Feasibility Flow Diagram Option 2

Page 1

Group 1 Scheme Design 2014

Feasibility Option 2

Storm Water Overflow

Sludge Return

Collection Network

Screening

Flow Monitoring (Flume)

Balancing Tank

Primary Settlement (Septic Tank)

Biological Zone (Aeration Tank)

Secondary Settlement (Horizontal Flow Secondary Tank)

Constructed Wetlands

Receiving Water

Sludge Return

Sludge Holding Tank

April 18, 2014

Page 1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.