All work is to conform to the latest version of SANS 10400, N.B.R. and Local Authority bylaws. Contractors are to locate and identify existing services on site and to protect these from damage throughout the duration of the works.

All dimensions are given in millimetres (unless denoted otherwise). Drawings are not to be scaled. All levels shown are measured as level above M.S.L. No foundation or structure is to encroach on boundary. All electrical and plumbing work is to be carried out by a registered Tradesman.

All demolition work to comply with SANS 10400 Part E.

S.S. Refers to Grade 316 Stainless Steel on all notes. The Contractor must ensure the safety on site of the workmen and visitors in terms of the Occupational Health and Safety Act of 1993. It is the responsibility of the Owner/Initiator to ensure that act 85 of 2003 is met.

No Part XA Required COUNCIL SUBMISSION DOCUMENT

No.DescriptionDate

PARKING:

BUILDING LINES:

SITE AREA:

EXISTING:

BUILDING ZONE:

EXISTING:

Hydromophic Residential 1 0000sqm 000sqm

Change House Building

SITE PLAN

VDD Ablution Block - Seriti MMS

11 September 2022

Ms R.Nyamupanedengu

Mr J Sithole

New Paving Note: Paving bricks on P.V.C sheet on 25mm sand levelled and rolled on compacted and levelled ground

Wall Note: White finish Panels manufactured using 0.5mm Chromadeck sheeting on both sides, with a poly-urethane injected foam core. Installed to manufacturer's

BALUSTRADE NOTE: 900mm high balustrade with 50x12mm mild steel flat bar on 50mm dia. tube balustrade posts wuth 30x8mm flat bar ribs stacked horozontally at 80mm centres from the top.

Air Source Heat Pump: Heating capacity 45.6KW, input power 16500 watt, Max discharge pressure 3.3MPa. Installed to manufacturer's specifications.

This article is from: