2019 - LEED Review

Page 1

AN ANNUAL SUPPLEMENT 2019

BUILDINGS-IN-REVIEW & A RECORD OF THE LEED BUILDINGS CERTIFIED IN 2019

PLATINUM Ì 1100, boulevard René-Lévesque Ouest, Recert., Quebec, QC, Oxford Properties Group Ì 26 Wellington Street East, Toronto, ON, H&R REIT Ì 278 Kirchoffer Ave., Ottawa, ON, Linebox Ì 5875 Explorer Dr., Mississauga, ON, BentallGreenOak Ì 600 Cochrane, Markham, ON, Canadian Urban Limited Ì 720 King West, Recert., Toronto, ON, GreinerPacaud/Hamilton Management Inc. Ì Aqualina at Bayside, Toronto, ON, Tridel Ì Bentall 5, Vancouver, BC, Bentall Kennedy (Canada) LP

Ì Broadway Tech Centre, Bldg 6, Vancouver, BC, QuadReal Property Group Ì Chahil House, Vancouver, BC, Home Owner Ì Écohabitations boréales, Val David, QC, Écohabitations boréales inc. Ì Éco-refuge, Saint-Donat, QC, Re/Max Alliance Inc. Ì Édifice Sun Life Montréal, Montreal, QC, Bentall Kennedy (Canada) LP Ì Elää - bâtiments A, B, C, D, E & F, Montreal, QC, Gestion Knightsbridge Ì Enercare Centre, Recert., Toronto, ON, Exhibition Place Ì EY Tower, Toronto, ON, Oxford Properties Group

Ì Kindrachuk Agrey Architecture Studio, Saskatoon, SK, Kindrachuk Agrey Architecture Ì L'Ecolo, Rawdon, QC, Construction Pascal Lanoue Inc. Ì LoyaltyOne, Floors 2-7, Toronto, ON, LoyaltyOne, Co. Ì Maisons EcoAlba, Saint-Lazare, QC, Maisons EcoAlba Construction Ì Maison LEEDéale Gaspésie, Maria, QC, Constructions Scandinaves Ì Okanagan College Trades Tower - Kelowna Campus, Kelowna, BC, Okanagan College Ì Prairie Architects Inc Office, Winnipeg, MB, Prairie Architects Inc.

Ì Résidence 1ère Avenue, Montreal, QC, SIGA Développement Ì Résidence Alain Joyal, Stoneham, QC, Chabot Construction Ì Résidence Félix Jasmin, St-Hippolyte, QC, Gestion nouvelle conscience inc. Ì Résidence St-Louis-Sheehy, Pointe-Claire, QC, Belvedair Construction inc. Ì St. Marguerite School, Calgary, AB, Calgary Catholic School Board Ì The Saltshaker, Banff, AB, Karoleena Homes Ì Waterpark Place, Toronto, ON, Oxford Properties Group

Ì 1600 Carling Avenue, Ottawa, ON, Manulife Investment Management Ì 18-005-Joly-Ames, Saint-Hippolyte, QC, Belvedair Construction inc. Ì 1950 Meadowvale, Mississauga, ON Ì 2 International Blvd., Toronto, ON, LaSalle Investment Management Ì 2 St. Thomas, Toronto, ON, Bentall Kennedy (Canada) LP Ì 2000 McGill College, Montreal, QC, Industrielle Alliance Ì 234 Wellington Street, Ottawa, ON, Bank of Canada Ì 250 Albert Street, Ottawa, ON, Morguard Investments Limited Ì 33 Yonge Street, Toronto, ON, GWL Realty Advisors Inc.

Ì 351 King Street East, Toronto, ON, First Gulf Corporation Ì 45 St. Clair Ave W, Toronto, ON, Manulife Real Estate Ì 5005 Lapinière, Complexe LL Phase 3, Brossard, QC, Complexe L.L phase 3 S.E.C Ì 5045 South Service Rd, Burlington, ON, Manulife Investment Management Ì 5090 Explorer Drive, Mississauga, ON, Manulife Investment Management Ì 5343 Dundas St W, Etobicoke, ON Ì 555-565 Great Northern Way, Vancouver, BC, Low Tide Properties Ltd. Ì 5775 Yonge Street, Toronto, ON, Bentall Kennedy (Canada) LP c/o True North Commercial REIT Ì 616 Main Street, Saskatoon, SK, Kindrachuck Agrey Architecture

Ì 6775 Financial Drive, Mississauga, ON Ì 685 Fairway Road - Buildings K & L, Kitchener, ON, First Capital Asset Management Ì 6880 Financial Drive, Recert., Mississauga, ON, Triovest Realty Advisors Inc. Ì 777 Hornby, Vancouver, BC, QuadReal Property Group Ì 88 Scott, Toronto, ON, Concert Properties Ltd. Ì 901 King Street West, Toronto, 0N, Crown Property Management Inc. Ì 9888 Jasper, Edmonton, AB, Bentall Kennedy (Canada) LP Ì Adler University: 520 Seymour St., Vancouver, BC, Adler University Ì AeroCentre, Mississauga, ON, Menkes Property Management Services Ltd. Ì Agriculture Place, Regina, SK, Harvard Developments Inc.

GOLD Ì 1 Adelaide St. E, Recert., Toronto, ON, GWL REALTY ADVISORS Ì 100 Sheppard Ave. E, Toronto, ON, Manulife Investment Management Ì 101 St. Clair Avenue W, Toronto, ON, 101 St. Clair Building Group Inc. Ì 105 Hotel De Ville, Gatineau, QC, GWL Realty Advisors Inc. Ì 1100 Melville Street, Vancouver, BC, BentallGreenOak Ì 1130 West Pender, Vancouver, BC, BentallGreenOak Ì 1140 West Pender, Vancouver, BC, BentallGreenOak Ì 1250 boul. René-Lévesque Ouest, Recert., Montreal, QC, Conseillers immobiliers GWL Ì 150 Slater Street, Ottawa, ON, Manulife Real Estate

SABMag - SPRING/SUMMER 2020

11


GOLD Ì Apostles of Jesus School, Calgary, AB, Calgary Catholic School Division Ì Atria 1, North York, ON, Epic Investment Services Ì Atria II & III, North York, ON, Epic Investment Services Ì Atrium on Bay, Toronto, ON, Triovest Realty Advisors Inc. Ì BentallGreenOak Head Office (Canada), Head Office (Canada), Toronto, ON, Bentall Kennedy Ì Bloor Islington Place, Recert., Toronto, ON, Starlight Investments Ì BP Centre, Calgary, AB, QuadReal Property Group Ì Broadway Tech Centre, Bldg 2 & 3, Bldg. 8, Vancouver, BC, QuadReal Property Group Ì Campbell River Facility, Campbell River, BC, Vancouver Island Health Authority Ì Canon Canada Headquarters, Brampton, ON, Canon Canada Inc. Ì Centre 10, Calgary, AB, 20VIC Management Inc. Ì Centre for Collaborative Education, Oshawa, ON, Durham College Ì Centre Universitaire de Santé McGill, Montreal, QC, Centre univ. de santé McGill Ì Chalet du parc Decelles, Saint-Laurent, QC, Ville de Montréal, Dev. actifs immobiliers Ì Christine Meikle School, Calgary, AB, Calgary Board of Education Ì Citigroup Place, Recert., Toronto, ON, Oxford Properties Ì Co:Here Housing, Vancouver, BC, Innovative Housing Consultants Ì Coach house, Bolton Ouest, QC, Les Ensembliers Ì Commerce Place Edmonton, Edmonton, AB, bcIMC Realty Corporation c/o GWL Realty Advisors Inc. Ì Comox Valley Facility, Campbell River, BC, Vancouver Island Health Authority Ì Cour de services Ville-Marie, Montreal, QC, Ville de Montréal Ì cSPACE King Edward, Calgary, AB, cSPACE Projects Ì Deloitte Office at Bay Adelaide Centre - East Tower, Toronto, ON, Deloitte Ì Devon Tower, Calgary, AB, Oxford Properties Group Ì Dr. George Stanley School, Calgary, AB, Calgary Board of Education Ì Ecohabitations boreales, Milles-Isles, QC, Écohabitations boréales inc. Ì Ecohabitations boreales, Ste-Adèle, QC, Écohabitations boréales inc. 12

SABMag - SPRING/SUMMER 2020

Ì Ecohabitations boreales, St-Eustache, QC, Écohabitations boréales inc. Ì École Rivière-Rouge, Winnipeg, MB, Seven Oaks School Division Ì Edmonton Tower, Floors 2-3, 5-19, Edmonton, AB, City of Edmonton Ì Edwin Parr Composite School, Athabasca, AB, Aspenview Public School Division Ì Etobicoke Ancillary Services Building, Toronto, ON, Morguard Investments Ltd. Ì Evergreen Bldg., Vancouver, BC, QuadReal Property Group Ì Evergreen Fire Station 37, Calgary, AB, The City of Calgary Ì Fire Station 7, Calgary, AB, City of Calgary Ì Gables House, Beaconsfield, QC, VERTical Construction Ì Grand Genesis, Richmond Hill, ON, Guizetti Development Inc. Ì Greenwood College School Expansion, Toronto, ON, Greenwood College School Ì Heathview North Tower, Toronto, ON, Morguard Corporation Ì Holy Child School, Calgary, AB, Calgary Catholic School Division Ì IC Savings Corporate Office and Etobicoke Centre Branch, Etobicoke, ON, IC Savings & Credit Union Ì Keynote Office Tower 1, Recert., Calgary, AB, Triovest Ì Killarney Seniors Centre, Vancouver, BC, City of Vancouver Ì Kitchener Bus Facility, Kitchener, ON, GO - Division of Metrolinx Ì Kitsilano Secondary School, Vancouver, BC, The Board of Education of School District 39 Ì Kwantlen Polytechnic University Chip and Shannon Wilson School of Design, Richmond, BC, Kwantlen Polytechnic University Ì L.R. Wilson Hall, Hamilton, ON, McMaster University Ì Laura Secord School Gymnasium, Winnipeg, MB, Winnipeg School Division Ì Le 1981 McGill College, Montreal, QC, Industrielle Alliance Ì Maison Babin Turcotte, Saint-Calixte, QC, Belvedair Construction inc. Ì Maison modèle Luxuor, Saguenay, QC, AR Construction Ì Manège Militaire pour le 35e Régiment du Génie de combat, Quebec, QC, Ministère de la Défense Nationale, Gouvernement du Canada Ì Manmeet Singh Bhullar School, Calgary, AB, Calgary Board of Education

Ì Manulife Global Head Office, Toronto, ON, Manulife Financial Ì Manulife Place, Recert., Edmonton, AB, Manulife Real Estate Ì Manulife Place, Vancouver, BC, The Manufacturers Life Insurance Company Ì MetroCentre, Recert., Toronto, ON, Oxford Properties Ì Millennium Tower, Calgary, AB, Oxford Properties Group Ì Miramichi Public Service Pay Centre, Fit-up, Miramichi, NB, Public Works and Government Services Canada Ì Miramichi Public Service Pay Centre, Miramichi, NB, 8424934 Canada Inc. Ì Mississauga Gateway Phase 2: 2 & 8, Mississauga, ON, Triovest Realty Advisors Inc. Ì NorQuest College, Singhmar Centre for Learning, Edmonton, AB, Norquest College Ì North American Centre, Recert., Toronto, ON, Manulife Real Estate Ì Okanagan Correctional Centre, Oliver, BC, Shared Services BC, Real Property DivisionWorkplace Development Services Ì Okotoks Operations Centre, Okotoks, AB, Town of Okotoks Ì ONE Properties Office, 25th Floor, Edmonton, AB, ONE Properties Limited Partnership Ì Our Lady of the Rosary School, Calgary, AB, Calgary Catholic School Board Ì P+W Toronto Offices, Toronto, ON, Perkins + Will Ì Pavillon d'accueil du Parcours Gouin, Montreal, QC, Ville de Montréal Ì PCOMS Office Expansion, Surrey, BC Ì PricewaterhouseCoopers Place # 250 Howe, Vancouver, BC, The Cadillac Fairview Corporation Ltd. Ì Purdy's Wharf, Halifax, NS, GWL Realty Advisors Inc. Ì Résidence Carignan-Dancose, Champlain, QC, Les dessins ConSpecTek inc. Ì Résidence Gabrielle et Nicolas, Val-David, QC, Gestion Nouvelle Conscience Inc. Ì Résidence Gervais Gendron, Chambly, QC, HumanID Ì Résidence Jonathan DUVAL, Cantley, QC, ÉNERGÉCO Concept Inc. Ì Résidence Lapointe, Trois-Rivières, QC, Les dessins ConSpecTek inc. Ì Résidence Pic Bois II, Baie Saint-Paul, QC, Tergos Architecture + Construction Ì Rés. Sylvain Perreault et Marjorie Minet, Lac Supérieur, QC, ÉNERGÉCO Concept Inc. Ì Ron Southern School, Calgary, AB, Calgary Board of Education

Ì Sacred Heart Community School, Regina, SK, Regina Catholic Schools Ì Sarcee Operations Workplace Centre, Calgary, AB, City of Calgary Ì Saunders Workshop No. 3, Victoria, BC, MAJESSA Project Service Ì Second Student Centre, Toronto, ON, York University Ì Senator Joyce Fairbairn Middle School, Lethbridge, AB, Lethbridge School District #51 Ì Seneca College, King Campus, Magna Hall, King City, ON, Seneca College Ì Seton Multi-Use Facility, Calgary, ON, City of Calgary Ì Shaw Court Common Areas and Offices, Calgary, AB, Shaw Communications Inc. Ì SickKids™ Peter Gilgan Centre for Research & Learning, Toronto, ON, The Hospital for Sick Children Ì Silver King Campus North and South Trades Buildings, Nelson, BC, Selkirk College Ì Stoney Transit CNG Bus Storage Facility, Calgary, AB, City of Calgary Ì Strathcona Branch Library/YWCA Cause We Care House, Vancouver, BC, City of Vancouver Ì TD, 10th St NW, TD - Mission, Calgary, AB, TD Bank Group Ì TD Centre, Halifax, NS, Compass Commercial Realty & Property Management Ì TD Tower 16th Floor, Toronto, ON, TD Bank Ì Telus Garden Offices, Storeys P1, 2-8, 21 & 22, Vancouver, BC, Telus Ì The Duke, Vancouver, BC, Edgar Development Corp. Ì The Haven, Building A & B, and Townhouses C, D, E, F, G and H, Ottawa, ON, Multifaith Housing Initiative (MHI) Ì The KIP District, Phase 1, Toronto, ON, Concert Properties Ltd. Ì The Residences of Alter Inc., Toronto, ON, Tridel Ì Town of Aurora Joint Operations Centre, Aurora, ON, Town of Aurora Ì UBC Brock Commons Tallwood House, Vancouver, BC, UBC Properties Trust Ì UBC Orchard Commons, Vancouver, BC, UBC Properties Trust Ì University of Calgary, Clinical Skills Building Expansion, Calgary, AB, University of Calgary Ì University of Calgary, High Density Library Expansion, Calgary, AB, University of Calgary Ì UpperWest, Ottawa, ON, The Minto Group Ì Vancity 183 Terminal Ave, Vancouver, BC, Vancouver City Savings Credit Union


GOLD Ì Vancouver Central Library, 8th and 9th Floors and Public Roof Garden, Vancouver, BC, City of Vancouver Ì Western Interdisciplinary Research Building, London, ON, University of Western Ontario

Ì Williams Parkway Operation Centre, Brampton, ON, The Corporation of the City of Brampton Ì Windsor Park Fire Station 11, Calgary, AB, The City of Calgary

Ì Yonge Corporate Centre (YCC)- 4110, 4100, 4120, North York, ON, The Cadillac Fairview Corporation Ltd.

Ì York Mills Centre, Recert., Toronto, ON, Manulife Real Estate Ì ZAC groupe A - E, St-Laurent, QC, Sotramont

Ì Complexe Médicale Nord-de l'île, Montreal, QC, 8766517 Canada Inc. Ì Computer Modelling Group Office Building, Calgary, AB, Remington Development Corp. Ì Constable Daniel Woodall School, Edmonton, AB, Edmonton Public Schools Ì Copperfield School, Calgary, AB, Calgary Board of Education Ì Don Campbell Elementary School, Red Deer, AB, Red Deer Public School District Ì Drysdale Row, Kelowna, BC, VanMar Constructors Inc. Ì Elbow Park School, Calgary, AB, Calgary Board of Education Ì Equitable Bank Toronto Offices, Toronto, ON, Equitable Bank Ì Evolo S, Montreal, QC, Proment Corporation Ì Faubourg Cousineau, St-Hubert, QC, Habitations Lussier Ì Fire Station #17, Edmonton, AB, The City of Edmonton Ì Global Transportation Hub, Regina, SK, Global Transportation Hub Authority Ì Green Acres Gymnasium, Brandon, MB, Brandon School Division Ì Guardian Angel School, Calgary, AB, Calgary Catholic School District Ì Halton Hills Warehouse, Halton Hills, ON, Triovest Realty Advisors Inc. Ì Hexagon Calgary, Calgary, AB, Remington Development Corporation Ì Joseph Brant Hospital, Burlington, ON, Joseph Brant Hospital Ì Jumelé : 1992 & 1998, Chicoutimi, QC, Les Constructions Phillipe Blackburn inc. Ì Jumelé : 2037 et 2041, Chicoutimi, QC, Les Constructions Phillipe Blackburn inc. Ì Kingsway Mews, Edmonton, AB, First Capital Asset Management LP

Ì Les Maisons jumelées du Nouveau SaintLaurent, Saint-Laurent, QC, Château St-Marc Entrepreneur Général Inc. Ì LoyaltyOne, Montreal, QC, LoyaltyOne Ì Max Aitken Academy, Miramichi, NB, Department of Education and Early Childhood Ì Medicine Hat Recovery Centre, Medicine Hat, AB, Alberta Infrastructure Ì Minto Beechwood, Ottawa, ON, The Minto Group Ì Minto Longbranch (Blocks 1/2/4), Etobicoke, ON, Minto Communities Canada Inc. Ì New Brighton School, Calgary, AB, Calgary Board of Education Ì Our Lady of Grace School, Calgary, AB, Calgary Catholic School District Ì Pergola Commons - Harvey's, Guelph, ON, FCHT Holdings (Ontario) Corporation Ì Pergola Commons - The Keg, Guelph, ON, First Capital Asset Management LP Ì Place Portobello - Chocolato, Brossard, QC, First Capital Realty Ì Poste Sûreté du Québec Memphrémagog, Magog, QC, MRC Memphrémagog Ì Prince of Peace School, Calgary, AB, Calgary Catholic School District Ì Prologis Meadowvale 3, Mississauga, ON, Prologis Inc. Ì Providence Care Hospital, Kingston, ON, Providence Care Hospital Ì Résidence Beaucher-Girard, Saguenay, QC, Home Owner Ì Rossdale Fire Station #21, Edmonton, AB, City of Edmonton Ì Roy Bickell Public School, Grande Prairie, AB, Grande Prairie Public School District Ì SAQ – Sélection Cartier, Quebec, QC, Société des alcools du Québec Ì Sarina Kensington Townhome, Calgary, AB

Ì Siège social de la Confédération des syndicats nationaux (CSN), Montreal, QC, Confédération des Syndicats Nationaux Ì St. André Bessette Catholic School, Fort Saskatchewan, AB, Elk Island Catholic Schools Ì St. Gregory the Great Catholic School, Blackfalds, AB, Red Deer Catholic Schools Ì St. Joseph High School, Red Deer, AB, Red Deer Catholic Regional Schools Ì St. Mary Catholic School, Beaverlodge, AB, St. Mary Catholic school Ì Stantec Regina Office, Regina, SK, Stantec Consulting Ltd. Ì TD Bank Group, AB, ON, BC, TD Bank Group Ì The Essential, Markham, ON, Emery Investments Ì The Mark Condo, Markham, ON, Pace Developments Ltd. Ì Trafalgar Park Comm. Ctre and Fire Station, Oakville, ON, Corporation of the Town of Oakville Ì TransLink Logistics Centre, Regina, SK, Morguard Investments Ltd. Ì Tribute Tower, Halifax, NS, Department of National Defence Ì Trouville, Calgary, AB, Steve Norris and Partners Building Ì Upper Harbour Place 2, Victoria, BC, Sun Life Assurance Company of Canada Ì West Highlands Elementary School, Amherst, NS, Chignecto Central Regional Centre for Education Ì West Ridge School, Calgary, AB, Calgary Board of Education Ì Westbrook Centre: Floors 2-4, Calgary, AB, City of Calgary Ì York Region Office, Newmarket, ON, The Regional Municipality of York

Ì 4 logements, 2001-2007 du Muscadet/343, 345, 347 et 349 du Sauvignon, Chicoutimi, QC, Les Constructions Phillipe Blackburn inc.

Ì 4 logements Luxuor/ AR Hubert, Chicoutimi, QC, AR Construction Ì Ajax Fire Station & Headquarters, Ajax, ON, The Corporation of the Town of Ajax

Ì Alectra Utilities Office Building, Barrie, ON, Alectra Utilities Ì Aréna Chaumont, Montreal, QC, Ville de Montréal

SILVER Ì 1050 West Pender, Vancouver, BC, West Pender I LP & 1050 WP Properties Ltd.c/o BentallGreenOak Ì 1415 Joshua's Creek Drive, Oakwoods Business Park, Oakville, ON, Cartterra Ì 191 Laurier Ave. West, Ottawa, ON, Slate Retail REIT Ì 2004 et 2010, rue du Merlot, Chicoutimi, QC, Les Constructions Phillipe Blackburn Inc. Ì 2034-2036, 2047 & 2051 des Condors, Chicoutimi, QC, Les Constructions Phillipe Blackburn Inc. Ì 305 Milner Avenue, Toronto, Gulf Pacific Property Management Ltd. Ì 41 Victoria, Gatineau, QC, Multivesco Ì 5011 Springs Boulevard, Delta, BC, Talisman Homes Ltd. Ì Airport Crossing, Buildings 3 and 4, Calgary, AB, Sunlife FInancial c/o Enright Capital Ltd. Ì Aréna Saint-Donat, Montreal, QC, Ville de Montréal Ì Beacon Hill Elementary School, Sylvan Lake, AB, Chinook's Edge School Division No. 73 Ì Bridgetown P-12 School, Bridgetown, NS, Nova Scotia, Dept of Education Ì CampusOne Student Residence, Toronto, ON, Knightstone Capital Management/KH College Street GP Inc. Ì Carbonear Long Term Care Facility, Carbonear, NL, Eastern Health Ì Central Green One, Kelowna, BC, Mission Group Homes Ì Chalet du Centre écologique FernandSeguin, Châteauguay, QC, Ville de Châteauguay Ì Christ The King Catholic K-9 School, Edmonton, AB, Facility Services, Edmonton Catholic Schools Ì Cold Lake K-4 School, Cold Lake, AB, Northern Lights School Division 69

CERTIFIED Ì 109518 Wells Fargo, Montreal, QC, Wells Fargo Bank Ì 353 à 359, rue de Sauvignon, Chicoutimi, QC, Les Constructions Phillipe Blackburn Inc.

SABMag - SPRING/SUMMER 2020

13


LEED SCORE CARD Platinum Rating Achieved Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environmental Quality Innovation in Design Regional Priority

82/100 19/26 7/14 31/35 5/10 10/15 6/6 4/4

26 WELLINGTON STREET EAST Built in 1981, 26 Wellington Street East is a 12-storey Class A Office Building that continues to outperform its newer neighbours in Toronto’s evergrowing Financial District. This near 40-year-old tower has undergone numerous upgrades to dramatically cut energy consumption and utility costs by over 60% since 2013.

Over half of the Wellington Street East’s total energy requirement is met with Green-ecertified renewable energy credits to reduce environmental impacts associated with fossil fuel energy use.

Upgrades include LED lighting throughout the office space, lobby, and parking garage, VFD control upgrades to ventilation equipment and pumps, and adaptive frequency drives installed on chiller compressors to improve efficiency. A submetering system was installed to enable automatic data collection and monitoring of lighting, receptacle, and HVAC loads, and is used in conjunction with BAS analytics to drive continuous improvement as part of an Ongoing Commissioning (OCx) plan.

In addition to achieving LEED Platinum certification, 26 Wellington Street East was awarded ENERGY STAR Certification in 2019 with a score of 97, proving once again it is top class in energy performance, and showcasing H&R REIT’s dedication to sustainability and excellence in building operations.

600 COCHRANE DRIVE, MARKHAM Canadian Urban Limited is proud to announce that 600 Cochrane Drive in Markham, Ontario, has been certified LEED Platinum – the only office building in Markham to achieve this designation. 600 Cochrane Drive is a five-storey, 100,161 square foot Class A office building situated in a well established and highly accessible office park in the Greater Toronto Area. Constructed in 2001, the building features an appealing glass curtain wall, a highly functional and desirable floor plate, and generous parking on its 4.24-acre site.

14

SABMag - SPRING/SUMMER 2020

Canadian Urban Limited is proudly committed to sustainable environmental practices. The journey to secure LEED Platinum certification was made possible by our valued tenants at 600 Cochrane Drive. WSP provided key consulting services and advice throughout the process. Lutron advised on initiatives regarding the upgrading to more sustainable low energy light fixtures. All of the fluorescent light fixtures in and outside 600 Cochrane Drive were replaced with new high-efficiency LED fixtures. Occupancy sensors were installed throughout the lobby, common areas and select offices in the building. Other ongoing improvements include a landscaping plan involving vegetation requiring a lower water supply. 600 Cochrane achieved a high score on a tenant survey regarding Human Experience in the building for air quality, cleanliness, HVAC, thermal comfort and lighting levels.


MANULIFE GLOBAL HEAD OFFICE, TORONTO AND 1600 CARLING AVENUE, OTTAWA Manulife Investment Management incorporates ESG considerations into each stage of the real estate value chain, from the development or acquisition of a building, through to property management and leasing. Our vision is to drive leadership in sustainable real estate across our global organization. Our employees, in collaboration with our tenants and local communities, work to provide healthy and efficient properties – today and into the future. ManulifeIM.com/realestate

Global Headquarters, Toronto.

Global Headquarters, Toronto.

1600 Carling Avenue, Ottawa.

MANULIFE GLOBAL HEAD OFFICE Our commitment to sustainability begins at home with our Global Headquarters located in Toronto. Already BOMA Best certified, our headquarters achieved LEED Gold and certified our North Tower Fitwel in 2019. Following the success of our LEED program, we developed an internal Fitwel certification guide for our property teams. Currently, over 80% of our portfolio, or 48 million square feet, is certified to a green building standard. We continue to target properties for LEED and other sustainable building certifications.

1600 CARLING In January 2019, 1600 Carling Avenue made history as the first building in Canada to become certified under the LEED version 4.1 for building Operations and Maintenance. With v4.1, LEED has streamlined the certification process by focusing on five data-driven performance outcomes: transportation, water, energy, waste and human experience. Drawing on lessons learned from 1600 Carling, we successfully certified an additional 15 buildings. Our dedication to providing sustainable spaces for our tenants led to the development of our internal sustainable building standards program in 2017. The program provides visibility into our buildings’ performance and allows property teams to collaborate with our tenants on creating sustainable spaces.

SABMag - SPRING/SUMMER 2020

15


CANON CANADA HEADQUARTERS, BRAMPTON Canon Canada’s 176,000 square foot, LEED Gold certified headquarters building is designed to communicate Canon’s brand values of clarity, precision, and technological elegance. This five-storey building is comprised of a silver-white curtainwall with vertical fins of fritted glass that float effortlessly above a recessed base of black granite. Canon Canada’s office demonstrates a creative approach to sustainability and design while promoting a healthy lifestyle for its employees. In 2019, Canon Canada was named one of Canada’s Greenest Employers. The building site, surrounded by landscaping, was key to ensuring Canon’s vision for a "building within a park," allowing generous views and connections to nature. Expansive outdoor terraces are linked to a serene walking trail that meanders around a stormwater management pond buffered by a naturalized meadow of native plantings, serving both Canon Canada and the residential community.

A highly sophisticated and energy efficient building automation system controls the indoor climate, under-floor air distribution, lighting systems, window blinds, A/V and security systems and provides optimized comfort for all staff. With this project, Canon Canada leads by example, going beyond the status quo in an area ripe for development. The building invigorates the local economy and encourages the development of a balanced and sustainable city where people can live, work and play in harmony.

The building includes a system that collects, filters and stores rainwater in a cistern underground. Once rainwater is filtered and available for use, domestic city water use is automatically shut off and the building begins to use the rainwater for flushing and irrigation. The system saves at least 20% of our domestic city water usage per year – the equivalent of 4.5 million water bottles (500 mL). The building’s biophilic interiors balance privacy and collegiality in an open and serene environment with offices oriented around a bright and airy central atrium, where daylight gently washes over travertine floors, western red cedar-slatted ceilings and tranquil rock gardens. Ergonomic furniture, interior plantings, individually-controlled lighting and low-VOC materials further enhance staff well-being. The carefully detailed vertical glass fins integrated into the exterior glazing provide solar shading and reduces indoor solar head gain and glare.

16

SABMag - SPRING/SUMMER 2020

LEED SCORE CARD Gold Rating Achieved Sustainable Sites Water Efficiency Energy & Atmosphere Materials & Resources Indoor Environment Quality Innovation in Design Regional Priority

61/110 12/26 8/10 14/35 6/14 12/15 5/6 4/4


AGRICULTURE PLACE, REGINA Agriculture Place is an 11-storey office tower in downtown Regina. This LEED Gold project captures a building design that’s responsive to the pedestrian condition at grade, through open interior spaces and public support functions; public seating with planters and bicycle storage; three levels of underground parking to maximize density; integrated art in the atria; and retail opportunities for tenants. The façade has an integrated deluge sprinkler system that allows larger windows to take advantage of natural light and views (over 90% of the occupied spaces have exterior sight lines), while allowing the tower to be located closer to neighbouring buildings, densifying the site consistent with the downtown plan. The building is linked to the original tower via a Level 2 podium, as well as through the underground parkade. With a Walk Score of 92, the building is very close to multiple public transportation options; has carpooling stalls onsite; secure bicycle storage; and showers and locker facilities. Water-conserving plumbing fixtures and multiple recycling options contribute to conservation efforts, and all materials were selected to meet LEED criteria for low emittance. Over 50% of wood materials were harvested from sustainable forests designated by the Forest Stewardship Council; an additional 22% are considered regional; and nearly 80% of construction waste was diverted from traditional waste streams to end-use recyclers.

BLOOR ISLINGTON PLACE, TORONTO Located at 3250, 3280 and 3300 Bloor Street West in Toronto, Bloor Islington Place is a 884,000 square foot on-transit office complex with three office towers interconnected by a full-service retail podium. Built between 1981-1991, this multi-purpose commercial complex offers a variety of tenant amenities including a gym, daycare, sit-down and take-away food options, health care providers, a national grocer and a green roof complemented by extensive underground parking. All the while located on the TTC, Mi-way, and close to the 400 series highways.

www.starlightinvest.com

Starlight Investments is dedicated to pursuing environmental performance and sustainability of its portfolio. In early 2020, Starlight completed LEED EB:O&M Gold recertification at Bloor Islington Place. There were many specific initiatives which resulted in improvements to its energy and resource efficiency as well as wellness of the tenants. Starlight updated operational processes, implemented green initiatives and deployed an extensive capital expenditure program to upgrade various HVAC equipment and water, electrical and mechanical systems. These green initiatives implemented included construction of a green roof, upgrades to water-efficient plumbing fixtures, installation of 32 EV charging stations, LED retrofits, installation of high-efficiency chillers, and optimization of chilled water and heating plants, air handling units, compartmental units, exhaust systems and terminal zones.

SABMag - SPRING/SUMMER 2020

17


THE PETER GILGAN CENTRE FOR RESEARCH AND LEARNING The Hospital for Sick Children, Toronto The Peter Gilgan Centre for Research and Learning (PGCRL) incorporates open areas, gathering spots, collaborative workspaces and state-of-the-art amenities, including a 250-seat auditorium where some of the world’s best scientists and trainees congregate and share ideas to transform the current state of child health. The 21-storey PGCRL contains 250 labs and six neighbourhoods connected through internal staircases and interactive lounges to encourage cross-collaboration. The commitment to ecological health and social responsibility led to PGCRL achieving three LEED Gold certifications: New Construction in 2015, Commercial Interiors in 2017, and Existing Buildings: Operations & Maintenance in 2019.

Some of the key design and operational parameters that distinguish PGCRL include: • A heat island reduction roofing system • Building automation system to reduce energy loads based on building occupancy • Automated lighting systems that reduce exterior lighting pollution • Reduction of potable water use by over 30 per cent, and grey water recovery for flushing • In the labs, a glass and plastic recycling program, and the ‘Shut the Sash’ program to reduce fresh air use • Building amenities that promote sustainable transportation

At Montoni, our experts are constantly pushing the limits in order to optimize our projects’ sustainability and energy efficiency. 41 projects/3,950,556 sq.ft. LEED certified Projects certified in 2019 : 1. Complexe Médical-Nord-de-l’île: Silver 2. Équipement SMS: Certified 3. Tornatech: Certified

1

2 18

SABMag - SPRING/SUMMER 2020

3


THE REGIONAL MUNICIPALITY OF YORK Office at 145 Harry Walker Pkwy., Newmarket, ON The Regional Municipality of York has a long-standing commitment to designing and constructing sustainable buildings. Since 2016, 17 York Region buildings have been certified under the LEED green building rating system. The Regional office at 145 Harry Walker Parkway in Newmarket, Ontario was most recently awarded LEED Silver certification in May 2019 under LEED Canada for New Construction and Major Renovations 2009.

(Photos: ŠAECOM. Mike Niedringhaus)

The renovations at 145 Harry Walker Parkway were completed in 2016; they comprised the partial conversion of a 27-year-old, 14,800 m2 warehouse into a 5,100 m2 administrative office building for more than 300 occupants while retaining the remaining warehouse for storage. The project began with an integrated LEED design charette involving the design team and representatives from York Region’s Property Services branch. Partially converting a large warehouse with solid metal cladding into an administrative office to accommodate over 300 workstations, multiple private offices, and training and conference rooms presented a few challenges. One of the challenges the project had to overcome was to find a way to incorporate adequate daylight to ensure occupant comfort and energy savings. To achieve this, new fenestrations on the building envelope were introduced; including three skylights and two sizable thermally broken curtain walls to bring natural light into the office space. The curtain wall system features a combination of highperformance, low-emitting insulating clear and translucent glass units which transform the sunlight into glare-free daylight. The lighting within the office space was further enhanced through the installation of LED light fixtures with indirect/direct light distribution, occupancy sensors and daylight controls.

The LEED design charette also considered the improvement of energy performance and water saving strategies such as; replacing the roof with high R-value insulation and high albedo roof, optimizing HVAC and lighting efficiencies, enhanced commissioning through implementing measurement and verification system, selection of salt- and drought-tolerant landscape design requiring no irrigation, and installing low-flow plumbing fixtures. Other notable sustainable strategies included selection of low-emitting building materials with regional and recycled content, a new stormwater bioswale, construction waste diversion management and construction indoor air quality management. In addition, the provision of showers, bike racks, electric vehicle charging stations and carpool spaces promotes sustainable transportation. The 145 Harry Walker building demonstrates how aging industrial space can be transformed into modern, welcoming and sustainable office space.

SABMag - SPRING/SUMMER 2020

19


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.