S&s pioneers package

Page 1

Standards & Satisfaction Pioneer Booklet and Questionnaire AIESEC in Morocco 14.15


Team Purpose O Bring clarity of the importance of Standards

and Satisfaction 16 elements implementation in our exchange delivery O Implement the 16 elements fully in the 4 core functions by all entities O Evaluate and track the respect of S&S elements


Job Description O Evaluate winter S&S delivery in o/i GCDP/GIP nationally O Create and frame coaching cycles to be implemented O O O O

O O

locally and nationally Create S&S tracker for o/i GCDP/GIP and implement it Create checklists to use during the exchange process Minimum quality standards booklet for the 4 function as promis to exchange partners Create feedback system after matching (for OGX) and after realization (for ICX) NPS evaluation and implementation plan Come up with action plans to ensure the complete implementation of S&S by each AIESEC in Morocco member


Additional information O Duration: from 1st March until 30th O O

O O O

September 2015 Hours of work: 4 to 6 hours per week Accountability: MCVP oGCDP Concerned: LC/IG VPs i/o GCDP/GIP or support department TM/Mkg Team: composed by 2 entities pioneers Mos: Growth in NPS score, # of coaching delivered, % of implementation in each entity


Requirements O Virtual presence mandatory O Attend weekly meetings

O Commitment O Delivery on time


Application process O Fill all the information in the questionnaire O Attach to your application 1

recommendation letter from an EP/TN manager with which your entity realized with an exchange *Will be taken into consideration, the NPS score and comments left by EPs realized by your entity


Application process O LC/IG Presidents are the ones who should

fulfill the application package to be an entity pioneer. O LC/IG Presidents propose the person from the EB team (VPs X or VP TM/Mkg) who will be in charge in one of the 3rd and 4th questions. O Pioneering responsibility will be transmitted in the transition P to P and VP representative to VP representative


Questionnaire 1. What is your motivation to be part of the

pioneers entities for S&S? 2. From the EB team, who do you see representing you as pioneers? Why? 3. In your opinion, what’s the main issue exchange suffer from? 4. How do you envision the implementation of S&S in AIESEC in Morocco? Propose 1 project to be driven by pioneers team


Applications are to be sent before

Saturday 28th Feb at 6 pm to hamza.merzguioui@aiesec.ma and sanae.elhabbari@aiesec.ma with as subject title: S&S_AF_Entity *Late or incomplete applications will be accepted. Make sure to attach the recommendation letter and to send it min few hours before deadline.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.