FACT SHEET GRAND OPENING FEBRUARY 13, 2014 #createastir New high-energy feature bar and lounge
Eight booths of alternating bold, glittery red
with a Las Vegas feel
and gold colors, each seating eight people
Hours of operation: 10 a.m. to 4 a.m.,
Eight tabletop bar tables, each seating four
seven days a week
people
Approximately 7,500 square feet
Twelve lounge benches around perimeter of
Total capacity for 296 people
bar, each seating four people
Total seating for 184 people
HD video wall specs: 512 diagonal inches;
Mounted high-definition video wall
2,160,000 pixels spaced six millimeters
measures 20 feet high by 40 feet wide
apart; more than 2,400 feet of power
Stage area underneath HD video wall for
cabling, and; a processor that can accept
live entertainment
various inputs such as cable TV, iPhone and
Bold carpeting designs and hardwood
advertising media
flooring for dance area
Construction period: January and February
Circular bar with cool-blue center lighting
2014
and 21 tabletop video gaming units;
STIR completes the $26 million master
40 single seats around bar
renovation project for main gaming floor,
Full beverage menu with signature cocktails
which began in June 2013
Beautiful “bevertainers� will provide
Architect: SOSH
choreographed dances to create excitement
Project manager: Seneca Construction
Twenty-five new team members hired
Management Corporation (SCMC)