Sara Contreras Escribano
Portfolio architecture selected works 2009|2015
CV nombre CONTRERAS ESCRIBANO, Sara dirección c/O’Donnell 6 28009, Madrid, España nacimiento
15 Diciembre1991
nacionalidad Española teléfono
0034 647 169 103
e-mail sarapsara15@gmail.com
formación académica 2015-2009
perfil personal: Soy una arquitecta creativa, ingeniosa y diligente, capaz de trabajar en equipo y también de manera independiente. Además de ser comprometida y responsable, soy una persona proactiva y estoy habituada a desenvolverme bajo condiciones de estrés, manteniendo mi precisión y entusiasmo. Escuela Técnica Superior de Arquitectura de Madrid (E.T.S.A.M)
2015-2013 Diseño web - WordPress|E.T.S.A.M (30 h) Adobe Illustrator CS6|E.T.S.A.M (30 h) Adobe Photoshop CS6 Avanzado|E.T.S.A.M (30 h) Archicad |E.T.S.A.M (30 h) 2013-2012 École Nationale Supérieure d’Architecture Paris-Malaquais 4º curso|ERASMUS Programa Internacional de Intercambio Junio 2009 Nota de acceso a la Universidad: 9.36/10 2002-1997
Ballet en el Centro de Danza Victor Ullate
2000-1997
Estudios de arte en la Escuela de Artes Decorativas de Madrid
2009-1994
Colegio Montealto, Madrid| Matrícula de honor (10)
Junio 2015
PFestC| Selección de los mejores PFCs| ETSAM
Mayo 2015
Proyecto Final de Carrera (PFC)| Matrícula de honor (10)
Abril 2015
XXV Concurso Ibérico Soluciones Constructivas PLADUR | Áccesit
2013-2012
Beca ERASMUS
2009
Beca de Excelencia de la Comunidad de Madrid
logros
2008 VII Fórum de la Universidad de Navarra para promover la inversión en África| Mención 2005
Concurso de tarjetas navideñas del Ayuntamiento de Madrid | 1er premio
2005
45ª edición del Concurso Nacional de Redacción de Coca-Cola | 5º premio
1997/2000/ 2004/2005/2007
Concurso escolar de tarjetas navideñas |1er premio
2011-2009
Fundación Pablo Horstmann| entretenimiento de niños enfermos, Hospital La Paz
voluntariado
2|
experiencia profesional / publicaciones / workshops EXPERIENCIA PROFESIONAL/ PUBLICACIONES/ WORKSHOPS
Junio 2014 Verano 2013 Junio 2013 Mayo 2013 Nov. 2012 competencias
Mayo 2011
115 días|Publicación académica de los mejores proyectos E.T.S.A.M. (prim. 2014)
Junio 2014
Revista 150 días| Publicación académica de los mejores proyectos E.T.S.A.M.
Verano 2013
Atelier [BP] Architecture, París| prácticas
Atelier [BP] Architectures, París| Prácticas
Exposición de proyectos para un nuevo puente en el ZAC Clichy-Batignolles| École des de un Paris Junio 2013 Nationale Supérieure Exposición deBeaux-arts proyectos para nuevo puente en el ZAC Clichy-Batignolles| École Nationale Superiéure des Beaux-arts de París Workshop BELLASTOCK de arquitectura experimental «Greenwashing»| ciudad efímera| arquitectura y naturaleza|París Mayo 2013 Workshop BELLASTOCK de arquitectura experimental «Greenwashing»| ciudad efímera| arquitectura y naturaleza| París Workshop en la Escuela de Arquitectura de Chandigarh|Clément Blanchet|India (2 weeks) Nov. 2012 Workshop
en la Bartlett SchoolenoflaArchitecture | Izaskun Inglaterra Workshop Escuela de Arquitectura deChinchilla|Londres, Chandigarh| India
Mayo 2011
Dibujo Competencias informáticas
Competencias sociales idiomas
Workshop en la Bartlett School of Architecture | Izaskun Chinchilla| Londres, Inglaterra
Dibujo a mano alzada, diseño 2D y 3D, renderizado, imagen y maquetación. PC y Mac COMPETENCIAS
Diseño 2D AutoCAD 2015 Dibujo a mano alzada, diseño 2D y 3D,Up|ArchiCAD renderizado, imagen y maquetación. Diseño 3D Rhinoceros (V-Ray)|Sketch 17|Laser cut Imagen Adobe Photoshop CC|Adobe Illustrator CC PC y Mac Competencias Vídeo AutoCAD Adobe 2015Premiere Pro CC Informáticas Presentación Adobe Adobe InDesign Photoshop CS6 CC IllustratorOffice CS6 Infomática Adobe Microsoft Adobe Premiere Diseño web WordPress Pro 4.2CS5.5 Rhinoceros 5 Cálculo estructural SAP 2000 Dibujo
Microsoft Office
Organizadora, buena comunicadora, negociadora, colaboradora, líder y motivadora.
Competencias sociales
Organizadora, buena comunicadora, negociadora, colaboradora, líder, motivada y entusiasta.
Idiomas Comprensión Oída
Expresión oral Leída
Interacción oral
Producción oral
Expresión escrita
Inglés Inglés
C2 Competente
C2 Competente
C2 Competente
C2 Competente
C2 Competente
Francés Francés
C1 Competente
B2 Intermedio alto
C1 Competente
C1 Competente
B2 Intermedio alto
Alemán Alemán
A1 Básico
A2 Básico
A2 Básico
A2 Básico
A2 Básico
(*) Common European Framework of Reference (CEF) level
hobbies / intereses
2015-2012
Feb-Jul|Madrid 2012 Institut Français | Madrid Institut Français
2009-2005
British Council |Madrid 2009-2005
2008
CAE (Certificate English) in Advanced English) 2008 in Advanced CAE (Certificate
Julio 2008
Programa intensivo de inglés|EF, Long Beach, EEUU
2006
FCE (First Certificate of English)
Julio 2006
Programa intensivo de inglés| FLS International, Boston, EEUU
2004/2005
Julio 2006 de inglés Programa de (verano) inglés | FLS International, Boston, EEUU Programa intensivo paraintensivo jóvenes Anglo-Continental School, Bournemouth, Inglaterra 2004/2005 Programa intensivo de inglés para jóvenes |Anglo-Continental, Bournemouth, UK
British Council |Madrid
Julio 2008
Programa intensivo de inglés | EF, Long Beach, EEUU
2006
FCE (First Certificate of English)
INTERESES
teatro|cine|arte|fotografía|viajar teatro|cine|arte|fotografía|viajar |3
4|
Contents
Battersea Power Station|London
Centre of interpretation for the ruins|Guardamar
final project| public|scenario
public |research |landscape |ephemeral
with honors (10MH)| issuu video: PFC
mark: 7/10
38
6 Cortijo del fraile|Almeria
Sports and emergency centre|Navacerrada
agriculture|landscape|restoration
public |sports |landscape
PLADUR competition: Áccesit
14
mark: 7,5/10
40 Øya Music Festival |Oslo
Urban agriculture in rooftops|Madrid
public|ephemeral
miscellaneous |sustainability|density mark: 7,5/10 video: P3 | P3.1
120 HOURS competition
18
44 Ahijones Urban planning|Madrid
Drawing|Sketch
residential|landscape|public space
nude|paysage|Paris
mark: 9/10
46
20 Footbridge SCALELAB|Paris
Photography
public|landscape |construction
amateur
mark: 17.5/20
26
--Urban planning |Chandigarh 2035 residential |landscape |density mark: 20/20
32
Videos |2010-2015 PFC | P3 | P3.1 | P2 | P1 Adobe PremierePro|iMovie
Public|Urban|Residential|Miscellaneous|Analysis|Construction|Photography|Design
* menú interactivo
|5
Pu DEUS EX MACHINA
Battersea Power Station
semester
fall 2014 - spring 2015
course
Final Project (PFC) qualified with honors (10)
duration
9 months
professor
Luis Pancorbo |Aula PFC Mª José Aranguren
location
Battersea Power Station|London, England
Looking
ahead,
more
and
more,
buildings
must
be
01
capable
of
adapting to any situation, to any scene. This is the case of the Battersea, survivor throughout the years, as a landmark for London and that seeks to reinvent now with a new use, a dream’s factory.
6|
ground level | technical floor
|7足
longitudinal section|possible scenarios
8|
possible scenarios 01_ Exposición de aviación 02_ Instalación “The Weather Project”- Olafur Eliasson 03_ Simultaneidad de espectáculos/ Festival 04_ Instalación “In Orbit”- Tomás Saraceno 05_ Plató de rodaje/ Museo del cine
01
02
03
04
05
|9
cross section|roof floor|ambiance Everything is flexible: light, sound and space perception. One might arrive to this great space and find it empty, overwhelming by its size, and then observe the white traces marked on the ground, which, as in a great theatre, speak of what can actually happen there. Then, looking up, he would perceive volumes, objects, walkways and natural light flows, everything diffuse and complex, two opposite worlds, that of the spectator and 50 meters above, that of stage manufacturers capable of imagining, surprising, and transforming into a unique place the Battersea Power Station.
10|
|11足
axonometric view| main elements scheme | construction
12|
|13足
Mi Unruinit Center for agricultural and landscape development
02
semester
spring 2015
competition
25th Iberian Competition for PLADUR building solutions
award
Áccesit local
team
Elisa Rodríguez - Reyes Sánchez
location
Ruins of the Cortijo del fraile, Almeria, Spain
Placed in the middle of the Nature reserve of Cabo de Gata, this country house built in the 18th century has provided the setting for numerous films as “The good, the bad and the ugly“. The intervention for the center of agricultural and landscape development tries to take advantage of the ruins of the cortijo, respecting its current condition. A platform goes through the new uses generating squares between them. The etfe parasols, emulating the plastic sea of Almeria protect the areas that have lost the original cover. Finally, the boxes adapt to the specific requirements of certain uses, modular and easily detachable, designed incorporating pladur system.
14|
intervention plan|sections|ambiance
|15足
construction|inside ambiance
16|
|17足
Pu Øya Music Festival
Meeting point and beacon
semester
spring 2014
competition
120 HOURS
team
Ángel Maestro - Elisa Marcos - Reyes Sánchez
location
Tøyenparken, Oslo, Norway
The
box
festival animals
has
view
been points,
generate
opened. and around
as
Its
light
smaller them
03
glimpses
from
all
elements
the
released
fleeting
nice
the
meetings.
It is a dynamic experience, which proposes, not one, but several meeting points, as clearly identifiable icons, in order to avoid large gatherings at the same place and also to cover the festival’s different stage areas. A solution of easy assembly and dismantling, using local materials and with a view to re-use, ultimately, an enriching complement for the Tøyenparken.
18|
festival plan |elevations
|19足
Ur Smart Fields Forever
PAU, a city from nowhere
semester
fall 2013
course
design VIII
duration
16 weeks
professor
JM. Lapuerta- AR. Barbarín- M. Ocaña- V. Acebo
location
Ahijones|Madrid, Spain
04
The south-east’s strategy sought to broaden Madrid’s extension by promoting repetitive dwelings without any character as part of an Urban Development Activity Programme (PAU). With the economic crisis these areas were abandoned, remaining useless even for their prior agrarian use. What if there was a better future? How should it be a city in the middle of nowhere? The city arises as an island, away from Madrid, disconnected and bounded by major infrastructures. The solution is to reinforce the isolation, thinking a self-sufficient city, surrounded by nature and structured around the PAU’s connecting axis, which is buried to generate a great linear square, urban heart for the city. Nevertheless, the city is not exclusively urban but an alive conviviality between rural and urban landscape. Once raised the scheme of the city in bands, focus lays on the transition from rural areas to the purest urban ones across public space defined by the building’s mass.
20|
general scheme |ambiance
|21足
sections|eclecticism|ambiance Eclecticism, a city without age The buildings come down differently, have different materiality according to use and participation from outer space. Public space gives coherence to this entropy. Longitudinally, a plinth sews buildings in the urban core and comes gradually unstitched towards the exterior landscape, its materiality, height and surface vary depending on the public space that buildings themselves provide to the street: entrances, squares, stores, street’s connections... Controlling that way flows and offering different perceptions: sound, visual and touch. On a larger scale, the city is crossed by interstitial paths through which rural landscape spreads across the city and ‘contaminates’ it with other uses: parks, rooftop greenhouses, vegetable façades...
22|
|23足
city plan|street view
24|
|25足
Pu Footbridge SCALELAB semester
spring 2013
course
design VII
duration
16 weeks
professor
M. Malinowsky - S. Mémet - R. Leroy - L. Couton
location
Paris, France
05
Located on the northwest of Paris, close to the Gare de Saint Lazare, and on the occasion of the development of a new urban area, arises the need to project a footbridge that would reconnect two neighbourhoods isolated until then by the train tracks space. The new footbridge attempts to revitalize this union and proposes a path’s dissociation offering, not only a fluid and direct access to the residential and business complex, but also a promenade that leads to the new planned park, which will become a new green lung for the city. This way, the project stretches up to the park to offer a direct link between park and city that takes advantage of this new privileged equipment for the area. The walkway is influenced by three local elements: the railway, the road and the new park projected together with the residential set. These, they are translated into three different perceptive sequences in the project’s conception, from more protected, over de rail tracks, to free and open, on its arrival to the park.
26|
site influences: city - ZAC - park
sequences
acces disociation
perceptions
strong urban landmark
park’s extension
50m
175m
125m
Rayon de courbure : 210m
|27Â
construction details
1
railways|open module
2
3
railways|covered module
1
2
park| open module
A
A’
3.00 0.00
28|
global structure | construction The construction is based on suspension bridge system on two of three parts of the deck. Along with the belvedere, on the park’s side, the bridge’s mast reveals the desire to create a strong urban landmark. The bridge is regulated by a system of identical structural brackets/consoles, oriented according to the bending radius of the bridge. The whole structure is tensioned by three foot-articulated masts.
SECTION AA’
structural performance sketches|sustenance and torsion effort
final solution
3
8.95
0.30 -1.30
|29
sequences|perception|ambiance The footbridge is divided following two different typologies over the railways. One, at a lower level, is conceived as a link sheltered from inclement weather and pollution and nuisances related with trains, offering a landscape perception punctuated by steel strips that obstruct or reveal environmental views. On the other hand, higher above the rails, the user takes the park’s leading path with the desire of enjoying directly a clear opened view.
30|
global model 1:200|detail 1:50
|31足
Ur Chandigarh 2035 Projects for the growth of the city
06
semester
fall 2012
course
design VI
duration
16 weeks
professor
Clément Blanchet [Director OMA France] - Thierry Mandoul
location
Chandigarh, India
Chandigarh, the “City Beautiful” of Le Corbusier, was initially planned for
150.000
inhabitants,
the
director
scheme
was
conceived
to
confront an expansion and to come up to 400.000 inhabitants. Today, Chandigarh reaches 600-650.000 inhabitants and at least a fifth part is in a more or less irregular situation in the vis-à-vis of the urban plan. The sector 19 is an exceptional opportunity to combine patrimony preservation with new architecture, as it’s clasified as one of the “heritage zones“ (HZ-8), there are 736 houses and equipments designed by P. Jeanneret, J. Drew and E.M. Fry. The different housing sets appear like allotements of different size, configuration and density, distributed heterogeneously, enriching the whole sector. The project aims to redefine the patrimony of the sector, to re-qualify the lots, intervening only in those which show a problem or interest, to densify them, nurturing the heterogeneity of the sector.
32|
city analysis|location
conceptual model
water flux
routes |sectorization
intensity of green areas
the 19th sector
the 19th sector|site
density
heights|sector’s profile
patrimony|heritage zones
public green areas
private green|vacant plots
green areas
green network
heritage zone HZ-8|patrimony
allotments|patrimony
new residential areas|relation with patrimony
insertion in the sector
process diagrams
paths|roads
|33Â
housing scheme The considered ingredients are therefore: - the sector’s heritage/patrimony - the heterogeneity of building typologies - the quantity and quality of green spaces - the located densities
allotment 1: miroir|mirror
allotment 2: encadrement|frame
Refers to a “patrimonial lot”: - Less dense typology, housing plots of 550m2 and 90m2 houses, in wich the garden surrounds the house. - The new scheme is opposite, the mass surrounds space. In addition, it includes several heights housind. - A green axis divides the site to connect the “green corridor” with the most remote areas.
- Around a heritage building: the engineers building who designed the city, conceived as a temporary work, it has been preserved due to its historical value but now it lacks function. - Surrounding the building, there are lots that were not built due to lack of financial means. All this facts give a huge densification potential to this area. - Assigning a new function to this unique building, it is revitalized to the whole contiguous zone, a new cultural equipment for all the inhabitants, a medialibrary or a library.
allotment 3: liaison|link - A linear strip - Connects large green spaces to the rest of the subsector, devoid of them. (cheap village) - Densification strategy: “opposites”, when there is mass on one side on the other there is a building less height or empty space. - Also new parkings will be created, enabling spaces used as such, to liberate green spaces.
allotment 4: emboîtement|fitting - Within the heritage/patrimony - Block pill around courtyards that can be traversed by pedestrians to facilitate the access, not only to this new wealth, but also to green areas.
miroir
land occupation scheme: before-empty-after
A
site plan|flux
34|
section AA’
patrimonial reference|house type 9-D
A’
air sight|insertion
Land use miroir|mirror
liaison|link
encadrement|frame
emboîtement|fitting
surface: 2,03 ha usages du sol avant: _habitations: 0,529 ha _jardins privés: 0,706 ha _j. publics occupés: 0,14 ha _espace pubic: 0,65 ha _vert: 0,387 ha _rues: 0,263 ha usages du sol après: _habitations: 0,894 ha _cours semi-privés: 0,58 ha _espace pubic: 0,554 ha _vert: 0,366 ha _rues: 0,414 ha coefficient d’occupation du sol: _avant: 0,24 _aprés: 0,44 nombre d’habitations: _avant: 22 _après: 203 surface du logement: _avant: 12,5*15,5= 193,75 m2 15*15= 225 m2 17*18= 306 m2 _après: 10*8= 80 m2 8*14= 112 m2
surface: 5,41 ha usages du sol avant: _habitations: 2,19 ha _jardins privés: 1,50 ha _espace pubic: 1,723 ha _vert: 0,68 ha _rues: 1,043 ha usages du sol après: _habitations: 1,622 ha _jardins privés: 0,80 ha _espace pubic: 2,79 ha _vert: 1,426 ha _rues: 1,365 ha _parking: 0,2 ha coefficient d’occupation du sol: _avant: 0,40 _après: 0,30 nombre d’habitations: _avant: 84 _après: 375 surface du logement: _avant: 15*17= 255 m2 _après: 12*8= 96 m2
surface: 4,27 ha usages du sol avant: _habitations: 0,636 ha _jardins privés: 0,47 ha _equipements: 0,45 ha _espace non batî: 0,99 ha _espace pubic: 1,727 ha _vert: 0,762 ha _rues: 0,965 ha usages du sol après: _habitations: 0,867 ha _cours semi-privés: 0,59 ha _equipements: 0,45 ha _espace pubic: 2,252 ha _vert: 1,51 ha _rues: 0,742 ha coefficient d’occupation du sol: _avant: 0,25 _après: 0,31 nombre d’habitations: _avant: 30 _après: 300 surface du logement: _avant: 15*16= 240 m2 15*20= 300 m2 10*12= 120 m2 _après:(1 module) _110 m2(*2) _84 m2 _70 m2 (*2) _126 m2
surface: 1,70 ha usages du sol avant: _habitations: 0,533 ha _jardins privés: 0,597 ha _espace pubic: 0,57 ha _vert: 0,27 ha _rues: 0,3 ha usages du sol après: _habitations: 1,017 ha _cours semi-privés: 0,355 ha _espace pubic: 0,33 ha _rues: 0,33 ha coefficient d’occupation du sol: _avant: 0,313 _après: 0,597 nombre d’habitations: _avant: 62 _après: 316 surface du logement: _avant: 9*9,5= 86 m2 _après: 9,5*8= 76 m2 10,5*8= 84 m2 11,5*8= 92 m2
encadrement
land occupation scheme: before-empty-after
site plan|flux|housing type
air sight|insertion
|35
liaison
land occupation scheme: before-empty-after
site plan|flux
36|
air sight|insertion
emboîtement
land occupation scheme: before-empty-after
site plan|flux
B’
B housing type
section BB’
|37
Pu Centre of interpretation for the ruins,Guardamar semester
spring 2012
course
design V
duration
16 weeks
professor
V. Berriochoa - V. Olmos - F. Ruiz Bernal
location
Guardamar del Segura, Alicante, Spain
07
On the occasion of the recent discovery of ruins that belong the Rabita Caliphate (Xth century) and the Phoenician city of Fonteta (VIII century BC to VI) in Guardamar del Segura, Alicante, the project proposes a center for visitors’ reception and interpretation of the ruins. These archaeological remains are located in an area of great landscape value, and currently belong to a natural protected environment, bounded by the mouth of the Segura river on the north, by the town of Guardamar itself west, and the Mediterranean sea on the east. The project is located on both sides of the path as an ephemeral structure that hosts museological, storage, research and management functions. The scaffolding structure reinforces
the
temporary
character
and
respects
the
immediate
environment, as it merges with the surrounding pine forest landscape.
38|
schemas|volumetry
construction system Aluminium module of 3x3m. Pieces are articulated by a ball-and-socket joint, which allows to connect infinite modules, achieving this way a silhouette adapted to site and functions.
Volumetric scheme of uses
site implementation
|39足
Pu Sports and emergency centre semester
fall 2011
course
design IV
duration
10 weeks
professor
J. Frechilla - J.M. L贸pez Pel谩ez
location
Navacerrada, Madrid, Spain
08
Located in the north mountain range of Madrid, Navacerrada, this building had to give an extremely sensitive response to the surrounding landscape. This scenery is known for its dense pine forests and the mantle of snow that covers everything during the winter season. The brief was complex as it had to combine a variety of uses including sports, sanitary and public features that necessarily required separated spaces. The result was conceived from the outside as a single volume. The slope of the mountains inspired its roof shape, redrawing their sinuous profile, creating on the whole a sculpture. Designed to appear solid during the day, when illuminated at night, the building gives the appearance of a floating blade leaning on slender pillars. The stereo metallic structure gives lightness to such a big building. It has an east-west orientation to take advantage of the incline of the mountain appearing half buried hiding the real dimension. The building also provides natural illumination through the full-height glazed facades that sieve light with louvres.
40|
access|plan
3 upper floor|public use
There are two different entrances. The first one links the building with the main road through a broad sculpted concrete stair that gives access to the hockey ring. This stair ends bellow the inclined tiers that provide catering for up to 2,000 spectators. The other access, located at the north boundary of the building, sends a promenade footbridge to the forest. There is also a secondary road that gives direct access to ambulances communicating the main road with the sanitary services.
3 2
- lobby - viewing-point for the painters - the painters’ coffee
2 second floor|public use
- kitchen and storehouse - restaurant - terrace - toilets - multipurpose store - sports’ store - fine arts store - office and meeting room
1 first floor|healthcare use
1 0
- ambulance parking - admission| administration - pharmacy - waiting room - toilets - infirmary consults - medical consults - observation - plasters’ room - x-ray room - treatment room - file room - staff rest area - staff toilets
- entrance hall - hockey and curling rink - grandstand seats - ticket offices - changng room - locker and footwear change - sports equipment rentals - surface smoothing machine’s depot - storage - technical room|installations 0 ground floor|access| sports use
|41
side elevation
inner space Inside, while the hockey ring occupies a full height volume, the other uses pile up in different levels creating stepped terraces with views over the ring. On the lower level are located storage and renting functions and also changing rooms. On the first level sanitary uses to supply the sports centre, the nearest ski slopes and Navacerrada’s village needs. The upper levels include public and social facilities like restaurants, shops and spaces for artists to paint the landscape. These uses will be mainly boxes to allow a unique flowing dynamic space to make easier circulations. The connections between these levels will be through stairs while a zigzag ramp links the higher level with the sports one offering unrivalled views out to the white rugged landscape.
longitudinal section
42|
front elevation
cross section AA’ | BB’
|43
Mi
09
Urban agriculture in rooftops semester
spring 2011
course
design III
duration
9 weeks
professor
Izaskun Chinchilla|Group of design experimentation
location
Madrid
The project’s brief demanded the design of a self-sufficient community, the pattern activity chosen for the project’s development is urban agriculture. In cities determined by an excessive population concentration and urban growth, projects like the green roofs and urban gardens are
being
consolidated
as
leisure
and
ecological
alternatives.
The solution is approached as an adaptable structure that groups the roofs of several buildings and can easily be widen. Under this organic shell, it gathers functions of horticulture, market, catering, workshops and even housing. The accesses might, well to take advantage of the own system of communication of the buildings, or adhere to the concerned façades. The aim is to generate a new habitable space in the middle of a highly densified city, to achieve maximum environmental sustainability and self-sufficiency.
44|
mm un ity 1|living ZOOM |co g in
2|mark et a ZOOM nd
ca te r
community plan|uses
diagrammatic section representation
irrigation sytem
horticulture (non-superficial roots)
global structure system
3|perfu me ZOOM
f ac to ry
PARFUM
PARFUM
HYDROPONIC CITY
PARFUM
crane collecting system
PARFUM SARA CONTRERAS ESCRIBANO
functional diagram|market
market stand type HYDROPONIC CITY
|45足
De Design year
fall 2009/spring 2013
place
Spain, France, India
techniques
46|
charcoal| watercolor| pencil| marker pen| acrylic
|47足
Contact 6, O’Donnell street 28009 Madrid, Spain t: 0034 647 169 103 sarapsara15@gmail.com