Sabry Arfaoui | Architecture Portfolio

Page 1

P O R T F O L I O SABRY ARFAOUI

1


C I R R I C U L U M V I TA E

PROFILE

PROFESSIONNAL EXPERIENCE

Born on 3 February 1991 in Groningen, The Netherlands. Sabry, son of a Tunisian father and a Dutch mother, has a very enriched culture that he deploys in his passion architecture. He adapts easily to new environments, is always open to learn something new and is a good team worker.

Syb van Breda & Co. Architects | Sept. 2017-May 2018 Intern Architect Sketch for projects Work on european tenders Developement of drawings and renders Winning tender for the construction of three bridges De Krijgsman, Muiden, the Netherlands Developement of execution drawings Developement of detail drawings of concrete structures Visit of construction site at steel contractor Hollandia Infra.

CONTACT

SABRY ARFAOUI EDUCATION

13, Street Tachkand Ennasr, Ariana, Tunisia arfaoui.sabry@gmail.com +216 25 173 330 +31 6 1821 3006 https://www.linkedin.com/in/sabry-arfaoui-720694154/

National Tunisian Architect Diploma |2018 École Nationale d’Architecture et d’Urbanisme Tunis, Tunisia First cycle of architectural studies |2014 École Nationale d’Architecture et d’Urbanisme Tunis, Tunisia High school diploma with honors. Section : Mathematics |2012 High school Menzah IX Tunis, Tunisia LANGUAGUES Arabic Dutch French English

|spoken and written |spoken and written |spoken and written |spoken and written

Socièté Bouzguenda Frères | June. 2017-September 2018 Intern Architect Survey construction site Survey of execution procedures Coordination between stakeholders Architecture office of Ms. Afef CHATER BACHA | July/Aug. 2016 Intern Architect Sketch for projects Developement of drawings and design Developement of execution details Visit and survey of construction sites Municipality of Dar Allouche, Nabeul, Tunisia | Aug. 2016 Intern Architect Dealing with building permit applications Architecture office of Ms. Afef CHATER BACHA | June/July 2014 Intern Architect Visit and survey of construction sites Sketch for villa design

SKILLS

SOFTWARES

Adaptability

Autodesk Autocad

Teamwork

Autodesk Revit

Communication

Adobe Photoshop

Embassy of the Kingdom of the Netherlands in Tunis, Tunisia | June/Aug. 2010 - June/July 2011 - June/Aug. 2012 - July/Aug. 2013 - July/Aug. 2015 July/Aug 2016 - July/Aug. 2017 Intern Consular service

Creativity

Adobe Indesign

Patience

Google Sketchup

CERTIFICATES

Multi-tasker

Lumion VectorWorks MS Office

Certification Autodesk Autocad | Level Advanced Certification Autodesk Revit Architecture | Level Intermediate


S U M M A R Y

123456789-

TRAINING AND PRODUCTION CENTER FOR AMATEUR CINEMA

4

HEADQUARTERS OF THE ASSOCIATION OF ARCHITECTS

10

URBAN RESTRUCTURING

16

URBAN HOTEL

20

VILLA AM

22

DE KRIJGSMAN BRIDGES

24

THE BLUE RUNNER

26

MODELS

28

PHOTOGRAPHY

30


The site

1

TRAINING AND PRODUCTION CENTER FOR AMATEUR CINEMA KÉLIBIA, NABEUL, TUNISIA GRADUATION PROJECT 2017

Kelibia has been receiving for more than half a century the International Amateur Film Festival (FIFAK). Amateur cinema has taken roots in the city and represents nowadays a part of its cultural background. This project tends to spatialize the heritage of this art in the aim of developing and valorizing it locally and nationally.

The forteress of the city MASS PLAN

SITUATION

The project is divided according to the cycle of making amateur cinema: Development, Production, and Broadcast, in addition to the headquarters of the amateur cinema club of the town. The cinématographic technique of staging is interpreted by the architecture of the project. In fact, the fortress, an iconic monument that represents the identity of the city, is staged in every part of the project. This is to link the center to the identity of Kélibia. At the heart of the project are grass bleachers that can host FIFAK festivities during the summer with the fortress in the background

GENERAL VIEW OF THE PROJECT: THE STAGING OF THE FORTRESS

4


Development

Production

3 unities translate the cycle of amateur cinema Projection

Through the project there are different projection spots

Disposition of the elements to stage the fortress. Alignment of the production unity with the road to assure an urban continuity.

The cycle of amateur cinema is readable in plan

The project is united by a large reception with exhibition to receive the festivalgoers in summer and visitiors during the rest of the year.

The club is transparent to invite people to the popular art and to accentuate the staging of the fortress

Creation of an interior spaces that will be reserved for outdoor projection and other festivities of the F.I.F.A.K.

Outside activities will be marked with the fortress in the background.

PLAN GROUND FLOOR

5


Interior social spaces are linked to the iconic monument of the city: the forteress.

PLAN FIRST FLOOR

6


The cultural café is in référence to a camera recoder fixed on the monument

Before entering the project, the staging is already in place

FAÇADE MAIN ROAD

The projection room of the project

Accessible roof

7


SECTION A-A

The library

The club of amateur cinema: a club for everbody

SECTION B-B

8


The reception with the exhibition hall

A temporary projection area is planned on the stage of the amphitheater during the festival

SECTION C-C

SECTION C-C

9


+1,20 +8,50

+8,50

+14,9

+14,9 +8,50

+5,3 +14,9

2

+11,7

HEADQUARTERS OF THE ASSOCIATION OF ARCHITECTS

+14,9

EL MANAR, TUNIS, TUNISIA 4TH YEAR PROJECT 2016

+14,9

+1,20

+5,3

+0,00

This project intends to design new headquarters for the association of architects in Tunis. The location is in El Manar in front of a university campus. The area of the site is 1820m², it’s a corner lot. The program of the project is divided into commercial areas (to finance the association), exposition areas, a kindergarten, incubators for young architects, a multimedia librabry and office environments for the association. The basement is reserved for parking spots and storage rooms. The new headquarters also dispose of a multi-purpose room which can be used as a conference room or rented to private parties. This project was carried out from sketch to the executional drawings. My concentration was based on the implantation of the project to its environment, finding a coherence between the spaces of the varied and charged program and profit of the corner site.

+14,9

SITUATION The withdrawal imposed by the law creates an intern alley to the kindergarten

Commercial areas on the western route where the flow is most important to have a higher trade value

The multi-purpose room has an individual entry Ventilation of the basement is assured by the elevated groundfloor (+1.20) in addition to the interior patio.

Vertical flows The groundfloor is elevated (+1.20) to assure ventilation of basement in addition to the interior patio

The exposition galleries

for

Offices of the Plan Masse headquarters on the south to benefit from the sight

Entry to the commercial areas

On top level are the spaces which need to avoid noise from the envronnement

The incubators young architects

MASS PLAN

Multimedia library

Main entry to the project from the angle, a well frequented intersection: urban continuity

The highlighted spaces are dedicated for Office of the President of the Order (Project Control Point) + Workshops of the young architects to encourage the younger members

10


2.79

1.85

B

6.74

6.73

1.85

1.80

0.25

6.71

1.20

3.80

36.40

2.63

4.23

8.25

4.15

13.75

8.25

2.25

2.00

1.75

14.00

1.75

6.20

0.95

1.75

8.45

1.75

1.10

5.30

5.30

4.40

4.55

4.34

2.27

1.35

0.45

0.90 0.10

1.35 0.30 0.15 1.75

club musique 40m² 5.85

6.13

5.83

0.43 1.40 0.97

1.95

21.15

3.63

0.30

0.35

1.40

0.25

2.00

2.46 1.75

0.35

0.82

0.15

3.70

0.20 0.30

4.36

0.35

2.00

0.35 13.30

14

1.05

5.00

librairie

A

3.30

-

2.45

A

Calpinage Patio

1.40

2.00

bibliothèque 38m² 0.10

4.10

23.25

PLAN PATIO DETAIL

0.15

2.40

3.85

1.75

55m²

0.25 15.80

12.58

5

0.35

2.10

3.30

Agence bancaire

6.56

2.00

2.0

0.90

0.10

6.13

0.60 0.60

2.77

0.35

4.30

0.10

1.35

0.48

P.T.

3.20

2.42

4.05

2.09

5.84

5.84

3.42

0.35

4.88

6.00

5.30

3.03

3.59

5.55

0.25 7.10

2.00

agence de voyage

15.22

3.30

27m²

0.30

41.60

5.70

7.45

25m²

2.15

0.63

1.75

0.63

1.7

0.70

7

1.0

0.60

1.80

0

1.40 3.80

0.5

1.4

0.05

0

7.30

5.9

8

0

0 1.3

0

1.05

1.40

380m² 0.5

0

2.0

5

.4

0.26

0.8

0

0.50 0.15

2.50

2.9

4

3.00

2.0

0

2.7

0

0.35

10

65 m²

1.65

0 0.3

2.20

Salle de conférences

accueil + expo

5

1.10

1.6

6.70

2.00

2.50

8.10

3.5

0

-

3.15

0.35

foyer 70m²

3.5

0 0.6

0.20

0.35 1.40

1.40 0.30

6.99

3.70

0.25

0.25

3.30

0.35

1.20

B

0.49

+1.20

0

9.9

0

11

0.41

.0

17

.8

1.20 0.70

Terre Végétale

0

Grillage Métallique (VH)

0

3.35

0.6

0

1.60

Gravier Epais

-1.70

0.60 0.60

Gravier Fin

1.80

3.35

Couche Anti-racines

3.3

0

5.40

0.60

3.00

3.50

7.60

0.50 6.00

20.45

3.3

0

Plan RDC

Couche PVC en Pente

PLAN GROUND FLOOR Drains qui mènent vers la pompe à eau

SECTION AIR OUTLET BASEMENT DETAIL

11


B

B

B 36.40

8.25

13.93

8.25

2.00

1.75

Groupe Electrogène

14.00

1.75

6.20

chaufferie

30m²

14.00

7

8 2.00

3

2

1

40m²

9

4

4.85

2.20

8.95

3.80

expo

4.00

13.90

4.85

0.90

0.50

5.50

0.60

Espace audio vis.

bureau responsable

2.20

22m² 0

9m²

atelier 1 37m²

0.70

2.40

37m²

1.00 2.15

3.10

2.10

3.00

4.20 0.45

3.3

0

8.90

1.00 0.35

0.10 1.35

11m²

9.05

0.10 3.20

bur. revue

10

.9

17

.8

1

0

67m²

B

26

bache à eau

celier

periodique

1

sec. revue 11m²

20

celier

espace livresque +

.9

B

celier 4.10

9.05

0.10

5.50

secrétaire gén. 17m² 10 0

5m²

0

13m²

0.10

6.40

3.5

fichier gén 1.40

18

1.40

atelier 2

0

1.30

3.10

3.10

1.40

0.10

3.5

24

1.40

2.40

0

3.80

3.50

0.8

1.40

5

1.00

repro.

3.70 0

2.0

0.10

0

0.5

1.65

0

13m²

6.0

.4

.8

11

3.90

0.70

dépôt 1.7

0

17

VH

trésorier

4.3

secrétariat + expo

A

21

salle polyvalente

36.58

3.35 0

10

VB

2.55

5.20

39.90 3.12

VH

0.65

0.10

0.5

VH

13

3.35

9.50

0.70

23m²

0

VB

salle poly 22m² 6.90

archives

1.5

celier

27.53

31m²

A

12

1.55

A

2.65

0.65

25

2.20

9.35

3.80

0.50 2.00 20.00

4.90

1.55

27.72

A

7.50

1.05

A

14m²

5.60

5.70

7.45

2.00

65 m²

6.00

31

27.72

1.40

0.25

6.55

23.35

0.30

1.40

52m²

0.65

10

12.50

12.50

club informatique

6.60

70m²

6.00

30

0.43

9.40

2.60

250m²

5.55

magasin

5.00

29

A

celier 5.80

23

3.20

22

0.10

3.35

club 5.60 art plastique 51m²

16

15.80

0.25

28

5.20

0.10

55m²

6.75

7.65

5.90

Agence bancaire

17

0.35

14

3.05

10

6.00

3.40

4.05

28.50 10.50

5

B

surpresseur VB

VB

60 m3

15 m²

7.00 3.3

0

3.35 3.35

1.60

5.20

0.80

7.59

0.60 3.50

0.63 0.90

6.00 6.00

4.50 3.35

7.60

1.80

12.75 20.45

PLAN SECOND FLOOR

Plan sous-sol

Plan 1ère ètage

PLAN THIRD FLOOR

Plan 3ème étage

PLAN BASEMENT

12


+16.00 +15.40 +14.90

+11.70

+08.5

+5.30

+1.20

+0.00

WEST FAÇADE

Façade Sud Façade Ouest 0.40

+16.00

+16.00

+15.40

+15.40 1.00

+14.90

+14.90

2.30

0.35

0.35 1.20

+11.70

+11.70

support de fixation encastre support de fixa joint intérieur

joint i

Laine de verre

Laine d

Simple vitrage emaille 5.20

0.20

+08.5

1.20

0.35

Ouverture par projection

Ouverture par projection

a l'italienne

a l'italienne

+5.30

2.30

+5.30

Simple v

+08.5

+1.20

+0.00

verre reflectasol 4mm lame d'air 12mm

verre reflectasol 4mm lame d'air 12mm

verre simple translucide 4mmverre simple translucide 4mm

0.10

+0.00

0.10

0.55 0.55

2.65

1.55

+1.20

0.60

1.50

0.35

0.70

Façade Sud

SOUTH FAÇADE

Escaliers:

SECTION FAÇADE SUD

SECTION CURTAIN WALL DETAIL

13


7.70

3.90

14.20

6.00

+16.00 +15.40 +14.90

HSP:+2.9

+11.70

HSP:+2.9

+08.5

HSP:+2.9

+5.30

HSP:+3.8

+1.20

+0.00

HSP:+2.6

-1.70

HSP:+2.6

SECTION A-A 7.70

3.90

14.20

6.00

7.70 4.40

+16.00

Coupe A - A

+15.40 +14.90

HSP:+2.9

HSP:+2.9

HSP:+2.9

HSP:+2.9

HSP:+2.9

HSP:+2.9

+11.70

+08.5

HSP:+2.9

HSP:+2.9

+5.30

+1.20

HSP:+3.8

HSP:+2.9

HSP:+3.8

HSP:+3.8

HSP:+2.6

HSP:+2.6

+0.00

-1.70

HSP:+2.6

SECTION B-B

14


EXECUTION DETAILS OF MULTI-PURPOSE ROOM 7.68

5.85

14.00

8.45

1.75

3.05

2.10

0.90 2.10

0.90

P5 175x220 P5 175x220

A

1.10

6.65

1.75

0.50

0.95

0.35 8.28

2.94

1.60

7.50

0.90

21.17

1.60

0.90

10.25

1.60

2.50

0.90

1.60

0.90

2.44

1.75

0.90

0.00

P5 175x220 0.35

1.60

13.30

0.90

0.35

0.20

0.05

4.62

0.90

5.56

1.60

0.25

8.08

0.62

0.33

0.70

1.05

1.75

0.10

A

1.40

P4 175x220

FALSE CEILING PLAN MULTI-PURPOSE ROOM

ELECTRICITY PLAN MULTI-PURPOSE ROOM

0.30 0.50

1.80

MASONRY PLAN MULTI-PURPOSE ROOM

0.50

3.05

0.90

1.60

0.90

1.60

0.90

1.60

0.90

1.60

0.90

1.60

0.90

1.60

0.90

0.66

1.60

2.80

1.07

3.00 0.51

2.35

0.60

0.50

SECTION MULTI-PURPOSE ROOM

15


WORKSHOP OF URBAN RESTRUCTURING

3

URBAN RESTRUCTURING

SOUSSE, TUNISIA 4TH YEAR STUDY TRIP PROJECT 2016

After a study trip to Sousse, we (students of ENAU) shed light on the urban anomalies that appear in the proposed study site: the west side of the medina of Sousse. In the form of workshops, we have redesigned the urban fabric in the aim of creating a contiuity between the medinal structure and the contemporary stucture. One of our main solutions was to transform the crowded road in front of the entry to the medina into an underground tunnel. This would create an urban square that allows a transition between the two different fabrics. We also suggested to remove the existing military base. This would solve traffic problems and enable a urban continuity. Finally, I was called upon to design the proposed urban square.

SITUATION

The military base inhibits any form of dialectic between the urban fabrics EXISTING URBAN PLAN

PROPOSED URBAN PLAN

16


3D MODEL OF THE PROPOSED URBAN PLAN

The new tunnel SECTION

Underground parking lots of the new buildings 17


URBAN SQUARE

Create a raised path

Spaces under the raised path can be used as cafĂŠs, restaurants and other services

The paths coming from the contemporary fabric reach the entry portal without encoutering obstacles

Create a contemporary element to create a dialogue with the portal to the medina

CONCEPTUAL INTENTIONS

MASS EASTPLAN FAÇADE

18


WEST FAÇADE

EAST FAÇADE

19


A

annexe depôt

entrée sous-sol

+0,30

B

B SAS

cuisine +1,20

réunion 1 +1,20

buanderie +1,20

4

entrée de service

+1,20

Infirmerie

entrée principale

URBAN HOTEL

LES BERGES DU LAC, TUNIS, TUNISIA 3RD YEAR PROJECT 2015

+1,20

It’s about designing an 8-storey urban hotel in the Berges du Lac in Tunis. The program of the project is composed of ,in addition to the rooms , a conference room, commercial areas, a restaurant and a café. The ground floor and the first floor are marked by a vegetated patio around which functions are distributed. All rooms benefit from green terraces and a view. In order to make the rooms of the last floors attractive, I made a corner treatment in the direction of the mountain Boukernin.

accès café accès galerie commerciale

A

PLAN GROUND FLOOR

A

SITUATION +3,45

B

B +6,20

+3,45

cuisine de finition

+6,20

+6,20

A

MASS PLAN

PLAN FIRST FLOOR

20


A

office

B

B

A

8eme

PLAN EIGHT FLOOR

SECTION A-A

COUPE A-A Ech:1/200

GENERAL VIEW

21


5

VILLA AM BOU ARGOUB , NABEUL, TUNISIA INTERNSHIP ARCHITECTURE OFFICE MS. AFEF CHATER BACHA 2016

This project consists of designing a villa in the countryside of Bou Argoub. The site is marked by a steep slope. We integraded the villa into the slope which lets the villa benefit from the good orientation and opens it on a breathtaking view of the countryside. The lower level of the site matches with the ground level which is dedicated for a garage and rooms for service employees (housekeepers). This level leads to the first floor which corresponds with the higher level of the site and represents the main entry level. This floor is allocated to the kitchen, a main living room and a secondary living room both opening on a large terrace with a swimming pool and benefit from the view, in addition to two suites. On the second floor there is the master bedroom.

SITUATION MASS PLAN

FAÇADE SOUTH/EAST

FAÇADE SOUTH/EAST

22


PLAN SECOND FLOOR

PLAN FIRST FLOOR (ENTRY LEVEL)

PLAN GROUND FLOOR

ARCHITECT AFEF CHATER BACHA 23


6

BRIDGES THE KRIJGSMAN MUIDEN, NORTH HOLLAND, THE NETHERLANDS

INTERNSHIP ARCHITECTURE OFFICE SYB VAN BREDA & CO. ARCHITECTS 2017

This project is part of a European tender for the design of 3 bridges, one road bridge which can be opened occasionally and two identical bicycle bridges which can be opened mechanically. The bridges cross the Muidertrekvaart canal and lead to the new urban planning: De Krijgsman. The presence of the powder factory, a historic monument in the site, led us to refer to the bailey military bridge, which we interpreted in our context. We transformed the parts which consitute the bailey bridge into two trusses and replaced the frames by a metal plate cut in gradation, with reninforcements where it is necessary ( the road bridge and the axe of rotation). We have opted for a rotational opening that fits better into the environment and does not break the long perspectives of the canal. The tender was won by Syb van Breda & Co. Architects.

SITUATION

FAÇADE SECTION ROAD BRIDGE

https://sybvanbreda.com/bridges-krijgsman-muiden/

24


MASS PLAN

FAÇADE BICYCLE BRIDGE

SECTION BICYCLE BRIDGE

SYB VAN BREDA & CO. ARCHITECTS 25


7

THE BLUE RUNNER WINSCHOTEN, GRONINGEN, THE NETHERLANDS

INTERNSHIP ARCHITECTURE OFFICE SYB VAN BREDA & CO. ARCHITECTS 2018

This project aims to create a bicycle connection between the two cities of Blauwestad and Winschoten as part of a European tender. It will be the longest bicycle bridge in Europe. The approach of the bridge from the Winschoten Parc is in the shape of a spiral which has been used to preserve the largest trees of the parc. Once on bridge level the different obstacles (Canal, motorway, meadows, lake and different roads) are crossed in one simple sweep. For the materials the main structure is 100% recycable weathering steel: cortene. The deck is combined of both wooden and steel elements.

SITUATION

https://sybvanbreda.com/blue-runner-winschoten/

SECTION OF THE DECK

26


PLAN OF THE BRIDGE

SYB VAN BREDA & CO. ARCHITECTS 27


EXPOSITION GALLERY WITH WORKSHOPS FOR ARTISTS 2013

8

FOUNDATION OF ARCHITECTURE IN TUNISIA 2014

MODELS ACADEMIC YEARS (2012 - 2018)

During my academic years at ENAU and especially during the first cycle, I produced different models for different projects

28


VILLA OF AN ARCHITECT IN TUNISIA 2014

WORKSHOP STRUCTURE: ICE SKATING RINK 2015

WORKSHOP URBAN RESTRUCTURING: SOUSSE 2015

29


9

PHOTOGRAPHY

Photography is one of my favorite passions

30


31


32


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.