Samuel Escoto_Architectural Design_Intern Architect

Page 1

SAMUEL ESCOTO ARCHITECTURAL DESIGN


INTENTIONALLY LEFT BLANK


00

Table of Contents Professional Work 01

Artesia Aquatic Center New Aquatic Center

02

Pueblo of Isleta Reception Hall New Pre-Engineered Metal Building

03

Jahva House Tenant Improvement and

04

Anderson School of Management New Building Proposal

05

Zimmerman Library 1st Floor Remodel

Personal Work 06

Columbarium By Design Architectural Rendering

Scholarly Work 07

Silver Grove Apartment Complex Retiree Affordable Housing

08

Tower M Library, Restaurant, Micro-Housing


Artesia Aquatic Center Completed 2018

The city of Artesia Aquatic Center includes 14,348 SF of natatorium space, 14,240 SF of support/admin space, and 8,252 SF of outdoor recreation pool.

W BUSH AVE

G F E

BOWMAN DR.

01

Artesia Aquatic Center

B

D

A E C

N

SITE PLAN NOT TO SCALE

A. B. C.

Bulldog Pool Wading Pool Lazy River

D. E. F

Water Slide Landing Detention Pond Parking Total 192

G.

Unpaved Bus Parking


My roles in this project:

• Created rendered floor plan and rendered site plan for initial project fundraising purposes. • Designed the front reception desk. • Assisted with the accessible design studies for wheelchair circulation throughout the natatorium. • Assisted with creating content for schematic design, design development, and construction documentation submittals. Programs Used: Revit, Photoshop

FLOOR PLAN

N

NOT TO SCALE Legend

Reception / Party Room / Concessions Administration / Staff / Training Storage / Mechanical / Janitorial / Electrical

Pool Mechanical Locker Rooms and Restrooms Natatorium: Competition pool / Lap pool


RECEPTION DESK

WEST ELEVATION

EAST ELEVATION

NORTH ELEVATION

SOUTH ELEVATION


INTENTIONALLY LEFT BLANK


02

Pueblo of Isleta Reception Hall Completed 2018

The Pueblo of Isleta Reception Hall is a 5,900 SF, one-story pre-engineered metal building that seats 260 people. The building contains a warm-up kitchen, table storage, and restroom facilities. The facility contains on-site parking for approximately 100 vehicles. Isleta Reception Hall water retention is split into a north retention pond and a small shallow retention pond to the south of the site.

D.

LR

IBA

TR 2 Isleta Reception Hall

N

SITE PLAN NOT TO SCALE Legend

Direction of Water Flow Grading Contour Area


My roles in this project:

• Drafted all drawings from Schematic Design through Construction Documentation. • Drafted Civil Sheets. • Created a rendered finish floor plan and rendered site plan for pueblo council approval. • Created a preliminary cost estimate through material take-offs. • Submitted 100% BID Documents to the client. • maintained communication with MEP and Structural consultants throughout the design of the building. • Responded to RFI’s, submittals, and reviewed shop drawings. Programs Used: Revit, Photoshop

2

1

3

4

5

6

7

A

B

B C

C

D A

D

E

F

G

E

N

FLOOR PLAN NOT TO SCALE

A. B. C.

Reception Hall Kitchen Mechanical / Janitorial

D. E. F.

Electrical Room Men’s Restroom Women’s Restroom

G.

Chair Storage


WEST ELEVATION

EAST ELEVATION

NORTH ELEVATION

SOUTH ELEVATION


INTENTIONALLY LEFT BLANK


02

Jahva House Kitchen Expansion and Roaster Addition Completed 2018

The Jahva House Kitchen Expansion and Roaster Addition was a tenant improvement to optimize and increase space use in the expansion of a bakery kitchen while also adding overflow seating. Operable walls divide the coffee roaster and coffee counter from the overflow seating to provide privacy. Additional space use consisted of adding a coffee bean storage room and overhead storage space above the existing restrooms. The project scope also included upgrading the existing exterior windows to allow for optimal daylighting.

STORAGE

RR

STAFF RR

RR

KITCHEN

Legend

Demolition

MECH.

Ceiling Demolition STORAGE

DEMOLITION PLAN NOT TO SCALE

OFFICE

Lintel removal N


My roles in this project:

• Drafted all drawings from Schematic Design through Construction Documentation. • Coordinated all drawings with mechanical, electrical, and plumbing. • Completed initial product research on equipment and plumbing fixtures to assure that building code was being met. • Created a preliminary cost estimate through material take-offs. • Submitted 100% Construction Documents to the client. • Created a 3D model in SketchUp for spacial studies and rendering purposes. DISPLAY SHELF

Programs Used: Autocad, Sketchup

SERVICE COUNTER

OPERABLE PARTITION OVERFLOW SEATING

OVERHEAD STORAGE

ROASTER

BEAN STOR.

RR

RR

KITCHEN EXPANSION

KITCHEN

STAFF RR

MECH.

STORAGE

FLOOR PLAN NOT TO SCALE

OFFICE

N


OPERABLE PARTITION

DISPLAY SHELF

ROASTER COUNTER

VIEW: SERVICE COUNTER OPERABLE PARTITION

VIEW: OPERABLE WALL

BEAN MENU

OVERHEAD STORAGE

VIEW: COUNTER AND OVERHEAD STORAGE

OVERHEAD STORAGE ROASTER COUNTER

OPERABLE PARTITION

VIEW: ROASTER AND OVERFLOW SEATING SOUTH

VIEW: ROASTER AND OVERFLOW SEATING NORTH

BEAN MENU

DISPLAY SHELVING

BAR COUNTER


INTENTIONALLY LEFT BLANK


04

Anderson School of Management Design Development Phase

The design of the Dean’s Suite entrance allowed for a comfortable and distinctive transition from public to private. The administrative offices are designed with an open floor plan for maximum versatility. Floor to ceiling glazing allows visual continuity to UNM’s North Campus and golf course.

My roles in this project:

• Designed the dean’s suite entrance, lobby, staff offices, and outdoor patio • Designed the shading system in the outdoor patio • Designed the chilled sails/radiant heating system layout • Provide renders for the Deans Suite entrance, lobby, outdoor patio, ground floor lobby, Atrium, and 3rd-floor lobby Programs Used: Revit + Photoshop





Zimmerman Library

05

1st Floor Remodel

The Zimmerman Library 1st-floor remodel My roles in this project: consisted of the demolition and upgrade of the HVAC system, ceiling grid, existing office • Assisted in the draft of the 1st-floor demo plan, the walls, and electrical systems. Upgrades reversed ceiling demo plan, and the mechanical demo plan corresponded to the proposed furniture layout. • Drafted the upgrades to the mechanical systems plan with the guidance of a mechanical systems engineer • Drafted the upgrade to the electrical system plan • Drafted the life safety sheet for the construction document • Assisted in the design of a circular laptop locker casework for the service desk • Designed the new lighting plan in conjunction with the new ceiling grid.

GENER A. B. C. D. E.

A

A1

B

Programs Used: Revit + Autocad

C

D

E

F

G

H

J

WORK S HTTP://I .PDF. ALL EXIS VACUUM SEAL AL COMPLI ALL BRA DAMPER ALL DUC WITH W STANDA CONSTR

DUCT E

FROM A FROM M FROM T F.

1

1

G. H.

13

PRESSU ACCORD WITNES NEW DU FIBERG PROVID WITH UN PROGR

14 COLD DUCT

INSULATE HOT AND COLD DUCT ABOVE ELECTRICAL ROOM

HOT DUCT

3

2

2

KEYED

10 200 CFM 3

3

11

1 4

225 CFM

4

4

10"ø 1 14"x12"

1

250 CFM

10"ø

10

22"x12"

22 "x1 2"

1

1

1

1

250 CFM

250 CFM

250 CFM

11

6

24"x12" 2 365 CFM

10 11 12

11 13

14

6.4

12"x12"

1

1

250 CFM

250 CFM

26"x14"

365 CFM

7

2 365 CFM

11

12

2

2

2

365 CFM

365 CFM

365 CFM

SUPPL BALAN SUPPL BALAN DUAL D CONTR DUAL D CONTR DUAL D CONTR DUAL D CONTR DUAL D CONTR SUPPL WIDTH. SPLIT-S RKs30PROVID SHALL CONCR OUTDO MOUNT THERM SUCTIO 0.016-IN

CONNE RETUR ROUTE CONCR DUCTS PROVID IN W.G SIZE AN INSULA LENGT BALAN

MENS 1 CUST 1 WOME MENS 1 WOME

2 12

10"x12"

12"ø

12"ø

5

2 365 CFM

34"x12"

125 CFM

250 CFM

2 365 CFM

34"x12"

1 250 CFM

11

2 365 CFM

15

1 250 CFM

12"x12"

10

5

10

200 CFM

200 CFM

300 CFM

12

14

7

10

22"x12"

1

12"ø

12"ø

14 1

10 200 CFM

10"ø 11

300 CFM

1 250 CFM

32"x14"

16"x12"

200 CFM

16"x12"

10"x12"

250 CFM

10"ø 14"x12"

10

200 CFM

16"x12"

8"x12"

6"x12"

9 CU-IT167

4

8"x12"

11

9

3

20"x12" 1

10 125 CFM

6

7 8

5.1

12"x12"

1

300 CFM

300 CFM

AC-IT167

5 6

5

24"x12"

12"ø

14"ø

225 CFM

1 9

1

225 CFM

6"x12"

3

12"x12"

1

6"ø

6"ø

12"ø

14

6"ø

PROVIDE 12 X 12 DUCT ACCESS PANELS IN EACH DUCT AT CHASE FOR ACCESS TO FIRE EXISTING DAMPER.

250 CFM 6 14"ø

8"x12" 8"x12"

10 125 CFM 2

14"ø

2

350 CFM

5.1

1

1 225 CFM 16"ø

6"ø

6"ø

14

4

5

3

15

6"ø

3

LEGEN

2 10 140 CFM

365 CFM

16"x12"

16"x12"

24"x12"

7.7

8

34 "x1 2"

8

12"x6"

1

1

1

1

1

1

2

2

2

2

2

250 CFM

250 CFM

250 CFM

250 CFM

250 CFM

250 CFM

2

365 CFM

365 CFM

365 CFM

365 CFM

365 CFM

365 CFM

11 26"x12"

10 140 CFM

11 12"x12"

9

24"x12"

10"x12"

11 26"x12"

11

10"x12"

11 10"x12"

11

19

MECH

1

1

1

1

1

1

2

2

2

2

2

2

250 CFM

250 CFM

250 CFM

250 CFM

250 CFM

250 CFM

365 CFM

365 CFM

365 CFM

365 CFM

365 CFM

365 CFM

10

1

1

1

1

1

250 CFM

250 CFM

250 CFM

250 CFM

250 CFM 2

2

2

2

365 CFM

365 CFM

365 CFM

365 CFM

11.5

11

11 10 100 CFM

34"x12"

14"x12"

1

1

250 CFM

250 CFM

22"x12"

22"x12"

14

10"x12"

1 250 CFM

16 "ø

1 250 CFM

12

10

10

130 CFM

130 CFM

7

16"ø

1

11

365 CFM

12"x12"

1 250 CFM

11

250 CFM

2

2 365 CFM

12"x12"

1 250 CFM

12"x12"

1 250 CFM

11

24"x12"

1 250 CFM

11

16"x12"

1 250 CFM 16"x12"

1 250 CFM

12

10.3

12"x12"

22"x12"

10"x12"

10"x12"

1 250 CFM

11

20"x12"

20"x12"

16"x 12"

10

1

2

2

2

2

250 CFM

365 CFM

365 CFM

365 CFM

365 CFM

10 10 10

130 CFM

130 CFM

100 CFM

13

14

10

15

24"x12"

" 12 "x 24

100 CFM

1 250 CFM

1

1

1

250 CFM

250 CFM

250 CFM

15

6

14"ø

14"ø

14"ø

4/7/2014 2:23:44 PM

6

14"ø

\\it153cfs01\pcd\data\Planning\0-OUA Projects\Project\053_Zimmerman_Learning Commons\CD\A0053-Central.rvt

FILE PATH:

PLOT DATE:

15

HOT DUCT

16

3

6"ø

17

8"ø

16

12"ø

6"ø 14"ø

17

8"ø COLD DUCT

8

13

180 CFM

18

Mechanical Plan 1 M-101

18

A

A1

B

C

D

E

F

G

H

J

MECHANICAL PLAN

N

1/8" = 1'-0"

KEY PLA 1/64" = 1'-0"

0'

4'

8'

16'

32'


A

A1

B

C

D

E

F

G

H

J

1 MECHANICAL 163

2

2 STOR 171A

3

CUST 172A

ELEC 170

MENS 172

WOMENS 162

3

STOR 166A STAIR 160A

TRASH 166B

STAIR 161

FACILITIES 176

4

4

5 5

OFFICE 169A

OFFICE 169B

OFFICE 169C

8'-0" A.F.F.

8'-0" A.F.F.

OFFICE 169D

OFFICE 169E

BREAK 169F

5.1

LOADING 166

5.1

WAP

CIRCULATION 171

5

5 8'-0" A.F.F.

IT 167

8'-0" A.F.F.

8'-0" A.F.F.

WAP

5

A.F.F. 8'-0"

A.R.T. 177

7'-6" A.F.F. 2

WAP

2

6

6 STOR 173

ELEV 175 FACP 150

6.4

8'-0" A.F.F.

6.4 ELEV LOBBY 174

CSP WORKROOM 169

WAP

5

BOOK DROP 174A

8'-0" A.F.F.

7

WAP

8'-0" A.F.F.

WAP EQ

6

MEETING 169G

6

EQ

6 5

CSP 151B

R

EQ

A-501

5 2

WAP

A-501

0" 8'-

EQ

ELEC 190

1

A-501

WAP

7.7

7.7 8'-0" A.F.F.

R9 '-10 "

4

8

4

4

4

4

4

1

EQ

EQ

13'-6"

13'-6"

STAIR 192 WAP

6 STAIR 146

WAP 13'-6"

13'-6"

13'-6"

13'-6"

2'-6"

13'-6"

13'-6"

13'-6"

6

19

9 WAP 5

2

WAP

2

6

5

24" 20" 20" 20" 24"

24" 20" 20" 20" 24"

24" 20" 20" 20"

8'-0" A.F.F.

24" 20" 20" 20" 24"

24" 20" 20" 20" 24"

WAP

LIBRARY COMMONS 151

EQ

9"

10.3

2 WAP

" 0'-9 R1

LOBBY 101

10

WAP

10

3

6

10.3 5

WAP 5

1 EQ

INFO 151A

11

11

EQ

EQ 5

WAP

11.5

'-4" R6

11.5

5

6

8'9" R

12

STUDY 158B

1

2'-10"

WAP

WAP

PRINT STATION 151C

3

12

STUDY 158

6

STUDY 158A

6 WAP 8'-0" A.F.F.

13

13

WAP

8'-0" A.F.F.

14

4

14 5

WOMEN 157

15 \\it153cfs01\pcd\data\Planning\0-OUA Projects\Project\053_Zimmerman_Learning Commons\CD\A0053-Central.rvt

4/7/2014 2:22:09 PM

FILE PATH:

PLOT DATE:

WAP

15

STAIR 183

MEN 154

5

16

EXIT 155A

8'-0" A.F.F.

WAP

ELEC 153D

16 STAIR 183A

17

17

MECHANICAL 155

18

FIRST FLOOR Plan - REFLECTED CEILING PLAN Lighting

18

A

A1

B

C

D

E

F

G

H

J

1

A-120

N

1/8" = 1'-0"

0'

Lighting Layout

4'

8'

16'

32'


06

Columbarium By Design Architectural Renders

Architectural Renders for Marketing and Materiality Studies (freelance)

Commissioned to provide architectural renders for Columbarium By Design LLC. Based in Santa Fe New Mexico, the owner would send me Revit models on a variety of columbarium designs located throughout the united states. The final renders were then used as a tool to guide client and project materiality conversations. The following renders are from varying projects.

GRAND LEGACY


ST. STEPHEN’S CREMATION GARDEN


THE WOODLAND- VAN CORTLANDT OUTDOOR MAUSOLEUM


SAN JOSE DE ARMIJO


07

Silver City Housing Complex

Retiree Affordable Housing - ARCH 603

As part of a 6 credit hour architectural studio course that was compacted into one month, we were asked to design a housing complex of our choosing. Based on the research collected by the team, I chose to design an affordable housing complex for retirees. The apartment complex is located at the edge of a historic road that was flooded and eroded, leaving a 20’ high ditch. Now, this ditch is full of vegetation and is part of a tour of silver city’s history. Programs Used: Revit + Photoshop


Insulation Study

June 21

August 21

December 21


11

-

UP

---

9

UP

8

Ground Floor ---

1

2

12

13

14

15

16

17

11

-

UP

--DN

9

EQ

UP

EQ

DN

Residents Floor 1 8 ---

1

2

12

13

14

15

16

17

11

UP

---

DN

9

UP

Residents Floor 2

DN

8



08

Tower M

Library, Restaurant, Micro-Housing - ARCH 604

Located within the boundaries of two existing buildings, TOWER M is an infill project that combines the programmatic requirements of designing a public library, a restaurant, and micro-unit residences at 200 SF each. Major pedestrian access enters from 7th street to James J walker park and to the public pool. Future design development would involve relocating a

portion of the park fence to allow access to James J Park. A designed seating area will border a portion of the park adjacent to the library, creating a shared space for public and library patrons. The primary intent of the design is to allow the public to create their own access and make the park, pool, and library, coexisting neighbors . Programs Used: Revit, Autocad, Illustrator + Photoshop


SITE RESEARCH AND ANALYSIS Project Location State of New York New York City

Located in the Manhattan borough of New York City, the project’s neighborhood is inside the historic Greenwich Village. Most known for its liberal artistic movement and historic civil rights activism. Relative Location Site Location (Macro) Neighborhood Context

New York City Manhattan

100’ 80’ 40’

7th Street context diagrammatic building height

Manhattan Greenwich Village 100’ 80’ 40’

Leroy Street Context diagrammatic building height


CONCEPTUAL WORK 3D Rhino Model Tower M Massing Extrusion

Allowable Height per NYC Code

Floor Slabs to heights 20’ First Floor 12’ Above

Floor Slabs to heights with slit diagram

Floor split access with conceptual egress stair placement


CONCEPTUAL WORK Site Access Diagram + Site Furniture Shared Exterior Space for reading and lounging with landscaping furniture similar to the library exterior patio. Shared Space Furniture ideas provided to the left.

Preliminary Unit Sizes + Configuration All Units strictly abide to a 200 SQ FT size. 10’

Unit A

Unit B

12.5’

12’ 12’ 20’

Unit A Configuration

16’’

Unit A Configuration

Unit B Configuration


N 20’

5’ 10’

DN

UP DN

Typ. ADA Unit

Typ. Unit 1/4” = 1’ - 0”

DN

N

N 1/16” = 1’ - 0”

1/16” = 1’ - 0”



Sectional Perspective Through Library and Restaurant and 1st Floor Residential


INTENTIONALLY LEFT BLANK