Portfolio of Selected Works of Ar. Sanat Shahir - January 2023

Page 1

Portfolio of Selected Works of Ar. Sanat Shahir

PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION

Portfolio of :

Ar. Sanat Yogesh Shahir

Council of Architecture Registration Number - CA/2021/130100

• Phone Number - +91 8169636850

E-Mail ID - sanatshahirarchitecture@gmail.com

LinkedIn - www.linkedin.com/in/sanat-shahir-685164147/

• Date of Birth - 12th December 1997, Age - 24

• Nationality - Indian, Passport valid till - March 2026 Current city of residence - Mumbai, Maharastra, India.

• Xth Grade - Gokuldham High School Mumbai. (ICSE Board 2013 - 94.3%)

XII th Grade - Lilavatibai Podar Sr. Sec. School, Mumbai. (ISC Board 2015 - 91.3%)

B.Arch - Rizvi College of Architecture, University of Mumbai (Overall CGPI 2020 - 7.2)

Software Skills :

2D Drafting - AutoCAD - Advanced User.

3D Model Making - SketchUp - Rhino/Grasshopper - Advanced user.

Building Information Modelling Authoring - Revit - Advanced User.

Architectural Rendering - Lumion - Twinmotion - Enscape- Advaned User.

Graphic Design - PhotoShop, GIMP, InDesign, Illustrator, Inkscape.Intermediate User.

Presentation - Prezi- Advaned User.

Video Editing - Premiere Pro - Beginner Level User.

Proficiency in all general Office Software.

Skills -

• Hand Drafting

• Design Theory

• Research and Analysis

Conceptual Model Making Final Model Making

• Building Documentation Architectural Photography

Soft SkillsSpoken English, Hindi, and Marathi; English Writing Fluency.

• Team Building and Coordination. Working under Pressure Efficiently.

• Trip Planning.

• Path-finding and other Exploration Skills on site visits and trips.

• Long Ride Driving.

Other Interests -

• Adventure Motorcycling

• Group Cycling Indian Politics

• Geopolitics Gaming Cooking

• Dance

2

Aug 2015 - Oct 2020 :

Rizvi College of Architecture.

• Participated in ZoNASA Convention in Dance Competition.

• Participated in a Class Documentation and Photography of a Warli Tribal Village called Vakipada near Dahanu, Maharashtra.

• Participated in a group competition - Lois I. Kahn Trophy 2016 - 2017 Documentation of Naggar Castle, Himachal Pradesh.

• Lead Researcher in a group competition - Lois I. Kahn Trophy 2017 - 2018; Documentation of Anand Bhavan Allahabad, Uttar Pradesh.

• Participated in a group Documentation and Photography of Low-Cost Housing in Indore, Madhya Pradesh.

• Internship - Research and Graphic Design of the Published book - “Indore - Dialogues in Existence” (in a group of 4), Sponsored by The Aga Khan Trust for Culture, Geneva and Published by Rizvi College of Architecture.

• Videography for College, including interviews with Ar. B.V. Doshi, Ar. Neelkant Chayya, Ar. Yatin Pandya and Public Interviews of Indore.

• Internship at Akhtar Chauhan & Associates - helped in the Graphic design and compilation of his soon-tobe-published books - “Towards a New Era of Humane Architecture “ and 1 other.

• Design Dissertation - Embassy of the Republic of India in Accra, Ghana. Research was based on “ROLE OF ARCHITECTURE IN INDIA’S INTERNATIONAL DIPLOMACY.”

• Final Semester Result(Graduation) - 26th October 2020

Nov 2021 - Feb 2021 Work Experience :

• Project - Made Working Drawings for 3 Bungalows and Design for 1 Bungalow for Einville Second Homes in Wada, Maharastra.(Built)

• Project - Designed and made Working Drawings for Row Houses for Einville Second Homes in Wada, Maharastra.(On-Hold)

Feb 2021 - Aug 2022 Work Experience :

Design Cell Landscape Architects, Mumbai Office.

• Worked on Landscape Design and its 3D modelling for I.T. Park called BAGMANE CAPITAL.

• Worked with Landscape Master Plan Team of L&T Powai Redevelopment - 3D Parametric Modelling for Entry Pavillion and Elements.

• Worked on multiple variations for a Luxury Villa in Assagao, Goa; for an Ex-Actress (On-Going). Made Construction Drawings.

• Lead Research for Alternatives to Expensive Paid Software. Open Software software use-case explored as well as Design Pipeline pertaining to Software. Made Presentations to the Office multiple times.

• Conducted doubt-solving meetings about Revit Architecture Software whenever asked.

• Worked on Landscape Design for Upcoming Museum at Adani Shantigram (On-Going). Made Tender Documents.

• Worked on Landscape Design for a 100m Tall Residential Tower Complex; on the Ground and on Terrace; at Adani Shantigram (On-Going). Made Design Development Drawings.

Oct 2022 - Jan 2023 Work Experience :

StudioPOD Designs Pvt Ldt., Mumbai.

• Worked as a group on Public Areas, Development Plans, Disaster and Flood Resiliency Strategy of Ponda and Valpoi. Client - Goa State Urban Development Authority (GSUDA).

• Worked on 3D models and Presentation Drawings of a Draft Masterplan for New Mopa Airport City.

• Worked on Graphical Diagrams for Development Masterplan for Hudariyat District in Abu Dhabi.

Courses Completed -

• Natural Construction Material Workshop - conducted by Put Your Hands Together (Architects).

• Revit Beginner Course - conducted by Capricot Technologies.

• P A R A M E T R I Z E D - Computational Form Finding (Rhino/Grasshopper) - conducted by EQUIM Architects.

• BIM GURU - conducted by Capricot Technologies.

3

Index:

I - Selected College Projects Rizvi College of Architecture

Basic Design - Exploring S. H. Raza Page 5 Vakdipada Tribal Settlement Page 9

Design Dissertation - Embassy of the Republic of India in Accra, Ghana. Page 12

II - Selected Projects worked on at Design Cell Landscape Architects

Luxury Casa in Assagao , Goa Page 19

Upcoming Museum at Adani Shantigram, Gandhinagar, Gujarat. Page 24

III - Selected Projects worked on at StudioPOD Designs Pvt Ldt. Page 30

IV - Miscellaneous Work Page 36

L.I.K. Trophy 2017 - The Naggar Castle Page 17

4

Basic Design - Exploring S. H. Raza

Semester 2 - November 2015 - April 2016

Reworked and Presented to Council of Architecture - Online Training Program - Beyond Basic Design - 15th March 2021.

Aims and objectives: Art is the reflection of events happening around us and we wanted them to study philosophical influences on art. Raza was greatly influenced by his trips to Banaras, Gujarat and Rajasthan, made him realize his role and study Indian culture more closely, the result was ‘Bindu’ and then he added new elements like triangles.

Process: We introduced S.H Raza as an artist from the modern art period in the class. We studied these paintings in detail and reinterpreted the same paintings as 3-D and created spaces for exhibition.

5

Basic Design - Exploring S. H. Raza

6

Basic Design - Exploring S. H. Raza

- DOWN - UP

General flow of a Person trying to walk through the designed area.

7

Basic Design - Exploring S. H. Raza

Vakdipada Tribal Settlement

Semester 4 - October 2016 - April 2017

Project designing an Tribal Settlement in Vakdipada near Dahanu.

This was a documentation based design process, the entire class was on site documenting existing Padas deep inside a jungle.

For Individual projects, a hypothetical scenario was placed as a challenge, to relocated 9 families within the Warli Tribal Village, so that not to alienate newcomers neither to intimidate earlier residents with swanky new painted houses.

All Natural Materials required for building purposes were discussed and utilized according to feasibility of the person who will build their own house themselves.

9

TOILETS

10 0 1 3 18 8 -5 PRODUCED BY AN AUTODESK STUDENT VERSION PRODUCED
FAMILY
4 FAMILY
6 FAMILY
6 FAMILY
3 FAMILY
3 FAMILY
4 FAMILY
3 FAMILY
6 FAMILY
4
TOILETS BIODIGESETER TOILETS
BIODIGESETER
TIMBER POST KARVI WALL CORRUGATED ROOF TIMBER BEAM MANGALORE TILES OTLA PLINTH KARVI WALLS TIMBER BEAM KITCHENNETE
Site Plan
Vakdipada Tribal Settlement
BY AN AUTODESK STUDENT BIODIGESETER TOILETS
OF
OF
OF
OF
OF
OF
OF
OF
OF
BIODIGESETER
TOILETS
EXISTING HOUSES NEAR THE SITE IN VAKDIPADA. - ONLY A SHELL STRUCTURE WITH WATTLE AND DAUB KARVI ENVELOPE AND NO PROPER WALLS
at Vakipada near Dahanu, Maharastra

Wattle and Daub - Karvi walls., made from locally available natural materials as per tradition.

Ota or front Verandah as a space to interact with people of the tribe.

A typically Outdoor space designed to be attached to a house

Floor made from earth and cowdung mixture as per tradition on a stone plinth.

Typical designed house for the Project

Tribal People in India have certain freedoms to use forest resources and timber is available readily for them.

Tradition of kitchen being an outdoors function followed as firewood is used.

Storage space for crops formalized into the house, moving it indoor from an outdoor environment.

Walls made from rammed earth adds extra insulation from weather elements as well as formalizes the house in the eyes of local self goverment.

11
Vakdipada Tribal Settlement

Design Dissertation - Embassy of the Republic of India in Accra, Ghana.

June 2019 - October 2020 - Semester 10 - Research based on “ROLE OF ARCHITECTURE IN INDIA’S INTERNATIONAL DIPLOMACY.”

Detailed Presentation - https://drive.google.com/file/ d/1F2X7qlorUjRsK4BQWLC-RRqHPZtkAkWy/view?usp=sharing

Design Dissertation - Embassy of India in Accra was a project I had taken up to look into culturally symbollic architecture which merges form with the function of specialized buildings with highly functional diplomatic spaces. The major sources of inspiration were ancient Indian palaces, caravan serais and rest stops. All of the features of these three were found in the stepwells of Gujarat which became the main inspiration for the leveling of site and design of underground spaces.

An underground building provided a sense of security as well as not making the Embassy look pompous in a less fortunate foreign country. The materials were an ode to India’s postIndepence Modern style of architecture as well as keeping the structure simple and the costs low.

12
10 5 10 10 7.5 10 50 10 10 5 10 7.5 50 25 7.5 15 25 7.5 15 25 7.5 7.5 10 10 10 15 m 18 m 38

Site Plan - Proposed Embassy Complex. La Road, Accra Suburbs, Ghana.

13
Embassy of the Republic of India in Accra, Ghana. Chancery Building Ambassdor’s Residences Helipad Inter University Centre Protective Ring of Trees Aerial View of the Chancery Building Embassy of the Republic of India in Accra, Ghana.

Embassy of the Republic of India in Accra, Ghana.

Basic Design evolution of the Structures guiding Design of the Chancery Building.

Project made with Revit and Twinmotion.

Basic Design evolution of the Structures guiding Design of the Inter-University Centre Building.

15 10 5 10 10 7.5 10 50 10 10 5 10 7.5 50 25 7.5 15 25 7.5 15 25 7.5 7.5 10 10 10 15
10 5 10 10 7.5 10 10 10 5 10 7.5 50 25 10 15 G-2 Level G-1 Level Ground Level G+1 Level
16.5 11.5 10 6.5 18 m 38
Roof Level

Sectional

View of the Chancery Building from the Ground Level Private Cort Side.

View of the Chancery Building from the Ground Level Private Cort Side.

Sectional Drawing Elaborating the use of Solar Chimneys to help with Fresh air flow throughout the Underground Part Building. Drawing Elaborating the use of Solar Chimneys to help with Fresh air flow throughout the Underground Part Building. Courtyard Effect is also Induced in Open Terraces below Ground Level.

L.I.K.

Trophy - The Naggar Castle

Semester 4 - October 2016 - February 2017

I had participated in the Louise. I. Kahn Trophy of NASA India, in Second Year, as an Ink Drafter to work on the Final Documentation Sheets. Workshops were conducted before starting any work on site in which parallel learning was achieved from college seniors. I had been on the site visit to Naggar Castle, Himachal Pradesh on extremely short notice.

The Team Leaders taught me the invaluable skills of Heritage Documentation and Architectural Archival Photography.

17

< View from the First Floor Balcony facing towards the Main Courtyard.

< Documentation of Arches as seen from Public Courtyard.

Part Plan where Linework was done by me using Rotring fineliners, on A0 Gateway paper.

< Detail Documentation of Railings.

Section-Elevation where Linework was done by me using Rotring fineliners, on A0 Gateway paper.

Design Cell Landscape Architects

Luxury Casa in Assagao , Goa

At Design Cell, I was handed the responsibility to make drawings, Revit models and renderings of a luxury casa in Assagao , Goa under the guidance of Prof. Ravi Punde..

The plot of land the casa was to be built upon was a unusual 107m long and just a 13 m wide. This meant that the casa had to be linear and had to be divided into multiple zones of use, which would help to specific public and private hierarchy. The private spaces, indoors, like living room and dining room are being replicated outdoors as a covered dining area as well as a double heighted Pavillion. The site various natural trees. The entire house has being designed keeping landscape design in mind, including elements like Koi Pond, Swimming pool, lawns and planter beds.

We made multiple design versions of the Casa, which went on for a year of client discussions, as well as issued GFC Drawings, when finalized. Project is soon to Start Construction.

19

Luxury Casa in Assagao , Goa Software used - Rhino, Revit and Twinmotion

View of the private Pavillion Design Work in Progress Render for a Client Meeting

View of the Master Suite and Swimming Pool. Design Work in Progress Render for a Client Meeting Luxury Casa in Assagao , Goa
23 Luxury Casa
Assagao , Goa 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0000 Ground Level 3150 SQ First Floor 3450 3150 SQ First Floor 3450 BEDROOM STORE ROOM PANTRY KITCHEN 28 D3 W3 14 D6 D6 17 WALKWAY 23.00° 23.00° ROOF FACIA 250mm ROOF FACIA 250mm 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0 0000 Ground Level D2 D B2 B1 E E1 2100 mm 2100 mm 3150 mm D1 D4 29 DS1 8 D4 30 CW CW 20 LIVING DINING ROOM BEDROOM 2625 2700 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm 3866 75mm LATERITE CLAD WALL WALKWAY 2700 BAY WINDOW 2110 LATERITE CLAD COLUMN BASE 23.00° 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0 0000 Ground Level 0 7050 Second Floor 7750 7050 Second Floor 7750 D2 D D1 CW 33 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm TERRACOTTA JALLI 75mm LATERITE CLAD WALL TOILET POWDER ROOM D1 10 D1 D4 32 W4 16 W4 VENTILATOR LIGHT WELL OUTDOOR DINING AREA BALCONY 2700 2700 LATERITE CLAD COLUMN BASE 23.00° ROOF FACIA 125mm SCALE (@ A1) CHECKED BY TITLE PROJECT NUMBER CLIENT PROJECT DRAWING NUMBER DRAWN BY DATE MUMBAI 306, 3rd FLOOR, SAMRPAN COMPLEX NEW LINK ROAD, CHAKALA, ANDHERI (EAST), MUMBAI 400099, MAHARASHTRA, N D A T: + 91 22 42290123 1 75 SECTION SHEET 1 M-1430 MALAVIKA TIWARI HOUSE, ASSAGAO , GOA MALAVIKA TIWARI RAVI PUNDE A103 SANAT 27/08/2022 1 75 Section 2 2 1 75 Section 3 3 1 75 Section 4 4 SECTION 1 SECTION 2 SECTION 3 SECTION 4 KEY PLAN GROUND FLOOR KEY PLAN FIRST FLOOR 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0000 Ground Level B D2 B2 A 3150 SQ First Floor 3450 3150 SQ First Floor 3450 B1 C E E1 D1 GARAGE DRIVER ROOM 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF DC1 28 W2 D5 22 D7 27 W1 CW 17 TERACOTTA JALLI 2400 TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm WALKWAY 23.00° 23.00° ROOF FACIA 250mm ROOF FACIA 250mm 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0 0000 Ground Level 0 B D2 B2 A 3150 SQ First Floor 3450 3150 SQ First Floor 3450 B1 C E E1 D1 BEDROOM STORE ROOM PANTRY KITCHEN 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF DC1 28 D3 W3 14 D6 D6 6 CW 17 TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm 3866 WALKWAY 23.00° 23.00° ROOF FACIA 250mm ROOF FACIA 250mm 4450 First Floor 4450 4450 First Floor 4450 B D2 B2 A B1 C E E1 2100 mm 2100 mm 3150 mm D1 D4 29 DS1 D4 30 CW CW 20 LIVING DINING ROOM BEDROOM 2625 2700 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm 3866 75mm LATERITE CLAD WALL WALKWAY 2700 BAY WINDOW 2110 LATERITE CLAD COLUMN BASE 23.00° 1 : 75 Section 1 1 1 : 75 Section 2 2 SECTION SECTION SECTION SECTION SECTION SECTION KEY PLAN GROUND FLOOR 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0000 Ground Level 7050 Second Floor 7750 7050 Second Floor 7750 -1200 Pool Bottom -1200 -1200 Pool Bottom -1200 9 10 12 13 11 3150 SQ First Floor 3450 3150 SQ First Floor 3450 5 5440 mm BEDROOM LIVING DINING ROOM PANTRY KITCHEN POWDER ROOM TOILET LIFT SHAFT TOILET BEDROOM BEDROOM CW 27 CW 24 CW 22 D5 33 CW 20 DS1 DS1 D6 CW 17 CW CW CW PAVILLION COVERED WALKWAY CW 18 DC1 28 OPEN AIR COURT TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm LOUVERS TERACOTTA TILE ROOF TERRACOTTA JALLI TERACOTTA TILE ROOF BALCONY 0450 Ground Floor 450 0450 Ground Floor 450 4450 First Floor 4450 4450 First Floor 4450 0000 Ground Level 0000 Ground Level 7050 Second Floor 7750 7050 Second Floor 7750 -1200 Pool Bottom -1200 -1200 Pool Bottom -1200 10 12 13 15 17 19 18 16 11 14 5440 mm 450 mm 1952 LIFT SHAFT TOILET BEDROOM BEDROOM CHANGE ROOM STUDY TOILET WALK IN CLOSET MASTER BEDROOM BEDROOM TOILET CW 10 D6 17 CW 12 CW 14 CW 30 CW 28 D6 35 CW 32 CW 27 CW 24 CW 22 D5 33 CW DC1 21 CW 16 D7 14 CW CW PAVILLION COVERED WALKWAY OPEN AIR COURT 25mm BOARDING 75mm SCREED TERACOTTA TILE ROOF 23.00° TIMBER BEAM 230x50mm TIMBER BEAM 150x75mm TIMBER BEAM 150x75mm LOUVERS TERACOTTA TILE ROOF BALCONY BALCONY CHECKED BY TITLE CLIENT PROJECT DRAWN BY DATE MUMBAI 306, 3rd FLOOR, SAMRPAN COMPLEX NEW LINK ROAD, CHAKALA, ANDHERI (EAST), MUMBAI 400099, MAHARASHTRA, N D A T: + 91 22 42290123 SECTION SHEET 4 MALAVIKA TIWARI HOUSE, ASSAGAO , GOA MALAVIKA TIWARI RAVI PUNDE SANAT 27/08/2022 1 75 Section 11 - Part 1 1 1 75 Section 11 - Part 2 2 SECTION SECTION 10 SECTION 11 KEY PLAN GROUND FLOOR Section 1 Section 3 Section 8 Design Documenation Sections Made with Revit
in

Design Cell Landscape Architects

Upcoming Museum at Adani Shantigram, Gandhinagar, Gujarat.

At Design Cell, I was handed the responsibility to make drawings, Revit models and renderings of Landscape Architecture of the mentioned project under the guidance of Prof. Ravi Punde and an associate of the firm.

The Site had to accomodate parking requirements underground hence most landscape work is done on top of a sunken Podium at ground level. Such and other obstacles were discussed multiple times back and fourth with the Architects, P.K. Das. & Assoc, as well as a flury of consultants they hired to work on the consolidated project.

I issued the Tender Drawings for landscape design. The Project is under stages of planning hence other details cant be shared to a open level.

24
View of the earth fill Mounds, Walkway and the Exit Plaza. Designed by Prof. Ravindra Punde. Software used - Rhino, Revit and Lumion.

Plan of the Upcoming Musuem.

Designed by Prof. Ravindra Punde. Software used - Rhino, Revit and Lumion.

Entrance Court Reflecting Pool Reflecting Pool Reflecting Pool Entry - Exit Road Earth fill Mound Earth fill Mound Exit Court Earth fill Mound Pause Court Pause Court Pause Court Public Walkway Public Walkway Public Walkway Public Walkway FTP Road FTP Road FTP Road FTP Road On Ground Parking

View of the Entry Court.

View of the Pause Court and Reflecting Pool.

MINIMUMDEPTHREQD.FORPLANTING

MINIMUMDEPTHREQD.FORPLANTING

29
+1 Lvl 5000
Ground Lvl 0 Ground
Ground +1 Lvl 5000
DROP OFF LANE FTP - PATHWAY POOL CASCADE REFLECTING POOL ENTRY PLAZA REFLECTING POOL
TOILET BLOCK F.S. 900 VEHCILE
W.L. 1100
Ground Lvl Ground
COURT RECESSED PLANTER RECESSED PLANTER
250
DROP-OFF LANE DROP-OFF COURT PLANTER + SEAT F.S. 160 ACO DRAIN AS PER MEP
MEMBRANE MOUNTABLE CURB DRAINAGE AS PER MEP FINISH IN ST 01/01 FINISH IN ST 02/02
+1 Lvl 5000 Ground +1
5000
DROP-OFF LANE WALKWAY DROP-OFF COURT PLANTER + SEAT DROP-OFF COURT F.S.
F.S.
F.S.
F.S.
F.S. 160 ACO DRAIN AS PER MEP WATERPROOFING MEMBRANE MOUNTABLE CURB FTP-
DRAINAGE AS PER MEP FINISH IN ST 01/01 FINISH IN ST 02/02 F.S.
F.G. 250 Ground Lvl 0 Ground +1 Lvl 5000 POLYSTYRENE FILL UNDER EARTH MOUND AS PER STRUCTURE PLANTER FTP - WALKWAY 1:3 EARTH MOUND ACO DRAIN AS PER MEP F.S. 360 F.S. 330 UNDER SEATING LIGHT F.S. 250 F.S. 303
MOUNTABLE CURB SERATED GRANITE CASCADE ACO DRAIN AS PER MEP POOL LIGHTS POOL LIGHTS LIGHTWEIGHT FILL S.L. -450 WATERPROOFING MEMBRANE PLAZA FINISH IN PC 01/01 WALKWAY FINISH IN PC 01/01 1 LS 102 ACO DRAIN AS PER MEP
Lvl 0 Ground +1 Lvl 5000 ENTRANCE
F.G.
WATERPROOFING MEMBRANE PLAZA FINISH IN PC 01/01 SEATS IN ST 02/03 WALKWAY FINISH IN PC 01/01 6 LS 102 TOILET BLOCK COURTYARD
WATERPROOFING
Ground Lvl 0 Ground Lvl 0 Ground
Lvl
PYRAMID 1 PLANTER
0
300
403
768
6000 F.S. 325 S.L. -450
768
S.L. -450 WATERPROOFING MEMBRANE FINISH IN ST 02/02 FINISH IN PC 01/01 3 LS 102 Ground Lvl Ground +1 Lvl PLANTER + SEAT F.S. 330 FTP WALKWAY REFLECTING POOL S.L. -450 DRAINAGE AS PER MEP WATERPROOFING MEMBRANE ACO DRAIN AS PER MEP UNDER SEAT LIGHT ACO DRAIN LIGHTWEIGHT FILL LIGHTWEIGHT FILL FINISH IN ST 03/01 1 : 100 Section 3 3 1 : 100 Section 4 4 1 : 100 Section 5 Ground Lvl 0 Ground +1 Lvl 5000 6 LS 102 TOILET BLOCK COURTYARD Ground Lvl 0 Ground Lvl 0 Ground +1 Lvl 5000 Ground +1 Lvl 5000 POLYSTYRENE FILL UNDER EARTH MOUND AS PER STRUCTURE PYRAMID 4 PLANTER FTP + WALKWAY 1:3 EARTH FILL MOUND
ACO DRAIN AS PER MEP UNDER SEAT LIGHT F.S. 300 F.S. 330 F.S. 360 F.S. 768 S.L. -450 F.G. 250 WATERPROOFING MEMBRANE LIGHTWEIGHT FILL FINISH IN ST 02/02 FINISH IN PC 01/01 Ground Lvl 0 Ground Lvl Ground +1 Lvl 5000 Ground +1 Lvl F.S. 350 PLANTER FTP + WALKWAY PLANTER + SEAT PAUSE COURT PLANTER + SEAT F.S. 300 F.S. 768 F.S. 450 F.S. 918 F.S. 415 F.S. 390 S.L. -450 F.G. 250 ACO DRAIN AS PER MEP UNDER SEAT LIGHT LIGHTWEIGHT FILL LIGHTWEIGHT FILL UNDER SEAT LIGHT WATERPROOFING MEMBRANE FINISH IN ST 02/02 FINISH
ST 01/01 4 LS 102 Ground Lvl 0 Ground Lvl 0 Ground +1 Lvl 5000 Ground +1 Lvl 5000 POLYSTYRENE FILL UNDER EARTH MOUND AS PER STRUCTURE F.S. 315 F.S. 286 F.S. 344 F.S. 768 F.S. 5450 1:3 EARTH FILL MOUND FTP WALKWAY PLANTER ACO DRAIN AS PER MEP UNDER SEAT LIGHT LIGHTWEIGHT FILL WATERPROOFING MEMBRANE FINISH IN PC 01/01 FINISH IN ST 02/02 S.L. -450 F.G. 450 S.L. -450 F.G. 250 SECTION 3 SECTION 4 SECTION 5 SECTION 7 SECTION 8 SECTION SECTION 6 1 : 100 Section 7 7 1 : 100 Section 8 8 1 : 100 Section 9 9 Ground Lvl 0 Ground +1 Lvl 5000 PAUSE COURT PLANTER + SEATPAUSE COURT PYRAMID 3 F.S. 385 W.L. 285 F.S. 385 F.S. 400 F.S. 473 F.S. 420 F.S. 918 REFLECTING POOL S.L. -450 DRAINAGE AS PER MEP WATERPROOFING MEMBRANE F.S. -15 ACO DRAIN LIGHTWEIGHT FILL FINISH IN ST 02/02 FINISH IN ST 03/01 Ground Lvl 0 Ground +1 Lvl 5000 F.S. 540 F.S. 400 F.S. 500 F.S. 510 F.S. 918 F.S. 480 F.S. 400 F.S. 350 F.S. 300 F.G. 250 PAUSE COURT PLANTER FTP WALKWAY PLANTER + SEAT PAUSE COURT F.S. 450
F.S. 768 F.S. 768 WATERPROOFING MEMBRANE UNDER SEAT LIGHT ACO DRAIN AS PER MEP COURT FINISH IN ST 01/01 SEAT FINISH IN ST 02/02 FINISH
ST 02/02 COURT
Ground
WATERPROOFING MEMBRANE F.S. -4500 W.L. -4300 S.L. -4800 W.L. 200 F.S. 0 S.L. -300 30.00° CERATED GRANITE CASCADE WATERPROOFING MEMBRANE FINISH IN ST 03/01 Ground Lvl 0 Ground Lvl 0 -4850mm G-1 Lvl -4850 -4850mm G-1 Lvl -4850 4500 W.L. 200 F.S. 0 W.L. -1300 S.L. -1800 F.S. -1500 W.L. -4300 S.L. -4800 F.S. -4500 S.L. -300 W.L. -2800 F.S. -3000 S.L. -3300
5 LS 102 1 : 100 Section 11 11 1 : 100 Section 12 12 Section 1 through the Entry Plaza and Refelecting Pool.
12
Ground Lvl Ground Lvl Ground +1 Lvl 5000 Ground +1 Lvl 5000 TOILET BLOCK F.S. 300 F.S. 350 F.S. 371 F.S. F.S. 900 VEHCILE DROP OFF LANE FTP PATHWAY POOL CASCADE REFLECTING POOL ENTRY PLAZA W.L. 1050 REFLECTING POOL F.S. 800 F.S. 800 W.L. 1100 MOUNTABLE CURB SERATED GRANITE CASCADE ACO DRAIN AS PER MEP W.L. 188 F.S. -112 POOL LIGHTS POOL LIGHTS LIGHTWEIGHT FILL S.L. -450 WATERPROOFING MEMBRANE PLAZA FINISH IN PC 01/01 WALKWAY FINISH PC 01/01 1 LS 102 ACO DRAIN AS PER MEP Ground Lvl Ground Lvl Ground +1 Lvl 5000 Ground +1 Lvl 5000 2400 3600 2400 3600 2400 PLANTER FTP DRIVEWAY ACCESIBILTY RAMP ENTRANCE COURT RECESSED PLANTER RECESSED PLANTER RECESSED PLANTER ACO DRAIN AS PER MEP 1:20 1:20 F.S. 220 F.S. 300 F.S. 250 F.G. 250 F.S. 1202 W.L. 1100 F.S. 800 S.L. -450 DRAINAGE AS PER MEP WATERPROOFING MEMBRANE POOL LIGHTS PLAZA FINISH IN PC 01/01 SEATS IN ST 02/03 WALKWAY FINISH IN PC 01/01 2 LS 102 6 LS 102 TOILET BLOCK COURTYARD Ground Lvl Ground Lvl Ground +1 Lvl 5000 Ground +1 Lvl 5000 UNDER EARTH MOUND AS PER STRUCTURE PYRAMID PLANTER FTP WALKWAY 1:3 EARTH FILL MOUND MINIMUMDEPTHREQD.FORPLANTING ACO DRAIN AS PER MEP UNDER SEAT LIGHT F.S. 300 F.S. 330 F.S. 360 F.S. 768 S.L. -450 F.G. 250 WATERPROOFING MEMBRANE LIGHTWEIGHT FILL FINISH IN ST 02/02 FINISH IN PC 01/01 Ground Lvl Ground Lvl Ground +1 Lvl 5000 Ground +1 Lvl 5000 PYRAMID 5 F.S. 350 PLANTER FTP WALKWAY PLANTER SEAT PAUSE COURT PLANTER SEAT REFLECTING POOL F.S. 300 F.S. 768 W.L. 350 F.S. 50 F.S. 450 F.S. 918 F.S. 415 F.S. 390 S.L. -450 S.L. -450 F.G. 250 ACO DRAIN AS PER MEP UNDER SEAT LIGHT LIGHTWEIGHT FILL LIGHTWEIGHT FILL UNDER SEAT LIGHT WATERPROOFING MEMBRANE FINISH IN ST 02/02 FINISH IN ST 01/01 FINISH IN ST 03/01 LS 102 SECTION SECTION SECTION SECTION SECTION SECTION SECTION SECTION 9 SECTION 10 SECTION SECTION 11 SECTION 102 1 100 Section 1 1 1 100 Section 2 2 1 100 Section 7 7 1 100 Section 8 8 1 1000 KEY PLAN 15 Key Plan
IN
S.L. -450 S.L. -450
IN
FINISH IN ST 01/01
Lvl 0 -4850mm G-1 Lvl -4850 FINISH IN ST 03/01 LIGHTWEIGHT FILL POOL LIGHT
FINISH IN ST 03/01 LIGHTWEIGHT FILL POOL LIGHT WATERPROOFING MEMBRANE
Section 4 through the Mound over the Podium and walkway. Section
through the layered Water Cascade. Section 9 through the Mound over the Podium and walkway. Tender Stage Landscape Design Sections. Made using Revit.

Oct 2022 - Jan 2023 Work Experience :

StudioPOD Designs Pvt Ldt., Mumbai.

• Worked as a group on Public Areas, Deveopment Plans, Disaster and Flood Resiliency Strategy of Ponda and Valpoi. Client - Goa State Urban Development Authority (GSUDA).

• Worked on 3D models and Presentation Drawings of a Draft Masterplan for New Mopa Airport City.

• Worked on Graphical Diagrams for Development Masterplan for Hudariyat District in Abu Dhabi.

30

Worked on 3D models and Presentation Drawings of a Draft Masterplan for New Mopa Airport City, Goa. Made using SketchUP, VRay, Photoshop and Illustrator.

Identification of Flood Resiliency Areas, Disaster and Flood Resiliency Strategy of Ponda, Goa. Made using ArcGIS, AutoCAD, Illustrator and Google Earth Pro.

Draft Public Park Rejuvenation Strategy of Ponda, Goa. Made

33
using SketchUP and Lumion. Draft Public Transit, Park Rejuvenation and Riverfront Flood Resiliency of Valpoi, Goa. Made using SketchUP and Lumion. Draft Public Park Rejuvenation and Slope Flood Resiliency Strategy of Valpoi, Goa. Made using SketchUP and Lumion.

Miscellaneous Work

A collection of other personal work, office work and other Interests.

Please feel free to quickly browse through this part if you are busy.

36

“Indore : Dialouges in Existence“

book published by Rizvi College of Architecture, Mumbai in collaboration with Aga Khan Trust for Culture, Geneva. Role - Researcher, Photographer and Project Facilitator

37

11"

1'-8" 3'-6" 3'6" 7'6" TOILET

1'-2" 1'-2"

11" 11" 7'6" TOILET

5'-9" 11'

11" 10' 4'-6"

1'-6" 3'-3" 3'-3" 1'-6"

13'-6" 3'-6" 4'-6"

BEDROOM 13'6" 11'6"

1'-6"

8'-6" 16' KITCHEN

29'

LIVING ROOM 10'6" 11'

30'-6" 2'-7" 5'-2" 4'-9" 29' 12'-3" 2'-9" 28'-6"

5'-4"

16' 15'6"

12' 1'-9" 2'-5" 2'-8"

2'-8" 3'-2"

11'-6" 15'-6" VERANDAH

5'-11" 5'-11" 5'-11"

5'-4" 22'-9"

GROUND FLOOR PLAN 1:50 BHAGYALAXMI SHAHIR BUNGALOW EINVILLE, AINSHET

5'-4"

22'

MOBILE 8169636850

ADD- 33/284, UNNAT NAGAR-2, GOREGAON(W), MUMBAI 400104

1'-8" 5'-6" 1'-4"

2'-4" 3'-9"

1'-10"

28'-6" 29'

10'-6" 15'-3"

1'-8" 3'-6" 3'6" 7'6" TOILET

8'-6"

11" 11" 7'6" TOILET

3'-6" 3'-9"

2'-9"

BEDROOM 10'6" 11'3"

11'-3"

3'-3" 3'-3" 2'-2"

2'-9"

10'-5" 2'-9" 28'-6"

1'-10" First Floor Plan

11" 11" 10'-9"

11" 10'

13'-6" 5'-3"

1'-3" 16'

BEDROOM 13'6" 11'6"

15'-6"

1'-8" 5'-6" 1'-4" Ground Floor Plan Private Residence near Wada, Maharastra (To be Built) Software used - Revit and Twinmotion.

ARCHITECT SANAT SHAHIR

REG. NO CA/2021/130100

MOBILE 8169636850

ADD- 33/284, UNNAT NAGAR-2, GOREGAON(W), MUMBAI 400104

FIRST FLOOR PLAN 1:50 BHAGYALAXMI SHAHIR BUNGALOW EINVILLE, AINSHET ARCHITECT SANAT SHAHIR REG. NO CA/2021/130100
5'-4"

Row Houses near Wada, Maharastra (To be Built)

Software used - Revit and Twinmotion.

Front Elevation

Row Houses near Wada, Maharastra (Built) Software used - Revit and Twinmotion.

40 Ground Ground 0 Level 600 Level 600 Level 3500 Level 3500 Level 5700 Level 5700 3200 3650 2400 1050 1500 3650 2400 1050 450 1500 400 3650 2400 1500 3650 2400 150 1050 450 450 1050 3650 2400 1500 400 3650 2400 1600 1600 1500 1500 850 14.05 Lower Bedroom Attached Toilet Common Toilet Attached Toilet Common Toilet Attached Toilet Common Toilet Attached Toilet Common Toilet Attached Toilet Common Toilet Attached Toilet Common Toilet 14.08 Lower Bedroom 14.08 Lower Bedroom 14.05 Lower Bedroom 14.05 Lower Bedroom 14.12 Lower Bedroom Living Room Living Room Living Room Living Room Living Room Living Room Kitchen Bar Dining Room Kitchen Bar Dining Room Kitchen Dining Kitchenette Dining Room Kitchenette Dining Room Kitchen Dining
First Floor Plan

View of the Feature wall with parametric holes for light penetration in the shape of a tree grove.

Software used - Rhino, Revit and Twinmotion.

View of the Feature Entry Pavillion in L&T Powai Software used - Rhino and Twinmotion.

Thank You,

For your consideration.

Portfolio of :

Ar. Sanat Yogesh Shahir

Phone Number - +91 8169636850

E-Mail ID - sanatshahirarchitecture@gmail.com LinkedIn - www.linkedin.com/in/sanat-shahir-685164147/

43

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.