Portfolio Sรกvio Jobim
Portfolio Sรกvio Jobim Selected works 2014-2017
Pedro Sávio Jobim Pinheiro University of São Paulo (USP)
professional experiences:
academic experience: _scholarship to interchange programme at Hogeschool van _Internship at OMA - Office for Amsterdam [2013]; Metropolitan Architecture [oct. 2016 _Research project at USP “The - feb. 2017]; designing process of a sustainable _Internship at Bjarke Ingels Group building“, professor Sheila Walbe [nov.2015 - jul. 2016]; Ornstein [2011/2012]; _Internship at Isay Weinfeld Archi- _Architecture Office Management tecture [jan.2015 - aug.2015]; course - Senac [2012] _Internship at Triptyque Architecture _exposer at Brazilian Week of Sci[dec.2014 - aug.2015]; ence and Technology [2008] and _Internship in lighting design at Brazilian Fair of Science and TechRoyal Philips Electronics [may 2014 nology [2007] - dec.2014]; _dialux EVO course [2014]
habilities: _autodesk revit architecture 2015 _autodesk autoCAD 2015 _google sketchup _vray render _dialux Evo _3D studio max (basic) _adobe Photoshop/Indesign _Physical modelling languages: _inglês (fluent) – TOEFL level 101 _francês (fluent) - DALF C1[2010]_ espanhol (intermediate)
contact: savio.jobim@gmail.com +55 (11) 99362-1068 Victor Brecheret st, 520, ap. 3AT8
prizes: _First Honorable prize in
Sustainable Building International Award, Spain, 2013. _Engineering Inspiration and Industrial Safety in FIRST Robotics Competition Brazil [2007]; _EMBRAPA Prize, in Brazilian Fair of Science and Technology – FEBRACE [2008]; _3º place in Social Sciences, FEBRACE [2008].
1
1
1
1
2
2
2
housing, offices and public equipment [São Paulo] vertical city, horitontal city developed with: Felipe Barradas Marco Scriboni
2
? 3
3
3
The design of housing+offices tower, together with a public equipment is included in the double population density policy of the center of Sao Paulo and diversification of plot occupancy modes, as set out in the new Master Plan of São Paulo (2014) . The project responds to these demands by two separate buildings: the public service building establishing a horizontal landmark in the center of the vertical city; and the housing+offices building, which composes more directly with existing verticality of the surroundings. The space between the buildings set up a large scaled public gallery, which accentuates the recreational potential of the center of São Paulo, usually fordibben or neglicted. 752.7
4
4
5
5
8
1. Cobertura com aletas difusoras de luz 2. Invólucro em tela metálica perfurada 3. Treliça estrutural 4. Blocos de serviço 5. Setor de atendimento IIRGD, Sert e Detran 6. Área de espera para atendimento 7. Refeitório e copa de funcionários 8. Setor administrativo 9. Circulação vertical 10. Galeria comercial 11. Praça em desnível
área técnica
carga e descarga
8
751.5
depósito
752.7
7
7
depósito
carga e descarga
8
10
10
10
11
11
11
11
150
b
754.5
756 754.3
marco respeitoarquitetônico aos edificações demolição edifícios demolidos eexistentes ao marco arquitetônico
b
754.5
756
15 0
0 2
a
depósito
área técnica
carga e descarga
b 757.5
754.5
756
respeito marco arquitetônico aos demolição edifícios demolidos e ao marco arquitetônico
b 757.5
757.5
respeito marco arquitetônico aos edifícios demolidos e ao marco arquitetônico
b
756
757.5
757.5
respeito aos edifícios demolidos e ao marco arquitetônico
b
756
757.5
757.5
b
756
757.5
a
a
depósito
carga e descarga
planta pavimento administrativo 0
1. Cobertura com aletas difusoras de luz 2. Invólucro em tela metálica perfurada 3. Treliça estrutural 4. Blocos de serviço 5. Setor de atendimento IIRGD, Sert e Detran 6. Área de espera para atendimento 7. Refeitório e copa de funcionários 8. Setor administrativo 9. Circulação vertical 10. Galeria comercial 11. Praça em desnível
5
756 754.3
a
área técnica
8
10
5
752.7
a
área técnica
9
0
754.5
marco arquitetônico edificações demolição existentes
?
5
9
1. Cobertura com aletas difusoras de luz 2. Invólucro em tela metálica perfurada 3. Treliça estrutural 4. Blocos de serviço 5. Setor de atendimento IIRGD, Sert e Detran 6. Área de espera para atendimento 7. Refeitório e copa de funcionários 8. Setor administrativo 9. Circulação vertical 10. Galeria comercial 11. Praça em desnível
756 754.3
a
9
1. Cobertura com aletas difusoras de luz 2. Invólucro em tela metálica perfurada 3. Treliça estrutural 4. Blocos de serviço 5. Setor de atendimento IIRGD, Sert e Detran 6. Área de espera para atendimento 7. Refeitório e copa de funcionários 8. Setor administrativo 9. Circulação vertical 10. Galeria comercial 11. Praça em desnível
edificações demolição existentes
?
4
5
7
9
754.3
a
7
edificações existentes
b 752.7
4
a
750
3
?
1
5
10m
planta pavimento administrativo 0
1
5
10m
planta pavimento administrativo 0
1
5
10m
planta pavimento de atendimento planta pavimento administrativo 0
1
5
10m
0
1
5
10m
planta pavimento de atendimento 0
1
5
10m
planta pavimento de atendimento 0
1
5
planta pavimento de atendimento
10m
0
1
5
10m
corte urbano
754.5 corte aa
planta galeria comercial 5
15 0
10
5
corte aa
corte aa
corte aa
corte bb
corte bb
corte bb
corte bb
buildings plan 1:1000
planta edificações
15
20m
0 2
modelo físico
modelo físico
10
20m
modelo físico
modelo físico
concurso internacional VIVIENDA concurso EN RED internacional SP 14 VIVIENDA concurso EN RED internacional SP 14 VIVIENDA concurso EN RED internacional SP 14 VIVIENDA EN RED SP 14
751.5
750
Vivienda en red é estar conectado à cidade e a espaço É a casa e sua interdependência com outras casas e as pesso
A distinção morfológica proposta entre edifício vertica horizontal (Poupatempo + galeria comercial) reflete a clareza projeto, abdicando de uma forçosa continuidade da forma urb O projeto reconhece a necessidade e importância da
habitações
754.5
Poupatempo
construção de vazios no tecido urbano. Estabelecendo um marco horizontal, o
comércio
proposta
organização funcional
distinção morfológica
adequação ao terreno
gallery plan h1:1000
percurso visual
planta galeria comercial 0 2
10
20m
contrapõe a verticalidade da região e revela uma clareira v potencial espaço de encontro exaltado pelo Edifício Renat referência urbana e marco histórico da arquitetura moderna p Viver em rede é traduzido no projeto como uma forma e apropriar-se do ambiente urbano.
materialização de viver em red módulos flexíveis, apoiando-se em um volume vertical A
os balanços e até mesmo os vazios formados pela justapos módulos habitacionais e de serviços permitem relações múltip
Cálculo das áreas Local
Área (m²)
Terreno 1 Terreno 2 Coeficiente de Aproveitamento
2722,89 1100,91
Total
15295,2
4
A independência estrutural entre edifício e módulos de
flexibilidade na ocupação, já que permite-s
espaços privados de acordo com a necessidade dos ocupant
Tipologia de Ocupação Área (m²)
habitações
Poupatempo comércio
proposta
Residencial/Serviços
6906,25
Comercial Poupatempo Praças
405,00 1762,43 4517,03
Área Total Construída 13590,71
organização funcional
distinção morfológica
urban section 1:1000
adequação ao terreno
amizades
trabalho
individualidade
housing+offices and public equipment [São Paulo] vertical city, horizontal city
social
individuo
relacao social
servicos
sociedade = rede
servicos
servicos
individualidade
amizades
trabalho
amizades
individualidade
amizades
individualidade
trabalho
amizades
trabalho
+
social
social
materialização
spatial units
external structures suporte
individuo
assembly process construção
individuo
The housing building inserted into the larger project of Housing+Offices and public equipment in downtown São Paulo proposes a constructive method that sets the existence of an external structure , responsible for the overall stability of the building, and a secondary structure that is characterized by multifunctional spatial modules. relacao social
e = rede
social
Each 4.5x4.5m spatial module represents a possibility of occupation: business rooms, living rooms , studios, bedrooms, balconies. Within the modules, sub-modules consisting of 1.5x1.5m blocks focus the hydraulic and electrical infrastructure, making it a more flexible construction to new uses that may arise.
sociedade = rede
relacao social
circulação vertical
trabalho
amizades
servicos
no pavimento 4, João e Maria, casados,individualidade vivem ao lado de Dora, solteira
sociedade = rede
relacao social
no pavimentos 13 e 14, a família Silva aluga o andar de cima para o escritório de Geraldo
social
rhythm of the facade configuração individuo
sociedade = rede
o duplex dos pavimentos 7 e 8 é a nova aquisição da família Souza
individuo
relacao social
sociedade = rede
studio to couples
studio to couples +
vertical circulation in a
two bedrooms apart-
kitchenette
rigid concrete block
ment + offices
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
materialização do viver em rede
RODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Vedação em vitrine para módulos comerciais
4 CUDORP LANOITACUDE KSEDOTUA NA YB DECUDORP
5
4
5
interchanging boards: .glass .perforated aluminium .concret
1. perfil U em aço 2. steel deck 3. viga metálica perfil I com furos 4. piso acabado 5. acabamento externo 6. placas intercambiáveis 7. guardacorpo 8. placa cimentícia side facilities
steel deck floor
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTEDUCATIONAL PRODU PRODUCED BY AN AUTODESK
connections
TCUDORP LAPRODUCT NOITACUDE KSEDOTUA NA YB DECUDORP PRODUCED BY AN AUTODESK EDUCATIONAL
Unidades hidráulicas associativas
um módulo de vivência é um espaço de 4.5m x 4.5m que pode abrigar usos habitacionais ou comerciais. Cada unidade é distinguível enquanto célula e se articula com as demais por meio de uma rede, materializada pela estrutura externa. PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Sub-modulação 1.5m x 1.5m
ções
cada módulo é dividido em submódulos de 1.5m x 1.5m, que permitem diferentes configurações de vedos e aberturas. Analogamente, a cada módulo podem ser associadas unidades de serviço que, em conjunto, configuram diferentes espaços às necessidades dos usuários. há 4 tipos de vedos modulares: placa cimentícia (cega); placa metálica perfurada, placa transparente em vidro; e guarda-corpo também em vidro.
secondary structure in I profile steel
submodules 1.5m x 1.5m
Associatives hydraulic submodules
Glass panels for offices and commercial modules
concurso internacional VIVIENDA EN RED SP 14
of the site. One level down there is the front door to the building itself. Here are the flexible working spaces located. These rooms can be easily transformed in multiple guest rooms. At this floor is a bathroom located, which you can enter from two directions.
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
ELEVATION
The villa will partly be built with traditional materials, in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. south elevation The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north 1 2 3 5m side of the villa. which are found ELEVATION
casa Jijona [Alicante] 3
1m
90cm 70cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
increase of study space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
optimization of free space
70cm
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT 90cm
70cm
1. private, home to all sanitary and hygienic functions; 2. social environment , which extends out to a possible external area.
food preparation
a aa
4000 WM
11600
10300
3
11600
4200 10300
1500
2
4000
first floor plan (above) ground floor plan (right) 1
KK
4200
PLANS
5m
1
2
3
4200 WM
KK
10000
11600 KK
10300
PLANS
9600
4200
first floor plan (above) ground floor plan (right)
5m
casa Jijona
1
2
3
PLANS
11600
first floor plan (above) ground floor plan (right)
4200
5m first floor plan
4000
9600
1500
planta pavimento superior 1:500
impression used materials
pedro sávio jobim pinheiro
planta pavimento inferior h1:500
1
2
3
4200
5m
ground floor plan
pedro sávio jobim pinheiro
WM
KK
(4 bedrooms x 2) +1 = 9 people, 9x 2 showers showers/day Used dater volume = 360l Average external temperaure: [36 + 17.7]/2 = Average humidity: 62.3%. Temperature = 9.15oC (4 bedrooms xamplitude: 2) +1 = 9 Apeople, 9x 2 showers Result: the Used housedater is healthy comfortable showers/day volume and = 360l
WM
washing machine
1m
impression used materials
9600 day = 18 per
26.8 per day = 18 for users.
Average external temperaure: [36 + 17.7]/2 = 26.8 Cold water temperatura Average humidity: 62.3%.= 20oC Stored wateramplitude: temperature 45oC Temperature A == 9.15oC Used water = 40oCand comfortable for users. Result: the temperature house is healthy Jijona “Irradiación Global Media” (Ig) in winter = 2.5 kWh/m2 [Agencia Estatal de Meteorología] Cold water temperatura = 20oC
storage
0.5m
KK
KK
KK
WM
impression used materials
0m
10000
10000
pedro sávio jobim pinheiro
b bb
2m floor plan level 1 1:25 floor level 2 1:25 floor planplan level 2 1:25
pedro sávio jobim pinheiro pedro sávio jobim pinheiro
Stored water temperature = 45oC Stored water volume: Vstw = [Vuw (Tuw - Tcw)]/(Tst - Tcw) Used water temperature = 40oC Vstw = “Irradiación [360 (40 - 20)]/ (45Media” - 20) (Ig) Vstw in = 288l Jijona Global winter = 2.5 kWh/m2 [Agencia Estatal de Meteorología] Estimated population in the house: Pe = 9 water x 0.7 volume: [coeficient accupation] Pe = 6.3 people Stored Vstw of = [Vuw (Tuw - Tcw)]/(Tst - Tcw) [~7people] of used day: Vuw = 288l x 6.3 Vuw Vstw = [360 Volume (40 - 20)]/ (45water - 20)per Vstw = 288l = 1814.4lNeeded Energy: En = Vstw x 0.001163 x (Tarm - Taf) [KWh/day] population En = 8.37KWh/day Estimated in the house: Pe = 9 x 0.7 [coeficient of accupation] Pe = Area of theVolume water of heating system: = [(En [~7people] used water perA day: Vuw+ x Ig) A En = 6.04 m2 x 0.001163 =4.901)]/(3.1247 1814.4lNeeded Energy: = Vstw Result: 3 En x 2m2 solar panels. [KWh/day] = 8.37KWh/day
6.3 people x Fi x =El) 288l x 6.3 Vuw x (Tarm - Taf)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Possibility: Internal walls; External walls; Roofx composiArea of the water heating system: A = [(En + El) Fi x tion; A = 6.04 m2 (3 xA 2m2 solar 4.901)]/(3.1247 x Ig) = 6.04 m2 panels) Result: 3 x 2m2 solar panels. Possibility: Internal walls; External walls; Roof composition; A = 6.04 m2 (3 x 2m2 solar panels)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
section b
impression interior
5m
2m
PRODUCED BY BY AN AN AUTODESK EDUCATIONAL PRODUCT PRODUCED AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube living cube
3
10300
first floor plan (above) ground floor plan (right)
impression used materials
90cm
2
electronic model
section a
4200
9600
4200
1500
The challenge of designing your own home in a 4x4x4m cube was the theme of this project, which aimed to synthetic analysis of the concept of living through the abdication of named spaces - kitchen, bedroom, living room, etc. The project was developed from the repertoire of domestic activities , which are grouped according to the degree of privacy . Developed the intimate and social centers, the activities are combined, in order to configure two different environments:
1
floor plan level 1 1:25
PRODUCED AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BYBY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube
PLANS
casa Jijona
0.5m
south elevation
impression used materials
washing machine
0m
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
pedro sávio jobim pinheiro
ELEVATION
10000
The villa will partly be built with traditional materials, which are found in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north side of the villa.
1500
food preparation openings with accordion doors
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
This sustainable house represents a series of investigations in order to give environmental comfort and energy efficiency in hot and arid environments. The house is configured as a scaling due to the natural slope of the land , giving different perspectives and organizing social and private spaces of the users. The double coverage serves as an air filter and provides constant ventilation to every room in the house.
10000
a
1
perspective of the ground floor 2 3 5m
1500
70cm
The entrance to the villa is a staircase on the highest part of the site. One level down there is the front door to the building itself. Here are the flexible working spaces located. These rooms can be easily transformed in multiple guest rooms. At this floor is a bathroom located, which you can enter from two directions.
4200
KK
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
90cm
11600
first floor plan (above) ground floor plan (right)
b
storage
5m
5m
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
cube cover
increase of study space
70cm
3
First Honorable prize in Sustainable Building International Award, Spain, 2013. Developed with: Devin Wesselius, Sven Berg, Lynn Ewalts, Wouter Hesterman
PLANS
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
living cube
study and leisure
90cm
openings for ventilation and difuse ilumination
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
food storaging and preparing
access to superior floor and intimate space
optimization of free space
2
4000
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
relaxing
social space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED PRODUCT BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL
intimate space
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1
4000
1
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
90cm 70cm
south elevation
south elevation
10300
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
ELEVATION
KK
ergonomy in little spaces
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
The villa will partly be built with traditional materials, which are found in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north side of the villa.
KK
cube house
The villa will partly be built with traditional materials, which are found in the environment. Constructive walls will be made of concrete and finished with white stucco plaster. The roof will be made of ceramic tiles, like the houses in the area. Aluminum is used for the perforated facade at the south side as well as for the shutters at the east and north side of the villa.
The master bedroom is located at the lowest level and orientated to the north side. It is directly connected to the living space, which consists of the living room and the kitchen. You can enter the deck from the living room by sliding open the panels and create an open space.
9600
4200
FAU Archive Contest
Digital Memory Pavilion developed with : Carolina Miki, Larissa Oliveira, Tadeu Baltar. 2
The proposed project for the FAUUSP Archive building reveals two elements that have long ago lost visibility in FAUUSP - the library projects and the stream that has been channelled to build Artigas building. Its materiality in steel and glass contrast with the exposed concrete texture FAU-USP, still proposing a permeable and accessible ground,
covered by a delicate marquise steel structure supported on slender metal columns. Associated with the pillars, interactive dashboards allow users’ interactions with the archive. The main block is comprised of two levels below the ground, both enveloped by a glass skin that delimits the climate-controlled area, protected from the weather. Its entrance is marked by a walkway, the consultation room and the
reception, which controls access to the collection and removal of items. The first basement includes the areas of collection and consultation, set back from the ground to ensure proper protection of the sunlight that environment demand. In the second basement, set up the restoration conservation areas and technical processing, the area inside the glass block, and a café and pleasant environment for visitors.
1
implantação 0
5
10
1 1
2
IME
1 - galeria coberta 2 - circulação vertical
RAMPA
3 4
FAU
5
6
8
7
1 - banheiros 2 - guarda-volumes 3 - circulação vertical
primeiro subsolo 0
5
10
1 1
2
4 - administração 5 - galeria 6 - área de consulta
7 - arquivo em estantes 8 - arquivo em mapotecas
3 4
5
segundo subsolo
6
1 - banheiros 2 - serviços 3 - circulação vertical
4 - copa cafeteria 5 - processamento técnico 6 - conservação/restauro
housing in São Paulo downtown [SãoPaulo]
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
occupying the emptiness
Developing a housing project in a plot of 4 meters large and 72 meters deep in front of the São Paulo cathedral, that was the challenge proposed to the housing+office buildings. Aligned with the proposed densification of São Paulo downtown, with the elimination of urban voids , the project proposes an internal square in the center of the block and with large common areas . The whole project consists of two buildings: the building facing the Cathedral Square , which can house services or studios, due to the increased visibility and proximity of noise sources , and the building facing Rua Quintino Bocayuva, at the other side of the plot, that dut to the different urban configuration , home to the largest housing units.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATION
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
750
755
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
a
housing in Sé Square
755
20
40 section aa scale 1:500 pedro sávio jobim pinheiro
a
levantamento planialtimétrico
a
AN AUTODESK EDUCATIONAL PRODUCT
760
insertion in the urban fabric 1:10.00
10
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Sé
0
plan of first five floors 1:500
750
760
corte urbano aa 1:500
esc. 1:500
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
a
plan of upper floors 1:500
corte do entorno
aup 152 habitação social - proposta
corteesc. 1: 1250 1:250
pedro sávio jobim pinheiro 7178360
requalification - Winterthur [Amsterdam] former office building into housing, Amsterdam
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
9
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4
hydraulic pre-fab modules
10
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4 7
10
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5 5
6 1
12
2
1 7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1
8
7
8 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
14
13
7
16
14
14
1
7 14
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1
details 1:20
Detail 3 (above) Detail 4 (middle) Detail 5 (below) Detail 3 (above) scale 1:10 Detail 4 (middle) Detail 5 (below) scale 1:10
d4
detailed section 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
8
12
7 1
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
11 8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
15
1
12 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
1:750
first floor plan esc. 1:750
14
12
7
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
14
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
ground floorBY plan PRODUCED AN AUTODESK EDUCATIONAL PRODUCT
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5 2
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
section B 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
12
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
8
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
11
3
12
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
4
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
3
2
sun studies9 8 1. summer 10h 2. summer1114h 8 3. winter 10h 11 4. winter 14h
1. Concrete structure 2. Steel Frame I profile 3. Insulation fiberglass 130mm 5 1. Concrete structure 4. Brickwork (facade) 2. Steel Frame I profile 5. Wood 7 3. Insulation fiberglass 130mm 6. EPS high density 30mm 4. Brickwork (facade) 7. Plaster 5. Wood 8. Aluminium window 7 13 6. EPS high density 30mm 9. Steel Truss Plaster 6 10. 7. Single glass panel 8. Aluminium window Doble glazed panel 13 1 11. 9. Steel Truss Isokorf 6 12. 10. Single glass panel 13. Concrete core activation Doble glazed panel 1 14. 11. Aluminium plate 12. Isokorf 15. Perforated steel panel 1 13. Concrete core activation 16. Gutter 14. Aluminium plate 15. Perforated steel panel 1 16. Gutter
8
2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
5
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
9
10
Original facade type (left) Detail 1 - Proposed facade (right)
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
facade multiple configurations Concept of the facade dynamics
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
section A 1:100
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TCUDORTPCLUADNOORIT PALCAUNDOEITKASCEUDDOETK US AENDAOY TU BADN EC AUYDBODREPCUDORP
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
in another buildings later. This constructive flexibility makes the building available to house other uses later on and offers the possibility of the user to configure the housing spaces according to his/her own needings.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
the criation of new spaces of public and condominium leisure. The components included in the design were thought to upcycling , which means that they can be disassembled and used analogously
TCUDORTPCLUADNOORIT PALCAUNDOEITKASCEUDDOETK US AENDAOY TU BADN EC AUYDBODREPCUDORP
The commercial building Winterthur was at an advanced stage of degradation. The retrofit design of the building into housing use included the adaptation of comeriais units to the new use as well as
lighting design_Caminho Niemeyer [Niterรณi]
Bringing the beauty of Niemeyer curves from the darkness [Philips 2014]
Bring the beauty of Niemeyer curves for Niterรณi nightlife was the main goal of this lighting installation project. The project includes projectors for general lighting of the buildings
and embedded luminaires in the floor of the central square . While during the day , the lights embedded in the floor little interfere in the landscape, at night they offer several possibilities of public space use, without affecting the
original architecture. Besides, allows the realization of public events also at night, which is a rare nowadays. The entire project was thought to omit the light sources so as to minimally interfere in the architecture.
interior design_Pullman Hotel [Guarulhos] Renders - Triptyque Architecture [2015]
The goal of this project was to bring a new identity to the hotel nearby SĂŁo Paulo International Airport in Guarulhos. The French-Brazilian architectural office Triptyque was asked to redesign
the interior common spaces of the hotel according to the new identity of Pullman using the existing structure but bringing a new sofisticated ambience.
The objective of the renders was to intermediate the office and the client in order to bring the best results for the project. The project was completed in 2016.
Picture: Arcoweb
Company headquarters [Tel-Aviv]
Physical model and Plans - Bjarke Ingels Group - Winning Proposal in competition 2015
The aim of this competition was to propose a new headquarters complex in the suburbs of Tel Aviv, in the municipality of Ra’anana. The concept of the project was a composition of buildings and courtyards
that together configure different workspaces. Responding to the requirement of the client of combining both human scale and yet iconic building, the complex connects two-floors high towers facing the existing orange
fields to twelve-floors high edifices facing Highway N4. The main user’s circulation emphasizes the shape of the building by creating internal plazas with variable configurations.
CAMPUS PROGRAM AxONOMETRIC PROGRAM LEGEND:
MANAGEMENT OFFICES
CONFERENCE ROOMS
CAMPUS PROGRAM AxONOMETRIC CONFERENCE CENTER CLOSED OFFICES TRAINING CENTER PROGRAM LEGEND:
DINING
OFFICE SUPPORT
BUILDING SUPPORT
WAREHOUSES
CAMPUS SUPPORT
ELEVATOR / WC CORES FACAdE
0
SCALE 1:500
OPEN OFFICES
R&D LABORATORIES
WELLNESS AREAS
FLOOR SUPPORT
MANAGEMENT OFFICES
CONFERENCE ROOMS
DINING
OFFICE SUPPORT
CLOSED OFFICES
CONFERENCE CENTER TRAINING CENTER
WAREHOUSES
CAMPUS SUPPORT
OPEN OFFICES
R&D LABORATORIES
WELLNESS AREAS
FLOOR SUPPORT
MODULE
P
PARKING BUILDING SUPPORT
Programme distribution ELEVATOR / WC CORES
P
PARKING
10 20 40M 0 10 20
1200 MM FACADE MODULE
1700 MM FACADE MODULE
The 800mm deep element is still not used to walk. However, this depth allows the façade to be able to contain a significant planter. Apart from the additional shading that plans create, the integration of the planters in the façade is an additional biophilic factor as plants improve the work environment. We propose that all 800mm modules integrate planters.
The 1200mm façade module is already deep enough to allow a balcony corridor. We design the module to have thinner vertical lamellas aligned at the exterior, where the interior is reserved to have a continuous balcony where employees can circulate. This element does not include a planter.
The largest element, with 1700mm depth, is a combination of the 800 and the 1200 mm ones, including both a balcony and a planter. Typically these elements are allocated at the south façade or at the top of the buildings in the interior of the campus, at the areas of highest façade solar exposure.
CAMPUS INFRASTRUCTURE CORES
40M
CAMPUS P. 75
Programme distribution
CAMPUS LAyOUT F01 PLAN
800 MM FACADE MODULE
The 300mm façade module is the smaller façade element. It is solely a small brise soleil used at the areas with less solar incidence. The fiber concrete elements are fixed onto the curtain wall.
SCALE 1:500
300 MM FACADE MODULE
Facade strategies, depending on the required depth for solar shading
CAMPUS P. 111
hualien residential [Hualien - Taiwan]
Renders, plans, sections, detail drawings in Bjarke Ingels Group [2015-2016]
This residential project in the city of Hualien, Taiwan, was inspired by the antique watercolors scrolls depicting the mountains of the country. The complex is composed by three main buildings to be erected in the first
phase and a fourth tower planned to be constructed as a second stage of the development. The shape of the buildings also responds to the sismic component of the country by the sucession of
structural walls. Free spaces and shared facilities are integrated in the complex, making Hualien Residential a potential case study of how utopian life in community may become real though architecture.
10 SITE PLAN ENLARGED PLAN 1:2000
Section Elevated garden 1:80
BIG Hualien Residential 100% DD Report June 1, 2016
17
Ground floor plan 1:2000
lille 10.6
Office building in Lille - Competition at OMA - Office for Metropolitan Architecture
Compressed between different infrastructures in the city of Lille, north of France, the proposal for this office building was to react to the chaotic surroundings by the tectonic moves of the floors, result of the multiple
combinations of 12m, 15m and 18m office plan depths. Taking into consideration the Masterplan for Euralille developed by OMA in 1989, the project is based on three atriums, voids of the originally
proposed buildings, that are analogously swallowed by the chaos of the existing environment. The reduced allowed footprint at the ground floor houses a public plaza and retail connected to a plaza.
View from the train
MIddle atrium
ETAGE MAMIE COCOTTE
BUREAUX R+1 VERS ETAGE MAMIE COCOTTE
ACCES PARKING / LIVRAISONS ENTREE BUREAUX MAMIE COCOTTE COUR / MEZZANINE MAMIE COCOTTE
ENTREE BUREAUX COUR COUVERTE PARTAGEE ENTREE BUREAUX FITNESS COUR COUVERTE SPA / FITNESS ENTREE RESIDENCE D’AFFAIRES
REZ-DE-CHAUSSÉE
VERS SPA DEPUIS RDC
PARKING SOUTERRAIN
SPA / HAMMAM SALLES DE SOINS COUR DU SPA / HAMMAM SS 01
Programme in the Ground floor
harmonia 1216
Final Project - Architecture Course, University of São Paulo
Located about 200m away from Vila Madalena Metro Station, this mixeduse building was developed according to the new policy of densifying the surroundings of public transport system. The building is composed by four
main parts: firt of all: the central plaza, which is the result of the original landscape consolidation; the second element is the commercial block, which is mainly horizontal and contrast with the original landscape; the third
element is the tower that instead of relating to the ground is related to the horizon. Finally, the fourth element is the rooftop, that establishes the end of the building by relating to the sky with a sky plaza. Program
Existing landscape
Consolidation
Extension of the existing plaza habitação 12.600m²
+795.6
+798.4 +793.0
Perimeter building and tower
escritório 3.200m² comércio 1600m² +790.0
Key-levels
Connections
Studies of future densification
South Facade
Typical plan - tower 1:500
2.5m 7.5m
Sistema verga-peitoril Instalações prediais
Steel deck Tubo de Venturi
Forro em placa perfurada Tela perfurada
Painéis perfurados de madeira
Tudo c
Espaços íntimos Fachada dupla de vidro
11m
Corte típo torre
Physical model in acrylic and gypsum
Access to the tower
Central Plaza
Entrance of the Plaza
Rooftop
experimental models
Moving Cubes Expo 92 Pavilion, by architect Marcos Acayaba developed with : Ana Costa, Ana Ramos, Bruna Mirabile, Denise Moreira, ThaĂs Bianchini
The exploration of different possibilities of articulation was the goal of the model in the first series, which consists of cubes that rotate , resulting in several opening
possibilities to architecture - window, skylight, doors. The model shown in the second series of the page is part of a study to restore the work of Marcos Acayaba,
one of the most important Brazilian architects. It represents the proposal made by the architect to the Brazilian Pavilion in the Expo 92, realized in Seville, Spain.
thank you. I dedicate this portfolio to all my friends and family for supporting me.