Ryan Rasmussen Koko Architecture 2013
Internship Summary Koko Architecture + Design was like family. I had many ideas of what my experience doing residency might be like, but I never imagined that working in an office could be so much fun. The firm I was working work was extremely knowledgeable and even more welcoming. The Koko team was comprised of eight people total, two principals, six architects, and one administrative assistant. All of the architects were relatively young, knowledgable, and like myself, hungry for knowledge. At the time I joined Koko, they had just hired two recent graduates and were experiencing tremendous growth. Within the course of a few weeks, the firm had doubled in size and new projects seemed to multiply overnight. Although I was less experienced in terms of education and work, I felt like that did not deter me from having an equal part in the design process. It felt like everyone, including the principals were equals. Many of the projects I worked on or was brought into required me to work with a colleague. This type of work environment encouraged me to ask for help when I needed it, freely give my input, and made for a pleasant introduction into the world of architecture. I learned everyday about the business and social side of architecture, the joys and perils of working with different clients, and how quickly unexpected problems can arise in projects. I had the opportunity to learn a new drafting program, Vectorworks, and use many of the skills that were taught at the University level. Although many of the initial projects were simple and at a small scale, this helped familiarize me with the typical process of how things get built. Many of these smaller introductory projects were actually realized and are regularly used by Koko which was incredibly motivating. After gaining familiarity with the building process, and eventually the computer program, I was introduced to larger projects and increasingly gain more responsibility. Many of the hands on skills, such as measuring a space to draw up a plan, and explaining ideas to contractors who cannot read your drawings, or just meeting with clients and resolving their needs cannot be learned in schools but can only be gained through experience. Koko was especially good about giving me time to explore the city, visit construction sites, and visit local “archi-dork� (as my boss, Adam affectionately calls them) sites. Through countless site visits and meetings with contractors and clients, I became more aware of the real world problems that arise when practicing architecture. I feel especially lucky with my experience because I had the opportunity to design at a variety of scales. From smaller pieces of millwork in the office, to a large highrise on the other side of the globe I was able to gain a wide variety of insight into how ideas are realized. I believe that this experience has not only been beneficial and helpful to me academically, but the knowledge and experiences gained while working at Koko will have a long lasting impact. 2
Projects Yang Residence
3
4
Tatami Room
10
Work Surface
12
Rolnick Bunks
14
Hawkins International
18
Schwartz Millwork
24
School of Rock Brooklyn
26
Taipei Highrise
30
RT OF THE WORK.
CONSTRUCTION INCLUDING BUT NOT LIMITED TO NG OF CONCRETE ARE TO BE CAREFULLY SUPERVISED HEY ARE DONE IN ACCORDANCE WITH THE DRAWINGS, RACTICE. DEVIATIONS FROM THE DRAWINGS AND UTHORIZED BY THE ARCHITECT.
TER QUALITY OR GREATER QUANTITY OF ANY GENERAL NOTES ROVED BY THE ARCHITECT.
EQUIP EXG EXT
EQUIPMENT EXISTING EXTERIOR
GA GC GEN GFI
GUAGE, GAGE GENERAL CONTRACTOR GENERAL GROUND FAULT INTERRUPTER GL GLASS, GLAZING GND GROUND GYPBD GYPSUM BOARD
1.ALL WORK SHALL COMPLY WITH ARIZONA STATE AND TOWN OF PARADISE VALLEY CODES.
OD OPP
OUTSIDE DIAMETER OPPOSITE
PLAM PLBG PLWD
PLASTIC LAMINATE PLUMBING1 PLYWOOD
QT
QUARRY TILE
RA RETURN AIR RADRADIUS RCP REFLECTED CEILING PLAN
CONTRACTOR IS TO OBTAIN ALL REQUIRED INSPECTIONS, PERMITS, APPROVALS, SIGN-OFFS ROVIDING AND MAINTAINING TOILET 2.GENERAL FACILITIES GENERAL AND TO OBTAIN ANOTES FINAL CERTIFICATE OF OCCUPANCY. THE OWNER IS TO PAY ALL BUILDING
DEPARTMENT FEES EXCEPT FOR THE CERTIFICATE OF OCCUPANCY WHICH MUST BE SUBMITTED TO THE 1.ALL WORK FINAL SHALLCOMPLETION. COMPLY WITH ARIZONA STATE AND TOWN OF PARADISE VALLEY CODES. OWNER BEFORE
YANG RESIDENCE
2.GENERAL CONTRACTOR IS TOBY OBTAIN ALL REQUIRED INSPECTIONS, PERMITS, APPROVALS, SIGN-OFFS 3.ALL WORK IS TO BE PERFORMED LICENSED AND INSURED CONTRACTORS. GENERAL CONTRACTOR
TO OBTAIN A FINALWITH CERTIFICATE OF OCCUPANCY. THE OWNER IS TO PAY BUILDING TOAND PROVIDE THE OWNER A CERTIFICATE OF INSURANCE FOR LIABILITY FORALL $1 MILLION MINIMUM WORK INCLUDING BUT NOT LIMITEDISTO MECHANICAL, FEES EXCEPTCOMPENSATION. FOR THE CERTIFICATE OF OCCUPANCY WHICH MUST BE SUBMITTED TO THE ANDDEPARTMENT STATUTORY WORKMAN'S OWNERWORK. BEFORE FINAL COMPLETION. SCAPE, CARPET, PAINTING AND SECURITY Location: Paradise Valley, AZ / 4.THE OWNER WILL FURNISH ONE SET OF SPECIFICATIONS, ONE SET OF PDF DRAWINGS AND THREE SETS
3.ALL WORKTHE IS TO BE PERFORMED BY LICENSED AND INSURED CONTRACTORS. CONTRACTOR OF DRAWINGS. GENERAL CONTRACTOR FOR THE COST OF ANYGENERAL ADDITIONAL SETS Duration: 14THE weeks /IS RESPONSIBLE Program: IS TO PROVIDE OWNER WITH A CERTIFICATE OF INSURANCE FOR LIABILITY FOR $1 MILLION MINIMUM
TO BE PRINTED FROM THE PDF DRAWINGS. WS: AND STATUTORY WORKMAN'S COMPENSATION. Private Residence 5.ALL WORK TO BE PERFORMED IN A CAREFUL WORKMANLIKE MANNER. EATING, AIR CONDITIONING AND VENTILATION SYMBOLS 4.THE OWNER WILL FURNISH ONE SET OF SPECIFICATIONS, ONE SET OF PDF DRAWINGS AND THREE SETS OF DRAWINGS. THE GENERAL RESPONSIBLE FOR THE COST OF ANY ADDITIONAL SETS 6.GENERAL CONTRACTOR IS LIABLECONTRACTOR FOR DAMAGEISTO THE PROPERTY OR CONSTRUCTION THAT RESULTS TOHIS BE OR PRINTED FROM THE PDF DRAWINGS. FROM HIS SUBCONTRACTOR'S NEGLIGENCE.
KITCHEN, LIBRARY, AND MISCELLANEOUS ITEMS. 5.ALL WORK TO BE PERFORMED IN A CAREFUL WORKMANLIKE MANNER. 7.SITE IS TO BE MAINTAINED IN AN ORDERLY FASHION AND LEFT CLEAN OF DEBRIS AT ALL TIMES DURING S APPROVAL. CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PICK UP OF ALL DEBRIS ON A
ITED TO:
ABBREVIATIONS A/C AIR CONDITIONING HC HOLLOW1 CORE ADJ ADJUSTABLE HDW HARDWARE AFF ABOVE FINISHED FLOOR HM HOLLOW METAL ALT ABBREVIATIONS ALTERNATE HORIZ HORIZONTAL ALUM ALUMINUM HT HEIGHT AP ACCESS PANEL HTG HEATING A/C AIR CONDITIONING HTRHEATER HC HOLLOW1 CORE ADJUSTABLE HARDWARE BET ADJBETWEEN HVACHDW HEATAING, VENTILATION ABOVE FINISHED FLOOR HM AND HOLLOW METAL BLDGAFF BUILDING AIR CONDITIONING ALT ALTERNATE HORIZ HORIZONTAL BLK BLOCK INCL INCLUDING ALUMINUM HT INSULATION HEIGHT BLKGALUM BLOCKING INSUL HEATING BM AP BEAMACCESS PANEL INT HTGINTERIOR HTRHEATER BS BOTH SIDES BET BETWEEN HVAC HEATAING, VENTILATION JF JOINT FILLER BUILDING CLG BLDG CEILING JST JOISTAND AIR CONDITIONING BLOCK INCL INCLUDING CLR BLKCLEAR BLOCKING INSULATION COL BLKG COLUMN MAS INSUL MASONRY BM CONCRETE BEAM INTERIOR CONC MAT INT MATERIAL BS CONSTRUCTION BOTH SIDES CONST MAX MAXIMUM JF MECHANICAL JOINT FILLER CONT CONTINUOUS MECH CEILING JOIST CT CLGCERAMIC TILE MFR JSTMANUFACTURER CLR CLEAR MIN MINIMUM COLUMN MASMOULDING MASONRY DET COLDETAIL MLDG CONC CONCRETE MAT MATERIAL DIAM DIAMTER MO MASONRY OPENING CONSTRUCTION MAXIMUM DIFF CONST DIFFUSER MW MAXMILLWORK CONTINUOUS MECH MECHANICAL DIM CONT DIMENSION CT CERAMIC TILE MANUFACTURER DISTR DISTRIBUTION NIC MFRNOT IN CONTRACT MIN MINIMUM DWG DRAWING NO NUMBER DET DETAIL MOULDING NOMMLDG NOMINAL DIAMTER MASONRY EA DIAM EACH NTS MO NOT TO SCALE OPENING DIFFUSER MW MILLWORK ELEVDIFF ELEVATOR DIMENSION EP DIM ELECTRICAL PANEL OC ON CENTER DISTR DISTRIBUTION OD NICOUTSIDE NOT DIAMETER IN CONTRACT EQUIP EQUIPMENT DRAWING NUMBER EXG DWG EXISTING OPP NO OPPOSITE NOM NOMINAL EXT EXTERIOR EA EACH NOT LAMINATE TO SCALE PLAMNTSPLASTIC ELEVATOR GA ELEV GUAGE, GAGE PLBG PLUMBING1 EP ELECTRICAL PANEL OC ON CENTER GC GENERAL CONTRACTOR PLWD PLYWOOD EQUIPMENT OD OUTSIDE DIAMETER GEN EQUIP GENERAL EXISTING OPPOSITE GFI EXGGROUND FAULT QT OPPQUARRY TILE EXT INTERRUPTER EXTERIOR PLASTIC GL GLASS, GLAZING RA PLAM RETURN AIR LAMINATE GUAGE, GAGE PLBG PLUMBING1 GND GA GROUND RADRADIUS GC GYPSUM GENERAL CONTRACTOR PLYWOOD GYPBD BOARD RCP PLWD REFLECTED CEILING PLAN GEN GENERAL GFI GROUND FAULT QT QUARRY TILE INTERRUPTER GL GLASS, GLAZING RA RETURN AIR GND GROUND RADRADIUS GYPBD GYPSUM BOARD RCP REFLECTED CEILING PLAN
The original design proposal for the house was created about DWG NO. a year before I was assigned to work on the project. At SECTION that point none of the more intricate- or finer details of the SHEET NO. house were flushed out. As new projects came up, the Yang DWG NO. WALL SECTION residence was put on hold. -
NOT FO
N
6.GENERAL ISCONTRACTOR LIABLE FOR DAMAGE TO RESPONSIBILITY THE PROPERTY OR CONSTRUCTION RESULTS REGULAR BASIS.CONTRACTOR THE GENERAL ASSUMES FOR CLEANING ALL THAT INTERIOR FROM HIS OR HIS SUBCONTRACTOR'S NEGLIGENCE. SURFACES, REMOVING ALL FIXTURE AND WINDOW LABELS, CLEANING GLASS ETC. BEFORE FINAL COMPLETION. IN ADDITION, THE SURROUNDING SITE IS TO BE FREE OF ALL DEBRIS, BUILDING 7.SITE ISETC. TO BE MAINTAINED IN AN ORDERLY FASHION AND LEFT CLEAN OF DEBRIS AT ALL TIMES DURING MATERIALS, BEFORE FINAL COMPLETION. CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PICK UP OF ALL DEBRIS ON A REGULAR BASIS. THE IS GENERAL CONTRACTOR ASSUMES RESPONSIBILITY CLEANING ALLSITE. INTERIOR X 8.GENERAL CONTRACTOR RESPONSIBLE FOR SAFETY OF ALL WORKERS ANDFOR VISITORS TO THE CLOSET TYPE SURFACES, REMOVING ALL FIXTURE AND WINDOW LABELS, CLEANING GLASS ETC. BEFORE FINAL COMPLETION. IN ADDITION, THE SURROUNDING SITE ISALL TO BE FREE OF ALL DEBRIS, BUILDING 9.GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS, QUANTITIES, AND FIELD MATERIALS, BEFORE FINAL CONDITIONS. HEETC. SHALL REPORT TO COMPLETION. THE ARCHITECT ANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS BEFORE PROCEEDING ON ANY PART OF THE WORK. 8.GENERAL CONTRACTOR IS RESPONSIBLE FOR SAFETY OF ALL WORKERS AND VISITORS TO THE SITE. 10.ALL MATERIAL, ASSEMBLIES AND METHODS OF CONSTRUCTION INCLUDING BUT NOT LIMITED TO 9.GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS, QUANTITIES,SUPERVISED AND FIELD FORMWORK, BRICKWORK, FRAMING, NAILING, LAYING OF CONCRETE ARE TO BE CAREFULLY CONDITIONS. HE SHALL REPORT TO THETHAT ARCHITECT ANY DISCREPANCIES IN THE DRAWINGS AND BY THE GENERAL CONTRACTOR TO INSURE THEY ARE DONE IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS BEFORE PROCEEDING ON ANY PART OF THE WORK. FROM THE DRAWINGS AND SPECIFICATIONS, APPLICABLE CODES AND GOOD PRACTICE. DEVIATIONS PARTITION TYPE SPECIFICATIONS ARE NOT ACCEPTABLE UNLESS AUTHORIZED BY THE ARCHITECT. 10.ALL MATERIAL, ASSEMBLIES AND METHODS OF CONSTRUCTION INCLUDING BUT NOT LIMITED TO FORMWORK, BRICKWORK, FRAMING, LAYING OF CONCRETE ARE QUANTITY TOSHEET BE CAREFULLY SUPERVISED 11.GENERAL CONTRACTOR IS TO PROVIDENAILING, THE BETTER QUALITY OR GREATER OF ANY NO. BY THE GENERAL CONTRACTOR TO INSURE THAT THEYBY ARE DONE IN ACCORDANCE WITH THE DRAWINGS, DISCREPANCY. ALL SUBSTITUTIONS MUST BE APPROVED THE ARCHITECT. SPECIFICATIONS, APPLICABLE CODES AND GOOD PRACTICE. DEVIATIONS FROM THE DRAWINGS AND SPECIFICATIONS ARE NOT ACCEPTABLE UNLESS AUTHORIZED BY THE ARCHITECT. 12.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING TOILET FACILITIES SHEET NO. DURING CONSTRUCTION. 11.GENERAL CONTRACTOR IS TO PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF ANY DISCREPANCY. ALL SUBSTITUTIONS MUST ALL BE APPROVED BY THE BUT ARCHITECT. 13.GENERAL CONTRACTOR IS TO COORDINATE WORK INCLUDING NOT LIMITED TO MECHANICAL, ELEVATION ELECTRICAL, PLUMBING, AUDIO, CABINETRY, LANDSCAPE, CARPET, PAINTING AND SECURITY WORK. ROOM NAME ROOM NAME 12.GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING TOILET FACILITIES DURING CONSTRUCTION. 14.SHOP DRAWING REQUIREMENTS ARE AS FOLLOWS: DWG NO. A. COMPLETE LAYOUT AND SPECIFICATIONS FOR HEATING, AIR CONDITIONING AND VENTILATION SYMBOLS 13.GENERAL CONTRACTOR IS TO COORDINATE ALL WORK INCLUDING BUT NOT LIMITED TO MECHANICAL, SYSTEMS. ELECTRICAL, CABINETRY, LANDSCAPE, CARPET,AND PAINTING AND SECURITY WORK. B. ALL CABINETRYPLUMBING, INCLUDINGAUDIO, BUT NOT LIMITED TO KITCHEN, LIBRARY, MISCELLANEOUS ITEMS. DWG NO. C. STEEL DESIGN TO BE PROVIDED FOR ENGINEER'S APPROVAL. 14.SHOP DRAWING REQUIREMENTS ARE AS FOLLOWS: DWG NO. A. COMPLETE LAYOUT AND SPECIFICATIONS FOR HEATING, AIR1CONDITIONING AND VENTILATION SYMBOLS 15.SAMPLES REQUIRED INCLUDE BUT ARE NOT LIMITED TO: DETAIL SYSTEMS. SECTION EXG XPARTITION A. ROOFING CLOSET TYPE B. ALL CABINETRY LIBRARY, AND MISCELLANEOUS ITEMS. A-1 B. EXTERIOR SIDING INCLUDING BUT NOT LIMITED TO KITCHEN, /FIXTURE TO BE C. STEEL SHEET NO. C.STONE ANDDESIGN GROUT TO BE PROVIDED FOR ENGINEER'S APPROVAL. D.FINISHED CONCRETE SHEET NO. DEMOLISHED DWGDWG NO. NO. 15.SAMPLES REQUIRED INCLUDE BUT ARE NOT LIMITED TO: E. HARDWOOD FLOORS WALLSECTION SECTION A. ROOFING F. WOOD VENEER X X CLOSET TYPE B. EXTERIOR NEW WALLPARTITION TYPE G. CERAMIC AND SIDING MARBLE TILES SHEET C.STONE AND GROUT SHEET NO. NO. H. GLASS D.FINISHED CONCRETE I. CORIAN AND LAMINATES COLUMN NO. COLUMN CENTER SHEETDWG C NO.NO. E. HARDWOOD J. FINISH METALS FLOORS WALL SECTION F. WOOD VENEER X K. PAINT COLORS AND FINISHES PARTITION TYPE LINE ELEVATION ROOM NAME ROOM NAME G. CERAMIC AND MARBLE TILES L. LACQUER H. GLASS DWGSHEET NO. NO. NEW SOLID CORE I. CORIAN AND LAMINATES 16.GENERAL CONTRACTOR IS TO PROVIDE TEMPORARY PROTECTION FROM WEATHER. EXG FLOOR TO BE SHEET NO. J. FINISH METALS DWG NO. K. PAINT CONTRACTOR COLORS AND FINISHES DOOR NO. DOOR ELEVATION REMOVED TO SOLID 1 17.GENERAL IS SOLELY RESPONSIBLE FOR MAINTAINING SITE SECURITY DURING DETAIL ROOM NAME NAME EXG ROOM PARTITION L. LACQUER (SEE DOOR A-1 CONSTRUCTION.
EXG STONE WALL TO REMAIN
5 D A
EXG STONE WALL TO REMAIN
Lillian
REMOVE EXG TILE FLOOR
NOT FOR CONSTRUCTION
REMOVE EXG PARTITIONS EXG STONE WALL TO REMAIN REMOVE EXG TILE FLOOR
REMOVE EXG WALL
X
Lillian
REMOVE EXG PARTITIONS & ROOF REMOVE EXG KITCHENETTE
5005 East Horseshoe Drive, Paradise Valley, AZ 85253
Owner Farley and Luc 5005 East Ho Paradise Valle
REMOVE EXG WALL
REMOVE AND FILL EXG SWIMMING POOL
SWIMMING POOL
Owner Farley and Lucy Yang Residence 5005 East Horseshoe Drive, Paradise Valley, AZ 85253
REMOVE EXG SWIMMING POOL
Design Architect Koko Architecture and Design 38 Delancey street #7D, NYC, New York 10002 Telephone: 212-206-3638 Fax: 212-206-3654
REMOVE EXG SEPTIC SYSTEM
Architect of Record Babos Design Studio 2049 Norwood St., Mesa, Arizona 85213 Telephone: 480-947-3443
1 A-1.1
EXISTING PLAN
EXG HORSE STABLE TO REMAIN
Scale: 3/32"=1'-0"
©2013 Koko Architecture + Design, L.L.C.
Owner Farley an Design Archite 5005 Eas KokoParadise Architec 38 Delancey s NYC, New Yor Telephone: 21 Design A Fax: 212-206 Koko Arc 38 Delan Architect R NYC, of New Babos Design Telephon 2049Fax: Norwoo 212 Mesa, Arizona Telephone: 48 Architect Babos De 2049 No Mesa, Ar Telephon
Drawing Title
Project Number Issue Date
Novermber, 4, 2013
Drawing No.
A-1.2
-/-
-/-
-/-
It was at this point that myself and a colleague were handed the project and asked to continue developing it to the point where contractor could place bids on the job. This single-family RARY PROTECTION FROM WEATHER. residence is located in a developed neighborhood and we were E FOR MAINTAINING SITE SECURITY DURING requested to make a unique desert residence. In order to keep costs to a minimum, we aimed to salvage whatever part of ENERAL CONTRACTOR IS TO PROVIDE A GUARANTEE existing ON ON THE ENTIREthe PROJECT UNLESShouse OTHER we could. Doing this helped generate a AS THE ROOF, WHICH SHALL BE GUARANTEED FOR form for the rest of the house. Drawing from the surrounding desert landscape and echoing archetypal desert morphologies, PLACED REGARDLESS OF THE ARCHITECT'S PRIOR we used a rammed earth wall to link Xthe existing part of the HARDWARESCHEDULE) TYPE 2'-10" U.N.O. house to the addition. OORDINATING AND SCHEDULING ALLnewer DELIVERIES TO
500 Drive AZ 8
Lillian
BID SET
EXG STONE WALL TO REMAIN PROVIDE TEMPORARY BRACING
16.GENERAL CONTRACTOR IS TO PROVIDE TEMPORARY PROTECTION FROM WEATHER. 18.NOTWITHSTANDING ANY OTHER WARRANTIES GENERAL CONTRACTOR IS TO PROVIDE A GUARANTEE OF FIVE (5) YEARS FROM DATE OF FINAL COMPLETION ON THE ENTIRE PROJECT UNLESS OTHER 17.GENERAL CONTRACTOR ISREQUIRED SOLELY RESPONSIBLE MAINTAINING SITEBE SECURITY DURING GUARANTEES ARE SPECIFICALLY SUCH AS THEFOR ROOF, WHICH SHALL GUARANTEED FOR TEN CONSTRUCTION. (10) YEARS.
C
18.NOTWITHSTANDING OTHERMUST WARRANTIES GENERAL CONTRACTOR IS TO PROVIDE A GUARANTEE 19.WORK THAT PROVES TO ANY BE FAULTY BE REPLACED REGARDLESS OF THE ARCHITECT'S PRIOR OF FIVE (5) YEARS FROM DATE OF FINAL COMPLETION ON THE ENTIRE PROJECT UNLESS OTHER APPROVAL.
1 WHICH SHALL GUARANTEES SPECIFICALLY BE GUARANTEED FOR WINDOW SELF WITH CONDITIONS AT THE SITE AND BRINGARETO THE REQUIRED SUCH AS THE ROOF, WINDOW NO. TEN (10) YEARS. 20.GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL DELIVERIES TO S BEFORE SUBMITTING HIS BID. THE SITE.
1 A-1
One of the challenges of this project was working with a site CEILING FINISH that was not readily available to visit. In order to survey the FLOOR HOLD THE OWNER AND ARCHITECT HARMLESS FROM ROOM FINISH C-1 F-1 FINISH areaCLAIMS correctly and achieve the views we needed E, LIABILITY, DAMAGES, FOR DAMAGES, W-1 B-1 BASEextensive work ON ACCOUNT OF ANY INJURY OR DAMAGE TO FINISH was CORPORATION done with OR Google Earth in conjunction with photographs WALL FINISH ER, ANY PERSON, FIRM, FINISH CLUDING DEATH TO ANY PERSON OR PERSONS FINISH F-1 taken on the site. D FOR OR PERFORMED IN THE CONTRACT OR FOR ANY X
C
1 A-1.2
SUBSTRATE /FIXTURE TO BE
DWG NO. SHEET NO.
1 A-1.1
DEMOLISHED
DWG NO.
NEW WALL
DETAIL COLUMN NO. COLUMN CENTER LINE SHEET NO. NEW SOLID CORE DOOR NO. DOOR (SEE DOOR HARDWARE COLUMN NO. COLUMN CENTER SCHEDULE) TYPE 2'-10"LINE U.N.O.
EXG PARTITION /FIXTURE TO BE DEMOLISHED EXG FLOOR TO BE NEW WALL REMOVED TO SOLID SUBSTRATE
ABOVE, BELOW OR HIDDEN
Scale: 3/32"=1'-0"
1 A-1.1
EXISTING PLAN Scale: 3/32"=1'-0"
DRAWING KEY A0.0 A0.1
COVER SHEET, PLOT PLAN & GENERAL NOTES SCHEDULES AND NOTES DRAWING A1.1 SITEKEY PLAN A1.2 DEMOLITION PLAN A0.0 COVER SHEET, PLOT PLAN & GENERAL NOTES A1.3 NEW CONSTRUCTION PLAN: OVERALL A0.1 SCHEDULES AND NOTES A1.4 NEW CONSTRUCTION PLANS: GUEST HOUSE A1.1 SITE PLAN A1.5 NEW CONTRUCTION PLANS: MAIN HOUSE A1.2 DEMOLITION PLAN A1.6 NEW CONSTRUCTION PLAN: MAIN HOUSE A1.3 NEW CONSTRUCTION PLAN: OVERALL A1.7 RCP/ELECTRICAL PLAN: GUEST HOUSE A1.4 NEW CONSTRUCTION PLANS: GUEST HOUSE A1.8 RCP/ELECTRICAL PLAN: MAIN HOUSE A1.5 NEW CONTRUCTION PLANS: MAIN HOUSE A1.9 RCP/ELECTRICAL PLAN: MAIN HOUSE A1.6 NEW CONSTRUCTION PLAN: MAIN HOUSE A1.10 EXT. ELEVATIONS A1.7 RCP/ELECTRICAL PLAN: GUEST HOUSE A1.11 EXT. ELEVATIONS A1.8 RCP/ELECTRICAL PLAN: MAIN HOUSE A1.12 SECTIONS A1.9 RCP/ELECTRICAL PLAN: MAIN HOUSE A1.13 INTERIOR ELEVATIONS A1.10 EXT. ELEVATIONS A1.14 INTERIOR ELEVATIONS A1.11 EXT. ELEVATIONS A1.15 INTERIOR ELEVATIONS A1.12 SECTIONS A1.13 INTERIOR ELEVATIONS A1.14 INTERIOR ELEVATIONS A1.15 INTERIOR ELEVATIONS
CONTRACTOR, SUBCONTRACTOR AND HIS OR THEIR
ALL PRIMARY SUBCONTRACTORS (PLUMBING, ELECTRICAL, MECHANICAL, POOL, CABINETRY, MANUFACTURERS' INSTRUCTIONS. GENERAL CONTRACTOR SHALL STAND BY THE MANUFACTURERS' STRUCTURAL). GENERAL CONTRACTOR TO SUBMITAND THREE (3) VERIFIABLE REFERENCES FOR EACH WARRANTIES. GENERAL CONTRACTOR IS TOISASSEMBLE PROVIDE THE OWNER WITH ALL PRODUCT SUBCONTRACTOR. INFORMATION, WARRANTIES ETC., INCLUDING THOSE FOR BUILDING PRODUCTS AND APPLIANCES.
ARCHITECT AND OWNER AT THE TIME OF BID A LIST OF 25.ALL MANUFACTURED ITEMSPROVIDE ARE TO BE USED AND CLEANED IN ACCORDANCE WITH 26.GENERAL CONTRACTOR MUST THEINSTALLED, OWNER WITH A RELEASE OF LIENS FROM HIMSELF ANDTHE CTRICAL, MECHANICAL, POOL, CABINETRY, MANUFACTURERS' GENERAL CONTRACTOR STAND BY THEPAYMENT MANUFACTURERS' EACH SUBCONTRACTORINSTRUCTIONS. AT 35% COMPLETION, 75% COMPLETIONSHALL AND BEFORE FINAL IS MADE. WARRANTIES. GENERAL CONTRACTOR IS TO ASSEMBLE AND PROVIDE THE OWNER WITH ALL PRODUCT MIT THREE (3) VERIFIABLE REFERENCES INFORMATION, FOR EACH PARTITION KEYAND APPLIANCES. WARRANTIES ETC., INCLUDING THOSE FOR BUILDING PRODUCTS 27.ARCHITECT IS TO APPROVE ALL PARTITION LAYOUTS IN THE FIELD BEFORE WALLS ARE CONSTRUCTED.
26.GENERAL CONTRACTOR MUST PROVIDE THE OWNER WITH A RELEASE OF LIENS FROM HIMSELF AND EACH SUBCONTRACTOR AT 35% COMPLETION, 75% COMPLETION AND BEFORE FINAL PAYMENT IS MADE.
A IN THERAMMED ED, USED AND CLEANED IN ACCORDANCE WITHISTHE EARTH WALL 27.ARCHITECT TO APPROVE ALL PARTITION LAYOUTS FIELD BEFORE WALLS ARE CONSTRUCTED. TRACTOR SHALL STAND BY THE MANUFACTURERS' MBLE AND PROVIDE THE OWNER WITH ALL PRODUCT B CONCRETE WALL SE FOR BUILDING PRODUCTS AND APPLIANCES.
WNER WITH A RELEASE OF LIENS FROM HIMSELF AND % COMPLETION AND BEFORE FINAL PAYMENT IS MADE.
C
STRAMIT STEEL MINI CORRY CLADDING W/ COLOR TBD
A B C
RAMMED EARTH WALL
PARTITION KEY
CONCRETE WALL
ASTRAMIT RAMMED EARTH STEEL MINI WALL CORRY CLADDING W/ COLOR TBD B CONCRETE WALL C
D
STRAMIT STEEL MINI CORRY CLADDING W/ COLOR TBD
D
PARTITION- NON-RATED
E
EXG WALL TO REMAIN
F
D PARTITION- NON-RATED TILE WALL E
EXG WALL TO REMAIN
F
TILE WALL
PARTITION- NON-RATED
E
EXG WALL TO REMAIN
F
TILE WALL
4
DR
EXISTING PLAN
19.WORK THAT PROVES TO BE FAULTY MUST BE REPLACED REGARDLESS OF THE ARCHITECT'S PRIOR APPROVAL. 1 X 21.GENERAL CONTRACTOR IS TO FAMILIARIZE HIMSELF WITH CONDITIONS AT THE SITE AND BRING TO THE ATTENTION OF THE ARCHITECT ANY DISCREPANCIES BEFORE SUBMITTING HIS BID. 20.GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL DELIVERIES TO FLOOR THE SITE.CONTRACTOR SHALL INDEMNIFY AND HOLD THE OWNER AND ARCHITECT HARMLESS FROM ABOVE, BELOW OR 22.GENERAL ROOM FINISH C-1 F-1 FINISH DIRECTIONDIRECTION OF HIDDEN AND AGAINST ANY AND ALL COSTS, LOSS, EXPENSE, LIABILITY, DAMAGES, CLAIMS FOR DAMAGES, W-1 B-1 OF BASE 1 WINDOW 21.GENERAL CONTRACTOR IS TO FAMILIARIZE WITH OF CONDITIONS ATOR THEDAMAGE SITE AND WINDOW NO. INCLUDING THE COST OF DEFENDING ANY ACTION HIMSELF ON ACCOUNT ANY INJURY TOBRING TO THE NORTH FINISH NORTH ATTENTION OF THE ARCHITECT ANY DISCREPANCIES SUBMITTING HIS BID. OR WALL FINISH BUILDING IMPROVEMENTS OR PROPERTY OF OWNER, ANYBEFORE PERSON, FIRM, CORPORATION CEILING FINISH FINISH ASSOCIATION OR ON ACCOUNT OF ANY INJURY INCLUDING DEATH TO ANY PERSON OR PERSONS FINISH F-1 FLOOR 22.GENERAL CONTRACTOR SHALL INDEMNIFY AND HOLD THE OWNER AND ARCHITECT HARMLESS FROM ROOM FINISH C-1 F-1 ARISING OR RESULTING FROM THE WORK PROVIDED FOR OR PERFORMED IN THE CONTRACT OR FOR ANY FINISH AND AGAINST ANY AND ALL COSTS, LOSS, EXPENSE, LIABILITY, DAMAGES, CLAIMS FOR DAMAGES, W-1 B-1 DIRECTION OF ACT, OMISSION OR NEGLIGENCE OF THE GENERAL CONTRACTOR, SUBCONTRACTOR AND HIS OR THEIR BASE INCLUDING THE COST OF DEFENDING ANY ACTION ON ACCOUNT OF ANY INJURY OR DAMAGE TO NORTH FINISH ELEVATION AGENTS OR EMPLOYEES. HT. WALL FINISH BUILDING IMPROVEMENTS OR PROPERTY OF OWNER, ANY PERSON, FIRM, CORPORATION OR ELEVATION HT. FINISH ASSOCIATION OR ON ACCOUNT OF ANY INJURY INCLUDING TO ANY PERSON OR PERSONS FINISH -F-1 ELEVATION 23.THE AIA "STANDARD FORM OF AGREEMENT BETWEEN OWNERDEATH AND CONTRACTOR" (DOCUMENT ARISING ORSERVE RESULTING FROM THE WORK FOR OR PERFORMED NAME A101/201) IS TO AS THE CONTRACT ANDPROVIDED WILL BE PREPARED BY OWNER. IN THE CONTRACT OR FOR ANY ACT, OMISSION OR NEGLIGENCE OF THE GENERAL CONTRACTOR, SUBCONTRACTOR AND HIS OR THEIR ELEVATION ELEVATION AGENTS OR EMPLOYEES. 24.GENERAL CONTRACTOR SHALL SUBMIT TO THE ARCHITECT AND OWNER AT THE TIME OF BID A LIST OF HT. HT. ELEVATION HT. ELEVATION HT. ALL PRIMARY SUBCONTRACTORS (PLUMBING, ELECTRICAL, MECHANICAL, POOL, CABINETRY, 23.THE AIA GENERAL "STANDARD FORM OF AGREEMENT BETWEEN AND CONTRACTOR" STRUCTURAL). CONTRACTOR IS TO SUBMIT THREE OWNER (3) VERIFIABLE REFERENCES (DOCUMENT FOR EACH PARTITION KEY ELEVATION - OWNER. NAME A101/201) IS TO SERVE AS THE CONTRACT AND WILL BE PREPARED BY SUBCONTRACTOR. ELEVATION
WEEN OWNER AND CONTRACTOR" (DOCUMENT NAME L BE PREPARED BY OWNER. 24.GENERAL CONTRACTOR SHALL TO THE USED ARCHITECT AND OWNER AT THE TIME WITH OF BID A LIST OF 25.ALL MANUFACTURED ITEMS ARE TO SUBMIT BE INSTALLED, AND CLEANED IN ACCORDANCE THE
Checked by: ARW Page no:
Scale:1/8"=1'-0"
ABOVE, EXGBELOW FLOOROR TO BE HIDDEN REMOVED TO SOLID SUBSTRATE
NEW SOLID CORE DOOR NO. DOOR (SEE DOOR WINDOW WINDOW NO. HARDWARESCHEDULE) TYPE CEILING FINISH 2'-10" U.N.O.
Drawn by: RR MW
EXG AND DEMOLITION PLAN
1
LOCATION MAP
1 A0.0
©2013 Kok
Drawing Title
Project Number Issue Date
Project Numb Issue Date Drawing No. Drawn by: RR MW
Checked by: Drawing ARWNo. Page no: Drawn by: RR M
Scale: NTS
A0.0
©2013 Koko Ar Drawing Title
LOCATION MAP
Checked by: AR
Scale: NTS
Page no:
1 A0.0
LOCATION MAP Scale: NTS
POOL EQUIP
22'-9 1/2"
CL
CL
8'-11 1/4" 5'-6"
10'-11 1/4"
GUEST
9'-0"
WOOD STORAGE
F.P.
SINK SINK
BOOKS
BOOKS
SHOWER
+29"
SINK
COURTYARD VEGETABLE GARDEN
+3
6 .
D.W
KITCHEN
CL
8'-0 1/4"
KITCHEN 2 DINING +3
POWDER PANTRY BATH F
+36
5'-7 1/4"
DN
11'-0"
GAME ROOM
9'-0 1/4"
17'-10 3/4"
12'-10" 22'-7 1/2"
REF 7'-1 3/4"
RE
+18
LIBRARY/STUDY +29"
12'-11 1/2"
LAUNDRY/MUD ROOM
MASTER BATHROOM
UTILITY ROOM
POOL
ENTRY 2
F.P.
60'-1"
CL WASHDRYER
SINK
BENCH +18"
POOL POWDER ROOM
BOOKS
MASTER CLOSET
SINK
NOTE: GAME ROOM FLOOR TO BE ELEVATED, LEVEL WITH DINING 17'-11 1/2"
18'-7 3/4"
LIVING ROOM LOUNGE
CL
3'-0"
2'-3 1/2"
GUEST DRYER LAUNDRY OUTDOOR WASH KITCHEN +36 +36
16'-10 1/4"
60'-3 1/2"
GRILL
+3
0
+3
6
8'-0 1/2"
BOOKS
KIDS BED 1 SHELVES
CL
KIDS BATH
9'-9 3/4"
46'-2 1/2"
MASTER DEN
DINING AREA
SHELVES
KIDS BED 2
MASTER BEDROOM
DW
F.P.
REFKITCHEN 4'-0 1/4"
OUTDOOR PATIO
GRILL
10'-11"
6'-4"
14'-0 1/4"
PANTRY
14'-2 1/4"
64'-1 1/4"
CL
12'-9 1/2"
GUEST BATH
GUEST BEDROOM
12'-9"
13'-0 1/4"
ADA SHOWER
+3
6
+1
6
+3
ENTRY
24'-8 3/4"
6 27'-4"
5'-11 1/2"
+3 20'-4 1/2"
1
UTILITY CLOSET 1
A1.4
UTILITY CLOSET
39'-8"
A1.6
DRIVEWAY
STORAGE
GARAGE
STORAGE
STORAGE
STORAGE
28'-0 3/4"
1 A1.5
1 A1.3
MASTER PLAN Scale:1/8"=1'-0"
EAST HORSESHOE DRIVE
5
DA
seshoe Valley,
DA
B
E
1 A1.8
E
E
ELEVATION (GARAGE/GUEST ROOM) SOUTH Scale:1/4"=1'-0"
B
C
E
2
A1.8
ELEVATION (GARAGE/GUEST ROOM) NORTH Scale:1/4"=1'-0"
sign, L.L.C.
B
C
3 LIVING ROOM ELEVATION SOUTH A1.10 Scale:1/4"=1'-0"
6
B
E
FUTURE POOL
4 SECTION GUEST HOUSE NORTH A1.11 Scale:1/4"=1'-0"
5 SECTION MAIN HOUSE EAST A1.11 Scale:1/4"=1'-0"
A
7
3 SECTION MAIN HOUSE NORTH A1.11 Scale:1/4"=1'-0"
NORTH A1.2
GUEST BATHROOM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
GUEST BATHROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
GUEST BATHROOM ELEVATION WEST Scale: 1/4" = 1'-0"
Owner Farley and Lucy Yang Residence 5005 East Horseshoe Drive, Paradise Valley, AZ 85253 Owner Farley and Lucy Yang Residence 5005 East Horseshoe Drive, Design Architect Paradise Valley, AZ 85253 Koko Architecture and Design 38 Delancey street #7D, NYC, New York 10002 Telephone: 212-206-3638 Design Architect Fax: 212-206-3654 Koko Architecture and Design
2 A1.2 2 A1.2
2
CLOSET EAST Scale: 1/4" = 1'-0"
A1.2
CLOSET EAST Scale: 1/4" = 1'-0"
A1.2
2
2
CLOSET SOUTH Scale: 1/4" = 1'-0"
A1.2
CLOSET SOUTH Scale: 1/4" = 1'-0"
A1.2
2
BID SET
B
38 Delancey street #7D, NYC, New York 10002 Architect of Record Telephone: 212-206-3638 Babos Design Studio Fax: 212-206-3654 2049 Norwood St., Mesa, Arizona 85213 Telephone: Architect of480-947-3443 Record
CLOSET WEST Scale: 1/4" = 1'-0"
CLOSET WEST Scale: 1/4" = 1'-0"
Babos Design Studio 2049 Norwood St., Mesa, Arizona 85213 Telephone: 480-947-3443
NOT FOR CONSTRN
Fireplace
E
E
E E
2 A1.2
2 2 2 FAMILY ROOM ELEVATION FAMILY ROOM NORTH ELEVATION FAMILY NORTHROOM ELEVATION FAMILY ROOM NORTH ELEVATION NORTH2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 A1.2 2 2 FAMILY FAMILY ROOM ELEVATION ROOM ELEVATION NORTH NORTH Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" A1.2 A1.2
Fireplace
Fireplace Fireplace Fireplace Fireplace E
E E
E
E
E
Fireplace
E
E
E EE
E E
E
Fireplace 2 2 2 2 2 2 2 FAMILY ROOM ELEVATION FAMILY ROOM SOUTH ELEVATION FAMILY SOUTH ROOM ELEVATION FAMILY ROOM SOUTH ELEVATION SOUTH FAMILY ROOM ELEVATION FAMILY ROOM WEST ELEVATION FAMILY WEST ROOM ELEVATION FAMILY ROOM WEST ELEVATION WEST Scale: 1/4" = 1'-0" = 1'-0" Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" E Scale: 1/4" = 1'-0"2E A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 E 2Scale: 1/4" = 1'-0"2A1.2 2 Scale: 1/4" 2FAMILY 2 FAMILY FAMILY FAMILY ROOM ROOM ELEVATION SOUTH SOUTH FAMILY ROOM ROOM ELEVATION WEST WEST FAMILY ROOM ELEVATION EAST ELEVATION ROOMELEVATION ELEVATION SOUTH E E E E Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" Scale: 1/4" Scale: = 1'-0" = 1'-0"A1.2 Scale: 1/4" =1/4" 1'-0"= 1'-0" E E E EA1.2 Scale: 1/4"A1.2 A1.2 A1.2 A1.2
2 A1.2
E
2 2 FAMILY ROOM FAMILY ROOM ELEVATION EASTELEVATION NORTH 2 ROOM Scale: 1/4" =EAST 1'-0" FAMILY FAMILY ELEVATION ROOM EAST ELEVATION Scale: 1/4" = 1'-0" A1.2 A1.2 2 21/4"ROOM FAMILY ROOM ELEVATION EAST EAST Scale: =FAMILY Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
2 FAMILY ROOM ELEVATION NORTH 2 ROOM FAMILY FAMILY ELEVATION ROOM NORTH ELEVATION NORTH Scale: 1/4" = 1'-0" A1.2 2 21/4"ROOM FAMILY ROOM ELEVATION NORTH NORTH Scale: =FAMILY Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: 2
E E
Fireplace 2 2 2 FAMILY ROOM ELEVATION FAMILY ROOM EASTELEVATION FAMILY EAST ROOM ELEVATION FAMILY ROOM EASTELEVATION EAST Fireplace Fireplace Scale: 1/4" = 1'-0" Scale: 1/4" = Fireplace 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 Fireplace E Scale: 1/4" = 1'-0" 2 2 2A1.2 FAMILY FAMILY ROOM ELEVATION ROOM ELEVATION EAST EAST FAMILY ROOM ELEVATION NORTH E Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0" A1.2 Scale: A1.2 A1.2
E E
E
22 FAMILYROOM ROOM ELEVATION ELEVATIONSOUTH EAST FAMILY 2 ROOM Scale: 1/4" 1'-0" FAMILY FAMILY ELEVATION ROOM SOUTH ELEVATION SOUTH Scale: 1/4" ==1'-0" A1.2 A1.2 2 21/4"ROOM FAMILY ROOM ELEVATION SOUTH SOUTH Scale: =FAMILY Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
2
E
2
A1.2
2 FAMILYWEST ROOM ELEVATION SOUTH FAMILY ROOM2 ELEVATION 2 ROOM Scale: 1/4" = 1'-0" FAMILY FAMILY ELEVATION ROOM WEST ELEVATION WEST Scale: 1/4" = A1.2 1'-0" A1.2 2 21/4"ROOM FAMILY ROOM ELEVATION WEST WEST Scale: =FAMILY Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
2
2
2
A1.2
NOT FOR C NOT FOR
FAMILY ROOM ELEVATIO Scale: 1/4" = 1'-0"
FAMILY ROOM ELEVATION Scale: 1/4" 5005 = 1'-0" East
Drive, Parad AZ 85253
Lillian
Lillian
5005 E 5005 Drive, P Drive, AZ 852 AZ 85 Lillian
Lillian
Lillian
Lillian
E
E
E
2 A1.2 2 A1.2
2 2 2 2 2 GUEST ENTRY ELEVATION GUEST ENTRY NORTH ELEVATION GUEST NORTHENTRY ELEVATION GUEST ENTRY NORTH ELEVATION NORTH E LIVING ROOM ELEVATION EAST Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = E 1'-0" A1.2 A1.2 A1.2 E A1.2 2 2 Scale: 1/4" = 1'-0" GUEST GUEST ENTRY ELEVATION ENTRY ELEVATION NORTH NORTH E E Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" A1.2 A1.2 2 EAST GUEST ENTRY ELEVATION NORTH LIVING ROOM ELEVATION 2 ENTRY GUEST ELEVATION ENTRY NORTH ELEVATION NORTH Scale: 1/4" = 1'-0" Scale: 1/4" =2 1'-0" GUEST A1.2 2 21/4"ENTRY GUEST ENTRY ELEVATION NORTH NORTH Scale: =GUEST Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
E
E
E
E
2 2 2 GUEST ENTRY ELEVATION GUEST ENTRY EASTELEVATION GUEST EAST ENTRY ELEVATION GUEST ENTRY EASTELEVATION EAST Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 2 ©201322Koko GUEST Architecture + Design, L.L.C. GUEST ENTRY ELEVATION ENTRY ELEVATION EAST GUEST ENTRY ELEVATION NORTHEAST Scale: Scale: ==1'-0" 1/4" = 1'-0" Scale:1/4" 1/4" 1'-0" A1.2 A1.2 A1.2 Drawing Title 2 ELEVATION 2 GUEST ENTRY GUEST ENTRY EAST ELEVATION NORTH 2 2 ENTRY Scale: 1/4" = 1'-0" GUEST GUEST ELEVATION ENTRY EAST ELEVATION EAST Scale: 1/4" =A1.2 1'-0" ©2013 Koko Architecture + Design, L.L.C. A1.2 2 21/4"ENTRY GUEST ENTRY ELEVATION EAST EAST Scale: =GUEST Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: Drawing Title
2
E
A1.2
Project Number Issue Date
Novermber, 4, 2013
Project Number
E
E
E E
2 A1.2 2 A1.2
Issue Date
Novermber, 4, 2013
E
E
A-1.14
Drawing No.
E
Drawn by: RR MW LIVING ROOM ELEVATION WEST 2 1/4" =TRANSITION 2 SPACE 2ELEVATION 2 SPACE 2 SPACE 2ELEVATION 2 SPACE TRANSITION ELEVATION SPACE NORTH TRANSITION NORTH TRANSITION ELEVATION SPACE NORTH ELEVATION TRANSITION TRANSITION ELEVATION SPACE EAST TRANSITION EAST TRANSITION ELEVATION SPACE EASTELEVATION EAST Scale: 1'-0" E 2 NORTH by: Checked Drawing No. Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" = 1'-0" Scale: 1/4" = 1'-0" A1.2 = 1'-0" Scale: 1/4" = 1'-0" E EA1.2 Scale: 1/4" ARW Scale: 1/4" A1.2 A1.2 A1.2 A1.2 A1.2 2 2 22 2 TRANSITION TRANSITION SPACE ELEVATION SPACE ELEVATION NORTH NORTH TRANSITION TRANSITION SPACE SPACE ELEVATION EAST TRANSITION SPACE ELEVATION ELEVATION NORTHEAST E E Page Drawnno: by: Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" Scale: Scale: ==1'-0" 1/4" = 1'-0" Scale:1/4" 1/4" 1'-0" A1.2 A1.2 A1.2 A1.2 A1.2 RR MW LIVING ROOM ELEVATION WEST Scale: 1/4" = 1'-0" Checked by: 2 2 TRANSITION SPACE ELEVATION NORTH TRANSITION 2SPACETRANSITION ELEVATION SPACE EAST ELEVATION NORTH ARW 2 2 2 2 1/4" = 1'-0" TRANSITION TRANSITION SPACE1/4" ELEVATION SPACENORTH ELEVATION NORTH TRANSITION TRANSITION SPACE1/4" ELEVATION SPACEScale: EAST ELEVATION EAST Scale: = 1'-0" Scale: = 1'-0" A1.2 A1.2 A1.2 2 21/4" =TRANSITION 2 21/4" =TRANSITION Page TRANSITION SPACE NORTH NORTH TRANSITION SPACE ELEVATION SPACE EAST EAST Scale: Scale: 1'-0" 1/4"ELEVATION = SPACE 1'-0" ELEVATION Scale: Scale: 1'-0" 1/4" = no: 1'-0" ELEVATION A1.2 A1.2 A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: A1.2 A1.21/4"Scale:
E
A-1.14
A
A A
2 A1.2
2 2 2 LIVING ROOM ELEVATION LIVING ROOM NORTH ELEVATION LIVING NORTHROOM ELEVATION LIVING ROOM NORTH ELEVATION NORTH Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 2 2 LIVING ROOM LIVING ROOM ELEVATION ELEVATION NORTH NORTH Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" A1.2 A1.2
A A 2 A1.2 2
2 LIVING ROOM ELEVATION NORTH 2ROOM LIVING LIVING ELEVATION ROOM NORTH ELEVATION NORTH Scale: 1/4" = 1'-0" A1.2 2 21/4" LIVING ROOM ROOM ELEVATION NORTH NORTH Scale: =LIVING Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: 2
A1.2
2 A1.2
A
2 A1.2
LIVING ROOM ELEVATION NORTH Scale: 1/4" = 1'-0"
E E
E
Owner Owner Farley and LucyFarley Yang a R 5005 East Horseshoe 5005 Ea D 2 Paradise Valley, Paradise AZ 852 GUEST ENTRY Scale: 1/4" = 1 A1.2 Owne Owne Farle 2 2 Owner 2 GUEST 2 ENTRY ELEVATION EASTSOUTH GUEST ENTRY WEST ELEVATION SOUTH GUEST ENTRY GUEST ENTRY ELEVATION GUEST2 ENTRY ELEVATION Owner Owne Farley and Lucy Farle Y 5005 2 2 ENTRY 2 2 ENTRY Design Design Scale: 1/4" =1/4" 1'-0" 1/4" = 1'-0" Scale: 1/4" = 1'-A GUEST GUEST ELEVATION ENTRY SOUTH ELEVATION SOUTH GUEST GUEST ELEVATION ENTRY WEST ELEVATION WEST Scale: = 1'-0" Scale: 1/4" = Scale: 1'-0" A1.2 A1.2 A1.2 A1.2 Architect A1.2 Farley andHorse Farley Lucy 5005 East 5005 2 21/4"ENTRY 2 21/4"ENTRY Para Koko Architecture Koko and Ar GUEST ENTRY ELEVATION SOUTH SOUTH GUEST ENTRY ELEVATION WEST WEST Scale: =GUEST Scale: 1'-0"ELEVATION 1/4" = 1'-0" Scale: =GUEST Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 A1.2 A1.2 5005 East 5005 HorsA Paradise Valley, Scale: = 1'-0"1/4" = 1'-0" Scale: = 1'-0"1/4" = 1'-0" 38 Delancey street 38 Parad Dela #7D A1.2 A1.21/4"Scale: A1.2 A1.21/4"Scale: Paradise Valley, Parad NYC, New York NYC, 10002 Ne Telephone: 212-206-3 Telepho Fax: 212-206-3654 Fax:Desig 21 Design Architect Desig Koko Design Architec Desig Koko Architectur Koko 38 D Koko Architectu Koko 38 Delancey 38 stre D NYC, Architect of Record Architec 38 Delancey 38 st De New York NYC, 1D Telep BabosNYC, Design Studio Babos NYC, New NYC, York 212-2 Telep Fax:N 2049 Telephone: Norwood 2049 St., Telephone: Telep 212 212-206-36 Fax: Mesa, Fax: Arizona 85213 Mesa, A Fax: 480-947-3 212-206-3 Fax: 2 Telephone: Telepho Arch Architect of Arch Reco E E E E Babo Architect Archit of Re Babos Design Babo Stu 204 E E E 2049 Babos Design Babos S Norwood 2049 S Mesa 2049 Norwood 2049 Mesa, Arizona Mesa 85 Tele Mesa, Arizona Mesa, 8 Telephone: 480Telep 2 SPACE 2ELEVATION 2 SPACE 2 ELEVATION 2 SPACE 2ELEVATION 2 SPACE 2ELEVATION 2 SPACE 2ELEVATION 2 SPACE TRANSITION TRANSITION ELEVATION SPACE SOUTH TRANSITION SOUTH TRANSITION ELEVATION SPACE SOUTH TRANSITION SOUTH TRANSITION ELEVATION SPACE TRANSITION SOUTH2 TRANSITION ELEVATION SPACE SOUTH2 TRANSITION SOUTH2 TRANSITION ELEVATION SPACE WEST TRANSITION WEST TRANSITION SPACE WEST ELEVA E ELEVATION ESOUTH2 Telephone: Telep 480 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" Scale: = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" E 1/4" = 1'-0" E 2A1.2 2 Scale:2 1/4" A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 2 2 2 2 2 TRANSITION 2 TRANSITION TRANSITION SPACE ELEVATION SPACE ELEVATION SOUTH SOUTH TRANSITION TRANSITION SPACE ELEVATION SPACE ELEVATION SOUTH2 SOUTH2 TRANSITION SPACE ELEVATION SPACE ELEVATION WEST WEST TRANSITION SPACE ELEVATION EAST TRANSITION SPACE ELEVATION SOUTH TRANSITION SPACE ELEVATION SO E E Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" Scale:A1.2 1/4" Scale: = 1'-0" 1/4" = 1/4" 1'-0"= 1'-0" Scale: Scale: = 1'-0" 1/4"1/4" = 1'-0" Scale: 1/4" = 1'-0" Scale: Scale: = 1'-0" A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 A1.2 A1.21/4" 2 2 2 GUEST ENTRY GUEST ENTRY SOUTH ELEVATION GUEST SOUTHENTRY ELEVATION GUEST ENTRY SOUTH ELEVATION SOUTH 2 E ELEVATION Scale: 1/4" =E 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" E A1.2 A1.2 A1.2 2 2 EAST 2 GUEST GUEST ENTRY ELEVATION ENTRY ELEVATION SOUTH SOUTH E E GUEST ENTRY ELEVATION Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 A1.2
A A
A A
A A
A
A A
A
3'-0 7/8"
3'-0 7/8"
3'-0 7/8"
3'-0 7/8"
3'-0 7/8" 3'-0 7/8"
2 LIVING ROOM ELEVATION LIVING ROOM NORTH ELEVATION 22 LIVING NORTHROOM 22 ELEVATION LIVING ROOM NORTH ELEVATION 2 NORTH 2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 2 2 LIVING ROOM LIVING ROOM ELEVATION ELEVATION NORTH NORTH 2 2 Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" A1.2 A1.2
2 A1.2 2
2 LIVING ROOM ELEVATION NORTH 2 2ROOM LIVING LIVING ELEVATION ROOM NORTH ELEVATION 2 NORTH 2 Scale: 1/4" = 1'-0" A1.2 2 21/4" LIVING ROOM ROOM ELEVATION NORTH 2 NORTH 2 Scale: =LIVING Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
LIVING ROOM ELEVATION NORTH Scale: 1/4" = 1'-0"
2 2 2 GUEST ENTRY ELEVATION GUEST ENTRY ELEVATION GUEST WEST ENTRY ELEVATION GUEST ENTRY WEST ELEVATION WEST E WEST Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 2GUEST 2ENTRYGUEST 2 GUEST ENTRY ELEVATION ENTRYSOUTH ELEVATION WEST WEST ELEVATION Scale: Scale: = 1'-0" 1/4" = 1'-0" Scale:A1.2 1/4" = 1/4" 1'-0" A1.2 A1.2
2 2 2 2 TRANSITION SPACE ELEVATION SOUTH TRANSITION SPACE ELEVATION SOU TRANSITION SPACE ELEVATION SOUTH2 TRANSITION SPACE ELEVATION WEST 2 2 2 2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" TRANSITION TRANSITION SPACE1/4" ELEVATION SPACESOUTH2 ELEVATION SOUTH2 TRANSITION TRANSITION SPACE1/4" ELEVATION SPACEWEST ELEVATION WEST Scale: = 1'-0" Scale: = 1'-0" A1.2 A1.2 A1.2 A1.2 2 21/4" =TRANSITION 2 21/4" =TRANSITION TRANSITION SPACE SOUTH2 SOUTH2 TRANSITION SPACE WEST WEST Scale: Scale: 1'-0" 1/4"ELEVATION = SPACE 1'-0" ELEVATION Scale: Scale: 1'-0" 1/4"ELEVATION = SPACE 1'-0" ELEVATION A1.2 A1.2 A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: A1.2 A1.21/4"Scale:
A A A
A A
A A A
E
2 2 TRANSITION SPACE ELEVATION EAST TRANSITION SPACE ELEVATION SOUTH 2 2 1/4"1/4" =ELEVATION 1'-0" TRANSITION TRANSITION SPACE SPACESOUTH ELEVATION SOUTH Scale: = 1'-0" A1.2A1.2 Scale: 2 21/4" =TRANSITION TRANSITION SPACE SOUTH SOUTH Scale: Scale: 1'-0" 1/4"ELEVATION = SPACE 1'-0" ELEVATION A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale:
A
A
E E
E
Lillian
2
LIVING ROOM ELEVATION3'-0 NORTH 2 7/8" Scale: 1/4" = 3'-0 1'-0" 7/8" 3'-0 7/8" 3'-0 7/8"
©2013 Koko Architecture ©2013 Ko
3'-0 7/8"
LIVING ROOM ELEVATION NORTH 2 Scale: 1/4" = 1'-0"
A1.2
Drawing Title
Drawing Tit
©2013 ©2013 Koko ©2013 Archit ©2013 Koko ©2013 Arch Drawing Drawing Title Drawing Drawing Title Drawing
Project Number Project Num Issue Date
B
B
B B
2 A1.2
B
2 LIVING ROOM ELEVATION SOUTH 2ROOM LIVING LIVING ELEVATION ROOM SOUTH ELEVATION SOUTH Scale: 1/4" = 1'-0" A1.2 2 21/4" LIVING ROOM ROOM ELEVATION SOUTH SOUTH Scale: =LIVING Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: 2
C
B
2 2 2 LIVING ROOM ELEVATION LIVING ROOM SOUTH ELEVATION LIVING SOUTHROOM ELEVATION LIVING ROOM SOUTH ELEVATION SOUTH Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 BScale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 A1.2 2 2 LIVING ROOM LIVING ROOM ELEVATION ELEVATION SOUTH SOUTH B B Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" BA1.2 A1.2 B
C
C
B 2 A1.2 2 A1.2
B
LIVING ROOM ELEVATIONCSOUTH Scale: 1/4" = 1'-0" C LIVING ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
C
C 2
C C C
B
C A1.2
B
B
C 2 2 2 LIVING ROOM ELEVATION LIVING ROOM SOUTH ELEVATION LIVING SOUTHROOM ELEVATION LIVING ROOM SOUTH ELEVATION SOUTH Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" A1.2 Scale: 1/4" = 1'-0" Scale: 1/4" = 1'-0" C A1.2 A1.2 2 2 LIVING ROOM LIVING ROOM ELEVATION ELEVATION SOUTH SOUTH Scale: 1/4" Scale: = 1'-0" 1/4" = 1'-0" A1.2 A1.2 2 LIVING ROOM ELEVATION SOUTH 2ROOM LIVING LIVING ELEVATION ROOM SOUTH ELEVATION SOUTH Scale: 1/4" = 1'-0" A1.2 2 21/4" LIVING ROOM ROOM ELEVATION SOUTH SOUTH Scale: =LIVING Scale: 1'-0"ELEVATION 1/4" = 1'-0" A1.2 A1.2 Scale: = 1'-0"1/4" = 1'-0" A1.2 A1.21/4"Scale: 2
8
B
B B
B B B
2 A1.2 2 A1.2
B B
LIVING ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0" LIVING ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
Issue Date Noverm
Project Project Number Project Project Number Project N Issue D Issue Issue No Da Drawing No. DateDrawing Issue Date Issue DaN
B B
A-1
Drawn by: Drawn by: RR MW RR
Checked by: Checked by Drawing ARW A Drawing No. Drawing no: Page no:Drawing Page No.Drawing Drawn b Drawn by: Drawn b DrawnRR by:MW Drawn by Checked RR MW R Checked by: Checked
by:Checked Checked ARW Page no Page no: ARW Page no Page no: Page no:
A1.2
EXISTING STONE TO REMAIN WALL FIREPLACE C-01 PAINT CERAMIC TILE 24X24 FULL HEIGHT TILES ALLOW $7.00/SF MATERIAL ONLY WALL CCAESARSTONE WALL(SOUTH) PAINT COUNTER TOP OR SIMILAR COUNTER TOP S-02S-02 CAESARSTONE OR SIMILAR GUEST KITCHEN BASEDOORS CABINET WD-04PLASTIC PLASTIC LAMINATE ON PLYWOOD CABINET PL-02 LAMINATE ON PLYWOOD FLOOR WD-06 CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST CABINET INTERIORS INT-2 PRE-FINISHED BIRCH WALL PAINT LAUNDRY/MUD ROOM BACKSPLASH S-02 CAESARSTONE OR SIMILAR 2 PAINT COUNTER TOP S-02 CAESARSTONE OR SIMILAR FLOOR C-01 CERAMIC TILEELEVATION 24X24 ALLOW $7.00/SF GARAGE WESTMATERIAL ONLY PANTRY WALL PL-02 WALL CABINET DOORS PAINT PLASTIC LAMINATE ON PLYWOOD GUEST BEDROOM Scale:1/4"=1'-0" A1.11 INT-2 CABINET INTERIORS WD-06 PRE-FINISHED BIRCH EDGE COUNTERTOP PL-01 CORK PLASTIC LAMINATE W/ $4.00/SF METAL FLOOR TILE 12X24 ASSUME MATERIAL COST BACKSPLASH S-02 OR SIMILAR BASE CABINET PL-02 PAINT PLASTICCAESARSTONE LAMINATE ON PLYWOOD WALL CABINETPANTRY DOORS WALL PL-02 1X3 DOUGLAS PLASTICPAINT LAMINATE ON PLYWOOD BASEBOARD WD-02 FIR SOLIDCLEAR POLYURETHANE FINISH GUEST BEDROOM CABINET INTERIORS INT-01 PRE-FINISHED BIRCH FLOOR WD-06 CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST UTILITY ROOM GUEST BATHROOM PAINT FLOOR WALL V.C.T. TILE TARKETT/AZROCK FLOOR C-01 CERAMIC 24X24 ALLOW $7.00/SF MATERIAL ONLY WD-02 1X3 DOUGLAS SOLIDCLEAR POLYURETHANE FINISH ONLY PAINTTILE WALL BASEBOARD WALL C-01 CERAMIC 24X24 FULL FIR HEIGHT TILES ALLOW $7.00/SF MATERIAL BASE CABINET PL-02 PLASTIC LAMINATE ON PLYWOOD GUESTLOUNGE BATHROOM LIVING ROOM/ CABINET DOORS PL-02 PLASTIC LAMINATE ON PLYWOOD FLOOR C-01 TILE 24X24 ALLOW $7.00/SFAND MATERIAL GROUNDCERAMIC (GRADE AND POLISHED,STAINED SEALEDONLY CONCRETE FLOOR C-02 PRE-FINISHED CABINET INTERIORS INT-01 BIRCH 1) WALL C-01 CERAMIC TILE 24X24 FULL HEIGHT TILES ALLOW $7.00/SF MATERIAL ONLY SOAPSTONE or SIM, WITH BLACKENED STEEL ANGLE FRAME FIREPLACE S-04 BASE CABINET PL-02 PLASTIC LAMINATE ON PLYWOOD SOAPSTONE or SIM FIREPLACE HEARTH S-04 GUEST LAUNDRY CABINET DOORS PL-02 PLASTIC LAMINATE ON MATERIAL PLYWOOD COST PAINTED STEEL COLUMNS FLOOR C-01 CORK TILE 12X24 ASSUME $4.00/SF CABINET INTERIORS INT-01 PAINT PRE-FINISHED BIRCH WALL (ABOVE WINDOWS) WALL PAINT DINING ROOM MASTER STUDY ROOM ELEVATION NORTH BASEBOARD WD-02 1X3 DOUGLAS FIR SOLID- CLEAR POLYURETHANE FINISH 2 GUEST LAUNDRY FLOOR GROUND (GRADE 1) AND POLISHED,STAINED AND SEALED CONCRETE C-02 Scale: 1/4" = 1'-0" C A1.2 FLOOR C-01 PAINT CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST WALL (ABOVE WINDOWS) POOL POWDER ROOM PAINT PAINTED STEEL COLUMNWALL FLOOR C-01 CERAMIC TILE 24X24 ALLOW $7.00/SF MATERIAL ONLY BASEBOARD WD-02 1X3 DOUGLAS FIR SOLIDCLEAR POLYURETHANE FINISH KITCHEN WALL PAINT FLOOR C-02 TEAKGROUND 1) AND POLISHED,STAINED AND SEALED CONCRETE BASE CABINET PL-02 VENEER(GRADE with WENGE EDGE (1/8”) POOL POWDERCABINET ROOM COUNTER TOP2 S-01 TEAKSTONE SLABMATERIAL ONLY DOORS PL-02 VENEER with ALLOW WENGE$20.00/SF EDGE (1/8”) FLOOR C-01 CERAMIC TILE$20.00/SF 24X24 ALLOW $7.00/SF MATERIAL ONLY BACKSPLASH S-01 PRE-FINISHED STONE SLABALLOW MATERIAL ONLY CABINET INTERIORS INT-01 BIRCH A1.11 Scale:1/4"=1'-0" WALL PAINT ON PLYWOOD BASE CABINET WD-04 TABU VENEER BASE CABINET TEAK VENEER with WENGE EDGE (1/8”) BASE CABINET DOORS WD-04 PL-02 TABU VENEER ON PLYWOOD OUTDOOR KITCHEN CABINET DOORS PL-02 TEAK VENEER BASE CABINET INTERIOR INT-2 CONCRETE PRE-FINISHED BIRCH with WENGE EDGE (1/8”) A FLOOR CO-02 CABINET INTERIORS INT-01 PRE-FINISHED BIRCH(1/8”) ISLAND COUNTER TOP S-01 TEAK STONE SLABMATERIAL ONLY BASE CABINET WD-04 VENEER with ALLOW WENGE$20.00/SF EDGE ISLAND FACE MT-01 TEAKTABU VENEER ON PLYWOOD CABINET DOORS WD-04 VENEER with WENGE EDGE (1/8”) OUTDOOR KITCHEN ISLAND CABINET DOORS WD-04 TABU VENEER ON PLYWOOD CABINET INTERIORS INT-01 FLOOR INTERIORS CO-02 CONCRETE ISLAND CABINET INT-2 PRE-FINISHED BIRCH GARAGE WD-04 VENEER with WENGE EDGE (1/8”) PANTRY BASE WALLCABINET PAINT TEAK FLOOR C-03 2 CONCRETEUNFINISHED GARAGE ELEVATION NORTH CABINET DOORS WD-04 TEAK VENEER with WENGE EDGE (1/8”) POWDER ROOM WALL PAINT Scale:1/4"=1'-0" A1.11PAINT CABINET INTERIORS INT-01 FLOORDOOR C-01 CERAMIC TILE 24X24 ALLOW $7.00/SF MATERIAL ONLY STORAGE 2 GARAGE WALL PAINT STUDY ROOM ELEVATION NORTH FLOOR CONCRETEUNFINISHED BASE CABINET WD-04 C-03 TABU VENEER ON PLYWOOD Scale: 1/4" = 1'-0" A1.2 PAINT ON PLYWOOD CABINETWALL DOORS WD-04 TABU VENEER DOOR PAINT BIRCH CABINETSTORAGE INTERIORS INT-01 PRE-FINISHED ENTRY CLOSET FLOOR C-02 GROUND (GRADE 1) AND POLISHED,STAINED AND SEALED CONCRETE 2 MASTER BEDRM ELEVATION NORTH WALL PAINT Scale: 1/4" = 1'-0" A1.2 ENTRY FLOOR BASE CABINET WD-04 TABU VENEER ON PLYWOOD BASE CABINET DOORS WD-04 TABU VENEER ON PLYWOOD BASE CABINET INTERIOR INT-2 PRE-FINISHED BIRCH
A1.2
C
2 A1.2
A1.2
2
MASTER STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0" C
A1.2
2
MASTER STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
BOOKSHELVES MASTER STUDY ROOM ELEVATION WEST Scale: 1/4" = 1'-0"
GARAGE ELEVATION WEST
GUEST ENTRY
FLOOR WALL BASEBOARD
WD-02
A
GAME ROOM
GUEST KITCHEN
WD-06
FLOOR FIREPLACE
WD-06
2
CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST A1.2 PAINT 1X3 DOUGLAS FIR SOLID- CLEAR POLYURETHANEA FINISH
BOOKSHELVES
2 A1.2
2 A1.2
A1.2
2
MASTER BEDRM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
STUDY ROOM ELEVATION NORTH Scale: 1/4" = 1'-0"
STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
2
MASTER BEDRM ELEVATION SOUTH Scale: 1/4" = 1'-0"
2
STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
C
CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST EXISTING STONE TO REMAIN
CAESARSTONE OR SIMILAR PLASTIC LAMINATE ON PLYWOOD PRE-FINISHED BIRCH CAESARSTONE OR SIMILAR PAINT BEDROOM ELEVATIONS
2
STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
MASTER BEDRM ELEVATION WEST Scale: 1/4" = 1'-0"
A1.2
STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
C
WALL(SOUTH)2 PAINT GARAGE ELEVATION NORTH A 1 FLOOR ELEVATION NORTH Scale:1/4"=1'-0" A1.11 BEDROOM WD-06 CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST 2 PAINT Scale:1/4"=1'-0" A1.11 WALL A1.2 COUNTER TOP S-02 CABINET PL-02 1 DOORS CABINET INTERIORS INT-2 A1.11 Scale:1/4"=1'-0" BACKSPLASH S-02 2 PANTRY WALL
C
C ROOM ELEVATION NORTH MASTER STUDY Scale: 1/4" = 1'-0"
2 A1.2
C
MASTER STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
2 A1.2
2
MASTER STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
MASTER STUDY ROOM ELEVATION WEST Scale: 1/4" = 1'-0"
A1.2
ELEVATION BEDROOM NORTH
GUEST BEDROOM
A1.11 Scale:1/4"=1'-0"
NORTH
2
2
BEDROOM2 ELEVATION NORTH Scale: 1/4" = 1'-0"
FLOOR WALL BASEBOARD
WD-06 WD-02
CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST A1.2 PAINT 1X3 DOUGLAS FIR SOLID- CLEAR POLYURETHANE FINISH
FLOOR WALL BASE CABINET CABINET DOORS CABINET INTERIORS
C-01 C-01 PL-02 PL-02 INT-01
CERAMIC TILE 24X24 ALLOW $7.00/SF MATERIAL ONLY 2 MASTER STUDY ROOM ELEVATION NORTH CERAMIC TILE 24X24 FULL HEIGHT TILES ALLOW $7.00/SF MATERIAL ONLY Scale: 1/4" = 1'-0" A1.2 PLASTIC LAMINATE ON PLYWOOD PLASTIC LAMINATE ON PLYWOOD PRE-FINISHED BIRCH
FLOOR WALL BASEBOARD
C-01
CORK TILE 12X24 ASSUME $4.00/SF MATERIAL COST PAINT 1X3 DOUGLAS FIR SOLID- CLEAR POLYURETHANE FINISH
FLOOR WALL BASE CABINET CABINET DOORS CABINET INTERIORS Scale:1/4"=1'-0"
C-01
A1.2
2
BEDROOM2 ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
MASTER STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
BEDROOM2 ELEVATION SOUTH Scale: 1/4" = 1'-0"
BEDROOM2 ELEVATION WEST Scale: 1/4" = 1'-0"
A1.2
Lillian
GUEST BATHROOM
GUEST LAUNDRY
POOL POWDER ROOM
WD-02
PL-02 PL-02 INT-01
2
A1.2 CERAMIC TILE 24X24 ALLOW $7.00/SF MATERIAL ONLY C PAINT TEAK VENEER with WENGE EDGE (1/8”) TEAK VENEER with WENGE EDGE (1/8”) PRE-FINISHED BIRCH
2 A1.2
2
MASTER BEDRM ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2
2
2
MASTER BEDRM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
MASTER STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2
MASTER BEDRM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
MASTER STUDY ROOM ELEVATION WEST Scale: 1/4" = 1'-0"
MASTER BEDRM ELEVATION WEST Scale: 1/4" = 1'-0" BOOKSHELVES
2 BEDROOM ELEVATIONS NORTH A1.11 OUTDOOR KITCHEN
GARAGE
2
BEDROOM ELEVATIONS NORTH BEDROOM ELEVATIONS NORTH
2
2 FLOOR CO-02 CONCRETE BASE CABINET WD-04 TEAK VENEER with WENGE EDGE (1/8”) A1.11 Scale:1/4"=1'-0" A1.11Scale:1/4"=1'-0" CABINET DOORS WD-04 TEAK VENEER with WENGE EDGE (1/8”) CABINET INTERIORS INT-01 FLOOR WALL STORAGE DOOR
C-03
A1.2
2
CONCRETE- UNFINISHED PAINT PAINT
A1.2
2
BEDROOM3 ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2
2
MASTER BEDRM ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2
2 STUDY ROOM ELEVATION NORTH Scale: 1/4" = 1'-0" A1.2 2 BEDROOM2 ELEVATION NORTH Scale: 1/4" = 1'-0"
C
2 A1.2
2 A1.2
2 A1.2 2 A1.2
2
A
2 BEDROOM ELEVATIONS NORTH 2 GARAGE ELEVATION NORTH A1.11 Scale:1/4"=1'-0" A1.11 Scale:1/4"=1'-0" 2 GARAGE ELEVATION NORTH A1.11 Scale:1/4"=1'-0"
A1.2
A
2 A1.2 2 A1.2
2 A1.2
2
MASTER STUDY ROOM ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2 2
BEDROOM3 ELEVATION NORTH Scale: 1/4" = 1'-0"
MASTER BEDRM ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2
2
C
A1.2
C
2 A1.2 2 A1.2
9
A1.2
2
2
2
MASTER BEDRM ELEVATION WEST Scale: 1/4" = 1'-0"
STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0" 2
BEDROOM2 ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2
STORAGE ELEVATION SOUTH Scale: 1/4" = 1'-0"
BEDROOM3 ELEVATION WEST Scale: 1/4" = 1'-0"
A1.2
BEDROOM2 ELEVATION WEST Scale: 1/4" = 1'-0"
O Fa 5 Pa
D K 3 N T Fa
A B 2 M T
STORAGE ELEVATION WEST Scale: 1/4" = 1'-0"
C 2
BEDROOM2 ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
MASTER STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2 2
BEDROOM3 ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
BEDROOM3 ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
MASTER BEDRM ELEVATION EAST Scale: 1/4" = 1'-0"
STORAGE ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
MASTER BEDRM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2 A1.2
A1.2
2
BEDROOM3 ELEVATION SOUTH Scale: 1/4" = 1'-0"
STUDY ROOM ELEVATION EAST Scale: 1/4" = 1'-0"
BEDROOM2 ELEVATION EAST Scale: 1/4" = 1'-0"
STORAGE ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
BEDROOM2 ELEVATION NORTH Scale: 1/4" = 1'-0"
STORAGE ELEVATION NORTH Scale: 1/4" = 1'-0"
A1.2
C
2
STORAGE ELEVATION NORTH Scale: 1/4" = 1'-0"
BEDROOM3 ELEVATION NORTH Scale: 1/4" = 1'-0"
2
2
A1.2
C
2 GARAGE ELEVATION WEST 1 ELEVATION BEDROOM NORTH A1.11 Scale:1/4"=1'-0" A1.11 Scale:1/4"=1'-0"
A1.2
MASTER BEDRM ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2
2
A1.2
C 2 AGARAGE ELEVATION WEST A1.11 Scale:1/4"=1'-0"
2
BEDROOM3 ELEVATION EAST Scale: 1/4" = 1'-0"
A1.2 2 A1.2
STORAGE ELEVATION SOUTH Scale: 1/4" = 1'-0"
2
BEDROOM2 ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2
MASTER STUDY ROOM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2 2
BEDROOM3 ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2
BEDROOM3 ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2
2
MASTER BEDRM ELEVATION SOUTH Scale: 1/4" = 1'-0"
A1.2 2 A1.2
BEDROOM2 ELEVATION WEST Scale: 1/4" = 1'-0"
STORAGE ELEVATION WEST Scale: 1/4" = 1'-0"
MASTER STUDY ROOM ELEVATION WEST Scale: 1/4" = 1'-0"
BEDROOM3 ELEVATION WEST Scale: 1/4" = 1'-0"
BEDROOM3 ELEVATION WEST Scale: 1/4" = 1'-0"
MASTER BEDRM ELEVATION WEST Scale: 1/4" = 1'-0"
©2
Draw
7C
Elevation A
7C
Elevation A
TATAMI ROOM
Location: Koko Studio,7C NY / W/D Duration: 2 weeks / Program: Renovation W/D
BATH
B
B EQ EQ
EQ
EQ
4 1/2" EQ
fax EQ
EQ
S EQ
EQ
A
4 1/2" EQ faxEQ EQ
S
1'-6" 1'-6" 1'-6"
Light Wood Section A Finish 3/4" Finished Plywood Light Wood Base Board Finish 3/4" Finished SectionBase APlywood Board
LIVING AREA LIVING AREA
Light Wood Finish 3/4" Finished Plywood Base Board
S
AMI LOFT
3/4"
VIF VIF
VIF
3/4" 3/4"
3/4"
Structural 2"x4" 1/2" Tatami Recessed Magnetic Catch 7/12" Dia Mat 3/4" Structural Plywood 2"x4" 1/2" Tatami Mat 3/4" Recessed Magnetic Catch 7/12" Dia Plywood Magnetic Finished Plywood Structural Panel 2"x4" Radius 1/2"1.5" Tatami Perforations MatMagnetic Finished Plywood 3/4" Panel Plywood 1.5" Radius Perforations Magnetic Finished Plywood Panel 1.5" Radius Perforations
Section A
LIVING AREA
fax
AMI LOFT
1/4"=1'-0"
EQ
EQ
3/4"
3/4"
KITCHEN
Elevation This project also helped meAunderstand the general process B REF. of how to get things built using a contractor. Working closely Elevation A with our contractor, Tony, I was able to help himKITCHEN with questions A REF. he had and sawB this project get realized over the course of 1/2" A The Tatami room housed many guests who EQ time EQ at4 Koko. my Elevation A EQ EQ EQ stopped by to either research, or just visit New York. REF. EQ
Recessed Magnetic Catch 7/12" Dia
Tatami Mat 3/4" Plywood Structural Tatami Mat 2"x4" 3/4" Plywood Structural 2"x4"
4 3/4" 4 3/4"
5 1/2"
Tatami Mat 3/4" Plywood Structural 2"x4"
4 3/4" 5 1/2"
3 1/2"
A
EQ
Plywood
3 1/2" 3 1/2"
B
al B 4" A A
Elevation A Light Wood Finish Structural 2"x4" 3/4"Light Finished Wood Plywood Finish Structural 2"x4" 3/4" Finished Plywood Light Wood Finish Structural 2"x4" 3/4" Finished
The Tatami roomMECH. was one of the first projects assigned to RM.familiarize myself with Vectorworks, and me and helped me W/D better understandMECH. the fundamentals of whatBATH is expected for RM. minor interior renovations. The Tatami room was added to the annex of our office which also serves as a spare room when guests come into MECH. town. Beneath the Tatami surface is a space RM. for storage. Magnetic hinges made the white perforated grill KITCHEN to be removed and provided access to the storage space below.
al 4"
al 4"
BATH
Section B
5 1/2"
Section B 4 3/4" Structural Section B 2"x4"
4 3/4"
Structural 2"x4" 4 3/4"
SK-1 SK-1 06.5.2013
Structural 2"x4"
10
Tatami Mat 3/4" Plywood Light Wood Tatami Mat Finish 3/4" 3/4" Finished Plywood Plywood Light Wood Finish 3/4" Finished Plywood Tatami Mat 3/4" Plywood Light Wood Finish 3/4" Finished Plywood
Base Board Base Board
Base Board
7C
W/D
Elevation A
BATH
Light Wood Finish Structural 2"x4" 3/4" Finished Plywood
Structural 2"x4" 1/2" Tatami Mat 3/4" Plywood
1'-6"
MECH. RM.
Recessed Magnetic Ca
3/4"
VIF
Structrual 2"x4"
3/4"
Magnetic Finished Panel 1.5" Radius Perforations
KITCHEN B
B Elevation A
Structural 2"x4" Post A
REF.
A
EQ
EQ
EQ
EQ
Section A
4 1/2" EQ
fax
LIVING AREA
Light Wood Finish 3/4" Finished Plywood Base Board
Tatami Mat 3/4" Plywood Structural 2"x4"
4 3/4"
3 1/2"
EQ
desk
EQ
desk
VIF
S
5 1/2"
Section B
4 3/4" Plan
Structural 2"x4"
11
Tatami Mat 3/4" Plywood Light Wood Finish 3/4" Finished Plywood
Base
WORK SURFACE Location: Koko Studio, NY / Duration: 1 week / Program: Renovation
Briefly before joining Koko, they had relocated their offices and were still in the process of moving in and organizing. After getting a bit more settled in, the need for a large work table emerged. I was asked to create simple drawings of a work surface that could double as storage space for materials and drawings. The base of the table is four existing storage cabinets, minimizing material cost and labor. It was nice to see a project, although simple, used almost everyday.
12
SHORT ELEVATION
2
SCALE: 3/8"=1'-0"
3'-4" x 9'-2" 3/4" MDF METROWIRE
METROWIRE
6" METAL STANDOFFS 3'-4" x 9'-2" 3/4" MDF
3'-4"
2'-1"
IKEA CABINETS
9'-2" METROWIRE
METROWIRE
METROWIRE 1 2
4
desk
desk
METROWIRE
PLAN
SCALE: 3/8"=1'-0"
6" WOOD SLATS
T: 212.206.3638 F: 212.206.3654
3'-4"
desk
SCALE: 1/4"=1'-0" SCALE: 3/8"=1'-0"
Lillian
T: 212.206.3638
OFFICE WORK
3'-4" x 9'-2" DESK 3/4" MDF
IKEA CABINETS
SK-4 08.15.2013
IKEA CABINETS
S
EXPLODED AXON PLAN
3'-4" x 9'-2" 3/4" MDF
3'-4" x 4'-7" 3/4" MDF
SCALE: 1/4"=1'-0"
2" x 8" WOOD SLATS
9'-2"
desk
3
EXPLODED AXON
Lillian
4 4
6" WOOD SLATS
6" WOOD SLATS
3'-4" x 9'-2" 3/4" MDF
4'-7"
3'-4" x 4'-7" 3/4" MDF
OFFICE WORK DESK
METROWIRE 3'-4" x 4'-7" 3/4" MDF
IKEA CABINETS
IKEA CABINETS
IKEA CABINETS
Lillian
SCALE: 3/8"=1'-0"
3/4" MDF 6" WOOD FRAME
SHORT ELEVATION
SHORT ELEVATION
2" x 8" WOOD SLATS
3'-4"
2 T: 212.206.3638 SCALE: 3/8"=1'-0" F: 212.206.3654
SCALE: 3/8"=1'-0"
S
9'-2"
3'-4" x 9'-2" 3/4" MDF
2" x 8" WOOD SLATS
IKEA CABINETS
LONG ELEVATION
METROWIRE
3
3/4" MDF
SCALE: 1/4"=1'-0"
IKEA CABINETS
6" WOOD FRAME 9'-2"
4
desk
METROWIRE
IKEA CABINETS 3'-4" x 4'-7"
SHORT ELEVATION 2 EXPLODED SCALE: 3/8"=1'-0" AXON
SLATS
3/4" MDF
4'-7"
SCALE: 3/8"=1'-0"
6" WOOD SLATS
6" WOOD S
desk
NETS WIRE
3'-1 1/2" 3'-1 1/2" 7 1/2" 2'-6"
3'-4"
OOD S
3'-4"
3/4" MDF 6" WOOD FRAME
SHORT ELEVATION
METROWIRE
3/4" MDF
MDF
7 1/2"
2
7 1/2"
SCALE: 3/8"=1'-0"
IKEA CABINETS
3'-1 1/2"
6" WOOD SLATS
LONG ELEVATION
3'-4"
7 1/2"
3/4" MDF
IKEA CABINETS 3/4" MDF 6" WOOD FRAME
3'-1 1/2"
IKEA CABINETS
3'-1 1/2"
1
6" WOOD SLATS 2'-6"
3'-1 1/2"
3/4" MDF
OFFICE WORK DESK
4
EXPLODED AXON SCALE: 1/4"=1'-0"
EXPLODED AXON SCALE: 1/4"=1'-0"
Lillian
SK-4
13
T: 212.206.3638 F: 212.206.3654
OFFICE WORK DESK
SK-4 08.15.2013
SK-3 08.15.2013
ROLNICK BUNK BEDS Location: Brooklyn, NY / Duration: 1 week / Program: Bunk Bed
Former clients had requested that we design a two custom beds for their children. For the first bed, the requirements were relatively simple, The bed had to be a full size bed that could deploy another full size trundle bed in case visitors came to stay. Their request was relatively flexible and did not have to be a bunk bed. I explored three options and modeled them in a 3D program to help better understand the dimensions required to make this project come to life. The client also request some sort of storage or shelving areas for books or toys. The request for the second set of custom beds was for their three boys, and was a bit more specific. The bunk beds were to not only serve as sleeping spaces when needed, but were also to serve as loft or play areas as well. The boys had a collection of Lego which they treasured and it was requested that we design special display units for their creations.
FULL SIZE BED
FULL SIZE BED
FULL SIZE TRUNDLE BED
1
PLAN
SCALE: 1/4"=1'-0"
14
2
PLAN W/ PULL-OUT FURNITURE SCALE: 1/4"=1'-0"
6
AXON VIEW SCALE: NTS
ATION 2
3
3/8"=1'-0"
5
ELEVATION 2 W/ PULL-OUT FURNITURE SCALE: 3/8"=1'-0"
AXON
SCALE: NTS
5
ELEVATION 2 PULL-OUT FURNITURE SCALE: 3/8"=1'-0"
6
AXON VIEW SCALE: NTS
15
16
17
Hawkins International Location: Flatiron District, NY / Duration: 6 weeks / Program: Office Renovation
Hawkins International is a public relations company based in New York. Much like Koko, they too were moving offices. I joined the design team shortly after the construction for their new offices had begun. However, since the project was fast tracked, there was still much detailing and millwork that needed to get designed. The client had specifically requested special requirements for a conference table. The table had to be modular for easy storage, with a unique aesthetic. The conference table would not only be the central location for formal meetings, but also needed to be used during parties as well. In addition to simple millwork and work desks, the owner of the company asked for a one-of-a-kind shelving system that she use in her office. I was asked to implement the “shiro-shelving� design into her office. The reception desk was another interesting design challenge as it was the first thing you would see upon entering the space. Using a series of 3-form acrylic planes to create volumes, the goal was to try and create a floating glowing desk that greeted visitors upon entry.
RAD A
CONFERENCE 1 S-1
16'-0"
2
4'-0"
KITCHEN
1
6
A
5
PLAN 18
C
C
S-2
Hollow Steel
A
A
CONFERENCE 1 KITCHEN
RAD S-1 S-1
16'-0" 16'-0"
2
A
CONFERENCE 1 2 2
6
1 1
2
5 6 6
PLAN
A
C
PLAN PLAN
C C
PLAN
C
2'-5 3/4"
ELEVATION 1
ELEVATION ELEVATION 11
ELEVATION 2
8'-0"
PLAN
C
PLAN
S-2
CONF. TABLE MODULE 8'-0" 8'-0"
Hollow Steel Tube
C
CONF. TABLE MODULE
S-2
S-2
Ho Tu
8'-0" CONF. CONF. TABLE TABLE MODULE MODULE Hollow Steel Ho Tube Hafele E-Leg Tu 13 Ply 13 Plywood, Pl Hollow Hollow Steel Steel Colors: TBD, Co Tube Tube Hafele E-Leg 2 Color Max 2C CONF. TABLE MODULE 13 Ply Steel Hafele E-Leg S-2 13 Hollow Ho Plywood, Pl Tube Tu Colors: TBD, Co Hafele Hafele E-Leg 2 Color Max 2E-C Hollow Steel 13 13 PlyPly Hollow Steel Ho Tube Plywood, Plywood, Tube Tu Colors: Colors: TBD, TBD, 2 Color Max 2 Color Max Hollow Steel Steel Hafele E-Leg ELEVATION 1Hollow ELEVATION 2 Tube Tube 13 Ply Plywood, Colors: TBD, TABLE MIL HAWKINS INT 2 Color Max ELEVATION 2HAWKINS INT ELEVATION 1MILLWORK #1: CONFERENCE #601 Steel 119 West 23RD ST,Hollow 119 West 23RD ST, #601 SC SCALE: NTS New York, NY 10011 New York, NY 10011 Tube 06.14.2013 06. S-2S-2
5
ELEVATION 1
5
5 S-2
CONF. TABLE MODULE1 A A PLAN 5 5
8'-0"
A
A
C
5
6
1
6
8'-0"
A
A
1
1
Lillian
Lillian
Lillian
HAWKINS INT 19 ST, #601 119 West 23RD New York, NY 10011
2'-5 3/4" 2'-5 3/4" 2'-5 3/4" 2'-5 3/4"
6
N
16'-0"
6
MILLWORK #1: CONFERENCE TABLE ELEVATION ELEVATION 2HAWKINS 2 INT 119 West 23RD ST, #601 SCALE: NTS New York, NY 10011
3/4"
S-1
1
4'-0"
KITCHEN KITCHEN
16'-0"
2
CONFERENCE CONFERENCE 1 1 KITCHEN
2
KITCHEN
CONFERENCE 1 S-1
16'-0"
2
S-1
4'-0"
A
4'-0"
A
KITCHEN
16'-0"
4'-0"
RAD RAD
CONFERENCE 1
A
S-1
16'-0"
4'-0" 4'-0"
S-1
RAD
CONFERENCE 1
A
4'-0"
RAD
Lillian
M MIL SC M
Steel Bracket work surface connectors
VIF
1
S-1
A
1" x 2" Cleat
KITCHEN
A
S-1 S-1 S-1
11 1
HOLD
1" x 2" Cleat 1" 1" x x 2" 2" Cleat Cleat A
2'-4" 2'-4" 2'-4"
1 1
ref ref ref
7 7 7
PLAN
VIF VIF VIF
A A
RAD RAD RAD 22 2
1'-11" 1'-11" 1'-11"
3'-6"
Hafele Hebgo Hafele Hebgo Hafele Hebgo Bracket Bracket Bracket Steel Bracket work surface Steel Bracket Steelconnectors Bracket work work surface surface connectors connectors
7 7'-3
1" x 2" Cleat 1" 1" x x 2" 2" Cleat Cleat KITCHEN
KITCHEN
VIF
Hafela Hebgo Bracket
2
Lillian
Formica Table Formica Table TopTop
MILLWORK #2: ACCOUNTING OFFICE WORKDESK SCALE: NTS 06.14.2013
VIF VIF VIF
VIF VIF VIF
MW-02
Upholstered Bench Upholstered Bench Upholstered Bench Cushion Cushion Cushion By Others By By Others Others Abet Laminati on 3/4" Abet Abet Laminati Laminati on on 3/4" 3/4" Ply Ply Ply TBD Color: Color: Color: TBD TBD
ELEVATION 1 ELEVATION 1 ELEVATION 1 TopTable Top Formica Formica Table
Nychrome Nychrome A154 1 3/8" A154 1 3/8"
2" 1'-8"
2'-5"
2'-5"
MILLWORK #2: ACCOUNTING OFFICE WORKDESK HAWKINS INTAbet Laminati #2: on 3/4" Abet Laminati on 3/4" MILLWORK HAWKINS INT MILLWORK #2: ACCOUNTING ACCOUNTING OFFICE OFFICE WORKDESK WORKDESK HAWKINS INT23RD West ST, #601 119 Ply Ply SCALE: NTS West 23RD ST, #601 119 SCALE: NTS WestYork, 23RDNY ST,Color: #601TBD 119 New Color: TBD NTS SCALE: 10011 06.14.2013 New New York, York, NY NY 10011 10011 06.14.2013 06.14.2013 4" RIGID SEAT 4"FOAM RIGID FOAM SEAT
1'-2"
Lillian
Restaurant Restaurant Table Table Legs Legs
Upholstered Upholstered Bench Bench Cushion Cushion By Others By Others
1'-2"
22
Lillian
Lillian
2'-4" 2'-4"
1'-8" 1'-8"
BB
7'-31/8" 1/8" 7'-3
ELEVATION 2 ELEVATION 2 ELEVATION 2
3'-0" 3'-0"
2'-4" 2'-4"
PLAN PLAN
ELEVATION 2
2'-4" 2'-4"
Hafela Hebgo Bracket Hafela Hebgo Hafela Hebgo Bracket Bracket
2
HAWKINS INT 119 West 23RD ST, #601 New York, NY 10011
B
2'-6" 2'-6" 2'-6"
1 1/2" White Ikea Counter Top, 11 1/2" Counter Top, 1/2" White White Ikea IkeaSupplied Counterby Top, owner Supplied Supplied by by owner owner
VIF
B
7'-3 1/8" 7'-3ELEVATION 1/8" 1 PLAN PLAN
2'-6"
A
Formica Table Formica TopTable Top
2'-4"
A A
1
PLAN PLAN PLAN
HOLD HOLD HOLD
2'-4" 1
Ikea Counter Top, 3'-6"1 1/2" WhiteSupplied 3'-6" by owner 3'-6"
MW-02 MW-02 EQ
2"
EQ EQ
EQ EQ
EQ
1'-8"
ELEVATION ELEVATION 1 1
ELEVATION ELEVATION 2 2
MILLWORK MILLWORK #3: BANQUETTE #3: BANQUETTE & TABLE& TABLE 20 Melamime HAWKINS INT INT 1" White 1" White Melamime tableHAWKINS table 23RD West ST, 23RD #601ST, SCALE: #601 SCALE: NTS NTS top w/top edge w/ edge 119 West119 Lillian
Lillian
MW-03 MW
21
5 S-2
Shop Spray Finish White 3/4" Plywood Counter Top Shop Spray Finish White A 3/4" Plywood Base
Corian Tabl Color
3/4"
Hafele Hebgo Brackets Bisley Cabinet By Others
"
3form Chroma Supplied by owner
" -6 2' 6"
3/4"
Scale: 3/8" = 1"
"
-8
-8
2'
Reception Desk Iso
" -6
4 1/2"
9"
4 1/2"
4'-0"
2'-0"
MILLWORK & DETAILS
"
1/2"
A403.00 A403.00 A403.00
HAWKINS INT 3form ST, #601 119 West 23RD Chroma New York, NY 10011
Lillian
Scale: 1/2" = 1"
05.13.13 05.13.1305.13.13
64'x4'4'x4' 6 3form 3form 4'x4' 3form Scale:Scale: 1/4" =1/4" Scale: 1" = 1"1/4" = 1" A403A403 A403 7 Shelf Elevation 7 OF 77 OF 7 7 OF 7 1/4" = 1" A403 Scale:22 6
2'
4 A403
MILLWORK MILLWORK &MILLWORK DETAILS & DETAILS & DETAILS Scale: 1/2" = 1"
2'-0"
" Scale: 3/8" = 1"
Shelf Plan
4'-0"
2'
A403
7ShelfShelf 7 Elevation Elevation Shelf Elevation Scale:Scale: 1/4" =1/4" Scale: 1" = 1"1/4" = 1" A403A403 A403
Reception Desk Iso 7
2' 1"
1/2"
4 1/2"
4 1/2"
2'-0"
Shelf Plan
5 4" A403
"
-8 2' " -8 " 2' -8 "
4'-0"5 A403
ELEVATION 1
3form Chroma Supplied by owner
'-0
"
1/2" 1/2" 2'-0" 2'-0" 2'-0"
2'-0" 2'-0"
2'-0"
Hafela Aluminum
Fax: 212-206-3654 Standoff
10
"
'-0
-0
' 10
3'-6"
10
RECEPTION 4'-0" 4'-0"
4"
4'-0"
1
4"
4'-0"
5ShelfShelf 5 Plan Plan Shelf Plan
4"
4'-0"
Shop Spray Finish White 3/4" Plywood Base
Scale:Scale: 1/2" =1/2" Scale: 1" = 1"1/2" = 1" A403A403 A403
PLAN
2
2'-5"
9"
9"
10'-0"
1"x2" Cleat Painted White
3'-6"
3'-6"
3'-6"
3'-6"
5
9"
Shop Spray Shop Spray Finish Shop Finish White Spray White Finish White 3/4" Plywood 3/4" Plywood Base 3/4"Base Plywood Base
Shop Spray Finish White Hafela Aluminum Standoffs 3/4" Plywood Base
1"
3Form Shelf: 3Form Walnut, or Glass Shop Spray Finish White 3/4" Counter Top
Hafela Alumin Stand
-1
2'-0"
MW-05
9'
2'-0"2'-0"
1"x2" Cleat 1"x2" Painted Cleat 1"x2" Painted White CleatWhite Painted White
MW-05
Hafele Hebgo Brackets 2'-0" Hafele Hebgo Koko Architecture and Design Bisley Brackets 38 Delancey Street, #7D 3form Cabinet New York, NY Chroma 10002 By Others Telephone: 212-206-3638
4 1/2"
4 1/2"
3Form Detail
Walnut, Walnut, or Glass orWalnut, Glass or Glass Shop Spray Shop Spray Finish Shop Finish White Spray White Finish White 3/4" Counter 3/4" Counter Top 3/4"Top Counter Top
4
Shop Spray Finish White Koko Architecture Koko Architecture Koko and Architecture Design and Design and Design 38 Delancey 38 Delancey Street, 38 Delancey Street, #7D Top #7D Street, #7D 3/4" Counter Corian New York, New York, NY 10002 New NY York, 10002 NYTable 10002 Top Telephone: Telephone: 212-206-3638 Telephone: 212-206-3638 212-206-3638 Color: TBD 1"x2" Cleat Painted White Fax: 212-206-3654 Fax: 212-206-3654 Fax: 212-206-3654
A
MILLWORK #5: RECEPTION DESK SCALE: NTS 06.14.2013
EXPLODED AXON 6 A403
4'x4' 3form Scale: 1/4" = 1"
05.13.13
-6
3'-5"
2'-6"
VIF
4" 3/ Shelf: 3Form3Form Shelf: 3Form 3Form 3Form Shelf: 3Form
Lillian
HAWKINS INT 119 West 23RD ST, #601 New York, NY 10011
Hawkins Int. #5: RECEPTION DESK MILLWORK HAWKINS INT West 23rd St, #401 119 West 23RD ST, #601 119 SCALE: NTS York, NY 10011 New New York, NY 10011 06.14.2013
Lillian
4 1/2"
3Form 3Form 3Form DetailDetail B Detail
Scale: 3/8" = 1"
ELEVATION 2
Hafela Aluminum Standoff
Lillian
ELEVATION 2
3 Reception Elevation #1 3Form Shelf: 3Form Scale: 3/8" = 1" A403 Walnut, or Glass
Reception Elevation #2
4 1/2"
2
ELEVATION 1
3form Chroma Hafela Aluminum Standoff
Hawkins Hawkins Int. Int. Hawkins 11" Int. ELEVATION 119 West 119 West 23rd119 St, 23rd #401 West St, #401 23rd St,1#401 NY 10011 NY York, 10011 NY 10011 New York, New York, New
3Reception 3 Reception Elevation Reception Elevation #1Elevation #1 #1 Scale:Scale: 3/8" =3/8" Scale: 1" = 1"3/8" = 1" A403S-2 A403 A403 A403
Hafela Aluminum Standoff
3Form Detail
3
Scale: 3/8" = 1"
3form Chroma Hafela Aluminum Standoff
Hafele Hebgo Brackets
Corian Table Top Color: TBD
Reception Elevation #1
Hafele Hebgo Brackets
Lillian
9"
1 2Reception 2 Scale: Reception Elevation Reception Elevation #21" Elevation #2 #2 1/4" = A403 Scale:Scale: 3/8" =3/8" Scale: 1" = 1"3/8" = 1" A403A403 A403
2
11"
Lillian
Corian Table Top Color: TBD
1/2"
DESIGN SET
1/2"
2'
Shelf: 3Form, Walnut, or Glass
11" 11"
3 A403
Scale: 3/8" = 1" Lillian
4" 3/ Reception Plan
1/2"
Reception Elevation #2
2 A403
RECEPTION
2/A403
2'-
DESIGN DESIGN SET DESIGN SET SET
3/4"
2'-5" 3'-5"
3'-5" 2'-6"
8'-0"
2'-6" 3'-5"
2'-6"
PTION
3/4"
B
EXPLODED AXON
2'-8"
Shop Spray Finish White 3/4" Plywood Counter Top Shop Spray Finish White A 3/4" Plywood Base
3/A403 3/4"
3/A403
2'-5" 3/A403
11"
Scale: 1/4" = 1"
Shelf: 3Form,3Form, Shelf: 3Form, Walnut, , or Glass orWalnut, Glass or Glass
3form Chroma
"
PLAN
Reception Plan5
'-0
1 A403
3form Chroma
2'-8"
EXPLODED AXON
10
pray hop Spray Finish Shop Finish White Spray White Finish White ywood /4" Plywood Counter 3/4"Counter Plywood Top Top Counter Top pray hop Spray Finish Shop Finish White Spray White Finish White A A A ywood /4" Plywood Base 3/4"Base Plywood Base
3form Ch Suppl o
"
RECEPTION
1
Hafela Al Sta
2'-8"
Hafela Aluminum Standoffs
11
2'-5"
1"
2'-
6"
Corian Table Top Color: TBD
10'-0"
PLAN
2
RECEPTION
A
9'-
1
2
B
RECEPTION
'-0
2'-6"
-6 2'-5" "
3form Chroma Supplied by owner
10
PLAN
2'
Hafela Aluminum Standoffs
1"
VIF
1
Hafele Hebgo Brackets Bisley Cabinet By Others
-1
2
10'-0"
S-2
10'-0"
5
Corian Table Top Color: TBD
9'
2'-5"
A
1"
B
3'-5"
2'-5"
VIF
RECEPTION
2/A403
A
S-2
Shelf: 3Form, Walnut, or Glass
8'-0"
B
VIF
3/A403
B
2'-0"
A403.00 7 OF 7
MILLWO SCALE: 06.14.20
4'-0"
2'-0"
1'-
2 CONFERENCE CLOSET SECTION A403 Scale: 3/8" = 1"
Owner Hawkins Int. 119 West 23rd St, #401 New York, NY 10011
Blocking as Required 3/4" MDF or Painted Plywood
2 CONFERENCE CLOSET SECTION A403 Scale: 3/8" = 1"
1'-6"
DATA RM
4" 1'-9"
Track Stop, Typ.
Hafele: EKU Regal A 52 H Foreslide
EW
1'-10"
Issue Date
HAWKINS INT. 119 WEST 23RD ST 5 SLIDING DOOR #601 A403 Scale: 3/4" = 1" New York, NY 10011
10'-0"
1'-6" 1'-6"
Blocking as Required 3/4" MDF or Painted Plywood Hafele: EKU Regal A 52 H Foreslide
8'-0"
elving Units
4 SLIDING DOOR DETAIL TOP A403 Scale: 3/4" = 1"
locking as Required MDF or Painted Plywood
Sheet Number
Track Stop, Typ.
Koko Architecture and Design VIF 38 Delancey Street, #7D
7'-3"
Number 7 OF 7 CONFERENCE CLOSET ELEVATION 1 Sheet A403 Scale: 3/8" = 1"
Hafele: EKU Regal A 52 H Foreslide Custom Shelving Units
Drawing Title
MILLWORK & DETAILS
4 SLIDING DOOR DETAIL TOP A403 Scale: 3/4" = 1"
5 SLIDING DOOR DETAIL BOTTOM A403 Scale: 3/4" = 1"
1'-10"
Fax: 212-206-3654
© Koko Architecture + Design, L.L.C.
Hafele: EKU Regal A 52 H Foreslide
7 OF 7
05.13.13
Issue Date
Architect
Sliding Door
e: EKU Regal 2 H Foreslide
Custom Shelving Units
A404.00
DETAIL BOTTOM
© Koko Architecture + Design, L.L.C.
A404.00
2 CONFERENCE CLOSET SECTION A403 Scale: 3/8" = 1"
05.13.13
Owner Title Hawkins Drawing Int. 119 West 23rd St, #401 MILLWORK & DETAILS New York, NY 10011
5 SLIDING DOOR DETAIL BOTTOM New York, NY 10002 Telephone: 212-206-3638 A403 Scale: 3/4" = 1"
4 SLIDING DOOR DETAIL TOP A403 Scale: 3/4" = 1"
3" MDF or Painted Plywood Shelf with backing
MILLWORK & DETAILS
Hafele: EKU Regal A 52 H Foreslide Lillian
3 CONFERENCE CLOSET PLAN VIEW A403 Scale: 3/16" = 1"
Drawing Title
8'-0"
Custom Shelving Units
Regal slide
© Koko Architecture + Design, L.L.C.
38 Delancey Street, #7D New York, NY 10002 Telephone: 212-206-3638 Fax: 212-206-3654
1'-7"
VATION
Architect
Koko Architecture and Design DESIGN SET
3/4" MDF or Painted Plywood
Issue Date
A404.00
4" 4"
4"
23
Blocking as Required 3/4" MDF or Painted Plywood Hafele: EKU Regal A 52 H Foreslide
05.13.13
3 CONFERENCE CLOSET PLAN VIEW A403 Scale: 3/16" = 1" Sheet Number
A
DATA RM
3" MDF or Painted Plywood Shelf with backing
1'-11"
Hafele: EKU Regal A 52 H Foreslide
1'-10"
DATA RM
7'-3"
Custom Shelving Units
4" 1'-9"
1'-6"
8'-0"
Hafele: EKU Regal Track Stop, Typ. A 52 H Foreslide
Sliding Door
Telephone: 212-206-3638 Fax: 212-206-3654
#601 New York, NY 10011
1'-6"
1 CONFERENCE CLOSET ELEVATION A403 Scale: 3/8" = 1"
7 OF 7
Hafele: EKU R A 52 H Fores
4 SLIDING DOOR DETAIL TOP A403 Scale: 3/4" = 1"
A
Schwartz Residence Location: Flatiron District, NY / Duration: 4 weeks / Program: Residential Millwork
This project was a very small scale renovation and addition to existing millwork in a studio apartment in the Flatiron District. The main request from the client was to keep it aesthetically traditional while dividing the room into two spaces. It was also requested that we optimized all the wall space so that he could store his expansive book collection. Inspired by a few photos the client had sent of the type of aesthetic he liked, a working desk was used as an implied partition breaking the studio apartment into two separate spaces. I saw this project from it’s inception, measuring his studio apartment and then drawing up the base plans before then implementing the requested millwork. Breaking from what we normally do at Koko, I was introduced into the design process for drawing up crown moulding. Although it was not my most exciting or favorite design, I was excited to have had the experience of designing in a more traditional way.
1'-8"
11'-9"
MW-7
MW-1
2/101
4/101
12'-3"
MW-5
AC
EXISTING MILLWORK TO REMAIN
5/101
BED (N.I.C.)
RAD
3/101
6" SHELF
1
24
3'-4"
4'-2"
3'-4"
MW-3
MW-4
MW-3
(2) HANGING RODS 5'-1"
6'-0"
MW-6
MW-2
Plan Scale: 1/2" = 1'-0"
KOKO ARCHITECTURE + DESIGN Lillian
SCHWARTZ MILLWORK
100 8/15/13
TV
TV FIRE PLACE 4'-0" MW-7 2
1'-3"
5'-11"
5'-5 1/2"
2'-10"
5'-2"
2'-10"
MW-6
MW-2
MW-6
MW-3
MW-4 FIRE PLACE
MW-3
5'-11"
5'-5 1/2"
2'-10"
5'-2"
2'-10"
MW-2
MW-6
MW-3
MW-4
MW-3
North Elevation
3
Scale: 3/8" = 1'-0" 4'-0" MW-7
2
SLIDING SHELF
1'-3" SLIDING SHELF
East Elevation Scale: 3/8" = 1'-0"
MW-6
North Elevation
3
Scale: 3/8" = 1'-0"
BRASS GRILL
BRASS GRILL
East Elevation Scale: 3/8" = 1'-0"
AC
1'-3" MW-6 4 1'-3"
AC
South Elevation
South Elevation
Scale: 3/8" = 1'-0"
1'-10"
BRASS GRILL
1'-8" MW-7
MW-5 5
Scale: 3/8" = 1'-0"
MW-6 4
BRASS GRILL
West Elevation
Scale: 3/8" = 1'-0" 1'-10" MW-5 5
West Elevation
Scale: 3/8" = 1'-0"
25
3'-0"
11'-9"
3'-0"
MW-1 KOKO ARCHITECTURE + DESIGN
1'-8" MW-7
Lillian
3'-0" 11'-9" SCHWARTZ MILLWORK MW-1
101 3'-0"
8/15/13
KOKO ARCHITECTURE + DESIGN Lillian
SCHWARTZ MILLWORK
101 8/15/13
COMMERCIAL GROUP USE GROUP TYPE OF CONSTRUCTION 1968 CONSTRUCTION CL BC27-357 TABLE 6-1
School Of Rock Location: Brooklyn, NY / Duration: 6 weeks / Program: Music School
B 9A (STUDIOS) 3-NON-FIREPROOF TABLE 6-1 TYPE IIB EXIT REQUIRENTS BUSINESS MAX TRAVEL SPRINKLER 200' TRAVEL DISTANCE PROPOSED 110'--OK CAPACITY DOOR OPENINGS TO OUTDOORS AT GRADE-100 PERSONS PER UNIT CORRIDORS MIN WIDTH-44' PROPOSED WIDTH-55.5"--OK MAX DEAD END-50' PROPOSED DEAD ENDPERMISSABLE INCREASE BC27-369(d) ALLOWS 100% INCREASE IN DEAD END CORRIDOR ENCLOSED IN 2HR FIRE RESISTANCE RATING, WITH ALL CORRIDOR DOORS BEING SELF-CLOSING1.5HR, PERMISSABLE LENGTH OF DEAD ENDS MAY BE INCREASE 100% ABOVE LISTED IN TALBLE 6-1
The School of Rock is a system of music schools around the country. The program works like a franchise where people, or BC27-358 OCCUPANT LOAD groups of people buy the rights to use the School of Rock logo, TABLE 6-2 MUSIC STUDIO (SIMILAR TO CLASSROOM) 20SF PER name, and business structure. Our particular clientPERSON bought the 3600SF/20SF/PERSON = OCCUPANT LOAD OF 180 STORAGE rights for a School of Rock in Brooklyn. Having worked closely 2150SF/200SF/PERSON = OCCUPANT LOAD OF 11 PERSONS with Koko in the past, School of Rock’s corporate headquarters TOTAL OCCUPANT LOAD = 191 recommended to the client that he work with us DOORS 2in @designing 36" 36" = 22" + 14" = 1.5 UNITS PER DOOR his School of Rock in Brooklyn. 2 X 1.5 UNITS = 3 UNITS 3 UNITS X 100 PERSONS / UNIT = 300 PERSONS ALLOWED 191 PERSONS REQUIRED < 300 PERSONS ALLOWED--OK PROPOSED OCCUPANCY 74 PERSONS < 300 ALLOWED--OK
Working with a colleague, I was brought on to help expedite the design process. Together we were able to coordinate LIGHTING design ideas, fulfill theBC27-381 need and request of theEXIT client and (a) AT LEAST 2 FOOT CANDLES AT CORRIDORS ANDEXITS get a bid set out to three separate contractors. In addition to BC27-383 EXIT SIGNS being involved in the design process I was able to visit the site THE LOCATION OF EVERY EXIT ON EVERY FLOOR SHALL BE CLEARLY INDICATED BY EXIT SIGNS. SUCH SIGNS numerous times and understand how contractors negotiate SHALL BE PLACED AT AN ANGLE WITH THE EXIT OPENING IF SUCH PLACEMENT IS REQUIRED FOR THE SIGNS TO bids with clients. I also gained a greater understanding of SERVE THEIR PURPOSE. IN LONG CORRIDORS, IN OPEN FLOOR AREAS, AND IN ALL OTHER SITUATIONS WHERE the bureaucratic process in getting architectural drawings THE LOCATION OF THE EXIT MAY NOT BE READILY VISIBLE approved through the department of building. OR UNDERSTOOD, DIRECTIONAL SIGNS SHALL BE PROVIDED TO SERVE AS GUIDES FROM ALL PORTIONS OF THE CORRIDOR OR FLOOR.
TABLE 3-4
CONSTRUCTION CLASSIFICATION CLASS IIB BEARING WALLS-EXTERIOR -2HR-NO CHANGE ROOF CONSTRUCTION -3/4HR EXCEPT 0HR IN BUILDING 1 STORY IN HEIGHT
26
AD
BO
AP
FLO
BLO
LO
ZO
MA
CO
A-
AAAAA-
A-
A-
M-
M-
M-
M-
M-
M-
M-
SP
SP
SP
SP
ADJACENT BUILDING
EXIT
ADJACENT BUILDING
RECEPTION/LOBBY 101
OFFICE 104
FATBOY OTTOMANS
3
SUPPLIED BY OWNER
RECEPTIONIST CHAIR
27
1
SUPPLIED BY OWNER
DESK
1
RECEPTRION COUNTER MERCHANDISE CASES MOBILE FILING CABINET
-
3 1
ATA CASES BY OWNER IKEA BY OWNER IKEA BY OWNER IKEA BY OWNER
ITEM VINYL
1 2
LOCATION
ENTRY DOOR (1)
ENTRY DOOR (2)
3,4,5 STOREFRONT WINDOWS 6 7
OFFICE WINDOW
STUDENT LOUNGE MTL WALL VARIOUS LOCATIONS
FROSTED GUITAR
PROVIDED AND INSTALLED BY OWNER
CLEAR GRAPHIC FILM
INSTALLED BY OTHERS
SOR LOGO
PROVIDED AND INSTALLED BY OWNER
FROSTED GUITAR
PROVIDED AND INSTALLED BY OWNER
FROSTED QUOTE
PROVIDED AND INSTALLED BY OWNER
12" SOR LOGOS
PROVIDED AND INSTALLED BY OWNER
CONSTRUCTION SET
CONSTRUCTION SET CONSTRUCTION SET CONSTRUCTION CONSTRUCT SET
Lillian
Lillian
Lillian
9'-0"
Lillian
9'-0"
9'-0"
9'-0"
9'-0"
9'-0"
3'-3"
Lillian
3'-3"
9'-0" 9'-0" 9'-0"
5'-4 1/2"
5'-4 1/2"
5'-4 1/2"
5'-4 1/2" 3'-3"
3'-3"
5'-4 1/2" 3'-3"
3'-3" 3'-3" 3'-3"
3'-3"5'-45'-4 1/2" 5'-4 1/2"1/2" 5'-4 1/2"
Lillian
Koko Architecture and Desig 38 Delancey Street, #7D New NY 10002 KokoYork, Architecture and Desig Koko Architecture and Desig Telephone: 212-206-3638 38 Delancey Street, #7D Koko Architecture Koko Architecture and Desig Koko an 38 #7D Fax: 212-206-3654 NewDelancey York, NYStreet, 10002 38 Delancey 38NY Delancey Street, Street, 38 D New York, 10002#7D Telephone: 212-206-3638 New 212-206-3654 York, New NY York, 10002 NY 1000 New Telephone: 212-206-3638 Fax: Telephone: Telephone: 212-206-3638 212-206 Tele Fax: 212-206-3654 Fax: 212-206-3654 Fax: 212-206-3654 Fax: May Sun Construction 100 Sackett Street Brooklyn, NY 11231 May Sun Construction May Construction Telephone: 718.643.3775 100 Sun Sackett Street May Sun May Construction Sun Constructio May 100 Sackett Fax: 718.855.9182 Brooklyn, NY Street 11231 100 Sackett 100 Sackett Street 100 Brooklyn, NY718.643.3775 11231 Street Telephone: Brooklyn, Brooklyn, NY718.643.3775 11231 NY 11231 Broo Telephone: Fax: 718.855.9182 Telephone: Telephone: 718.643.3775 718.643 Tele Fax: 718.855.9182 Fax: 718.855.9182 Fax: 718.855.9182 Fax:
Pavane and Kwalbrun Consul Engineers 306 West Street, 17th Pavane and37th Kwalbrun Consul Pavane andNY Kwalbrun New York, 10018 Consul Engineers Pavane and Pavane Kwalbrun and Kwalbrun Consul Pava Engineers Telephone: 212-727-3408 306 West 37th Street, 17th Engineers Engineers Engi 306 West 37th Street, 17th Fax: New 212-627-3610 York, NY 10018 306 West 306 37th West Street, 37th 17th 306 Stre New York, NY 10018 Telephone: 212-727-3408 New York, New NY York, 10018 NY 1001 New Telephone: 212-727-3408 Fax: 212-627-3610 Telephone: Telephone: 212-727-3408 212-727 Tele Fax: 212-627-3610 Fax: 212-627-3610 Fax: 212-627-3610 Fax:
08.09.2013
08.09.2013 08.09.2013 08.09.2013 08.09
PC PC PC PC
5 OF 19
PC
5 OF 19 5 OF 19 5 OF 19 5 OF 19
28
P
5O
7 A500 7 A500
CONSTRUCTION
Lillian
Koko Architecture and D 38 Delancey Street, #7D New York, NY 10002 Telephone: 212-206-36 Fax: 212-206-3654
May Sun Construction 100 Sackett Street Brooklyn, NY 11231 Telephone: 718.643.377 Fax: 718.855.9182
Pavane and Kwalbrun Co Engineers 306 West 37th Street, 1 New York, NY 10018 Telephone: 212-727-34 Fax: 212-627-3610
08.09.201
PC
6 OF 19
29
Taipei Highrise Location: Taipei, Taiwan / Duration: 9 weeks / Program: Residential Mixed-use
This highrise in Taipei, Taiwan was designed in conjunction with a property development firm based in Taiwan. The client requested we implement a museum showcasing his oil production company, but was otherwise aimed to be a flexible mixed-use residential building in this rapidly growing part of the city. Koko worked closely in collaboration with local architects to fully understand the details of the code and other parameters we were required to follow by law. We split into three different design teams and wound up with three different iterations to present to the property development company. I collaborated with one colleague to develop the main idea and was in charge of producing images and renderings to convey the idea of the space to the property developers and the client. We were given a corner lot, but unfortunately one of the property owners didnâ&#x20AC;&#x2122;t want to rebuild and wanted to keep their existing building as is. This gave us an L-shaped building footprint to work with. In order to make the building become an iconic landmark and make sure the building didnâ&#x20AC;&#x2122;t get lost in the existing urban fabric, the main idea was that we would create a unique artful screen like ones made traditionally in that part of the world. Drawing from local traditions and ideas we deconstructed a cherry blossom and abstracted it to create a screen that would appear to be moving as you drove past the building. This moray affect would be achieved by layering super-graphics painted on the building, and similar graphics perforated into metal mesh.
the overall function of the building keeping in mind ways to serve the public as well. What was originally a back of house alley-access service area will be transformed into a publicly used floating garden area. After many iterations and renderings we were able to consolidate our three separate ideas and compile a presentation that one of our principal architects was able to present.
Some alterations to the program were made as well to improve
30
31
32
1
2
3
4
5
6 33
34
35
36
37