84 R2 d) oun rthb (No
Existing Clarifier
n
Flo w
o cti
Di re
cti
re Di
on
ow
Fl
Existing Imhoff Tank
Flow Directio
n
Sludge Tank
ow Fl
Di
ct re
n io
Existing Ejector station
Existing Sludge Drying Bed
Existing Screening
Dire
8 R2
Flow
Main
Dire
Foul
Sew
er N etwo rk
d)
ction
un
Flow
bo
uth
So
4(
ction
Existing Lab/Operators Room
Knoc
kran
ny
Existing Manhole to be tapped
Group 1 Scheme Design 2013-2014 Athlone Institute of Technology, Athlone, Westmeath.
Mr. Paul Dolan (Staff Member of AIT)
Site Layout Mirivano Carrig
Mirivano Carrig
2013-01-01
A1 05/04/2013 1 OF
1
Existing Site Layout Scale: N/A
As Shown
7