complete cad solutions The Cad Room has come a long way in the last 5 years, we have grown significantly in the last year alone doubling our staff to accommodate workload. The introduction of BIM has had a massive increase in demand probably due to the lack of trained resource. We strive to recruit promising individuals who we can train and mould into the building services industry. As an outsource company we make it our busi-
ness to know your business, we want to act as your CAD/BIM department. You may have your own resource in house or you may want to outsource your entire workload we are only too happy to accommodate your needs. We have extensive experience in all sectors of our industry from healthcare to education, so if you have a project in mind please let us know.
Manchester Institute for Sports & Performance The owners of Manchester City FC have been part of a local authority initiative to regenerated the surrounding areas around the Eithad Stadium. Everyone is aware of the sporting history of Manchester with two of largest clubs in world located within a mile of each other. With this sporting heritage the need a scientific performance building was commissioned and The Cad Room was asked to lead in the coordination of the MEP services throughout the building. This was a complex building with exposed steel work and dropdown beams. Services included ventilation, heating, chilled, domestics, above ground drainage, containment and specialist artic pipework to serve the cold rooms.
Alder Hey
Childrens Hospital
Alder Hey is a world renowned children’s hospital in the north west of England. It has been a part of LivCrown House Technologies erpool for decades and 2010 a new state of the art Liverpool hospital was commissioned to be built. We were employed by our client Crown House TechSkills Needed: nologies to help with the coordination and prefabriRevit MEP 2012 cation of service modules for all MEP related services. Categories: This included ventilation, heating, chilled, domestics, Prefabrication containment, above ground drainage and extensive project medical gas pipework throughout our area. Upon successful completion of our initial zone we were asked to completed further areas within the project like; external trenches, plantrooms and the new Out Patients department (OPD) building. We completed all aspects of our contract and established a great working relationship with our client.
Royal Liverpool University Hospital Crown House Technologies Liverpool Skills Needed: Revit MEP 2014 Categories: Prefabrication project
In the same area as the new Alder Hey children’s hospital the adult hospital was in need of a new resurgence. Thanks to significant investment a new university hospital was given the green light to be built. In 2014 after our success on Alder Hey we were asked to be involved with this even larger project. Initially we were given a floor to complete fully coordinated modules and working drawings, there were approximately 125 modules on this floor all detailed to the manufactures specifications. Over the course of the project we have now completed 5 floors in total which includes around 450 modules
Dumfries and Galloway Woman’s and Children’s Unit Crown House Technologies Scotland Skills Needed: Revit MEP 2015 Categories: Prefabrication project
Thanks to our ongoing success with our previous hospitals completed with our client Crown House Technologies The Cad Room were invited to coordinate the woman and children’s building for the new Dumfries and Galloway hospital in Scotland. Although this project is of a smaller scale to our previous projects our coordination expertise was very much utilised as this part of the build was heavily congested with services and how we still had to add modules for prefabrication. Currently we are still on the project and looking forward to a successful completion and a bright future with our client.
The Christies Proton Beam Therapy Unit The Christies are renowned for their Cancer treatment and aftercare; they have helped millions of peoInterserve Engineering ple over the years to successful overcome this cripLondon/Manchester pling disease. The Christies are dedicated to curing cancer and as such investment millions in new and innovative research to help the fight. The Christies Skills Needed: has commissioned 2 new state of art Proton Beam Revit MEP 2015 Therapy Units in London and Manchester. Categories: The Cad Room are the lead projects coordinators for Prefabrication this BIM level 2 project, this includes prefabricated project modules in all service corridors. Currently we are half way through the project and look to be completed in the next couple of months. As a company this is our most prestigious project to date bearing in mind the nature of the building and we look forward to completing many more projects with our client Interserve Engineering services (IES).
8 Salisbury Square With us being based in Manchester we can offer a centralised outsource service with minimum expense to our clients, thanks to our success in the north we are now a household name. As a company we are seeing a lot of enquiries from the London area and as such we have successfully secured our first large scale 3D project with a new client MJL (Michael Lonsdale). The project is a part refurb part new install of the old KPMG building in London and we are looking forward to starting a new working relationship with MJL and that this is the first of many more project in the future.