Group 1 Scheme Design 2014
Feasibility Option 2
Storm Water Overflow
Sludge Return
Collection Network
Screening
Flow Monitoring (Flume)
Balancing Tank
Primary Settlement (Septic Tank)
Biological Zone (Aeration Tank)
Secondary Settlement (Horizontal Flow Secondary Tank)
Constructed Wetlands
Receiving Water
Sludge Return
Sludge Holding Tank
April 18, 2014
Page 1