2018/Q3 STR Quarterly Report

Page 1

Save the Rain Third Quarterly Report 2018

A-

\

-V l->

f

W

rS|

*ÿÿ r

\

f£> i1

M

* #

el

/

j

U

u

k

'id /

V

l

r

%*s

M

*ÿ

*

I

I i

k'k

i

N I t.

lU

*

July-September 2018 Joanne M. Mahoney County Executive

www.savetherain.us


ONONDAGA COUNTY DEPARTMENT OF WATER ENVIRONMENT PROTECTION VISION To be a respected leader in wastewater treatment, storm water management, and the protection of our environment using state-of-the-art, innovative technologies and sound scientific principles as our guide.

MISSION To protect and improve the water environment of Onondaga County in a cost-effective manner ensuring the health and sustainability of our community and economy.

CORE VALUES

Excellence Teamwork Honesty Innovation Cost-Effectiveness Safety

Save the Rim


Table of Contents Report from Commissioner

1

Gray Projects Update

3

Projects Summary

Green Projects Update  

Projects Summary Fact Sheets

Green Improvement Fund Update  

29

Metro Phosphorus Optimization Project Metro Phosphorus Work Plan Project Onondaga Lake Water Quality Model Ambient Monitoring Program Water Quality Sampling Tributary Sampling Tributary Bacteria Compliance Assessment Onondaga Lake Sampling Biological Monitoring Program Sampling Summary

Legislative/Regulatory/Media Update   

25

Green Improvement Fund Program Summary Fact Sheets

Metro WWTP Phosphorus Projects/TMDL/Ambient Monitoring Program Update    

7

49

Action Items for County Legislature Action Items for the Environmental Protection Committee Media Update

Financial Update 

Contracts New Contracts Amendments to Existing Contracts Change Orders

Funding State Bond Act Funds Federal EPA Funds

63


Federal Army Corps of Engineers Funds EFC Loans 

Onondaga County Lake Improvement Project Fourth Stipulation of the ACJ Clinton/Lower MIS CSO Improvement Harbor Brook Drainage Basin CSO Abatement Midland CSO Abatement Sewer Separation of CSO Areas: 022/038/040/045/046A/046B/047/048/050/051/053/054 3 Save the Rain Education and Outreach Grant Appendix     

Project Payments Lake Improvement Project Status Report Federal and State Grants/Loans Approved and Received Chronology of Project Construction Starts Contractors for Construction Projects  Metro Treatment Plant  CSOs WEP Acronyms

74



1


2


p

GRAY PROJECTS UPDATE

3


4


Gray Projects Update There were no gray projects underway in the Save the Rain program during the third quarter of 2018.

5


6


p

GREEN PROJECTS UPDATE

7


8


Green Projects Update: Progress continues to be made on several Save the Rain projects during the third quarter of 2018. During the third quarter, construction of the McKinley Park Greening (CSO 067), Comstock Avenue Green Street (CSO 060/077), South Avenue Green Street (CSO 052), Ostrom Place Road Reconstruction (CSO 060/077), and South Geddes Street Road Reconstruction (CSO 014) projects reached the completion phase. The McKinley Park project features a large bioretention area within the park that manages runoff from West Newell Street, and a reconstructed parking lot with a porous asphalt and infiltration system that manages the parking lots runoff. A total of 945,000 gallons of runoff is reduced annually as a result of this project. The Comstock Avenue Green Street project became the largest green street projects completed to date within the Save the Rain Program project portfolio. The project features a series of underground infiltration trenches and bioswales to manage runoff from Comstock Avenue and surrounding areas. In total, over 15 acres of impervious area is managed by the GI within this project, equating to a remarkable runoff reduction of over 14 million gallons per year. The South Avenue Green Street project is the first of five green street projects within CSO 052 to be constructed. This project features four underground infiltration trenches that manage runoff from South Avenue and adjacent side streets, which equates to 938,000 gallons of runoff reduction annually. The Ostrom Place and South Geddes Street road reconstruction projects are the fourteenth and fifteenth completed GI projects in partnership with the City’s annual road reconstruction program. Prior to the road reconstruction efforts, the City, through County funding and County-supplied design, constructs green infrastructure to manage the runoff from the street and surrounding areas. Both Ostrom Place and South Geddes Street feature underground infiltration trenches to manage stormwater runoff. The Ostrom Place project reduces runoff by 718,000 gallons per year and South Geddes Street manages 1.9 million gallons of runoff annually. Due to the partnership with the City’s road reconstruction program, the County’s restoration costs are greatly reduced, and the overall project costs are substantially lower than a standalone County-led green street project. Additionally, during the third quarter of 2018, construction began and continued on the Roney Lane Green Street (CSO 060/077) and Elmhurst Avenue Green Street (CSO 052) projects. It is anticipated that both projects will be completed early in the fourth quarter. Furthermore, construction of the following projects is planned to begin during the fourth quarter with completion either during the fourth quarter or in 2019.     

Charmouth Drive Green Street (CSO 052) Fairfield Avenue Green Street (CSO 052) Hutchinson Avenue Green Street (CSO 052) Syracuse Fire Station No. 5 (CSO 007) Berkeley Drive Road Reconstruction (CSO 060/077)

The County continued their aggressive public education and outreach strategy for all of the Countyled projects under construction and in design during the quarter. For projects under construction, the public was kept apprised of schedule and temporary construction impacts primarily via mailers, but also during various public events and meetings that the Save the Rain team attended.

9


The designs of several GI projects progressed during the third quarter. The Harbor Brook Green Streets projects on Lakeview Avenue, Richmond Avenue, South Geddes Street, Wilbur Avenue, and Magnolia Street progressed past the 50% design phase with 90% design expected early in the fourth quarter. Public meetings to review and educate the public on the GI designs will be held after the County’s consultant completes the 90% design. Furthermore, the additional green street candidate projects in CSO 060/077 neared the 25% design phase. These streets include South Salina Street, Elk Street, Robert Drive, Moore Avenue, and Vincent Street. The 25% design is expected from the County’s consultant early in the fourth quarter, at which time public meetings and discussions will be held. The CSO 005 Sewer Reconfiguration project, reached the regulatory review phase with the NYSDEC and ASLF. This project features a reconfiguration of the underflow connection from the CSO 005 sewer on West Genesee Street to the Harbor Brook Interceptor Sewer (HBIS) to significantly improve sewer hydraulics. Once complete, the SWMM modeling for the project projects a 1 million gallon CSO reduction (1.5 MG to 0.5 MG) and a decrease in CSO activation frequency from 12 events per year to 6 events per year, based on the 1991 typical year. This project is planned for construction in early 2019.

10


Project: Project Owner: Project Location: Sewershed: Technology: Runoff Reduction: Year Contracted: Project Cost:

Cit

FACT SHEET Fire Station No. 5

Prime Contractor:

Fire Station No. 5 City of Syracuse 114 N. Geddes Street CSO 007 Infiltration Trench 570,000 gal/yr 2018 $180,000 (engineer’s estimate) D.E. Tarolli

Project Description: The Fire Station No. 5 project is another example of the Save the Rain Program targeting a specific priority area for green infrastructure implementation. This project, within the CSO 007 sewershed, is intended to reduce pollution to Harbor Brook and Onondaga Lake. The CSO 007 sewershed is a tributary to the Harbor Brook Intercepting Sewer. This project will serve to reduce overflows from this sewershed and will provide a new parking lot and site improvements at Fire Station No. 5, located on North Geddes Street. An infiltration trench will be constructed beneath the parking lot at the Fire Station. This green infrastructure practice provides water quality improvement through infiltration and storage, thus reducing overflows. The underground infiltration trench will capture a very large volume of stormwater runoff beneath the parking area. Upon completion, the underground infiltration trench will capture runoff from approximately 3/4 acre of impervious area from the fire station parking lot, building roof and North Geddes Street. This will reduce stormwater runoff to the combined sewer by approximately 570,000 gallons annually.

Typical Underground Infiltration Trench

Project Location – N. Geddes Street

Street View of Firehouse 5 (credit: Google)

Version 09/16/18

11


Project: Project Owner: Project Location: Sewershed: CSO: GI Technologies:

FACT SHEET Green Park: McKinley Park

Capture Area: Runoff Reduction: Year Contracted: Cost: Prime Contractor:

McKinley Park City of Syracuse Parks Department West Newell Street, West Calthrop, and West Pleasant Avenues. Midland 067 Bioretention, Infiltration, and Porous Pavement 51,800 sq. ft. (estimated) 945,000 gal/yr (estimated) 2017 $690,000 D.E. Tarolli and J&J Landscaping

Project Description: The McKinley Park Project is one of many projects accomplished through the collaborative efforts of Onondaga County Save the Rain and the City of Syracuse Parks and Recreation Department. McKinley Park has served the recreational needs of the community as a neighborhood park since 1920. The primary goal of this project was to reduce the volume of stormwater flowing into the combined sewer system along West Newell Street, West Calthrop Avenue, and West Pleasant Avenue – all within the CSO 067 area. Now complete, this project implemented various green infrastructure technologies, including bioretention (also known as rain gardens) and porous pavement with an underground infiltration system. This infrastructure will capture runoff from the park and surrounding areas, totaling 51,000 square feet of drainage area. Stormwater will slowly soak into the ground or evaporate, eliminating excess runoff into the sewer system and improving the overall stormwater management and drainage in this area. A secondary goal of this project was to enhance McKinley Park by increasing green space and improving the basketball court. Existing pavement formerly used as a tennis court was removed entirely and replaced with open green space. Additionally, the former basketball half court was replaced with a full-sized porous pavement basketball court in partnership with the Jim and Juli Boeheim Foundation’s Courts4Kids Program. Court construction was completed and dedicated in summer of 2017. In its entirety, the McKinley Park project will remove an estimated 945,000 gallons of stormwater runoff per year from the combined sewer in the CSO 067 area.

Newly installed Bioretention Area along West Newell Street

Porous pavement parking lot

Version 09/14/2018

12


Project: Project Owner: Project Location:

Cit

Sewershed: Technology: Runoff Reduction: Year Contracted: Project Cost: Construction: Prime Contractor:

FACT SHEET Green Streets in CSO 052 Sewershed

CSO 052 Green Streets City of Syracuse Elmhurst, South, Fairfield, Fletcher, Edgewood, and Hutchinson Avenues and Charmouth Drive CSO 052 Infiltration Trench, Bioretention 6,500,000 gal/yr (total, estimated) 2018 $2,000,000 (engineer’s estimate) 2018 D.E. Tarolli

Project Description: The Green Streets in CSO 052 Project is another example of the Save the Rain Program targeting a specific priority area for green infrastructure implementation. This project, within the high priority CSO 052 sewershed, is intended to reduce pollution to Onondaga Creek and Onondaga Lake. The project will be located on seven streets within the City: Elmhurst Avenue, South Avenue, Charmouth Drive, Fairfield Avenue, Fletcher Avenue, Edgewood Avenue, and Hutchinson Avenue. This Green Streets project will use two types of green infrastructure technologies: underground infiltration trenches, and rain gardens (also known as bioretention). These green infrastructure practices will provide water quality improvements through infiltration and storage, thereby reducing stormwater contribution to the combined sewer system. This increased capture will reduce sewer overflows. In total, the project consists of 19 underground infiltration trenches and 1 rain garden. The underground infiltration trenches provide a very high capture volume without an obtrusive footprint at the surface, maximizing cost efficiency. Upon completion of all seven streets, the project will capture runoff from approximately 9.75 acres of impervious area, reducing stormwater runoff to the sewer by approximately 6.5 million gallons annually. Project areas include:  Charmouth Drive from Robineau Road to Arlington Avenue – 6 underground infiltration trenches; annual stormwater runoff capture: 1,800,000 gallons 

Fairfield Avenue from Fletcher to South Avenues – 1 underground trench using modular storage units, 1 bioretention area; annual stormwater runoff capture: 437,000 gallons.

Hutchinson Avenue from Clayton to South Avenues and Fletcher and Edgewood Avenues from Hutchinson to Fairfield avenues – 5 underground infiltration trenches; annual stormwater runoff capture: 2,198,000 gallons South Avenue from W. Brighton to Eastman avenues – 4 underground infiltration trenches; annual runoff capture: 938,000 gallons Elmhurst Avenue from Bishop Avenue to Hunt and Randall Avenues 3 underground infiltration trenches; annual runoff capture: 1,222,000 gallons

 

Charmouth Dr Elmhurst Ave Glenwood Ave

Fairfield Ave Hutchinson Ave

Project Locations 13

Version 09/14/2018


Underground infiltration trench installation on South Avenue

Underground infiltration trench installation on South Avenue

Completed infiltration trench awaiting new pavement on Elmhurst Avenue

14


Project: Property Owner: GI Technologies: Project Locations:

FACT SHEET Green Streets in CSO 060/077 Sewershed Project Description: The Green Streets in CSO 060/077 Sewershed projects are comprehensive green street applications located on multiple streets within the CSO 060/077 sewershed. This is a high priority sewershed that discharges frequently during rain events. The green streets are listed below and include capture area and runoff reduction estimates:

Sewershed: CSO: Capture Area: Runoff Reduction: Year Contracted: Cost: Contractors:

 Lancaster Avenue (Spring 2017) Capture Area: 560,489 sq. ft. Runoff Reduction: 3,290,000 gal/yr Project Locations Completed Project Cost: $880,980 In Red Boxes  Ackerman Avenue (Summer 2017) Capture Area: 387,245 sq. ft. Runoff Reduction: 3,450,000 gal/yr Completed Project Cost: $655,860  McKinley Avenue (Summer 2017) Capture Area: 123,709 sq. ft. Runoff Reduction: 1,370,000 gal/yr Completed Project Cost: $202,760  Roney Lane (Spring/Summer 2018) Capture Area: 187,778 sq. ft. Runoff Reduction: 760,000 gal/yr Project Cost: $558,950  Comstock Avenue (Spring/Summer 2018) Capture Area: 659,494 sq. ft. Runoff Reduction: 5,590,000 gal/yr Project Cost: $1,344,878

Green Streets in CSO 060/077 City of Syracuse Bioretention, Bioswales, Infiltration Trenches McKinley Ave. between S. Salina St. & S. State St.; Roney Ln. at Smith Ln.; Comstock Ave. between E. Colvin St. & Euclid Ave.; Ackerman Ave between Euclid Ave. & Kensington Rd.; Lancaster Ave. between Euclid Ave. & Kensington Rd. Midland 060/077 1,918,715 sq. ft. (total, all areas) 14,460,000 gal/year (total) 2017/2018 $3,643,428 D.E. Tarolli and J&J Landscaping

During the third quarter of 2018, construction was substantially completed on both Comstock Avenue and Roney Lane. Each design implements green infrastructure applications at key points along these streets in order to capture stormwater and enhance local urban streetscapes. Each project incorporates street tree plantings in the right-of-way, the installation of infiltration trenches underneath the roadway, tree planters, and rain gardens and bioretention areas throughout the project boundaries.

Bioretention Area 1 and Full Depth Roadway Reconstruction at Roney Lane Circle

Version 09/17/2018

15


Bioretention Area 2 at Roney Lane

Vegetated Infiltration Trenches at Comstock Avenue

16


Project: Property Owner: GI Technologies: Project Locations:

FACT SHEET Green Streets in Harbor Brook Sewershed Sewershed: CSOs: Capture Area: Runoff Reduction: Year Contracted: Bid Price: Contractors:

Project Description: The Green Streets in Harbor Brook Sewershed projects are comprehensive green street applications located on multiple streets within the Harbor Brook sewershed. CSOs 005, 006, 007 and 009 are high priority sewersheds that discharge frequently during rain events. The candidate streets are listed below with capture area and runoff reduction estimates:

Green Streets in Harbor Brook City of Syracuse Bioretention Areas, Infiltration Trenches Lakeview Ave. between W. Fayette St. & W. Marcellus St.; S. Wilbur Ave. between Conservation Pl. & W. Marcellus St.; Richmond Ave. between Liberty St. & N. Geddes St.; N. Geddes Street at W. Genesee St. Harbor Brook 005, 006, 007, 009 194,106 sq. ft. (total, all areas) 3,427,095 gal/year (total) TBD TBD TBD )

 Lakeview Avenue (CSO 006) Capture Area: 37,619 sq. ft. Runoff Reduction: 664,193 gal/yr  Magnolia Street (CSO 009) Capture Area: 89,300 sq. ft. Runoff Reduction: 1,576,662 gal/yr  South Wilbur Avenue (CSO 009) Capture Area: 19,901 sq. ft. Runoff Reduction: 351,368 gal/yr  Richmond Avenue (CSO 007) Capture Area: 36,298 sq. ft. Runoff Reduction: 640,870 gal/yr  North Geddes Street (CSO 007) Capture Area: 10,988 sq. ft. Runoff Reduction: 194,002 gal/yr This proposed project will incorporate infiltration trenches, bioretention areas, and tree plantings to manage stormwater from Lakeview Avenue, Magnolia Street, S. Wilbur Avenue, Richmond Avenue and North Geddes Street. Infiltration trenches capture water in an underground stone trench located beneath a roadway. From there, it slowly infiltrates into the ground. A bioretention area is a depressed, vegetated area that receives stormwater runoff from adjacent paved areas. The runoff then infiltrates to groundwater or is released to the atmosphere through evapotranspiration. When complete, these green streets will capture a total of 3,427,095 gallons of stormwater annually.

Version 09/19/2018

17


Example of a bioretention area (rain garden)

Example of a typical infiltration trench

18


Project: Project Owner: Project Location:

FACT SHEET Berkeley Drive Road Reconstruction

Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:

Berkeley Drive Road Reconstruction City of Syracuse Berkeley Drive (Stratford Street to Windsor Place) Midland 060/077 Infiltration Manholes 48,190 sq ft. 800,000 gal/yr 2018 $150,000 Ballard Construction

Project Description: The Road Reconstruction project on Berkeley Drive demonstrates the continued partnership between Onondaga County and the City of Syracuse. This project is another example of the City’s Department of Public Works partnering with Onondaga County to include green infrastructure in their road reconstruction program. This application, within CSO 060/077, is intended to reduce combined sewer overflows to Onondaga Creek and Onondaga Lake. The project uses several infiltration manholes between Stratford Street and Windsor Place, to manage the runoff from Berkeley Drive. The infiltration manholes are a unique application of storage structures to manage stormwater in areas that have limited space to do so. Due to their small footprint and high storage volume, infiltration manholes offer greater efficiency and ease of construction than other similar green infrastructure technologies, like underground infiltration trenches. High flows from large rain events (above one inch over two hours) will flow back into the existing combined sewer system for safety. The streetscape will not look different after the work is complete, as the manholes are completely underground with no visible features at the surface. This project manages runoff from over 48,000 square feet of impervious drainage area, equating to approximately 800,000 gallons of stormwater runoff annually, in the high priority area of CSO 060/077.

Stratford Street

Berkeley Drive

Windsor Place

Limits of the Road Reconstruction Project on Berkeley Drive

Example Infiltration Manhole Version 9/12/2018

19


Project: Project Owner: Project Location:

FACT SHEET Ostrom Place Road Reconstruction

Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:

Ostrom Place Road Reconstruction City of Syracuse Ostrom Place (Euclid Ave to South Dead End) Midland 060/077 Underground Infiltration Trench 40,655 sq ft. 718,000 gal/yr 2018 $179,518 Ballard Construction

Project Description: The Road Reconstruction project on Ostrom Place further exemplifies the continued partnership between Onondaga County and the City of Syracuse. This project is another example of the City’s Department of Public Works partnering with Onondaga County to include green infrastructure in their road reconstruction program. This application, within CSO 060/077, reduces pollution to Onondaga Creek and Onondaga Lake. The project uses one underground infiltration trench between Euclid Avenue and the dead end to the south, to manage the runoff from Ostrom Place. This area, although a short, dead-end street, is highly impervious due to the expanding parking of college students in areas that were formerly green space. This project captures an exceptionally high volume of stormwater compared to similar streets of this size and length. The infiltration trench is designed to manage runoff from varying areas of Ostrom Place to maximize the stormwater capture for the benefit of the environment. High flows from large rain events (above one inch over two hours) flow back into the existing combined sewer system for safety. The streetscape does not look different after the completed work, as the trenches are completely underground with no visible features at the surface. This project manages over 40,000 square feet of impervious drainage area, equating to greater than 700,000 gallons of stormwater runoff annually, in CSO 060/077. The infiltration trench was constructed in summer 2018. Limits of the Road Reconstruction Project on Ostrom Place are outlined in red on the map to the right 000000000

Construction of the Infiltration Trench (July 2018) Euclid Avenue

Dead End

Version 9/12/2018

20


Project: Project Owner: Project Location:

FACT SHEET South Geddes Street Road Reconstruction

Sewershed: CSO: GI Technology: Capture Area: Runoff Reduction: Year Contracted: Construction Cost: Prime Contractor:

South Geddes Street Road Reconstruction City of Syracuse South Geddes Street (Delaware Street to Shonnard Street) Harbor Brook 014 Underground Infiltration Trench 109,900 sq ft. 1,981,500 gal/yr 2018 $350,000 Ballard Construction

Project Description: The Road Reconstruction project on South Geddes Street further exemplifies the continued partnership between Onondaga County and the City of Syracuse. This project is another example of the City’s Department of Public Works partnering with Onondaga County to include green infrastructure in their road reconstruction program. This application, within CSO 014, reduces pollution to Harbor Brook and Onondaga Lake. The project uses three underground infiltration trenches between Delaware Street and Shonnard Street, to manage the runoff from South Geddes Street and parts of Merriman Avenue and Shonnard Street. By capturing this additional side-street runoff, the project is highly efficient, capturing nearly 2 million gallons annually. The infiltration trenches are designed to maximize the stormwater capture for the benefit of the environment. High flows from large rain events (above one inch over two hours) flow back into the existing combined sewer system for safety. The streetscape does not look different after the completed work, as the trenches are completely underground with no visible features at the surface. This project manages a total of 109,900 square feet of impervious drainage area, equating to approximately 1,981,500 gallons of stormwater runoff annually, in CSO 014. Construction was completed in summer of 2018.

Construction of Infiltration Trench #1 (August 2018)

Shonnard Street

Delaware Street

Limits of the Road Reconstruction Project on South Geddes Street are outlined in red on the map above Version 9/12/2018

21


Project: Project Owner: Project Location:

FACT SHEET CSO 005 Sewer Reconfiguration

Sewershed: CSO: Technology: CSO Reduction: Year Contracted: Construction Cost: Prime Contractor:

CSO 005 Sewer Reconfiguration City of Syracuse Intersection of West Genesee St. and Eureka St. Harbor Brook 005 Sewer Hydraulic Improvement 1,000,000 gal/yr TBD TBD DE Tarolli

Project Description: The CSO 005 Sewer Reconfiguration is a project that highlights a minimally invasive construction for maximum benefit in CSO volume reduction. CSO 005 has a history of frequent overflows, estimated at 1.5 MG per year via 12 activations (data from County SWMM model). This is primarily due to poor sewer hydraulics conveying flows to the Harbor Brook Interceptor Sewer (HBIS). By placing a new regulator structure upstream of a hydraulic bottleneck in the system, the project is able to reduce overflow volume at CSO 005 by 1 million gallons per year. This will reduce CSO activations by 6 occurrences/year (as predicted by the County’s SWMM model). The existing 005 regulator will remain as the secondary overflow and underflow for any laterals attached to the sewer. A backflow preventer will also be installed in the existing regulator underflow pipe to eliminate an unintended high flow release point for the HBIS. These hydraulic improvements provide significant improvement in CSO 005, reducing pollution to Harbor Brook and Onondaga Lake.

Version 9/21/2018

CSO 005 Sewer Reconfiguration Schematic (north is down) 22


FACT SHEET Green Streets in CSO 060/077 Sewershed Project Description: This proposed project will incorporate bioswales, bioretention areas, infiltration trenches, tree trenches, and enhanced tree pits to manage stormwater at the following locations: 

S. Salina St. Green Corridor: The proposed project includes bioswales, tree trenches, enhanced tree pits, and underground infiltration on a 10 block stretch of South Salina Street. The County received a $1.8M GIGP grant for this project through NYSEFC. Estimated runoff reduction: 4,881,429 gallons/yr Elk St. Green Street: The proposed project includes bioswales between the curb and the sidewalk on Elk Street. Estimated runoff reduction: 1,293,921 gallons/yr Robert Dr. Green Street: The proposed project includes underground infiltration trenches on Robert Drive Estimated runoff reduction: 1,445,206 gallons/yr Moore Ave. Green Street: The proposed project includes underground infiltration trenches on Moore Ave. Estimated runoff reduction: 2,213,407 gallons/yr Vincent St. Green Street: The proposed project includes underground infiltration trenches on Vincent Street. Estimated runoff reduction: 1,470,967 gallons/yr

Project: 2017 CSO 060/077 Green Streets Property Owner: City of Syracuse GI Technologies: Bioswales, Tree Trenches, and Infiltration Trenches Project Locations: South Salina St. between East Colvin and East Newell St., Elk St. South Salina Street and Dougal Ave., Robert Drive between East Colvin Street and North Hughes Place., Moore Ave between East Colvin Street and Smith Lane, Vincent St. between Harriette Avenue and Burten Street. Sewershed: Midland CSOs: 060/077 Capture Area: 640,253 sq. ft. (total, all areas) Runoff Reduction: 11,304,929 gal/year (total) Year Contracted: 2019 (est) Bid Price: $3,900,000 (Engineer’s Estimate) Contractors: D.E. Tarolli and J&J Lanscaping

A bioswale is a depressed, vegetated area that receives stormwater runoff from adjacent paved areas. The runoff then infiltrates to ground or is released to the atmosphere through evapotranspiration. Tree trenches and enhanced tree pits include stone trenches constructed beneath sidewalk areas to manage stormwater runoff and incorporate enhanced tree root growing space for improved long-term tree health. Infiltration trenches capture water in an underground stone trench where it then slowly infiltrates into the ground. When complete, these green streets will capture a total of 11,304,929 gallons of stormwater annually. Example of a tree trench Version 09/20/2019

23


24


p

GREEN IMPROVEMENT FUND

25


26


Green Improvement Fund Update: During the third quarter of 2018, no new GIF applications were received. Three resubmissions of previously submitted applications were reviewed by the County during the quarter. These were for the projects at Believer’s Chapel Church, Home Headquarters – 122 West Fayette Street, and 800 Block LLC, the former Assumption School at 812 North Salina Street. Each of the projects were reviewed by the GIF Committee and revised award amounts and contracts were issued by the County. Two other resubmissions were received late in the third quarter and will be reviewed by the GIF Committee during the fourth quarter. The Bellevue Country Club GIF project continued to progress during the quarter with the completion of fieldwork and preliminary design review by the City of Syracuse. This project will feature improved management of significant groundwater flow into the CSO 078/018 combined sewer from a stream on the golf course and management of stormwater from the main parking lot at the Country Club. No new projects reached the completion phase during the quarter, however, projects at 900 East Fayette Street and Performance Park (207 Wyoming Street) cleared several permitting hurdles that will allow for the imminent start of construction during the fourth quarter.

Green Improvement Fund Summary (as of 09/30/18) Projects Completed

95

Contract/Implementation Phase

16

Projects in Award Phase

6

Applications Under Review

1

Inactive/Ineligible

53

Total Applications Received

171

27


28


p

METRO WWTP PHOSPHORUS PROJECTS /TMDL/AMBIENT MONITORING PROGRAM UPDATE

29


30


ACJ Quarterly Status Report – 3rd Quarter 2018 Metro WWTP Projects Work progresses on the Metro Phosphorus Optimization project. Throughout the summer work focused on the “secondary process system” requiring partial treatment reductions. This work is largely completed and a second “tertiary” shutdown will occur in October 2018 to complete the remaining required work. The project is still on schedule for completion in 2019.

Ambient Monitoring Program (AMP) Tributary Water Quality Monitoring Program Tributary Sampling Event Summary (July – September 2018) July 2018:  Tributary Bacteria sampling events: July 5, 16 and 18  Tributary Biweekly sampling events: July 10 and 24 August 2018:  Tributary Bacteria sampling events: August 2, 6 and 20  Tributary Biweekly sampling events: August 14 and 28 September 2018:  Tributary Quarterly sampling event: September 5  Tributary Bacteria sampling events: September 10, 13 and 24  Tributary Biweekly sampling event: September 18

Tributary Bacteria Compliance (May - July 2018) The table below summarizes the results of the bacteria compliance assessment for samples collected at the routine AMP sampling sites during the April tributary sampling events.

31


AMP Tributary Bacteria Monthly Compliance Assessment1 (May – July 2018) Compliance Sampling Site Harbor Brook Velasko Road Hiawatha Boulevard Culvert (near Onondaga Lake) Onondaga Creek Dorwin Avenue Kirkpatrick Street Ley Creek at Park Street Ninemile Creek at Lakeland (Route 48) Bloody Brook at Onondaga Lake Parkway Tributary 5a at State Fair Boulevard Sawmill Creek at Onondaga Lake Recreational Trail

May

June

July

√ X X

√ X X

√ X X

√ X √ √ X √ √

X X X √ X X X

X X X X X X X

1

Compliance assessed with the applicable NYS Ambient Water Quality Standard (AWQS) for Fecal Coliform bacteria in the surface water as set forth in 6NYCRR Part 703.4 as follows:

“The monthly mean geometric mean, from a minimum of five examinations, shall not exceed 200.”

Onondaga Lake Water Quality Monitoring Program Onondaga Lake Sampling Summary (July - September 2018) July 2018:  Lake Weekly sampling events: July 2, 9, 12 and 23  Lake Biweekly sampling event: July 19 August 2018:  Lake Weekly sampling events: August 9, 13, and 16  Lake Biweekly sampling events: August 7 and 21 September 2018:  Lake Weekly sampling events: September 6 and 20  Lake Quarterly sampling event: September 11

32


Onondaga Lake Water Quality, 2018 Total Phosphorus Phosphorus is the limiting nutrient for algal growth in Onondaga Lake. Too much phosphorus causes excessive algae, which in turn makes the water appear green and cloudy, and contributes to low oxygen levels in the deep water. New York State has promulgated a narrative standard for phosphorus in water: “None in amounts that will result in growths of algae, weeds and slimes that will impair the waters for their best usages” (NYSCRR §703.2). For ponded waters the narrative standard is interpreted using a guidance value of 20μg/L calculated as the average total phosphorus concentration in the lake’s upper waters between June 1 and September 30. The phosphorus total maximum daily load (TMDL) target is a numeric endpoint that ensures protection of the designated best uses of a water body. The AMP tracks the summer average total phosphorus (TP) concentration in the lake’s upper waters. The ultimate measure of the success of the Onondaga Lake Phosphorus TMDL is the extent to which the in-lake total phosphorus criteria and beneficial uses are achieved. Since 2007, summer average (data from June through September) total phosphorus in the upper waters (0-3 meters) of the lake has been close to 20 ppb (µg/L), which NYS has established as a guidance value for determining a lake’s suitability for recreational uses.

33


Chlorophyll-a Less phosphorus in the lake has resulted in fewer and less severe algal blooms. Occurrences of phytoplankton blooms, subjectively defined for the AMP as Chlorophyll-a concentrations of 15 µg/L and 30 µg/L for minor (impaired conditions) and major blooms (nuisance conditions), respectively, have decreased dramatically since implementation of Actiflo®. No major algal blooms have been measured in Onondaga Lake in the past eight summers (June-September), based on laboratory measurements. The NYSDEC Division of Water issues "water-bodies with blue-green algae notices" for several regional lakes (see http://www.dec.ny.gov/chemical/77118.html for more information). Many varieties of algae are beneficial to lakes, providing the basis of the food chain that supports the entire ecosystem. Other types, like cyanobacteria (also known as blue-green algae), can produce toxins that are harmful to humans and can even cause death to animals that consume it (referred to collectively as harmful algal blooms (HABs)). Large blooms, even non-toxic ones, affect ecosystem health. Algae blooms most frequently occur in nutrient-rich waters, particularly during hot, calm weather. Based on NYSDEC’s September 21, 2018, update, 98 waterbodies were listed with HABs bloom notifications, with Jamesville Reservoir being the only waterbody in Onondaga County with a confirmed bloom based on lab sample results. In July 2018, colonies of Anabaena (a cyanobacteria associated with toxic blooms) were observed throughout Onondaga lake and accumulating in the marina. This resulted in very small isolated scums in a few locations, including the marina, and was characterized as a "pre-HAB" which did not materialize into a full-blown HAB.

34


PROGRESS REPORT Onondaga Lake and Watershed The attached progress report, dated April 2018, describes how changes in wastewater collection and treatment have brought about major improvements to Onondaga Lake. The large reductions in phosphorus and ammonia loading from Metro have profoundly altered the water quality and habitat conditions in Onondaga Lake. Improved stormwater management and Save the Rain’s innovative green infrastructure projects have helped prevent bacteria-laden combined sewer overflows from reaching streams and nearshore lake areas. In addition to the municipal investment, actions by Honeywell International to remediate the legacy of industrial pollutants have been successful in improving water quality and habitat conditions. The coordinated efforts to address wastewater, stormwater, and industrial contamination have brought about this remarkable transformation of Onondaga Lake.

BIOLOGICAL MONITORING PROGRAM (July - September 2018) Sampling Summary (July)  Completed larval seine event. Sampling Summary (August)  Completed Tributary macroinvertebrate sampling.  Completed first juvenile seine event  Completed macrophyte field verification survey  Completed macrophyte aerial survey Sampling Summary (September)  Completed second juvenile seine event  Completed annual adult electrofishing event

Macroinvertebrates Since 2000 Onondaga County has sampled the macroinvertebrate communities of Onondaga Lake and several of its tributaries to characterize the existence and severity of use impairment, and to evaluate the effectiveness of control actions [improvements to wastewater collection and treatment, both at Metro and the combined sewer overflows (CSOs)]. 2017 marked the last collection of

macroinvertebrates from Onondaga Lake and the finale tributary macroinvertebrate collections were completed in 2018 fulfilling the requirements of the Amended Consent Judgment. The results from each study will appear in the 2017 (lake macroinvertebrates) and 2018 (tributary macroinvertebrates) Onondaga Lake Ambient Monitoring Program Reports. Macroinvertebrates are an important component of the aquatic food web. Freshwater macroinvertebrate taxa include aquatic insects (Insecta), worms (Oligochaeta), snails (Gastropoda), clams (Bivalvia), leeches (Hirudinea), and crustaceans (Crustacea). These organisms provide the link in

35


the food web between microscopic organisms and fish, and facilitate the transfer of energy and materials between the terrestrial and aquatic ecosystems. One important difference between groups of macroinvertebrates is their tolerance to organic (oxygen-demanding) wastes. Macroinvertebrates can be grouped into three broad categories: intolerant, moderately tolerant, and tolerant to this class of pollutant. The intolerant group includes species of mayflies, stoneflies, caddisflies, riffle beetles, and hellgrammites; the tolerant group includes worms, some midges, leeches, and some snails. The moderately tolerant group includes most snails, sowbugs, scuds, blackflies, craneflies, fingernail clams, dragonflies, and some midges.

Stonefly (intolerant to pollution inputs)

Chironomidae larvae (tolerant to pollution inputs)

Crane Fly Larvae (moderately tolerant to pollution inputs)

36


ACJ Outreach Newsletter

Fall 2018

 Onondaga County has made huge strides in wastewater and stormwater management.  Green and gray infrastructure has surpassed the CSO capture volume of 95% mandated for December 31, 2018.  Still, sources of bacteria persist in the watershed, requiring the County, NYSDEC, and ASLF to determine a path forward to conclude the ACJ.

Plans for Ongoing Improvement

To meet regulatory goals for water quality, USEPA guidance states that integrated plans for wastewater and stormwater are intended to be innovative and effective initiatives to prioritize and coordinate efforts on a watershed basis.

Finalize a Long-Term Control Plan (LTCP)

CS O

Watershed Influences on Lake Water Quality

s

LIT T

• Onondaga County is in the process of selecting a consultant for engineering support services relating to the LTCP.

Stormwater and urban runoff create water quality challenges.

FA R

M

Engage the Community • Public support is necessary to attain water quality goals without causing substantial and widespread economic and social impacts.

R

• Private entities, municipalities, and institutions can incorporate green infrastructure into their projects.

OF UN

Litter and debris are washed down storm drains and into the system.

AN

FF

ER

UR B

• The additional CSO control initiatives will continue as part of the CSO LTCP, as required by the Metro SPDES permit.

NO RU

CSOs carry bacteria into streams. Severe rainstorms intensify this problem.

F

Agricultural runoff can carry Ley Creeksediment, nutrients, and bacteria.

Mi le e

e ak

n

aL ag nd no

O

Ni

ek Cre

Bl

dy Brook oo

GEDDES

oo k r Br rbo Ha

• Residents can help by picking up litter and debris, using rain barrels, and planting trees.

Continue to Invest Wisely

S Y R AC U S E

• Expanding green infrastructure through innovative projects like rain gardens, green roofs, and porous pavement will help to absorb stormwater.

O N O N DAG A

Onondag a C re e k

C A M ILLU S

M A RC E LLU S

• Maintaining gray infrastructure will ensure CSOs will continue to be captured and treated effectively.

L A FAY E T TE

ake

oL isc

Ot

• The County’s vision is to focus on infrastructure improvements rather than extensive monitoring programs and reporting. This will allow the County to direct more of its resources toward achieving water quality improvements and related community benefits.

OTI SCO

T U LLY

Joanne M. Mahoney County Executive

• Post-2018, the County will continue to implement green and innovative infrastructure, guided and prioritized by the volume and frequency of the remaining CSO discharges.

37

Tom Rhoads, P.E. Commissioner


PROGRESS REPORT

Onondaga Lake and Watershed April 2018

Joanne M. Mahoney County Executive

Tom Rhoads, P.E. Commissioner

Dramatic Improvements in Onondaga Lake Onondaga Lake has been transformed. Once considered among the most polluted lakes in the United States, the lake and shoreline now host hundreds of families, outdoor enthusiasts, and community events each year. The story of the lake’s recovery exemplifies the benefits of tackling environmental challenges in a collaborative way. For decades, Onondaga County leaders have fostered a culture of innovation in science and engineering and engaged the community in a discussion of a shared vision for a restored lake. This progress report describes how the investment in science and engineering has improved the lake and watershed and helped attain the community vision for this important natural resource. Advanced treatment for phosphorus and ammonia at the Metropolitan Syracuse Wastewater Treatment Plant (Metro) reduced the input of these chemicals to Onondaga Lake. In response, the lake now meets water quality standards for phosphorus and ammonia, hosts a diverse community of plants and animals, and is an attractive community asset. Advanced wastewater treatment processes and expanded capacity at Metro have helped to dramatically improve water quality in Onondaga Lake.

Onondaga County has met or exceeded state and federal regulatory requirements to improve the wastewater collection and treatment system, and the quality of the waters is a testament to the value of this community investment.

A successful stormwater management program has also contributed to improving water quality conditions in Onondaga Lake and its tributary streams. Onondaga County has used a combination of traditional and innovative measures to reduce runoff during wet weather help maintain the capacity of the collection system to direct wastewater to Metro. The County’s Save the Rain program has garnered national recognition and awards. In addition to the municipal investment, actions by Honeywell International to remediate the legacy of industrial pollutants have been successful in improving water quality and habitat conditions. The coordinated efforts to address wastewater, stormwater, and industrial contamination have brought about this remarkable transformation of Onondaga Lake. To understand the magnitude of improvement, it’s necessary to review the regulatory process and milestones associated with meeting the federal Clean Water Act goal of “swimmable, fishable” waters and benchmark historical conditions.

38 Progress Report: Onondaga Lake and Watershed, 2016-17

1


Regulatory Framework for Restoring Our Waters The 1972 federal Clean Water Act defines the regulatory framework for water pollution control in the US. The objective of the 1972 Act was “to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters” {section 101(a) PWL 92-500}. The same section defined two “national goals”: (1) eliminating the discharge of toxic pollutants into navigable waters by 1985, and (2) achieving an interim water quality level that would protect fish, shellfish, and wildlife while providing for recreation in and on the water wherever attainable.” Common shorthand for the national goals is “swimmable, fishable” waters; this effectively captures the congressional intent to protect both human uses and aquatic ecosystems. The Clean Water Act recognizes that the states have primary responsibility for meeting these goals. A welldeveloped framework for states to evaluate and test their waters, define assimilative capacity (i.e., sensitivity to pollutants), and regulate discharges has emerged. The success of Onondaga Lake’s restoration illustrates how this regulatory framework can be effectively applied to address complex pollution issues.

Classification and Best Use The regulatory framework begins with classification (Figure 1). States are required to classify the water bodies within their boundaries according to their “best use.” In New York, the Department of Environmental Conservation (NYSDEC) is responsible for classifying lakes, streams, FIGURE 1. Regulatory process to define and address impaired water bodies rivers, and estuaries. These waters are classified as suitable for drinking water sources, recreation (swimming and boating), aquatic life protection, industrial cooling water, etc. Water quality standards are defined based on scientific analyses that reflect these designated best uses. For example, a lake serving as a public water supply requires more stringent limits on potential contaminants than a lake used for boating or industrial uses. Regular testing is conducted to ensure that water quality and habitat conditions support these designated uses. Waters that do not meet the water quality standards associated with their classification are considered “impaired” and reported to the federal Environmental Protection Agency (EPA). Efforts to restore impaired waters are given high priority for state and federal funding.

Onondaga Lake Classification Onondaga Lake includes both Class B waters (northern segment) and Class C waters (southern segment and near the confluence of Ninemile Creek) (Figure 2). The best uses of Class B waters are for primary and secondary water contact recreation and fishing. Primary water contact recreation includes activities that immerse the body in the water, such as swimming; secondary water contact recreation includes activities without full immersion, such as boating. In addition, Class B waters shall be suitable for fish, shellfish, and wildlife propagation and survival. The best usage of Class C waters is fishing. These waters shall also be suitable for fish, shellfish and wildlife propagation and survival. Class C waters shall be suitable for primary and secondary water contact recreation, although other factors may limit the use for these purposes. 2

FIGURE 2. Water quality classification, Onondaga Lake

39 Progress Report: Onondaga Lake and Watershed, 2016-17


Historical Water Quality: Impairment Onondaga Lake was included on NYSDEC’s inaugural list of impaired waters in 1996, meaning that measured water quality conditions were not adequate to support the designated best use for aquatic life protection and recreation. The lake was listed due to its elevated levels of ammonia nitrogen, phosphorus, and bacteria; and low levels of dissolved oxygen. Treated effluent from Metro was identified as a primary source of phosphorus and ammonia to Onondaga Lake. The low levels of dissolved oxygen (DO) are related to the elevated phosphorus concentrations: phosphorus is the key nutrient supporting the growth of phytoplankton (algae and cyanobacteria) in the lake water. When phytoplankton die and settle into the deep waters, they are decomposed by microorganisms in an aerobic process that depletes the supply of DO. Low concentrations of DO preclude fish and other aquatic animals from surviving in the deeper waters. Elevated bacteria counts were also linked to the municipal wastewater collection and treatment system. Portions of the City of Syracuse are served by combined sewers; these large underground pipes carry both storm runoff and sewage to Metro. During wet weather, pipe capacity can be exceeded, causing combined sewer overflows (CSOs) to nearby streams.

Commitment to Improvements In 1998, Onondaga County committed to a 15-year phased program of improvements to its wastewater collection and treatment infrastructure as a necessary investment to address the lake’s impaired condition. The program, referred to as the Amended Consent Judgment (ACJ), included three central elements: • Improvements to Metro to enhance ammonia and phosphorus removal; • Improvements to the collection system to reduce the frequency, magnitude, and duration of CSOs; and • Comprehensive monitoring through an annual Ambient Monitoring Program (AMP) to measure the effectiveness of the improvements and evaluate whether impaired uses are restored.

Combined sewer overflow to Onondaga Creek during an intense rain storm, Syracuse, NY

The 1998 estimate for the required infrastructure improvements was $380 million, and Onondaga County received substantial state and federal aid. The ACJ was subsequently modified to include additional projects and to extend through 2018. As of December 2017, the ACJ projects to address wastewater collection and treatment and stormwater management total over $640 million. Onondaga County has shouldered an increasing share of the costs of more recent projects, including the Save the Rain green infrastructure projects. The local share of the total $640 million investment is approximately 56%.

Improvements to Wastewater Treatment Enhanced Ammonia Removal at Metro In the 1990s, concentrations of ammonia nitrogen in the lake waters were above regulatory standards designed to protect sensitive aquatic life forms, including early life stages of fish. Treated effluent from Metro represented over 90% of the external ammonia input to Onondaga Lake. As part of the ACJ, NYSDEC required Onondaga County to undertake a phased program to upgrade and expand the wastewater treatment capacity and processes at Metro in order to reduce 40 Progress Report: Onondaga Lake and Watershed, 2016-17

3


effluent ammonia levels. Onondaga County implemented best management practices and maximized existing Metro capacity while searching for an effective long-term solution. The County consulted with international experts for advice on emerging technologies capable of reliable nitrification (biological conversion of ammonia to nitrate, a non-harmful form of nitrogen) in cold climates like Syracuse. A Biological Aerated Filtration (BAF) system was selected; the engineering team completed pilot tests to confirm its effectiveness at cold temperatures and brought the process on-line in January 2004. BAF technology uses millions of tiny polystyrene beads to provide the vast surface area needed for the microbial community to metabolize ammonia to nitrate nitrogen. Metro’s contribution of ammonia to Onondaga Lake has declined in response to the interim measures and, most dramatically, when the BAF system came online (Figure 3).

FIGURE 3. Discharge of Ammonia-N to Onondaga Lake from Metro, 1990–2016

Lake Response to Reduced Ammonia Inputs The interim actions to enhance ammonia removal after the ACJ began in 1998 helped improve the lake’s water quality. Installation of the BAF system in 2004 brought about a 98% reduction in Metro’s ammonia loading. The lake response to the load reduction was rapid and dramatic, as shown in Figure 4. Since 2007, Onondaga Lake has consistently met the regulatory standards designed to protect sensitive aquatic life. In 2008, NYSDEC formally de-listed Onondaga Lake as impaired by ammonia–N (Table 1).

FIGURE 4. Time series of reduction in ammonia N, Onondaga Lake upper waters, 1990–2017

TABLE 1. Measured compliance with ammonia N standard, Onondaga Lake, 1998–2017

4

41 Progress Report: Onondaga Lake and Watershed, 2016-17


Enhanced Phosphorus Removal at Metro The search for cutting-edge technology extended to the phosphorus treatment as well. Onondaga County engaged experts to identify alternatives and conduct pilot tests. Among the performance indicators for the pilot tests was an examination of effluent phosphorus bioavailability. That is, how “potent” was the treated effluent in growing phytoplankton (algae and cyanobacteria)? Because phosphorus is the limiting nutrient for phytoplankton growth in Onondaga Lake, and because Metro contributed about 60% of the external loading, reducing bioavailable phosphorus in treated effluent was projected to have a dramatic impact on lake quality. To measure how well the various technologies were able to reduce bioavailable phosphorus, samples of Metro effluent from pilot tests were sent to a specialty testing laboratory. Filtered and unfiltered samples of treated Metro effluent were incubated with algal cells under controlled conditions; all other nutrients except phosphorus were added to the laboratory vessels. The amount of algae grown in the vessels is an indicator of phosphorus bioavailability.

FIGURE 5. Total P input from Metro to Onondaga Lake, 1990–2016

Based on the bioavailability testing results, among other factors, a High Rate Flocculation System (HRFS), trade name Actiflo®, was selected and installed at Metro. Actiflo® is a physical-chemical treatment process that uses microsand particles along with iron salts to enhance coagulation and settling of particulate materials from the wastewater stream. The introduction of HRFS to the Metro treatment train in 2005 reduced the phosphorus loading to the lake from Metro by approximately 86% (Figure 5) and achieved a significant reduction in bioavailable phosphorus to the lake. To understand the significance of the Metro phosphorus reductions in meeting lake water quality goals, samples from the lake tributaries were also subjected to bioassay studies, using the standard laboratory incubation technique described above. This 2009 study focused on the particulate fraction of phosphorus, since almost all dissolved phosphorus supports phytoplankton growth. The results confirmed the results from the pilot testing. Only a tiny percent of the particlebound phosphorus in Metro effluent is available to the algal community. In contrast, particles entering Onondaga Lake through the watershed tributaries exhibit much higher potential for supplying phosphorus to support phytoplankton (Table 2).

TABLE 2. Bioavailability of P bound to particles, Onondaga Lake inflows

Source

Bioavailable Fraction of Particulate P

Metro Effluent

1%

Metro Bypass

25%

Onondaga Creek

50%

Ninemile Creek

20%

Ley Creek

6%

Harbor Brook

20%

Tributary 5A

20%

East Flume

20%

Source: Upstate Freshwater Institute, 2009

42 Progress Report: Onondaga Lake and Watershed, 2016-17

5


Lake Response to Reduced Phosphorus Inputs As displayed in Figure 6, implementation of the High Rate Flocculated Settling technology Actiflo® had an immediate impact on lowering phosphorus concentrations in Onondaga Lake waters. Since 2007, summer average TP levels have fluctuated around the NYSDEC 20 µg/L guidance value; concentrations are slightly higher during wet summers when there is ample runoff from the watershed. The lower summer TP has led to a decline in algal abundance and the frequency, magnitude, and duration of algal blooms in Onondaga Lake. Once a frequent summer phenomenon, algal blooms are now rare and of limited duration when they do occur. The County’s AMP tracks the concentration of chlorophyll-a, the primary photosynthetic pigment as an indicator of phytoplankton abundance. The decline in phytoplankton blooms (Figure 7) is evidence

FIGURE 6. Summer average TP in Onondaga Lake’s upper waters compared to NYS guidance value, 1990–2017

FIGURE 7. Percent of sampling events detecting algal blooms in Onondaga Lake, June 1–Sept. 30, 1990–2017

6

43 Progress Report: Onondaga Lake and Watershed, 2016-17


of the effectiveness of the controls on phosphorus inputs to the lake. The AMP also identifies and enumerates the phytoplankton community and tracks the percent of cyanobacteria in the assemblage. Cyanobacterial blooms, also known as harmful algal blooms, can impair water quality for recreation. These data further document the lake’s return to a healthy condition (Figure 8).

FIGURE 8. Cyanobacterial contribution to phytoplankton biomass, Onondaga Lake, June 1–Sept. 30, 1990–2016

Addressing the Combined Sewers Like many older cities, portions of the City of Syracuse are served by combined sewers. These large pipes convey both wastewater and stormwater to Metro for treatment. During wet weather, the pipe capacity can be overwhelmed, resulting in overflows to nearby waterways and periodic exceedances of bacteria counts in the receiving waters.

Onondaga County is required to

In 2009, Onondaga County launched its Save the Rain capture or eliminate 95% of the volume program to meet the challenges of addressing combined sewer overflows. The program uses a multi-pronged of combined sewage reaching the approach that involves both conventional and innovative waterways by December 31, 2018. strategies. Since combined sewers convey both storm runoff and sewage to Metro, two conventional strategies to reduce Save the Rain enabled the County the frequency and magnitude of overflow events include to meet this aggressive goal in 2014, sewer separation (reconfiguring/adding pipes resulting four years ahead of schedule. in one for storm runoff and one for sewage) and storage (installing large tanks or tunnels to capture a portion of wet weather flows, thus ensuring pipe capacity and reducing the risk of overflows). The captured wet weather flows are conveyed to Metro for treatment once the storm is over. These measures are referred to as gray infrastructure because of the substantial concrete construction component of the projects. Seven gray projects have been completed at a cost of $147 million. This investment in sewer separation, piping, and storage facilities prevents over 201 million gallons of combined stormwater runoff and sewage from reaching Onondaga Lake and its tributaries each year. Save the Rain also spearheads green infrastructure projects to reduce the volume of stormwater runoff that enters the combined sewer system. As a result of this program, Onondaga County has become a nationally recognized leader in application of green infrastructure solutions for stormwater management. Hundreds of projects have been installed across Syracuse, including green roofs, rain barrels, rain gardens, porous pavement, tree plantings, and vegetated swales. To date, more than 200 unique green infrastructure projects have been completed, including both public and private Green Improvement Fund (GIF) projects, with a total investment of $58.8 million; these projects—some large, some small—prevent an estimated 154 million gallons of stormwater from reaching the collection system. 44 Progress Report: Onondaga Lake and Watershed, 2016-17

7


Onondaga Lake as a Recreational Resource Water quality conditions in much of Onondaga Lake support water contact recreation, and have for many years as displayed in Figure 9. With the exception of sites along the southern shoreline, where CSO-affected streams enter the lake, bacteria counts are within New York State health standards for water contact recreation. As documented in the technical report “Attainment of Designated Uses in Onondaga Lake” a beach located at Willow Bay would have been open continuously during the summer since 2008. Much of the lake shoreline is in public ownership, with ongoing projects designed to connect the lake with the City of Syracuse and surrounding areas through trails, parklands, and destination venues. A collaborative research and monitoring program that includes the County’s Department of Water Environment Protection (OCDWEP), SUNY College of Environmental Sciences and Forestry (SUNY-ESF), NYSDEC, and Honeywell is in place to track the fish community’s response to changing water quality and habitat conditions. This collaborative program documents that Onondaga Lake’s fish community includes a diverse group of native and nonnative species. Surveys conducted since the late 1980s have identified 66 fish species. Onondaga Lake is part of the Oswego River Basin and the fish community is similar to those found in Oneida Lake and the Seneca River. In the 1980s, the Onondaga Lake fish community consisted almost entirely of pollution-tolerant species; the current fish community includes pollution-sensitive species as well. The program has documented increasing numbers and expanding distribution of brown trout. Many lake fishes are highly valued by anglers, including largemouth bass, smallmouth bass, walleye, brown trout, brown bullhead, yellow perch, and sunfish. Some fish, such as alewife, golden shiner, and other small species, are a food source for predatory fish. Still other species, such as longnose gar, bowfin, and the state-threatened lake sturgeon, are important for their unique appearance, life history, or relative scarcity. Invasive species present in Onondaga Lake, like the zebra mussel, round goby, and alewife, have a profound effect on the lake ecosystem by altering food-web relationships, affecting water clarity, and changing nutrient exchange between the water and the bottom sediments. The research and monitoring efforts provide early warning of new invasive species. Further changes in the lake’s fish community are anticipated as water quality and habitat conditions continue to improve.

8

Once rarely caught in Onondaga Lake, brown trout now persist throughout most of the year due to improved dissolved oxygen levels.

Similar to many New York State waterbodies, there are health advisories limiting consumption of fish from Onondaga Lake. The New York State Department of Health (NYSDOH) recommends that women under age 50 and children under age 15 eat no fish from the lake. This advisory is in place for several water bodies in the Finger Lakes region. The NYSDOH further advises eating no walleye, carp, channel catfish, or white perch from Onondaga Lake. The health advisory also applies to largemouth and smallmouth bass over 15 inches; these larger fish should not be consumed. Other fish species are considered safe for adult men, but with some warnings: limit consumption of brown bullhead and pumpkinseed to four meals per month, and other species to one meal per month.

45 Progress Report: Onondaga Lake and Watershed, 2016-17


90–100%

50–89%

<50%

Figure 9. Percentage of summer months that meet water quality standards for bacteria at ten nearshore stations in Onondaga Lake, 2008–2017 46 Progress Report: Onondaga Lake and Watershed, 2016-17

9


Conclusions This progress report describes how the changes in wastewater collection and treatment have brought about major improvements to Onondaga Lake. The large reductions in phosphorus and ammonia loading from Metro have profoundly altered the water quality and habitat conditions in Onondaga Lake. Improved stormwater management and Save the Rain’s innovative green infrastructure projects have helped prevent bacteria-laden combined sewer overflows from reaching streams and nearshore lake areas. The lake’s biota has responded to the improving water quality and habitat conditions with increasing numbers of species as well as a shift in community composition to include more pollution-sensitive organisms. As algal blooms have become rare, increased light penetration has enabled the rooted aquatic plant (macrophyte) community to expand into deeper water. These macrophytes provide improved spawning and nursery habitat and stabilize the lake sediments, which further benefits water clarity. With the improving aesthetic conditions, thousands more people visit Onondaga Lake parks and shoreline each year to enjoy walking, fishing, biking, paddling, and community events. The investment in innovative wastewater and stormwater solutions has allowed the community to meet its vision and reconnect with Onondaga Lake.

MORE INFORMATION Learn more on the web at www.ongov.net/wep

10

47 Progress Report: Onondaga Lake and Watershed, 2016-17

April 2018


48


p

LEGISLATIVE /REGULATORY / MEDIA UPDATE

49


50


Legislative/Regulatory Update Action Items for the County Legislature (July – September) 

Authorizing the Transfer of Real Property to the City of Syracuse and Approving the Classification of an Unlisted Action under SEQRA (Creekwalk trail).

Authorizing the County of Onondaga to Grant a Permanent Easement to National Grid for Construction, Operation and Maintenance of a Utility Pole/Line.

Resolution Calling a Public Hearing in Connection with Proposed Improvements for the Onondaga County Sanitary District for the Meadowbrook-Limestone Wastewater Treatment Plant.

Authorizing Execution of Agreements with Cooperating Municipalities in the Meadowbrook-Limestone Service Area to Apply for Funding Through the NYS Intermunicipal Water Infrastructure Grants Program and to Collaborate in Implementation of Such Grants.

Authorizing the County Executive to Enter into a Contract with the US Department of the Interior for the Operation and Maintenance of Stream Gaging Stations.

Action Items for the Environmental Protection Committee (September) 

Approving Proposed Improvements for the Onondaga County Sanitary District Consisting of the Removal of Extraneous Flows from the Meadowbrook-Limestone Wastewater Treatment Plant.

Authorizing the Issuance of $9,000,000 Bonds of the County of Onondaga to Pay Cost of Improvements Consisting of the Removal of Extraneous Flows from the Meadowbrook-Limestone Wastewater Treatment Plant.

51


Media Update Facebook

52


Sample Q3 Facebook Posts

53


54


List of all Q3 Facebook Posts

55


56


57


Instagram

Sample 2018 Q3 Instagram Posts

58


Twitter

59


2018 Clean Water Fair Flyer

2018 Save the Rain Ad Buys

60


2018 Save the Rain Billboards

Sample Save the Rain Billboard

61


62


p

FINANCIAL UPDATE

63


64


Financial Update Contracts New Contracts     

Save the Rain Outreach Contract with the 7 Enterprises Marketing for promotional outreach campaign for Save the Rain and Connect the Drops. Contract amount: $200,000. Executed: 6/23/18.

Master Term Services – Green Design Contract with Environmental Design & Research (EDR) for design of green sites, streets and storm sewers. Executed: 7/26/18.

  

Master Term Services – Green Design Contract with CH2M Hill Engineering for design of green sites and streets. Executed: 8/22/18.

  

Master Term Services – Green Design Contract with Prudent Engineering for design of storm sewers. Executed: 9/5/18.

  

Master Term Services – Green Design Contract with O’Brien & Gere for design of green sites. Executed: 9/5/18.

 

Green Improvement Fund Contract with Crest Cadillac for reimbursement of green improvements in the Clinton sewershed. Contract amount: $372,310. Executed: 9/5/18.

Amendments to Existing Contracts     

Stormwater Compliance Contract with Onondaga County Soil & Water Conservation District for program assistance and stormwater permit compliance through December 2018. Amendment Amount: $77,500. Executed: 7/18/18. Environmental Education Contract with Cornell Cooperative Extension for educational outreach. Amendment Amount: $189,131. Executed: 7/27/18

1 65


  

Green Infrastructure Maintenance Contract with Onondaga Earth Corps for green infrastructure maintenance. Amendment Amount: $77,500. Executed: 8/2/18.

 

Non-Point Source Pollution Contract with Onondaga County Soil & Water for assistance with phosphorus reduction program and non-point source pollution education. Amendment Amount: $82,500. Executed: 9/5/18.

Change Orders 

None to report.

2 66


Funding Grants NY State Grant Reimbursements Received: Optimization: $1,880,278 S. State Street: $1,296,991 Federal EPA Funds  Reimbursements requested: None  Reimbursements received: None Federal Army Corps of Engineers Funds  Reimbursements requested: None  Reimbursements received: None 

GIGP Grants Requested: None Received: None

EFC Reimbursements Received: Midland LT $32,993.16 on 8/28/18 Clinton LT $33,8703.19 on 8/28/18 Harbor Brook LT $44,112.19 on 8/28/18

67


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Clinton/Lower MIS CSO Improvements Summary of Current and County Authorizations

Total Project Costs Expended To 9/30/18

Project /Task/Line Item Clinton Street CSO Facility Planning (Original) Engineering Services (EEA) $ Original Facility Plan Subtotal $

751,266 751,266

$ $

751,266 $ 751,266 $

Clinton Street CSO Conveyances Project Contract No. 1 - Phase 1 Conveyances (Delaney) Contract No. 2 - Phase 2A Conveyances (Delaney) Engineering/Construction Services (CDM/C&S) Conveyances Subtotal

$ $ $ $

14,478,053 4,074,455 2,738,000 21,290,508

$ $ $ $

14,478,053 4,074,455 2,738,000 21,290,508

Clinton Storage Project (1) Construction Estimate Engineering Services (EEA and others) Construction Management and Administration (CDM/C&S) Construction Testing (CME)

$ $ $ $

77,742,858 12,122,013 4,833,411 327,847

$ $ $ $

79,831,600 11,925,712 4,521,602 277,716

CSO Storage Subtotal $

95,026,129

$

Facility Plan for CSOs 027 & 029 Construction Estimate Engineering Services (Ch2MHill) Engineering Services (TBD) Floatables Arcadis County Administration and Other Costs Facility Plan Subtotal

$ $ $ $ $

3,100,000 91,211 782,032 3,973,243

Clinton/Lower MIS Green Implementation Program Construction Contracts incl. GIF Public/Private $ Ch2MHill Program Management & Engineering $ Green Subtotal $

38,508,611 15,900,000 54,408,611

Program Management Project Management (CDM/C&S) Project Management for Facility Plan (CDM/C&S) (2) $ Program Management Subtotal $ Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Other Contingency

Authorization Remaining

Total Proposed Budget

$ $ $ $

(0) (0) 0 (0)

$ $ $ $ $ 96,556,631 $

(2,088,742) 196,301 311,809 50,131 (1,530,502)

$

$ 91,186 $ 35,338 $ $ 126,524 $

3,100,000 25 746,694 3,846,719

$ $ $

33,375,391 $ 11,864,028 $ 45,239,418 $

5,133,220 4,035,972 9,169,193

$

$ $ $

$ $

-

$ $ $ $ $ $ $ Miscellaneous Subtotal $

3,726,350 4,861,000 126,115 301,334 234,885 310,738 489,863 10,050,285

$ $ $ $ $ $

$

185,500,042

$

Authorized Budget 185,500,042

Notes: (1) Includes engineering costs from original Clinton RTF Project (2) CDM/C&S Project Management costs are included in the total facility plan costs

68

(0) (0)

$

-

3,726,350 3,959,746 350,857 226,334 879,337 740,944

$ $ $ $ $ $ $ 9,883,567 $ 173,847,915

$

-

901,254 (224,742) 75,000 (644,452) (430,206) 489,863 166,718 11,652,127


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Harbor Brook Drainage Basin CSO Abatement Summary of Current and Proposed Costs, and County Authorizations Total Project Costs Total Proposed Budget

Project /Task/Line Item

Expended to 9/30/18

Authorization Remaining

Harbor Brook CSO Abatement Project Original Engineering Expenses

$

5,500,000

$

5,500,000

$

HBIS Replacement and CSO Abatement Project Construction Contract No. 1 (1) (JJ Lane) Other Miscellaneous Work Engineering/Construction Sevices (CDM/C&S) County Administration and Other Costs

$ $ $ $

18,289,918 2,482,920 2,012,615 114,547

$ $ $ $

23,391,425 2,651,315 953,749

$ $ $ $

(5,101,507) 2,482,920 (638,700) (839,202)

HBIS Replacement and CSO Abatement Project Total $

22,900,000

$

26,996,490

$

(4,096,490)

$ $ $ $ $ $

34,502,000 4,200,000 3,390,000 2,280,000 44,372,000

$ $ $ $ $ $

29,468,827 3,971,487 4,600 1,497,536 5,360,579 40,303,030

$ $ $ $ $ $

5,033,173 228,513 (4,600) 1,892,464 (3,080,579) 4,068,970

$ $ $ $ FCF Program Total $

12,000,000 1,878,731 800,000 400,000 15,078,731

$ $

144,843 15,300

$

160,143

$ $ $ $ $

12,000,000 1,733,888 784,700 400,000 14,918,588

Lower Harbor Brook Storage & Conveyance Construction Estimate (with contingency) Engineering Services (EEA) Barton & Loguidice (flood plain dev permit) Engineering Services (CDM/C&S) Project Escalation to Midpoint of Construction Lower Harbor Brook Storage & Conv Total Harbor Brook CSOs FCF Program Construction Estimate Engineering Services (Arcadis) County Administration and Other Costs Project Escalation to Midpoint of Construction

Other Harbor Brook Green Construction Contracts incl. GIF Public/Private & Rain Barrels O'Brien & Gere Wetlands disinf project CH2MHILL Cso 018 Monitoring Ch2MHill Engineering & Program Management Harbor Brook Green Project Total

-

$ $ $ $ $

13,000,000 3,650,000 16,650,000

$ $ $ $ $

16,819,606 55,360 185,599 6,681,721 23,742,286

$ $ $ $ $

(3,819,606) (55,360) (185,599) (3,031,721) (7,092,286)

Program Management Project Management (CDM/C&S) $ Project Management for FCF Plan Implem (CDM/C&S) $ Program Management Total $

499,269 499,269

$

2,813,628

$

(2,314,359)

$

2,813,628

$

(2,314,359)

Harbor Brook Mitigation

$

3,500,000

$

3,265,000

$

235,000

Total Costs for Harbor Brook CSO Area under 4th Stip

$

108,500,000

$

102,780,577

$

5,719,423

69


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Midland CSO Abatement Summary of Current and Proposed Costs, and County Authorizations

Total Project Costs Total Proposed Budget

Project /Task/Line Item Midland Ave. RTF & Conveyances Midland Phase 1 Conveyances - Construction Midland Phase 2 RTF & Conveyances - Construction Midland Demolition Contracts - Construction Other Construction Phase 1 and 2 Engineering (Parsons & EEA) CME Construction Testing RTF Modifications (Construction, Eng, CM, Admin) Facility Plan Total

Expended to 9/30/18

Authorization Remaining

$ $ $ $ $ $ $ $

1,836,434 53,372,689 748,483 137,000 14,717,163 227,341 3,000,000 74,039,110

$ $ $ $ $ $

1,836,434 53,372,689 748,483 136,342 12,503,353 219,815

$

68,817,116

$ $ $

12,296,549 64,800 750,000

$ $ $

12,098,662 66,130 729,224

$

13,111,349

$

12,894,017

FCF Facility Plan Construction Estimate Engineering Services (Arcadis and others) Construction Management and Administration Project Escalation to Midpoint of Construction Clinton Storage Project Total

$ $ $ $ $

1,300,000 623,954 210,000 2,133,954

$ $

38,802 46,039

$ $ $

1,261,198 577,915 210,000

$

84,841

$ $

2,049,113 2,049,113

Facility Plan for Midland CSOs Construction Estimate Engineering Services (Ch2MHill) Engineering Services, County Admin, ect (TBD) Facility Plan Total

$ $ $ $

14,900,000 121,401 3,720,000 18,741,401

$ $ $ $

121,368 181,584 302,953

$ $ $ $ $

14,900,000 33 3,538,416 18,438,448 18,438,448

Midland Green Implementation Program Construction Contracts incl. GIF Public/Private $ Ch2MHill Program Management & Engineering $ Clinton Green Program Total $

7,500,000 3,917,636 11,417,636

$ $ $

12,812,985 3,300,687 16,113,672

$ $ $ $

(5,312,985) 616,949 (4,696,036) (4,696,036)

6,530,602

6,641,383 6,641,383

$

(110,781)

6,530,602

$ $ $

$ $

(110,781) (110,781)

$

1,809,802

$

1,809,802

$

$ $ $ $ $ Miscellaneous Costs Total $

182,323 194,317 635,031 2,591,117 526,211 5,938,801

$ $ $ $ $

$181,975 194,317 746,035 529,813 3,461,941

$ $ $ $ $ $

348 0 (111,004) 2,591,117 (3,602) 2,476,860

131,912,853

$

$

23,596,929

CSO 044 Conveyances Project Contract No. 6. - JJ Lane Construction Contingency 5% Engineering Services (EEA) Construction Management Sevices (CDM/C&S) see below Conveyances Project Total

Program Management Project Management (CDM/C&S) includes CSO 044 $ Project Management for Facility Plan (CDM/C&S) (1) Program Management Total $

Miscellaneous County Costs Land Acquisition IMA Legal Consulting (John Clare & Mezey) Debt Contingency Other

Total Cost for Midland project under 4th stipulation

$

Authorized Master Budget $128,300,000

Notes: (1) CDM/C&S Project Management costs are included in the total facility plan costs

70

108,315,924

$ $ $ $ $ $ $ $ $

(0) (0) 0 658 2,213,810 7,526 3,000,000 5,221,994 5,221,994

$ $ $ $ $ $

197,887 (1,330) 20,776 217,332 217,332

-


Onondaga County Lake Improvement Project 4th Stipulation of the ACJ Sewer Separation of CSO Areas 022/038/040/045/046A/046B/047/048/050/051/053/054 Summary of Current and Proposed Costs, and County Authorizations

Total Proposed Budget

Project /Task/Line Item Sewer Separation Construction Contracts CSO 024 (Falter) CSO 053/054 (Falter) CSO 038//40/046A/046B (Falter) CSO 047/048 (Falter) CSO 050 (Lane) CSO 051 (Lane) CSO 022/045 (Lane ed Joy)

Total Project Costs Expended to 9/30/18

Authorization Remaining

Construction Total

$698,864 $2,000,817 $3,598,931 $1,654,022 $4,362,188 $5,037,280 $6,750,000 $24,102,102

$698,864 $2,000,817 $3,524,487 $1,654,022 $4,362,188 $5,037,280 $5,611,423 $22,889,082

$0 $0 $74,444 $0 $0 $0 $1,138,577 $1,213,020

Service Contracts (Engineering /Consulting /Program Management) ACE CDM/C&S CME Department of the Army Spectra Engineering/Management Total

$484,286 $1,446,468 $109,492 $153,504 $437,996 $2,631,746

$484,286 $1,997,539 $49,704 $153,504 $437,996 $3,123,029

$0 -$551,071 $59,788 $0 $0 -$491,283

Miscellaneous Costs Total

$135,084 $101,425 $116,269 $14,235 $569,885 $13,540 $950,438

$479,637 $101,425 $142,816 $14,235 $15,928 $4,093 $758,134

-$344,553 $0 -$26,547 $0 $553,957 $9,447 $192,304

Total

$27,684,286

$26,770,245

$914,041

Miscellaneous County Costs City of Syracuse Consulting (John Clare & Mezey) Debt Legal GREEN Other

Authorized by Legislature $27,684,286

71


Onondaga County Lake Improvement Project Save The Rain Education and Outreach Grant Summary of Current and Additional Costs, and County Appropriations September 2018

Funding Sources

Appropriations

Program Funding 09,10,11 Appropriations 2011 Suburban Green Infrastructure 2012 Appropriation 2011 Trolley Lot Parking Mitigation Appropriation* 2012 Green grant education 2013 Green Grant education 2014 Green Grant education 2015 Green Grant education 2016 Green Grant education 2017 Green Grant education 2018 Green Grant education Total Appropriation

$ $ $ $ $ $ $ $ $ $ $

875,000 200,000 400,000 125,000 200,000 400,000 400,000 100,000 185,000 185,000 170,000

$

3,240,000

Funding Uses Contract Amount

Retz Advertising + Design 2010/2011 Marketing Services 2012 Marketing Services

$ $ $

Marketing Services Subtotal

411,789 224,303 636,092

Expended to Date $ $ $

411,789 224,303 636,092

Contract Amount $ 100,155 $ 110,212 $ 49,937 $ 13,040 $ 22,601 $ 7,937 $ 303,882

Expended to Date $ 84,510 $ 70,623 $ 27,024 $ 2,833 $ 22,601 $ 20,000 $ 227,590

SubTotal

$ $ $ $ $ $ $ $ $

21,000 4,000 1,200 5,200 3,000 1,000 4,000 60,614 100,014

$ $ $ $ $ $ $ $ $

10,131 78 1,359 35 2,022 50,328 63,953

Education & Outreach Subtotal

$ $ $ $ $

346,677 241,815 237,758 350,126 1,176,376

$ $ $ $ $

346,677 241,815 237,758 350,125 1,176,376

Environmental Finance Center Education and Outreach Environmental Finance Center Staff Onondaga Environmental Institute ESF Onondaga Earth Corps Baltimore Woods Nature Center Purchased Services (ASLF) SubTotal Non-Labor Expenses (EFC) Printing-Outreach Postage Travel Facilities Rental Program-related Supplies - Other Web -based Marketing Efforts Training Supplies and Materials Indirect/Overhead

2011 Education and Outreach 2012 Education and Outreach 2013 Education and Outreach 2014 Education and Outreach

72

Difference + (-)

$

(0)

Difference + (-)

$

0


Baltimore Woods Supplies Transport Travel Env Educator Hours Administrative Hours Dev & other

Contract Amount $ $ $ $ $ $ Baltimore Education & Outreach $

15,346 35,013 3,854 62,726 48,008 5,855 170,801

Contract Amount

Miscelaneous Ed/Outreach Expenses 2010/2011 Miscellaneous Exp. 2012 Miscellaneous Exp. 2013 Miscellaneous Exp 2014 Miscellaneous Exp 2015 Miscellaneous Exp 2016 Miscellaneous Exp 2017 Miscellaneous Exp 2018 Miscellaneous Exp

$ $ $ $ $ $ $ $

105,764 79,852 34,158 46,657 20,988 48,494 24,168 163,928

Travel Purchase card/Petty cash Rain harvest syst The Page seed Co Catering at the Zoo Jean Kessner RV Hall Enterp Lamar Adv

MOST 7 Enterprises Marketing Focus Greater Syr OEI - RB Workshops Pinckney Hugo Grp Environmental Design and Research 2010/2011 media 2012 Media

Miscellaneous Subtotal

STR Education and Outreach Totals

Remaining Balance

Expended to Date $ $ $ $ $ $ $

15,376 35,166 3,589 65,106 47,755 3,810 170,801

Difference + (-) $ $ $ $ $

(30) (153) 265 (2,380) 254

$

-

Expended to Date $ $ $ $ $ $ $

105,764 79,852 34,158 46,657 20,988 48,494 24,168

$ $ $ $ $ $ $

1,544 25,538 1,860 2,154 7,500 330 1,125

Difference + (-)

$ $ $ $ $ $ $ $ $

25,000.00 200,000.00 20,000 37,470 400,000 20,000 28,750 1,500 -

$ $ $ $ $ $ $ $ $

20,000 10,188 17,375 32,668 399,562 20,000 28,750 1,500 -

$

$

1,256,730

$

930,175

$

Contract Amount

Expended to Date

$

$

3,240,000

2,913,445

326,554

Difference + (-) $

326,555

$

326,555

*Trolley lot parking mitigation money is from the Clinton CSO Storage Facility Budget and is funding education and outreach specific to that project.

73


p

APPENDIX

74


75


Sept 2018 FINANCIAL TRACKING SUMMARY: FEDERAL & STATE GRANTS/LOANS APPROVED & RECEIVED

PROJECT NAME METRO - CURRENT AERATION SYSTEM UPGRADE AMMONIA REMOVAL DEMO BIOSOLIDS-MECHANICAL THICKENERS(c ) DIGESTER MOD/CHEMICAL STORAGE DIGITAL SYSTEM IMPROVEMENTS MISCELLANEOUS IMPROVEMENTS ODOR CONTROL AMMONIA REMOVAL FULL SCALE/ STAGE II PHOSPHORUS REMOVAL PHOSPHORUS REMOVAL PILOT PHOS TREAT OPTIMIZATION (587601) CSO - CURRENT CLINTON ST CONVEYANCE & RTF ERIE BLVD SEW SEP STORAGE FRANKLIN ST FCF HARBOR BROOK FCF HARBOR BROOK CSO ABATEMENT (a) HIAWATHA INTERCEPTOR/RTF KIRKPATRICK ST PUMP STATION MALTBIE ST FCF MIDLAND AVE CONVEYANCE MIDLAND AVE PHASE II & RTF MIDLAND AVE PHASE III MIDLAND AVE MITIGATION COSTS (b) NEWELL ST FCF ONONDAGA CREEK FCF SEWER SEPARATION(a) SIPHON REHABILITATION TEALL BROOK FCF WEST ST SEWER SEPARATION OTHER AMBIENT WATER MONITORING OXYGENATION DEMO SEQR REGULATORY TOTAL DOLLARS

PROJECT BUDGET

NYS GRANT APPROVED

NYS GRANT RECEIVED

FED EPA GRANT APPROVED

FED EPA GRANT RECEIVED

SHORT-TERM SHORT-TERM LONG-TERM LONG-TERM ACE EFC LOAN EFC LOAN EFC LOAN EFC LOAN GRANT APPROVED RECEIVED APPROVED RECEIVED APPROVED

$8,500,000 $2,000,000

$5,834,381 $1,145,109

$5,834,381 $1,145,109

$7,365,000 Full-Scale

$6,868,954 $202,078

$5,600,000 $2,900,000 $1,400,000 $7,700,000

$4,319,819 $1,563,317

$4,319,819 $1,563,317

$4,938,419 $1,849,000

$4,938,419 $1,849,000

$190,000,000 $5,000,000

$47,331,203

$47,331,203

$3,760,556

$1,880,278

$31,245,000 $3,000,000 $3,200,000 $250,000 $5,444,000 $8,000,000 $5,642,000 $250,000 $3,000,000 $45,000,000 $27,000,000

$56,370,000 $1,700,000 $3,828,053 $384,200 $3,880,000

$56,166,991 $1,700,000 $3,828,053 $384,200 $3,880,000

$7,502,302 $211,097 $26,055,238

$7,502,302 $211,097 $26,055,238

$1,310,000 $3,000,000 $7,704,000 $1,230,000 $175,000 $1,000,000

$367,737 $442,154

$367,737 $442,154

$870,768 $1,045,162 $2,299,460

$870,768 $1,045,162 $2,299,460

$54,705,015

$14,003,569

$34,900,616

$54,705,015

$15,378,304

$1,049,185

$14,613

$14,676,422 $775,509 $285,682

$14,711,148 $154,126 $3,833

$7,413,199

$7,389,197

ACE GRANT RECEIVED

$108,000,000 Full Scale $9,613,444

$105,860,930 $1,936,991 $4,378,417

$17,200,000

$989,323

$70,288,890 $2,301,876 $4,726,762

$41,834,264 $2,094,314 $4,589,759

$53,689,500

$46,700,136

$12,000,000 $212,000

$10,940,632 $188,106

$78,568,119 $923,162 $1,179,012 $343,500 $62,477,416 $2,710,169 $4,246,376

$40,062,454 $216,543 $296,823 $348,596 $26,334,994 $37,749 $828,115

$15,000,000 $10,000,000

$15,000,000

$37,339,317

$24,450,852

$1,024,433 $1,094,139 $2,481,443

$11,332,407 $140,623 $188,809 $395,540

$10,276,648 $1,958 $5,743 $6,621

$14,050,177 $14,050,177

$1,435,500 $1,236,594 $3,059,716

$251,982,015 $241,244,447 $126,129,335

$17,456,177 $17,456,177

$3,406,000

$3,406,000

$33,525,880

$8,000,000 $2,400,000 $50,000 *$380,000,000

$168,910,556 $166,827,269 $103,609,200 $103,609,200

*Original budget figures were based on 1997 dollars NYS includes awards beyond original pledge (i.e. civic strip) (a) NOTE: PROJECT IS US ARMY CORPS OF ENGINEERS PROJECT (b) NOTE: PROJECT RECEIVED $40,500 COST SHARE GRANT FROM (NYSERDA) (c )NOTE: PROJECT RECEIVED $87,500 COST SHARE GRANT FROM (NYSERDA)

76

$305,716,701


Lake Improvement Project Status Report For The Period Ending 9/30/2018

ACJ START DATE

Project Title

ACJ FINISH DATE

COUNTY FINISH DATE

ORIGINAL BUDGET(2)

AUTHORIZED BUDGET

ENGINEER

METRO - Current 1 AERATION SYSTEM UPGRADE 2 AMMON. REMOVAL DEMONSTRATION

11/1/1998

7/1/2002

01/03/00 $

8,500,000 $

3/1/2000

12/31/99 $

2,000,000 $

3 BIOSOLIDS - MECHANICAL THICKENERS

$

6,925,115 EEA

1

1,347,187 EEA

2

14,815,674

3

4 DIGESTER MOD/CHEMICAL STORAGE

7/1/2002

10/31/00 $

5,600,000 $

5,092,545 C&S

4

5 DIGITAL SYSTEMS IMPROVEMENTS

7/1/2002

06/31/01 $

2,900,000 $

3,520,317 Systems Integrated

5

6 MISCEL. IMPROVEMENTS

7/1/2002

01/31/99 $

1,400,000 $

1,400,000

6

7,700,000 $

8,393,855 OBG

7

$

128,688,040 EEA

8

5,000,000 $

4,111,714 EEA

9

$

2,840,000 GHD

$

185,500,042 EEA

7 ODOR CONTROL 8

7/1/2002

12/20/00 $

AMMONIA REMOVAL FULL SCALE/

10/1/2001

11/1/2003

11/01/03 $

125,000,000

STAGE II PHOSPHORUS REMOVAL

10/1/2003

4/1/2005

$

65,000,000

4/1/2006

4/1/2007

12/31/00 $

9 PHOSPHORUS REMOVAL - PILOT PHOSPHORUS OPTIMIZATION (587601) CSO - Current 10

CLINTON ST. CONVEYANCE/

5/1/2003

5/1/2007

10/28/06 $

15,987,190

CLINTON ST. RTF

5/1/2007

1/1/2012

12/28/10 $

15,258,090

7/1/2002

04/13/02 $

3,000,000 $

2,684,523 Barton & Loguidice

11

11 ERIE BLVD STORAGE SYSTEM 12 FRANKLIN ST. FCF

5/1/2000

05/01/00 $

3,200,000 $

4,948,516 EEA

12

13 HARBOR BROOK FCF

7/1/2002

07/01/02 $

250,000 $

889,109 EEA

13

14 HARBOR BROOK CSO ABATEMENT

7/1/2002

$

5,443,980 $

(3)

7/1/2002

12/31/00 $

8,000,000 $

16 KIRKPATRICK ST. PUMP STATION

7/1/2002

10/29/02 $

5,641,860 $

8/31/1998

7/1/2002

04/26/99 $

5/1/1999

5/1/2004

12/06/00 $

20 NEWELL STREET RTF

7/1/2002

07/01/01 $

1,310,000 $

473,132 Moffa & Assoc.

20

21 ONONDAGA CREEK FCF

7/1/2002

07/01/02 $

3,000,000 $

648,342 Parsons

21

22 SEWER SEPARATION

1/1/2012

01/01/12 $

7,703,880 $

27,684,286 OBG

22

23 SIPHON REHABILITATION

7/1/2002

06/11/99 $

1,230,000 $

1,026,391 C&S

23

7/1/2002

12/01/01 $

175,000 $

1,235,346 EEA

24

01/14/00 $

1,000,000 $

2,720,572 CHA

25

15 HIAWATHA INTERCEPTOR/RTF

4/26/1999

10

17 MALTBIE STREET FCF 18 MIDLAND AVE RTF & CSO ABATEMENT

25 WEST ST SEWER SEPARATION

6,047,183 EEA/Parsons

15 16

250,000 $

362,028 EEA

17

75,000,000 $

131,912,853 EEA

18

$

5/1/1999

14

12,558,335 EEA

19 MIDLAND AVE MITIGATION COSTS

24 TEALL BROOK FCF

108,500,000 Moffa & Assoc.

3,000,000

26 ERIE BLVD CSO ABATEMENT

19

New Project

26

OTHER 27 AMBIENT WATER MONITORING(4) 28 OXYGENATION DEMO PROJECT

5/1/1999

7/1/2002

$

4/1/2003

02/25/04 $

29 SEQRA REGULATORY COMPLIANCE(1)

$

TOTAL DOLLARS (2)

* $

*Original budget figures were based on 1997 dollars (1) SEQR costs are reflected in the individual projects under total payments to date (2) Original budget figures were based on 1997 dollars (3) Hiawatha project costs did not all appear on county account partial ACE (4) AMP is paid through operating funds not in projects

A-3

77

8,000,000 2,400,000 $

27 10,087

50,000

380,000,000 $

28 Parsons

667,335,192

29


Lake Improvement Project Status Report For The Period Ending 9/30/2018

CONSTRUCTION CONTRACT AMOUNTS

SOFT COST CONTRACTS

$

352,747 $

6,473,110

TOTAL PAYMENTS TO DATE

$

TOTAL ESTIMATED COST

FORECASTED COSTS

6,925,115

$

6,925,115 $

OVER/UNDER BUDGET

% COMPLETED EXPENDITURES

(1,574,885)

100.00%

(652,813)

100.00%

$

1,346,856

$

1,347,187

$

1,347,187 $

$

1,266,345 $

13,131,105

$

14,815,674

$

14,815,674 $

$

748,386 $

4,357,480

$

5,092,545

$

5,092,545 $

(507,455)

100.00%

$

451,713 $

2,974,514

$

3,520,317

$

3,520,317 $

620,317

100.00%

$

1,400,000

$

1,400,000 $

14,815,674

693,855

100.00%

100.00%

$

999,299 $

6,956,868

$

8,393,855

$

8,393,855 $

100.00%

$

21,289,868 $

106,962,810

$

128,688,040

$

128,688,040 $

(61,311,960)

100.00%

$

4,111,714 $

(888,286)

100.00%

$

4,055,734

$

4,111,714

$

1,749,597

$

8,971,020 $

15,223,980 $

24,195,000 $

24,195,000

37.08%

11,652,127 $

185,500,042 $

154,254,762

93.72%

$

34,294,218 $

127,115,744

$

173,847,915 $

$

901,556 $

1,734,929

$

2,684,523

$

2,684,523 $

$

973,543 $

3,920,238

$

4,948,516

$

4,948,516 $

1,748,516

100.00%

$

436,363 $

373,370

$

889,109

$

889,109 $

639,109

100.00%

$

22,748,443 $

77,385,459

$

102,780,576 $

5,719,424 $

108,500,000 $

103,056,020

94.73%

540,945

$

5,535,152

$

6,047,183

$

9,453,183 $

1,453,183

63.97%

2,520,394 $

9,882,154

$

12,558,335

$

12,558,335 $

6,916,475

100.00%

$ $ $

109,483 $

152,418

$

362,028

$

26,070,792 $

75,550,125

$

108,315,925 $

$

3,000,000 $

$

472,572

$

473,132

$

503,551

$

648,342 26,770,245 $

$

(315,477)

100.00%

$

362,028 $

112,028

100.00%

23,596,928 $

131,912,853 $

56,912,853

82.11%

$

3,000,000 $

3,000,000

100.00%

$

473,132 $

(836,868)

100.00%

$

648,342 $

(2,351,658)

100.00%

-

2,600,778 $

22,879,464

$

914,041 $

27,684,286 $

$

1,021,823

$

1,026,391

$

1,026,391 $

19,980,406 (203,609)

96.70% 100.00%

$

320,039 $

903,566

$

1,235,346

$

1,235,346 $

1,060,346

100.00%

$

403,332 $

2,311,126

$

2,720,572

$

2,720,572 $

1,720,572

100.00%

$

-

$

(2,389,913)

100.00%

$

$

10,087

125,166,639 $

469,621,456

$

22,506,457 $

$

10,087

$

654,090,149 $

-

$

10,087 $

57,106,500 $

692,096,192 $

A-4

78

320,146,192


Sept 2018

Project Title

TOTAL PAYMENTS TO DATE 9-30-18

TOTAL PAYMENTS TO DATE 6-30-18

Change

METRO - Current 1 AERATION SYSTEM UPGRADE

$

6,925,115

$

6,925,115

$

-

2 AMMON. REMOVAL DEMONSTRATION

$

1,347,187

$

1,347,187

$

-

3 BIOSOLIDS - MECHANICAL THICKENERS

$

14,815,674

$

14,815,674

$

-

4 DIGESTER MOD/CHEMICAL STORAGE

$

5,092,545

$

5,092,545

$

-

5 DIGITAL SYSTEMS IMPROVEMENTS

$

3,520,317

$

3,520,317

$

-

6 MISCEL. IMPROVEMENTS

$

1,400,000

$

1,400,000

$

-

7 ODOR CONTROL

$

8,393,855

$

8,393,855

$

-

8 AMMONIA REMOVAL FULL SCALE/

$

128,688,040

$

128,688,040

$

-

STAGE II PHOSPHORUS REMOVAL

$

-

$

-

9 PHOSPHORUS REMOVAL - PILOT

$

4,111,714

$

4,111,714

$

PHOSPHORUS OPTIMIZATION

$

8,971,020

$

6,311,309

$

CSO - Current 10 CLINTON ST. CONVEYANCE/ CLINTON ST. RTF

$ $

173,847,915

$

-

$ $

173,738,081 -

$

2,659,711 109,834

$

-

11 ERIE BLVD STORAGE SYSTEM

$

2,684,523

$

2,684,523

$

-

12 FRANKLIN ST. FCF

$

4,948,516

$

4,948,516

$

-

13 HARBOR BROOK FCF

$

889,109

$

889,109

$

-

14 HARBOR BROOK CSO ABATEMENT

$

102,780,576

$

102,710,020

$

70,556

15 HIAWATHA INTERCEPTOR/RTF

$

6,047,183

$

6,047,183

$

-

16 KIRKPATRICK ST. PUMP STATION

$

12,558,335

$

12,558,335

$

-

17 MALTBIE STREET FCF

$

362,028

$

362,028

$

-

18 MIDLAND AVE RTF & CSO ABATEMENT

$

108,315,925

$

105,616,182

$

19 MIDLAND AVE MITIGATION COSTS

$

3,000,000

$

3,000,000

$

-

20 NEWELL STREET RTF

$

473,132

$

473,132

$

-

21 ONONDAGA CREEK FCF

$

648,342

$

648,342

$

-

22 SEWER SEPARATION

$

26,770,245

$

26,425,692

$

23 SIPHON REHABILITATION

$

1,026,391

$

1,026,391

$

-

24 TEALL BROOK FCF

$

1,235,346

$

1,235,346

$

-

25 WEST ST SEWER SEPARATION

$

2,720,572

$

2,720,572

$

-

26 ERIE BLVD CSO ABATEMENT

$

$

-

$

-

-

$

-

OTHER

2,699,743

344,553

27 AMBIENT WATER MONITORING

$

22,506,457

$

22,506,457

$

28 OXYGENATION DEMO PROJECT

$

10,087

$

10,087

$

-

29 SEQRA REGULATORY COMPLIANCE

$

-

$

-

$

-

$

-

TOTAL DOLLARS

$

654,090,149

79

$

648,205,751

$

(0)

5,884,398


Chronology of Project Construction Starts Status

Location

Complete Complete

Metro Metro

Digital Systems Upgrade Ammonia Removal Demonstration Aeration System Upgrade Hiawatha RTF - ACOE Newell St. RTF Demo/Improvements Maltbie St. FCF Siphon Rehab

Complete Complete Complete Complete Complete Complete Complete

Metro Metro Metro Regional Market W.Newell/Vale St. Maltbie/Plum St. Various

Digester Modifications/Chemical Storage Franklin St. FCF West Street Sewer Separation

Complete Complete Complete

Ammonia Trackdown

Complete

Metro I-690/Franklin W. Genesee, Plum, Tracy, N. West St. Metro

Midland Ave. Conveyance Phase I Phosphorus Removal – Phase I Pilot

Complete Complete

Tallman/Oxford St. Metro

Erie Blvd. Storage System Upgrade Full Scale Ammonia Removal/ Stage II Phosphorus Removal Kirkpatrick St. Pump Station & Force Main Onondaga Creek FCF Teall Brook FCF Water Street Sewer Separation (CSO 024)

Complete

Franklin to Teall

Complete Complete Complete Complete Complete

Metro Kirkpatrick St. Inner Harbor Teall Ave. Water Street

Harbor Brook FCF Brighton Ave Sewer Separation (CSO 053/054)

Complete Complete

W.Hiaw./I-690 Brighton/Bishop Ave

Pre-ACJ Signing (1/20/98) General Improvements Odor Control and Residuals Handling

1998

1999

2000

2001

2002

80


Project

Status

Location

Tallman/Onondaga Sewer Separation (CSO 038, 040, 046A &046B) Midland Phase II RTF/Conveyances

Complete

Tallman/Onondaga

Complete

Blaine/Oxford St.

Phosphorus Removal – Phase II Pilot Biosolids Handling Improvements

Complete Complete

Metro Metro

Sewer Separation – CSO 047 & 048

Complete

South Ave/ Bissell St.

Sewer Separation – CSO 050 Clinton Phase I Conveyances

Complete Complete

Parkway/Rockland

Clinton Phase IIA Conveyances

Complete

Sewer Separation – CSO 051

Complete

Colvin St.

Harbor Brook Interceptor Sewer

Complete

Velasko/Fayette

Midland CSO 044 Clinton Storage Facility Lower Harbor Brook (Conveyance & Storage) Save the Rain Green Projects CSO 022 Sewer Separation Project CSO 045 Sewer Separation Project

Complete Complete Complete Authorized/Underway Authorized/Underway Authorized/Underway

W. Castle/South Ave Armory Square Hiawatha/State Fair Blvd. Various West Genesee/Franklin South Avenue

Save the Rain Green Projects

Completed

Various

Save the Rain Green Projects

Completed

Various

Save the Rain Green Projects Harbor Brook CSO 063 Conveyances Project

Completed Underway

Various Hiawatha/State Fair Blvd.

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

81


CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant AERATION SYSTEM UPGRADE Bongiovanni Construction (General) Ridley Electric (Electrical)

$ 5,626,956.41 $ 846,154.00

DIGITAL SYSTEM UPGRADE Systems Integrated

$ 2,974,514.27

ODOR CONTROL CONTRACT #1 Falconet, Inc. (General) Scriba Electric (Electrical) Burns Bros. (Heating/Ventilation) Burns Bros. (Plumbing)

$ 4,872,660.53 $ 315,580.30 $ 82,459.00 $ 50,168.00

ODOR CONTROL CONTRACT #2 Murnane Construction

$ 1,636,000.00

PHASE III IMPROVEMENTS CONTRACT 1 - DIGESTER & LAGOON IMPROVEMENTS Maxim Construction

$

645,730.74

PHASE III IMPROVEMENTS CONTACT 2 - CHEMICAL STORAGE & FEED FACILITIES C.O. Falter Construction Corp. (General) Barry & Barry Electrical Co. (Electrical) Burns Bros. (HVAC) Edward Joy Company (Plumbing)

$ 2,527,300.08 $ 193,665.22 $ 224,232.51 $ 38,669.35

PHASE III IMPROVEMENTS CONTRACT 3 - DIGESTER & LAGOON CLEANING Waste Stream Environmental Inc.

$

727,881.80

$ $ $ $

28,388.00 112,224.00 32,295.00 18,440.00

FULL SCALE AMMONIA/PHOSPHORUS REMOVAL - FIELD OFFICE James & Son Construction Resun Leasing, Inc. Ridley Electric Co. Burns Brothers

FULL SCALE AMMONIA/PHOSPHORUS REMOVAL U.S. Filter - Kruger Products, Inc. U.S. Filter - Kruger Products, Inc.

$ 8,261,182.00 $ 3,918,080.00

82


CONTRACTORS FOR CONSTRUCTION PROJECTS Metro Treatment Plant FULL SCALE AMMONIA/PHOSPHORUS REMOVAL SITE PREPARATION - CONTRACT 2 C.O. Falter Construction Corp. (General) Ridley Electric (Electrical) C.O. Falter Construction Corp. (Pile Testing) Moretrench Environmental

$ 22,243,604.98 $ 255,627.00 $ 431,008.00 $ 4,602,086.57

PILE INSTALLATION - CONTRACT 3 M.A. Bongiovanni Construction

$ 9,045,731.95

GENERAL - CONTRACT 4 The Pike Company (General) Ridley Electric Co. (Electrical) Edward Joy Company (HVAC) Burns Brothers (Plumbing/Fire Protection)

$ $ $ $

46,860,263.46 6,927,238.00 3,009,057.61 1,217,583.74

BIOSOLIDS HANDLING IMPROVEMENTS C. O. Falter Construction Corp. (General) Ridley Electric (Electrical) Airside Technology (HVAC) Burns Bros. (Plumbing) Independent Field Svs (Cogen)

$ 10,929,016.19 $ 1,476,223.00 $ 532,187.00 $ 173,679.09 $ 18,019.75

CSO's CLINTON CONVEYANCES PHASE I & 2A The Delaney Group, Inc. The Delaney Group, Inc. SIDA MOU (City of Syracuse) MOU City of Syracuse (Connective Corridor)

$ 14,478,053.39 $ 4,074,455.32 $ 2,634,999.43 $ 168,000.00 $3,825,000.00

CLINTON CSO ABATEMENT Ruston Paving (Farmers' market Lot) Davis Wallbridge (Pearl St/Lot 3) Davis Wallbridge (Townsend St.) J&B (Pirro Conv. Center) C.O. Falter (War Memorial) Ridley (War Memorial) Economy Paving (On Center) J&B (Erie Canal Museum) Jett Industries (Clinton Storage) Joy Process Mechanical (Cistern War Memorial) C&S Technical (Cistern War Memorial) Green Culture (Rain Barrels) Syracuse Utilities (Duct Bank) Water Cooling Corp. (Storage Tank)

83

$ 188,046.14 $ 635,873.93 $ 476,625.39 $ 1,083,727.39 $ 692,298.87 $ 447,957.66 $ 1,094,119.49 $ 73,480.00 $ 79,762,239.12 $ 82,615.00 $ 233,652.56 $ 44,335.50 $ 59,982.56 $ 2,875.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MOU City of Syracuse (Road Reconstruction) MOU City of Syracuse (Dr. Weeks) MOU City of Syracuse (Bank Alley) MOU City of Syracuse (Upstate) Wallbridge (Streetscape/Water St) Ruston Paving (Sunnycrest Parking Lot) MA Bongiovanni Inc. Acts II Construction (Skiddy Park) D.E. Tarolli (Otisco Street) Orchard Earth & Pipe (Syr School dist Park Lot) Slate Hill Construction (E. Water St) Davis Wallbridge (Onon Cty Pub Library) Tumbers, Schichtels Nursery (Trees), Martisco, Dixie, Pro Scapes Acts II (Seymour Academy) Paul R. Vitale (City Lot 4) John R. Dudley (Leavenworth Park) VIP (Onon Public Library) Ballard Construction (Westcott Comm Ctr) Cornerstone Paving (Oswego St) John Dudley Construction (W. Onondaga St.) Barrett Paving (W. Fayette St.) Davis Wallbridge (Westcott St.) ProScapes (Sunnycrest Arena) & C&S Sweeping Acts II (E. Washington St) John R. Dudley (690 Downspout) Josall (Maganelli Comm Ctr) Spectra (Butternut Circle) Barton & Loguidice (State St) D E Tarolli (annual green) J&J Landscape (annual green) King & King Architects (GIF) Jefferson Clinton Commons (GIF) ESF Foundation, Abby Lane Housing (GIF) Hotel Skyler (GIF) Near West Side Initiatives, Inc. (GIF) Near West Side Initiatives, Inc. (GIF) Tash Taskale (GIF) St. Lucy's Church (GIF) Putnam Properties (GIF) Centro (GIF) 500 W. Onondaga St. Inc. (GIF) CNY Jazz Arts Foundation (GIF) Jim & Juli Boeheim Foundation (GIF) Home Headquarters, Inc. (GIF) Galleries of Syr, 147 E. Onondaga St. (GIF) Syracuse Housing (GIF)

84

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

638,997.06 89,000.00 108,000.00 1,500,000.00 1,432,437.86 410,372.20 3,000.00 550,916.44 1,847,459.81 430,172.42 147,952.84 320,291.95 991,497.10 373,309.00 607,852.44 719,311.20 51,382.74 52,500.00 109,046.54 1,371,475.75 588,982.07 870,263.89 89,441.47 155,591.53 597,965.65 378,400.00 65,640.00 159,400.00 2,099,385.19 297,362.48 100,000.00 100,000.00 78,000.00 100,000.00 22,730.69 78,000.00 100,011.00 125,000.00 75,757.00 65,390.00 52,740.00 52,188.00 163,203.51 40,500.00 100,000.00 120,290.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) Kopp Billing Agency (GIF) CNY Philanthropy (GIF) American Beech (GIF) Park Central Presbyterian Church (GIF) Loon Creek (GIF) NHW Syracuse (GIF) McMahan/Ryan Child Advocacy (GIF) Jeffrey DeRoberts (GIF) Bethany Baptist Church (GIF) St. Lucy's Church (GIF) 500 W. Onondaga St. Inc. (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Gemmi Boy (GIF) Mr. Lady Bug (GIF) Grace Episcopal Church (GIF) Snapse Downtown (GIF) 360 Warren Associates (GIF) Housing Visions Unlimited (GIF) Near West Side Initiatives, Inc. (GIF) Scannell Properties (GIF) Genesee Armory (GIF) Third National Associates (GIF) Center for Peace & Social Justice (GIF) Graham Millwork (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) Onondaga Commons LLC (GIF) PEACE (GIF) Syracuse Business Center (GIF) Erie Bruce Corp (GIF) 538 Erie Boulevard West (GIF) Near West Side Initiatives, Inc. (GIF) UAS (GIF) Brewster Medical (GIF) Richmond UAS Properties (GIF) Taksum Assoc. (GIF) Zip Networks (GIF) Ra lin Inc. (GIF) Ra lin Inc. (GIF) Butternut St. LLC (GIF) Nojaim Inc. (GIF) St. Joseph's Hospital Health Center (GIF) Auto Row (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

85

25,300.00 62,700.00 53,050.00 61,050.00 137,350.00 129,400.00 178,050.00 99,311.00 343,333.00 69,000.00 34,347.00 124,200.00 198,300.00 175,787.00 77,800.00 47,537.00 46,700.00 99,000.00 35,700.00 107,864.00 194,650.00 34,500.00 204,000.00 144,400.00 533,300.00 57,700.00 90,500.00 124,100.00 33,400.00 294,300.00 52,200.00 517,000.00 151,700.00 130,850.00 94,300.00 57,600.00 221,000.00 299,200.00 45,200.00 205,775.00 137,000.00 238,400.00 104,430.00 234,800.00 145,900.00 138,000.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) WCNY (GIF) Auto Row (GIF) University Hill Apts. (GIF) J C Smith Inc. (GIF) St. Joseph's Hospital Health Center (GIF) Housing Visions Unlimited (GIF) R J Westcott (GIF) R J Westcott (GIF) R J Westcott (GIF) Nick's Garage (GIF) Tan A Grocery (GIF) Consuela's-Tato Britter Transp. (GIF) Auto Row (GIF) Jorge Auto Repair (GIF) Pyramids Halal Meat (GIF) Lisa Welch (GIF) Heritage Lincoln (GIF) JNJ (GIF) 900 E Fayette (GIF) 712-715 E Fayette Group (GIF) Gadsen Property (GIF) MPL Armory m(GIF) Near West Side (GIF) North Side Learning (GIF) 751 N Salina LLC (GIF) Lisa Welch (GIF) 800 Block (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

98,527.00 164,000.00 36,500.00 84,411.00 33,100.00 70,200.00 125,750.00 130,400.00 18,000.00 382,000.00 52,000.00 38,237.50 147,600.00 109,500.00 49,000.00 32,877.00 654,600.00 83,200.00 65,800.00 47,600.00 58,000.00 48,000.00 681,658.00 189,000.00 53,800.00 40,423.00 170,500.00

ERIE BOULEVARD STORAGE SYSTEM M. Hubbard Construction Ridley Electric (Electrical) Endeco/YSI (SE33923)

$ 1,556,752.00 $ 154,059.00 $ 24,117.90

FRANKLIN STREET FCF Burns Bros (Mechanical) Scriba Electric (Electrical) Burns Bros. (Plumbing) Maxim

$ 179,167.67 $ 144,640.61 $ 28,400.00 $ 3,568,029.43

HARBOR BROOK CSO ABATEMENT Joseph J. Lane Construction (Interceptor Sewer Replacement) Bette Cring (Elephant Barn Greening) John Dudley Construction (Geddes St) J&B Installations (Hazard Library/Erie Canal Museum) Economy Paving (Rosamond Gifford Zoo)

86

$ 23,391,425.07 $ 207,701.00 $ 279,068.06 $ 67,275.00 $ 688,638.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) J.J. Lane (Lower HB) A.J. Montclair (HB CSO Storage) C.O. Falter (HB CSO Storage) Davis Wallbridge (Onon Cty Pub Library) Cornerstone Paving (Parking Lots) Green Culture Tumbers, Schichtels Nursery (trees), Proscapes, Dixie City of Syracuse VIP Steadman Old Farm Bette Cring (Zoo Wetlands) Marcellus Const. (CSO 063) OnSite J J Lane (CSO 18) Patricia Electric (Wetland Pilot) MOU City of Syracuse (Road Reconstruction) Davis Wallbridge (Wadsworth Park) Acts II (Lewis Park) J & J Landscape (Annual Green) DE Tarolli (Green Structures) Knapp Electric (Wetlands) Vitale Excavating (Bedding Sand), Butler Fence Barton & Loguidice NYSARC, Inc. (GIF) Vibrant Spaces, LLC (GIF) James Ranalli, W. Genesee (GIF) Vibrant Spaces, LLC (GIF) Brooklyn Pickle (GIF) St. Patrick's Loft (GIF) Smith Housing (GIF) Richard Destito (GIF) Burnet Park Newstand (GIF) Visiting Nurse Assoc. of CNY (GIF) All Times (GIF)

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

5,373,078.94 260,000.00 30,259,100.80 378,920.43 149,195.48 80,665.00 347,542.53 3,342,875.63 51,382.74 11,480.00 1,290,064.10 5,612,007.53 8,755.00 4,370,168.29 197,767.56 138,165.00 345,524.55 217,285.58 25,807.00 12,576.00 41,856.00 232,533.35 4,600.00 78,907.14 153,618.00 616,100.00 198,680.00 30,555.00 177,300.00 52,600.00 232,200.00 60,622.00 60,349.20 92,600.00

$

373,370.21

HARBOR BROOK FCF C.O. Falter Construction Corp. (General)

KIRKPATRICK ST. PUMP STATION & FORCE MAIN C.O. Falter Construction Corp. C.O. Falter Construction Corp. Patricia Electric King & King Mechanical G.J. Adams Plumbing

$ 4,398,009.12 $ 4,425,766.31 $ 761,184.63 $ 245,569.51 $ 51,624.16

87


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) MALTBIE STREET FCF Over & Under Piping

$

152,418.00

MIDLAND AVENUE CONVEYANCES Marcellus Construction (General)

$ 1,836,434.47

MIDLAND AVENUE PHASE II CONVEYANCES & RTF Empire Dismantlement Corp. (Demolition) Murnane Building Contractors, Inc. (General) Ridley Electric Company (Electrical)

$ 457,681.50 $ 47,929,392.75 $ 2,904,771.00

MIDLAND AVENUE PHASE III CONVEYANCES Titan Wrecking & Environmental, LLC (Demolition) Edward Joy Company (HVAC) Edward Joy Company (Plumbing) Tumbers, Schichtels Nursery, Ballantyne, Other(Batcon) J.J. Lane Acts II (Hugh's Magnet School Parking Lot) Davis Wallbridge (Onon Cty Pub Library) J & J Landscape (annual green) VIP (Onon Public Library) Green Culture (Rain Barrels) Weather Guard Tecta (USPO Salina St) MOU City of Syracuse (Road Reconstruction) MA Bongiovanni (storage Tank) MOU City of Syracuse (ESF) Env. Design (Gazones Stormwater) Barton & Loguidice (green design) D E Tarolli (Annual green) Marcellus Construction (green Infrastructure) Jubilee Homes of Syracuse (GIF) Dunbar Association, Inc. (GIF) Syracuse Model Neighborhood (GIF) People's AME Zion Church (GIF) People's Community Dev. Corp (GIF) Salina Shoe Salon (GIF) People's AME Zion Church (GIF) Matawon Development Group (GIF) Tucker Missionary Baptist Church (GIF) Swallows (GIF) Viraj NY (GIF) Viraj Salina (GIF) Believers Chapel (GIF) Southside Comm. Coalition (GIF)

88

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

290,801.39 2,053,808.50 484,717.17 595,409.00 12,098,662.37 314,439.81 116,033.35 92,997.00 25,691.39 44,335.50 242,860.00 408,332.04 66,130.00 100,000.00 118,172.50 334,800.00 2,606,540.28 2,428,114.52 200,000.00 99,840.00 250,000.00 61,300.00 80,825.00 48,000.00 5,000.00 24,214.00 146,700.00 111,900.00 125,200.00 320,100.00 167,800.00 59,800.00


CONTRACTORS FOR CONSTRUCTION PROJECTS CSO's (cont) SEWER SEPARATION - CSO 022/045 Joy Process Mechanical (Plumbing) Joseph J. Lane Construction

$ 853,536.68 $ 4,757,886.66

SEWER SEPARATION - CSO 024 C.O. Falter Construction Corp.

$

698,863.74

SEWER SEPARATION - CSO 053/054 C.O. Falter Construction Corp.

$ 2,000,817.40

SEWER SEPARATION - CSO 038, 040, 046A&B C.O. Falter Construction Corp.

$ 3,524,487.29

SEWER SEPARATION - CSO 047 & 048 C.O. Falter Construction Corp.

$ 1,654,022.34

SEWER SEPARATION - CSO 050 Joseph J. Lane Construction

$ 4,360,527.06

SEWER SEPARATION - CSO 051 Joseph J. Lane Construction

$ 5,029,323.00

SEWER SEPARATION - OTHER Other - tree, fence Pastime Athletic Club (GIF)

$ $

144,701.90 92,700.00

SIPHON REHABILITATION Insituform Metropolitan

$ 1,021,822.99

C.O. Falter Construction Corp. (General) Scriba Electric (Electrical)

$ $

Maxim Construction (General)

$ 2,311,125.85

89

877,095.43 26,470.20


x

90


WEP ACRONYMS ACJ

Amended Consent Judgment

AMP

Ambient Monitoring Program

AMSA

Association of Metropolitan Sewerage Agencies

ARRA

American Recovery and Reinvestment Act

ASLF

Atlantic States Legal Foundation

AWQS

Ambient Water Quality Standards

BAF

Biological Aerated Filter (Biostyr)

BMP

Best Management Practices

BOD

Biological Oxygen Demand

BPJ

Best Professional Judgment

Brew

WEP’s Standard Abbreviation for the Brewerton Wastewater Treatment Plant

Bville

WEP’s Standard Abbreviation for the Baldwinsville Wastewater Treatment Plant

CAA

Clean Air Act

CALM

Consolidated Assessment and Listing Methodology

CAMP

Community Air Monitoring Plan

CIP

Capital Improvement Plan

CMOM

Capacity, Management, Operation, and Maintenance

CSLAP

Citizens Statewide Lake Assessment Program

CSO

Combined Sewer Overflow

CWA

Clean Water Act

DMR

Discharge Monitoring Report

DO

Dissolved Oxygen

EBM

Ecosystem-Based Management

ECL

Environmental Conservation Law

ECM

Energy Conservation Measures

EECBG

Energy Efficiency and Conservation Block Grant

ELAP

Environmental Laboratory Approval Program

EMS

Environmental Management System

ERM

Environmental Resource Mapper

FCF

Floatable Control Facility

FOG

Fats, Oil, and Grease

GIF

Green Improvement Fund

H:\2013\MoRpt\Abbreviations\abbreviations.doc

91


HRFS

High Rate Flocculation Settling

I&I

Inflow & Infiltration

IW

Industrial Wastewater

km

Kilometers

km2

Square Kilometers

LA

Load Allocations

LF

Linear Feet

m

Meters

MCP

Municipal Compliance Plan

MDV

Multiple Discharge Variance

Metro

WEP’s Standard Abbreviation for the Metropolitan Syracuse Wastewater Treatment Plant

MGD

Million Gallons Per Day

mg/L

Milligrams Per Liter

MIS

Main Interceptor Sewer

ML

WEP’s Standard Abbreviation for the Meadowbrook/Limestone WWTP

MS4s

Municipal Separate Storm Sewer Systems

mt

Metric Tons

NACWA

National Association of Clean Water Agencies

NBP

National Biosolids Partnership

NELAC

National Environmental Laboratory Accreditation Conference

NPDES

National Pollutant Discharge Elimination System

NYSDEC

New York State Department of Environmental Conservation

NYSDOH

New York State Department of Health

NYSEFC

New York State Environmental Facilities Corp.

NYWEA

New York Water Environmental Association

OAK

WEP’s Standard Abbreviation for the Oak Orchard WWTP

OLP

Onondaga Lake Partnership

OLWQM

Onondaga Lake Water Quality Model

OU

Odor Unit

P2

Prevention Program

P2CO

Prevention Program County Operations

PdM

Predictive Maintenance

H:\2013\MoRpt\Abbreviations\abbreviations.doc

92


PIDs

Photo-ionization Detectors

PFRP

Process to Further Reduce Pathogens

PLA

Project Labor Agreement

POTW

Publicly Owned Treatment Works

PWL

Priority Waterbodies List

RTF

Regional Treatment Facility

SCA

Sediment Consolidation Area

SCADA

Supervisory Control and Data Acquisition

SEPS

Secondary Effluent Pump Station

SEQR

State Environmental Quality Review

SGIP

Suburban Green Infrastructure Program

SHB

Solids Handling Building

SMPs

Storm Water Management Practices

SOP

Standard Operating Procedure

SORP

Sewer Overflow Response Plan

SPCC

Spill Prevention, Control, and Countermeasures

SPDES

State Pollutant Discharge Elimination System

SRP

Soluble Reactive Phosphorus

SSES

Sanitary Sewer Evaluation Study

SSI

Sewage Sludge Incinerator

SSV

Site-Specific Variance

SUNY-ESF

State University of New York College of Science and Forestry

SWMM

Storm Water Management Modeling

SWMP

Storm Water Management Plan

SWPPP

Storm Water Pollution Prevention Plan

TBEL

Stechnology-Based Effluent Limits

TDP

Total Dissolved Phosphorus

TMDL

Total Maximum Daily Load

TP

Total Phosphorus

TSI

Trophic State Index

UAA

Use Attainability Analysis

UFI

Upstate Freshwater Institute

ug/l

Micrograms per Liter

USEPA

United States Environmental Protection Agency

H:\2013\MoRpt\Abbreviations\abbreviations.doc

93


USFWS

United States Fish and Wildlife Service

USGBC

United States Green Building Council

USGS

United States Geological Survey

UST

Underground Storage Tank

VOC

Volatile Organic Compounds

WAN

Wide Area Network

WLA

Waste Load Allocations

WEF

Water Environment Federation

WEP

Water Environment Protection

WET

Whole Effluent Toxicity

WLA

Waste Load Allocations

WQBEL

Water Quality-Based Effluent Limits

WR

WEP’s Standard Abbreviation for the Wetzel Road Wastewater Treatment Plant

WSE

Waste Stream Environmental

H:\2013\MoRpt\Abbreviations\abbreviations.doc

94


95


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.