Portfolio
Sรกvio Jobim
Pedro Sávio Jobim Pinheiro University of São Paulo (USP)
professional experiences:
academic experience: _scholarship to interchange _Internship at Isay Weinfeld programme at Hogeschool van Architecture [jan.2015 - now]; Amsterdam [2013]; _Research project at USP “The _Internship at Triptyque Architecture designing process of a sustainable [dec.2014 - now] building“, professor Sheila Walbe Ornstein [2011/2012]; _Internship in lighting design at _Architecture Office Management Royal Philips Electronics [may 2014 course - Senac [2012] - dec.2014]; _exposer at Brazilian Week of Sci.development of the lighting ence and Technology [2008] and design of two Oscar Niemeyer Brazilian Fair of Science and Techprojects in Niteroi and Brasilia nology [2007] _dialux EVO course [2014]
habilities: _autodesk revit architecture 2015 _autodesk autoCAD 2015 _google sketchup _vray render _dialux Evo _3D studio max (basic) _adobe Photoshop/Indesign _Physical modelling languages: _inglês (fluent) – TOEFL level 101 _francês (fluent) - DALF C1[2010]_ espanhol (intermediate)
contact: savio.jobim@gmail.com +55 (11) 95208 0003 Victor Brecheret st, 520, ap. 3AT8
prizes: _First Honorable prize in
Sustainable Building International Award, Spain, 2013. _Engineering Inspiration and Industrial Safety in FIRST Robotics Competition Brazil [2007]; _EMBRAPA Prize, in Brazilian Fair of Science and Technology – FEBRACE [2008]; _3º place in Social Sciences, FEBRACE [2008].
housing, offices and public equipment [S達o Paulo] vertical city, horitontal city developed with: Felipe Barradas Marco Scriboni
The design of housing+offices tower, together with a public equipment is included in the double population density policy of the center of Sao Paulo and diversification of plot occupancy modes, as set out in the new Master Plan of S達o Paulo (2014) . The project responds to these demands by two separate buildings: the public service building establishing a horizontal landmark in the center of the vertical city; and the housing+offices building, which composes more directly with existing verticality of the surroundings. The space between the buildings set up a large scaled public gallery, which accentuates the recreational potential of the center of S達o Paulo, usually fordibben or neglicted.
? edificações existentes
756 754.3
a
756 754.3
a
756
?
marco respeitoarquitetônico aos edificações demolição edifícios demolidos eexistentes ao marco arquitetônico
b
754.5
a
área técnica
?
marco arquitetônico edificações demolição existentes
b
754.5
b 757.5
754.5
a
756
respeito marco arquitetônico aos demolição edifícios demolidos e ao marco arquitetônico
b 757.5
757.5
respeito marco arquitetônico aos edifícios demolidos e ao marco arquitetônico
b
756
757.5
757.5
respeito aos edifícios demolidos e ao marco arquitetônico
b
756
757.5
757.5
b
756
757.5
a
depósito
carga e descarga
pavimento administrativo
l
edificações demolição existentes
b 752.7
?
5
10m
planta pavimento administrativo 0
1
5
10m
planta pavimento administrativo 0
1
5
10m
planta pavimento de atendimento planta pavimento administrativo 0
1
5
10m
0
1
5
10m
planta pavimento de atendimento 0
1
5
10m
planta pavimento de atendimento 0
1
5
planta pavimento de atendimento
10m
0
1
5
10m
corte urbano
corte aa
corte aa
corte aa
corte aa
corte bb
corte bb
corte bb
corte bb
buildings plan 1:1000
planta edificações
15
0 2
modelo físico
modelo físico
10
20m
modelo físico
modelo físico
concurso internacional VIVIENDA concurso EN RED internacional SP 14 VIVIENDA concurso EN RED internacional SP 14 VIVIENDA concurso EN RED internacional SP 14 VIVIENDA EN RED SP 14
751.5
750
Vivienda en red é estar conectado à cidade e a espaço É a casa e sua interdependência com outras casas e as pesso
A distinção morfológica proposta entre edifício vertica horizontal (Poupatempo + galeria comercial) reflete a clareza projeto, abdicando de uma forçosa continuidade da forma urb O projeto reconhece a necessidade e importância da
754.5
construção de vazios no tecido urbano. Estabelecendo um marco horizontal, o adequação ao terreno
gallery plan h1:1000
percurso visual
planta galeria comercial 0 2
10
20m
contrapõe a verticalidade da região e revela uma clareira v potencial espaço de encontro exaltado pelo Edifício Renat referência urbana e marco histórico da arquitetura moderna p Viver em rede é traduzido no projeto como uma forma e apropriar-se do ambiente urbano.
materialização de viver em red módulos flexíveis, apoiando-se em um volume vertical A
os balanços e até mesmo os vazios formados pela justapos módulos habitacionais e de serviços permitem relações múltip
Cálculo das áreas Local
Área (m²)
Terreno 1 Terreno 2 Coeficiente de Aproveitamento
2722,89 1100,91
Total
15295,2
4
A independência estrutural entre edifício e módulos de
flexibilidade na ocupação, já que permite-s
espaços privados de acordo com a necessidade dos ocupant
Tipologia de Ocupação Área (m²)
habitações
Poupatempo comércio
proposta
Residencial/Serviços
6906,25
Comercial Poupatempo Praças
405,00 1762,43 4517,03
Área Total Construída 13590,71
organização funcional
distinção morfológica
urban section 1:1000
adequação ao terreno
amizades
trabalho
individualidade
housing+offices and public equipment [São Paulo] vertical city, horizontal city
social
individuo
relacao social
servicos
sociedade = rede
servicos
servicos
individualidade
amizades
trabalho
amizades
individualidade
amizades
individualidade
trabalho
amizades
trabalho
+
social
social
materialização
spatial units
external structures suporte
individuo
assembly process construção
individuo
The housing building inserted into the larger project of Housing+Offices and public equipment in downtown São Paulo proposes a constructive method that sets the existence of an external structure , responsible for the overall stability of the building, and a secondary structure that is characterized by multifunctional spatial modules. relacao social
e = rede
social
Each 4.5x4.5m spatial module represents a possibility of occupation: business rooms, living rooms , studios, bedrooms, balconies. Within the modules, sub-modules consisting of 1.5x1.5m blocks focus the hydraulic and electrical infrastructure, making it a more flexible construction to new uses that may arise.
sociedade = rede
relacao social
circulação vertical
trabalho
amizades
servicos
no pavimento 4, João e Maria, casados,individualidade vivem ao lado de Dora, solteira
sociedade = rede
relacao social
no pavimentos 13 e 14, a família Silva aluga o andar de cima para o escritório de Geraldo
social
rhythm of the facade configuração individuo
sociedade = rede
o duplex dos pavimentos 7 e 8 é a nova aquisição da família Souza
individuo
relacao social
sociedade = rede
studio to couples
studio to couples +
vertical circulation in a
two bedrooms apart-
kitchenette
rigid concrete block
ment + offices
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
materialização do viver em rede
RODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Vedação em vitrine para módulos comerciais
4 CUDORP LANOITACUDE KSEDOTUA NA YB DECUDORP
5
4
5
interchanging boards: .glass .perforated aluminium .concret
1. perfil U em aço 2. steel deck 3. viga metálica perfil I com furos 4. piso acabado 5. acabamento externo 6. placas intercambiáveis 7. guardacorpo 8. placa cimentícia side facilities
steel deck floor
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTEDUCATIONAL PRODU PRODUCED BY AN AUTODESK
connections
TCUDORP LAPRODUCT NOITACUDE KSEDOTUA NA YB DECUDORP PRODUCED BY AN AUTODESK EDUCATIONAL
Unidades hidráulicas associativas
um módulo de vivência é um espaço de 4.5m x 4.5m que pode abrigar usos habitacionais ou comerciais. Cada unidade é distinguível enquanto célula e se articula com as demais por meio de uma rede, materializada pela estrutura externa. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Sub-modulação 1.5m x 1.5m
ções
cada módulo é dividido em submódulos de 1.5m x 1.5m, que permitem diferentes configurações de vedos e aberturas. Analogamente, a cada módulo podem ser associadas unidades de serviço que, em conjunto, configuram diferentes espaços às necessidades dos usuários. há 4 tipos de vedos modulares: placa cimentícia (cega); placa metálica perfurada, placa transparente em vidro; e guarda-corpo também em vidro.
secondary structure in I profile steel
submodules 1.5m x 1.5m
Associatives hydraulic submodules
Glass panels for offices and commercial modules
three bedrooms apartment
cube house
ergonomy in little spaces
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
cube cover
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT optimization of free space
90cm
openings for ventilation and difuse ilumination
increase of study space
70cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 90cm
70cm
a
food preparation openings with accordion doors
storage
washing machine
0m
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube
study and leisure
90cm 70cm
b
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
pedro sรกvio jobim pinheiro
0.5m
1m
2m floor plan level 1 1:25
PRODUCED AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BYBY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
food storaging and preparing
access to superior floor and intimate space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
relaxing
social space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL
intimate space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube
The challenge of designing your own home in a 4x4x4m cube was the theme of this project, which aimed to synthetic analysis of the concept of living through the abdication of named spaces - kitchen, bedroom, living room, etc. The project was developed from the repertoire of domestic activities , which are grouped according to the degree of privacy . Developed the intimate and social centers, the activities are combined, in order to configure two different environments:
90cm 70cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
increase of study space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
optimization of free space
90cm 70cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 90cm
70cm
1. private, home to all sanitary and hygienic functions; 2. social environment , which extends out to a possible external area.
food preparation
a aa
storage
washing machine
0m
0.5m
1m
2m floor plan level 1 1:25 floor level 2 1:25 floor planplan level 2 1:25
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY BY AN AN AUTODESK EDUCATIONAL PRODUCT PRODUCED AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube living cube
pedro sรกvio jobim pinheiro
b bb
pedro sรกvio jobim pinheiro pedro sรกvio jobim pinheiro
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
section b
electronic model
section a
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
-
n-
vn.
The villa will partly be built with traditional materials, which are found in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north side of the villa.
The villa will partly be built with traditional materials, in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. south elevation The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north 1 2 3 5m side of the villa. which are found ELEVATION
casa Jijona [Alicante]
ELEVATION
south elevation
1
2
3
5m
First Honorable prize in Sustainable Building International Award, Spain, 2013. Developed with: Devin Wesselius, Sven Berg, Lynn Ewalts, Wouter Hesterman
south elevation
3
5m
10300
11600
first floor plan (above) ground floor plan (right) The entrance to the villa is a staircase on the highest part of the site. One level down there is the front door to the building itself. Here are the flexible working spaces located. These rooms can be easily transformed in multiple guest rooms. At this floor is a bathroom located, which you can enter from two directions.
1
4000
impression interior
PLANS
4200
perspective of the ground floor 2 3 5m
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
ELEVATION
south elevation
1
2
3
5m
WM
10300
11600
4200
10300
2
3
11600
4200 10300
4000
first floor plan (above) ground floor plan (right)
1500
PLANS
1
KK
KK
10000
The villa will partly be built with traditional materials, which are found in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north side of the villa.
5m
4200 WM
KK
KK
11600
10000
impression used materials 10300
PLANS
9600
4200
first floor plan (above) ground floor plan (right)
PLANS first floor plan (above) ground floor plan (right) 2
3
5m
casa Jijona
2
3
5m first floor plan
pedro sávio jobim pinheiro
planta pavimento inferior h1:500
1
2
3
4200
5m
ground floor plan
pedro sávio jobim pinheiro
10000 WM
KK
KK
KK
10000
WM
KK
10000
1
1
PLANS
11600
first floor plan (above) ground floor plan (right)
4200
4000
9600
1500
planta pavimento superior 1:500
impression used materials
This sustainable house represents a series of investigations in order to give environmental comfort and energy efficiency in hot and arid environments. The house is configured as a scaling due to the natural slope of the land , giving different perspectives and organizing social and private spaces of the users. The double coverage serves as an air filter and provides constant ventilation to every room in the house. 4000
2
4000
1
1500
impression used materials
(4 bedrooms x 2) +1 = 9 people, 9x 2 showers showers/day Used dater volume = 360l Average external temperaure: [36 + 17.7]/2 = Average humidity: 62.3%. Temperature = 9.15oC (4 bedrooms xamplitude: 2) +1 = 9 Apeople, 9x 2 showers Result: the Used housedater is healthy comfortable showers/day volume and = 360l
9600 day = 18 per
26.8 per day = 18 for users.
Average external temperaure: [36 + 17.7]/2 = 26.8 Cold water temperatura Average humidity: 62.3%.= 20oC Stored wateramplitude: temperature 45oC Temperature A == 9.15oC Used water = 40oCand comfortable for users. Result: the temperature house is healthy Jijona “Irradiación Global Media” (Ig) in winter = 2.5 kWh/m2 [Agencia Estatal de Meteorología] Cold water temperatura = 20oC Stored water temperature = 45oC Stored water volume: Vstw = [Vuw (Tuw - Tcw)]/(Tst - Tcw) Used water temperature = 40oC Vstw = “Irradiación [360 (40 - 20)]/ (45Media” - 20) (Ig) Vstw in = 288l Jijona Global winter = 2.5 kWh/m2 [Agencia Estatal de Meteorología] Estimated population in the house: Pe = 9 water x 0.7 volume: [coeficient accupation] Pe = 6.3 people Stored Vstw of = [Vuw (Tuw - Tcw)]/(Tst - Tcw) [~7people] of used day: Vuw = 288l x 6.3 Vuw Vstw = [360 Volume (40 - 20)]/ (45water - 20)per Vstw = 288l = 1814.4lNeeded Energy: En = Vstw x 0.001163 x (Tarm - Taf) [KWh/day] population En = 8.37KWh/day Estimated in the house: Pe = 9 x 0.7 [coeficient of accupation] Pe = Area of theVolume water of heating system: = [(En [~7people] used water perA day: Vuw+ x Ig) A En = 6.04 m2 x 0.001163 =4.901)]/(3.1247 1814.4lNeeded Energy: = Vstw Result: 3 En x 2m2 solar panels. [KWh/day] = 8.37KWh/day
6.3 people x Fi x =El) 288l x 6.3 Vuw x (Tarm - Taf)
Possibility: Internal walls; External walls; Roofx composiArea of the water heating system: A = [(En + El) Fi x tion; A = 6.04 m2 (3 xA 2m2 solar 4.901)]/(3.1247 x Ig) = 6.04 m2 panels) Result: 3 x 2m2 solar panels. Possibility: Internal walls; External walls; Roof composition; A = 6.04 m2 (3 x 2m2 solar panels)
4200
9600
4200
1500
KK
impression used materials
1500
WM
KK
h
ELEVATION
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
9600
4200
FAU Archive Contest
Digital Memory Pavilion developed with : Carolina Miki, Larissa Oliveira, Tadeu Baltar.
The proposed project for the FAUUSP Archive building reveals two elements that have long ago lost visibility in FAUUSP - the library projects and the stream that has been channelled to build Artigas building. Its materiality in steel and glass contrast with the exposed concrete texture FAU-USP, still proposing a permeable and accessible ground,
covered by a delicate marquise steel structure supported on slender metal columns. Associated with the pillars, interactive dashboards allow users’ interactions with the archive. The main block is comprised of two levels below the ground, both enveloped by a glass skin that delimits the climate-controlled area, protected from the weather. Its entrance is marked by a walkway, the consultation room and the
reception, which controls access to the collection and removal of items. The first basement includes the areas of collection and consultation, set back from the ground to ensure proper protection of the sunlight that environment demand. In the second basement, set up the restoration conservation areas and technical processing, the area inside the glass block, and a cafĂŠ and pleasant environment for visitors.
2
1
implantação 0
5
10
1 1
2
IME
1 - galeria coberta 2 - circulação vertical
RAMPA
3 4
FAU
5
6
8
7
1 - banheiros 2 - guarda-volumes 3 - circulação vertical
primeiro subsolo 0
5
10
1 1
2
4 - administração 5 - galeria 6 - área de consulta
7 - arquivo em estantes 8 - arquivo em mapotecas
3 4
5
segundo subsolo
6
1 - banheiros 2 - serviços 3 - circulação vertical
4 - copa cafeteria 5 - processamento técnico 6 - conservação/restauro
housing in São Paulo downtown [SãoPaulo]
occupying the emptiness
Developing a housing project in a plot of 4 meters large and 72 meters deep in front of the São Paulo cathedral, that was the challenge proposed to the housing+office buildings. Aligned with the proposed densification of São Paulo downtown, with the elimination of urban voids , the project proposes an internal square in the center of the block and with large common areas . The whole project consists of two buildings: the building facing the Cathedral Square , which can house services or studios, due to the increased visibility and proximity of noise sources , and the building facing Rua Quintino Bocayuva, at the other side of the plot, that dut to the different urban configuration , home to the largest housing units. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
750
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
755
760
Sé
760
insertion in the urban fabric 1:10.00
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
aup 152 habitação social - proposta
a
housing in Sé Square
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATION
corte urbano aa 1:500 0
10
20
40 section aa scale 1:500 pedro sávio jobim pinheiro
a
plan of first five floors 1:500 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT AN AUTODESK EDUCATIONAL PRODUCT
a a
plan of upper floors 1:500
requalification - Winterthur [Amsterdam] former office building into housing, Amsterdam
The commercial building Winterthur was at an advanced stage of degradation. The retrofit design of the building into housing use included the adaptation of comeriais units to the new use as well as
the criation of new spaces of public and condominium leisure. The components included in the design were thought to upcycling , which means that they can be disassembled and used analogously
ground floor plan 1:750
in another buildings later. This constructive flexibility makes the building available to house other uses later on and offers the possibility of the user to configure the housing spaces according to his/her own needings.
first floor plan esc. 1:750
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
section A 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
9
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4
11
10
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4 7
10
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5 5
6 1
12
2
1 7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1
8
7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
13
7
16
14
14
1
7 14
1
details 1:20
Detail 3 (above) Detail 4 (middle) Detail 5 (below) Detail 3 (above) scale 1:10 Detail 4 (middle) Detail 5 (below) scale 1:10
d4
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
7 14
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
detailed section 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
7 1 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
8 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
11 8
12
1
12
8 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
12
7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
15
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5 2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
12
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
12
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
hydraulic pre-fab modules
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
2
sun studies9 8 1. summer 10h 2. summer1114h 8 3. winter 10h 11 4. winter 14h
10
1. Concrete structure 2. Steel Frame I profile 3. Insulation fiberglass 130mm 5 1. Concrete structure 4. Brickwork (facade) 2. Steel Frame I profile 5. Wood 7 3. Insulation fiberglass 130mm 6. EPS high density 30mm 4. Brickwork (facade) 7. Plaster 5. Wood 8. Aluminium window 7 13 6. EPS high density 30mm 9. Steel Truss Plaster 6 10. 7. Single glass panel 8. Aluminium window Doble glazed panel 13 1 11. 9. Steel Truss Isokorf 6 12. 10. Single glass panel 13. Concrete core activation Doble glazed panel 1 14. 11. Aluminium plate 12. Isokorf 15. Perforated steel panel 1 13. Concrete core activation 16. Gutter 14. Aluminium plate 15. Perforated steel panel 1 16. Gutter
8
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
9
section B 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
facade multiple configurations Concept of the facade dynamics
lighting design_Caminho Niemeyer [Niter贸i]
Bringing the beauty of Niemeyer curves from the darkness [expected to be implemented in 2016]
Bring the beauty of Niemeyer curves for Niter贸i nightlife was the main goal of this lighting installation project. The project includes projectors for general lighting of the buildings
and embedded luminaires in the floor of the central square . While during the day , the lights embedded in the floor little interfere in the landscape, at night they offer several possibilities of public space use, without affecting the
original architecture. Besides, allows the realization of public events also at night, which is a rare nowadays. The entire project was thought to omit the light sources so as to minimally interfere in the architecture.
experimental models
Moving Cubes Expo 92 Pavilion, by architect Marcos Acayaba developed with : Ana Costa, Ana Ramos, Bruna Mirabile, Denise Moreira, ThaĂs Bianchini
The exploration of different possibilities of articulation wa the goal of the model, which consists of cubes that rotate , resulting in several opening possibilities to architecture.
dynamic pavilion exploring different junctions and movements to configure new spaces
The model below is part of a study to restore the work of Mark Acayaba, ont of the most important brazilian architects.
general model of Sevilla Pavilion
thank you.
I dedicate this small portfolio to all my friends and family, especially to Guilherme Miguel Bullejos, for understanding and supporting me.