INTRODUCTION
The new library (currently under construction), situated on the site of the previous library, will embody the academic mission of the Tecnológico de Monterrey, a place where students, faculty, staff, and the region’s industry leaders come together to access information, study, collaborate, and be inspired.
REGENERACIÓN REVISITED Tecnológico de Monterrey, with an extraordinary and continuously expanding influence across the spectrum of Mexican education, is poised to become a leader in stimulating urban and economic regeneration and prove the power of Latin American universities as engines of innovation and entrepreneurship. In response to this vision, the 2014 Master Plan establishes the framework for the long-term evolution of the campus and the regeneration of the communities surrounding the university into a lively, attractive, dynamic, and integrated district, while creating an environment that will attract significant research and development investment. The public realm of the university and the district is carefully connected and integrated through a series of pedestrian routes, public spaces and shared uses.
The new roundabout will greatly improve the pedestrian environment, better connect with the surrounding urban context. With the project, the Tec sends a powerful message about its role in the evolution of the Distrito.
That vision for the Distrito has been widely published and recognized by multiple Mexican and international awards, such as the National Prize for Urban and Regional Development, The Ministry of Agrarian, Land and Urban Development (SEDATU, Mexico), The Pierre L’Enfant International Planning Excellence Award, American Planning Association (APA) and the Honor Award for Excellence in Planning from the Society for College and University Planning (SCUP). Two years later, the effectiveness of the planning process has yielded tangible results. Detailed designs for catalytic campus projects, such as the new library (now under construction), La Carreta pavilion, the Borregos Stadium and the Wellness Center were kickstarted. Furthermore, renewed interest from the private sector to invest in the Distrito has been faster than expected. The dynamic environment created 2014 Master Plan has thus required for the vision to be revisited, integrating projects that are now under implementation and accommodating opportunities that were not present in the previous process. Land acquisition and partnerships with developers and neighbors will allow the Tec to have greater influence in the evolution of the district. The approval of a new and innovative Plan Parcial for the Distrito spearheaded by the Tec and based on the 2014 plan - has also created a clearer regulatory framework that needs to be re-introduced to the vision.
8
INTRODUCTION
Throughout a series of workshops in Mexico, new ideas were generated and integrated to the plan. New program elements were introduced and market input was tested, resulting in a revised strategy for the distribution of uses in the district. Valuable land adjacent to the university is retained to promote partnerships with allied industries, and the introduction of additional co-work/incubator uses will support a dynamic ecosystem of innovation. An increase in residential uses, with an emphasis on new forms of urban living (live/work and co-living) will help attract and retain a new generation of residents, supporting a vibrant, mixed-use Distrito. The team also developed a clearer phasing and implementation scenario that focuses on early improvements to the Garcia Roel/Covarrubias “Armature”, reinforcing the relationship between the campus and its immediate context. The Framework Plan update will further support the university, public officials and private entities to continue the collaborative implementation of the Distrito vision, where the Tec can continue to be a catalyst for the transformation of Monterrey and Mexico as a whole.
9
INITIAL RESULTS While the Distrito Tec initiative expected to attract private investments in the neighborhoods around the university, the rate of success has been faster than previously envisioned.
ReEvolución
TOTAL INVESTMENTS
In addition to private investments in the surroundings of the university, the Tec is also transforming its core campus with new buildings and infrastructure. These key priority projects, such as the new library and Nano building, together represent an investment of U$ 141 million and will promote the Tec21 pedagogical vision, expand the Tec’s research capacity and improve the quality of the public realm that ties together the Distrito and the campus.
Residencias IX
Paseo Tec 2
$141
Nano Rotonda
$168
$269 PROGRESS/ APPROVALS
Tec Stadium
Nuevo Sur
Wellness Center La Carreta
Biblioteca
$57
Torre Av. del Estado
OPERATING
Condo Tec
TEC CAMPUS TEC PARTNERSHIPS
Co-work
Residential/ Retail F+B
Stadium Annex
Hotel
PRIORITY PROJECTS
Nové
Escamilla
Torre Shiro
$1BN
With U$ 57 million in operating projects and U$ 634 million in the pipeline, the level of engagement of the private sector represents a significant vote of confidence for the Distrito. Furthermore, strategic partnerships with key developers, for properties in the university’s landholdings, will bring an additional U$ 168 million in investments. These projects are intimately tied to the Distrito Tec vision and will help transform the district into a vibrant, mixed-use environment.
Transpais
254 Ingenieros
$365
Deptos. Elizondo Torre Rio Panuco
UNDER CONSTRUCTION Conjunto Agua Naval
Garza Sada 2 Garza Sada 3
Urban Village
Investments coming from diverse sources will help transform the area into a vibrant mixed use district.
DISTRITO INVESTMENT PANORAMA OPERATING
UNDER CONSTRUCTION
PROGRESS / APPROVALS
STRATEGIC PARTNERSHIPS + TEC
Tec Strategic Partnerships Operating
10
INTRODUCTION
Under Construction
In Progress / Approvals
Tec Campus Priority Projects
11
FRAMEWORK UPDATE KEY INTERVENTIONS
• • •
• • • •
ESCAMILLA Integration of New Sports Study New Landscape Concept Integration of Public ROW
MIXED USE RESEARCH CLUSTER • 10,000m2 of GFA Added • Additional Residential Uses • More Incubator Spaces • CEDES Edge Improvements • Public Realm Improvements
CAMPUS NORTE 55,000m2 of GFA Added Additional Live/Work Uses New Plaza and Connections Shared Parking RESIDENTIAL / RETAIL EDGE Integrates Stadium Parking
BORREGOS STADIUM Integration of Detailed Design
SHARED PARKING Integrated with Retail and Tec Sports Facilities
MIXED USE SPORTS DISTRICT • • •
14,000m2 of GFA Added Additional Residential Uses Integration of New Rec Fields and Public Spaces
NEW ARMATURE USES Residential / Retail / Co-Work NEW CAMPUS GATEWAY Plaza and Tec Store
CA M
PU
SS
PIN
E
WELLNESS CENTER Integration of Detailed Design
LA CARRETA Integration of Detailed Design TEC LIBRARY Integration of Detailed Design
CONECTA TEC Visitor + Alumni Center
CA M
PU
SS
PIN
E NEW PABELLÓN Office and Incubators
CONFERENCE HOTEL Increases Lodging and Event Capacty NEW CAMPUS GATEWAY Plaza and F+B DISTRITO ARMATURE Renewed Focus on Street Environment NEW PROPOSED BUILDINGS REVISED DISTRICT FRAMEWORK DETAILED DESIGN INTEGRATION
BAJO PUENTE Underpass Improvements
ELIZONDO SPINE Renewed Focus on Street Environment
LANDSCAPE IMPROVEMENTS 12
INTRODUCTION
13
FRAMEWORK STRATEGIES
EXISTING CAMPUS ESCAMILLA
(SPORTS FIELDS)
BRIL
CL AV E
LE S
32
OS
34
DE
LA
31
VE
PRACTICE FIELDS
PI
22
A
OM
RI N
EO S
GA
25 28
24 A
Í RC
26
O ND
L OE
29
R
21
GA
AV. C OVAR R
A
N ER
UBIA
F
LAGO DE LOS PATOS
17
4
18 24
2 1
24
3
5 24
NORTE
20
8
6
9
DO
L DE
ES
27
JARDÍN DE LAS CARRERAS
7 UNDER CONSTRUCTION
10
11
SPORTS CENTER
12
S
I LU
E
Z LI
24
O NI ZA
R GA
O NC
DA SA
S
JU
AN CH JU HUR N C SA CO S BO
14
A
L DE
RE
LE
O
ND
S
I LU
O IZ
15
GA
C BA
VE
L HI
DO
ON
GE
O IC
24
13
23
EU
UE ÓG RQ OL PA ECN T
24
STADIUM
FRAMEWORK STRATEGIES
19
UNDER CONSTRUCTION
. AV
16
S
30
16
TA
CORE
33
LI
NC O
RI
JU
JESÚS CANTÚ LEAL
2 DE A
DE IO REY R R SA TE CH RO ON UR M CH
R UE RQ PA
1 RECTORIA 2 LA CARRETA (UNDER CONSTRUCTION) 3 CENTRALES (DINING / ADMIN) 4 AULAS 1 5 AULAS 2 6 CETEC 7 LIBRARY (UNDER CONSTRUCTION) 8 CAMPANARIO 9 GYM 10 MANUFACTURING LAB 11 AULAS 3 12 AULAS 4 13 AULAS 7 / LAB 14 STUDENT CENTER 15 PABELLÓN TEC 16 BIOTECHNOLOGY 17 ARTS 18 BUSINESS / SOCIAL SCIENCES / HUMANITIES 19 SWIMMING POOL 20 ADMIN 21 CIAP (CLASSROOMS) 22 CEDES 23 DINING 24 DORMS 25 RESIDENCIAS III (DORM) 26 LA CHOZA 27 CULTURAL CENTER 28 ARCHITECTURE 29 PARKING GARAGE 30 TECNOLÓGICO STADIUM 31 WATER TREATMENT PLANT 32 CAMPUS NORTE (TEC SYSTEM ADMIN / LOTTERY) 33 LA CURVA GYM 34 GUARDERIA TEC (DAYCARE)
EL
17
CONCEPT
LA CARRETA
EXISTING BUILDINGS PROPOSED AND RENOVATED BUILDINGS KEY PROGRAM BUILDINGS 18
FRAMEWORK STRATEGIES
19
L IV E/W OR
K
LIVE/WORK
PROGRAM AND USES
LIVE/WORK
OFFICE
S FIE POR LD TS S
CO-WORK
SP L TIA
NANO
IDE
AL NTI
RES
C
SE CA ACADEMIC W HO EXPANSION
B
HU
COMMUNITY RESOURCE CENTER
E
TE
START-UP SHOWCASE
ENTRY PLAZA
CONFERENCE
LEARNING COMMONS
R&D
/ ON / ITI TOR R B I I H S E EX VI CENT
HOTEL
STUDENT HOUSING
DISTRICT PLAZA
S
OR ST
LEARNING COMMONS
BIO-TECH PLAZA
RESIDENTIAL RESIDENTIAL
NG
KI
R PA
FLEXIBLE
REC CENTER
R&D
FIELDS
B
SHOWCASE
OFFICE/COWORK
STADIUM
LA
CONFERENCE SHARED LAB
SEMINAR
NG
G
ED
R&D
LD
KI
RE CEDES
FIE
PA R
N
E SID
TS
BIO-TECH
IN US
AR
SH
O
H NT
E
RECTORIA
CAMPUS SPINE
R
OR
SH
E AS D C & OW
RETAIL / RESIDENTIAL
LIVE/WORK
LA CARRETA
MAIN LIBRARY
D TU
S
DINING
ACADEMIC
NEW DESIGN SCHOOL
H
CULTURAL CENTER EVENTS/ PROJECT CHALLENGES
ING
S OU
CULTURE SPORTS CENTER
SCHOOL OF ENGINEERING G
SIN
U HO
STUDENT CENTER
START-UPS CONFERENCE 20
FRAMEWORK STRATEGIES
OFFICE
21
OVERALL FRAMEWORK
15
13
14
14 12
9 16
10 4
8
5 5
1 LA CARRETA 2 LIBRARY 3 DESIGN CENTER 4 BIOTECH PLAZA 5 ACADEMIC EXPANSION 6 NON DENOMINATIONAL CHAPEL 7 RECTORÍA / CEDDIE 8 DISTRITO HUB 9 RESEARCH CLUSTER PLAZA 10 WELLNESS CENTER 11 CULTURAL EXPANSION 12 BORREGOS STADIUM 13 ESCAMILLA 14 SHARED PARKING GARAGE 15 CAMPUS NORTE LIVE/WORK/PLAY 16 COMMUNITY RESOURCE CENTER 17 PARQUE TECNOLÓGICO 18 PABELLÓN TEC
0
50
22
100
FRAMEWORK STRATEGIES
200m
7
1
11
5 11 6
2
3
17
18
23
OVERALL FRAMEWORK
24
FRAMEWORK STRATEGIES
25
INTEGRATED FRAMEWORK
15
13
14
14 12
9 16
10 4
8
5 5
1 LA CARRETA 2 LIBRARY 3 DESIGN CENTER 4 BIOTECH PLAZA 5 ACADEMIC EXPANSION 6 NON DENOMINATIONAL CHAPEL 7 RECTORÍA / CEDDIE 8 DISTRITO HUB 9 RESEARCH CLUSTER PLAZA 10 WELLNESS CENTER 11 CULTURAL EXPANSION 12 BORREGOS STADIUM 13 ESCAMILLA 14 SHARED PARKING GARAGE 15 CAMPUS NORTE LIVE/WORK/PLAY 16 COMMUNITY RESOURCE CENTER 17 PARQUE TECNOLÓGICO 18 PABELLÓN TEC
0
50
26
100
FRAMEWORK STRATEGIES
200m
7
1
11
5 11 6
2
3
17
18
27
LIVE / RESEARCH CLUSTER + THE ARMATURE
L
CE
AR EP
T IVA R P
30
LIVE/RESEARCH CLUSTER + ARMATURE
31
FRAMEWORK The proposed mixed-use research cluster in the area around CEDES is well connected to both the campus and the district. The pedestrian armature of the core campus is extended through the district, creating a porous and publicly accessible fabric of urban blocks. L
CE
A plaza at the heart of the new district will promote serendipitous encounters between residents, researchers and the university community.
AR EP
T IVA
PR
The district provides further connectivity to the surroundings and Paseo Tec complex. At the crossroads of the pedestrian flows, a new plaza will provide a heart for the area.
AN RI ST EL DE NN PE TU
LA CARRETA
32
LIVE/RESEARCH CLUSTER + ARMATURE
33
PASEO TEC
MASSING
CEL TE PAR A V I R P
CLUSTER PLAZA
F
HUB
EL
RCÍA RO
CO GA RANCIS
CIAP PLAZA
HOTEL AND CONFERENCE
ARCHITERTURE PLAZA
CONECTA TEC
LACARRETA
34
LIVE/RESEARCH CLUSTER + ARMATURE
35
ACTIVE GROUND LEVEL USES
PASEO TEC
CEL TE PAR A V I R P
CLUSTER PLAZA
CIAP PLAZA
HOTEL AND CONFERENCE
HUB
CONECTA TEC
RECTORIA
Retail, F+B and active uses frame the primary pedestrian and public space network, drawing the university community to the new district.
36
LIVE/RESEARCH CLUSTER + ARMATURE
LACARRETA
37
OVERALL FRAMEWORK Active ground level uses draw the community into the new district and frame the primary public space network. The Hub building strengthens the synergies between alumni in the business community and student and faculty entrepreneurs
PA R IVA TE PR
PR
IVA TE
PA R
CE
L
The district plaza allows for seamless pedestrian connectivity through the new district. It’s design relate to the programs around its edges, with a vegetated zone near the residential buildings, and a more flexible and active area that responds to the office and R+D uses.
CE L
PLAZA AND PROGRAM RELATIONSHIPS
38
LIVE/RESEARCH CLUSTER + ARMATURE
39
PARCEL LINE
PARCEL LINE
DISTRICT PLAZA EDGE
Min. 3m setback at ground and first level creates shaded arcade, allowing active uses to spill out towards plaza Setback Min. 9m above 13m height
PLAZA STREET SECTION
Sidewalk
Travel lanes
Bike
Sidewalk
5m
7m
2.5m
10m
A pedestrian friendly public realm will support the retail activities in the district. A wide sidewalk along these uses allows F+B functions to extend outdoors.
RESIDENTIAL 40
LIVE/RESEARCH CLUSTER + ARMATURE
41
A MIXED USE DISTRICT
PASEO TEC
8% 7%
INSTITUTIONAL
RETAIL
25%
*INCLUDES HUB, AND ACADEMIC SPACES IN STUDENT HOUSING
50% 10%
RESIDENTIAL
CEL TE PAR A V I R P
CLUSTER PLAZA
RESEARCH + OFFICE / HOTEL CO-WORK CONFERENCE
CIAP PLAZA HUB HOTEL AND CONFERENCE
CONECTA TEC
RECTORIA
LACARRETA
42
LIVE/RESEARCH CLUSTER + ARMATURE
43
44
LIVE/RESEARCH CLUSTER + ARMATURE
45
OVERALL FRAMEWORK
rage
g Ga
in Park
rive
vice d
g ser
dr op
-o
ff
in exist
serv existing ice d rive
PEDESTRIAN ARMATURE
46
LIVE/RESEARCH CLUSTER + ARMATURE
Connections to and from the campus are reinforced by the public space network. A pedestrian spine draws the community from the round-about entry plaza to the main district plaza. The new district is porous and allows for multiple destinations to be reached on foot.
VEHICULAR CIRCULATION Vehicular Circulation Service drive Underground Parking Access
The district is served by a series of new streets that extend the fabric of the neighborhood into the development. A consolidated vehicular drop-off serves all the office and R+D parcels without dominating the district plaza. The addition to the CEDES building fronts directly onto the plaza without interruption from vehicular traffic.
47
PARCEL LINE
Setback Min. 20m above 25m height
PARCEL LINE
PEDESTRIAN SPINE
Min. 3m setback at ground and first level creates shaded arcade, allowing active uses to spill out to the pedestrian spine.
Setback Min. 10m above 15m height
BUILDING HEIGHTS Tecnolรณgico de Monterrey, with an extraordinary and continuously expanding influence across the spectrum of Mexican education, is poised to become a leader in stimulating urban and economic regeneration and prove the power of Latin American universities as engines of innovation and entrepreneurship.
22F
m
ROW 21m
10
15F
in M M
in
3m
M
in
3m
M
in
RO W
20
21
m
m
PEDESTRIAN SPINE
BUILDING HEIGHTS Tecnolรณgico de Monterrey, with an extraordinary and continuously expanding influence across the spectrum of Mexican education, is poised to become a leader in stimulating urban and economic regeneration and prove the power of Latin American universities as engines of innovation and entrepreneurship.
RC1 48
LIVE/RESEARCH CLUSTER + ARMATURE
PEDESTRIAN SPINE
RC2 49
OVERALL FRAMEWORK
RECTORIA
BUILDING HEIGHTS
50
LIVE/RESEARCH CLUSTER + ARMATURE
The height profile of buildings respond to the scale of the core campus and Rectoria (highlighted) along Francisco Garcia Roel and gradually rises as it fronts the district plaza.
PRIMARY VIEWS
The height profile allows for privileged views south towards the Cerro de la Silla mountain range, visually connecting the district to its regional context.
51
54
LIVE/RESEARCH CLUSTER + ARMATURE
55
DISTRITO ARMATURE
NUEVO SUR
MIXED USE DEVELOPMENT
R+D / OFFICE /F+B
A key new element of the Master Plan update is a reinforced Av. del Estado - Av. Francisco GarcÃa Roel Av. Covarrubias corridor. A revised program strategy for this spine, named the Distrito Armature, will blur the boundaries between the campus and the district. The armature is a strategic component of the plan, allowing the Tec to reverse the current edge condition along its boundaries and projecting a new image of the university to the wider community. Ground-level uses have been carefully curated to showcase the research being done on campus, provide amenities that can be shared between the university and the neighborhood and to help activate the public realm.
CO-WORK / F+B / TEC HALL OF FAME STUDENT HOUSING
NEW STADIUM MARKET HOUSING / RETAIL / F+B
MARKET HOUSING / RETAIL / F+B
CO WORK
COMMUNITY RESOURCE CENTER
A new landscape strategy provides a better balance the vehicular traffic with pedestrian and bikes, creating an environment that will draw the university to the district and the community to the campus. Ultimately, the Armature creates a clear and focused framework for the first stage implementation of the Distrito projects by the Tec and the private sector, where the transformation of the district can be tested and be made visible.
TEC STORE / CAFE / COMMONS STUDENT HOUSING / RESTAURANT
ACADEMIC / SHOWCASE CONECTA TEC R+D / OFFICE / F+B
ACADEMIC EXPANSION
HUB
RESIDENTIAL / RETAIL
NANO / CAFE HOTEL + CONFERENCE
56
LIVE/RESEARCH CLUSTER + ARMATURE
57
58
LIVE/RESEARCH CLUSTER + ARMATURE
59
DISTRITO ARMATURE
PLAZA
The segment between the round-about and Jesus Cantu Leal is a critical part of the armature, where the Tec controls most of the parcels on both sides of the spine and can thus be very influential in the development of new buildings and the public realm.
PLAZA
T EN UD E ST LIF
More importantly, the Francisco Garcia Roel segment will be an essential connecting tissue between the core campus environment and the mixed-use research cluster to the north. The tec has the opportunity to transform the edge relationship of the campus and the community, providing an environment where the two converge and interact. Key programs such as the Conecta Tec, Distrito Hub, Tec Store, showcase spaces, as well as F+B uses will serve both the university and the larger community. A series of “wedge� and pocket plazas relate to the public program of buildings and allow for uses and activities to extend outdoors, creating a much more dynamic and complex edge condition. An entry-court adjacent to the academic expansion building relates to the primary pedestrian flow towards the mixed-use research district plaza to become a new gateway to the university.
WEDGE PLAZA
WEDGE PLAZA PLAZA
DISTRITO ARMATURE The Tec controls most of the parcels on both sides of the Armature between the round-about and Jesus Cantu Leal, allowing the university to influence future development and the quality of the public realm.
60
LIVE/RESEARCH CLUSTER + ARMATURE
61
RE-ENGAGING WITH THE DISTRITO AND TEC COMMUNITY
Visitor Center Showcase DistritoTec Exhibit
Plaza
On the campus side, new buildings will be engaging and transparent at the ground-level and will allow for greater porosity. Key programs such as the Conecta Tec, a visitor and alumni center will improve the arrival experience to the campus, and will include exhibit space for the Distrito Tec project. An academic expansion building will also provide showcase spaces for the research being undertaken in the university,
Accelerators
Events
Across the street, the Distrito Hub strengthens the synergies between the business community and student and faculty entrepreneurs.
Incubator Space
CONECTA TEC
L RO E CIA GA R
I
FR AN
CIS
CO
MN U L A
R
TE CEN
TUNN
EL
MEDIA
ER
E
LIVE/RESEARCH CLUSTER + ARMATURE
O
NAN
IN
OM C L E
62
Alumni Center
The Conecta Tec building combines uses that will improve the interface between the campus, the community and visitors.
ADM
W
Cafe / Restaurant
T CEN
TO R E
CTOR IA
63
DISTRITO ARMATURE
District Plaza
24/7
Wedge Plazas
Academic Expansion Tec21 pedagogical vision is expressed in the spatial configuration of study and research spaces
Showcase Nano building reinforces the street edge and projects to the community the research work of the university
Hotel + Conference
Mixed-Use District
Ensures the district plaza has adequate sun exposure
Compact urban development facilitates access to district amenities and promotes walkability
Are framed by active uses and create a respite from the busy street environment
Streetscape
An improved streetscape that promotes biking and walking, reduces carbon emissions, and activates the public realm
Skyline Transition
SK
YL
Research + Development
IN
E
Allied industries located adjacent to the university will further support the expansion of the Tec’s applied research capacity
Distrito Hub
Supports the Distrito’s innovation ecosystem with incubator spaces, areas for events and F+B to promote the interaction of the university community with venture capitalists and entrepreneurs
Provides a heart for the mixed-use district, with amenities for both employees and residents
Green Roofs Green roofs reduce stormwater runoff while providing pleasant exterior spaces
ood
Neighborh
za
District Pla pus
To Core Cam
BIKE
2m BIKE
6m lk Sidewa
14m es an Travel L
2m
6m lk Sidewa
F+B and Retail Uses Frame the street and wedge plazas, activating the public realm and drawing the university community outside the core campus
64
LIVE/RESEARCH CLUSTER + ARMATURE
65
66
LIVE/RESEARCH CLUSTER + ARMATURE
EW VI
EXISTING
67
FERNANDO GARCIA ROEL
68
LIVE/RESEARCH CLUSTER + ARMATURE
11m
2m
Travel lanes 14m
HUB
Bike
Sidewalk
Bike
CONECTA TEC
Sidewalk
2m
6m 69
THE DISTRITO HUB The expansion of the Tec as a center for research and innovation will rely on partnerships with leaders in the business community, many of whom are Tec alumni. To encourage these partnerships, the Master Plan proposes a Hub building on a highly visible site adjacent to the Rectoria and core campus, and linked directly to the cluster of R+D buildings and visible from Garza Sada. As in many innovation districts, the Hub will become a focal point for innovators, venture capitalists, entrepreneurs and the larger community. It will support an innovation ecosystem by providing formal and informal meeting and event spaces, a training center, a cafe and incubators. The Hub will be engage and strengthen the public realm of the armature and signal a new path for the development of the district. The images on this spread show a precedent for a similar initiative, District Hall in the Seaport District in Boston. A large and flexible space at the entry of the building offers free gathering spaces and wifi for anyone in the city, while meeting rooms and an auditorium can be reserved at subsidized rates. A restaurant with outdoor seating is a popular venue for happy hours and networking events.
DISTRICT HALL, BOSTON Flexible spaces can be used for individual and group work, as well as for larger events. Transparency and porosity help the building to engage with the street and the district.
70
LIVE/RESEARCH CLUSTER + ARMATURE
71
72
LIVE/RESEARCH CLUSTER + ARMATURE
73
TEC STORE + PLAZA At the critical intersection of Junco de la Vega and Francisco Garcia Roel, the Tec will project itself to the street creating a new entry to the campus. F+B and retail spaces are connected to a vibrant new public plaza will help activate the Armature and completely transform the relationship between the university and the surrounding community.
Transit Hub
Retail
Learning Commons
A new, shaded station consolidate stops for all Tec shuttles and public buses.
Distrito Cafe
Stores that are currently isolated within the campus will help activate the Armature and serve the Distrito community.
New collaboration spaces on the second level will expand the Tec’s offerings of informal study areas.
Plaza The new plaza will provide a vibrant public realm to students and the community. Large benches will allow users to sit in groups and engage with each other.
The cafe will activate the plaza and provide a much needed amenity to the Distrito.
A
X CH E
TE BIO
DEN
TEC O I B
RETA
ON
SI N A P
RESI
IL
GI O L NO
A NEW GATEWAY TO THE CAMPUS The Tec Store and Cafe address a key issue of the district, repairing the edge of the campus to be more welcoming and active, contributing to the vitality of its urban context.
TIAL
NG RNI LEA MONS COM
CA F
E F&B Co-Work
CO-W ORK
CIS CO GA RCI AR OE FR
f
of
p ro
/D
The new community facility will provide amenities for both the Tec and its neighbors, promoting meaningful interaction.
CO MM UN IT CE Y RE NT S ER OUR C
ub tH
si
an Tr
Social/Community Incubator
L
GA
A VE L E D O C JUN
AN
OPOFF
HUB / DR
E
TRANSIT
Supports the Distrito’s innovation ecosystem with incubator spaces and F+B, helping retain and attract a new generation of entrepreneurs to the area.
74
LIVE/RESEARCH CLUSTER + ARMATURE
75
76
LIVE/RESEARCH CLUSTER + ARMATURE
Travel lanes
6m
2m
14m
Bike
Sidewalk
Bike
FERNANDO GARCIA ROEL
2m
Sidewalk 8m
77
The Tec Store and Cafe will create a new gateway to the core campus and activate its edge along the Armature.
78
LIVE/RESEARCH CLUSTER + ARMATURE
EXISTING
VIEW
79
80
LIVE/RESEARCH CLUSTER + ARMATURE
81
LA CARRETA
82
LIVE/RESEARCH CLUSTER + ARMATURE
83
LUIS ELIZONDO NODE
RK
/WO
LIVE
LUIS ELIZONDO SPINE NC O
DE
LA
PARKING
JU
VE
PARKING
EU
COV ARR
UBI
ITY
AR OG
NI
GE
COMMUN
HOUSING / RETAIL
GA
The Master Plan update seeks to reverse this condition, reinforcing the pedestrian environment and creating a new public space that takes advantage of the flow of students and faculty to and from campus.
JESÚS CANTÚ LEAL
The Luis Elizondo gate and its immediate context have a weak public realm in spite of being a very popular entry point into the Campus. The Garza Sada overpass, with its dark and ambiguous spaces -known as Bajo Puente - also contribute to a perception of unsafety.
C0-WORK
C0-WORK
CO -W OR
AS
K
EL TEC STORE
DA
SA
ING
ZA
A
CI
R GA
RO
NANO
HUB
L
DE
LA
I
C AN
E
F CA
TE HO
O SC
HO
NC O
US
JU
FR
BIAS
VE
GA
G
IN
S OU
CONECTA TEC
H
TS
G
IN
EN
EV
COVA RRU
S OU
H
B
F+
CULTURE
O EVENTS CHALLENGES
CULTURE
ZA AR OG
NI GE
AV
E
EU
L
E .D
AD ST
DA SA B
LA
B FA
E
EL
LA GA VE
IS LU
CAFE
DE
I
N SO
O NC
DO
STUDENT CENTER
JU
IN
SP
E
F CA
86
LUIS ELIZONDO NODE
CE
FI
OF
87
LUIS ELIZONDO NODE The Luis Elizondo gate and its immediate context have a weak public realm in spite of being a very popular entry point into the Campus. The Garza Sada overpass, with its dark and ambiguous spaces -known as Bajo Puente - also contribute to a perception of unsafety. The Master Plan update seeks to reverse this condition, reinforcing the pedestrian environment and creating a new public space that takes advantage of the flow of students and faculty to and from campus.
88
LUIS ELIZONDO NODE
89
LA CARRETA
90
LUIS ELIZONDO NODE
91
LUIS ELIZONDO NODE
92
LUIS ELIZONDO NODE
93
LUIS ELIZONDO NODE
Will showcase academic and cultural activities on campus and in the Distrito.
Plaza A shaded plaza will preserve the existing trees and create an environment where students and the community can meet.
Skyline Transition Provides a balance between the scale of the Pabellon and the neighborhood.
Merchants
An area in the Bajo Puente will allow local food vendors and merchants to sell their products.
Student Center Currently operating at capacity, some of its functions will be moved to the new Pabellon Tec.
TO L URA CULT ER CENT
A new plaza that spans Av. Luis Elizondo will help tie together the different programs in the node, with an outdoor F+B kiosk, seating and vegetation. It is expected that the new event facilities in Pabellón Tec (that will expand the Tec’s conferencing capacity) will increase the pedestrian movement in the area even further. The existing stairwell access to the basement of the Student Center will receive a new multi-media skin that will showcase events and activities happening in the Tec and the Distrito (Media Cube.)
Events Spaces for conferences will expand the Tec’s ability to host events in the district.
Co-Work
EN
GIN
EE
RIN
G
Part of the new Pabellon Tec will be devoted to co-work spaces that will support the Distrito’s innovation ecosystem
R)
CO-WORK INCUBATOR
EN
TC
OFFICE
(ST
CAFE
CE
NT
RO
EN
ES
DE
TU
SIG
TE
NC
DIA
EN
NT
TE
IL
R
The area under the Garza Sada bridge will receive recreation and exercise equipment that will be shared with the Distrito, as well as an area that can support local food merchants. What is currently a bleak crossing from the Tecnológico neighborhood to the campus will be transformed into a vibrant and playful space.
UD
The Elizondo Node takes advantage of the existing pedestrian flow into the university to create a new nexus of activity at the southern edge of the core campus. The redevelopment of Pabellón Tec as an administrative, co-work and events facility will further increase the population of Tec employees and entrepreneurs in the area.
Media Cube
ELIZONDO PLAZA A pedestrian oriented public realm will tie together the uses in the new Pabellón Tec and the core campus
CAFE
LO B
BY
+R
EVENTS
eta
ilCAFE
CONFERENCE FACILITIES
aci ic F
bl Pu lity
ADA S A Z R A G UGENIO
AV. E
TALLATION
TEMPORARY ART INS
94
LUIS ELIZONDO NODE
EXISTING RETAIL
EXISTING RETAIL
TO IA O C LON ICO G Ó L TECNO
95
F+B
B
F+
BAJO PUENTE AND PLAZA A pedestrian friendly public realm will tie together the programs of the Elizondo Node and improve the edge condition of the core campus as it relates to the Distrito.
96
LUIS ELIZONDO NODE
IC L Y B PU ILIT C FA 97
VIE
W
LUIS ELIZONDO NODE The plaza and new uses will transform the southern edge of the core campus into a vibrant and dynamic environment.
98
LUIS ELIZONDO NODE
99
F+B
C
E
BAJO PUENTE The area under the Garza Sada bridge can become a playful and unique destination in the Distrito.
100
LUIS ELIZONDO NODE
ÓN L L
TE
W
NE
B F+
B PA
101
The combination of public art and local food will transform the Bajo Puente in a dynamic space. 102
LUIS ELIZONDO NODE
103
The Tec can also create a more permanent structure for F+B related uses. 104
LUIS ELIZONDO NODE
105
PRECEDENT IMAGES: A8ERNA, NETHERLANDS PRECEDENT IMAGERY PRECEDENT IMAGES: A8ERNA, NETHERLANDS
Retail uses help activate the space under a highway in the Dutch city of Zaanstad.
106
LUIS ELIZONDO NODE
107
PRECEDENT IMAGES: TORONTO UNDERPASS PARK
PRECEDENT IMAGERY
PRECEDENT IMAGES: TORONTO UNDERPASS PARK Public spaces with recreation facilities create an attraction for the community under a highway in Toronto, Canada.
108
LUIS ELIZONDO NODE
109
110
INTRODUCTION
111
112
INTRODUCTION
113
MIXED-USE SPORTS DISTRICT
CONCEPT DIAGRAM The relocation of the current stadium creates an opportunity for enhanced connectivity between Escamilla and the core campus, bringing recreation and the Mind, Body,Spirit philosophy - to the daily life of university and Distrito community. A mix of uses, that include residential, R+D, retail, culture and wellness (the new indoor recreation center), will transform how the Tec engages with the Distrito. A key new element in the Master Plan update was to accommodate changes to the new stadium design. A new strategy was conceived together with additional consultants to maintain the vision of the previous scheme while adding more parking capacity. The new concept pushes the stadium west and includes two new parking garages that will be wrapped with residential and ground-floor retail along Av. JesĂşs CantĂş Leal.
LA CARRETA
116
MIXED USE SPORTS DISTRICT
117
118
MIXED USE SPORTS DISTRICT
119
120
MIXED USE SPORTS DISTRICT
121
PROGRAM DISTRIBUTION
HOUSING RECREATION + STUDENT LIFE CULTURAL RETAIL/ F+B R&D / OFFICE CO-WORK 122
MIXED USE SPORTS DISTRICT
123
ESCAMILLA
124
MIXED USE SPORTS DISTRICT
125
AV. JUNCO DE LA VEGA A bold landscape strategy is critical to connecting the uses of the core campus to the larger district, and Av. Junco de la Vega is an important component of this vision. The plan proposes to significantly reduce the vehicular traffic by limiting access to the E1 parking garage and moving it’s main access to Covarrubias.
TEC STORE LEARNING COMMONS
A new transit hub next to the Wellness Center (previously on Francisco GarcĂa Roel) will provide a comfortable shaded environment and promote the use of alternative modes of transportation. At the intersection of Junco de la Vega and Luis Elizondo, a new hub of activity will promote culture and the arts in the Distrito. A new Cultural center will consolidate programs that are currently dispersed in the campus and make them more visible. With the construction of the new Wellness Center, the current Gymnasium can be converted to a flexible space that can hold Challenges and events tied to the Tec21 pedagogical vision.
126
MIXED USE SPORTS DISTRICT
127
CULTURAL NODE The new uses in the node will allow the Tec to reconfigure its edge condition, creating more active public space in the Distrito.
128
MIXED USE SPORTS DISTRICT
129
CULTURAL EXPANSION The Auditorio Luis Elizondo serves the Tec community as a cultural center, but is no longer adequate to support the range of cultural activities, extracurricular interests, and performances that characterize a vibrant university with a balanced focus on Mind, Body, and Spirit. The new cultural center adjacent to Luis Elizondo proposed in the Master Plan will house a range of activities reflecting student interests, such as video and photography, culinary arts, arts and crafts, and will be a major contribution to the quality of student life.
New Housing with reserved apartments for resident art fellows
Cafe / Restaurant Folklore Music Studios + Rehearsal Rooms Multi-Purpose Rooms Exhibit Space and Lounge 300 seat Performance Arts Auditorium
Consolidate programs that are dispersed on campus. Showcase work by emphasizing transparency along street edges • • • • •
Culinary arts Cafe Photography Craft + Fine Arts Administration
Auditorio Luis Elizondo Renovation of existing facilities 130
MIXED USE SPORTS DISTRICT
131
132
MIXED USE SPORTS DISTRICT
133
CAMPUS NORTE LIVE/WORK/PLAY
The current Campus Norte is an isolated, low density cluster of corporate Tec facilities that presents a remarkable potential for the transformation of the Distrito.
136
CAMPUS NORTE
137
138
CAMPUS NORTE
139
NEW FORMS OF LIVING The 2014 Master Plan envisioned Campus Norte as a long-term development opportunity, that could provide additional R+D spaces when other areas of the Distrito were fully developed and occupied. In the MP update workshop, the design team and advisors to the Tec proposed a departure from that strategy to accommodate additional housing opportunities that is better integrated with new forms of living. Campus Norte has the potential to become a forwardlooking neighborhood, where Live/Work spaces can help attract and retain young professionals and entrepreneurs in the Distrito. These future residents will have needs and demands that are different from the typical housing market, and where the university can have a leading role in influencing the development of new housing typologies. These include units with shared amenities, that support co-working activities and allow for an active use of ground-level spaces with incubators and start-ups. Its location in the district is favorable to protect it from rising rents that typically occur in innovation districts and make it challenging for the organic, spontaneous entrepreneurial environment to thrive. The study for a new Campus Norte included - as illustrated in the diagram below - land that is controlled by an outside partner and that was not available for consideration in 2014.
140
CAMPUS NORTE
141
142
CAMPUS NORTE
143
MIX OF USES The new Campus Norte has a greater emphasis on living spaces, while also retaining Tec administrative uses in a more vertical distribution. A new plaza engages and draws the community into the university environment visually and physically, creating a new heart for this area of the Distrito.
50%
LIVE / WORK
7%
RETAIL
30%
RESEARCH + OFFICE
*PARKING GARAGE 13%
LIVE / WORK RETAIL R&D / OFFICE
144
CAMPUS NORTE
145
146
CAMPUS NORTE
147
The plaza has great views to Escamilla and the Research Cluster, connecting Campus Norte to its larger whole.
148
CAMPUS NORTE
149
SECTION
ESCAMILLA
150
CAMPUS NORTE
JESUS CANTU LEAL
151
SECTION
PLAZA NORTE
152
CAMPUS NORTE
153
PRECEDENT IMAGERY LIVE/WORK Projects like TAXI in Denver are tapping into a new market, that provides more experimental working and housing arrangements for young professionals and entrepreneurs.
154
CAMPUS NORTE
155
PHASING AND DEVELOPMENT STRATEGY
DEVELOPMENT PARCELS + PARKING
CNR4 CNR2 503 spaces 3-level
CNR3 371 spaces 3-level
Core Campus
Armature
Mixed-Use Research Cluster
Escamilla
CNR1
AREA
90,650 m2
6,420 m2
43,890 m2
13,120 m2
1075 spaces 3-level
GFA
34,090 m2
38,300 m2
204,255 m2
25,590 m2
Campus Norte
Mixed-Used Sports Cluster
Pabellรณn
40,830 m
RC4
AREA GFA
24,560 m
2
2
110,505 m2 146,070 m2
ES4
622 spaces 5-level
Stadium
8,880 m
41,170 m2
RC3
45,240 m2
61,160 m2
471 spaces 3-level
2
ES5 RCH1-C
RCH1-B
ESCAMILLA CAMPUS NORTE
RC2
831 spaces 5-level
626 spaces 4-level
439 spaces 5-level
MIXED-USE RESEARCH CLUSTER
RC-IC
135 spaces 2-level
MUH6
STD3
326 spaces 3-level
73 spaces 2-level MUR2
CC-CIAP
340 spaces 3-level
MU-RC MUR1
142 spaces 1-level
CC BIO
CC BIO2
MUH4
MUH2
65 spaces 1-level
71 spaces 1-level MUH1
515 spaces 4-level
MU-Arts1
44 spaces 1-level
CC BS
CORE CAMPUS
110 spaces 2-level
MU-Arts2
143 spaces 2-level
CC GS 43 spaces 1-level
MUH3 76 spaces 1-level
332 spaces 3-level
CC CUL
AE 2
MIXED-USE SPORTS CLUSTER AVENIDA DEL ESTADO
MU-CRC
256 spaces 3-level AE 1
STADIUM
98 spaces 1-level
ES6
RCH1-A
RC1-A
STD4 671 spaces 5-level
140 spaces 3-level
102 spaces 2-level
RC1-B
STD1 STD2
61 spaces 3-level
199 spaces 2-level
RC-CEDES
CAMPUS NORTE EXTENSION
393 spaces 2-level
CC-LIB
CC-DC 343 spaces 2-level MUH 5
212 spaces 2-level
PABELLON
DISTRITO ZONES
PT 1 851 spaces 5-level
PT 2 131 spaces 5-level
158
PHASING AND DEVELOPMENT
159
INCUBATION STAGING
TRIGGERING REGENERATION
SPRINGBOARD APPROACH
PHASING GOALS
MARKET DEMAND + MP RESPONSE Focus on market demand opportunities that are consistent with goals of the Tec vision
The phasing strategy seeks to provide early on the necessary infrastructure to help incubate new businesses in the Distrito. After the initial catalytic investments, new initiatives should focus on providing growth opportunity for pioneer interests and capitalize on the success of the district.
QUICK WINS Focus on high-impact interventions in the early stages that can be quickly implemented INNOVATION ECOSYSTEM Provide support services for innovation and entrepreneurship that are enhanced at every phase of development BALANCED INVESTMENT Create a vibrant, 24/7 district that balances R+D, housing and retail amenities with a connected public realm >> concentrate, critical mass STRATEGIC PARKING STRATEGY Ensure every phase provides the necessary approval requirements by strategically sharing parking among components
SUPPORTING INNOVATION A strategic phasing approach will allow early investments to help catalyze businesses in the district. DIGITAL VENTURE CENTER TRAINING CENTER CREATIVE EXCHANGE LAB SOCIAL INCUBATOR
SMALL OFFICE ENTREPRENEURIAL LAUNCHPAD
HUB
LAB SHARED RESOURCES EVENT ROOM
OFFICE
EXHIBITION SPACE
MARKET SPACE FABRICATION LAB
PLAZA
PLAZA SHOWCASE CAFE/ RESTAURANT
CAFE/ RESTAURANT
1
3
1 2
160
PHASING AND DEVELOPMENT
INCUBATORS
The retrofit of campus housing for incubators can be a launchpad for new businesses at a very low cost
2
3
ACCELERATORS
GRADUATION
The Hub expands the innovation and entrepreneurial capacity of the Tec community, accelerating the growth of small ventures
Mid size office typology allows for successful businesses to “graduate”, and move to a more established work environment
161
EXISTING SURFACE PARKING CEDES
UNDER CONSTRUCTION
STUDENT HOUSING
CAMPUS NORTE
DINING
SCHOOL OF ARCHITECTURE
LA CUEVA
CIAP
BIOTECH
RECTORIA
CETEC
CARRETA UNDER CONSTRUCTION
STADIUM LIBRARY UNDER CONSTRUCTION GYMNASIUM
STUDENT CENTER
CULTURAL CENTER
PABELLÓN TEC
162
PHASING AND DEVELOPMENT
163
PHASE 0
DEVELOPMENT PHASING
PEDESTRIAN BRIDGE Street improvements will allow the Tec to demolish the existing pedestrian overpass
UNDER CONSTRUCTION
INCUBATOR Reuse the structure of the existing student housing
TP01 LA CARRETA
1 MAIN LIBRARY
2 RESIDENTIAL ACADEMIC STUDENT LIFE CULTURAL
PARKING
RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL
PHASE 0 Parcel ID
Area
1 CC-TEC
3450
2 CC-LIB
17000
TP01-A
12275
GFA
Required Parking Spaces
Underground Parking Levels
Proposed Parking Spaces
600 0
351
RENOVATION UNDER CONSTRUCTION
PHASING AND DEVELOPMENT
Area
GFA
Required Parking Spaces
351
PHASE PARKING
351
CUMMULATIVE
351
PHASE 1
164
Parcel ID
Excess/ Deficit
165
Underground Parking Levels
Proposed Parking Spaces
Excess/ Deficit
PHASE 1
DEVELOPMENT PHASING NANO Expands research activity and helps create new campus gateway
1
STUDENT HOUSING Balances uses in the research cluser
2
10
2 9
CIAP RENOVATION Plaza/ Tec Store (GL)/ Learning Common (2F)
3
4 5
6 PHASE 0 Parcel ID
CAFE
STREET IMPROVEMENT
Area STADIUM GFA
1 CC-TEC
3450
2 CC-LIB
17000
TP01-A
12275
7
Underground Parking Levels
Required Parking Spaces
600
Proposed Parking Spaces
Excess/ Deficit
TP01 0
351
8
351
PHASE PARKING
351
CUMMULATIVE
351 PARKING
PHASE 1 Parcel ID
Area
Required Parking Spaces
GFA
1 RCH1-C
3484
11,480
2 ES-1
1740
2,250
3 ES-2
320
260
RESIDENTIAL
4 ES-3
620
330
ACADEMIC
5 ES 5
710
STUDENT LIFE
6 ES 6
1634
11 TP02
CULTURAL RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL
7 STD 1
N/A
Underground Parking Levels 2
199
115
2,350
43
3
61
18
4,200
77
3
140
63
0
0
0
0
0
8 STD 3
1276
6,150
112
2
73
(39)
9 RC1-B
3070
11,750
213
5
439
226
10 CC-CIAP
6940
NA
48
0
0
(48)
11 CC-CP
1270
300
TP02-A
26870
0
768
768
TP01-AB
2675
0
(76)
(76)
Stadium Parking
(1221) PHASE PARKING
UNDER CONSTRUCTION
PHASING AND DEVELOPMENT
Excess/ Deficit
84
RENOVATION
166
Proposed Parking Spaces
CUMMULATIVE
156 167
PHASE 1B Required
(194)
Underground
Proposed
Excess/
PHASE 1B
DEVELOPMENT PHASING MARKET HOUSING Takes advantage of views to park and Cerro de la Silla
2 REC CENTER Indoor recreation facilities
1 2
Parcel ID
PHASE 0
Area
1 CC-TEC
3450
2 CC-LIB
17000
TP01-A
12275
Underground Parking Levels
Required Parking Spaces
GFA
Proposed Parking Spaces
Excess/ Deficit
600 0
351
351
PHASE PARKING
351
CUMMULATIVE
351
PHASE 1 Parcel ID
REC CENTER
Area
ACADEMIC STUDENT LIFE
199
115
2,350
43
3
61
18
4,200
77
3
140
63
0
0
0
0
0
11,480
2 ES-1
1740
2,250
3 ES-2
320
260
4 ES-3
620
330
5 ES 5
710
6 ES 6
1634 N/A
8 STD 3
1276
6,150
112
2
73
(39)
9 RC1-B
3070
11,750
213
5
439
226
10 CC-CIAP
6940
NA
48
0
0
(48)
11 CC-CP
1270
300
TP02-A
26870
0
768
768
TP01-AB
2675
0
(76)
(76)
Stadium Parking
(1221) PHASE PARKING
CULTURAL
CUMMULATIVE
RETAIL/ F+B HOTEL
OFFICE SPORT & RECREATIONAL
Parcel ID
Area
GFA
Required Parking Spaces
(194) 156 PARKING
PHASE 1B
CONFERENCE/ SHOWROOM R&D
Excess/ Deficit
2
3484
TP02
RESIDENTIAL
Proposed Parking Spaces
TP01 84
1 RCH1-C
7 STD 1
Underground Parking Levels
Required Parking Spaces
GFA
Underground Parking Levels
Proposed Parking Spaces
Excess/ Deficit
1 MU-RC
9910
11,000
97
1
142
45
2 MUH6
3800
25,500
319
3
326
7
RENOVATION
PHASE PARKING CUMMULATIVE
UNDER CONSTRUCTION 168
Parcel ID
Area
GFA
Required
208 169
PHASE 2
PHASING AND DEVELOPMENT
51
Underground
Proposed
Excess/
PHASE 0 Parcel ID
PHASE 2
DEVELOPMENT PHASING 1
HOTEL + CONFERENCE Expands conferencing and hospitality capacity of the district.
Area
1 CC-TEC
3450
2 CC-LIB
17000
TP01-A
12275
Underground Parking Levels
Required Parking Spaces
GFA
Proposed Parking Spaces
Excess/ Deficit
600 0
351
351
PHASE PARKING
351
CUMMULATIVE
351
PHASE 1 Parcel ID
STREET IMPROVEMENT
Area
1 RCH1-C
3484
11,480
2 ES-1
1740
2,250
3 ES-2
320
260
4 ES-3
620
330
5 ES 5
710
6 ES 6
1634
7 STD 1
Underground Parking Levels
Required Parking Spaces
GFA
Proposed Parking Spaces
Excess/ Deficit
84
2
199
115
2,350
43
3
61
18
4,200
77
3
140
63
0
0
0
0
0
N/A
8 STD 3
1276
6,150
112
2
73
(39)
9 RC1-B
3070
11,750
213
5
439
226
10 CC-CIAP
6940
NA
48
0
0
(48)
11 CC-CP
1270
300 0
768
768
0
(76)
(76)
TP02-A 26870 CULTURAL EXPANSION 2675 A newTP01-AB cultural center and student Stadium Parking housing (with student life uses in the ground level) will enhance the cultural experience in the district.
(1221) PHASE PARKING
(194)
CUMMULATIVE
156
PHASE 1B
2
ParcelTP02 ID
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 MU-RC
9910
11,000
97
1
142
45
2 MUH6
33800
25,500
319
3
326
7
PHASE PARKING
RESIDENTIAL
51
CUMMULATIVE
ACADEMIC
208
STUDENT LIFE CULTURAL RETAIL/ F+B
Parcel ID
HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL RENOVATION UNDER CONSTRUCTION
PARKING
PHASE 2
PLAZA + PABELLON Investments in the public realm and ground level of Pabellรณn Tec
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 AE 1
4505
33,000
359
4
515
2 MU Arts 1
2503
7,500
66
0
0
3 MU Arts 2
2500
9,600
63
2
143
TP02-AB
4920
0
(141)
MU Arts 2 Loss
80 (141)
PHASE PARKING
(65)
CUMMULATIVE
142 171
PHASE 3
PHASING AND DEVELOPMENT
Area
(66)
(95)
170
Parcel ID
156
GFA
Required
Underground
Proposed
Excess/
PHASE 3
DEVELOPMENT PHASING
2 ES-1
1740
2,250
3 ES-2
320
260
4 ES-3
620
330
5 ES 5
710
2,350
43
3
61
18
6 ES 6
1634
4,200
77
3
140
63
0
0
0
0
0
7 STD 1
3 1 HUB
Support services for entrepreneurial activity
PARKING GARAGE Shared parking facility reduces development cost and allows for greater density along the armature
N/A
8 STD 3
1276
6,150
112
2
73
(39)
9 RC1-B
3070
11,750
213
5
439
226
10 CC-CIAP
6940
NA
48
0
0
(48)
11 CC-CP
1270
300
TP02-A
26870
0
768
768
TP01-AB
2675
0
(76)
(76)
Stadium Parking
(1221) PHASE PARKING
4
(194)
CUMMULATIVE
156
PHASE 1B Parcel ID
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 MU-RC
9910
11,000
97
1
142
45
2 MUH6
3800
25,500
319
3
326
7
PHASE PARKING
51
CUMMULATIVE
208
PHASE 2 Parcel ID
2 MIXED USE CORNER Helps transform the roundabout
RESIDENTIAL ACADEMIC STUDENT LIFE CULTURAL RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 AE 1
4505
33,000
359
4
515
2 MU Arts 1
2503
7,500
66
0
0
3 MU Arts 2
2500
9,600
63
2
143
TP02-AB
4920
0
(141)
156 (66) 80 (141)
MU Arts 2 Loss
(95)
5
PHASE PARKING
(65)
CUMMULATIVE
142 PARKING
PHASE 3
DESIGN CENTER Allows for the conversion of the current architecture school.
Parcel ID
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 RC-IC
1280
5,200
46
0
0
(46)
2 AE 2
1920
5,300
78
2
110
31
3 ES 4
8100
16,200
87
2
393
307
4 STD 2
3438
21,200
272
1
98
(174)
5 CC-DC
8000
8,000
86
2
343
257
ES 4 Parking
(184)
STD 2 Loss
(142) PHASE PARKING
RENOVATION
CUMMULATIVE
UNDER CONSTRUCTION
PHASE 4
172
PHASING AND DEVELOPMENT
Parcel ID
Area
GFA
Required Parking Spaces
49 192
173
Underground Parking Levels
Proposed Parking Spaces
Excess/ Deficit
Stadium Parking
(1221) PHASE PARKING
(194)
CUMMULATIVE
PHASE 4
156
PHASE 1B Parcel ID
DEVELOPMENT PHASING
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 MU-RC
9910
11,000
97
1
142
45
2 MUH6
3800
25,500
319
3
326
7
PHASE PARKING
51
CUMMULATIVE
TP05
208
PHASE 2 Parcel ID
TP04
5
TP03
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 AE 1
4505
33,000
359
4
2 MU Arts 1
2503
7,500
66
0
0
3 MU Arts 2
2500
9,600
63
2
143
TP02-AB
4920
0
515
(141)
MU Arts 2 Loss
3 LAB +OFFICE Partnerships in Biotech
4
(65)
CUMMULATIVE
142
Parcel ID
SCHOOL OF ARCHITECTURE
Area
GFA
Underground Parking Levels
Required Parking Spaces
1 RC-IC
1280
5,200
46
2 AE 2
1920
5,300
78
3 ES 4
8100
16,200
87
4 STD 2
3438
21,200
272
5 CC-DC
8000
8,000
86
9
Proposed Parking Spaces
Excess/ Deficit
0
0
2
110
31
2
393
307
1
98
(174)
2
343
257 (184)
STD 2 Loss
(142)
Parcel ID
RESIDENTIAL ACADEMIC
RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL
CULTURAL CENTER
49
CUMMULATIVE
Area
GFA
Required Parking Spaces
Underground Parking Levels
192
PARKING Excess/ Deficit
5960
39,000
705
5
851
146
2 PT 2
920
6,240
109
5
131
22
3 RC02
5474
31,350
564
4
626
62
4 RCH1-A
2362
8,500
62
2
135
73
5 RCH1-B
1784
5,625
40
2
102
62
6 MUR2
3969
27,000
474
3
340
(134)
7 MUH3
2649
8,200
63
1
76
13
8 MU-CRC
2720
3,420
30
0
0
9 STD 4
7860
33,810
144
5
671
(30) 528
TP03
5820
0
166
166
TP01-B
9600
0
(274)
(274)
TP02-BC
8130
0
(232)
RC Plaza Parking PHASE PARKING CUMMULATIVE
2
PHASE 5
174
PHASING AND DEVELOPMENT
Proposed Parking Spaces
1 PT 1
RENOVATION UNDER CONSTRUCTION
(46)
ES 4 Parking
PHASE 4
PABELLÓN Office swing space
(141)
PHASE 3
7
1
80
PHASE PARKING
PHASE PARKING
CULTURAL
(66)
(95)
8
6
STUDENT LIFE
156
Parcel ID
Area
GFA
Required Parking Spaces
Underground Parking Levels
Proposed Parking Spaces
(232) (131) 271 462
175
Excess/ Deficit
PHASE 5
PHASE PARKING
(65)
CUMMULATIVE
142
PHASE 3 Parcel ID
DEVELOPMENT PHASING
4
CEDES Renovation creates new front on district plaza and improves access to building
1
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 RC-IC
1280
5,200
46
0
0
(46)
2 AE 2
1920
5,300
78
2
110
31
3 ES 4
8100
16,200
87
2
393
307
4 STD 2
3438
21,200
272
1
98
(174)
5 CC-DC
8000
8,000
86
2
343
257
ES 4 Parking
(184)
STD 2 Loss
(142)
3
PHASE PARKING
49
CUMMULATIVE
2
192
PHASE 4 Parcel ID
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 PT 1
5960
39,000
705
5
851
146
2 PT 2
920
6,240
109
5
131
22
3 RC02
5474
31,350
564
4
626
62
4 RCH1-A
2362
8,500
62
2
135
73
5 RCH1-B
1784
5,625
40
2
102
62
6 MUR2
3969
27,000
474
3
340
(134)
7 MUH3
2649
8,200
63
1
76
13
8 MU-CRC
2720
3,420
30
0
0
(30)
9 STD 4
7860
33,810
144
5
671
TP03
5820
0
166
166
TP01-B
9600
0
(274)
(274)
TP02-BC
8130
0
(232)
(232)
RC Plaza Parking
(131) 271
PHASE PARKING
462
CUMMULATIVE RESIDENTIAL ACADEMIC STUDENT LIFE CULTURAL RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE
528
PARKING
PHASE 5 Parcel ID
Area
GFA
Required Parking Spaces
Underground Parking Levels
Proposed Parking Spaces
Excess/ Deficit
1 RC03
5500
37,200
476
3
471
(4)
2 RC1-A
5820
50,100
899
5
831
(68)
10765
5,880
102
0
0
(102)
4 RC04
4356
30,050
398
5
622
TP03
5820
0
(166)
(166)
TP04
5500
0
(157)
(157)
TP05
4355
0
(124)
(124)
3 RC-CEDES
SPORT & RECREATIONAL
PHASE PARKING
RENOVATION
CUMMULATIVE
224
(398) 64
UNDER CONSTRUCTION
PHASE 5B
176
PHASING AND DEVELOPMENT
Parcel ID
Area
GFA
Required Parking Spaces
Underground Parking Levels
Proposed Parking Spaces
177
Excess/ Deficit
CUMMULATIVE
192
PHASE 4
PHASE 5B
Parcel ID
Area
1 PT 1
DEVELOPMENT PHASING
5960
GFA
Underground Parking Levels
Required Parking Spaces
39,000
Proposed Parking Spaces
Excess/ Deficit
705
5
851
146
109
5
131
22
4
626
62
62
2
135
73
40
2
102
62
3
340
(134)
1
76
13 (30)
5 RCH1-B
CAMPUS NORTE 920 6,240 Provides a mix of 5474 31,350 office,8,500 live/work and 2362 housing. 1784 student 5,625
6 MUR2
3969
27,000
474
7 MUH3
2649
8,200
63
8 MU-CRC
2720
3,420
30
0
0
9 STD 4
7860
33,810
144
5
671
2 PT 2 3 RC02 4 RCH1-A
9
564
8
7
528
TP03
5820
0
166
166
TP01-B
9600
0
(274)
(274)
TP02-BC
8130
0
(232)
(232)
RC Plaza Parking
6
(131) 271
PHASE PARKING CUMMULATIVE
462
PHASE 5 Parcel ID
Area
3
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 RC03
5500
37,200
476
3
471
(4)
2 RC1-A
5820
50,100
899
5
831
(68)
10765
5,880
102
0
0
(102)
4 RC04
4356
30,050
398
5
622
TP03
5820
0
(166)
(166)
TP04
5500
0
(157)
(157)
TP05
4355
0
(124)
(124)
3 RC-CEDES
5
GFA
PHASE PARKING
224
(398)
CUMMULATIVE
2 RESIDENTIAL ACADEMIC
1
Parcel ID
64 PARKING
PHASE 5B
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 MUH1
2259
6,900
52
1
65
12
STUDENT LIFE
2 MUH2
2472
7,400
56
1
71
15
CULTURAL
3 MUH4
2060
9,850
70
1
59
(12)
RETAIL/ F+B
4 MUH5
3714
9,900
139
2
212
73
HOTEL
5 MUR1
3878
19,800
346
3
332
(14)
CONFERENCE/ SHOWROOM
6 CNR1
12540
61,500
759
3
1075
316
R&D
7 CNR2
5870
23,350
308
3
503
195
8 CNR3
4328
20,680
288
3
371
83
9 CNR4
1871
4,975
65
0
0
(65)
(395)
(395)
OFFICE SPORT & RECREATIONAL RENOVATION UNDER CONSTRUCTION
4
TP02-C
13820
0
PHASE PARKING
209
CUMMULATIVE
274
178
PHASING AND DEVELOPMENT
179
PHASE 6-7 Required
Underground
Proposed
Excess/
9 STD 4
PHASE 6-7
7860
33,810
144
5
671
528
TP03
5820
0
166
166
TP01-B
9600
0
(274)
(274)
TP02-BC
8130
0
(232)
(232)
RC Plaza Parking
(131) 271
PHASE PARKING
DEVELOPMENT PHASING
CUMMULATIVE
462
PHASE 5 Parcel ID
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 RC03
5500
37,200
476
3
471
(4)
2 RC1-A
5820
50,100
899
5
831
(68)
10765
5,880
102
0
0
(102)
4 RC04
4356
30,050
398
5
622
TP03
5820
0
(166)
(166)
TP04
5500
0
(157)
(157)
TP05
4355
0
(124)
(124)
3 RC-CEDES
PHASE PARKING
224
(398)
CUMMULATIVE
5
PHASE 5B
1
Parcel ID
ACADEMIC EXPANSION
3
64
2
ACADEMIC EXPANSION
4
Area
GFA
Underground Parking Levels
Required Parking Spaces
Proposed Parking Spaces
Excess/ Deficit
1 MUH1
2259
6,900
52
1
65
12
2 MUH2
2472
7,400
56
1
71
15
3 MUH4
2060
9,850
70
1
59
(12)
4 MUH5
3714
9,900
139
2
212
73
5 MUR1
3878
19,800
346
3
332
(14)
6 CNR1
12540
61,500
759
3
1075
316
7 CNR2
5870
23,350
308
3
503
195
8 CNR3
4328
20,680
288
3
371
83
9 CNR4
1871
4,975
65
0
0
(65)
(395)
(395)
TP02-C
13820
0
RESIDENTIAL
PHASE PARKING
209
CUMMULATIVE
274
ACADEMIC STUDENT LIFE CULTURAL RETAIL/ F+B HOTEL CONFERENCE/ SHOWROOM R&D OFFICE SPORT & RECREATIONAL RENOVATION UNDER CONSTRUCTION
PARKING
PHASE 6-7 Parcel ID
Area
GFA
Required Parking Spaces
Underground Parking Levels
Proposed Parking Spaces
1 CC-CUL
1210
3,000
26
0
0
(26)
2 CC-BT2
2300
5,500
59
0
0
(59)
3 CC-GS
1500
1,890
20
1
43
23
4 CC-BS
3530
6,600
71
0
0
(71)
5 CC-BIO
2990
8,200
93
3
256
CC-GS Loss
13820
0
163 (50)
PHASE PARKING
(20)
CUMMULATIVE
253
180
PHASING AND DEVELOPMENT
Excess/ Deficit
181
TOTAL PROPOSED PARKING
10,569
PHASE PARKING
51
208
PHASE 2 Parcel ID AE 1 MU Arts 1 MU Arts 2
DETAILED PHASING STRATEGY
TP02-AB MU Arts 2 Loss
Area 4505 2503 2500 4920
GFA 33,000 7,500 9,600
Required Parking Spaces
359 66 63 0
Parking Spaces per level
129 72 71
Required Parking Levels
Parking Levels 2.8 0.9 0.9
4 0 2
Proposed Parking Spaces
515 0 143 (141)
PHASE PARKING
Parcel ID
Area
CC-TEC CC-LIB
3450 17000 12275
TP01-A
GFA 600
Required Parking Spaces
Parking Spaces per level
Required Parking Levels
Proposed Parking Spaces
Parking Levels
0
351 PHASE PARKING
PHASE 1 Parcel ID
Area 3484 1740 320 620 710 1634 N/A
TP02-A TP01-AB
1276 3070 6940 1270 26870 2675
GFA 11,480 2,250 260 330 2,350 4,200 0 6,150 11,750 NA 300
Required Parking Spaces
84
Parking Spaces per level
100
Required Parking Levels
Parking Levels 0.8
2
2.1 1.7 0.0 3.1 2.4 0.0
3 3 0 2 5 0
Excess/Deficit
Cummulative
Proposed Parking Spaces
Parcel ID
351 351
Excess/Deficit
199
115
61 140 0 73 439 0
18 63 0 (39) 226 (48)
768 (76)
768 (76) (1221)
351
RC-IC AE 2 ES 4 STD 2 CC-DC
ES 4 Parking Loss STD 2 Loss
20 47 0 36 88 198
0 0
PHASE PARKING
Area 1280 1920 8100 3438 8000
GFA 5,200 5,300 16,200 21,200 8,000
Required Parking Spaces
46 78 87 272 86
Parking Spaces per level
37 55 231 98 229
Required Parking Levels
Parking Levels 1.3 1.4 0.4 2.8 0.4
0 2 2 1 2
PT 1 PT 2 RC02 RCH1-A RCH1-B MUR2 MUH3 MU-CRC STD 4
(194)
156
Area 9910 3800
GFA 11,000 25,500
97 319
Parking Spaces per level
283 109
Required Parking Levels
Parking Levels 0.3 2.9
1 3
Proposed Parking Spaces
142 326
Excess/Deficit
TP02-AB MU Arts 2 Loss
Area 4505 2503 2500 4920
GFA 33,000 7,500 9,600
Required Parking Spaces
359 66 63 0
Parking Spaces per level
129 72 71
Required Parking Levels
Parking Levels 2.8 0.9 0.9
4 0 2
Proposed Parking Spaces
515 0 143 (141)
Excess/Deficit
TP03 TP01-B TP02-BC RC Plaza Loss
Parcel ID 208
RC-IC AE 2 ES 4 STD 2 CC-DC
ES 4 Parking Loss STD 2 Loss
1280 1920 8100 3438 8000
GFA 5,200 5,300 16,200 21,200 8,000
Required Parking Spaces
46 78 87 272 86
Parking Spaces per level
37 55 231 98 229
Required Parking Levels
Parking Levels
156 (66) 80 (141) (95)
1.3 1.4 0.4 2.8 0.4
0 2 2 1 2
0 110 393 98 343
PHASE PARKING
Excess/Deficit
Cummulative
(46) 31 307 (174) 257 (184) (142) 49
Area 5960 920 5474 2362 1784 3969 2649 2720 7860 5820 9600 8130
GFA 39,000 6,240 31,350 8,500 5,625 27,000 8,200 3,420 33,810
Required Parking Spaces
705 109 564 62 40 474 63 30 144 0 0 0
Parking Spaces per level
170 26 156 67 51 113 76 78 143
Required Parking Levels
Parking Levels 4.1 4.2 3.6 0.9 0.8 4.2 0.8 0.4 1.0
5 5 4 2 2 3 1 0 5
Proposed Parking Spaces
851 131 626 135 102 340 76 0 671 166 (274) (232)
192
Excess/Deficit
Cummulative
146 22 62 73 62 (134) 13 (30) 528 166 (274) (232) (131) 271
Area 5500 5820 10765 4356 5820 5500 4355
GFA 37,200 50,100 5,880 30,050
Required Parking Spaces
476 899 102 398 0 0 0
Parking Spaces per level
157 166 308 124
Required Parking Levels
Parking Levels 3.0 5.4 0.3 3.2
3 5 0 5
Proposed Parking Spaces
471 831 0 622 (166) (157) (124)
PHASE PARKING
462
Excess/Deficit
Cummulative
(4) (68) (102) 224 (166) (157) (124) (398)
64
PHASE 5B
(65)
Proposed Parking Spaces
RC03 RC1-A RC-CEDES RC04
TP03 TP04 TP05
Cummulative
142
Parcel ID MUH1 MUH2 MUH4 MUH5 MUR1 CNR1 CNR2 CNR3 CNR4
PHASE 3 Area
Excess/Deficit
PHASE 5
51
PHASE PARKING
Parcel ID
0 110 393 98 343
Cummulative
45 7
PHASE 2 AE 1 MU Arts 1 MU Arts 2
Proposed Parking Spaces
PHASE PARKING
Required Parking Spaces
PHASE PARKING
Parcel ID
142
PHASE 4
PHASE 1B Parcel ID
(65)
PHASE PARKING
Cummulative
Parcel ID 43 77 0 112 213 48
Statium Parking Loss
MU-RC MUH6
Cummulative
156 (66) 80 (141) (95)
PHASE 3
PHASE 0
RCH1-C ES-1 ES-2 ES-3 ES 5 ES 6 STD 1 STD 3 RC1-B CC-CIAP CC-CP
Excess/Deficit
Cummulative
(46) 31 307 (174) 257 (184) (142)
TP02-C
Area 2259 2472 2060 3714 3878 12540 5870 4328 1871 13820
GFA 6,900 7,400 9,850 9,900 19,800 61,500 23,350 20,680 4,975
Required Parking Spaces
52 56 70 139 346 759 308 288 65 0
Parking Spaces per level
65 71 59 106 111 358 168 124 53
Required Parking Levels
Parking Levels
0.8 0.8 1.2 1.3 3.1 2.1 1.8 2.3 1.2
1 1 1 2 3 3 3 3 0
Proposed Parking Spaces
65 71 59 212 332 1075 503 371 0 (395)
PHASE PARKING
49
Excess/Deficit
Cummulative
12 15 (12) 73 (14) 316 195 83 (65) (395) 209
274
192
PHASE 6-7 PHASE 4 Parcel ID PT 1 PT 2 RC02 RCH1-A RCH1-B MUR2 MUH3 MU-CRC STD 4
TP03 TP01-B TP02-BC RC Plaza Loss
Area 5960 920 5474 2362 1784 3969 2649 2720 7860 5820 9600 8130
GFA 39,000 6,240 31,350 8,500 5,625 27,000 8,200 3,420 33,810
Required Parking Spaces
705 109 564 62 40 474 63 30 144 0 0 0
Parking Spaces per level
170 26 156 67 51 113 76 78 143
Required Parking Levels
Parking Levels 4.1 4.2 3.6 0.9 0.8 4.2 0.8 0.4 1.0
5 5 4 2 2 3 1 0 5
Proposed Parking Spaces
851 131 626 135 102 340 76 0 671 166 (274) (232)
PHASE PARKING
Parcel ID Excess/Deficit
Cummulative
CC-CUL CC-BIO CC-BT2 CC-GS CC-BS
146 22 62 73 62 (134) 13 (30) 528 166 (274) (232) (131)
CC-GS Loss
Area 1210 2990 2300 1500 3530 13820
GFA 3,000 8,200 5,500 1,890 6,600
Required Parking Spaces
26 93 59 20 71 0
Parking Spaces per level
35 85 66 43 101
Required Parking Levels
Parking Levels 0.8 1.1 0.0 0.5 1
0 3 0 1 0
Proposed Parking Spaces
0 256 0 43 0
PHASE PARKING
Excess/Deficit
(20)
TOTAL PROPOSED PARKING
271
462
Cummulative
(26) 163 (59) 23 (71) (50)
CUMMULATIVE PARKING EXCESS TOTAL GFA TOTAL AREA
253
10,825 253 658,090 176,411
PHASE 5 Parcel ID
182
Area
RC03 5500 PHASING AND DEVELOPMENT RC1-A 5820 RC-CEDES 10765 RC04 4356
GFA 37,200 50,100 5,880 30,050
Required Parking Spaces
476 899 102 398
Parking Spaces per level
157 166 308 124
Required Parking Levels
Parking Levels 3.0 5.4 0.3 3.2
3 5 0 5
Proposed Parking Spaces
471 831 0 622
Excess/Deficit (4) (68) (102) 224
Cummulative
183
MU Arts 2
Cultural , Residential
2,500
2500
9,600
3.8
2,093
84%
63
71
0.9
2
MU-CRC
Community Resource Center
2,720
2720
3,420
3,420
1.3
2,600
96%
30
78
0.4
0
0
MU-RC
Recreation Center
9,910
9910 42,434
11,000
11,000
1.1
8,000
81%
97 1,776
283
0.3
1
142 1,765
TOTAL
Plan 2016
ion
e/r R&D
Others (Parking Garage, etc)
Retail
58,550
3,300
47,800
2,300
10,750
1,000
29,650
1,700 2,600
20,000
2,000 8,050
5,200 1,000 Hub
600
B
800
12,480 ,800 1% 52%
13,350 100% 8%
5,800
ion
Others
Retail (Parking Garage, etc)
78%
5,746Residential,75% Retail, Academic A
1,350
e/r R&D
RCH1 3.4
1,000
4,280
46
1,280
186
7,630
PARCEL ID 62
Institution/ FAR PARCEL COV. ID Culture (M2) Academic
23,700
1,650
MUR2 6.8 1,650
3,335Office, Lab,84% Research, Retail
3,969
1,200 200
ion e/r R&D
30,590 20,700 9,890
4,220
ion e/r R&D
5,500
ion
e/r R&D
Others (Parking Garage, etc)
Retail
2,330 15,000 900 1,430 15000 2,590 1,750 830 1,460 475
Others (Parking Garage, etc)
Retail
1,600 650 2050 23,540
Others (Parking Garage, etc)
Retail
500 1,500 0
ion
e/r R&D
2,100 3,550
ion e/r R&D
,800
ion
e/r R&D
26,000 ,000 5,300
Others (Parking Garage, etc)
Retail
2,700 10,800 250 650
Others (Parking Garage, etc)
Retail
6,000 1,500
Others (Parking Garage, etc)
Retail
6,000 470
25,605 5,746 0.9
PROGRAM 0.98,500 67 2362 0.85,625 51 1784
78% 0
0
46
22,655436 186 PARCEL 7,500 135 62
75% 2
USES 2 2
5,025 102 10,130199
AREA 40
(46)
37 250PARKING 2,950 218 73 1,000 67 AREA 62 600 51
1.3 0.9 0.9
Student Housing
30,590 20,700 9,890
0.8
2
474
19,800 5.1 3,310 3.1 111 3878 PROGRAM 27,000 6.8 3,335 4.2 113 3969
3 85% USES
332
346 16,500
AREA 340 474 23,700
3 84%
(14) 1,650 111 AREA (134) 1,650 113
Proposed Hotel Parking Spaces
20,760 1270 15,760 831 5,000 439 15,000 626 4,500 471
Convention Others Excess/Deficit(Parking Garage, etc) Center
158
102
B C D CNR2 A B CNR3 4.8 CNR4 2.7 TOTAL
Office, Lab, Research, Retail Residential, Retail Parking Garage
206 165 0 PARCEL308 ID 229 2,875Residential,86% Retail ES-1 79 838Residential,75% Retail 288 3,126Office, Lab,72% Research, Retail ES-2 65 902Office, Lab,48% Research, Retail ES-3 1,420
1770 11,320 3535 13,580 13,580 97 3390 5 0.0 15,000 PROGRAM 168 5870 320,760 1.8 23,350 USES 3360 3,360 2,875 86% 15,760 Retail, Athletic 2510 1,110Soccer Stands, 838 75% 5,000 124 4328 315,000 4,328Baseball 4.8 3,126 2.3 72% 20,680 Stands, Retail, Athletic 0 4,500 1,871 2.753 1871 1.2 902 48% 4,975 Softball Stands, Retail, Athletic 24,609 110,505
15000
206 9,890 1,430 165 PARCEL 436 0 97 436PARKING 503 308 168 196 2,590 AREA AREA 229 1,750 79 1,740 830 1740 371 288 4,220 124 320 320 83 1,460 0 65 53 (65) 475 620 620529 1,949 1,420
(4)
3
Residential 332
4.2 1,650
3
340
GFA
5 3
STD 4 TOTAL
Parking Garage, Residential, Retail
Institution/ FAR PARCEL COV. ID Culture (M2) Academic
CC-CM NA CC-TEC NA CC-LIB NA CC-BIO 2.7 7,700 CC-BT2 2.4 5,500 CC-CIAP NA 1,500 CC-BS 1.9 6,600 CC-CP 0.2 CC-DC 1.0 8,000 CC-A4 NA CC-GS 1.3 1,890 CC-LE NA CC-CUL NA TOTAL
143 7860 12,574
1.0 33,810 61,160
5
8220
671 144 843 528
PARCEL
528 315
1.0
143 2050
5
PARKING
58920610 20,610NA 20,610 NA NA Hotel & Convention CenterNA 3,450 NA99 3450 3,450600 across NA the 48617000 17,000NA 17,000Retail+Residential NA 3 2,990 2.785 2990 2,100 1.18,200 70% 2,300 2.466 2300 1,400 0.95,500 61%0 198 6940 6,940 NA 450NA NA 101 3530 3,530 1.9 1,750 0.76,600 50%0 1,270 0.236 1270 300300 24% PROGRAM USES 229 8000 2 8,000 1.0 2,900 0.48,000 36% 52418350 18,350 NA NA NA 1 1,500Pabellon 1.343 1500 1,000 0.5 67% 1,890 Tec 100 3500 3,500 NA 2,305NA NA Tec 2 0.83,000 0 1,210Pabellon NA35 1210 NA 90,650 34,090
Hotel
0 4505 4,505 00 589 0 99 0 1,920 0 486 1920 256 93 856,425 163 500 0 59 66 (59) 48 198 (48) 1,500 0 71 101 (71) 0 PARCEL 0 36 0 PARKING 343 AREA 86 229 257 AREA 0 524 0 43 20 5,960 23 43 5960 0 100 0 920 0 26 920 (26) 35 6,880 642 404 238
PARCEL PARKING Required Proposed Required Parking Spaces Required Parking Spaces Convention Others Student Housing Office/ Excess/Deficit Levels Residential COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) R&D Retail GFA Parking (Parking Garage, etc) Center ParkingParking Spaces Spaces Parking Spaces per level AREAper level AREAParking Levels
1,740Soccer Stands, NA Retail, Athletic 320Baseball Stands, NA Retail, Athletic 620Softball Stands, NA Retail, Athletic 8,100Parking Structure 100% 570Office+Retail 80% 1,200Office+Retail 73%
0 1,740 0 320 0 620 87 10,800 8,100 710 43 77 1,634 207
NA 0 1740 NA 0 320 NA 0 620 231 8100 2.0 3.320 710 2.647 1634 13,124
1,740 2,250 320260 620330 8,100 0.4 16,200 2,350 2.1 570 1,200 1.74,200 25,590
NA NA NA 2 100% 3 80% 3 73%
33,000 5,300 7,700 38,3003 1.1
0.9 5,500 1,500 6,600 0.7
GFA
0.4 8,000
0.5 1,890 0.8
224
0 0 0 0 0 0 0 0 0 393 87 231 307 2,700 250 61 43 2,100 18 20 140 77 3,550 63 47 650 MP GFA 594 207 388
2,700 0.4 2.1 1.7
250
Student Housing 73
by District
PARCEL PARKING Required Proposed Required Parking Spaces Required Parking Spaces Convention Others Student Housing Office/ Excess/Deficit Levels Residential USES FAR COV. (M2) COV. (%) R&D Retail GFA Parking (Parking Garage, etc) Center ParkingParking Spaces Spaces Parking Spaces per level AREAper level AREAParking Levels
79%
Parking Spaces per level
COV. (M2)
4.3
10,782
COV. (%)
Required Parking Spaces
76%
254
4.4
5
1270
899
166
5.4
5
831
(68)
213
88
2.4
5
439
226
64%
564
156
3.6
4
626
476
157
3.0
3
471
6.9
4,000
92%
398
124
3.2
5
622
1,000
78%
46
37
1.3
0
0
5,746
75% Institution/
186
218
0.9
3.4
Retail
Culture 62
Academic
40
115 0.5
5,500
1,600 2,000
650 2050
0
84 19%
102 N/A
Hotel 67
0.9 0.8
51
2 Convention Center2
102
100
0.8
2
199
308
0.3
0
0
N/A
N/A
N/A
Office/ 5.1 R&D
(134)
6.8
COV. (M2)
Required Parking Spaces
COV. (%)
3,310 Retail
85%
3,335
84%
Institution/ Academic
Parking Spaces per level
346 Culture
111 Hotel
3.1
474
113
4.2
RC4Proposed
Parking Spaces
340
69%
52
65
0.8
1
65
56
71
0.8
1
71
76
13
3.1
1,650
62%
(12)
4.8
67%
212
73
2.7
1,390500 2,800
75%
7
6.7
2,470
3.0
2,300
92%
80
3.8
1,500 0 2,093
65%
(66)
0
(30)
1.3
2,600
96%
142 1,765
45
1.1
8,000
81%
(11)
326 0 143
84%
63
76
0.8
1
70
59
1.2
1
139
106
1.3
2
319
109
2.9
3
66
72
0.9
63
71
0.9
30
78
0.4
97 1,776
283
0.3
7,700 5,500 1,500 6,600 8,000
RC3
76 59
471 spaces 212 3-level326
0
0
2
143
RC-CEDES 0 1
0 142 1,765
1,890 Proposed Hotel Parking Spaces
Convention Others Excess/Deficit(Parking Garage, etc) Center
1075
371 0 1,949 Proposed Hotel Parking Spaces
316
15,000
436
Student Housing 196
Office/ R&D 4.8 2.7
83 (65) 529
0 (174) (39) 528 23,540 315
Student Housing
343 43 0
642 Proposed Hotel Parking Spaces
393 61 140 594
0 0 0 163 (59) (48) (71) 0 Student Housing 257 0 23 0 (26) 238
0 0 0 307 18 63 388
10,800
2,016 197,135Convention Others Excess/Deficit(Parking Garage, etc) 146,070 Center 25,200 515 1,800 156 110,505 110 31 34,090 625 188 25,590 Proposed Convention Others Excess/Deficit(Parking Garage, etc) Hotel61,160 Center Parking Spaces 38,300 851 1,000 146 45,240 131 22 983 168 658,090 Proposed Hotel Parking Spaces
6.2 4.8
FAR
NA NA NA 2.7 2.4 NA 1.9 0.2 Office/ 1.0 R&D NA 1.3 26,000 NA 5,300 NA
Convention Others Excess/Deficit(Parking Garage, etc) Center
COV. (M2)
COV. (%)
10,782
76%
Academic/ Student Life
Retail 2,875 838 3,126 902
86% 75% 72% 48%
2,700 FAR 2,100 COV. (M2) 250COV. (%) 13,360650 45% 3,550
Office/ R&D
Convention Others Excess/Deficit(Parking Garage, etc) Center
Residential
4.3
15000
Convention Others Excess/Deficit(Parking Garage, etc) Center
0 98 73 671 843
FAR
Required Parking Spaces
FAR NA NA NA 2.0 3.3 2.6
FAR 7.3 2.8
FAR 6.5 6.8
2,696 1,276
Retail
COV. (M2)
Academic/ Required
470
1,740 320 620 8,100 570 1,200
COV. (M2) 3,400 820
COV. (M2) 5,500 920
NA NA NA 70% 61% NA 50% 24% Academic/ 36%Student Life NA 67% 6,000 NA 470 NA
COV. (%) NA NA NA 100% 80% 73%
COV. (%) 75% 43%
COV. (%) 92% 100%
Required Parking Levels Parking Levels RC1-A
2.1
358
97 Hotel 168
0.0 1.8
Required Parking Spaces
359 78 437 Required Parking Spaces
705 109 814
RC1-B 3 0
98 AE 1 2.8 36 3.1 143515 spaces 1.0
4-level
per level
0 0 0 93 59 48 71 0 Culture 86 0 20 0 26 404
0 0 0 87 43 77 207
Convention 5 Center3
Parking Levels
589 25,200 99 486 85 66 198 101 36 Hotel 229 524 43 100 35
1.1 0.9
1 2 5
Convention
AE 2
0.5 0.8
Proposed Parking Spaces
RC2 1075
0
Convention Center2
0 0 0 231 20 47
Parking Spaces per level
129 55
Parking Spaces per level
170 26
0.4 2.1 1.7
Required Parking Levels Parking Levels
2.8 1.4
4 2
Required Parking Levels Parking Levels
4.1 4.2
5 5
45% 78% 100%
436
FAR 196 83 NA (65) 529NA
430spaces 1-level Others (Parking Garage, 343 etc)
0
Proposed Parking Spaces
393 61 140 594 Proposed Parking Spaces
515 110 625 Proposed Parking Spaces
851 131 983
0 7.3 0 2.8 0 163 (59) (48) (71) 0 FAR 257 0 23 6.5 0 6.8 (26) 238
Excess/Deficit
Required ES4 Parking Spaces
393 spaces 2-level
0 0 0 93 59 48 71 0 86 0 20 0 26 404
1,740 320 620 8,100 570 1,200
COV. (%) NA NA NA 100% 80% 73%
3
97 168
0.0 1.8
CNR3 5 371 spaces3 3-level
124 53
2.3 1.2
3 0
Parking Spaces per level
COV. (M2) 3,400 820
COV. (%)
Parking Spaces per level
75% 43%
359 78 437
1075
503 spaces 3-level
371 0 1,949
3-level
2.8 3.1 1.0
Required Parking Levels Parking Levels
MU-Arts1
Proposed Parking Spaces
COV. (M2) 5,500 920 CC-DC
COV. (%)
Required Parking Spaces
92% 100%
705 109 814
STD4
1.1 0.9
3 0
0.7
671 spaces 5-level
256 0
0
0.4
0
2
0.5
1
STD3
343
73 spaces 2-level
43
MUR2 0
0.8
0 642 MUH3 Proposed Parking Spaces 76 spaces 1-level
332 spaces 3-level
MUH2 2 713spaces 1-level 3
0.4 2.1 1.7 MUH1 44 spaces 1-level
MU-Arts2
Required Parking Levels Parking Levels
Proposed Parking Spaces
143 spaces 4 2-level 2
2.8 1.4
PHASING AND DEVELOPMENT
Parking Spaces per level
170 26
Required Parking Levels Parking Levels
4.1 4.2
5 5
Proposed Parking Spaces
851 131 983
MUH 5
212 spaces 2-level
156 31 188
PT 1 851 spaces 5-level
PT 2
185 MP GFA by District RC MU
2014 185,562 133,270
2,016 197,135 146,070
Excess/Defi
515 110 625
131 spaces 5-level
184
Excess/Defi
393 61 140 594
343 spaces 2-level
Excess/Deficit
146 22 168
Excess/Defi
CC-LIB
0 0 0 307 18 63 388
Excess/Deficit
3
STD1
Required Parking Levels MUR1 Parking Levels
0 0 0 MUH4 231 65 spaces 20 1-level 47
129 55
5
Excess/Defi
0 98 73 671 843
1 2 5
340 spaces 3-level
Parking Spaces per level
436 503
Proposed Required Parking Levels 1075 spaces Parking Spaces Parking Levels
589 99 STD2 486 98 spaces 85 66 1-level 198 101 36 229 MUH6 524 326 spaces 43 3-level 100 35
0 1-level 0 0 87 43 77 207
Required BS Parking CC Spaces
Excess/Defi
CNR1
98 36 143
Parking Spaces Required Parking Spaces 142 spaces per level
CC BIO2
Proposed Parking Spaces
CNR2
MU-RC
COV. (M2)
(39) 528 315
CC GS
43
COV. (%)
NA NA ES5 NA 61 spaces 70% 3-level61% ES6 NA 140 spaces 50% 3-level 24% 36% NA MU-CRC 1,000 67% 2,305 NA NA CC-CIAP
2-level
FAR
0
CNR4
2.1
358
0 272 112 144 528
20,610 3,450 17,000 2,100 1,400 450 1,750 300 2,900
256 spaces 2.0 3-level Excess/Deficit 3.3 0 0 2.6 98CC CUL (174)
0
2 3 3
COV. (M2)
(134)
Others Proposed (Parking Garage, etc) Excess/Deficit Parking Spaces
1 1,000
Required Parking Levels Parking Levels
(14) FAR
NA CC BIO
10,800
Required Parking Spaces
220
316
256
0
COV. (%)
542
NA 12 NA 15 13 NA (12) 2.7 RCH1-C 73 2.4 7 199NA spaces (66) 2-level 1.9 80 0.2 (30) RCH1-B 1.0 45 102 spaces (11) NA 2-level 1.3 NA RCH1-A Excess/Deficit 135 NA spaces
RC-IC
642
Parking Spaces per level
4.8
Others 436 (Parking Garage, 503 etc)
1,800 3
13,360 2,696 1,276
115
6.2 (102)
626 spaces 4-level
Proposed Parking Spaces
COV. (M2)
62
73 671 843
Center Parking Levels
110 spaces 0.7 2-level 0.4
250
FAR 73
143
Required Parking Levels Parking Levels
(46)
371 0 1,949
Required Parking Levels Parking Levels
Culture Parking Spaces Hotel Required
Required Parking Spaces
3
831 spaces 5-level
124 439 spaces 2.3 53 5-level 1.2
Parking Spaces per level
0 272 112 144 528
COV. (%) Student Life Parking Spaces
1,000 6,000 2,305
3,000
759 387 206 165 0 Culture 308 229 79 288 65 1,420
Required Parking Spaces
78% 100%
20,610 6,000 3,450 1,500 17,000 2,100 1,400 450 1,750 300 Retail 2,900
COV. (M2)
2,700
Parking Spaces per level
224
Convention 622 spaces Others 3 332 Center 5-level(Parking Garage, etc) 3
86% 75% 72% 48%
Excess/Deficit
62%
59
2.7 (4)
23,540 3,425 *including CEDES 1,896
Required Parking Levels Parking Levels
2,875 838 3,126 902
4.8 62
N/A
2,883 1,675
FAR
158
436 Others (Parking Garage, 135 etc)
2
100%
(14) Student Housing
Excess/Deficit
1112
Parking Spaces per level
759 387 206 165 0 308 229 79 288 65 1,420
15000
Proposed Parking Spaces
69%
62
1,800 542 1% 220
Parking Levels
4.1
Office/ R&D
(102)
Required Parking Levels
1,570
0
2014 RC 185,562 Required Academic/ Parking Levels COV.Hotel PROGRAM (%) Culture Student Life Parking Levels MU 133,270 359 129 4505 4 515 359 129 4 AE 7.31 3,400Hotel & Convention 25,200 75% Center 1,800 4,505 7.3 3,400 2.8 75% 156 33,000 2.8 CN6,000 56,180 78 2 3,800 110 78 55 2 2.82 820Retail+Residential 43% 1,920 2.855 1920 1.4 820 43% 31 1,500 AE across the Hotel 5,300 1.4 CC 31,090 TOTAL 437 6,425 38,300 625 437 188 ESC 2,840 PARCEL PARKING Required Required Parking Spaces Proposed Required ParkingST Spaces Required Academic/ Convention Academic/ Others Student Housing Office/ Excess/Deficit Levels ParkingCulture Levels Residential FAR PARCEL COV. ID Culture (M2) COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) R&D Retail Parking GFA Parking (Parking Garage, etc) Student Life Student Center Life ParkingParking Spaces Spaces Parking Spaces per level Levels AREAper level AREAParking Levels AE 705 170 5960 5 851 705 26,000 146 6,000 170 5 PT 6.516,000 5,500Pabellon Tec 92% 1,000 5,960 6.5 5,500 4.1 92% 6,000 39,000 4.1 PT 470 109 5 131 109 5,300 22 26 5 PT 6.82 470 920Pabellon Tec 100% 2 920 6.826 920 4.2 920 100% 6,240 4.2 470 TOTAL 814 6,880 45,240 983 814 168 TOTAL 408,942 Academic/ FAR PARCEL COV. ID Culture (M2) Student Life
Required Parking Spaces
COV. (%)
2,590 7,000 1,750 830 1,460 3,500 3,800475
1,540
0
2 3 3
8,050
(46)
COV. (M2)
3.1
256 0
Required Academic/ ParkingCulture Levels Student Life Parking Levels
FAR
15,000
3.0
0
39,000 1 6,2403,000 0 45,240
2,330 900 1,430
12
3,800
2
Others (Parking Garage, etc)
15
Residential PARCEL USES PARKINGPROGRAM Proposed Proposed Required IDPARCEL Parking Spaces Required Parking Spaces Required Required Convention Institution/ GFA Others Student Housing AREA Excess/Deficit Levels ParkingCulture Levels Residential COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) Office/ R&D Retail Hotel GFA Parking AREA (Parking Garage, etc) Academic Center ParkingParking Spaces Spaces Parking Spaces Parking Spaces per level Parking Levels AREAper level AREAParking Levels
0 20,610Student Faculty NA Commons* AE 1 0 3,450La Carreta (Encuentro) NA AE 2 0 17,000Library* NA 93 2,100Biotechnology/Sciences 70% TOTAL 59 1,400Biotechnology/Sciences 61% 48 450CIAP and Biotec NA Plaza 71 1,750Business School 50% Expansion 0 300Chapel 24% PARCEL ID 86 2,900Design Center 36% 0 Aulas 4 NA 20 1,000Academic Expansion 67% PT 1 0 2,305Luis Elizondo NAPlaza PT 2 26 Conecta TecNA 3,000 TOTAL 404
Academic/ FAR PARCEL COV. ID Culture (M2) Student Life
ES-1 NA ES-2 NA NA ES-3 ES 2.042,700 ES 3.35 ES 2.66 TOTAL
144 23,540 8,512 528
Convention Center
Hotel
65
436
2,250 2603 0 330 8100 8,100 16,200 ES 4 Parking Structure PARKING Required Required Proposed Parking Spaces Required Parking Spaces Institution/ Convention Institution/ Others Student Housing Office/ Excess/Deficit Levels Parking Levels Residential FAR PARCEL COV. ID Culture (M2) COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) R&D Retail Parking Culture GFA Parking ES 5Required (ParkingPARCEL Office+Retail 710 2,350 710 Garage, etc) Academic Academic Center ParkingParking Spaces Spaces Parking Spaces per level Levels AREAper level AREAParking Levels 0 0 N/A 0 1,634 0 STD 1 13,360Stadium 0 *capacity* 45% 29,596Office+Retail 13,360 45% 1634 ES 6 4,200 0 272 119,600 98 272 98 1 STD 6.2 2 2,696Residential78% and Retail 3,438 6.298 3438 2,696 2.8 78% (174) 1,600 21,200 2.8 13,124 25,5902 TOTAL 112 2 73 112 5,500 (39) 650 36 STD 4.8 3 1,276Office, Lab, 100% Research, Retail 1,276 4.836 1276 1,276 3.16,150 100% 3.1
Culture
71
Residential 503
2.3 1.2
6.8
Convention Others Excess/Deficit(Parking Garage, etc) Center
3.1 1,650GFA
0.0 1.8
4,220 5.7
62
436
2
7.0
226
0
Residential 135
FAR
(68)
622
2
20610 0.8 700 CC-CM Faculty Commons* NA1 1 6,900 5,50065 MUH1 3.1 700 1,570Residential,69% Retail, Academic 2,259Student 3.165 2259 1,570 0.8 69% 700 5220,610 12 65 52 CC-TEC 6001 1 5,90071 MUH2 3.0 750 1,540Residential,62% Retail, Academic 2,472La Carreta 3.071 2472(Encuentro) 1,540 0.87,400 62% 750 56 3,450 15 71 3450 0.8 750 56 1 6,50076 MUH3 3.1 850 1,650Residential,62% Retail, Academic 2,649Library* 3.176 2649 1,650 0.88,200 62% 850 CC-LIB NA1 6317,000 13 76 17000 0.8 850 63 1 1 8,25059 MUH4 4.8 800 1,390Residential,67% Retail, Academic 2,060Biotechnology/Sciences 4.859 2060 1,390 1.29,850 67% 70 2,990 (12) 800 59 2990 1.2 800 8,200 70 CC-BIO 2 7,900 MUH5 2.7 2,800Residential,75% Retail, Cultural 3,714 2.7 2,800 1.39,900 75% 0 212 139 2,300 73 2,000 106 2300 1.3 106 3714 5,5002 CC-BT2 139 Biotechnology/Sciences 3 323,100 25,500 2.9 MUH6 6.7 1,200 2,470Residential,65% Retail, Academic 3,800 6.7 3800 2,470 2.9 65% 7 1,200 1,200 326 319 109 6940 CC-CIAP 319 CIAP 109 and Biotec Plaza 6,940 NA 0 0 0.9 7,500 MU 3.0Arts 1 2,300 Cultural Center 92% 2,503 3.072 2503 2,300 0.97,500 92% (66) 7,500 0 66 72 66 3530 CC-BS Business School Expansion 3,530 6,600 2 2 8,000 0.9 MU 3.8Arts 1,4002 2,093Cultural , Residential 84% 2,500 3.871 2500 2,093 0.99,600 84% 200 1,400 80 143 63 71 63 3003,420 CC-CP 0 0 1.3 2,600 1.378 2720 2,600 0.43,420 96% MU-CRC Community96% Resource Center 2,720Chapel 3,420 0 30 1,270 (30) 78 1270 0.4 30 8,000 CC-DC 1 1 11,000 11,000 MU-RC 1.1 8,000 Recreation81% Center 9,910Design 1.1 8,000 0.3 81% 11,000 9910 97 8,000 45 283 8000 0.3 142 97 283Center TOTAL 146,070 1,765 1,776 18,350 (11) 18350 CC-A4 1,776 Aulas42,434 4 NA 1500 1,500 1,890 CC-GS Academic Expansion 3500 CC-LE Elizondo Plaza 3,500 NA PARCEL PARKING Required ParkingLuis Spaces Proposed Required Parking Spaces Required Required Institution/ Convention Institution/ Others Student Housing Residential Parking Levels Excess/Deficit Parking Levels FAR PARCEL COV. ID Culture (M2) COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) Office/ R&D Retail Parking Culture GFA (Parking Garage, etc) Academic Academic Center Parking Spaces level AREAParking Levels ParkingParking Spaces Spaces per level Levels AREAper Conecta 1210 CC-CUL Tec 1,210 3,000 759 15,000 35812540 10,782 313,580 1075 759 30,590 316 2,330 358 3 CNR1 4.3 10,782 76% 14,231 4.3 2.1 76% 61,500 2.1 90,650 34,090 TOTAL 387 3845 387 20,700 A Office, Lab, Research, Retail 21,600 900
Institution/ Academic
Retail
13,580
5,200 0
GFA
Office/ R&D
13,580
PARCEL PARKING Required Required Parking Spaces Proposed Required Parking Spaces Proposed Required Convention Institution/ Others Student Housing Office/ Residential Levels Excess/Deficit ParkingCulture Levels COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) R&D Retail Parking Hotel GFA Parking (Parking Garage, etc) Academic Center Parking Spaces ParkingParking Spaces Spaces Levels Parking Spaces AREAper level AREAParking Levels PARCEL per levelPARKING 3,878
2,000
Residential
N/A STD 1 Stadium *capacity* 29,596 115 0.8 11,480 2 0.8 2 1,350 84 100 3484 84 100 199 3438 0.3 800 21,2000 STD 2 and2,000 Retail 3,438 19,600 0 5,880 10,765Residential 0.5 0.3 19% 0 0 102 4,280 (102) 800 308 102 30810765 1276 STD 3 Office, Lab, Research, Retail 1,276 6,150 RCH-PRIVATE Living Tec 33,230 27,430 5,800 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 8220 STD1,800 4 2,883 Parking Garage, Residential, Retail 22,655 8,512 542 13,350 7860 800 33,8105,200 TOTAL800 5,200 25,200 43,895 197,135 34,600 3,425 2,883 112,480 25,200 3,425 2% that are11% 1% 100% 233,135 *including 15% CEDES 10% 52% 8% 2% *including CEDES 11% % include 2% Conecta Tec, Hotel not in RC 12,574 61,160 2% TOTAL 1,675 1,896 1,675 220 1,896 3,310Office, Lab,85% Research, Retail PARCEL346 ID
850
GFA
2,000Office, Research 19%
MUR1 5.1 1,650
800
1,000 1.35,200
C
RC-CEDES 0.5 800
1,650 700
4.137 1280 3.4 218 7630
40
16,500
750
PARKING AREA
12540 CNR1 14,231 61,500 3845 A Office, Lab, Research, Retail 21,600 1770 B Office, Lab, Research, Retail 11,320 3535 C Residential, Retail 13,580 TEC Master Plan 2016 3390 Garage 15,000 D Required PARCEL PARKING ParkingParking Spaces Parking Proposed Required Parking Spaces Parking Required Required Institution/ Convention Institution/ Others Student Housing Office/ Residential Excess/Deficit FAR PARCEL COV. ID Culture (M2) COV.Hotel PROGRAM (%) USES FAR COV. (M2) COV. (%) R&D Retail Parking Culture GFA (Parking Garage, etc) Academic Academic Center Levels Levels Parking Spaces ParkingParking Spaces Spaces per level Levels AREAper level AREAParking Levels 5870 CNR2 23,350 61,850 4.4 5 RC01 7.0 7,000Office, Lab,79% Research, Retail 8,890 7.0 7,000 4.4 79% 5 1270 1112 58,550 158 3,300 254 1112 254 8890 3360 A Residential, Retail 3,360 5.4 50,100 5 5.4 5 A 899 166 5820 831 899 47,800 (68) 2,300 166 2510 B Residential, Retail 1,110 2.4 11,750 5 2.4 5 B 213 88 3070 439 213 10,750 226 1,000 88 4328 3.6 CNR3 Lab, Research, 4,328 20,6804 31,350 Retail RC02 5.7 3,500Office, Lab,64% Research, Retail 5,474Office, 5.7 3,500 3.6 64% 4 626 564 29,650 62 1,700 156 564 156 5474 1871 CNR4 Office, Lab, Research, Retail 1,871 4,975 37,200 3.0 3 RC03 6.8 3,800Residential,69% Retail 5,500 6.8 3,800 3.0 69% 334,600 (4) 2,600 471 476 157 476 157 5500 24,609 3.2 110,5055 TOTAL 30,050 RC04 6.9 4,000Office, Lab,92% Research, Retail 4,356 6.9 4,000 3.2 92% 5 622 398 20,000 224 2,000 124 398 8,050 124 4356 RC-IC 4.1
2,950
PARCEL AREA
PROGRAM USES
1,400
146,070
DEVELOPMENT SUMMARY PARCEL ID
200
8,000
Excess/Defi
DETAILED DEVELOPMENT SUMMARY TEC Master Plan 2016 PARCEL ID
PROGRAM USES
RC01
Office, Lab, Research, Retail
PARCEL PARCEL ID AREA RC01
PARKING AREA
8,890
A
A
B
B
RC02
Office, Lab, Research, Retail
RC02
5,474
RC03
Residential, Retail
RC03
5,500
RC04
Office, Lab, Research, Retail
RC04
4,356
RC-IC
Hub
RC-IC 1,280
RCH1
Residential, Retail, Academic
RCH1 7,630
Residential PROGRAM GFA USES
Office, Lab, Research, 61,850 Retail 8890 50,100 5820
A
A B
C
C
11,750 3070 Office, Lab, Research, 31,350 Retail 5474
1784
MUR1 3,878 MUR2 3,969
MUH1
Residential, Retail, Academic
MUH1 2,259
MUH2
Residential, Retail, Academic
MUH2 2,472
MUH3
Residential, Retail, Academic
MUH3 2,649
MUH4
Residential, Retail, Academic
MUH4 2,060
MUH5
Residential, Retail, Cultural
MUH5 3,714
MUH6
Residential, Retail, Academic
MUH6 3,800
MU Arts 1
Cultural Center
MU Arts2,503 1
MU Arts 2
Cultural , Residential
MU Arts2,500 2
MU-CRC
Community Resource Center
MU-CRC2,720
MU-RC
Recreation Center
TOTAL
PARCEL ID CNR1 A B C D CNR2 A B CNR3 CNR4 TOTAL
PARCEL ID STD 1 STD 2 STD 3 STD 4 TOTAL
PARCEL ID CC-CM CC-TEC CC-LIB CC-BIO CC-BT2 CC-CIAP CC-BS CC-CP CC-DC CC-A4 CC-GS CC-LE CC-CUL TOTAL
PARCEL ID
PROGRAM USES Office, Lab, Research, Retail Office, Lab, Research, Retail Residential, Retail Parking Garage Residential, Retail Residential, Retail Office, Lab, Research, Retail Office, Lab, Research, Retail
PROGRAM USES Stadium *capacity* Residential and Retail Office, Lab, Research, Retail Parking Garage, Residential, Retail
PROGRAM USES Student Faculty Commons* La Carreta (Encuentro) Library* Biotechnology/Sciences Biotechnology/Sciences CIAP and Biotec Plaza Business School Expansion Chapel Design Center Aulas 4 Academic Expansion Luis Elizondo Plaza Conecta Tec
PROGRAM USES
ES-1 Soccer Stands, Retail, Athletic ES-2 Baseball Stands, Retail, Athletic ES-3 Softball Stands, Retail, Athletic 186 PHASING AND DEVELOPMENT ES 4 Parking Structure ES 5 Office+Retail ES 6 Office+Retail
2,300
899
10,750 3070 29,650 5474
1,000 11,750
10,750
1,000
5500 20,000 4356
2,600 37,200
20,000
1,700
5.7
3,500
64%
6.8
3,800
69%
6.9
4,000
92%
4.1 5,200
1,000
78%
3.4
5,746
75%
2,000
1,280
1280
5,200
22,655 7,630
7630
2,950 25,605
22,655
2,950
8,050
5,200
5
1112
1270
254
158 4.4
5
1270
166
5.4
5
899
831
166
(68) 5.4
5
831
158 (68)
213 5.7 564
88 3,500 156
2.4
5
213
439
88
226 2.4
5
439
226
64% 3.6
4
564
626
156
62 3.6
4
626
62
6.8 476 6.9 398
3,800 157 4,000 124
69% 3.0
3
476
471
157
(4) 3.0
3
471
92% 3.2
5
398
622
124
224 3.2
5
622
4.1 46 3.4 186
1,00037 5,746 218
78% 1.3
0
46
0
37
(46) 1.3
0
0
75% 0.9
2
186
436
218
250 0.9
2
436
250 73
(4) 224 (46)
0.9
2
62
135
67
73 0.9
2
135
0.8
2
40
102
51
62 0.8
2
102
62
10,130
3484 4,280 10765
1,350 11,480
10,130
1,350
100 2,000 308
0.8
2
84
199
100
115 0.8
2
199
115
102
0
308
33,230
10,765 27,430 34,600 15%
Residential PROGRAM GFA USES
5,880 800 5,800 33,230
22,655 10%
PARCEL AREA
Student Housing
112,480 43,895 52%
PARKING Office/ R&D AREA
3,878
16,500 3878 23,700 3969
3,969
13,350 197,135 233,135 8%
Retail GFA
800
4,280
27,430 34,600 800 15% 2% Institution/ Academic
Residential
800
800
0.5
2,000
22,655 5,200 10% 2%
Student Housing Culture
25,200 112,480 11% 52%
Office/ Hotel R&D
13,350 1,800 8%1% Convention Retail Center
N/A 800 100% 2% Institution/ Others (Parking Garage, etc) Academic
5,200 2%
Culture FAR
25,200 11%
COV. Hotel (M2)
1,800 1% Convention
COV. (%) Center
1,650 19,800
1,650
16,500
1,650
1,650
5.1
3,310
85%
1,650 27,000
1,650
23,700
1,650
1,650
6.8
3,335
84%
5,500 2,259
2259
6,900 700
700
5,500
700
700
3.1
1,570
69%
5,900 2,472
2472
7,400 750
750
5,900
750
750
3.0
1,540
62%
6,500 2,649
2649
8,200 850
850
6,500
850
850
3.1
1,650
62%
2060
9,850 800
800
8,250
800
800
4.8
1,390
67%
3,714 0
3714
2,000 9,900
7,900
0
2,000
2.7
2,800
75%
Residential, Retail, 25,500 Academic 23,100 3800 Cultural 2503 Center 7,500
3,800
3800
1,200 25,500
23,100 1,200
1,200
6.7
2,470
65%
2,503
2503
7,500
3.0 7,500
2,300
92%
8,000 2,500
2500
9,600 200
3.8
2,093
84%
2,720
2720
3,420
3,420
1.3 3,420
2,600
96%
9,910
9910 42,434
11,000
11,000
11,000 1.1
8,000
81%
146,070
146,070
Residential PROGRAM GFA USES
12540 61,500 3845 Office, Lab, Research, 21,600 Retail 1770 Office, Lab, Research, 11,320 Retail 3535 Residential, Retail 13,580 3390Garage15,000 Parking 5870 23,350 3360 Residential, Retail 2510 Residential, Retail 4328 Office, Lab, Research, 20,680 Retail 1871 Office, Lab, Research, 4,975 Retail 24,609 110,505
13,580
PARCEL AREA
Student Housing
14,231
PARKING Office/ R&D AREA
12540 30,590 3845 20,700 1770 9,890 3535 3390 5870 3360 2510 4328 4,220 1871 24,609
13,580 20,760 15,760 5,000 15,000 4,500
Residential PROGRAM GFA USES
STD 1 29,596 N/A Stadium *capacity* 3438 STD 2 3,438 Residential and21,200 Retail 19,600 1276 STD 3 1,276 Office, Lab, Research, 6,150 Retail 7860Garage, 8220 STD 4 8,512 Parking 33,810 Residential, Retail TOTAL 12,574 61,160 Residential PROGRAM GFA USES
20610Faculty Commons* Student NA 3450 (Encuentro) La Carreta 600 17000 Library* NA 2990 8,200 Biotechnology/Sciences 2300 5,500 Biotechnology/Sciences 6940 CIAP and Biotec Plaza NA 3530 School6,600 Business Expansion 1270 Chapel 300 8000Center 8,000 Design 18350 Aulas 4 NA 1500 Expansion Academic 1,890 Luis3500 Elizondo Plaza NA 1210 Tec Conecta 3,000 90,650 34,090 Residential PROGRAM GFA USES
1740Stands, Retail, Soccer 2,250 Athletic 320 Stands, Retail, Baseball 260 Athletic 620Stands, Retail, Softball 330 Athletic 8100Structure Parking 16,200 Office+Retail 2,350 710 1634 Office+Retail 4,200
3,360 1,110 4,328 1,871
PARCEL AREA
Student Housing
PARKING Office/ R&D AREA
29,596 N/A 3,438 1,276 8,512
PARCEL AREA
Student Housing
20,610 3,450 17,000 2,990 2,300 6,940 3,530 1,270 8,000 18,350 1,500 3,500 1,210
PARCEL AREA
Student Housing
1,740 320 620 8,100 710 1,634
3438 1276 5,500 7860 12,574
PARKING Office/ R&D AREA 20610 3450 17000 2990 2300 6940 3530 1270 8000 18350 1500 3500 1210 90,650
PARKING Office/ R&D AREA 1740 320 620 8100 2,100 710 1634 3,550
Retail GFA 2,330 61,500 21,600 900 11,320 1,430 13,580 15,000 2,590 23,350 1,750 830 1,460 20,680 4,975 475 110,505
Retail GFA
1,200 7,500
1,400
Institution/ Academic
Residential
8,000
Student Housing Culture
13,580
200
Office/ Hotel R&D 30,590 20,700 9,890
Convention Retail Center
2,330 900 1,430
1,400
Institution/ Others (Parking Garage, etc) Academic
15,000
Culture FAR 4.3
Retail GFA NA 600 NA 8,200 500 5,500 1,500 NA 6,600 0 300 8,000 NA 1,890 NA 3,000 34,090
Retail GFA 2,250 260 330 2,700 16,200 250 2,350 4,200 650
10,782
Convention
COV. (%) Center
76%
15000
Institution/ Academic
Residential
4,220
Student Housing Culture
Office/ Hotel R&D
2,590 1,750 830 1,460 475
Convention Retail Center
Institution/ Others (Parking Garage, etc) Academic
Culture FAR 0
19,600 5,500 8220
Institution/ Academic
Residential
Student Housing Culture
Office/ Hotel R&D
7,700 5,500 1,500 6,600
1,600 650 2050
Convention Retail Center
500 1,500 0
6.2 4.8
Institution/ Others (Parking Garage, etc) Academic
7,700 5,500 1,500 6,600 8,000
1,890
1,890 3,000
Academic/ Student Life
Student Housing Culture
Office/ Hotel R&D
2,700 2,100 3,550
Convention Retail Center
2,700 250 650
COV. Hotel (M2) 13,360 2,696 1,276
86% 75% 72% 48%
Convention
COV. (%) Center
Academic/ Others (Parking Garage, Student Life etc)
10,800 2,700
N/A
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
NA NA NA 2.7 2.4 NA 1.9 0.2 1.0 NA 1.3 NA NA 3,000
Culture FAR NA NA NA 2.0 3.3 2.6
COV. Hotel (M2) 20,610 3,450 17,000 2,100 1,400 450 1,750 300 2,900 1,000 2,305
COV. Hotel (M2) 1,740 320 620 8,100 570 1,200
Convention
COV. (%) Center
Convention
NA NA NA 100% 80% 73%
N/A N/A 2,883 3,425 *including CEDES 1,675 1,896
Required
0
0
N/A 542
3,425 *including CEDES 1,896
220
Required Proposed Parking Spaces
(102)
N/A
Required
Parking Levels Excess/Deficit Parking Levels COV. (%) Parking Levels Parking Spaces Parking Spaces per level Parking Levels
Proposed Parking Spaces
542 220 Excess/Deficit
3.1 52 3.0 56 3.1 63
1,57065 1,54071 1,65076
62% 0.8
1
63
76
76
13 0.8
1
76
13
4.8 70 2.7 139
1,39059 2,800 106
67% 1.2
1
70
59
59
(12) 1.2
1
59
(12)
75% 1.3
2
139
212
106
73 1.3
2
212
73
6.7 319 3.0 66
2,470 109 2,30072
65% 2.9
3
319
326
109
7 2.9
3
326
92% 0.9
0
66
0
72
(66) 0.9
0
0
3.8 63 1.3 30
2,09371 2,60078
84% 0.9
2
63
143
71
80 0.9
2
143
96% 0.4
0
30
0
78
(30) 0.4
0
0
(30)
1.1 97 1,776
8,000 283
81% 0.3
1
97 1,776
142 1,765
283
45 0.3
1
142 1,765
(11)
15,000
759 4.3 387 206 165 15000 0 308 229 79 288 4.8 65 2.7 1,420
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
0 272 6.2 112 4.8 144 528
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
0 NA 0 NA 0 NA 93 2.7 59 2.4 48 NA 71 1.9 0 0.2 86 1.0 0 NA 20 1.3 0 NA 26 NA 404 OthersRequired (ParkingParking Garage, etc)Spaces
FAR
10,800
Parking Spaces COV. (M2) per level
(102) 0.3 N/A
3,310 111 3,335 113
FAR
NA NA NA 70% 61% NA 50% 24% 36% NA 67% NA NA
COV. (%) Center
0 N/A N/A
5.1 346 6.8 474
OthersRequired (ParkingParking Garage, etc)Spaces
23,540
Culture FAR
19% 0.3 N/A
2,883 100% 1,675
45% 78% 100%
23,540
8,000
Residential
2,875 838 3,126 902
4.8 2.7
0 1,600 21,200 6,150 650 2050 33,810 61,160
COV. Hotel (M2)
13,580 20,760 15,760 5,000 15,000 4,500
84 0.5 102
19%
5,800
8,250 2,060
PARCEL PARKING PARCEL ID AREA AREA
79% 4.4
51
Residential, Retail, 9,850 Academic 2060 Residential, Retail, 9,900 Cultural 7,900 3714
PARCEL PARKING PARCEL ID AREA AREA
Excess/Deficit
7,000 254
67
Residential, Retail, 6,900 Academic 2259 Residential, Retail, 7,400 Academic 2472 Residential, Retail, 8,200 Academic 2649
PARCEL PARKING PARCEL ID AREA AREA
8,050
Proposed Parking Spaces
40
42,434
1,740 320 620 8,100 710 1,634
47,800
2,600
7.0 1112
Parking Levels
62
MU-RC 9,910
ES-1 ES-2 ES-3 ES 4 ES 5 ES 6
2,300 50,100
2,000 30,050
79%
ParkingRequired Proposed Parking Spaces Required Excess/Deficit Levels Parking Spaces Parking Spaces per level Parking Levels
600
TOTAL
CC-CM20,610 CC-TEC3,450 CC-LIB17,000 CC-BIO 2,990 CC-BT22,300 CC-CIAP6,940 CC-BS 3,530 CC-CP 1,270 CC-DC 8,000 CC-A4 18,350 CC-GS 1,500 CC-LE 3,500 CC-CUL1,210 TOTAL
3,300
Required COV. (%) Parking Levels
1,000
Cultural 9,600 2500 , Residential Community Resource 3,420 Center 2720 Recreation 11,000 9910 Center
CNR1 14,231 A B C D CNR2 A 3,360 B 1,110 CNR3 4,328 CNR4 1,871 TOTAL
58,550
29,650
Parking Spaces COV. (M2) per level
FAR
5,025
Office, Lab, Research, 19,800 Retail 3878 Office, Lab, Research, 27,000 Retail 3969
PARCEL PARKING PARCEL ID AREA AREA
OthersRequired (ParkingParking Garage, etc)Spaces
3,300 61,850
34,600
7,000
Convention
COV. (%) Center
58,550 8890 47,800 5820
1,700 31,350
7.0
COV. Hotel (M2)
7,500
TOTAL 43,895 197,135 % include Conecta Tec, Hotel that are233,135 not in RC
Office, Lab, Research, Retail
Culture FAR
5,625 600
Living Tec
Office, Lab, Research, Retail
Institution/ Others (Parking Garage, etc) Academic
1,000 8,500
RC-CEDES 10,765
MUR2
Convention Retail Center
1784
RCH-PRIVATE
MUR1
Office/ Hotel R&D
2362
Office, Research
PARKING AREA
Student Housing Culture
5,025
Living Tec
PARCEL PARCEL ID AREA
4,356
Retail GFA
7,500
RC-CEDES
PROGRAM USES
5,500
TEC Master Plan 2016 Institution/ Residential Academic
5,625
RCH-PRIVATE
PARCEL ID
5,474
Hub1280 5,200 Residential, Retail, 25,605 Academic 7630 8,500 2362 11,480 3484 Office, Research5,880 10765
TOTAL % include Conecta Tec, Hotel that are not in RC
8,890
Residential, Retail 37,200 34,600 5500 Office, Lab, Research, 30,050 Retail 4356
B
PARCEL PARKING Student Housing Office/ R&D AREA AREA
0 NA 0 NA 0 NA 87 2.0 3.3 43 77 2.6
Parking Spaces COV. (M2) per level
85% 3.1
3
346
332
111
(14) 3.1
3
332
(14)
84% 4.2
3
474
340
113
(134) 4.2
3
340
(134)
69% 0.8
1
52
65
65
12 0.8
1
65
12
62% 0.8
1
56
71
71
15 0.8
1
71
15
Required Required Required Proposed Parking Spaces Parking Levels Excess/Deficit Parking Levels COV. (%) Parking Levels Parking Spaces Parking Spaces per level Parking Levels
358 10,782
76% 2.1
3
97 168 2,875 838 124 3,126 90253
0.0 1.8 86% 75% 72% 2.3 48% 1.2
5 3
Parking Spaces COV. (M2) per level
13,360 2,69698 1,27636 143
Parking Spaces COV. (M2) per level
589 20,610 3,45099 486 17,000 2,10085 1,40066 198 450 101 1,750 30036 229 2,900 524 1,00043 100 2,305 35
Parking Spaces COV. (M2) per level
1,740 0 320 0 620 0 231 8,100 57020 1,20047
(11)
759 387 206 165 0 308 229 79 288 65 1,420
3 0
0 272 112 144 528
1 2 5
3 0 0 2 1 0
0 0 0 93 59 48 71 0 86 0 20 0 26 404
2 3 3
0 0 0 87 43 77
Excess/Deficit
316 2.1
3
1075
316
436 503
97 168
436 0.0 196 1.8
5 3
436 503
436 196
371 0 1,949
124 53
83 2.3 (65) 1.2 529
3 0
371 0 1,949
0 98 73 671 843
98 36 143
0 (174) 2.8 (39) 3.1 528 1.0 315
256 0 0 343 43 0
589 99 486 85 66 198 101 36 229 524 43 100 35
642
0 0 0 163 1.1 (59) 0.9 (48) (71) 0.7 0 257 0.4 0 23 0.5 0 (26) 0.8 238
393 61 140
0 0 0 231 20 47
0 0 0 307 0.4 18 2.1 63 1.7
Proposed Parking Spaces
1 2 5
3
Proposed Parking Spaces
256 0
0
0 343
1
43
0
0 642
2 3 3
0 (174) (39) 528 315 Excess/Deficit
0
2
83 (65) 529 Excess/Deficit
0 98 73 671 843
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
NA NA NA 100% 0.4 80% 2.1 73% 1.7
45
358
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
NA NA NA 70% 1.1 61% 0.9 NA 50% 0.7 24% 36% 0.4 NA 67% 0.5 NA NA 0.8
80
1075
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
45% 78% 2.8 100% 3.1 1.0
Proposed Parking Spaces
7 (66)
Proposed Parking Spaces
393 61 140
0 0 0 163 (59) (48) (71) 0 257 0 23 0 (26) 238 Excess/Deficit
0 0 187 0 307 18 63
CNR2 A B CNR3 CNR4 TOTAL
Residential, Retail Residential, Retail Office, Lab, Research, Retail Office, Lab, Research, Retail
CNR2 A B CNR3 CNR4 TOTAL
3,360 1,110 4,328 1,871
5870 23,350 20,760 3360 Residential, Retail 15,760 2510 Residential, Retail 5,000 4328 Office, Lab, Research, 20,680 Retail 15,000 1871 Office, Lab, Research, 4,975 Retail 4,500 24,609 110,505
5870 3360 2510 4328 4,220 1871 24,609
3,360 1,110 4,328 1,871
23,350 2,590 1,750 830 20,680 1,460 475 4,975 110,505
20,760 15,760 5,000 15,000 4,500
4,220
DETAILED DEVELOPMENT SUMMARY PARCEL ID
STD 1 STD 2 STD 3 STD 4 TOTAL
PROGRAM USES
Stadium *capacity* Residential and Retail Office, Lab, Research, Retail Parking Garage, Residential, Retail
PARCEL ID CC-CM CC-TEC CC-LIB CC-BIO CC-BT2 CC-CIAP CC-BS CC-CP CC-DC CC-A4 CC-GS CC-LE CC-CUL TOTAL
PROGRAM USES Student Faculty Commons* La Carreta (Encuentro) Library* Biotechnology/Sciences Biotechnology/Sciences CIAP and Biotec Plaza Business School Expansion Chapel Design Center Aulas 4 Academic Expansion Luis Elizondo Plaza Conecta Tec
PARCEL ID ES-1 ES-2 ES-3 ES 4 ES 5 ES 6 TOTAL
PROGRAM USES Soccer Stands, Retail, Athletic Baseball Stands, Retail, Athletic Softball Stands, Retail, Athletic Parking Structure Office+Retail Office+Retail
PARCEL ID AE 1 AE 2 TOTAL
PROGRAM USES Hotel & Convention Center Retail+Residential across the Hotel
PARCEL ID PT 1 PT 2 TOTAL
PROGRAM USES Pabellon Tec Pabellon Tec 2
PARCEL PARKING PARCEL ID AREA AREA
Residential PROGRAM GFA USES
STD 1 29,596 N/A Stadium *capacity* 3438 STD 2 3,438 Residential and21,200 Retail 19,600 1276 STD 3 1,276 Office, Lab, Research, 6,150 Retail 7860Garage, 8220 STD 4 8,512 Parking 33,810 Residential, Retail 12,574 61,160 TOTAL
PARCEL PARKING PARCEL ID AREA AREA
CC-CM20,610 CC-TEC3,450 CC-LIB17,000 CC-BIO 2,990 CC-BT22,300 CC-CIAP6,940 CC-BS 3,530 CC-CP 1,270 CC-DC 8,000 CC-A4 18,350 CC-GS 1,500 CC-LE 3,500 CC-CUL1,210 TOTAL
20610Faculty Commons* Student NA 3450 (Encuentro) La Carreta 600 17000 Library* NA 2990 Biotechnology/Sciences 8,200 2300 Biotechnology/Sciences 5,500 6940 CIAP and Biotec Plaza NA 3530 School6,600 Business Expansion 1270 Chapel 300 8000Center 8,000 Design 18350 Aulas 4 NA 1500 Expansion Academic 1,890 Luis3500 Elizondo Plaza NA 1210 Tec Conecta 3,000 90,650 34,090
PARCEL PARKING PARCEL ID AREA AREA
ES-1 1,740 ES-2 320 620 ES-3 ES 4 8,100 ES 5 710 ES 6 1,634 TOTAL
Residential PROGRAM GFA USES
4505 Hotel & Convention 33,000 Center 1920 5,300 3,800 Retail+Residential across the Hotel 6,425 38,300
PARCEL PARKING PARCEL ID AREA AREA PT 1 5,960 PT 2 920 TOTAL
Residential PROGRAM GFA USES
Residential PROGRAM GFA USES
5960 Tec 39,000 Pabellon 920 Tec 2 6,240 Pabellon 6,880 45,240
RC MU CN CC ESC ST AE PT TOTAL
188
PHASING AND DEVELOPMENT
2014 185,562 133,270 56,180 31,090 2,840
408,942
PARCEL AREA
Student Housing
PARCEL AREA
Student Housing
1,740 320 620 8,100 710 1,634
PARCEL AREA
Student Housing
4,505 1,920
PARCEL AREA
Student Housing
5,960 920
MP GFA by District
PARKING Office/ R&D AREA
29,596 N/A 3,438 1,276 8,512
20,610 3,450 17,000 2,990 2,300 6,940 3,530 1,270 8,000 18,350 1,500 3,500 1,210
1740Stands, Retail, Soccer 2,250 Athletic 320 Stands, Retail, Baseball 260 Athletic 620Stands, Retail, 330 Athletic Softball 8100Structure Parking 16,200 Office+Retail 2,350 710 1634 Office+Retail 4,200 13,124 25,590
PARCEL PARKING PARCEL ID AREA AREA AE 1 4,505 AE 2 1,920 TOTAL
Residential PROGRAM GFA USES
PARCEL AREA
Student Housing
3438 1276 5,500 7860 12,574
PARKING Office/ R&D AREA 20610 3450 17000 2990 2300 6940 3530 1270 8000 18350 1500 3500 1210 90,650
PARKING Office/ R&D AREA 1740 320 620 8100 2,100 710 1634 3,550 13,124
PARKING Office/ R&D AREA 4505 1920 6,425
PARKING Office/ R&D AREA 5960 26,000 920 5,300 6,880
Retail GFA
Institution/ Academic
Residential
Student Housing Culture
Office/ Hotel R&D
2,590 1,750 830 1,460 475
Convention Retail Center
4.8 2.7
Institution/ Others (Parking Garage, etc) Academic
Culture FAR
0
1,600 21,200 650 6,150 2050 33,810 61,160
Retail GFA NA 600 NA 8,200 500 5,500 1,500 NA 6,600 0 300 8,000 NA 1,890 NA 3,000 34,090
Retail GFA 2,250 260 330 2,700 16,200 2,350 250 4,200 650 25,590
Retail GFA 6,000 33,000 1,500 5,300 38,300
Retail GFA 6,000 39,000 6,240 470 45,240
0
19,600
5,500
8220
Institution/ Academic
Residential
Student Housing Culture
Office/ Hotel R&D
7,700 5,500 1,500 6,600
1,600 650 2050
Convention Retail Center
500 1,500 0
6.2 4.8
Institution/ Others (Parking Garage, etc) Academic
7,700 5,500 1,500 6,600 8,000
1,890
1,890 3,000
Academic/ Student Life
Student Housing Culture
Office/ Hotel R&D
2,700 2,100 3,550
Academic/ Student Life
Residential
Student Housing Culture
Office/ Hotel R&D 25,200
3,800
Academic/ Student Life
Residential
6,000 470
Student Housing Culture
Office/ Hotel R&D 26,000 5,300
Convention Retail Center
2,700 250 650
Convention Retail Center
Academic/ Others (Parking Garage, Student Life etc)
10,800 2,700
Academic/ Others (Parking Garage, Student Life etc)
6,000 1,800 1,500
Convention Retail Center
6,000 1,000 470
COV. Hotel (M2) 13,360 2,696 1,276
Convention
COV. (%) Center
6,000 470
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
45% 78% 100% 23,540
Culture FAR NA NA NA 2.7 2.4 NA 1.9 0.2 1.0 NA 1.3 NA NA 3,000
Culture FAR NA NA NA 2.0 3.3 2.6
Culture FAR 7.3 2.8
Academic/ Others (Parking Garage, Student Life etc)
308 229 79 288 4.8 65 2.7 1,420
86% 75% 72% 48%
23,540
8,000
Residential
2,875 838 3,126 902
Culture FAR 6.5 6.8
COV. Hotel (M2) 20,610 3,450 17,000 2,100 1,400 450 1,750 300 2,900 1,000 2,305
COV. Hotel (M2) 1,740 320 620 8,100 570 1,200
COV. Hotel (M2) 25,200 3,400 820
COV. Hotel (M2) 5,500 920
Convention
COV. (%) Center
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
NA NA NA 70% 61% NA 50% 24% 36% NA 67% NA NA
Convention
COV. (%) Center
NA NA NA 100% 80% 73%
Convention
COV. (%) Center
75% 1,800 43%
Convention
COV. (%) Center
92% 1,000 100%
0 272 6.2 112 4.8 144 528
0 NA 0 NA 0 NA 93 2.7 59 2.4 48 NA 71 1.9 0 0.2 86 1.0 0 NA 20 1.3 0 NA 26 NA 404 OthersRequired (ParkingParking Garage, etc)Spaces
FAR
10,800
0 NA 0 NA 0 NA 87 2.0 3.3 43 77 2.6 207
OthersRequired (ParkingParking Garage, etc)Spaces
FAR
359 7.3 78 2.8 437 OthersRequired (ParkingParking Garage, etc)Spaces
FAR
705 6.5 109 6.8 814
168 2,875 838 124 3,126 90253
Parking Spaces COV. (M2) per level
13,360 2,69698 1,27636 143
Parking Spaces COV. (M2) per level
589 20,610 3,45099 486 17,000 2,10085 1,40066 198 450 101 1,750 30036 229 2,900 524 1,00043 100 2,305 35
Parking Spaces COV. (M2) per level
1,740 0 320 0 620 0 231 8,100 57020 1,20047
Parking Spaces COV. (M2) per level
129 3,400 82055
Parking Spaces COV. (M2) per level
170 5,500 92026
1.8 86% 75% 72% 2.3 48% 1.2
3
308 229 79 288 65 1,420
3 0
503
168
196 1.8
3
503
371 0 1,949
124 53
83 2.3 (65) 1.2 529
3 0
371 0 1,949
Required Required Required Proposed Parking Spaces Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
45% 78% 2.8 100% 3.1 1.0
0 272 112 144 528
1 2 5
0 98 73 671 843
98 36 143
0 (174) 2.8 (39) 3.1 528 1.0 315
1 2 5
3 0 0 2 1 0
0 0 0 93 59 48 71 0 86 0 20 0 26 404
256 0 0 343 43 0
589 99 486 85 66 198 101 36 229 524 43 100 35
642
0 0 0 163 1.1 (59) 0.9 (48) (71) 0.7 0 257 0.4 0 23 0.5 0 (26) 0.8 238
3
0
0 343
1
2 3 3
0 0 0 87 43 77 207
393 61 140 594
0 0 0 231 20 47
0 0 0 307 0.4 18 2.1 63 1.7 388
4 2
359 78 437
515 110 625
129 55
156 2.8 31 1.4 188
4 2
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
92% 4.1 100% 4.2
5 5
705 109 814
851 131 983
170 26
146 4.1 22 4.2 168
0 642
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
75% 2.8 43% 1.4
43
0
2 3 3
5 5
0 (174) (39) 528 315 Excess/Deficit
256 0
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
NA NA NA 100% 0.4 80% 2.1 73% 1.7
Proposed Parking Spaces
0
2
83 (65) 529 Excess/Deficit
0 98 73 671 843
Required Proposed Parking Spaces Required Required Excess/Deficit Parking Levels Parking Levels COV. (%) Parking Spaces Parking Levels Parking Spaces per level Parking Levels
NA NA NA 70% 1.1 61% 0.9 NA 50% 0.7 24% 36% 0.4 NA 67% 0.5 NA NA 0.8
Proposed Parking Spaces
196
Proposed Parking Spaces
393 61 140 594 Proposed Parking Spaces
515 110 625 Proposed Parking Spaces
851 131 983
0 0 0 163 (59) (48) (71) 0 257 0 23 0 (26) 238 Excess/Deficit
0 0 0 307 18 63 388
Excess/Deficit
156 31 188 Excess/Deficit
146 22 168
MP GFA by District 2,016 197,135 146,070 110,505 34,090 25,590 61,160 38,300 45,240 658,090
RC MU CN CC ESC ST AE PT TOTAL
2014 185,562 133,270 56,180 31,090 2,840
408,942
2,016 197,135 146,070 110,505 34,090 25,590 61,160 38,300 45,240 658,090
189
In Memoriam Sasaki Associates Dennis Pieprz Victor Eskinazi Youngju Cho Zhicheng Xu Lachlan Hicks Difei Xu Mengchen Xia Gloriana Gonzalez
www.distritotec.mx 218
DISTRITO TEC FRAMEWORK PLAN UPDATE TECNOLĂ“GICO DE MONTERREY TecnolĂłgico de Monterrey, with an extraordinary and continuously expanding influence across the spectrum of Mexican education, is poised to become a leader in stimulating urban and economic regeneration and prove the power of Latin American universities as engines of innovation and entrepreneurship. In response to this vision, the 2014 Master Plan establishes the framework for the long-term evolution of the campus and the regeneration of the communities surrounding the university into a lively, attractive, dynamic, and integrated district, while creating an environment that will attract significant research and development investment. The public realm of the university and the district is carefully connected and integrated through a series of pedestrian routes, public spaces and shared uses. Two years later, the effectiveness of the planning process has yielded tangible results. Detailed designs for catalytic campus projects, such as the new library (now under construction), La Carreta pavilion, the Borregos Stadium and the Wellness Center were kickstarted. Furthermore, renewed interest from the private sector to invest in the Distrito has been faster than expected. The Framework Plan update will further support the university, public officials and private entities to continue the collaborative implementation of the Distrito vision, where the Tec can continue to be a catalyst for the transformation of Monterrey and Mexico as a whole.