Team Management Precedence Diagram

Page 1

Activities List Precedence Diagram

Group 1 Scheme Design 2014

3.1. Produce Risk Register 2.1. Complete Machinery Inventery 1.1. Plant Requirements

3.2. Establish Contract Risks

1.3. Plant Properties

2.8. Work Breakdown Structure (WBS) + Dictionary

2.2. Anxillery Items

3.3. Research Unforseen Risks 3.5. Establish RAM

2.9. Define Activities 2.3. Labour Inventory 1.6.Consumables Start

1.2. Investigate plant process options

3.6. Establish Control and Mitigation Measures

3.4. Establish a Risk Matrix

2.10. Determine PERT and CPA

3.9. Establish Milestones and Baselines

3.7. Make Amendments to WBS and Schedule

4.4. Feedback from Performance

4.5. Link with Excel

4.6. Control Measures

4..7. Link with Excel

11.0 Testing and Trouble Shooting

3.8. Establish SOP for Risk occuring (EXCEL)

1.5.Excel

1.7Maintainance, Repairs, life span (WLC)

2.4. Site Facilities and Security

1.8.investigate plant treatment options

2.5. Determine Material Inventory

2.6. Determine Area of site

2.7. Establish Professional Fees

2.11. Produce Initial Schedule

4.1. Determine CPA

4.2. Link with Excel 10.0 Formatting

End

9.0. Powerpoint

8.0. Wordpress

7.0. Lessons Learned 5.1. Determine Stakeholder Register

6.6. Assumptions Log

6.4. Contract 5.2. Determine Scope Baseline

6.1. Drawings

6.2. Bills of Quantities (BOQ CESSM3)

6.3. Cost

6.5. Schedule of Works (client)

April 16, 2014

Page 1