SAMUEL ESCOTO ARCHITECTURE
PORTFOLIO 2014
My Progression Through Architecture I always had this inert passion to create. I can confess though, that as a child, I did not know that architecture existed as a career. Before my parents decided to brings my siblings and I to live in the United States, I had a chance to see an “albañil,” a brick layer, create a dome in my grandmothers double height living room. I was mesmerized with the way the brick and mortar came together to create such an artistic pattern. I hold these memories close because it reminds me of how far I have progressed through life.
In my early undergraduate semesters I did not have much confidence in my design abilities. I felt that I did not have the same skills and knowledge as the rest of my classmates.
tern, under his mentorship, to do an analysis of the pathway conditions throughout the Central Campus at UNM. I compiled this information into a presentation which was used
However, my passion and persistence made me want to keep pursuing this career.
to appropriate funds to remedy the issues. One of the first pathways to be worked on was the pathway that started the movement. It brought me joy to see that I was a part of something that was a benefit to many, whether they are physically impaired or not.
Towards the end of my undergraduate program, I became involved in an AIAS group called Freedom by Design. Freedom By Design is a community service program that provides modifications to enhance the homes of low-income and disabled individuals by addressing their struggles with everyday tasks. As a handicap student, I felt that there were also some areas in the University of New Mexico that needed some attention. It was very difficult for myself to travel from my dorm to class because of the lack of curb ramps at the parking areas by my school. At the time, Bob Doran was my studio professor. I created a map of the route I took to class and the areas that needed improvement and brought it to his attention. He was very impressed with my analysis that he decided hire me as a student in-
At this time Bob was creating a studio group for the university and asked if I wanted to join the team. Here is where my confidence in my abilities exponentially grew. My design skills improved drastically. I have grown more as a person and as a designer in this past year with the guidance and mentorship from Bob and the studio team. This improvement clearly shows in the collection of work that I am providing you with. I thank you for taking the time to review my work.
PROFESSIONAL WORK Anderson School Of Management
01
Zimmerman Library 1st Floor Remodel
02
UNM Gallup Masterplan Basemap
03
ADA Pathway Study
04 05
Sergio De Haro Study
01
Anderson School Of Management UNM, Albuqurque, New Mexico
The Douglas M. Brown Dean’s Suite As a retirement gift to the former Dean of the Anderson School of Management, the school decided to name the Dean’s Suite after him. I was given the task of designing and rendering the entire suite. The space has a very open and spacious plan. The Deans office is located on the north-west corner which provides views to the Sandia Mountains. The choice of materials was limited to neutral colors, which gave the mohagony thresholds and interior furniture an opportunity for exhibition. The suite also contains a public terrace which provides views to UNM’s North Campus and also of the West Valley volcanoes.
Dean’s Suite Entrance (North View) Revit Render + Photoshop
Dean’s Suite Reception and Lobby Revit Render + Photoshop
Dean’s Suite Terrace Revit Render + Photoshop
Cafe and Lobby Spaces There are two ways to enter the Anderson School of Management. The first entrace is located on the first floor, at the south east corner of the building. You enter into a three floor atrium with a glass pyramid ceiling. This floor gives access to the cafe and study spaces. On the third floor, there are areas for student lounging and interaction. The other entrance into the school is located at the north east corner of the building. The ground floor lobby functions as a student community area. The space gives access to two lecture spaces, a technology lab, and two large study spaces.
Atrium, 2nd Floor
Atrium, 3rd Floor Balcony
These images were created using Revit Redering + Photoshop Ground Floor Lobby
Anderson School of Management Site Plan AutoCAD + Illustrator
N
6/19/2014 8:49:44 PM
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
OFFICE OF CAPITAL SERVING BUILDING 1818 CAMINO DEL SERVICIO NE ALBUQUERQUE, NM 87131 (505) 379-2241 CONTACT: ERIC SCHWANER ELSCH@UNM.EDU
CONSTRUCTION MANAGER:
OFFICE OF CAPITAL SERVING BUILDING 1818 CAMINO DEL SERVICIO NE ALBUQUERQUE, NM 87131 (505) 934-0491 CONTACT: MARIA DION MDION@UNM.EDU
PROJECT MANAGER:
PHYSICAL PLAN DEPARTMENT SERVING BUILDING 1818 CAMINO DEL SERVICIO NE ALBUQUERQUE, NM 87131 (505) 277-1141 CONTACT: DAVID PENASA DPENASA@UNM.EDU
ELECTRICAL ENGINEERING
PHYSICAL PLAN DEPARTMENT SERVING BUILDING 1818 CAMINO DEL SERVICIO NE ALBUQUERQUE, NM 87131 (505) 277-3567 CONTACT: JESSE HART HARTJ@UNM.EDU
MECHANICAL ENGINEERING
ROBERT W. DORAN A.I.A. OFFICE OF THE UNIVERSITY ARCHITECT 1841 LOMAS BLVD NE ALBUQUERQUE, NM 87131 (505) 277 9290 CONTACT: AMBER STRAQUADINE AMBERS@UNM.EDU
ARCHITECT:
G-000 G-001 G-002 S-101 AD-101 AD-120 A-101 A-102 A-120 A-401 A-501 A-601 MD-101 M-101 M-201 ED-101 E-101 E-102 FA-1 FA-2 TC-101
COVER SHEET LEGEND ABREVIATIONS & SYMBOLS LIFE SAFETY STRUCTURAL FLOOR PLAN DEMOLITION FLOOR PLAN DEMOLITION CEILING PLAN FLOOR PLAN FURNITURE PLAN REFLECTED CEILING PLAN INTERIOR ELEVATIONS SECTIONS & DETAILS FINISHES MECHANICAL DEMOLITION MECHANICAL PLAN HVAC CONTROLS ELECTRICAL DEMOLITION POWER AND DATA PLAN LIGHTING PLAN FIRE ALARM FIRE ALARM SPECIAL SYSTEMS PLAN
SHEET NUMBER SHEET TITLE
INDEX OF DRAWINGS
PHASE:
PROJECT TEAM:
8TH APRIL 2014
100% CONSTRUCTION DOCUMENT
ISSUE DATE:
N
PROJECT LOCATION
The scope of this project is to renovate the east wing, first floor of Zimmerman Library. Renovation of this area will include removal and relocation of the current circulation desk. This service desk will function as a combined service point to accommodate modern library functions such as laptop and electronic device distribution in addition to traditional library consultations. The library commons renovation will include new carpet, new ceiling systems as shown on drawings. It will also include new lighting and hvac ductwork and digital controls as shown on drawings.
PROJECT SCOPE STATEMENT:
1900 ROMA AVE NE ALBUQUERQUE, NM 87106
ZIMMERMAN LIBRARY COMBINED SERVICE POINT & LEARNING COMMONS
UNIVERSITY OF NEW MEXICO
N
1/64" = 1'-0"
KEY PLAN
AREA OF WORK
With the guidance and supervision of Robert Doran (University Architect), and Amber Straquadine (Project Lead), I assisted in the development of the Zimmerman Library’s 1st floor remodeling from schematic design through 100% construction documentation. One of my main responsibilities was to draft the entire electrical and mechanichal drawings. I was given lead in the design of the ceiling and lighting for this space. COMBINED SERVICE POINT
Documents created in Revit14
FILE PATH:
Architect
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
RWD PROJECT NO.:
8TH APRIL 2014
1/64" = 1'-0"
G-000
SHEET NUMBER:
SHEET TITLE: COVER SHEET
ISSUE DATE:
PLOT SCALE:
Project Number
CHECKED:
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
DATE
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
DESCRIPTION
LIBRARY COMMONS & COMBINED SERVICE POINT AS / SE
1
Project Management
Office of Capital Projects
The University of New Mexico MARK
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
UNM, Albuqurque, New Mexico
PLOT DATE:
02 Zimmerman 1st Floor Remodel
6/19/2014 8:50:03 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
CONTRACTOR PARKING SHALL NOT BLOCK ANY FIRE LANES OR IMPACT ANY LANDSCAPE IN THE AREA. COORDINATE WITH UNM SRS AND UNM LANDSCAPE ARCHITECT.
H --------------------HB HOSE BIBB HDPE HIGH DENSITY POLYETHYLENE HDW HARDWARE HDWD HARDWOOD HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER) HM HOLLOW METAL HMD HOLLOW METAL DOOR HORIZ HORIZONTAL HT HEIGHT HYDR HYDRAULIC
G --------------------G NATURAL GAS GALV GALVANIZED GB GRAB BAR GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED BY GOVERNMENT GFRG GLASS-FIBER-REINFORCED GYPSUM GLZ GLAZING GR FL GROUND FLOOR GUT GUTTER GYP BD GYPSUM BOARD GYP PLAS GYPSUM PLASTER
H ------------HB HOSE BIBB HDPE HIGH DENSITY POLYETHYLENE HDW HARDWARE HDWD HARDWOOD HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER) HM HOLLOW METAL HMD HOLLOW METAL DOOR HORIZ HORIZONTAL HT HEIGHT HYDR HYDRAULIC F --------------------FA FIRE ALARM FAAP FIRE ALARM ANNUNCIATOR PANEL FAS BD FASCIA BOARD FC BRK FACE BRICK FCO FLOOR CLEANOUT FD FLOOR DRAIN FDTN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FED FEDERAL FF FINISH FACE FF EL FINISH FLOOR ELEVATION FF INSUL FOIL BACKED INSULATION FGL FIBERGLASS FH FIRE HOSE FHP FULL HEIGHT PARTITION FIN FINISH FIN BS FINISH BOTH SIDES FIN FLR FINISH FLOOR FIN GR FINISH GRADE FIXT FIXTURE FLDG FOLDING FLEX FLEXIBLE FLG FLOORING FLMT FLUSH MOUNT FLR FLOOR FM FACTORY MUTUAL FOC FACE OF CONCRETE FOM FACE OF MASONRY FR FIRE RESISTANT FRG FIBER REINFORCED GYPSUM FRMG FRAMING FRP FIBERGLASS REINFORCED PLASTIC FRTW FIRE RETARDANT TREATED WOOD FS FEDERAL SPECIFICATION FSTNR FASTENER FT FEET FTG FOOTING FWC FABRIC WALLCOVERING
E --------------------E LABEL CLASS E DOOR EA EACH EF EACH FACE EIFS EXTERIOR INSULATION AND FINISH SYSTEM EJ EXPANSION JOINT ES EACH SIDE EL ELEVATION ELEV ELEVATOR ENTR ENTRANCE EPS EXPANDED POLYSTYRENE BOARD (INSULATION) EQ EQUAL EWC ELECTRIC WATER COOLER EXP EXPOSED EXT EXTERIOR EXT EXTINGUISHER EXT GR EXTERIOR GRADE GB GRAB BAR GFCI GOVERNMENT FURNISHED CONTRACTOR INSTALLED GFGI GOVERNMENT INSTALLED FURNISHED INSTALLED BY GOVERNMENT GFRG GLASS-FIBER-REINFORCED GYPSUM GLZ GLAZING GR FL GROUND FLOOR GUT GUTTER GYP BD GYPSUM BOARD GYP PLAS GYPSUM PLASTER
D --------------------D DEPTH D LABEL CLASS D DOOR DBL DOUBLE DEMO DEMOLITION DEPT DEPARTMENT DET DETAIL DIA DIAMETER DIR DIRECTION DIST DISTANCE DOC DOCUMENT DR DOOR DS DOWNSPOUT
C --------------------C CONC CAST CONCRETE C LABEL CLASS C DOOR CAB CABINET CATW CATWALK CAV CAVITY CBB CEMENTITIOUS (BACKER) BOARD CD CONSTRUCTION DOCUMENTS CDW CHILLED DRINKING WATER CEM PLAS CEMENT PLASTER CER CERAMIC CF CONTRACTOR FURNISHED CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED CFE CONTRACTOR FURNISHED EQUIPMENT CFLG COUNTERFLASHING CFM CUBIC FEET PER MINUTE CFMF COLD-FORMED METAL FRAMING CFS CUBIC FEET PER SECOND CG CORNER GUARD CI CAST IRON CIP CAST-IN-PLACE CJ CONTROL JOINT CL CENTER LINE CLG CEILING CLG DIFF CEILING DIFFUSER CLG HT CEILING HEIGHT CLL COLUMN LINE CLO CLOSET CLR COLOR CLRM CLASSROOM CMU CONCRETE MASONRY UNIT CNDS CONDENSATE CDR CARD READER CO CLEANOUT COL COLUMN COMM COMMUNICATION CONC CONCRETE CONC FLR CONCRETE FLOOR CONF CONFERENCE CONT CONTINUE COORD COORDINATE CORR CORRIDOR CP CONCRETE PIPE CPT CARPET CR CONTROL ROOM CS CAST STONE CSWK CASEWORK CT CERAMIC TILE CTB CERAMIC TILE BASE CTF CERAMIC TILE FLOOR CTR CENTER CU FT CUBIC FEET CW CASEMENT WINDOW
B --------------------B LABEL CLASS B DOOR BALC BALCONY BB BASEBOARD BC BOOKCASE BD BOARD BDRY BOUNDARY BFF BELOW FINISH FLOOR BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION BLDG BUILDING BLKG BLOCKING BLT IN BUILT-IN BN BULLNOSE BOS BOTTOM OF STEEL BOT BOTTOM BP BUILDING PAPER BRKT BRACKET BSMT BASEMENT BTWN BETWEEN BUR BUILT-UP ROOFING
--------------------KEYPAD KITCHEN KICKPLATE --------------------LAMINATE LAVATORY LUMBER POUND LANDING LINEAR FEET (FOOT) LIBRARY LINEAR LOCKER LOCATION LIGHT LOUVER DOOR LOUVER
K KPD KIT KPL L LAM LAV LBR LBS LDG LF LIB LIN LKR LOC LT LVDR LVR
------------------OVERALL ON CENTER OUTSIDE DIAMETER OVERFLOW DRAIN OFFICE OBSCURE GLASS OPPOSITE HAND OPENING OPPOSITE OPAQUE OPEN WEB STEEL JOIST OPERABLE OVERFLOW ROOF DRAIN ORIGINAL
O OA OC OD OFD OFF OGL OPH OPNG OPP OPQ OWSJ OPR ORD ORIG
-------------------QUARRY TILE QUANTITY
T -------------------T TREAD T/S TUB/SHOWER TC TERRA COTTA TD TRENCH DRAIN TEL TELEPHONE TEMP TEMPORARY TER TERRAZZO TFF TOP OF FINISH FLOOR THK THICKNESS TK BD TACKBOARD TMPD GL TEMPERED GLASS TN TRUE NORTH TOF TOP OF FOOTING TOM TOP OF MASONRY TOP TOP OF PARAPET TOPO TOPOGRAPHY TOS TOP OF SLAB TRANS TRANSOM TRTD TREATED TV TELEVISION
S -------------------SB SPLASH BLOCK SCHED SCHEDULE SD SMOKE DETECTOR SF SQUARE FOOT (FEET) SFTWD SOFTWOOD SGL SINGLE SHT MTL FLASH SHEET METAL (FLASHING) SHTHG SHEATHING SHV SHELVING SIM SIMILAR SJ SCORED JOINT SKLT SKYLIGHT SLNT SEALANT SMK SMOKE SMLS SEAMLESS SP EL SPOT ELEVATION SPEC SPECIFICATION SQ SQUARE SQ IN SQUARE INCH SQ YD SQUARE YARD SST STAINLESS STEEL ST STAIRS STD STANDARD STL JST STEEL JOIST STL RF DK STEEL ROOF DECK STOR STORAGE STR STRINGERS STRB/HRN STROBE/HORN SUB FL SUBFLOOR SV SHEET VINYL SW SIDEWALK
R -------------------RB RESILIENT BASE RBM REINFORCED BRICK MASONRY RBR RUBBER RC REINFORCED CONCRETE RCP REFLECTED CEILING PLAN RD ROOF DRAIN RDG INS RIGID INSULATION, SOLID REC RECESSED REC ROOM RECREATION ROOM REF REFERENCE REM REMOVABLE REP REPAIR REPL REPLACE REQ REQUIRE REQD REQUIRED RESIL RESILIENT REST RESTROOM RF RESILIENT FLOORING RFG ROOFING RH ROOF HATCH RHR RIGHT HAND REVERSE RL ROOF LEADER RLG RAILING RM ROOM RO ROUGH OPENING RSD ROLLING STEEL DOOR RV ROOF VENT RVL REVEAL
Q QT QTY
P -------------------PA PUBLIC ADDRESS PAR PARAPET PAT PATTERN PB PULL BOX PBD PARTICLEBOARD PCC PRECAST CONCRETE PCF POUNDS PER CUBIC FOOT PCT PERCENT PERF PERFORATED PERIM PERIMETER PH PHASE PIL PILASTER PL PROPERTY LINE PL GL PLATE GLASS PLAM PLASTIC LAMINATE PLAS PLASTER PLBG PLUMBING PLG PILING PLYWD PLYWOOD PNL PANEL PP PL PUSH/PULL PLATE PR PAIR PRCST PRECAST PRKG PARKING PS CONC PRESTRESSED CONCRETE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT PRESSURE TREATED PTD PAPER TOWEL DISPENSER PTDR PAPER TOWEL DISPENSER AND RECEPTACLE PTN PARTITION PWR POWER
--------------------NORTH NOT APPLICABLE NATIONAL FIRE PROTECTION ASSOCIATION NOT IN CONTRACT NUMBER NOMINAL NO PAINT NOISE REDUCTION COEFFICIENT NOT TO SCALE
N N NA NFPA NIC NO NOM NP NRC NTS
M --------------------MACH RM MACHINE ROOM MATL MATERIAL MAX MAXIMUM MC MOISTURE CONTENT MD METAL DECK MECH MECHANICAL MECH RM MECHANICAL ROOM MEMB MEMBRANE MF MILL FINISH MFR MANUFACTURER MID MIDDLE MIL STD MILITARY STANDARD MIN MINIMUM, MINUTE MIRR MIRROR MISC MISCELLANEOUS MLDG MOLDING (MOULDING) MO MASONRY OPENING MOD MODIFY MB MOISTURE BARRIER MTG MOUNTING MTL METAL MVBL MOVABLE MWP MEMBRANE WATERPROOFING
--------------------INTERNATIONAL BUILDING CODE INSULATION INTERIOR IN LIEU OFJ --------------------JANITOR
I IBC INSUL INT ILO JAN UNM SHALL HAVE FIRST RIGHT OF REFUSAL ON ANY ITEMS REMOVED FROM THIS PROJECT. COORDINATE SCOPE OF WORK AND ALL REMOVALS WITH UNM OFFICE OF CAPITAL PROJECTS, UNM SAFETY AND RISK SERVICES, AND UNM INFORMATION TECHNOLOGY. PRIOR TO THE START OF DEMOLITION ACTIVITIES, COORDINATE REMOVALS WITH UNM ASBESTOS REMOVAL REPORT. CONFIRM THAT ASBESTOS HAS BEEN REMOVED. VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK. SHOULD DISCREPANCIES BE DISCOVERED, VERIFY INTENT WITH THE ARCHITECT BEFORE PROCEEDING. MAINTAIN ALL MECHANICAL, ELECTRICAL, AND COMMUNICATION SERVICES TO OWNER’S OPERATIONAL AREAS WHILE PERFORMING WORK. PROVIDE ALL BYPASS, CROSS-CONNECTS, AND/OR TEMPORARY ROUTINGS AND CONNECTIONS AS REQUIRED TO INSURE FULL OPERATION OF ALL SERVICES TO ALL AREAS NOT UNDER CONSTRUCTION AT NO ADDITIONAL COST. COORDINATE ANY REQUIRED SHUTDOWN OF SERVICES WITH THE OWNER AND PROVIDE AT LEAST 1 WEEK NOTICE BEFORE SUCH SHUTDOWNS MAY BE REQUIRED. REWORK EXISTING WET PIPE FIRE PROTECTION SYSTEM IN ACCORDANCE WITH NFPA 13 “STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS”. SPRINKLER SYSTEM WORK INCLUDING DESIGN, MATERIAL, INSTALLATION, INSPECTION AND TESTING SHALL BE DONE IN ACCORDANCE WITH NFPA 13 “ STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS”. REWORK SPRINKLER DESIGN UNDER ORDINARY HAZARD. SPRINKLER SYSTEM WORK SHALL BE COORDINATED WITH OTHER TRADES INCLUDING BUT NOT LIMITED TO, PIPING, DUCT WORK, LIGHTING, AND DIFFUSERS.
1
Ref
1
A
Name Elevation
INTERIOR ELEVATION
SECTION
PLAN, BLOW-UP DETAIL
SHEET KEYNOTE
FLOOR LEVEL & NAME
SPOT ELEVATION
PLATE NUMBER WHERE SECTION/DETAIL IS DRAWN
SIM
PLATE NUMBER WHERE SECTION/DETAIL IS DRAWN
SIM
PLATE NUMBER WHERE SECTION/DETAIL IS DRAWN
EXTERIOR ELEVATION
PLATE NUMBER WHERE SECTION/DETAIL IS DRAWN
A-101
A101
1
Ref A101
1
A101
NORTH
WALL TYPE
WINDOW TYPE
Egress_Length
EGRESS ROUTE ID AND SECTION LENGTH
ROOM OCCUPANCY & AREA
NORTH ARROW w/ TRUE NORTH INDICATION
REVISION TAG
DOOR NUMBER
EQUIPMENT NUMBER
GRID / COLUMN LINE DESIGNATOR
EGRESS :Egress_ID
150 SF
101
Room Rm_Occupancy
1
1i
0
1i
01
101
Room name
ROOM NAME/NUMBER
NUMBER OF PLAN, DETAIL, ETC. ON SHEET
SHEET NUMBER WITHIN SERIES
SERIES NUMBER
DISCIPLINE: G - GENERAL C - CIVIL L - LANDSCAPE A - ARCHITECTURE M - MECHANICAL E - ELECTRICAL P - PLUMBING S - STRUCTURAL
ANNOTATION CALLOUTS/DRAWING SYMBOLS
LEGEND
A2.10/01
NUMBERING SYSTEM:
INDEX OF DRAWINGS
H. I.
G.
F.
E.
D.
C.
A. B.
GENERAL NOTES
101
A --------------------A LABEL CLASS A DOOR A/C AIR CONDITION A/C UNIT AIR CONDITIONING UNIT A/E ARCHITECT/ENGINEER AB ANCHOR BOLT ACC ACCESSIBLE ACS AUTOMATIC CONTROL SYSTEM ACS DR ACCESS DOOR ACS PNL ACCESS PANEL ACT ACOUSTICAL CEILING TILE ADA AMERICANS WITH DISABILITIES ACT ADMIN ADMINISTRATION AFC ABOVE FINISHED COUNTER AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AFS ABOVE FINISHED SLAB AGGR AGGREGATE AHU AIR HANDLING UNIT AIB AIR INFILTRATION BARRIER ALT ALTERNATE ALUM ALUMINUM ANOD ANODIZE APC ACOUSTICAL PANEL CEILING APPROX APPROXIMATE AR AS REQUIRED ARCH ARCHITECT ASC ABOVE SUSPENDED CEILING ASSY ASSEMBLY ATC ACOUSTICAL TILE CEILING AVG AVERAGE AW ARCHITECTURAL WOODWORK AWT ACOUSTICAL WALL TREATMENT Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: 3/16" = 1'-0"
G-001
SHEET NUMBER:
SHEET TITLE: LEGEND ABREVIATIONS & SYMBOLS
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
DRAWING ABBREVIATIONS
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
CONTRACTOR STAGING:
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:50:21 PM
1
G-002
DOOR 160 36"
DOOR 160 36"
DOOR 160 36"
1/8" = 1'-0"
LOBBY 101
STAIR 146
LIFE SAFETY PLAN
DOOR 160 36"
FACP 150
MAX TRAVEL DISTANCE
S
ELEV LOBBY 174
INFO 151A A-3 15 314.16 SF 20.944
BOOK DROP 174A
ELEV 175
IT 167
LOADING 166
B 100 136.37 SF 1.3637
S
F
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
STOR 173
CIRC 171
116'
F
TRASH 166B
S
DOOR 160 36"
STOR 166A
S
S
DOOR 160 36"
MAX
CE AN DIST
S
TR AV EL DIS TA
B 100 662.91 SF 6.6291
A.R.T. 177
B 100 594.95 SF 5.9495
FACILITIES 176
MA X
EL AV TR
NC E
ELEC 170
131'
158'
F E
STOR 171A
CUST 172A
MEN 154
127'
A-3 15 15918.50 SF 1061.23
LIBRARY COMMONS 151
ELEC 153D
CSP 151B
B 100 3709.71 SF 37.0971
CSP WORKROOM 169
A-3 15 314.16 SF 20.944
MENS 172
A-3 15 415.13 SF 27.6753
PRINT STATION 151C
S
S
S
S S S
S S S
E S
S
S
S S
F
S
E S
S
S
DOOR 160 36"
S
S
S S
MECHANICAL 155
WOMEN 157
E
EXIT 155A
STAIR 183A
MAX TRAVEL DISTANCE
S
OFFICE 169B B 100 133.33 SF 1.3333
S
OFFICE 169A B 100 133.33 SF 1.3333
STAIR 161
DOOR 160 36"
STAIR 160A
F WOMENS 162
STAIR 183
E DOOR 160 36"
OFFICE 169D B 100 133.33 SF 1.3333
MAX TRAVEL DISTANCE
S
117'
S
OFFICE 169C B 100 133.33 SF 1.3333
OFFICE 169E B 100 133.33 SF 1.3333
MAX TRAVEL DISTANCE
S
BREAK 169F B 15 421.57 SF 28.1046
STUDY 158B
STUDY 158A
A-3 15 64.97 SF 4.3313
A-3 15 66.19 SF 4.4126
F
111'
0'
4'
A-3 15 0.00 SF 0
STUDY 158
B 15 515.47 SF 34.3646
MEETING 169G
116'
M F E
8'
108'
F
S
FILE PATH:
S
S
S
MECHANICAL 163
F
STAIR 192
ELEC 190
16'
DOOR 160 36"
S S
S
PLOT DATE:
S
S
S
S
DOOR 160 36"
32'
N
UNLIMITED 11
IBC TABLE 1004.1.1 15 NET 100 GROSS 238.22 IN 540 IN
OCCUPANT LOAD FACTOR ASSEMBLY UNCONCENTRATED BUSINESS AREAS EGRESS WIDTH FACTOR REQUIRED PROVIDED
250 FT 158 FT
6 2
DRINKING FOUNTAINS BUSINESS OCCUPANCY WATER CLOSETS FEMALE MALE
2
5 2
DRINKING FOUNTAINS
IBC 2902.1
1 PER 100
1 PER 40 FOR THE FIRST 80 1 PER 80 FOR REMAINDER
1 PER 25 FOR THE FIRST 50 1 PER 50 FOR REMAINDER
1 PER 500
1 PER 200
1 PER 65 1 PER 125
xx'
E
M
OCCUPANCY TYPE APPROXIMATE FLOOR AREA OCCUPANT LOAD FACTOR CALCULATED OCCUPANT LOAD
EGRESS CAPACITY AT 0.2"/PERSON
MANUAL FIRE PULL
SMOKE DETECTOR
1/64" = 1'-0"
KEY PLAN
B 100 1000.00 SF 10
DOOR 160 36"
FIRE EXTINGUISHER
STROBE FIRE ALARM
SPEAKER STROBE FIRE ALARM
EXIT SIGN
APPROXIMATE TRAVEL DISTANCE FROM THIS AREA TO NEAREST EXIT
PRIMARY EGRESS ROUTE
LIFE SAFETY LEGEND:
THIS DRAWING SHALL BE USED FOR REFERENCE AND INFORMATION ONLY - IT IS ONLY A REFERENCE OF BASIC CODE REQUIREMENTS AND IS NOT AN EXTENSIVE COMPILATION OF ALL REQUIREMENTS THAT ARE INCORPORATED INTO THE CONSTRUCTION DOCUMENTS.
1
2 2
4 4 LAVATORIES
3
5
REQUIRED
6
NOTE :
IBC TABLE 1016.1
MINIMUM 44 IN IBC 1018.2 36 IN WHERE OCCUPANCY IS LESS THAN 50 1 HR IBC TABLE 1017.1 50 FT IBC 1017.3
9 5
6
PROVIDED
1 HR 0 FT
PROVIDED ? ?
LAVATORIES
ASSEMBLY OCCUPANCY WATER CLOSETS FEMALE MALE
PLUMBING FIXTURES:
RATING DEAD END
WIDTH
CORRIDORS
EXIT ACCESS TRAVEL DISTANCE MAXIMUM PROVIDED
SECOND MEANS OF EGRESS IBC 1015.1 ONE EXIT REQUIRED FOR OCCUPANT LOADS NOT TO EXCEED 49 PEOPLE
DOOR SWING IBC 1008.1.2 DOORS SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL WHERE SERVING AN OCCUPANT LOAD OF 50 OR MORE PERSONS
IBC 1005.1 .2 IN PER OCCUPANT
IBC 508.4
EGRESS:
IBC 602
BUILDING SEPARATION 1 HOUR FIRE RESISTANCE RATING FOR EXTERIOR WALL OCCUPANCY SEPARATION 1 HOUR FIRE RATED SEPARATION BETWEEN A-3 AND B-1
FIRE ALARM DETECTION SYSTEM ADJUST EXISTING SYSTEM AS REQUIRED FOR ALTERED SPACE
PORTABLE FIRE EXTINGUISHERS ADJUST EXISTING SYSTEM AS REQUIRED FOR ALTERED SPACE
AUTOMATIC SPRINKLER SYSTEM ADJUST EXISTING SYSTEM AS REQUIRED FOR ALTERED SPACE
STRUCTURAL SYSTEM RENOVATIONS DO NOT AFFECT THE STRUCTURAL SYSTEM OR FIRE RATINGS OF THE STRUCTURAL SYSTEM
FIRE PROTECTION:
FIRST FLOOR AREA BUILDING TOTAL AREA BUILDING HEIGHT N/A
IBC TABLE 601 IBC TABLE 503 ALLOWABLE
RENOVATED
IBC 303.1
EXISTING 77,177 SF 270,187 SF 4
CONSTRUCTION TYPE TYPE 1-B SPRINKLERED BUILDING
PRIMARY OCCUPANCY GROUP A-3 LIBRARY
BUILDING DATA:
DESCRIPTION OF WORK REMOVAL OF EXISTING REFERENCE DESK AND STAFF WORK AREA NEW COMBINED SERVICE POINT DESK AND STAFF WORKAREA NEW LIBRARY COMMONS
IEBC WORK CLASSIFICATION LEVEL 2 ALTERATION NO CHANGE IN OCCUPANCY OR OCCUPANT LOAD
PROJECT SUMMARY:
N
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE:
G-002
SHEET NUMBER:
SHEET TITLE: LIFE SAFETY
8TH APRIL 2014
PLOT SCALE: As indicated
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
INTERNATIONAL BUILDING CODE 2009 NFPA 101 LIFE SAFETY 2006 NEW MEXICO EXISTING BUILDING CODE 2009
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
APPLICABLE CODES
LIBRARY COMMONS & COMBINED SERVICE POINT
PROJECT DATA AND CODE CRITERIA
F
S
E
S
S
DOOR 160 36"
S
S
S
S
F
DOOR 160 36"
S
S
S
S
F
E
S
F S
S
S
S
S
F S
F
S
E S S
S
F
E
6/19/2014 8:51:46 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
S-101
LOBBY 101
STAIR 146
FACP 150
1/8" = 1'-0"
FLOOR STRUCTURE- REFERENCE ONLY
18
17
16
15
14
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
A
INFO 151A
BOOK DROP 174A
A1
90"
90"
+/- 117"
+/- 90"
+/- 90"
ELEV LOBBY 174
IT 167
LOADING 166
ELEV 175
TRASH 166B
STOR 173
STOR 166A
CIRC 171
+/- 78"
78"
+/- 78"
+/- 78"
+/- 78"
B
78"
54" 78"
78"
78"
78"
A.R.T. 177
FACILITIES 176
STOR 171A
ELEC 153D
90"
+/- 90"
+/- 90"
+/- 90"
ELEC 170
C
36"
MENS 172
MEN 154
72"
150"
+/- 100"
141"
6" 30" 6" +/- 100"
+/- 90"
CUST 172A
CSP 151B
+/- 48" +/- 126"
141"
WOMEN 157
72"
+/- 100"
LIBRARY COMMONS 151
6"
+/- 100"
+/- 90"
CSP WORKROOM 169
WOMENS 162
D
36"
+/- 148"
+/- 148"
OFFICE 169A
STAIR 160A
MECHANICAL 155
STAIR 183A
+/- 156"
+/- 148"
EXIT 155A
78"
MECHANICAL 163
D
OFFICE 169B
STAIR 161
E
STAIR 183
E
+/- 36"
2
+/- 54" +/- 120"
+/- 54" +/- 54" +/- 52" 54"
+/- 54" 54" 54"
+/- 90"
TYP 24"
54" +/- 54" 54"
+/- 60"
C
+/- 162"
+/- 36"
F
+/- 30"
30"
OFFICE 169C
F
+/- 174"
+/- 36"
+/- 174"
OFFICE 169D
OFFICE 169E
+/- 60"
+/- 126"
+/- 120"
+/- 126"
G
+/- 144"
STUDY 158A
STUDY 158B
+/- 54"
+/- 54"
+/- 60"
BREAK 169F
G
+/- 18"
+/- 60" STUDY 158
+/- 72"
MEETING 169G
H
H
STAIR 192
ELEC 190
J
J
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
C.
STRUCTURAL FLOOR PLAN FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL NEW FLOOR BOX LOCATIONS RELATIVE TO EXISTING CONSTRUCTION. IF CONFLICT ARISES WITH EXISTING STRUCTRUAL ELEMENTS, NOTIFY UNM PROJECT MANAGER FOR COORDINATION OF FINAL LOCATION. VERIFY CONDITIONS AT BASEMENT LEVEL PRIOR TO LOCATING FLOOR BOXES.
+/- 12" 36"
+/- 54" 54"
54"
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: 1/8" = 1'-0"
S-101
SHEET NUMBER:
SHEET TITLE: STRUCTURAL FLOOR PLAN REFERENCE ONLY
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
A. B.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
1
B
+/- 90"
+/- 36"
A1
24"
+/- 54" +/- 54" 54" 54"
+/- 12" 48"
+/- 60" 48"
A
+/- 72"
+/- 60" +/- 12"
+/- 48" +/- 126" 84"
+/- 60" +/- 72" +/- 48"
+/- 60" +/- 96" +/- 12"
F
6/19/2014 8:33:38 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
AD-101
1/8" = 1'-0"
DEMOLITION FLOOR PLAN
18
17
16
15
14
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
2
LOBBY 101
STAIR 146
2
FA CONTROL 1 150
11
11
15
11
11
15
A
4
4
5
7
1
4
1
8
7
7
4
7
4
10
CIRC DESK 151
IT 173
4
9
5
4
4
8 STUDY 153K
STUDY 153M
4
5
COMPUTER STATIONS 152
STUDY 153L
7
4
14
10
11
10
10
1
ELEV LOBBY 174
A1
9
LOAD 166
ELEV 175
TRASH 166B
STOR 166A
7
7
8
5
4
5
4
T
4
3
9
STOR 151B
4
5
5
5
7
STUDY 153J
4
4
OFFICE 151C
5
9
CIRCULATION 171
3
7
10
1
B
7
8
4
4
5
4
4
4
7
4
STUDY 153
STUDY 153G
5
4
7
7
7
4
7
7
5
STUDY 153B
4
5
1
7
4
4
7
4
4
7
ELEC 153D
1
7
OFFICE 177
2
CIRC DESK 164
5
4
ELEC 170
STUDY STUDY 153F 153E
E
4
4
4
4
13
7
ILL 176
STOR 171A
WORKROOM 151A
STUDY 153A
5
6
6
STUDY 153H
4
STUDY 153N
STUDY 153P
C E
C
2
4
4
CUST 172A
C
8
4
7
4 7
13 5
13
4
4
OFFICE 168B
OFFICE 168
OFFICE 168A
MENS 154
8
WORKROOM 169
MENS 172
4
8
8
4
7
7
4
4
4
WOMENS 157
5
3
WOMENS 162
D
D
MECH 163
C
1
B
12
MECH 155
EXIT 155A
7
OFFICE 167D
EXIT 160
2
STAIR 183A
4
1
STAIR 161
STAIR 161A
STAIR 183
2
E
7
OFFICE 167E
E
7
OFFICE 167F
2
F
F
7
7
LIBRARY COMMONS 167
7
OFFICE 167H
2
7
OFFICE 167G
2
16
16
G
G
1
7
7
16
STUDY 158A
STUDY 158B
7
STUDY 158
0'
4'
M E
8'
H
H
STAIR 192
J
16'
ELEC 190
J
32'
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
N
E
APROXIMATE LOCATION OF EXPANSION JOINT
EXISTING FIRE ALARM MANUAL PULL TO REMAIN
EXISTING FIRE EXTINGUISHER TO REMAIN
1/64" = 1'-0"
KEY PLAN
EXISTING THERMOSTAT TO BE REMOVED
EXISTING FIRE ALARM STROBE SPEAKER TO BE REMOVED EXISTING THERMOSTAT TO REMAIN
EXISTING FIRE ALARM STROBE SPEAKER TO REMAIN
EXISTING FIRE ALARM HORN STROBE TO BE REMOVED
EXISTING BELL TO REMAIN EXISTING FIRE ALARM HORN STROBE TO REMAIN
C
ELECTRICAL
M
EXISTING DOOR TO BE REMOVED
EXISTING DOOR TO REMAIN
EXISTING WALL TO BE REMOVED
EXISTING WALL TO REMAIN
NO WORK IN THIS AREA
LEGEND
N
EXISTING WALL TO REMAIN. EXISTING DOOR TO REMAIN. EXISTING FIRE EXTINGUISHER TO REMAIN. REMOVE EXISTING WALL IN ITS ENTIRETY. REMOVE DOOR, FRAME AND ASSEMBLY. REMOVE EXISTING WALL AND PREPARE TO RECEIVE NEW DOOR. REMOVE CARPET, BASE, ADHESIVE, AND TRANSITION STRIPS. REMOVE EXISTING GLAZING AND FRAME ASSEMBLY. REMOVE WALL MOUNTED EQUIPMENT. SAVE AND PROTECT FOR RE-USE IN THIS PROJECT. REMOVE BUILT-IN CASEWORK. TEMPORARY CONSTRUCTION WALL. LIGHT GUAGE METAL STUD WITH 3/5" GYP BD ON OUTTER SIDE. APPROXIMATE LOCATION OF EXPANSION JOINT. PROTECT DURING DEMOLITION. REMOVE DOOR, FRAME AND ASSEMBLY. SAVE AND PROTECT FOR RE-USE IN THIS PROJECT. REMOVE BUILT IN BOOK RETURN ROLLERS. RETURN TO OWNER. REMOVE DECORATIVE MILLWORK. RETURN TO OWNER. DECORATIVE MILLWORK TO REMAIN.
REFER TO GENERAL NOTES SHEET G-001. ALL STRUCTURES, FINISHES, MECHANICAL/ELECTRICAL/PLUMBING EQUIPMENT TO REMAIN SHALL BE PROTECTED FROM DAMAGE. REMOVE AND PROPERLY CAP MECHANICAL AND ELECTRICAL CONNECTIONS ASSOCIATED WITH DESIGNATED REMOVAL OF WALLS. PATCH/REPLACE ADJACENT FLOOR FINISHES, WALL FINISHES, CEILING FINISHES, ETC. AFFECTED BY THE DEMOLITION TO ACHIEVE A UNIFORM FINISH. PATCH AND REPAIR FLOOR AS REQUIRED TO RECIEVE NEW FLOOR FINISH. REPAIR AND/OR REPLACE ANY FIRE PROOFING AS REQUIRED TO MAINTAIN EXISTING FIRE RATING. UNM HAS FIRST RIGHT OF REFUSAL ON ALL CASEWORK, MILLWORK DOORS, HARDWARE AND ASSEMBLY. COORDINATE WITH UNM OCP GENERAL CONTRACTOR PRIOR TO DEMOLITION. SAVE AND PROTECT WALL AND CEILING MOUNTED EQUIPMENT FOR REUSE IN THIS PROJECT. SAVE AND PROTECT DECORATIVE MILLWORK. RETURN TO OWNER.
KEYED NOTES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I.
H.
G.
E. F.
D.
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: As indicated
AD-101
SHEET NUMBER:
SHEET TITLE: DEMOLITION FLOOR PLAN
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
C.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
A. B.
LIBRARY COMMONS & COMBINED SERVICE POINT
GENERAL NOTES:
F F S S T T
A1
C
A
E
E E
1
AD-120
17
LOBBY 101
STAIR 146
FA CONTROL 150
1/8" = 1'-0"
DEMOLITION REFLECTED CEILING PLAN
18
16
15
14
12
11
10
19
8
7
6
5.1
5
4
A
1
5
1
A1
STUDY 153L
6
S
2
3
1
IT 173
STOR 166A
WAP 1
TYP.
3
2
2 1
STUDY 153K
STUDY 153M 1
1
1
5
5
7
STOR 151B
STUDY 153J
1
STUDY 153N
STUDY 153P
B
6
6
OFFICE 151C
STUDY 153H
6
1
1
1
1
1
S
1
S
1
1
5
6
6
1
6
6
5
5
5
1
ELEC 153D
3
1
6
C
C
WAP
OFFICE 177 S
CIRC DESK 164
ELEC 170
STUDY STUDY 153F 153E
1
6
STUDY 153B
ILL 176
STOR 171A
1
STUDY 153
STUDY 153G
1
STUDY 153A
1
6
TYP.
TYP.
WORKROOM 151A
5
5
6
6
5
5
1
5
5 TYP
CIRCULATION 171
CIRC DESK 151
6
5
1
COMPUTER STATIONS 152
S
ELEV LOBBY 174
5
LOAD 166
5
ELEV 175
TRASH 166B
WAP
3
S
S
2
S
S
S
CUST 172A
5
1
5
3
5
MENS 154
6
6
6
6
TYP. S
1
3
S
1
OFFICE 168B
6
OFFICE 168
6
1
S
WORKROOM 169
OFFICE 168A
WAP
6
5
5
MENS 172
S
1
5
6
3
6
5
6
5
6
6
5
WOMENS 157
5
WOMENS 162
D
EXIT 160
WAP
MECH 155
EXIT 155A
3
OFFICE 167D
MECH 163
D
STAIR 183A
1
STAIR 161
STAIR 161A
1
TYP.
E
TYP.
STAIR 183
6
6
OFFICE 167E
E
OFFICE 167F
3
TYP.
WAP
F
WAP
5
3
1
F
1
6
S
TYP.
1
1
6
S
TYP.
S
1
OFFICE 167H
LIBRARY COMMONS 167
OFFICE 167G
HD
5
3
4
4
TYP.
WAP
5
5
5
1
6
STUDY 158A
0'
STUDY 158
4
S
TYP.
TYP.
STUDY 158B
6
3
4'
5
5
5
WAP
8'
H
H
16'
STAIR 192
ELEC 190
J
J
32'
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
N
CEILING TO BE REMOVED
NO WORK IN THIS AREA
EXISTING LAY-IN CEILING (GRID PATTERN VARIES) TO REMAIN
LIGHTING FIXTURES TO BE REMOVED
LIGHT FIXTURES TO REMAIN
MOTION DETECTOR TO BE REMOVED
EMERGENCY LIGHT TO BE REMOVED
EMERGENCY LIGHT TO REMAIN
FIRE ALARM STROBE TO BE REMOVED
FIRE ALARM STROBE TO REMAIN
EXIT SIGN TO BE REMOVED
EXIT SIGN TO REMAIN
WIRELESS ACCESS POINT TO BE REMOVED
WIRELESS ACCESS POINT TO REMAIN
1/64" = 1'-0"
KEY PLAN
DIFFUSER TO BE REMOVED
EXISTING RETURN TO REMAIN
EXISTING SUPPLY TO REMAIN
MECHANICAL DEMOLITION:
S
S
WAP
SMOKE DETECTOR TO REMAIN SMOKE DETECTOR TO BE REMOVED WAP
ELECTRICAL DEMOLITION:
LEGEND:
REMOVE EXISTING CEILING SYSTEM. REMOVE GYPSUM BOARD CEILING. REMOVE CEILING MOUNTED EQUIPMENT. SAVE FOR RE-USE IN THIS PROJECT. CEILING GRID AND A.C.T TO REMAIN. REMOVE LIGHTING FIXTURES. REMOVE DIFFUSER. REMOVE GYP BD CEILING TO FACILITATE REMOVAL OF V.A.V. BOX.
REFER TO GENERAL NOTES SHEET G-001. ALL STRUCTURES, FINISHES, MECHANICAL/ELECTRICAL/PLUMBING EQUIPMENT TO REMAIN SHALL BE PROTECTED FROM DAMAGE. DISCONNECT AND REMOVE EXISTING LIGHTING IN THIS AREA. NOTE ADDITIVE ALTERNATE. REMOVE AND PROPERLY CAP MECHANICAL AND ELECTRICAL CONNECTIONS ASSOCIATED WITH DESIGNATED REMOVAL OF WALLS. PROVIDE NECESSARY MEASURES TO INSURE SAFE DEMOLITION.
KEYED NOTES
1 2 3 4 5 6 7
E.
C. D.
N
Architect
DESCRIPTION
DATE
Checker
8TH APRIL 2014
As indicated
AD-120
SHEET NUMBER:
SHEET TITLE: DEMOLITION CEILING PLAN
ISSUE DATE:
PLOT SCALE:
Project Number
CHECKED:
PROJECT NO.:
FILE:
2014.04.23
Author
ADDENDUM 1
DRAWN BY:
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
A. B.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
1
S
B
S
S
S
A1
S
S
S
S
A
S
S
S
S
6/19/2014 8:33:51 PM
S
S
S S
S
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
S
S
WAP
S
S
FILE PATH:
S
S
S
S
S
PLOT DATE:
S
WAP
S
6/19/2014 8:31:20 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
1/8" = 1'-0"
FIRST FLOOR PLAN
LOBBY 101
STAIR 146
9
FACP 150
3
3
3
3
A-401
16
3
A
PT-2
BOOK DROP 174A
A
ELEV 175
IT 167
LOADING 166
INFO 151A
A1
4
10
PT-2
A-401
12
14Sim
12'-0"
ELEV LOBBY 174
E
A-101
18
17
16
15
14
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
TRASH 166B
9'-6"
3
PT-2
A-401
STOR 173
7
5
167
9
CIRC 171
2 A-401
A
3'-6" PT-2
6'-6"
10'-6"
STOR 166A
4" 171
B
PT-2
177
176 18" 64" 2
34"
2
A-401
14
12'-0"
1
A.R.T. 177
1
2 5
FACILITIES 176
STOR 171A
A
10
2
1'-11"
ELEC 153D
MEN 154
4'-2"
A
CUST 172A
C
A-501
PT-3
6
ELEC 170
1'-2" 12'-1" 1'-3"
C
CSP 151B 18'-9"
2
1
PRINT STATION 151C
2
6
2
2
CSP WORKROOM 169
LIBRARY COMMONS 151
2
6
2
2
MENS 172
OFFICE 169A
8"
WOMEN 157
4'-2"
7
MECHANICAL 155
8
STAIR 183A
PT-3
3 A-401
11'-10"
A
1 A-401
EXIT 155A
1
STAIR 161
9
STAIR 160A
WOMENS 162
D
MECHANICAL 163
D
E
STAIR 183
1
E
A-501
2
OFFICE 169B
E
1
1
A
1
1
OFFICE 169C
F
F
1
A
9
1
15 A-401
A-501
1
OFFICE 169D
1
A-401
18
1
A
1
OFFICE 169E
6
1
6"
G
169D
G
7
1
A
169C
A
STUDY 158A
STUDY 158B
1
STUDY 158
0'
A
4'
9
1
MEETING 169G
13'-3"
DOOR & SIDELIGHT TO BE REUSED
MATCH WIDTH TO EXISTING 55"
1
A
7
1
BREAK 169F
30'-11"
1
E
169A
B
1
E
A1
PT-3
169B
4" PT-2
8'
H
H
STAIR 192
16'
ELEC 190
J
J
32'
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
N
NEW FIRE EXTINGUISHER
EXISTING FIRE EXTINGUISHER
NO WORK IN THIS AREA
NEW WINDOW
EXISTING DOOR
NEW DOOR
EXISTING WALL
1/64" = 1'-0"
KEY PLAN
E
E
FUTURE WALL NEW WALL
N
NEW FLOORING & COVE BASE. SEE SCHEDULE. INFILL WALL AT DOOR REMOVAL. 5/8" GYPSUM BOARD OVER METAL STUD FRAMING. TEMPORARY CONSTRUCTION WALL. LIGHT GUAGE METAL STUD WITH 3/5" GYP BD ON OUTTER SIDE. 3FORM PARTITION 200.21.03. WITH 4' VARIA ECORESIN PANEL IN VARIA COURIER, SANDSTONE FINISH FRONT AND BACK. VERSA HARDWARE SYSTEM WITH SLIM PROFILE HEADERS IN SQUARE PROFILE POSTS WITH SIDE BRACKETS. MOUNT TO CONCRETE FLOOR. PLASTIC LAMINATE COUNTER. CORNER GUARD. EXISTING DOOR TO BE REUSED FROM THIS PROJECT. COORDINATE WITH UNM OCP DURING DEMOLITION. NEW FIRE EXTINGUISHER. SURFACE MOUNT. EXISTING FIRE EXTINGUISHER TO REMAIN. EXISING FIRE EXTINGUISHER. REUSED FROM DEMOLITION. SURFACE MOUNT.
LEGEND:
8 9 10
5 6 7
KEYED NOTES
1 2 3 4
PROVIDE CONCEALED BACKING FOR ALL WALL-MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO DOOR BUMPERS, DOOR HOLDERS, GRAB BARS, AND CASEWORK EQUIPMENT. PARTITIONS TO BE TYPE A UNLESS OTHERWISE NOTED. Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: As indicated
A-101
SHEET NUMBER:
SHEET TITLE: FLOOR PLAN
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
B.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
A.
LIBRARY COMMONS & COMBINED SERVICE POINT
GENERAL NOTES:
000A
A
E
E
E
E
6/19/2014 8:32:20 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
A-102
LOBBY 101
STAIR 146
FACP 150
FACP
1/8" = 1'-0"
FURNITURE & EQUPIMENT FLOOR PLAN
18
17
16
15
14
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
2
A
BOOK DROP 174A
FACP
A1
INFO 151A
ELEV LOBBY 174
IT 167
STOR 173
STOR 166A
LOADING 166
ELEV 175
TRASH 166B
A1
CIRC 171
B
B
STOR 171A
A.R.T. 177
FACILITIES 176
ELEC 170
ELEC 153D
C
MEN 154
CUST 172A
C
MENS 172
PRINT STATION 151C
LIBRARY COMMONS 151
CSP 151B
CSP WORKROOM 169
D
MECHANICAL 155
WOMEN 157
WOMENS 162
EXIT 155A
OFFICE 169A
MECHANICAL 163
D
STAIR 183A
STAIR 160A
STAIR 183
E
OFFICE 169B
STAIR 161
E
OFFICE 169C
F
F
OFFICE 169D
OFFICE 169E
G
G
STUDY 158A
STUDY 158B
STUDY 158
BREAK 169F
0'
4'
MEETING 169G
H
H
8'
STAIR 192
J
16'
ELEC 190
J
32'
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
N
1/64" = 1'-0"
KEY PLAN
NO WORK IN THIS AREA
NEW FURNITURE
FUTURE FURNITURE OPTION
EXISTING FURNITURE PROVIDED BY OWNER
LEGEND:
KEYED NOTES
FURNISHINGS PROVIDED UNDER SEPARATE CONTRACT.
N
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: As indicated
A-102
SHEET NUMBER:
SHEET TITLE: FURNITURE PLAN REFERENCE ONLY
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
1
A
FACP
A.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:33:04 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
A-401
3
12
4
A-501
8
14
4
1'-8" TYP
A-501
3
1
6
6
6
8
6
3
12
A-501
13'-6"
" 2'-0 R1
6
4
A-401
7
4
A-501
CSP 151B
10
A-401
6
" 97
6 A-501
12
13'-6"
" 24
1
3
18 "
12
A-401
14
3
7
1
A-401
1/4" = 1'-0"
30" OC
4
5
3 A-501
12'-0"
24 "
1/4" = 1'-0"
N
CHARGING STATIONS
1/4" = 1'-0"
CONSULTATION DESK
4
2
8
A-401
2
A-401
5
A-401
2'-6"
10
6
1/4" = 1'-0"
18"
A-401
" R 4'-8
5
R 8'-0"
8
INFO 151A
1'-4"
2 A-501 1
3'-0"
1/4" = 1'-0"
5'-9"
1'-1" 6"
11" 8"
3'-10"
3'-10"
1
1
13
13
3'-0"
8
8
10
1/4" = 1'-0"
3
1
N
8" 8"
9
A-401
3
A-401
6
A-401
3
1
A-401
12
ENLARGED PLAN- NICHE WALL
1
1/4" = 1'-0"
WALL
3'-0"
13
13
ENLARGED PLAN- INFORMATION DESK
6
12
23"
INFORMATION DESK WEST
1/4" = 1'-0"
INFORMATION DESK EAST
3
1
2'-0" TYP
A-401
15
A-401
18
8
8
0" 9'-
ENLARGED PLAN- COMBINED SERVICE POINT
5
1/4" = 1'-0"
COMBINED SERVICE POINT NORTH
1/4" = 1'-0"
DEVICE STORAGE SOUTH
3
12
8
1/4" = 1'-0"
DEVICE STORAGE NORTH
7
1/4" = 1'-0"
17
3
1
R
A-401
1
17
A-401
4
A-401
7
A-401
10
A-401
2'-10"
BOOK DROP
2'-10"
16
2'-10"
5
2'-6"
8
2'-4"
3 5
3'-6"
2'-0" 18"
3
5"
30"
2'-4"
1
3
1
A-501 1
13
8
1
13
8
TYP
2'-0"
11
16'-6" VIF
10
2'-0" TYP
6
6
6
EQ
R
" '-6 11
6
4'-
6"
9
A-401
R
12
6
EQ
10
" 18
" 24
13
13
PRINT STATION 151C
6
8
8
24"
3
1
1/4" = 1'-0"
ENLARGED PLAN- PRINT & SCAN STATION
24"
1/4" = 1'-0"
PRINT STATION SOUTH
1/4" = 1'-0"
SCAN STATION NORTH
1/4" = 1'-0"
LOUNGE DIVIDER WEST
5'-9"
3
1 A-501
4'-0" 3'-0"
9"
5"
2'-4"
7'-4"
N
7
3
1
13
8
13
8
14
13
12
11
7 8 9 10
6
EXISTING COLUMN, PAINT AS SCHEDULED. NEW GYP BD WALL, PAINT AS SCHEDULED. BASE AS SCHEDULED. 1 1/2" STEEL TUBE SUPPORT BRACKET, 32" O.C. SMOOTH EDGES. PLASTIC LAMINATE COUNTERTOP WITH 4" BACKSPLASH AND BULLNOSE EDGE. SEE FINISH LEGEND. SERVICE DESKS, OWNER FURNISHED, VENDOR INSTALLED. PLASTIC LAMINATE COUNTERTOP AND BULLNOSE EDGE. PLASTIC LAMINATE TOP IN SHADOW MICRO 2923 BY STEELCASE. PLASTIC LAMINATE BASE IN BLACK 2746 BY STEELCASE. PROVIDED UNDER SEPARATE CONTRACT. DOOR AS SCHEDULED. WINDOW AS SCHEDULED. EXISTING DOOR. 3FORM PARTITION 200.21.03 WITH 7' VARIA ECORESIN PANEL IN VARIA COURIER, SANDSTONE FINISH FRONT AND BACK. VERSA HARDWARE SYSTEM WITH SLIM PROFILE HEADERS IN SQUARE PROFILE POSTS WITH SIDE BRACKETS. MOUNT TO CONCRETE FLOOR. 3FORM PARTITION 200.21.03. WITH 4' VARIA ECORESIN PANEL IN VARIA COURIER, SANDSTONE FINISH FRONT AND BACK. VERSA HARDWARE SYSTEM WITH SLIM PROFILE HEADERS IN SQUARE PROFILE POSTS WITH SIDE BRACKETS. MOUNT TO CONCRETE FLOOR. WOOD COUNTERTOP WITH BULLNOSE EDGE. MATCH FINISH TO EXISTING WOODWORK IN LIBRARY. RAISED PANEL MILLWORK. MATCH GEOMETRY AND FINISH TO EXISTING WOODWORK IN LIBRARY. COORDINATE WITH ARCHITECT. RAISED PANEL DOOR. MATCH GEOMETRY AND FINISH IN LIBRARY. COORDINATE WITH ARCHITECT.
KEYED NOTES
1 2 3 4 5
GENERAL NOTES Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: 1/4" = 1'-0"
A-401
SHEET NUMBER:
SHEET TITLE: INTERIOR ELEVATIONS DETAIL PLANS
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
9
16 "
1'-2"
12'-1"
1'-3"
3'-0"
9"
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
A-501
EQ EQ
3'-6"
6"
8'-
R
LIBRARY COMMONS & COMBINED SERVICE POINT
12'-1" VIF
-0" R 8'
38"
6/19/2014 8:33:12 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
5
A-501
16
1
A-501
1 1/2" = 1'-0"
1 1/2" = 1'-0"
WALL TYPE A
GYP BD CEILING
1
2
2
21
1
14
15
4
14
2 A-501
4
14
1 1/2" = 1'-0"
WALL SECTION 2
15
1 1
2
21
2
14
21
14
15
4
14
3 A-501
4" 9
4
12
13
1 1/2" = 1'-0"
WALL MOUNTED COUNTER
4
11
10
24"
17
30"
A-501
4
A-501
6
A-501
6
7
20
19
1
1
20
14
6" 8
3
18"
1 1/2" = 1'-0"
DEVICE STORAGE
4
19
6
19
5
19
2
1
21
1 1/2" = 1'-0"
PLAN SECTION
5
5
7
3"
4
7
18
20
1
1
19
20
7
5
20 21
14 15 16 17 18 19
9 10 11 12 13
8
3 5/8" METAL STUD. 5/8" HIGH IMPACT GYP. BD. WINDOW AS SCHEDULED. BASE AS SCHEDULED. PLASTIC LAMINATE ADJUSTABLE SHELF. HOLES FOR ADJUSTABLE SHELVING. RAISED PANEL DOOR. MATCH GEOMETRY AND FINISH IN LIBRARY. COORDINATE WITH ARCHITECT. WOOD COUNTERTOP WITH BULLNOSE EDGE. MATCH FINISH TO EXISTING WOODWORK IN LIBRARY. EXISTING CONCRETE FLOOR. FIRE RETARDANT WOOD BLOCKING AS REQUIRED. EXISTING WALL, PAINT AS SCHEDULED. 1 1/2" STEEL TUBE SUPPORT BRACKET, 32" O.C. SMOOTH EDGES. PLASTIC LAMINATE COUNTERTOP WITH 4" BACKSPLASH AND BULLNOSE EDGE. SEE FINISH LEGEND. CONTINUOUS METAL RUNNER. TOP OF SLAB. NEW GYP BD WALL, PAINT AS SCHEDULED. NEW LAY-IN ACT CEILING AS SCHEDULED. CANNED RECESSED LIGHT PER LIGHTING PLAN. 3 NEW DUPLEX RECEPTACLES. STACKED ONE ABOVE THE OTHER. INSTALL INSIDE CASEWORK. WOOD TRIM. MATCH FINISH IN LIBRARY. COORDINATE WITH ARCHITECT. 3.5" BATT INSULATION.
KEYED NOTES
1 2 3 4 5 6 7
Architect
DESCRIPTION
ISSUE DATE: 1 1/2" = 1'-0"
A-501
SHEET NUMBER:
SHEET TITLE: SECTIONS & DETAILS
8TH APRIL 2014
PLOT SCALE:
Project Number
PROJECT NO.:
CHECKED: Checker FILE:
DATE
2014.04.23
DRAWN BY:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
4 A-501
2'-10"
GENERAL NOTES:
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
19"
1 1/2" 4"
1
8" 8" 6" 4"
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:33:23 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
7'-0" 7'-0" 7'-0" 7'-0" 7'-0" 7'-0"
SEE
TYPE A
SEE
5 A-601
SEE
EQ
TYPE B
EQ
SCHEDULE 2'-0"
V.I.F.
TYPE 1
8 A-601
A-601 1
4 A-601
SEE SCHEDULE 2"
TYPE 2
8 A-601
INFO
CSP PRINT STATION ELEC STUDY STUDY STUDY IT CSP WORKROOM OFFICE OFFICE OFFICE OFFICE OFFICE BREAK MEETING BOOK DROP FACILITIES A.R.T.
151A
151B 151C 153D 158 158A 158B 167 169 169A 169B 169C 169D 169E 169F 169G 174A 176 177
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
-
NUMBER ROOM NAME NORTH 151 LIBRARY COMMONS P-1
1/4" = 1'-0"
HARDWARE SCHEDULE
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
-
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
-
P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1 P-1
-
B-1
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
1'-7"
3"
FLOOR FINISH CPT - 6
FINISH SCHEDULE
6 A-601
CEILING FINISH 2 x 4 ACT
Head Height 7'-0" 7'-6" 3'-10"
1
8 A-601
4 A-601
A-601
9
7
10
8
1
6
3" = 1'-0"
WINDOW SILL
4
7
12
3" = 1'-0"
1
8
10
7
9
WINDOW JAMB
6
7
11
4
3" = 1'-0"
WINDOW HEAD
6
5
7
4
HEIGHT NOTES & REMARKS (SEE NOTES) 8'-0" SEE A101 FLOOR PLAN FOR ACCENT PAINT WALLS CPT - 6 2 X 4 ACT- REFER TO PLAN 8'-0" FOR LAYOUT CPT - 6 2 x 4 ACT 8'-0" CPT - 6 2 x 4 ACT 8'-0" EXISTING TO REMAIN EXISTING TO REMAIN PATCH AND REPAIR TO MATCH EXISTING CPT - 6 EXISTING TO REMAIN CPT - 6 EXISTING TO REMAIN CPT - 6 EXISTING TO REMAIN VCT - 1 SEE SHEET TC-101 FOR REQUIREMENTS CPT - 6 2 x 4 ACT 8'-0" CPT - 6 EXISTING TO REMAIN 8'-0" CPT - 6 EXISTING TO REMAIN 8'-0" CPT - 6 EXISTING TO REMAIN 8'-0" CPT - 6 EXISTING TO REMAIN 8'-0" CPT - 6 EXISTING TO REMAIN 8'-0" VCT - 1 2 x 4 ACT 7'-6" CPT - 6 2 x 4 ACT 8'-0" EXISTING TO REMAIN EXISTING TO REMAIN 8'-0" VCT - 1 2 x 4 ACT 8'-0" CPT - 6 2 x 4 ACT 7'-6"
TYPE 3
10 A-601
3 A-601
3"
FRAME GLAZING DETAILS Finish Material Type Thickness Head Jamb Sill OAK 3/8" OAK 3/8" OAK N/A NO GLASS
WINDOW SCHEDULE Remarks FROSTED GLASS DECAL FROSTED GLASS DECAL FROSTED GLASS DECAL
FRAME DETAILS Materia Hardware l Type Finish Head Jamb Set No. Comments B HM P-1 2" 2" 2 REUSE DOOR FROM DEMOLISHED ROOM 177 A WD 2" 2" 1 MATCH DOOR AND FRAME FINISH TO EXISTING DOOR 169b B WD 2" 2" 1 REUSE DOOR FROM DEMOLISHED ROOM 168B B HM 2" 2" 2 REUSE DOOR FROM DEMOLISHED ROOM 168A B WD 2" 2" 2 REUSE DOOR FROM DEMOLISHED ROOM 168 A HM P-1 2" 2" 1 A HM P-1 2" 2" 2 A HM P-1 2" 2" 2
WALL FINISH BASE EAST SOUTH WEST FINISH P-1 P-1 P-1 B-1
4 A-601
V.I.F.
TYPE C
SEE SCHEDULE 2"
1 A-601
2"
TYPE B
WINDOW FRAME TYPES
2"
1/4" = 1'-0"
DOOR FRAME TYPES
TYPE A
2 A-601
SCHEDULE
2"
2"
DOOR TYPES
1/4" = 1'-0"
PT-1
1HR 1HR 1HR
R.O. Mark Width Height Type 1 3'-0" 5'-0" Window_Fixed with screen 2 2'-0" 4'-8" CSP Fixed Window wit h Screen 3 2'-0" 1'-0" Book Drop
SCHEDULE
Count
SEE SCHEDULE
10 15 1
26 Bright Chrome Plated
WD WD WD HM HM HM
Fire Rating 1HR
Manufacturer/ Cataloge Number Function Comments Sargent 10line 10G04 LL 26 F04 ANSI 1 Lockset, 3 Hinges, 3 Silencers, 1 Wall/Floor Stop, 1 Closer Design Sargent 10line 10G04 LL 26 F04 ANSI 1 Lockset, 3 Hinges, 3 Silencers, 1 Wall/Floor Stop Design
2" 2" 2" 2" 2" 2"
Thickness Material Finish 2" HM PT-1 2" WD
5'-3"
2
Set # Hardware Finish 1 26 Bright Chrome Plated
3'-0" 3'-0" 4'-0" 4'-0" 4'-0" 4'-0"
V.I.F
C C C B B B
DOOR
D
169B 169C 169D 171 176 177
SEE SCHEDULE
2"
SEE SCHEDULE
EX ISTI NG TO
BE RE -US E
3"
SIZE Height 7'-0" 7'-0"
2'-6"
V.I.F.
8
9
7
7
10
5 A-601
2 A-601
2" 1" 1"
3" = 1'-0"
DOOR JAMB
3" = 1'-0"
DOOR HEAD
1"
Door Numb er Type Width 167 A 3'-0" 169A A 3'-0"
2"
SEE SCHEDULE
2" 2'-0"
SE D
BE RE -U
TO
EX IST ING
2"
SEE SCHEDULE
2" 2'-10"
7"
3" 3'-0"
1
2
3
3
2
10 A-601
6 A-601
3 A-601
2"
1"
1"
2
1"
2
1
1
2
3" = 1'-0"
WINDOW TYPE 3 SILL
3" = 1'-0"
WINDOW TYPE 3 JAMB
1"
3" = 1'-0"
WINDOW TYPE 3 HEAD
1" 2" 1" 1" 2"
not used INTERFACE COMMERCIAL FLOR S201 BLACK 9784 ARMSTRONG IMPERIAL TEXTURE STANDARD EXCELON 51915 CHARCOAL 12" X 12"
VCT-1
ARMSTRONG 02 IRON
DUNN EDWARDS PAINT RAGING TIDE DE5809
DUNN EDWARDS PAINT ORANGE DELIGHT DE5306
DUNN EDWARDS PAINT NAVAJO WHITE DEC772
STEELCASE - BASE PANEL BLACK 2746
PL-3
CIRRUS HIGH-NRC 48" X 24" PANEL EDGE: ANGLED TEGULAR
1/4" = 1'-0"
FINISH LEGEND
MATCH EXISTING
WOOD STAIN AND FINISH
ACT-1
ACCOUSTIC CEILING TILES
WILSONART LAMINATE 4886-38 PEARL SOAPSTONE STEELCASE - COUNTERTOP SHADOW MICRO 2923
PL-1 PL-2
COUNTERTOPS:
P-3
P-2
P-1
WALL PAINT:
B-1
BASE COVE:
not used
not used
CPT-6
not used CPT-3
CPT-5
not used CPT-2
CPT-4
CPT-1
FLOORING
3 5/8" METAL STUD. HM FRAME. DOOR AS SCHEDULED. CASTING. TOP RAIL. DOUBLE PANED 3/8" GLASS. WOODEN SPACER. FIRE RETARDANT WOOD BLOCKING AS REQUIRED. WOOD SCREEN. WOOD FRAME. SIDE RAIL. BOTTOM RAIL.
PROVIDE TRANSITION STRIPS WHERE CHANGE IN TYPES AND LEVEL OF FLOOR OCCUR. ALL DOORS, FRAMES AND HARDWARE TO COMPLY WITH UNM PPD LOCKSHOP STANDARDS AND SPECIFICATIONS. ALL HARDWARE REQUIRED TO BE SARGENT BRAND ORIGINAL.
KEYED NOTES
1 2 3 4 5 6 7 8 9 10 11 12
C.
A. B. Architect
DESCRIPTION
DATE
2014.04.23
PROJECT NO.:
ISSUE DATE: As indicated
A-601
SHEET NUMBER:
SHEET TITLE: FINISHES DOOR, WINDOW SCHEDULE
8TH APRIL 2014
PLOT SCALE:
Project Number
Checker FILE:
CHECKED:
ADDENDUM 1
Author
DRAWN BY:
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
DOOR SCHEDULE
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:51:29 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
MD-101
A
A1
3
3
1
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN
18
17
16
15
14
13
B
4
3
WAP
C
2
2
REMOVE ABANDONED DUCT
2
3
1
3
2
2
3
1
2
1
D
1 TYP 30
E
5
E
2 TYP 30
F
F
FIRE DAMPER AT CHASE TO REMAIN
5
G
G
5
0'
4'
8'
H
H
16'
J
J
32'
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
N
18
17
16
15
14
13
12
1
1
3
1
3
2
D
11.5
TYP
3
1
3
C
12
3
2
1
CAP
3
B
11.5
11
10.3
10
19
8
7
6.4
6
5.1
5
4
3
2
A1
1/64" = 1'-0"
KEY PLAN
NO WORK IN THIS AREA
DIFFUSER TO BE REMOVED
EXISTING RETURN TO REMAIN
EXISTING SUPPLY TO REMAIN
MECHANICAL
5
REMOVE DIFFUSER AND DUCT WORK BACK TO MAIN AS SHOWN. REMOVE RETURN GRILLE. REMOVE VAV OR DUAL DUCT BOX IN ITS ENTIRETY. REMOVE PNEUMATIC LINES BACK TO LAST ACTIVE BRANCH AND CAP. REMOVE BRANCH DUCT AND DIFFUSERS SERVING STUDY ROOMS BACK TO THE DUAL DUCT BOX LOCATED ABOVE THE RESTROOM CEILING. REMOVE DUAL DUCT BOX, LOCATED ABOVE RESTROOM CEILING, AND CAP HOT AND COLD DUCT AT MAINS. REMOVE DUCTBOARD IN ITS ENTIRETY BACK TO THE FIRE DAMPER AT THE CHASE.
KEYED NOTES
4
1 2 3
N
Architect
T: 505.277.2421 www.unm.edu
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: As indicated
MD-101
SHEET NUMBER:
SHEET TITLE: MECHANICAL DEMOLITION
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
The University of New Mexico
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
1
A
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:50:54 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
1
M-101
1/8" = 1'-0"
MECHANICAL PLAN
18
17
16
15
14
12
11
10
19
8
7
6
9 CU-IT167
A
A1
1
6
8
8"ø
6"ø
6"ø
180 CFM
8"ø
3
250 CFM
1
250 CFM
1
11
250 CFM
1
250 CFM
1
250 CFM
1
11
250 CFM
1
250 CFM
9
6"ø
5.1
AC-IT167
6"ø
3
2 350 CFM
6"ø
5
4
6"ø
3
14
14
5
14
14"ø
12"ø
10
10 125 CFM
14
125 CFM
10
125 CFM
11
11
1
250 CFM
250 CFM
1
1 250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
11
250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
11
1
250 CFM
250 CFM
1
1
4
300 CFM
1
14"x12"
16"ø 10"ø
10"ø
4
10"ø
10"ø
225 CFM
1
14"x12"
300 CFM
1
B
1 225 CFM
6
HOT DUCT
14"ø 12
1
5
1
250 CFM
250 CFM
1
C
COLD DUCT
250 CFM
1
HOT DUCT
1 250 CFM
1 250 CFM
11
250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
1 250 CFM
11
1
250 CFM
1
250 CFM
1
11
250 CFM
1
250 CFM
1
250 CFM
1
300 CFM
1
225 CFM
1
11
1 225 CFM
300 CFM
12"ø
10
3
10"x12"
6
INSULATE HOT AND COLD DUCT ABOVE ELECTRICAL ROOM
12"ø
7
14"x12"
16"x12"
15
3
1
13
250 CFM
1
15
13
D
100 CFM
10
2 365 CFM
1
11
365 CFM
2
365 CFM
2
11
365 CFM
2
365 CFM
2
365 CFM
2
20"x12"
200 CFM
10
250 CFM
250 CFM
1
250 CFM
1
250 CFM
1
250 CFM
1
250 CFM
1
250 CFM
1
250 CFM
6"ø
COLD DUCT
6"ø
200 CFM
8"x12" 8"x12" 8"x12"
8"x12"
6"x12" 6"x12"
24"x12" 16"x12" 10"x12"
12"x12" 10"x12"
14
16"x12"
D
12"x12"
C
200 CFM
10
2
E
365 CFM
12
E
10 200 CFM
F
365 CFM
365 CFM
2
365 CFM
2
11
2 365 CFM
2 365 CFM
2 365 CFM
2 365 CFM
11
2
365 CFM
2
10
2
365 CFM
G
34 "x1 2"
12
200 CFM
365 CFM
2
365 CFM
2
200 CFM
10
PROVIDE 12 X 12 DUCT ACCESS PANELS IN EACH DUCT AT CHASE FOR ACCESS TO FIRE EXISTING DAMPER.
F
2 365 CFM
G
100 CFM
10
2
11
10 100 CFM
10
130 CFM
10
130 CFM
365 CFM
2
2
2
11
365 CFM
365 CFM
365 CFM
2 365 CFM
2
32"x14" 365 CFM
365 CFM
2
24"x12"
3
12"ø
22"x12" 12"x12"
B
24"x12"
2
A1
16"x12" 10"x12" 10"x12" 16"x12" 22"x12" 24"x12" 14"ø
12"ø
22 "x1 2"
14"ø
34"x12"
14"ø 12"ø 22"x12" 16"x12" 10"x12" 10"x12" 16"x12" 22"x12"
12"ø 14"ø
12"x12" 26"x14" 24"x12" 12"x12"
14"ø 16"x 12"
22"x12" 24"x12" 34"x12" 16 "ø
34"x12" 26"x12" 20"x12" 12"x12"
26"x12" 20"x12" 12"x12"
10"x12" 16"ø
12"x12" 12"x12"
2
0'
2
11
4'
2
8'
H
130 CFM
10
130 CFM
10
365 CFM
2
365 CFM
365 CFM
2
12"x6"
365 CFM
2
365 CFM
11
365 CFM
H
16'
140 CFM
10
J
10 140 CFM
J
32'
N
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
GWB CEILING
NEW LAY-IN CEILING (GRID PATTERN VARIES)
1/64" = 1'-0"
NO WORK IN THIS AREA
NEW SUPPLY DIFFUSER
NEW RETURN DIFFUSER
EXISTING SUPPLY DIFFUSER
EXISTING RETURN DIFFUSER
CONNECTION BETWEEN NEW AND EXISTING DUCT
MECHANICAL:
KEY PLAN
SUPPLY AIR: 200 CFM SUPPLY AIR: 100 CFM SUPPLY AIR: 250 CFM SUPPLY AIR: 320 CFM
EXISTING LAY-IN CEILING (GRID PATTERN VARIES)
MENS 172, EXHAUST AIR: 200 CFM CUST 172A, EXHAUST AIR: 100 CFM WOMENS 162, EXHAUST AIR: 200 CFM MENS 154, EXHAUST AIR: 350 CFM WOMENS 157, EXHAUST AIR: 420 CFM
CONNECT TO EXISTING SUPPLY DIFFUSER, BALANCE TO CFM INDICATED. RETURN AIR GRILLE EQUIVALENT TO PRICE MODEL 80. 24 X 24 EGG CRATE ROUTE MAIN DUCT IN THE NORTH / SOUTH DIRECTION TO BE CENTERED BETWEEN CONCRETE STRUCTURE IN ORDER TO ALLOW BRANCH DUCT CROSSINGS ABOVE THE MAIN DUCTS. PROVIDE MERV 13 V-BANK AIR FILTERS EQUIVALENT TO CAMFIL FARR DURAFIL ES WITH 0.27 IN W.G. INITIAL RESISTANCE. PROVIDE (6) 24 X 24 FILTERS. CONTRACTOR TO VERIFY EXACT SIZE AND EXISTING CONDITIONS PRIOR TO ORDERING. INSULATE SECTION OF EXISTING DUCT WORK WHERE INSULATION IS MISSING. FIELD VERIFY LENGTH OF SECTION. BALANCE THE AIR IN THE RESTROOMS TO THE FOLLOWING:
SUPPLY AIR DIFFUSER EQUIVALENT TO PRICE MODEL SDC WITH 8" DIAMETER NECK. BALANCE TO CFM INDICATED. SUPPLY AIR DIFFUSER EQUIVALENT TO PRICE MODEL SDC WITH 10" DIAMETER NECK. BALANCE TO CFM INDICATED. DUAL DUCT VAV BOX EQUIVALENT TO PRICE MODEL DDV SIZE 6 WITH FIBER FREE LINER. CONTROLLER BY UNM ENGINEERING AND ENERGY SERVICES. DUAL DUCT VAV BOX EQUIVALENT TO PRICE MODEL DDV SIZE 10 WITH FIBER FREE LINER. CONTROLLER BY UNM ENGINEERING AND ENERGY SERVICES. DUAL DUCT VAV BOX EQUIVALENT TO PRICE MODEL DDV SIZE 12 WITH FIBER FREE LINER. CONTROLLER BY UNM ENGINEERING AND ENERGY SERVICES. DUAL DUCT VAV BOX EQUIVALENT TO PRICE MODEL DDV SIZE 14 WITH FIBER FREE LINER. CONTROLLER BY UNM ENGINEERING AND ENERGY SERVICES. DUAL DUCT VAV BOX EQUIVALENT TO PRICE MODEL DDV SIZE 16 WITH FIBER FREE LINER. CONTROLLER BY UNM ENGINEERING AND ENERGY SERVICES. SUPPLY AIR DIFFUSER EQUIVALENT TO PRICE MODEL SDS, 4' LENGTH, 2 SLOT, 3/4" SLOT WIDTH. PROVIDE WITH INSULATED SUPPLY PLENUM. BALANCE TO CFM INDICATED SPLIT-SYSTEM AC UNIT. EQUIVALENT TO DAIKIN MODEL FTXs30LVJU INDOOR UNIT AND RKs30-LVJU OUTDOOR UNIT. UNIT SHALL BE CAPABLE OF 30 MBH COOLING AND BE PROVIDED WITH VARIABLE SPEED COMPRESSOR UTILIZING R-410A REFRIGERANT. UNIT SHALL BE CAPABLE OF LOW AMBIENT OF OPERATION. MOUNT OUTDOOR UNIT ON A 4" THICK CONCRETE HOUSEKEEPING PAD, 12" FROM THE WALLS IN BOTH DIRECTION. PLACEMENT OF OUTDOOR UNIT IS CRITICAL AS SPACE IS NEEDED FOR FUTURE GENERATOR INSTALLATION. MOUNT INDOOR UNIT ABOVE DOOR. PROVIDE INDOOR UNIT WITH CONDENSATE PUMP AND THERMOSTAT. ROUTE CONDENSATE PIPE TO CUST. 172A. INSULATE REFRIGERANT PIPING, SUCTION LINE WITH 1 1/2" THICK ARMAFLEX. ARMAFLEX APPLIED OUTSIDE SHALL RECIEVE 0.016-INCH ALUMINUM JACKET.
LEGEND:
15
14
13
10 11 12
9
8
7
6
5
4
3
2
P P P
4" 2" 1" PRESSURE TEST ALL DUCTWORK RATED AT 3 IN W.G. OR MORE. TESTING SHALL BE ACCORDING TO SMACNA. ADVISE UNM WHEN TESTING TO ALLOW UNM PPD AND CxA TO WITNESS. NEW DUCT WORK SHALL BE INSULATED WITH 1.5” THICK FIBERGLASS BLANKET WITH FSK. FIBERGLASS BLANKET SHALL HAVE DENSITY OF 0.75 PCF. PROVIDE AIR TEST AND BALANCE. TEST AND BALANCE. CONTRACTOR SHALL COORDINATE WITH UNM ENGINEERING AND ENERGY SERVICES DURING CONTROLS WORK AND PROGRAMMING.
FROM AIR HANDLING UNIT TO TERMINAL UNIT: FROM MULTI ZONE AHU TO DIFFUSER: FROM TERMINAL UNIT TO DIFFUSER:
WORK SHALL BE DONE IN ACCORDANCE WITH UNM DESIGN STANDARDS. HTTP://ISS.UNM.EDU/PPD/WEBPDFS/DESIGNSTANDARDSCSIFORMATREVISION2DATED02262014 .PDF. ALL EXISTING DUCT WORK TO REMAIN SHALL BE CLEANED, UTILIZING ROTARY AIRBRUSH AND VACUUM METHOD. SEAL ALL EXISTING AND NEW DUCT WORK JOINTS. DUCT SEALANT SHALL BE LEED COMPLIANT. SEAL TO CLASS A. ALL BRANCH DUCT TAKE-OFFS SHALL UTILIZE A HIGH EFFICIENCY TAKE-OFF WITH BALANCING DAMPER. SPIN-IN COLLARS ARE PROHIBITED. ALL DUCTS SHALL BE CONSTRUCTED OF GALVANIZED SHEET STEEL. CONSTRUCT DUCTWORK WITH WALL THICKNESS AND REINFORCING PER THE SMACNA HVAC DUCT CONSTRUCTION STANDARDS, SECOND EDITION, 1995, AND UMC 2009 CHAPTER 6, PRESSURE CLASSES: CONSTRUCT DUCTWORK TO THE FOLLOWING PRESSURE CLASSES: RELATIVE PRESSURE DUCT ELEMENT DESCRIPTION PRESSURE CLASS -
KEYED NOTES
1
H.
G.
F.
E.
D.
C.
B.
N
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE: As indicated
M-101
SHEET NUMBER:
SHEET TITLE: MECHANICAL PLAN
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
A.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
1
A
14"ø
" 12 "x 24
1
M-201
1/8" = 1'-0"
HVAC CONTROL PLAN
18
17
A
A1
B
C02
16
T
15
INFO 151A
C02
14
ELEV LOBBY 174
STOR 173
CIRC 171
T
13
BOOK DROP 174A
ELEV 175
T
T
A.R.T. 177
FACILITIES 176
STOR 171A 3
4
ELEC 153D
ELEC 170
C
CUST 172A
MENS 172
EXISTING
LIBRARY COMMONS 151
CSP 151B
CSP WORKROOM 169
WOMEN 157
WOMENS 162
D
T
MEN 154
PRINT STATION 151C
EXIT 155A
OFFICE 169A
MECHANICAL 155
C02
12
LOBBY 101
STAIR 146
FACP 150
IT 167
LOADING 166
THERMOSTAT FURNISHED WITH SPLIT SYSTEM AC
TRASH 166B
STOR 166A
T
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
2
MECHANICAL 163
D
STAIR 183A
STAIR 160A
STAIR 183
E
EXISTING
OFFICE 169B
STAIR 161
E
OFFICE 169C
F
F
OFFICE 169D
EXISTING
OFFICE 169E
G
STUDY 158A
STUDY 158B
BREAK 169F
G
0'
STUDY 158
OS
2
EXISTING
1
OS
4'
8'
MEETING 169G
H
H
16'
STAIR 192
ELEC 190
J
J
32'
N
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
EXISTING THERMOSTAT
1/64" = 1'-0"
KEY PLAN
Demand Control Ventilation When the zone level CO2 rises above the setpoint of 900 ppm (adjustable), the outside air damper at the AHU shall modulate open in 10% increments. An alarm shall be generated if the concentration reaches 1200 PPM.
N
Temperature Control Each zone damper at the unit shall modulate to maintain the space temperature. During a call for cooling, maintain the space temperature at the cooling setpoint of 76 °F (adjustable) for occupied periods and 85 °F (adjustable) during unoccupied periods. During a call for heating, maintain the space temperature at the heating setpoint of 72 °F (adjustable) for occupied periods and 55 °F (adjustable) during unoccupied periods.
Multi-Zone
Demand Control Ventilation When the zone level CO2 rises above the setpoint of 900 ppm (adjustable), reset the minimum air flow of active supply air damper and allow mixing to maintain temperature setpoint. If the CO2 concentration remains above the setpoint after the terminal unit is supplying the maximum air flow, the outside air damper at the respective AHU shall modulate open in 10% increments. An alarm shall be generated if the concentration reaches 1200 PPM.
Temperature Control Each dual duct terminal unit shall modulate the cold duct supply air damper and the hot duct supply air damper independently to maintain the space temperature. Mixing shall not be allowed. During a call for cooling, the hot duct supply air damper shall be closed and the cold deck supply air damper shall modulate between the minimum and maximum cooling air flows to maintain the space temperature at the cooling setpoint of 76 °F (adjustable) for occupied periods and 85 °F (adjustable) during unoccupied periods. During a call for heating, the cold duct supply air damper shall be closed and the hot deck supply air damper shall modulate between the minimum and maximum heating air flows to maintain the space temperature at the heating setpoint of 72 °F (adjustable) for occupied periods and 55 °F (adjustable) during unoccupied periods.
Dual Duct VAV
SEQUENCE OF OPERATIONS:
NO WORK IN THIS AREA
NEW THERMOSTAT
NEW CO2 SENSOR
NEW OCCUPANCY SENSOR
HVAC ZONE
LEGEND:
3 4
PROVIDE CEILING MOUNTED OCCUPANCY SENSOR TO OVERRIDE ZONE CONTROL. WHEN MEETING 169F IS OCCUPIED, ZONE SHALL CONTROL TO THE THERMOSTAT IN THE MEETING ROOM. WHEN THE MEETING ROOM IS UNOCCUPIED, ZONE SHALL CONTROL TO LIBRARY SPACE. PROVIDE CEILING MOUNTED OCCUPANCY SENSOR TO OVERRIDE ZONE CONTROL. WHEN STUDY 158 IS OCCUPIED, ZONE SHALL CONTROL TO THE THERMOSTAT IN THE STUDY ROOM. WHEN THE STUDY ROOM IS UNOCCUPIED, ZONE SHALL CONTROL TO LIBRARY SPACE. PROVIDE VAV CONTROL TRANSFORMER EQUIVALENT TO RIB PCS300 PROVIDE VAV CONTROL TRANSFORMER EQUIVALENT TO RIB PCS100.
ALL CONTROLS WORK SHALL BE BY UNM PPD ENGINEERING AND ENERGY SERVICES. GENERAL CONTRACTOR SHALL COORDINATE AND SCHEDULE CONTROLS WORK WITH OTHER TRADES.
KEYED NOTES
2
1
A.
T
Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE:
M-201
SHEET NUMBER:
SHEET TITLE: HVAC CONTROLS
8TH APRIL 2014
PLOT SCALE: As indicated
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
GENERAL NOTES:
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
1
C02
T C02
6/19/2014 8:51:14 PM
C02
T
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
T
FILE PATH:
T T T
T
C02
C02
T
T C02
T T
OS C02
C02
T
C02 C02
PLOT DATE:
LIBRARY COMMONS & COMBINED SERVICE POINT
C
C02
B
T
A1
C02
A
T
T
T
T
C02
1
ED-101
1
STUDY 153M
STUDY 153K
3
COMPUTER STATIONS 152
STUDY 153L
A1
2
1
3
F
1
1+1
1
2
TO
T
1
1
STUDY 153J
B
STUDY 153P STUDY 153N
OFFICE 151C
STOR 151B
FROM
2
STUDY 153A
STUDY 153H
3
3
2
STUDY 153G
STUDY 153
2
WORKROOM 151A
2+2
3
2
2
1
2
S
STUDY 153F
STUDY 153B
2
1
ILL 176
STOR 171A
STUDY 153E ELEC 153D
2
1
OFFICE 177
CIRC DESK 164
S
ELEC 170
2
2
2
C
1
2
T
2
T
2
2
2
2
CUST 172A
MENS 154
2
2
2
OFFICE 168B
OFFICE 168
OFFICE 168A
WORKROOM 169
MENS 172
1
1
1+1
2
2
WOMENS 162
D
2
2
MECH 155
WOMENS 157
2
1
3
STAIR 161
STAIR 161A
EXIT 155A
2
2
2
2
STAIR 183A
STAIR 183
S
S
2
OFFICE 167E
OFFICE 167D
S
EXIT 160
E
2
OFFICE 167F
S
F
2
4
4
2
S
S
LIBRARY COMMONS 167
OFFICE 167H
OFFICE 167G
2
2
G
G
2
2
1
1
STUDY 158A
STUDY 158B
2
STUDY 158
1
2
1
1
2
2
1
H
H
1
STAIR 192
ELEC 190
J
J
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
EXISTING FIRE ALARM HORN STROBE TO REMAIN EXISTING FIRE ALARM HORN STROBE TO BE REMOVED
XD XP
X
X
X
X
X
NO WORK IN THIS AREA
EXISTING COMBINATION POWER/DATA FLOOR BOX W/ X CABLED DATA CONNECTIONS TO REMAIN
EXISTING AC WALL OUTLET DUPLEX TO REMAIN
EXISTING AC WALL OUTLET TO BE REMOVED
EXISTING AC WALL OUTLET TO REMAIN
EXISTING DATA (WALL OUTLET W/ X CABLED CONNECTIONS) TO BE REMOVED
EXISTING DATA (WALL) OUTLET W/ X CABLED CONNECTIONS TO REMAIN
EXISTING DATA (WALL) OUTLET W/ X CABLED CONNECTIONS TO BE REMOVED
EXISTING DATA (WALL) OUTLET W/ X CABLED CONNECTIONS TO REMAIN
EXISTING DATA AND PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS TO BE REMOVED
EXISTING DATA AND PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS TO REMAIN
EXISTING THERMOSTAT TO BE REMOVED
EXISTING FIRE ALARM STROBE SPEAKER TO BE REMOVED EXISTING THERMOSTAT TO REMAIN
EXISTING FIRE ALARM STROBE SPEAKER TO REMAIN
X
EXISTING FIRE ALARM MANUAL PULL TO REMAIN
M
EXISTING RECESSED J BOX TO REMAIN
LEGEND:
RELOCATE DOOR ALARM ANNUNCIATOR PANEL EXISTING LTG CONTROL STATION BANK OF SWITCHES TO BE RELOCATED FROM THE SOUTH SIDE OF THE WALL TO THE NORTH SIDE OF WALL.
KEYED NOTES
1 2
VERIFY DEMOLITION OF ACTIVE DATA PORTS WITH UNM IT PRIOR TO COMMENCEMENT OF DEMOLITION. DISCONNECT AND REMOVE EXISTING RECEPTACLES IN THIS AREA LOCATED ON WALLS BEING REMOVED. MAINTAIN CIRCUIT CONTINUITY FOR DEVICES REMAINING.
1/64" = 1'-0"
A
4
1
F
CIRC DESK 151
IT 173
1
1 CIRCULATION 171
S
5'-7"
KEY PLAN
1
2
ELEV LOBBY 174
ELEV 175
LOAD 166
STOR 166A
F
T
1/8" = 1'-0"
LOBBY 101
STAIR 146
FA CONTROL 150
2
TRASH 166B
S
E
F
ELECTRICAL DEMOLITION PLAN
18
17
16
15
14
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
2
D
MECH 163
C
B. Architect
DESCRIPTION
DATE
PROJECT NO.:
ISSUE DATE:
ED-101
SHEET NUMBER:
SHEET TITLE: ELECTRICAL DEMOLITION
8TH APRIL 2014
PLOT SCALE: As indicated
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
A.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
1
C
6/19/2014 8:48:33 PM
F
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
F T
F
S
FILE PATH:
C
S
B
F
F T F T C E F T
M F E J F
J
F F S S T T
F S
F
F E
F
T S
F
S
F
F
F
PLOT DATE:
F F
S
S S
S
S
A1
E
S
S S S
S
S
F
S
S
E
S
A
S
S
S F S
S
F
1
E-101
1/8" = 1'-0"
POWER AND DATA PLAN
18
17
16
2D 2P
A
EX
EX
9
WAP
EX
EX
INFO 151A
WAP
EX
EX
2 +36" WAP
ELEV LOBBY 174
ELEV 175
1
STOR 173
4D 4P
+36"
8
TO P1AA
J
EX
CR
EX
19
FROM
AC-IT167
EX
EX
EX
WAP
TO
EX
1
CR
1
EX
CR
1
EX
EX
WAP
A1
WAP
EX
B
EX
EX
9
EX
1
EX
2
2
ELEC 170
2
EXIST PANEL "P1C" (EXIST PANEL "PBC", IN BSMT BELOW
EXIST PANEL "L1D" (EXIST PANEL "LBC", IN BSMT BELOW)
8
EX
T
TO LBC 8
EX
TO P1AA
+36"
2
ELEC 153D
TO "P1C"
2
+36"
+36"
TO P1A 8
2
+36"
EX
8
EX
EX 2
EX
1
EX
TO 8 LBC
8
4
TO P1B
WAP
2
TO P1AA 8
EX
WAP
WAP
+36"
EX
4
A.R.T. 177
2
2
FACILITIES 176
EX
STOR 171A
VAV CONTROL POWER TRANSFORMER
EX
9
2
EX
EX +36"
EX
2
+36"
EX +36"
3
C02
15
TO 8 P1A
EXIST PANEL "P1A" 17
EXIST PANEL "L1A"
EXIST PANEL "E1"
TO P1A
BOOK DROP 174A
5
IT 167
4
9
LOADING 166
CIRC 171
8 TO P1AA
EX EX
VAV CONTROL POWER TRANSFORMER
T
14
LOBBY 101
STAIR 146
FACP 150
6
CW-IT167
TRASH 166B
STOR 166A
1
16 EXIST PANEL P1AA
EXIST PANEL "L1B"
EXIST PANEL "L1C"
EXIST. PANEL "P1B"
C02
13
12
11.5
11
10.3
10
19
8
7.7
7
6.4
6
5.1
5
4
3
2
1
EX
EX
TO P1C
MEN 154
1
EX
C
TO LBC
9
+36"
+36"
8
+36"
+36"
+36"
CSP 151B
2
8D 4P
+36"
14
2
2
WAP
LIBRARY COMMONS 151
2
2D 2P
+36"
9
EX
EX
EX
2
D
3
EX
2 EX
TO LBC
9
D
2
EX
EX
EX
MECHANICAL 163
WOMENS 162
+36" 15 TYP. +36"
2
CSP WORKROOM 169
TO 8 +36" P1AA
9
MENS 172
TO P1B
EX
2
EX
2
EX
CUST 172A
C
2D 2P
8
8
4D 2P
PRINT STATION 151C
3
WOMEN 157
EX
EX
EXIT 155A
18
STAIR 183A
2
4D 6P
2D 2P
2D 2P
STAIR 183
EX 2P
E
2
2D 2P
TO 8 1LC
9
F
EX
F
WAP
4
2
WAP
4D 4P
EX
EX
4D 4P
EX
4
EX
4D 6P
EX 4
EX
3
3
EX
OFFICE 169C
E
OFFICE 169B
STAIR 161
WAP EX
WAP
TYP.
4D 6P
8
MECHANICAL 155
2
EX
7
3
OFFICE 169A
STAIR 160A
WAP
9
TO 8 1LC
4D 6P
3
EX
OFFICE 169D
EX
EX 2P
2
2
2D 2P
4D 6P
2D 6P
2D 2P
3
OFFICE 169E
EX
EX
4D 6P
EX
G
TO 8 1LC
9
2
0'
STUDY 158A EX
EX
2
STUDY 158B
EX
4D 6P
+36"
4'
TO 1LC
TO 1LC
BREAK 169F
2D 2P
TO 1LC 8
WAP
WAP
WAP
EX
EX 2
TO 8 1LC
2
EX
EX
G
8'
EX 2P
EX
STUDY 158
EX
2
2
9
EX
4D 6P
16'
WAP
EX
9
2
EX TO 8 1LC
+36"
MEETING 169G
13 4D 4P
EX
EX
EX
EX
TO 1LC
1
EX
H
EX
EX
H
STAIR 192
8
ELEC 190
32'
J
J
N
NEW PANEL "1LC"
EXIST. PANEL "1LB"
10
12
EXIST. PANEL "1LA" 11
18
17
16
15
14
13
12
11.5
11
10.3
10
9
8
7.7
7
6.4
6
5.1
5
4
3
2
1
CR
EX
NEW DOUBLE DUPLEX (QUADPLEX) RECEPTACLE
NO WORK IN THIS AREA
CONDUIT RUN W/ CIRCUITS AND CONDUCTORS AS INDICATED
CONDUIT RUN IN CEILING SPACE OF FLOOR BELOW
NEW COMBINATION POWER/DATA FLOOR BOX, FLUSH, FIRE RATED W/ (2) 20A, 125A SIMPLEX RECEPTACLES AND X CABLED DATA CONNECTIONS
NEW COMBINATION POWER/DATA FLOOR BOX, FLUSH, FIRE RATED W/ (6) 20A, 125A SIMPLEX RECEPTACLES AND X CABLED DATA CONNECTIONS
EXISTING COMBINATION POWER/DATA FLOOR BOX W/ X CABLED DATA CONNECTIONS
NEW DATA FLOOR BOX W/ X CABLED DATA CONNECTIONS
EXISTING DATA FLOOR BOX W/ X CABLED DATA CONNECTIONS
1/64" = 1'-0"
KEY PLAN
2P
6P
XD
XP XD
XD
EXISTING DOUBLE DUPLEX (QUADPLEX) RECEPTACLE
NEW DUPLEX RECEPTACLE
EXISTING DUPLEX OUTLET W/ X CABLED CONNECTIONS
NEW DATA WALL OUTLET W/ X CABLED CONNECTIONS
EXISTING DATA WALL CONNECTION
NEW PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS
X
X
EXISTING PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS
EXISTING DATA AND PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS
X
XD
EX
EXISTING RECESSED J BOX EXISTING DATA AND PHONE (WALL) OUTLET W/ X CABLED CONNECTIONS
X
X
X
NEW CARD READER
LEGEND:
16 17 18 19
12 13 14 15
11
8 9 10
7
PROVIDE 120V CONNECTION TO HVAC CONTROLS TRANSFORMER. REINSTALL EXISTING RECEPTACLE AT NEW MOUNTING HEIGHT. NO WORK TO THIS AREA. MOUNT QUADPLEX RECEPTACLE ON NEW CABLE TRAY BEING PROVIDED BY OTHERS. 30A 250V DISCONNECT SWITCH FUSED AT 20A. NEM 3R ENCLOSURE. 2POLE + E.G. 3/4" C. - 2 # 10 AND 1 # 10 GRD TO EXIST. PANEL P1AA. PROVIDE 25A - 2P BREAKER IN AVAILABLE SPACES. WIREMOLD EVOLUTION 8 AT SERIES POKE- THROUGH FLOOR BOX (TYP) FOR POWER AND DATA. TO AVAILABLE SPARE 20A-1P BREAKER(S) IN EXISTING OR NEW PANEL. CIRCUIT TO EXISTING DEVICE. PROVIDE NEW SQUARE D NQOD 208/120V, 3 PHASE, 4-WIRE, 225A M.L.O. PANELBOARD WITH 30-20A-1P BREAKERS. 10,000 AIC. NEMA 1 DOOR-IN-DOOR CONSTRUCTION. PROVIDE 125A - 3P BREAKER IN AVAILABLE SPACES. REARRANGE EXISTING BREAKERS AS NEEDED TO INSTALL BREAKER. 2" C. - 4 #1/0 AND 1 #6 GRD. FOR CEILING MOUNTED VIDEO PROJECTOR, COORDINATE EXACT LOCATION AND MOUNTING. CHANGE OUT EXISTING SMALL COMBINATION FLOOR BOX. 3 NEW DUPLEX RECEPTACLES. STACKED ONE ABOVE THE OTHER. INSTALL INSIDE CASEWORK. PROVIDE 8-20A-1P BREAKERS IN AVAILABLE SPACE POSITIONS. PROVIDE 6-20A-1P BREAKERS IN AVAILABLE SPACE POSITIONS. RELOCATE DOOR ALARM ANNUNCIATOR PANEL EXISTING LTG CONTROL STATION BANK OF SWITCHES TO BE RELOCATED FROM THE SOUTH SIDE OF THE WALL TO THE NORTH SIDE OF WALL.
KEYED NOTES
1 2 3 4 5 6
Q. R. S.
P.
O.
N.
M.
L.
K.
J.
H. I.
G.
F.
E.
D.
C.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND PROVIDING ALL WORK INDICATED BY THE ELECTRICAL DWGS. THIS WORK CONSISTS OF FURNISHING ALL LABOR, MATERIAL AND SUPPLIES. PERFORM ALL WORK IN A NEAT, WORKMANLIKE MANNER IN FULL COMPLIANCE WITH ALL APPLICABLE ADOPTED STATE CODES, INCLUDING BUT NOT LIMITED TO THE NEW MEXICO ELECTRICAL CODE, NEW MEXICO EXISTING BUILDING CODE, NEW MEXICO ENERGY CONSERVATION CODE, NFPA AND ADA CODES, AND THE ELECTRICAL SPECIFICATIONS FOR CONTRACTORS AND UNM PERSONNEL DOING WORK AT THE UNIVERSITY OF NEW MEXICO (LATEST EDITION). THE CONTRACTOR SHALL VERIFY ELECTRICAL DEVICE LOCATIONS (FLOOR BOXES, ETC.) WITH UNM OCP CONSTRUCTION MANAGER PRIOR TO ANY ROUGHING. ALL CONDUCTORS SHALL BE COPPER, 600V RATED, THHN/THWN/MTW. TYPE AC OR MC CABLE NOT PERMITTED. MINIMUM WIRE SIZE SHALL BE #12, AND STRANDED FOR #10 AND LARGER. ALL WIRING SHALL BE RUN IN CONDUIT. CONDUIT SHALL BE 3/4” MINIMUM AND EMT. EMT FITTINGS SHALL BE COMPRESSION TYPE. (DIECAST FITTINGS NOT PERMITTED.) FLEXIBLE METALLIC CONDUIT SHALL ONLY BE USED FOR LUMINAIRE AND FURNITURE WHIPS, AND RUNS DOWN INSIDE EXISTING WALLS OR COLUMNS. SUPPORT ALL CONDUIT INDEPENDENTLY FROM THE BLDG STRUCTURE. DO NOT SUPPORT FROM HVAC DUCTWORK OR PIPING, SUSPENDED CEILING GRID OR OTHER HANGERS. USE ONLY ACCEPTABLE METHODS OF SUPPORT. RECESSED LAY-IN LUMINARIES SHALL BE INDEPENDENTLY SUPPORTED FROM STRUCTURE (2 CORNERS), IN ADDITION TO GRID CLIPS. BRANCH CIRCUITS SHALL UTILIZE #10 CONDUCTORS FOR ALL RUNS OVER 100’. ALL 120V POWER BRANCH CIRCUITS SHALL UTILIZE SEPARATE NEUTRALS. (SHARED NEUTRALS NOT PERMITTED.) PROVIDE SHOP DWG SUBMITTALS FOR APPROVAL FOR FLOOR RECEPTACLES AND LUMINARIES (INCLUDE PHOTOMETRICS AND BALLAST/LAMP PRODUCT DATA). UPDATE PANEL SCHEDULES IN ALL AFFECTED PANELS UPON PROJECT COMPLETION. PROVIDE CIRCUIT LABELS ON ALL NEW RECEPTACLES. NEW RECEPTACLES IN EXISTING WALLS OR COLUMNS SHALL BE RECESSED AND WITH CONCEALED CONDUIT RUNS. ELECTRICAL CONTRACTOR SHALL PROVIDE PATHWAYS (RACEWAYS) (WITH PULLCORDS), BOXES & FLOOR BOXES TO SERVE TELEPHONE AND DATA SYSTEMS. CABLING AND EQUIPMENT BY UNM IT. NUMBER ADJACENT TO DATA OUTLET INDICATES NUMBER OF CAT-6 CABLES ROUTED TO DEVICE. ALL PENETRATIONS THROUGH FIREWALLS AND FLOOR TO FLOOR PENETRATIONS SHALL BE SEALED WITH HILTI CP 653 SPEED SLEEVES ALL DATA DEVICES SHALL HAVE 1" CONDUITS STUBBED UP INTO AN ACCESSIBLE CEILING SPACE UNLESS OTHERWISE NOTED. REFER TO DATA/VOICE DETAIL ON SHEET TC-101 COORDINATE EXACT FLOOR RECEPTACLE LOCATIONS DURING CONSTRUCTION (TYPICAL). CONTRACTOR SHALL TRACE OUT AND LABEL ALL EXISTING RECEPTACLES WITHIN THE PROJECT WORK AREA C.E.G., (THOSE IN WALLS, COLUMNS AND FLOOR) AS TO THE PANEL AND CIRCUIT NUMBER SERVING THEM.
GENERAL ELECTRICAL NOTES:
N
Architect
DESCRIPTION
DATE
2014.04.23
PROJECT NO.:
ISSUE DATE:
E-101
SHEET NUMBER:
SHEET TITLE: POWER AND DATA PLAN
8TH APRIL 2014
PLOT SCALE: As indicated
Project Number
Checker FILE:
CHECKED:
ADDENDUM 1
Author
DRAWN BY:
1
MARK
T: 505.277.2421 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
The University of New Mexico
B.
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
A.
LIBRARY COMMONS & COMBINED SERVICE POINT
B
WAP
A1
WAP
J
A
T
6/19/2014 8:48:02 PM
C02
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
C02
FILE PATH:
T
PLOT DATE:
C02
J
T C02
WAP
C02
T T
6/19/2014 8:48:51 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
Architect
T: 505.277.2421 www.unm.edu
DATE
PROJECT NO.:
ISSUE DATE: 3/8" = 1'-0"
FA-1
SHEET NUMBER:
SHEET TITLE: FIRE ALARM
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
DESCRIPTION
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131 Author
1
MARK
The University of New Mexico
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:49:09 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
Architect
T: 505.277.2421 www.unm.edu
DATE
PROJECT NO.:
ISSUE DATE: 3/8" = 1'-0"
FA-2
SHEET NUMBER:
SHEET TITLE: FIRE ALARM
8TH APRIL 2014
PLOT SCALE:
Project Number
CHECKED: Checker
DRAWN BY:
2014.04.23
FILE:
ADDENDUM 1
DESCRIPTION
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131 Author
1
MARK
The University of New Mexico
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
LIBRARY COMMONS & COMBINED SERVICE POINT
6/19/2014 8:51:54 PM
PLOT DATE:
D:\Work\Zimmerman Learning Commons\Zimmerman Learning Commons.rvt
FILE PATH:
KEYED NOTES
Architect
T: 505.277.2421 www.unm.edu
DESCRIPTION
PROJECT NO.:
TC-101
SHEET NUMBER:
SHEET TITLE: SPECIAL SYSTEMS PLAN
8TH APRIL 2014
ISSUE DATE:
Project Number
CHECKED: Checker
DRAWN BY:
PLOT SCALE:
DATE
2014.04.23
FILE:
ADDENDUM 1
Author
1
MARK
The University of New Mexico
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Office of Capital Projects
Project Management
T: 505.277.0111 www.unm.edu
Service Building 1818 Camino del Servico NE Albuquerque, NM 87131
Physical Plant Department
Engineer
T: 505.277.9290 www.unm.edu
1841 Lomas Blvd NE Albuquerque, NM 87131
Department of Planning & Campus Development
Office of the University Architect
A0053 ZIMMERMAN LIBRARY 1900 ROMA AVE. NE ALBUQUERQUE, NM 87131
GENERAL NOTES:
LIBRARY COMMONS & COMBINED SERVICE POINT
03
UNM Gallup Master Plan: Basemap UNM, Gallup, New Mexico
This study shows a proposal site for the housing at the UNM Gallup campus. The student housing will contain 200 beds for the commutting students of the area. The site is located at the north-eastern portion of the campus. The basemap was developed using AutoCAD and Illustrator.
05
ADA Pathway Study UNM, Albuqurque, New Mexico
Paving and Sidewalk Issues
Q4
Q1
LEGEND Map shows where the issues are located through-out the Central Campus.
7
8
24
The number associated with the dot corresponds to a picture taken of the problem area. The pictures are available on a folder which separated the pictures into 4 Quadrant
11 10
8
9
26
Curb Issues
15
18 17
20
14 12 13
47
19 48
51
14
1646
5 4
3
7
6
3
4 5
41
27
10 9
6
1
32 33
80
86
90
72
25
92 26
73 63
93
43
34
63
81
64
80
79
38
55 53
39
54
25
18
45
61
29
23
36 76
22
37 77 78
21
20 53
9
52
5114 46
78
15
48 47 6
12
13
49
10
19
18 19
16 17
62 57 58 59 61
20
27
16
39 38
41
42 32 31 33
37 56
28
17 11
50 55
29
8
30
15
9
60
34
19
7 13
12
6
10
Q3
9 8 12
20
1011
7
28 27
4
5 21 23
86
14
26
3536 22
84 85
24 60
44
83
82
32 33
30
51 50
77
76
42
66
31 62
52 47 48 49
64
54
35 73 72
65
75
65
24
59 74
7170 6968 67
69 70 68 71 67 66
91 94
14
58 75
44 46 45
81 82 74
39
56
36
79
78 89
88 87
44
57
39 40 38
85
13
11
38 36
98 95
7 42
30 43
43
99
34
37 41
83 84
97
8
35
42
40
100
9
1
2
96
10
3 2
31
29
17 18
11 6
40 37
28
16 7 6 5 4 1 3 2
8
54
13 26 23 22 24 25 212019
11
2
53
45
4
1
52
49
15
5
Paving Issues
25 50
21 22 23
5 4
26
4 3
6
11 5
2
2
1
22
2
4
21
27
28
10
29
5
6
1
3
9 10
11
2
1
25
24
23
30 3 31
13 32
33
Q2 16
12 3
18
17
7 8
1
3435
14
15
89
88
87
87
Located all of the problematic areas in the Central Campus of UNM. Then created layers of paths that began in areas of access to the campus and ended in interest points such as libraries and food courts.
With these layers, we found areas with high activity and high ADA issues. These areas would become the target for remedy.
06
Sergio De Haro Study UNM, Albuqurque, New Mexico
Sergio De Haro is a scientist and a professor, at the Biomedical Research Facility, UNM, He struggled to access his office and classroom because of his physical disability. In this tour, we noted all the dificulties and found a faster and less strenuous route which he could use. In this path we remedied as many of the accessibility issues as possible so that his daily routine would be less difficult.
P M
221
Domenici Center
f
e s on ath
299B 249
266
248
g cle
m-
200
200
on east
263
234
289
299C
Path from Parking lot to Sergio’s office.
Cam ino de S
228 229
253
211
Path from Sergio’s office to his classroom
201
alu d
264
ess
227
Patient Parking
n
re
235A
Physics and Astronomy
202
University Hospital
207 Barbara & Bill Richardson Pavilion
235
H
SERGIO’S OFFICE
elevator
SECOND FLOOR
PARKING SPACE
elevator
FIRST FLOOR
GROUND FLOOR
UNDERGRADUATE WORK Urban Arts Studio + Learning Center
01
Skills Development Center
02
Arroyo InnoRail System
03
Garden Of Natural Disasters: Mass Shelter
04
METAMORPHOSIS We tested our imagination and also our drafting skill when we were asked to create a creature using a bug and a tool. I chose the Water Strider and a Compass.
01
Urban Arts Studio + Learning Center Barelas, Albuqurque, New Mexico
In an area ridden with crime and poverty, the Urban Arts Studio provides an outlet for the the youth of this community to express themselves artistically without being categorized as vandals. The Art studio focused on the street arts. The center studio walls are adjustable and removable so that the work can be transported when finished. The center also has a supply shop and an apartment in the back for the shop owner.
Types of media displays
Digital Display
Large mural
Movement of media Digital display.
Mural
ARCH 202:02 E7 Interior Perspectives Samuel Escoto
ARCH 202:02 E7 Interior Perspectives Samuel Escoto
02
Skills Development Center Nob Hill, Albuqurque, New Mexico
This second chance institution gives the impoverished individual in the city of Albuquerque a place where they can learn, work, and become self sufficient. The center provides a learn/work enviroment which specializes in areas pertaining to the workforce. The
Shadow Study
West Elevation
1/8”=1’-0”
East Elevation
1/8”=1’-0”
South Elevation
1/8”=1’-0”
East Section
North Elevation
1/8”=1’-0”
South Section
03
ARROYO InnoRail Transportation System Albuqurque, New Mexico
Stopping at the most visited areas of Albuquerque, New Mexico, the ARROYO InnoRail gives access to these sites in a very fast and accessible mode of transportation. By placing the InnoRail inside the Arroyo of I40 Interstate, we give it an audience. Underneath the InnoRail, a safe park which allows the community to take leisure walks, bike riding, and skate boarding priviledges as they deboard the InnoRail.
Bridge at Pennsylvania St. An entrance to the arroyo
Bridge at San Mateo Blvd Light rail stop at this bridge
Pedestrian and Bike bridge An entrance to the arroyo
Bridge at San Pedro Dr. An entrance to the arroyo
Bridge at Louisiana Blvd. An entrance to the arroyo
Multi-Modal Hub Light Rail Route Length of Arroyo Length of Arroyo Park
N
Bridge at Wyoming Blvd. An entrance to the arroyo
04
Garden of Natural Disaster Pensacola, Florida
Before a storm, the shelter acts as a park and recreational center. The people of the surrounding community within the 50 feet radius of the park have the ability to evacuate immidiately. The close proximity of the shelter allows the families to be within a familiar enviroment with familiar people of their community.
Pensacola, Florida Pensacola Florida History As of the 2010 census, the city had a total population of 51,923. The population density was 2,478.7 people per square mile.Pensacola was founded in 1559 by a Spanish explorer named Tristรกn de Luna y Arellano. It was officially America's first settlement. After about 116 years of Spanish rule, the French took control over Pensacola from 1719 to 1722. The colony was then passed to the British who seized control of Pensacola temporarily through the Peace of Paris. Pensacola was also named the capital of the new British Colony. During the Civil War, Pensacola was a part of the Confederacy. The United States later regained control, and Pensacola was once again a part of the union on May 1862.
Major Storms That hit Pensacola, Fl. Flossy (1956) Florence (1953)
Ethel (1960) Debbie (1961)
Baker (1950)
Hilda (1964) Eloise (1975) Frederic (1979) Alberto (1982) Elena (1985) Juan (1985)
Hurricane Ivan Over $6 billion in damage occurred in the metro area and more than 10,000 homes were destroyed, with another 27,000 heavily damaged. NASA created a comparison image to illustrate the massive damage. Hurricane Ivan drove up the cost of housing in the area, leading to a severe shortage of affordable housing.
Erin (1995) Opal (1995) Danny (1997) Barry (2001) Ivan (2004) Dennis (2005) Helene (2006) Hanna (2008) Ida (2009)
Arlene (2011)
Garden of Natural Disaster Samuel Samuel Escoto Escoto Arch_402 Arch_402Final FinalPresentation Presentation Karen KarenKing King May May1, 1,2013 2013
Neighborhood parks as mass shelter 1,000 FEET RADIUS At this circumfrence, It would be more convenient and safer to shelter at the neighborhood park zone.
Evacuating from a flood zone takes time and preparation. With the correct instructions and possible transportation a person can evacuate safely. For those that are unable to obtain a vehicle or have a are physically unable to travel long distances, the safety provided by the neighborhood park comes as a relief.