NAVA DE BANGKOK -
05 08 11 17 21 26 28 57
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
K L O N G
S A N
-
PREFACE
NAVA DE BANGKOK HOTEL (KLONG SAN)
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
044 002
PROJECT MEMBERS
CHAIYASIT J. 59020011
THIDANAT H. 59020026
TERAPONG B. 59020028
CHAVALIT T. 59020008
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
GANSIREE S. 59020005
NUTIDA K.
59020017
THANAPORN K. 59020021
WARALUK I. 59020057
003
PROJECT PROCESS
Relationship Diagram User Diagram Functional Diagram Area Requirement Schedule time use Analysis
Site Analysis View & Image Analysis Environmental Analysis Code & Regulation Analysis Site Specification Zoning Diagram
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Site Lay-out Form and Space Shade Shadow Texture Colour Materials Structure and Construction Mechanical and Equipment Sustainable
044 004
TABLE OF CONTENT
01
PROJECT BACKGROUND ❖ ❖ ❖ ❖ ❖
PROJECT INFORMATION TARGET GROUP PROJECT AREA SITE INFORMATION CASE STUDY
04-3 SANITARY SYSTEM
❖ ❖ ❖ ❖
SANITARY EQUIPMENT COLD WATER SYSTEM WASTE AND SOILED DRAINAGE WATER
❖ ❖ ❖ ❖ ❖ ❖ ❖
02
03
04-1
DESIGN PHRASE
STRUCTURAL PHASE
ELECTRICAL SYSTEM
CONCEPT DESIGN DEVELOP PLAN SECTION ELEVATION ROOMTYPE PERSPECTIVE
❖ ❖
04-4
❖ ❖ ❖ ❖ ❖
FIRE ALARM AND EMERGENCY DEVICES FIRE ALARM SYSTEM FIRE FIGHTING SYSTEM FIRE REEL HOSE CABINET FIRE TYPE HEAT DECTECTOR
❖ ❖ ❖ ❖ ❖
04-5
FIRE PROTECTION SYSTEM ❖
STRUCTURAL CONCEPT BUILDING MATERIAL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
VERTICAL TRANSPORTATION LIGHTING PROTECTION OTHER SYSTEM SECURITY SYSTEM GARBAGE MANAGEMENT ACOUSTIC SYSTEM
AIR CONDITIONAL SYSTEM ❖ ❖ ❖ ❖ ❖
05
OTHER SYSTEM
❖ ❖ ❖ ❖ ❖ ❖
POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM
04-2
06
COST & CONSTRUCTION MANAGEMENT ❖ ❖ ❖ ❖ ❖ ❖ ❖
POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM
PROJECT CONCLUSION ❖ ❖ ❖
EIA LEED CHECKLIST BIBLIOGRAPHY
044 005
01
PROJECT BACKGROUND ❖ ❖ ❖ ❖ ❖
PROJECT INFORMATION TARGET GROUP PROJECT AREA SITE INFORMATION CASE STUDY
006
01
PROJECT BACKGROUND
PROJECT INFORMATION ❖
TOR
NAVA DE BANGKOK
BUSINESS & TRAVEL
BUSINESS & HOTEL
MEETING 1,600 600 400 100
SQ.M. SQ.M SQ.M SQ.M
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
1,200 UNIT
FOOD & RESTAURANT THAI, CHINESE JAPANESE, HALAN ITALION, FRACE VIETNAMESE
4,500 MILLION BATH
RELAX • YOGA • GYM • SWIMMIN G POOL • SPA 007
01
PROJECT BACKGROUND
PROJECT INFORMATION ❖
TARGET GROUP
BUSINESSMAN EXPLOITATIVE TRAVEL
JET
SETTER
TOURIST PLEASURE FIRST TRAVEL
“BUSINESS & TRAVEL”
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
008
01
PROJECT BACKGROUND
AREA PROJECT ❖ GUEST ROOM
TYPE OFGUEST ROOM GRAND ROOM
JUNIOR SUITE
EXECUTIVE SUITE
PRESIDENTAL SUITE
(40 SQ.M.)
(85 SQ.M.)
(130 SQ.M.)
(180 SQ.M.)
01 02 03
1,000
42,480
80
8,075
116
4,940
6
1,260
ROOMS
SQ.M.
ROOMS
SQ.M.
ROOMS
SQ.M.
ROOMS
SQ.M.
04
SERVICE ROOM
05 06 07 08
SERVICE ROOM LENIN ROOM CLEANING STORAGE
15 15 6
SQ.M.
SQ.M.
TRASH ROOM FOOD PREPARATION ROOM
6 10
SQ.M. SQ.M.
SQ.M.
09
X 60 STOREY
TOTAL AREA CIRCULATION 15% TOTAL GUESTROOM AREA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
3,120
59,875.00
SQ.M.
8,981.25
SQ.M.
68,858.00
SQ.M.
SQ.M.
009
01
PROJECT BACKGROUND
AREA PROJECT ❖ FRONT OF HOUSE
PUBLIC SPACE
FOOD AND BEVERAGE
BUSINESS AREA
CONCESSION
1,942
2,486
826
559
SQ.M.
SQ.M.
SQ.M.
SQ.M.
01 02 03 04 05 06
FUNTION AREA
SPECIAL ACCOMODATION
3,044
1,004
SQ.M.
SQ.M.
07 08 09
TOTAL AREA TOTAL AREA
8,075.00 SQ.M. 59,875 SQM.
CIRCULATION 30% CIRCULATION 15%
3,566.00 SQ.M. 8,981.25 SQM.
TOTAL FOH AREA AREA TOTAL GUESTROOM
11,641.00 SQ.M. 68,858 SQM.
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
010
01
PROJECT BACKGROUND
AREA PROJECT ❖ BACK OF HOUSE
ADMINISTRATION
GENERAL SERVICE SPACE
EMPLOYEE FACILITY
02
759
1,773
1,629
03
SQ.M.
SQ.M.
SQ.M.
01
04 05 06
H.K. & LAUNDRY
MECHANICAL AREA
ENGINEER &MAINTENANCE
FOOD PREPARATION
1,268
4,056
712
829
SQ.M.
SQ.M.
SQ.M.
SQ.M.
07 08 09
TOTAL AREA TOTAL AREA CIRCULATION CIRCULATION 15% TOTAL BOH AREA TOTAL GUESTROOM AREA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
10,197.00 SQ.M. 59,875 SQM. 2,540.00 SQ.M. 8,981.25 SQM. 12,489.00 SQ.M. 68,858 SQM. 011
01
PROJECT BACKGROUND
AREA PROJECT ❖ TOILET AND CAR
GUEST ROOM
OFFICE (BOH)
120
85
EVENT ROOM
HALL
170
278
FOOD AND
10
2
20
LIMOUSINE & TAXI
TOURISM BUS
MOTORCYCLE
BEVERAGE
SHOP
50
39
10
3
SPECIAL CAR PARK
TOTAL CARS AREA / CAR TOTAL PARKING AREA
742.00 CARS 35.00 SQ.M. 25,970.00 SQ.M.
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TOTAL CARS AREA / CAR TOTAL PARKING AREA
SERVICES CAR
781.00 CARS 35.00 SQ.M. 27,315.00 SQ.M.
TRUCK
TOTAL
781
012
01
PROJECT BACKGROUND
AREA PROJECT ❖ ELEVATOR CALCULATION
PASSENGER LIFT
SERVICE LIFT
TOTAL
SERVICE LIFT
PASSENGER LIFT
7
11
HALL CALL DESTINATION ELEVATOR SYSTEM FLOOR FLOOR
TRACTION ELEVATOR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
11
11
013
01
PROJECT BACKGROUND
AREA PROJECT ❖ TOTAL AREA
DISALABLE AREA 29%
PARKING 21 %
SALES
119,619
BOH 10.4 %
AREA
SQ.M.
GUEST ROOM 58 %
FOH 10.4 % GUEST ROOM
FRONT OF HOUSE
SALABLE AREA
71 %
BACK OF HOUSE
SALABLE AREA 71% SALABLA AREA
PARKING
DISALABLE AREA
▪ GUEST ROOM (NO CIRCULATION)
▪ CIRCULATION OF GUEST ROOM
▪ FOOD AND BEVERAGE
▪ ADMINISTRATION
▪ SPECIAL ACCOMODATION ▪ BUSINESS AREA ▪ CONCESSION AND SUBRENTAL SPACE
DISALABLE AREA
29 %
▪ GENERAL SERVICE SPACE ▪ EMPLOYEE FACILITY ▪ HOUSE KEEPING AND LAUNDRY
▪ MULTI –PURPOSE AREA
▪ ENGINEER AND MAINTENACE
▪ FUNCTION AREA
▪ MECHANICAL AREA
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
014
01
PROJECT BACKGROUND
SITE INFORMATION ❖ DISTRICT
KLONGSAN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
015
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE COMPARISON
FAR OSR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
016
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE COMPARISON
ICON SIAM
1
2
BTS
BTS
3
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
017
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE COMPARISON
FAR OSR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
018
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE COMPARISON
12.25 RAI
2,940,000,000 B
8
0.75 KM
819
3
FAR
6
0.30 KM
OSR
5
0.30 KM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
019
01
PROJECT BACKGROUND
SITE INFORMATION ❖ ACCESSIBILITY
TAKSIN BRIDGE
U-TURN
TAKSIN BRIDGE
U-TURN POINT
NAVA
DE BANGKOK
NAVA
DE BANGKOK
U-TURN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
020
01
PROJECT BACKGROUND
SITE INFORMATION ❖ ACCESSIBILITY
TOURIST ATTRACTIONS BY BOAT
CHAO PHRAYA RIVER
THRIVE - EXPRESS BOAT * PRIVATE BOAT * AVAILABLE ( ADDITIONAL CHARGE ) FREE BOAT ( 06.00 AM. – 06.00 PM. )
ROUTE A : HERITAGE ROUTE ROUTE B : COMMERCIAL / LANDMARK
** ระยะเวลาขึน้ อยูก่ บั ความล่าช้าของเรือ ** INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
021
01
PROJECT BACKGROUND
SITE INFORMATION ❖ ACCESSIBILITY
TOURIST ATTRACTIONS PRACHATHIPOK
BY TRAIN KLONG SAN
BTS
CHAROEN NAKHON
ICON SIAM
KRUNG THONBURI
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
022
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SURROUNDING
ICON SIAM
COMMERCIAL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
COMMUNITY MALL
DEPARTMENT STORE
- VANILLA MOON
- ICON SIAM - CENTRAL SILOM COMPLEX - RIVER CITY BANGKOK - SILOM COMPLEX - THE MALL THA PHRA - CHAMCHURI SQUARE 023
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SURROUNDING
ICON SIAM
COMPETTITIVE HOTEL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
HOTEL ( RIVERSIDE )
HOTEL
- MILLENNIUM HILTON BANGKOK - THE PENINSULA BANGKOK - IBIS BANGKOK RIVERSIDE - ROYAL ORCHID SHERATON - SHANGRI-LA HOTEL - MANDARIN ORIENTAL
- PULLMAN BANGKOK HOTEL G - W BANGKOK - LEBUA AT STATE TOWER - NOVOTEL BANGKOK SILOM ROAD - EASTIN GRAND HOTEL SATHORN - AMARA BANGKOK 024
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SURROUNDING
ICON ICON SIAMSIAM
OFFICE
OFFICE BUILDING - WORLD TRADING COMPANY - EARTH COMPANY LIMITED - UNION WEALTH CORPORATION - CLC CORPORATION CO.,LTD. - TEIJIN CORPORATION THAILAND T.C.NATURAL CO.,LTD
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
025
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SURROUNDING
ICON SIAM
TOURIST ATTRACTIONS
ETC.
TEMPLE
TCDC ASIATIQUE THE RIVERFRONT - CHINA TOWN - GIANT SWING - KING POWER MAHANAKHON
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
026
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE ANALYSIS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
027
01
PROJECT BACKGROUND
SITE INFORMATION ❖ SITE REGULATION
2,940,000,000 B
8
0.75 KM
819
12.25 RAI
FAR
6
0.30 KM
OSR
5
0.30 KM
SITE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
19,800 12.25
SQ.M. RAI
AREA REQUIERMENT
119,610
SQ.M.
FAR 6 FAR BONUS 20% OSR 5 (5%FAR) BAF
118,800 + 23,760 5,940 2,970
SQ.M. SQ.M. (LEED) SQ.M. (5%FAR) SQ.M. (50%OSR)
028
01
PROJECT BACKGROUND
CASE STUDY ❖ DESIGN CASE
²
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
²
²
²
²
029
01
PROJECT BACKGROUND
CASE STUDY ❖ STRUCTURE CASE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
030
01
PROJECT BACKGROUND
CASE STUDY ❖ SUSTAINABLE •
SCG 100TH YEARS BUILDING
SUSTAINABLE • • SITES
•
•
•
• • •
•
• • •
•
• • •
• • •
• •
• • • •
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
031
01
PROJECT BACKGROUND
CASE STUDY ❖ SUSTAINABLE • Site selection • Development density and community connectivity • Alternative transportation SUSTAINABLE public transportation access SITES • Alternative transportation low-emitting and fuelefficient vehicles • Alternative transportation parking capacity • Site development maximize open space • Heat island effect – nonroof • Tenant design and construction guidelines
• Water efficient landscaping • Water use reduction
• Increased ventilation • Construction IAQ management plan - during construction • Low-emitting materials adhesives and sealants • Low-emitting materials paints and coatings • Indoor chemical and pollutant source control • Thermal comfort – design • Daylight and views - views INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Pearl River Tower
Optimize energy performance On-site renewable energy Enhanced commissioning Enhanced refrigerant management • Measurement and verification - base building • Measurement and verification - tenant submetering • • • •
• •
• Construction waste management • Recycled content • Regional materials
• Optimize energy performance • Enhanced commissioning • Water efficient landscaping • Water use reduction
032
02
DESIGN PHRASE
❖ ❖ ❖ ❖ ❖ ❖ ❖
CONCEPT DESIGN DEVELOP PLAN SECTION ELEVATION ROOMTYPE PERSPECTIVE
001
02
DESIGN PHASE
PROJECT CONCEPT “ THRIVE ALONG THE RIVER ”
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
002
02
DESIGN PHASE
PROJECT CONCEPT ❖ ZONING CONCEPT River origin
RIVERINE SOCIETY
Abundance
Delta
Riverine society GARDEN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PEOPLE
CULTURE 003
02 DESIGN PHASE
MASS DESIGN CONCEPT ❖ MASS ALTERNATIVE MASS (TOWER) - 01
MASS (TOWER) - 02
MASS (TOWER) - 03
MASS (TOWER) - 04
c
1 RIVERVIEW
1 RIVERVIEW
1 RIVERVIEW
1 RIVERVIEW
2 ROOMS
2 ROOMS
2 ROOMS
2 ROOMS
3 CHARACTOR
3 CHARACTOR
3 CHARACTOR
3 CHARACTOR
4 WIND
4 WIND
4 WIND
4 WIND
5 SUNLIGHT
5 SUNLIGHT
5 SUNLIGHT
5 SUNLIGHT
6 SHADING
6 SHADING
6 SHADING
6 SHADING
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
004
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ CORE ALTERNATIVE
1
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
2
3
005
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ MASS ALTERNATIVE
2
1
❖
❖
❖
❖
❖ ❖
❖ ❖
❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
006
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON
W
JUPITER COMMUNICATIONS NAVA
NAGA RESIDENCE ICON SIAM THE RIVER HOTEL
CHATRIUM HOTEL
PENINSULA HOTEL
IBIS BANGKOK RIVERSIDE
N
S SHANGRI-LA HOTEL
MANDARIN ORIENTAL HOTEL
CENTRE POINT HOTEL
E INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
007
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON NAVA DE BANGKOK
THE RIVER HOTEL
JUPITER COMMUNICATIONS
CHATRIUM HOTEL
SHANGRI-LA HOTEL
CENTRE POINT HOTEL
PENINSULA HOTEL ICON SIAM
CHAO PHRAYA RIVER
EAST
PERCEPTION
E
NAVA DE BANGKOK THE RIVER HOTEL PENINSULA HOTEL
SHANGRI-LA HOTEL
JUPITER COMMUNICATIONS
CHATRIUM HOTEL
CENTRE POINT HOTEL
ICON SIAM
WEST
PERCEPTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
W
008
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON NAVA DE BANGKOK THE RIVER HOTEL
JUPITER COMMUNICATIONS CENTRE POINT HOTEL
PENINSULA HOTEL ICON SIAM
CHAO PHRAYA RIVER
NORTH
N
SOUTH
S
PERCEPTION
NAVA DE BANGKOK
ICON SIAM JUPITER COMMUNICATIONS CHATRIUM HOTEL
SHANGRI-LA HOTEL
CENTRE POINT HOTEL
CHAO PHRAYA RIVER
PERCEPTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
009
02
DESIGN PHASE
MASS DESIGN CONCEPT MASS SURROUND COMPARISON
NAVA DE BANGKOK
BIRD EYE VIEW PERCEPTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
010
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ WIND SIMULATION
BEFORE
CONSTRUCTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
011
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ WIND SIMULATION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
012
02
DESIGN PHASE
MASS DESIGN CONCEPT ❖ SUN SIMULATION % SHADOW 0% 10%
TIMING
20%
8.00-17.00
30% 40% 50%
60% 70%
12 MONTHS
80% 90% 100% 90%
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
013
02
DESIGN PHASE
ZONING CONCEPT TOWER
GUEST ROOM ZONE 3 ❖ ❖ ❖ ❖
PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL
GUEST ROOM ZONE 2 PODIUM
❖ ❖
EXECUTIVE SUITE GRAND ROOM
PODIUM ❖ ❖ ❖ ❖ ❖
RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING
GUEST ROOM ZONE 1 ❖ ❖
EXECUTIVE SUITE GRAND ROOM
GRAND BALLROOM ❖ MEETING ROOM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
014
02
DESIGN DESIGN PHASE PHASE
ZONING CONCEPT ❖ PODIUM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
015
02
DESIGN PHASE
ZONING CONCEPT ❖ TOWER
PRIVATE POOL
PRIVATE LOBBY
SKY LOUNGE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
016
02
DESIGN PHASE
ZONING CONCEPT ❖ ROOM TYPE USER BEHAVIOR
70%
30%
BUSINESSMAN
TOURIST
TWIN BEDROOM
70% GROUP WORK SINGLE BEDROOM
30%
SINGLE WORK
CON NECT
CON NECT
TWIN BEDROOM
PARTNER WORK
SINGLE BEDROOM
TWIN BEDROOM
GROUP TOURIST
FAMILY
PARTNER TOURIST
TWIN BEDROOM
CONNEC T
TWIN BEDROOM
SINGLE BEDROOM
SINGLE BEDROOM
ROOM REQUIREMENT SHOWER
VANITY
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
FAST WIFI
CHARGER
DESK
TUB
017
02
DESIGN PHASE
ZONING CONCEPT ❖ ROOM TYPE
TYPE
A
GRAND ROOM
45 SQ.M.
TYPE
B
JUNIOR SUITE
85 SQ.M.
TYPE
C
EXECUTIVE SUITE
85 SQ.M.
TYPE
D
PRESIDENTAL SUITE
260 SQ.M.
SINGLE BEDROOM KINGBED
SINGLE BEDROOM KINGBED
SINGLE BEDROOM KINGBED
SINGLE BEDROOM KINGBED
TWIN BEDROOM CONNECT
TWIN BEDROOM CONNECT
TWIN BEDROOM CONNECT
TWIN BEDROOM CONNECT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
018
02
DESIGN PHASE
ZONING CONCEPT ❖ ZONING ROOM TYPE
PRESIDENTAL SUITE
TYPE
D
FLOOR
64-65
2
3
FLOORS
ROOMS
6 ROOMS
FLOOR 64 TYPE
FLOOR 56
EXECUTIVE SUITE
C
FLOOR
56-63 TYPE
2
8
FLOORS
ROOMS
16 ROOMS
JUNIOR SUITE
B
FLOOR
56-63
FLOOR 44
10
8
FLOORS
ROOMS
80 ROOMS
TRANSFER FLOOR FLOOR
44
TYPE
ROOM
EXECUTIVE SUITE
C
FLOOR
5-55 TYPE
2
50
FLOORS
ROOMS
GRAND ROOM
A
FLOOR
5-55 FLOOR 5
SUMMARY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
1 FLOOR
10
50
FLOORS
ROOMS
1,202
100 ROOMS
1000 ROOMS
ROOMS
019
02
DESIGN PHASE
PLAN ❖ 1ST FLLOR PLAN LOBBY
HALAL RESTAURANT
PARKING
BUSPARKING
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
LOBBY PARKING LOUNGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
1ST FLOOR PLAN - LOBBY 020
02
DESIGN PHASE
SECTION ❖
PODIUM SECTION HIGH ZONE
LOW ZONE 11TH
FLOOR
+49.20
10TH
FLOOR
+45.40
9TH
FLOOR
+41.60
8TH
FLOOR
+37.80
7TH
FLOOR
+34.00
6TH
FLOOR
+30.20
5TH
FLOOR
+26.40
4TH
FLOOR
+22.60
3RD
FLOOR
+14.00
2ND
FLOOR
+8.40
PARKING BUILDING
BUSINESS AREA
LOBBY
DROP OFF 2ST
FLOOR
PARKING
G FLOOR
PARKING
B1 FLOOR
PARKING
B2 FLOOR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
+2.80 +0.00 -2.80 -5.60
021
02
DESIGN PHASE
SECTION ❖
PODIUM SECTION SERVICE LOFT
FIRE EXIT 11TH
10TH
FLOOR FLOOR
FLOOR
9TH
+49.20
+37.80
7TH
FLOOR
+34.00
5TH
4TH
GRAND ROOM
+41.60
FLOOR
FLOOR
SERVICE ROOM
+45.40
8TH
6TH
HIGH ZONE
SERVICE ROOM SERVICE ROOM
SERVICE ROOM
+30.20
FLOOR
+26.40
FLOOR
+22.60
SERVICE ROOM SERVICE ROOM SERVICE ROOM
SWIMMING POOL 3RD
FLOOR
+14.00
2ND
FLOOR
+8.40
FLOOR
G FLOOR B1 FLOOR B2 FLOOR
SERVICE ROOM
STARBUCK GARDEN
2ST
SERVICE ROOM
+2.80 +0.00
LOUNGE
LOUNGE
STAFF DINING
STAFF LOUNGE
-2.80 -5.60
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
022
03
ARCHITECTURAL DRAWING
MAIN ENTRANCE INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN
023
03
ARCHITECTURAL DRAWING
PERSPECTIVE
SWIMMING POOL
LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN
LOUNGE 024
03
ARCHITECTURAL DRAWING
PLAZA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN
025
02
DESIGN PHASE
PLAN ❖ CORE DETAILS
ELECTRIC SHAFT STO
TELE SHAFT
EE AHU
MAID
HIGH ZONE
SERVICE LIFT
FRESH AIR SHAFT
FACILITIES
NET
CHILLED WATER SHAFT
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
HIGH ZONE FIREMAN LIFT
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
LOW ZONE
STO
0
5
10
20
30
CORE DETAILS 026
02
DESIGN PHASE
PLAN ❖ GROUND FLOOR PLAN STORAGE RECEIVING OFFICE
ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE
PARKING CHEF ROOM
ST.
DRY ST.
DRINK ST.
MEAT ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
ADMINISTRATOR
ENGINEERING ROOM
LINEN ROOM
CONTROL ROOM
STAFF DINING STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
HOUSE KEEPING
BABY ROOM
FLOWER
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TV REPAIR KEY SHOP
CARPENTER CHOP
PAINT SHOP
PLUMBLING SHOP
UNHOLD STORY SHOP
EE SHOP
0
5
10
20
30
GROUND FLOOR PLAN – BACK OF HOUSE 027
02
DESIGN PHASE
PLAN ❖ B1 FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
B1 FLOOR PLAN – CAR PARKING 028
02
DESIGN PHASE
PLAN ❖ B2 FLOOR PLAN
PUMBLING AND BOILING ROOM
MECHANICAL TREATMENT
MAIN TANK ROOM
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PUMP ROOM
0
5
10
20
30
B2 FLOOR PLAN – CAR PARKING 029
02
DESIGN PHASE
PLAN ❖ 2ND FLOOR PLAN
VIETNAM RESTAURANT ITALIAN RESTAURANT
JAPANESE RESTAURANT
FRENCH RESTAURANT
PARKING
STARBUCK COFFEE SHOP
PRE-FUNCTION
BUSINESS AREA
PREFUNCTION
GRAND BALLROOM PRE-FUNCTION RENTAL AREA
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
2ND FLOOR PLAN – GRAND BALLROOM 030
02
DESIGN PHASE
SECTION ❖
RESTAURANT SECTION
4th FLOOR
+19.60
BAR SWIMMING POOL
FLOOR
3rd
+14.00 2nd
MACHINE
THAI RESTUARANT
FLOOR
JAPANESE
VIETNAMESE
STORAGE
+8.40
CHINESE 1st
FLOOR
+3.50
G FLOOR
HALAL
STORAGE
FOOD PREPARE
CHECK IN (LOADING DROP)
ALLDAY DINING RESTUARANT KITCHEN
+0.00
B1 FLOOR
-2.80
RAIN WATER HARVEASTING SYSTEM
0
5
10
20
30
RESTAURANT SECTION INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
031
02
DESIGN PHASE
SECTION ❖
GRAND BALLROOM SECTION
0
5
10
20
30
GRAND BALLROOM SECTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
032
02
DESIGN PHASE
PERSPECTIVE ❖
INTERIOR DESIGN GRAND BALLROOM
GRAND BALLROOM INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
033
02
DESIGN PHASE
PLAN ❖ 3RD FLOOR PLAN FACILITIES
VIETNAM RESTAURANT ITALIAN RESTAURANT
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BALLROOM BACK OF HOUSE BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
3RD FLOOR PLAN - FACILITIES 034
02
DESIGN PHASE
PLAN ❖ 4TH FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
4TH FLOOR PLAN 035
02
DESIGN PHASE
PLAN ❖ 5TH-55TH FLOOR PLAN GUESTROOM
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
5TH – 55TH FLOOR PLAN – GUEST ROOM 036
02
DESIGN PHASE
PLAN ❖ PLAN EXECUTIVE SUITE AND GRAND ROOM
TYPE
C
EXECUTIVE SUITE FLOOR
5-55
50
2
FLOORS
ROOMS
100 ROOMS
EXECUTIVE SUITE A
TYPE
A
GRAND ROOM FLOOR
5-55
50
10
FLOORS
ROOMS
EXECUTIVE SUITE B
1000 ROOMS
GRAND ROOM A
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
GRAND ROOM B
037
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN GRAND ROOM
❖
TYPE
A
GRAND ROOM FLOOR
5-55
50
10
FLOORS
ROOMS
1000 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
GRAND ROOM A
GRAND ROOM B
038
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN GRAND ROOM
❖
TYPE
A
GRAND ROOM FLOOR
5-55
50
10
FLOORS
ROOMS
1000 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
GRAND ROOM A
GRAND ROOM B
039
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN EXECUTIVE SUITE
❖
TYPE
C
EXECUTIVE SUITE FLOOR
5-55
50
2
FLOORS
ROOMS
100 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
EXECUTIVE SUITE A
EXECUTIVE SUITE B
040
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN EXECUTIVE SUITE
❖
TYPE
C
EXECUTIVE SUITE FLOOR
5-55
50
2
FLOORS
ROOMS
100 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
EXECUTIVE SUITE A
EXECUTIVE SUITE B
041
02
DESIGN PHASE
PLAN ❖ 44TH FLOOR PLAN SKY LOUGE
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
44TH FLOOR PLAN – SKY LOUNGE 042
02
DESIGN PHASE
SECTION ❖
SKY LOUGE SECTION SERVICE HIGH LIFT HALL ZONE 72TH
FLOOR
+231.80
71TH
FLOOR
+228.00
70TH
FLOOR
+224.20
69TH
FLOOR
+220.40
68TH
FLOOR
+216.60
67TH
FLOOR
+212.80
66TH
FLOOR
+209.00
65TH
FLOOR
+205.20
LIFT HALL
RESTAURANT 64TH
FLOOR
+201.40 BAR
63TH
FLOOR
+197.60
62TH
FLOOR
+193.80
61TH
FLOOR
+190.00
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
BAR
043
02
DESIGN PHASE
PERSPECTIVE ❖
SKY LOUGE
SKY LOUNGE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
044
02
DESIGN PHASE
PLAN ❖ 45TH FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
45TH FLOOR PLAN – CORE TRANFER 045
02
DESIGN PHASE
PLAN ❖ 46TH FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
46TH FLOOR PLAN – PRIVATE POOL 046
02
DESIGN PHASE
PERSPECTIVE ❖
PRIVATE POOL
PRIVATE POOL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
047
02
DESIGN PHASE
PLAN ❖ 56TH-63TH FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
56TH – 63TH FLOOR PLAN 048
02
DESIGN PHASE
PLAN ❖ PLAN EXECUTIVE SUITE AND JUNIOR SUITE
TYPE
D
EXECUTIVE SUITE FLOOR
56-63
8
2
FLOORS
ROOMS
16 ROOMS
EXECUTIVE SUITE A
TYPE
B
JUNIOR SUITE FLOOR
56-63
8
10
FLOORS
ROOMS
EXECUTIVE SUITE B
80 ROOMS
JUNIOR SUITE A
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
JUNIOR SUITE B
049
02
DESIGN PHASE
PLAN ❖ 64TH-65TH FLOOR PLAN
LOBBY PARKING LOUGE RESTAURANT
RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA
BALLROOM BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
5
10
20
30
64TH – 65TH FLOOR PLAN 050
02
DESIGN PHASE
PLAN ❖ PLAN PRESIDENTAL SUITE
TYPE
D
PRESIDENTAL SUITE FLOOR
64-65
PRESIDENTAL SUITE A
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
2
3
FLOORS
ROOMS
6 ROOMS
PRESIDENTAL SUITE B
051
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE B
❖
TYPE
D
PRESIDENTAL SUITE FLOOR
64-65
2
3
FLOORS
ROOMS
6 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PRESIDENTAL SUITE B
052
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE B
❖
TYPE
D
PRESIDENTAL SUITE FLOOR
64-65
2
3
FLOORS
ROOMS
6 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PRESIDENTAL SUITE B
053
02
DESIGN PHASE
PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE A
❖
TYPE
D
PRESIDENTAL SUITE FLOOR
64-65
2
3
FLOORS
ROOMS
6 ROOMS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PRESIDENTAL SUITE A
054
02
DESIGN PHASE
SECTION ❖
SECTION A- A TOWER
GUEST ROOM ZONE 3 ❖ ❖ ❖ ❖
PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL
GUEST ROOM ZONE 2 PODIUM
❖ ❖
EXECUTIVE SUITE GRAND ROOM
PODIUM ❖ ❖ ❖ ❖ ❖
0
5
10
20
30
SECTION A-A
RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING
GRAND BALLROOM
GUEST ROOM ZONE 1 ❖ ❖
EXECUTIVE SUITE GRAND ROOM
❖ MEETING ROOM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
055
02
DESIGN PHASE
ELEVATION ❖
DAY ELEVATION
EAST
ELEVATION
NORTH
WEST
ELEVATION
ELEVATION
0
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
20
40
60
SOUTH
ELEVATION
80
056
02
DESIGN PHASE
ELEVATION ❖
NIGHT ELEVATION
EAST
ELEVATION
NORTH
WEST
ELEVATION
ELEVATION
0
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
20
40
60
SOUTH
ELEVATION
80
057
03
STRUCTURAL PHASE ❖ ❖
STRUCTURAL CONCEPT BUILDING MATERIAL
090
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT ❖
STRUCTURAL DIAGRAM
TOWER
GUEST ROOM ZONE 3
7
zone
❖ ❖ ❖ ❖
PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL
GUEST ROOM ZONE 2 ❖ ❖
PODIUM
PODIUM ❖ ❖ ❖ ❖ ❖
EXECUTIVE SUITE GRAND ROOM
GUEST ROOM ZONE 1 ❖ ❖
EXECUTIVE SUITE GRAND ROOM
RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING
UNDERGROUND
GRAND BALLROOM ❖ MEETING ROOM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
BASEMENT CAR PARKING FOUNDATION
091
03
POST TENTION FLOOR
STRUCTURAL CONCEPT
STRUCTURAL PHASE
SLOPE COLUMN
❖ GUEST ROOM ZONE 1 TRUSS BEAM
➢ DETAILS A STEEL BRACING
CONSTRUCTION
PHASE 1
➢ DETAILS A GUEST ROOM ZONE 1 CRITERIA
❖ ❖ ❖ ❖ ❖ ❖
CONCRETE CORE
WITHOUT LARGE BEAM STRAPPING WITHOUT COLUMN OPEN SPACE TO RIVER VIEW UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
EXPLOSION DIAGRAM
TRUSS BEAM DIAGRAM
FORCE
DIAGRAM
STRUCTURE
WALL
CANTILEVER
DEPTH
(M)
(M)
(M)
-
-
0.15
-
-
0.30
STEEL
@ 5.50
-
6.80
REINFORCED
5.50
-
-
5.50
10.00
7.80
MATERIAL
REINFORCED
REINFORCED
CONCRETE
CONCRETE
FLOOR
POST TENTION
BEAM
TRUSS
COLUMN
SLOPE COLUMN
BRACING
BRACING
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
SPAN
SYSTEM
CONCRETE
WITH STRANDS
CONCRETE STEEL
092
03
STRUCTURAL PHASE
➢ DETAILS A
STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 1
CONCRETE CORE
CONSTRUCTION
PHASE 1
GUEST ROOM ZONE 1 CRITERIA
❖ ❖ ❖ ❖ ❖ ❖
WITHOUT LARGE BEAM STRAPPING WITHOUT COLUMN OPEN SPACE TO RIVER VIEW UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
STEEL BRACING
TRUSS BEAMS WITH TEEL BRACING ISOMETRIC
CONCRETE CORE 43.00 M. 8.70 M. 8.70 M.
DEPTH 6.80 M. CONCRETE CORE 43.00 M. @ 5.50 M. DEPTH 7.80 M.
TRUSS BEAM TOP VIEW
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TRUSS BEAMS WITH TEEL BRACING ELEVATION
093
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT
TRUSS BEAM
CONCRETE CORE
❖ GUEST ROOM ZONE 2
➢ DETAILS A
CONSTRUCTION
PHASE 1
POST TENTION FLOOR
GUEST ROOM ZONE 2 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖
CAST-IN-PLACE CONCRETE COLUMN
NON-REFLECTIVE STRUCTURE REDUCED COSTS SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
EXPLOSION DIAGRAM
TRUSS BEAM DIAGRAM
FORCE
DIAGRAM
STRUCTURE
WALL
SYSTEM
MATERIAL
REINFORCED
REINFORCED
CONCRETE
CONCRETE CONCRETE
SPAN
CANTILEVER
DEPTH
(M)
(M)
(M)
-
-
0.15
-
-
0.30
FLOOR
POSTENTION
BEAM
TRUSS
STEEL
@ 5.50
10.80
3.40
CAST-IN-PLACE
REINFORCED
CONCRETE
CONCRETE
5.50
-
1.20 × 0.80
COLUMN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
WITH STRANDS
094
03
STRUCTURAL PHASE
➢ DETAILS A
STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 2
CONCRETE CORE
CONSTRUCTION
PHASE 1
GUEST ROOM ZONE 2 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖
NON-REFLECTIVE STRUCTURE REDUCED COSTS SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
TRUSS BEAM ISOMETRIC
CANTILEVER 14.00 M. 10.80 M. CONCRETE CORE 43.00 M. CANTILEVER 10.80 M.
14.00 M.
CONCRETE CORE 43.00 M. DEPTH 3.40 M.
@ 5.50 M.
TRUSS BEAM TOP VIEW
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TRUSS BEAM ELEVATION
095
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT
CAST IN PLACE CONCRETE ROOF
❖ GUEST ROOM ZONE 3 TRUSS BEAM
CONSTRUCTION
➢ DETAILS A
PHASE 1
CABLE COLUMN
GUEST ROOM ZONE 3
PRECAST SLABS FLOOR
CRITERIA ❖ ❖ ❖ ❖ ❖ ❖
SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST
➢ DETAILS B CONCRETE CORE ➢ DETAILS B EXPLOSION DIAGRAM
TRUSS BEAM DIAGRAM
FORCE
DIAGRAM
STRUCTURE
WALL
SYSTEM
MATERIAL
REINFORCED
REINFORCED
CONCRETE
CONCRETE CONCRETE
SPAN
CANTILEVER
DEPTH
(M)
(M)
(M)
-
-
0.15
10.00
-
0.30
FLOOR
PRECAST SLABS
BEAM
TRUSS
STEEL
@ 5.50
-
7.60
COLUMN
CABLE COLUMN
STEEL CABLE
5.50
20.00
3.80
CAST IN PLACE
REINFORCED
CONCRETE
CONCRETE
5.50
-
-
ROOF
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
WITH STRANDS
096
03
STRUCTURAL PHASE
➢ DETAILS A
STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 3
CONCRETE CORE
CONSTRUCTION
PHASE 1
GUEST ROOM ZONE 3 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖
SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST
TRUSS BEAM ISOMETRIC
14.00 M. CONCRETE CORE 43.00 M. 14.00 M. CONCRETE CORE 43.00 M. DEPTH 6.80 M.
@ 5.50 M.
TRUSS BEAM TOP VIEW
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TRUSS BEAM ELEVATION
097
03
STRUCTURAL PHASE PRECAST SLABS FLOOR
➢ DETAILS B
STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 3
CONSTRUCTION
CONCRETE CORE
PHASE 1
GUEST ROOM ZONE 3
CABLE COLUMN
CRITERIA
CABLE COLUMN WITH PRECAST SLABS ❖ ❖ ❖ ❖ ❖ ❖
ISOMETRIC
SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST
STEEL HINGE PIN DIAMETER 0.20 M.
TENSION FORCE CABLE COLUMN DIAMETER 0.20 M.
CASE STUDY
MEDIA TIC BUILDING
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
JOINT
DETAIL
098
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT ❖ PODIUM
POST TENTION FLOOR
CAST IN PLACE CONCRETE WITH GREEN ROOF
CAST IN PLACE CONCRETE FLOOR
CONSTRUCTION
PHASE 1
CAST IN PLACE CONCRETE POOL
PODIUM CRITERIA
❖ ❖ ❖ ❖ ❖ ❖ ❖
NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF INFINITY POOL
FORCE
CAST IN PLACE CONCRETE COLUMN
EXPLOSION
➢ DETAILS A
STRUCTURE
DIAGRAM
SYSTEM
MATERIAL
DIAGRAM WALL
FLOOR
COLUMN
REINFORCED
CONCRETE
CONCRETE
WITH STRANDS
POSTENTION
CONCRETE
CONCRETE
WITH STRANDS
CONCRETE WITH GREEN ROOF
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
WITH STRANDS
CAST-IN-PLACE
CAST IN PLACE ROOF
CONCRETE
CONCRETE WITH STRANDS
SPAN
(M)
CROSS SECTION AREA (SQ.M.)
DEPTH
(M)
-
-
0.15
8.00 – 12.00
-
0.30
8.00 – 12.00
0.40 × 1.20
-
-
-
0.80
099
03
STRUCTURAL PHASE
➢ DETAILS A
STRUCTURAL CONCEPT ❖ PODIUM
PHASE 1
CRITERIA
❖ ❖ ❖ ❖ ❖ ❖ ❖
CAST IN PLACE CONCRETE
NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF INFINITY POOL
S W I M M I N G
CONSTRUCTION
PODIUM
POOL TOP COPING
P O O L
GUTTER TOP GRILL
OVERFLOW SWIMMING POOL RETAINING WALL WITH GUTTER SECTION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
100
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT
TRUSS BEAM
POTTED PLANT
❖ GRAND BALLROOM
METAL SHEET ROOF
➢ DETAILS A
POST TENTION FLOOR
CONSTRUCTION
PHASE 1
CAST IN PLACE CONCRETE FLOOR
GRAND BALLROOM CRITERIA
❖ ❖ ❖ ❖ ❖ ❖
NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
CAST-IN-PLACE CONCRETE COLUMN ➢ DETAILS A EXPLOSION DIAGRAM
STRUCTURE
SYSTEM
FORCE
DIAGRAM
WALL
FLOOR
BEAM
COLUMN
ROOF
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MATERIAL CONCRETE
ACOUSTIC INS
WITH STRANDS
CAST IN PLACE
CONCRETE
CONCRETE
WITH STRANDS
CAST-IN-PLACE
CONCRETE
CONCRETE
WITH STRANDS
CAST-IN-PLACE
CONCRETE
CONCRETE
WITH STRANDS
TRUSS BEAM WITH
STEEL WITH METAL
METAL SHEET
SHEET
SPAN
CANTILEVER
DEPTH
(M)
(M)
(M)
-
-
0.25
10.00
0.50
0.30
10.00
0.50
1.00
20.00–27.00
-
0.40 × 1.20
20.00–27.00
-
2.00 101
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT ❖ GRAND BALLROOM
CONSTRUCTION
PHASE 1
GRAND BALLROOM CRITERIA
❖ ❖ ❖ ❖ ❖ ❖
NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
➢ DETAILS A
SECTION A INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
WALL
SECTION
SECTION B 102
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT ❖ BASEMENT CAR PARKING
CONSTRUCTION
CAST IN PLACE CONCRETE FLOOR CAST IN PLACE CONCRETE RAMP
RETAINING WALL
PHASE 1
CAST IN PLACE CONCRETE COLUMN
BASEMENT CAR PARKING CRITERIA
❖ ❖ ❖ ❖
SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
❖
❖
EXPLOSION DIAGRAM
FORCE
STRUCTURE
DIAGRAM
OUTSIDE
5.6 m
WALL
CAR PARKING
FLOOR
BEAM
COLUMN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
SYSTEM
RETAINING WALL
MATERIAL
CONCRETE WITH STRANDS
CAST IN PLACE
CONCRETE
CONCRETE
WITH STRANDS
CAST IN PLACE
CONCRETE
CONCRETE
WITH STRANDS
CAST IN PLACE
CONCRETE
CONCRETE
WITH STRANDS
SPAN (M)
CROSS SECTION AREA (SQ.M.)
DEPTH (M)
-
-
0.60
-
-
0.30
10.00
-
0.80
10.00
0.40 × 1.20
103
03
STRUCTURAL PHASE
STRUCTURAL CONCEPT ❖ FOUNDATION
MATT FOUNDATION ❖
❖
CONSTRUCTION
BEARING PILE
PHASE 1
❖
❖
FOUNDATION ❖
CRITERIA
❖ ❖ ❖ ❖
SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF
HARD SOIL LAYER ❖
EXPLOSION DIAGRAM
FORCE
DIAGRAM
STRUCTURE
SYSTEM
FOUNDATION
MATT FOUNDATION
PILE
BEARING PILE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MATERIAL CONCRETE WITH STRANDS
CONCRETE WITH STRANDS
SPAN
LENGTH
DEPTH
(M)
(M)
(M)
-
-
5.00
8.00 – 12.00
60.00
-
104
03
STRUCTURAL PHASE
BUILDING MATERIAL
❖ TOWER
OPAQUE MATERIAL
TRANSPARENT
ALUMINIUM COMPOSITE
MATERIAL
CURTAIN WALL 4 SIDED
1
1
A
2
TRANPARENT
2
MATERIAL
1
OPAQUE B
MATERIAL
2
2
3
A
B B
A A
B
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
105
03
STRUCTURAL PHASE
BUILDING MATERIAL
❖ PODIUM
TRANSPARENT
OPAQUE
MATERIAL
MATERIAL
SLOPING CURTAIN WALL
SOLID SURFACE
3
INTERIOR
1
TRANSPARENT
MATERIAL
MATERIAL
SOLID SURFACE
2
1
2
3
OPAQUE MATERIAL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
106
03
STRUCTURAL PHASE
BUILDING MATERIAL
❖ CAR PARKING
TRANSPARENT
OPAQUE
MATERIAL
MATERIAL
PERFORATED MESH
SOLAR FACADE - BIPV
2
OPAQUE MATERIAL
4 3
2
2
5
1 1 TRANSPARENT 2
MATERIAL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
6
7
1
107
03
STRUCTURAL PHASE
BUILDING MATERIAL
❖ LAND SCAPE SOFT SCAPE
HARD SCAPE
MATERIAL
MATERIAL
2
1
HARD SCAPE MATERIAL
SOFT SCAPE MATERIAL
1
2
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
108
04-1 ELECTRICAL SYSTEM ❖ ❖ ❖ ❖ ❖
POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ POWER LOAD ZONING
ZONING 3
TOWER
TOTAL
3,442
ZONING 2
BALLROOM
KVA
ZONING 1
❖ ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PODIUM& PARKING
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ LOAD ESTIMATE CALCULATION ²
PODIUM
BALLROOM
TOWER
PARKING
PUBLIC SPACE FOOD&BEVERAGE BUSINESS AREA CONCESSION SPECIAL ACCOMODATION ADMINISTRATION WC GENERAL SERVICE EMPLOYEE FACILITY H.K.&LAUNDRY MECHANIC AREA ENGINEER&MAINTENANCE BALLROOM MEETING ROOM WC GUEST ROOM CIRCULATION SERVICE ROOM PARKING AREA MECHANIC AREA
1,942 2,486 826 559 1,004 759 2,013 1,773 1,629 1,268 1,056 712 1,600 1,262 384 56,755 8,981 900 27,315 861
²
²
-
2
-
4,972 -
10 15 10 15 15 15 2 2 2 15 15
7,590 26,595 16,290 19,020 15,840 10,680 3,200 2,524 113,510 13,500 12,915
² 10 18 22 22 22 30 8 8 20 20 8 8 20 20 8 10 25 8 8 8
19,420 44,748 18,172 12,298 22,088 22,770 16,104 14,184 32,580 25,360 8,448 5,696 32,000 25,240 3,072 567,550 224,525 7,200 218,520 6,888 -
70 90 70 50 70 70 20 20 50 10 10 10 90 70 20 4 70 20
135,940 223,740 57,820 27,950 70,280 53,130 40,260 35,460 81,450 12,680 10,560 7,120 144,000 88,340 7,680 238,371 628,670 18,000 -
155,360 273,460 75,992 40,248 92,368 83,490 56,364 76,239 130,320 57,060 34,848 23,496 179,200 116,104 10,752 919,431 853,195 38,700 218,520 6,888
TOTAL TOTAL LOAD BUILDING
3,442,035 VA
3,442 KVA
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ POWER LOAD ZONING
ZONING 1
1
PODIUM&PARKING
-
PODIUM 1,099 KVA PARKING 225 KVA
TOTAL 1,324 KVA
EMDB
EMERGENCY MAIN DISTRIBUTION BOARD
GEN
GENERATOR
RMU
AUTOMATIC TRANSFER SWITCH
ATS
RING MAIN UNIT
TM
TRANSFORMER
MDB MAIN DISTRIBUTION BOARD
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
LP
LOAD PANEL
DB
DISTRIBUTION BOARD
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ POWER LOAD ZONING
ZONING 2
2
BALLROOM&MEETING RM
-
MEETING ROOM 179 KVA BALLROOM 116 KVA
TOTAL 306 KVA
EMDB
GEN
EMERGENCY MAIN DISTRIBUTION BOARD GENERATOR
RMU AUTOMATIC TRANSFER SWITCH ATS
RING MAIN UNIT
TM
TRANSFORMER
MDB MAIN DISTRIBUTION BOARD LP
LOAD PANEL
DB
DISTRIBUTION BOARD
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ POWER LOAD ZONING
ZONING 3
3
TOWER
-
TOWER 1,811 KVA
TOTAL 1,811 KVA
EMDB
GEN
EMERGENCY MAIN DISTRIBUTION BOARD
GENERATOR
RMU AUTOMATIC TRANSFER SWITCH ATS
RING MAIN UNIT
TM
TRANSFORMER
MDB MAIN DISTRIBUTION BOARD LP
LOAD PANEL
DB
DISTRIBUTION BOARD
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ LIGHTING PLANNING CONCEPT
100 200 300 400 500
LAW
LIGHTING TYPE
LUX LUMEN/SQ.M.
ARRANGEMENT
LUX LUMEN/SQ.M.
MANUAL
MOTION ACTIVATED SENSOR
PHOTOELECTRIC LIGHT SENSOR
LUX LUMEN/SQ.M.
INDOOR OUTDOOR INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
ANALOG TIME SWITCH
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ OUTDOOR LUMINAIRES AND LAMPS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ LANDSCAPE LIGHTING PLAN
)
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ LANDSCAPE LIGHT SECTION
) INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ INDOOR LUMINAIRES AND LAMPS
LED PENDANT
W 68 H 1140 D 90 cm 36W DAY LIGHT WORK SPACE
DOWNLIGHT LED
FLAT LED QUADRATE
W 27 H 23.5 D 18 cm 40W WARM LIGHT
chandelier
LED PANEL LIGHT
W80 x D80 x H75 cm WARM LIGHT
W 9 H 45 cm 2 x G4 LED MAX 5 W WARM LIGHT
48W 30x120CM 48w DAY LIGHT
LOBBY
GUESTROOM
FACILITY
LOBBY, LOUNGE
LED STRIP
LED CLONY
LED FLUORESCENT
SURFACE LUMINAIRE
CHIP DLP PROJECTOR
W300 x D1220 x H85 mm 2 x 14W DAY LIGHT
W120 x D1155 x H105 mm 6M 4.8W/M DAY LIGHT
RESTAURANT SHOP
OFFICE, EMPLOYEE AREA
610-350LM 48w WARM LIGHT
6M 4.8W/M WARM LIGHT
W120 x D1155 x H105 mm 18/36W DAY LIGHT
CIRCULATION, GUESTROOM
RESTAURANT SHOP
OFFICE, EMPLOYEE AREA
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ 1ST FLOOR LIGHTING PLAN
S
0
5
10
20
2nd FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
30
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ GUEST ROOM LIGHTING PLAN
S
0
5
10
20
5TH – 55TH GUEST ROOM INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
30
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ NATURAL LIGHT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ ELECTRIC POWER
0
5
10
20
30
5TH – 55TH GUEST ROOM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-1
ELECTRICAL SYSTEM
ELECTRICAL SYSTEM ❖ SOLARCELL SYSTEM
×
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-2
AIR CONDITIONAL SYSTEM ❖ ❖ ❖ ❖
WATER COOLED WATER CHILLER AIR CONDITIONAL SYSTEM OF BUILDING RISER DIAGRAM VENTILATION SYSTEM
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER
CHILLER
HRV
PRE-COOL FRESH AIR
COOLING TOWER
AHU
VAV
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER
HRVS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
PRECOOLED
AHU
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖ AIR CONDITIONAL SYSTEM OF BUILDING
TOWER TOWER
PODIUM PODIUM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM PODIUM
❖ RISER DIAGRAM
PODIUM 1,942
932,160
-
BUSINESS AREA
826
396,480
-
CONCESSION
559
268,320
-
1,004
481,920
-
ADMINISTRATION
759
364,320
-
WC
234
112,320
GENERAL SERVICE
1,773
851,040
-
EMPLOYEE FACILITY
1,629
781,920
-
H.K.&LAUNDRY
1,268
608,640
-
MECHANIC AREA
1,056
506,880
-
WC
352
168,960
-
ENGINEER&MAINTENANCE
712
341,760
BALLROOM
1,600
768,000
-
MEETING ROOM
1,262
605,760
-
384
184,320
2,486
1,193,280
829
397,920
PUBLIC SPACE
SPECIAL ACCOMODATION
WC FOOD&BEVERAGE FOOD PREPARATION
2,555,520
3,259,200
1,558,080 1,591,200
RM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
COOLING TOWER
SUPPLY WATER
CHILLER
RETURN WATER
AHU
SUPPLY AIR
FHU
RETURN AIR
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER
GUEST ROOM
56,755
45,404,000
-
CIRCULATION
8,981
4,310,880
-
SKY LOUNGE
1,450
696,000
50,410,880
RM
RM
RM
COOLING TOWER
SUPPLY WATER
CHILLER
RETURN WATER
AHU
SUPPLY AIR
FHU
RETURN AIR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
TOWER TOWER
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖
HEAT RECOVER VENTILATION PRE-COOLED FRESH AIR VARIABLE AIR VOLUME AIR HANDIMG UNIT COOLING TOWER CHILLER SUPPLY WATER RETURN WATER AHU/FCU
FRESH AIR
RETURN DUCT
RETURN AIR
SUPPLY DUCT
COOLING WATER SUPPLY
RETURN AIR
COOLING WATER RETURN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
04-2
AIR CONDITIONAL SYSTEM
AIR CONDITIONAL SYSTEM ❖ VENTILATION SYSTEM
WC
VENTILATION SYSTEM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
LIFT
VENTILATION SYSTEM
PARKING
VENTILATION SYSTEM
04-3
SANITARY SYSTEM
❖ ❖ ❖ ❖
SANITARY EQUIPMENT COLD WATER SYSTEM WASTE AND SOILED SYSTEM DRAINAGE WATER SYSTEM
133
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ SUMMARY PARKING ZONE o
o
o
o
FACILITY ZONE o
o
o
o
RESTAURANT ZONE
TOWER ZONE o
o
o
o
HALL ZONE o
o
o
o
BALLROOM ZONE
o
o
o
o
o
o
o
o
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
134
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ SANITARY EQUIPMENT CALCULATION COLD WATER SYSTEM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
135
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ SANITARY EQUIPMENT CALCULATION 1000
60,000
226,800
226.80
WATER REUSE SYSTEM สุขภัณฑ์ อ่ำงล้ำงมือ ฝักบัว
อ่ำงอำบน้ำ อ่ำงล้ำงทั่วไป
จำนวน
ค่ำ FU
รวม
1,562.00
2.00
3,124.00
1,110.00
4.00
4,440.00
1,204.00
4.00
4,816.00
1,204.00
2.25
2,709.00
รวมค่ำ FU
อัตรำควำมเร็ว
ตัวคูณลด
ควำมเร็วทีแ่ ท้จริง(ลิตร/นำที)
อัตรำกำรใช้นำ้ สูงสุด(ลิตร/ชม.)
ประสิทธภำพเครือ ่ งสูบนำ้ (ลิตร/นำที)
15,089
4,392.41
0.61
2,679.37
160,762.13
5,358.74
SOIL WATER SYSTEM • • •
453 INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
1,607
3,600
18 136
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ SANITARY EQUIPMENT
70%
20%
30% WASHBASIN AND FAUCET
WATER CLOSET
SHOWER AND BATHTUB
CENCOR FAUCET
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
137
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ SANITARY EQUIPMENT INFORMATION WASTE SYSTEM
COLD WATER SYSTEM(DOWNFEED)
TOWER
WATER REUSE SYSTEM GREY WATER
RAIN DRANAGE WATER SYSTEM
COLD WATER SYSTEM(UPFEED)
PODIUM m
Ø Ø
BASEMENT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Ø ROOFDRAIN
138
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ COLD WATER SYSTEM FLOOR 64
P
FLOOR 64
T
P
T
COLD WATER SYSTEM EQUIPMENT FLOOR 44
FLOOR 44
P
T
P
T
Ø Ø Ø
FLOOR B2
M
P
T
SECTION A
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
M
P
T
M
SECTION B
139
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ COLD WATER SYSTEM
M MECHANI CAL TREATME NT
PAR KING
P
T
MAIN TANK ROOM
P P P
GROUND FLOOR PLAN
B2 FLOOR PLAN
SYMBOL
T
P
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
M
140
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ REUSE WATER AND DRANAIGE SYSTEM FLOOR 64
FLOOR 64 S S S S S S S S S S S S S S S S S S S
S S S S S S S S S S S S S S S
S S S S
S S S S
FLOOR 44
S S
FLOOR 44
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
TO LANDSCAPE TO SEWER
S
W C
S
W C
SECTION A
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Ø Ø Ø
W C
W C
FLOOR B2
COLD WATER SYSTEM EQUIPMENT
S
S
W C
S
W C
SECTION B
M TO LANDSCAPE TO SEWER
141
04-3
SANITARY SYSTEM
SANITARY SYSTEM ❖ DRAINAGE WATER SYSTEM
1:200
1:200
1:200
STORAGE RECEIVING OFFICE ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE PARKING CHEF ROOM
ST.
DRINK MEAT ST. ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
1:200
DRY ST.
ADMINISTRATOR
ENGINEERING ROOM LINEN ROOM STAFF DINING
STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
1:200
HOUSE KEEPING
BABY ROOM
1:200
CONTROL ROOM TV REPAIR KEY SHOP
FLOWER
CARPENTER CHOP PAINT SHOP
UNHOLD STORY SHOP
PLUMBLING SHOP
1:200
EE SHOP
1:200
SYMBOL
0
5
10
20
30
GROUND FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
142
04-4
FIRE PROTECTION SYSTEM ❖ ❖ ❖ ❖ ❖ ❖ ❖
FIRE ALARM AND EMERGENCY DEVICES FIRE ALARM SYSTEM DIAGRAM FIRE FIGHTING SYSTEM DIAGRAM FIRE REEL HOSE CABINET FIRE TYPE HEAT DECTECTOR / SMOKE DETECTOR SPRINKLER SYSTEM
143
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE
FIRE ALARM CONTROL PANEL (FCP)
ADDRESSABLE MODULE (RTU)
HEAT DETECTOR
SMOKE DETECTOR
ALARM DEVICES
DUCT SMOKE DETECTOR
EMERGENCY TELEPHONE
MANUAL STATION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
144
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE ALARM SYSTEM DIAGRAM
FIRE ALARM SYSTEM DIAGRAM SIGN OTHER SYSTEM FIRE BRIGADE
LOOP 1
FIRE ALARM CONTROL
MONITOR MODULE
SMOKE DETECTOR
LOOP 2
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
OTHER SYSTEM
CONTROL MODULE
RELAY MODULE
HEAT DETECTOR
BELL
SPEAKER
MANUAL STSTION
STROBE
145
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE FIGHTING SYSTEM RELATIONSHIP DIAGRAM
FIRE FIGHTING SYSTEM RELATIONSHIP DIAGRAM SIGN
FIRE TRUCK
FIRE WATER TANK
GENERATOR
FUEL TANK
FIRE DEPARTMENT CONNECTION
FIRE PUMP
FIRE ALARM CONTROL
FIRE HOSE CABINET AND STANDPIPE
OUTDOOR
INDOOR
INDOOR SPRINKLE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
146
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE TYPE AND EQUIPMENT FIRE PUMP
JOCKEY PUMP
20.00 m.
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
147
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE PUMP SYSTEM
,,
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
148
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE HOSE REEL CABINET
กงล้อสำย SRI Auto Swing Hose Reel ขนำดสำย 1"x 30เมตร(100ฟุต)
เครื่องดับเพลิง"SATURN" ชนิดผงเคมี แห้ง ขนำด 10lbs, 2A-2B
Angle Valve, ชนิดทองเหลือง ขนำด 2.5"(NPT/NST)
"NIBCO" BRS Ball V., T-FP-40, UL/FM, 350psi
DOOR AND GLASS TYPE FULL(G)
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
149
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR
SMOKE DETECTOR ชนิดจุด ควำมสูงฝ้ำมีระยำม่สง ู มำก แต่ใช้กับควำมสูงไม่เกิน 10.00 เมตร ระยะห่ำงอุปกรณ์ควรติดตั้งมีระยะห่ำง ไม่เกิน 7.00 เมตร
SMOKE DETECTOR ชนิดยิงลำแสง ควำมสูงฝ้ำมีระยะมำก แต่ใช้กับควำมสูงไม่เกิน 25.00 เมตร ระยะห่ำงอุปกรณ์ควรติดตั้งมีระยะห่ำง ไม่เกิน 9.00 เมตร
HEAT DETECTOR ใช้กำรตรวจจับควำมร้อนเนือ ่ งจำก ควำมร้อนจำกควันรถ
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
150
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR
HALAL RESTAURANT
PARKING
BUSPARK ING
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
0
5
10
20
30
1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
151
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR
LOW RISE PLAN
HIGHG RISE PLAN
0
5
10
20
30
TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
152
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM
แบ่งระบบหัวจ่ำยน้ำ
1
2
3
4
อัตโนมัติเป็น 4 ประเภท
WET PIPE SYSTEM
DRY PIPE SYSTEM
PRE-ACTION SYSTEM
หัวจ่ำยน้ำ
4 ประเภท CONCEAL
PENDENT
SIDEWALL
UPRIGHT
DELUGE SYSTEM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
153
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM CONCEAL
PENDENT
SIDEWALL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
154
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM
HALAL RESTAURANT
PARKING
BUSPARK ING
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
0
5
10
20
30
1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
155
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE
LOW RISE PLAN
HIGH RISE PLAN
0
5
10
20
30
TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
156
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE EXIT AND ASSEMBLY POINT
STORAGE RECEIVING OFFICE ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE PARKING CHEF ROOM
ST.
DRY ST.
DRINK MEAT ST. ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
ADMINISTRATOR
ENGINEERING ROOM LINEN ROOM STAFF DINING
STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
HOUSE KEEPING
BABY ROOM
FLOWER
CONTROL ROOM TV REPAIR KEY SHOP
CARPENTER CHOP PAINT SHOP
UNHOLD STORY SHOP
PLUMBLING SHOP
EE SHOP
0
5
10
20
30
GROUND FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
157
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE EXIT AND ASSEMBLY POINT
HALAL RESTAURANT
PARKING
BUSPARK ING
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
0
5
10
20
30
1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
158
04-4
FIRE PROTECTION SYSTEM
FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE
LOW RISE PLAN
HIGH RISE PLAN
0
5
10
20
30
TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
159
04-5 OTHER SYSTEM
❖ ❖ ❖ ❖ ❖ ❖
VERTICAL TRANSPORTATION LIGHTING PROTECTION OTHER SYSTEM SECURITY SYSTEM GARBAGE MANAGEMENT SYSTEM ACOUSTIC SYSTEM
160
04-5
OTHER SYSTEM
VERTICAL TRANSPORTATION ❖ PASSENGER ELEVATOR HALL CALL DESTINATION ELEVATOR SYSTEM FLOOR FLOOR
11
11
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
161
03
STRUCTURAL PHASE
VERTICAL TRANSPORTATION ❖ FREIGHT / FIREMAN ELEVATOR
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
162
03
STRUCTURAL PHASE
VERTICAL TRANSPORTATION ❖ ESCALATOR
º
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
º
163
03
STRUCTURAL PHASE
LIGHTING PROTECTION ❖ LIGHTING PROTECTION METHOD
LIGHTING RED
DOWN CONDUCTOR SYSTEM
SURGE PROTECTION DATA AND COMMUNICATIONS INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
SURGE PRATECTION ELECTRICAL NETWORK
GROUNDING SYSTEM
164
03
STRUCTURAL PHASE
FIRE PROTECTION SYSTEM ❖ LIGHTING PROTECTION METHOD
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
165
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ CONCEPT DESIGN PA SYSTEM
SOUND REINFORCEMENT SYSTEM (PA)
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
166
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ CONCEPT DESIGN PA SYSTEM
″
″
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
167
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ SOUND SYSTEM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
168
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ FIBER OPTIC INTERNET
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
169
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM
STORAGE RECEIVING OFFICE
ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE
PARKING CHEF ROOM
ST.
DRY ST.
DRINK ST.
MEAT ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
ADMINISTRATOR
ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
HOUSE KEEPING
BABY ROOM
FLOWER
SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
CONTROL ROOM TV REPAIR KEY SHOP
CARPENTER CHOP
PAINT SHOP
PLUMBLING SHOP
UNHOLD STORY SHOP
EE SHOP
GROUND FLOOR PLAN – BACK OF HOUSE
170
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM
HALAL RESTAURANT
PARKING
BUSPARKI NG
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
1ST
FLOOR PLAN - LOBBY
171
03
STRUCTURAL PHASE
OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM
LOW RISE PLAN
SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
HIGHG RISE PLAN
TYPICAL GUEST ROOM PLAN
172
03
STRUCTURAL PHASE
SECURITY EQUIPMENT ❖ SECURITY EQUIPMENT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
173
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV SYSTEM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
174
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ SECURITY EQUIPMENT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
175
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
STORAGE RECEIVING OFFICE
ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE
PARKING CHEF ROOM
ST.
DRY ST.
DRINK ST.
MEAT ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
ADMINISTRATOR
ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
HOUSE KEEPING
BABY ROOM
FLOWER
CONTROL ROOM TV REPAIR KEY SHOP
CARPENTER CHOP
PAINT SHOP
PLUMBLING SHOP
UNHOLD STORY SHOP
EE SHOP
GROUND FLOOR PLAN – BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
176
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
MECHANIC AL TREATMEN T
B1 FLOOR PLAN – CAR PARKING
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MAIN TANK ROOM
PUMP ROOM
B2 FLOOR PLAN – CAR PARKING
177
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
HALAL RESTAURANT
PARKING
BUSPARKI NG
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
1ST
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
FLOOR PLAN - LOBBY
178
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
VIETNAM RESTAURAN T
ITALIAN RESTAURAN T
JAPANESE RESTAURAN T
ITALIAN RESTAURAN T
FRENCH RESTAURAN T
VIETNAM RESTAURAN T
PARKIN G
STARBUCK COFFEE SHOP
PRE-FUNCTION
BUSINESS AREA
PREFUNCTION
GRAND BALLROOM PRE-FUNCTION RENTAL AREA
2ND FLOOR PLAN – GRAND BALLROOM
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
3RD FLOOR PLAN - FACILITIES
179
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
4TH FLOOR PLAN
5TH – 55TH
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
FLOOR PLAN – GUEST ROOM
44TH FLOOR PLAN – SKY LOUNGE
180
03
STRUCTURAL PHASE
SECURITY SYSTEM ❖ CCTV PLAN
45TH FLOOR PLAN – CORE TRANFER
56TH – 63TH FLOOR PLAN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
46TH FLOOR PLAN – PRIVATE POOL
64TH – 65TH FLOOR PLAN
181
03
STRUCTURAL PHASE
WINDOW WASHING EQUIPMENT ❖ GONDOLA
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
182
03
STRUCTURAL PHASE
BUILDING AUTOMATION SYSTEM ❖ CONCEPT OF BAS
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
183
03
STRUCTURAL PHASE
GARBAGE MANAGEMENT SYSTEM ❖ WASTE CALCULATION
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
184
03
STRUCTURAL PHASE
GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION
STORAGE RECEIVING OFFICE
ALL DAY DINING INTERNATIONAL RESTAURANT
MAIN KITCHEN GARBAGE
PARKING CHEF ROOM
ST.
DRY ST.
DRINK ST.
MEAT ST.
VEG ST.
PURCHASING DEPARTMENT
WASH
STAFF KITCHEN
ADMINISTRATOR
ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM
CHINESE RESTAURANT
HOUSE KEEPING
BABY ROOM
FLOWER
CONTROL ROOM TV REPAIR KEY SHOP
CARPENTER CHOP
PAINT SHOP
PLUMBLING SHOP
UNHOLD STORY SHOP
EE SHOP
1ST
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
FLOOR PLAN - LOBBY
185
03
STRUCTURAL PHASE
GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION
HALAL RESTAURANT
PARKING
BUSPARKI NG
ALL DAY DINING KITCHEN
RENTAL AREA
LOUGE
LOUGE BAR
LIFT HALL
LOBBY
PRE-FUNCTION MEETING ROOM L MEETING ROOM M
MEETING ROOM S
SERVICE CORRIDOR
GROUND FLOOR PLAN – BACK OF HOUSE
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
186
03
STRUCTURAL PHASE
GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION
LOW RISE PLAN
HIGHG RISE PLAN
TYPICAL GUEST ROOM PLAN
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
187
03
STRUCTURAL PHASE
ACOUSTIC SYSTEM ❖ ACOUSTIC MATERIAL
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
188
05
COST & CONSTRUCTION MANAGEMENT ❖ ❖ ❖ ❖ ❖ ❖ ❖
189
05
COST & CONSTRUCTION MANAGEMENT
1 2 3 4 5 6
1 2 3 4 5 6 7 8 9
3
9
8
7
4
5
6 2
5 1 2 INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
3
1 4
1 2 3 4 5
190
05
COST & CONSTRUCTION MANAGEMENT
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
191
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 1 ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MONTH 1-2 ❖ ❖ ❖ ❖
192
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 2-4 ❖ ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MONTH 4-6 ❖ ❖ ❖
193
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 6-7 ❖ ❖ ❖
MONTH 8 ❖ ❖ ❖
❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
194
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 8-9 ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MONTH 9-16 ❖ ❖ ❖ ❖ ❖
195
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 16
MONTH 17
❖
❖
❖ ❖ ❖
❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
196
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 18-21 ❖ ❖ ❖ ❖ ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MONTH 22 ❖ ❖ ❖ ❖ ❖ ❖ ❖
197
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 23-24 ❖ ❖ ❖ ❖ ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
MONTH 25-35 ❖ ❖
❖ ❖
198
05
COST & CONSTRUCTION MANAGEMENT
❖
MONTH 36 ❖ ❖ ❖ ❖ ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
199
05
COST & CONSTRUCTION MANAGEMENT
❖ GENARAL INFORMATION
COST ESTIMATION 2019
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
200
05
COST & CONSTRUCTION MANAGEMENT
CONSTRUCTION PERIOD 36 months
TOTAL BUILDING COST : 7,106,044,493 THB or 59,217 THB/SQM
Construction Cost Summary F
ARCHITECTURAL 3,647,574,500
OPERATION 386,026,725
STRUCTURAL 1,459,029,800
SITE DEVELOPMENT 182,378,725
FACTOR F 1,014,691,743
INITIAL FEE 416,343,000
Payment Direct
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Indirect
201
05
COST & CONSTRUCTION MANAGEMENT
CONSTRUCTION COST SEGMENTATION PAYMENT
10
ARCHITECTURAL 3,647,574,500
64 45
11 24
1,641,408,525 401,233,195 875,417,880 364,757,450 218,854,470 145,902,980
51
Demolishing Preparation Cleaning
35
25
9 181,432,561 196,873,630 7,720,535
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Tower Podium Carpark System work
510,660,430 364,757,450 145,902,980 437,708,940
30
OPERATION 386,026,725
2
47
Tower Podium Carpark Interior Tower Interior Podium Furniture
STRUCTURAL 1,459,029,800
10
7 30
12 17
25
SITE DEVELOPMENT 182,378,725 Hard Scape Soft Scape Concrete Courtyard Fetch Pond Trees
54,713,618 45,594,681 31,004,383 21,885,447 16,414,085 12,766,511
202
05
COST & CONSTRUCTION MANAGEMENT
COST & CONSTRUCTION MANAGEMENT Construction Plan Schedule ลำดับ
รำยกำร
วัน
มูลค่ำกำรก่อสร้ำง(บำท)
M1
ร้อยละ W1
W2
M2
W3
W4
W1
W2
M3
W3
W4
W1
A
หมวดงำนรือ้ ถอนอำคำร
40
181,432,561
3.20
0.64
0.64
0.64
0.64
0.64
B
หมวดงำนเตรียมพืน้ ที่ก่อสร้ำงและอำนวยกำร
75
133,041,076
2.34
0.23
0.23
0.23
0.23
0.23
1.ทำรั้วชั่วครำวรอบพืน้ ที่ก่อสร้ำง
10
15,469,893
0.27
0.27
2.สำนักงำนภำคสนำมสำหรับผู้คุมงำน/ผู้ว่ำจ้ำง
16
17,016,882
0.30
0.15
0.15
3.งำนติดตั้งเครื่องจักร
22
32,486,774
0.57
0.19
0.19
0.19
4.งำนขุดดิน/ถมดิน
30
37,127,742
0.65
0.16
0.16
0.16
5.งำนเชื่อมต่อไฟฟ้ำ/ประปำชั่วครำว
15
12,375,914
0.22
0.11
0.11
6.งำนถนนชั่วครำว
22
18,563,871
0.33
0.11
0.11
0.11
C
หมวดวิศวกรรมโครงสร้ำง
751
1,459,029,800
25.71
0.25
C1
งำนโครงสร้ำงใต้ดิน
150
277,215,662
4.88
0.24
1.งำนเจำะเสำเข็ม
75
118,487,339
2.09
0.26
2.งำนทดสอบเสำเข็ม/ตัดเสำเข็ม
40
3,193,729
0.06
75
C3
C4
D
E
F
G
H
0.23
0.23
W2
M4
W3
W4
W1
W2
M5
W3
W4
W1
W2
M6
W3
W4
W1
W2
M7
W3
W4
W1
W2
M8
W3
0.23
0.23
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.24
0.26
0.26
0.26
0.26
0.26
0.26
0.26
0.01
0.01
0.01
0.01
0.01
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.14
0.14
0.14
0.14
W4
W1
W2
M9
W3
W4
W1
W2
M10
W3
W4
W1
W2
M11
W3
W4
W1
W2
M12
W3
W4
W1
W2
M13
W3
W4
W1
W2
M14
W3
W4
W1
W2
M15
W3
W4
W1
W2
M16
W3
W4
W1
W2
M17
W3
W4
W1
W2
M18
W3
W4
W1
W2
M19
W3
W4
W1
W2
M20
W3
W4
W1
W2
M21
W3
W4
W1
W2
M22
W3
W4
W1
W2
M23
W3
W4
W1
W2
M24
W3
W4
W1
W2
M25
W3
W4
W1
W2
M26
W3
W4
0.25
0.25
0.25
0.25
0.25
0.14
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
122,319,814
2.16
75
78,565,729
1.38
0.14
0.14
0.14
0.14
งำนโครงสร้ำงเหนือดิน อำคำรจอดรถ
150
131,312,682
2.31
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
1.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 1-3
40
35,108,864
0.62
0.12
0.12
0.12
0.12
0.12
2.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 4-6
40
35,108,864
0.62
0.12
0.12
0.12
0.12
0.12
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.17
0.27
0.27
0.27
0.44
0.44
0.44
0.44
0.44 0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06 0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.14
0.25
0.25
##
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
##
0.15
0.15
##
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
##
0.04
0.04
##
0.06
##
0.06
0.06
0.06
0.06
0.06
0.06 0.04
0.04
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.05
0.05
61,094,953
1.08
335,576,854
5.91
0.17
0.17
0.17
0.17
0.17
0.17
134,230,742
2.37
0.40
0.40
0.40
0.40
0.40
0.40
40
77,182,676
1.36
0.27
0.27
3.งำนโครงสร้ำง Widespan BANQUET HALL
40
124,163,436
2.19
งำนโครงสร้ำงเหนือดิน TOWER
365
408,528,344
7.20
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
1.งำนโครงสร้ำงคำ้ ยันพิเศษรอบแกนอำคำร
60
245,117,006
4.32
0.54
0.54
0.54
0.54
0.54
0.54
0.54
0.54
2.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 5-9
30
13,889,964
0.24
0.06
0.06
3.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 10-14
30
13,889,964
0.24
4.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 15-19
30
13,889,964
0.24
5.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 20-24
30
13,889,964
0.24
6.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 25-29
30
13,889,964
0.24
7.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 30-34
30
13,889,964
0.24
8.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 35-39
30
13,889,964
0.24
9.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 40-45
30
13,889,964
0.24
10.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 46-47
30
8,170,567
0.14
11.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 48-52
30
13,889,964
0.24
12.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 52-57
30
13,889,964
0.24
13.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 58-60
30
8,170,567
0.14
0.04
0.04
14.งำนโครงสร้ำงเสำ/พืน้ /ห้องเครื่องลิฟต์ ชั้นดำดฟ้ำ
30
8,170,567
0.14
0.04
0.04
0.04
0.04
หมวดงำนระบบวิศวกรรมประกอบอำคำร
545
306,396,258
5.40
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
##
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
##
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
1.งำนระบบไฟฟ้ำและสื่อสำร
440
59,905,277
1.06
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
##
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
##
0.02
0.02
0.02
0.02
0.02
0.02
2.งำนระบบปรับอำกำศและระบำยอำกำศ
410
51,386,637
0.91
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
##
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
##
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02
3.งำนระบบสุขำภิบำล
440
44,928,958
0.79
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
##
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
##
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
4.งำนระบบป้องกันอัคคีภยั
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
##
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
##
0.01
0.01
0.06
0.04
410
42,867,997
0.76
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
5.งำนระบบลิฟต์และบันไดเลื่อน
90
31,051,818
0.55
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
6.งำนระบบรักษำควำมปลอดภัย
120
29,677,844
0.52
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
7.งำนระบบไฟฟ้ำพลังงำนแสงอำทิตย์
90
31,876,203
0.56
0.05
0.05
0.05
8.งำนระบบ BAS
30
14,701,524
0.26
หมวดงำนสถำปั ตยกรรม
515
2,918,059,600
51.42
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
##
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
##
1.งำนก่ออิฐผนัง
365
392,842,223
6.92
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
##
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
##
2.งำนผนังฉำบปูนและตกแต่งผิวผนัง
365
245,354,090
4.32
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
##
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
3.งำนฝ้ำเพดำน
330
334,949,685
5.90
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
##
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
4.งำนประตู/หน้ำต่ำง
315
337,706,472
5.95
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
##
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
5.งำนตกแต่งผิวพืน้
365
336,328,079
5.93
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
##
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
6.งำนสุขภัณฑ์
120
301,868,234
5.32
7.งำนทำสี
365
241,218,909
4.25
8.ตกแต่งภำยนอก
240
707,116,001
12.46
9.งำนเบ็ดเตล็ดและเก็บตกงำนตำบแบบ
120
85,323,380
1.50
หมวดงำนสถำปั ตยกรรมภำยใน
365
583,611,920
10.28
0.2
0.21
0.21
0.21
0.2
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.2
0.21
0.21
0.21
0.2
0.21
0.21
0.21
0.2
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.21
0.2
0.21
0.21
0.21
0.2
0.21
0.2
0.21
1.งำนตกแต่งภำยในส่วน PODIUM
365
152,687,379
2.69
0
0.04
0.04
0.04
0
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0
0.04
0.04
0.04
0
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0
0.04
0.04
0.04
0
0.04
0
0.04
2.งำนตกแต่งภำยในส่วน TOWER
365
364,757,450
6.43
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.1
0.13
0.13
0.13
0.1
0.13
0.1
0.13
0.1
0.13
0.13
0.13
0.1
3.งำนตกแต่งภำยในส่วน BANQUET HALL
270
0
0.03
0.03
0.03
0
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0.03
0
0.03
0.03
0.03
0
0.03
0.03
0.03
0
0.03
0.03
0.03
0.03
0.03
0.03
0.03
หมวดงำนผังบริเวณและภูมิทัศน์
180
182,378,725
3.21
0.1
0.13
0.13
0.13
0.1
0.13
0.1
0.13
0.1
0.13
0.13
0.13
0.1
1.SOFT SCAPE
60
45,594,681
0.80
2.HARD SCAPE
60
54,713,618
0.96
3.งำนต้นไม้ยืนต้น ไม้ประดับ
30
12,766,511
0.22
4.ลำนคอนกรีตและถนนคอนกรีต
45
31,004,383
0.55
5.งำนสระนำ้
30
16,414,085
0.29
6.รั้ว
60
21,885,447
0.39
หมวดงำนทดสอบเดินระบบ
40
63,832,554
1.ทดสอบระบบส่วน อำคำรจอดรถ
10
1,276,651
2.ทดสอบระบบส่วน PODIUM และ BANQUET HALL
10
21,064,743
3.ทดสอบระบบส่วน TOWER
10
M29
W3
W4
W1
W2
M30
W3
W4
W1
W2
M31
W3
W4
W1
W2
0.25
0.25
0.03
0.03
0.03
0.03
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.07
0.07
0.07
0.07
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.69
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1
1.04
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.1
0.13
0.1
0.1
0.134
0.1
0.1
0.1
0.134
0.1
0.1
0.1
0.134
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.12
0.12 0.06
0.06
0.06
0.06
1.12
0.2
0.22
0.2
0.2
0.224
0.02
0.02
0.37
0.37
31,916,277
0.56
0.56 0.01
0
0
0.005
0
0.023
0
0
0
0.023
0.09
1.17
1,276,651
0.02
หมวดงำนเก็บกวำด ทำควำมสะอำด
45
7,720,535
0.14
หมวดงำนครุภณ ั ฑ์
120
145,902,980
2.57
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
##
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.09
0.69
0.69
##
0.09
0.09
0.13
##
0.13
0.14
##
0.14
0.12
##
0.12
0.09
##
0.09
0.69
0.69
0.69
0.69
0.69
0.69
0.13
0.13
0.13
0.13
0.13
0.13
0.13
0.14
0.14
0.14
0.14
0.14
0.12
0.12
0.12
0.33
0.33
0.33
0.33
0.33
0.33
0.09
0.09
0.09
0.09
0.09
0.09
0.39
0.39
0.12
0.1 0.1
0.07
0.07
W4
M33
M34
M35
M36
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
M7
M8
M9
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
0.09
0.1
0.09
0.1
0.09
0.1
0.07
0.1
0.07
0.12
0.1
0.12
0.12
0.12
0.39
0.07
0.2 M1
M32 W3
0.25
0.69
J
ค่ำ FACTOR F 1.1788 (ไม่รวมครุภณ ั ฑ์)
W2
0.69
I
มูลค่ำรวม (ไม่รวมครุภณ ั ฑ์) + FACTIR F 1.1788
W1
0.69
66,167,091
416,343,000
W4
0.25
75
5,529,106,770
M28
W3
0.25
75
5,675,009,750
W2
0.25
250
มูลค่ำทุกหมวด
W1
0.25
1.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ ชั้น 4/หลังคำ
มูลค่ำ (ไม่รวมครุภณ ั ฑ์)
W4
0.25
1.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ ชั้น 1-3/หลังคำ
Francise Initial fee
M27
W3
0.25
งำนโครงสร้ำงเหนือดิน PODIUM
30
W2
0.25
3.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 7/หลังคำ
4.ทดสอบระบบส่วนอื่นๆ
W1
0.16
4.งำนโครงสร้ำงใต้ดินชั้น 1-2
3.งำนฐำนรำก/ตอหม้อ/คำนคอดิน
C2
0.23
0.16 M23
0.2
0.16
0.2
0.16 M24
0.07
0.16
0.07
0.16
0.2
0.16 M25
0.16
0.16
0.16
0.16 M26
0.16
0.16
M2
M3
M4
M5
M6
M27
M28
M29
M30
M31
1.81
1.52
1.20
1.24
1.41
1.37
2.39
2.45
3.94
4.30
4.12
4.09
4.29
4.39
4.16
4.08
4.01
4.08
4.12
4.07
4.32
4.67
4.20
4.96
5.49
5.10
3.79
1.05
0.92
0.40
3.89
5.40
6.60
7.84
9.26
10.62
13.01
15.45
19.40
23.69
27.81
31.90
36.19
40.58
44.74
48.82
52.82
56.90
61.02
65.09
69.41
74.08
78.28
83.24
88.73
93.83
97.63
98.68
99.60
100.00
M32
M33
M34
M35
M36
100
1,014,691,743 6,960,141,513 145,902,980
งำนครุภณ ั ฑ์ มูลค่ำงำนต่อเดือน (บำท) มูลค่ำรวมสุทธิ
7,106,044,493
มูลค่ำงำนต่อเดือน (ร้อยละ) มูลค่ำงำนสะสม (ร้อยละ)
2.08
TOTAL CONSTRUCTION PERIOD 2 Years 7 Months INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
203
06
PROJECT CONCLUSION ❖ ❖ ❖
EIA LEED CHECKLIST BIBLIOGRAPHY
204
06
PROJECT CONCLUSION
EIA ❖ SETBACK -
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
205
06
PROJECT CONCLUSION
EIA ❖ PLANTS LIST
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
206
06
PROJECT CONCLUSION
EIA ❖
GREEN AREA
-
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
207
06
PROJECT CONCLUSION
OTTV ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
208
06
PROJECT CONCLUSION
RTTV
WALL SECTION
❖
Detail
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
209
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ CRITERIA
1.)
LEED BD+C
SUSTAINABLE SITES LOCATION AND TRANSPORTATION
26%
NEW CONSTRUCTION AND MAJOR RENOVENTION
2.)
ENERGY AND ATMOSPHERE
33%
TOTAL SCORE : 1 1 0
3.)
INDOOR ENVIRONMENT QUALITY
16%
4.)
WATER EFFICIENCY
11%
5.)
MATERIAL AND RESOURCES
13%
6.)
INNOVATION & REGIONAL PRIORITY
10%
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
210
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ SUSTAINABLE SITES
อ
SS
( 22 ) 26
อ LAYOUT PLAN
RAINWATER MANAGEMENT REDUCED PARKING FOOTPRINT
0
0
Y N N
LIGHT POLLUTION REDUCTION
Y Y ACCESS TO QUALITY TRANSIT
N Y 0
BICYCLE FACILITIES , GREEN VEHECLES
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
Y Y Y Y Y Y Y
SUSTAINABLE SITES PREREQ CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT
0
CONSTRUCTION ACTIVITY POLLUTION PREVENTION SITE ASSESSMENT SITE DEVELOPMENT - PROTECT OR RESTORE HABITAT OPEN SPACE RAINWATER MANAGEMENT HEAT ISLAND REDUCTION LIGHT POLLUTION REDUCTION LOCATION AND TRANSPORTATION
CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT
SENSITIVE LAND PROTECTION HIGH PRIORITY SITE SURROUNDING DENSITY AND DIVERSE USES ACCESS TO QUALITY TRANSIT BICYCLE FACILITIES REDUCED PARKING FOOTPRINT GREEN VEHICLES
7 REQUIRED
1 1 1 2 1 1
15 1 2 5 4 1 1 1 211
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ ENERGY AND ATMOSPHERE
E&A
GREEN POWER AND CARBON OFFSETS
( 20 ) 33
ATMOSPHERE
MINIMUM ENERGY PERFORMANCE
BUILDING-LEVEL ENERGY METERING
0 DEMAND RESPONSE BASELINE ENERGY EFFICIENCY
PEAK PERIOD
DEMAND LIMITING DEMAND SHEDDING
DEMAND
DEMAND SHIFTING
0 PREREQ
FUNDAMENTAL COMMISSIONING AND VERIFICATION
REQUIRED
Y
PREREQ
MINIMUM ENERGY PERFORMANCE
REQUIRED
Y
PREREQ
BUILDING-LEVEL ENERGY METERING
REQUIRED
Y
PREREQ
FUNDAMENTAL REFRIGERANT MANAGEMENT
REQUIRED
CREDIT
ENHANCED COMMISSIONING
6
CREDIT
OPTIMIZE ENERGY PERFORMANCE
16
CREDIT
ADVANCED ENERGY METERING
1
CREDIT
DEMAND RESPONSE
2
N
CREDIT
RENEWABLE ENERGY PRODUCTION
3
N
CREDIT
ENHANCED REFRIGERANT MANAGEMENT
1
CREDIT
GREEN POWER AND CARBON OFFSETS
2
BUILDING
Y N Y
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
33
Y
N
TIME OF THE DAY
ENERGY AND ATMOSPHERE
Y
212
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ WATER EFFICIENCY
E&A
COOLING TOWER USE
( 11 ) 13 COOLING TOWER
0
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
0
WATER EFFICIENCY
11
Y
PREREQ
OUTDOOR WATER USE REDUCTION
REQUIRED
Y
PREREQ
INDOOR WATER USE REDUCTION
REQUIRED
Y
PREREQ
BUILDING-LEVEL WATER METERING
REQUIRED
Y
CREDIT
OUTDOOR WATER USE REDUCTION
Y
CREDIT
INDOOR WATER USE REDUCTION
Y Y
CREDIT CREDIT
COOLING TOWER WATER USE WATER METERING
2 6 2 1 213
06
PROJECT CONCLUSION
LEED CHECKLIST ❖
INDOOR ENVIRONMENT QUALITY
EQ
ACOUSTIC PERFORMANCE
( 16 ) 16
THERMAL COMPORT LOW-EMITTING MATERIAL
REVERBERATION TIME REQUIRMENTS HOTEL 0.6
:
ROOM OR SUITE :
T60 < 0.8 ** T60 ( SEC )
HOTEL : STCc 55 STCc 50
REDUCE INDOOR TAMPERATURE
QUALITY VIEW
STCc 60
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
,
AT 500Hz
, 1000Hz
:
HOTEL ROOM :
: ,
:
COMOM HALLWAY :
RETAIL
:
** MINIMUM COMPOSIE SOUND TRANSMISSION CLASS RATING FOR ADJACENT SPACES **
0
N
BANQUET ROOM
SOUND ISOLATION
2000Hz **
: T60 <
0
INDOOR ENVIRONMENTAL QUALITY
16
Y
PREREQ MINIMUM INDOOR AIR QUALITY PERFORMANCE
REQUIRED
Y
PREREQ ENVIRONMENTAL TOBACCO SMOKE CONTROL
REQUIRED
Y
CREDIT
ENHANCED INDOOR AIR QUALITY STRATEGIES
2
Y
CREDIT
LOW-EMITTING MATERIALS
3
Y
CREDIT
CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PLAN
1
Y
CREDIT
INDOOR AIR QUALITY ASSESSMENT
2
Y
CREDIT
THERMAL COMFORT
1
Y
CREDIT
INTERIOR LIGHTING
Y
CREDIT
DAYLIGHT
Y
CREDIT
QUALITY VIEWS
2 3 1
Y
CREDIT
ACOUSTIC PERFORMANCE
1 214
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ MATERIAL AND RESOURCES
M&R
CONSTRUCTION : MATERIAL
( 11 ) ❖
13 ENVIRONMENTAL PRODUCT DECLARATIONS
❖
SOURCING OF RAW MATERIAL
STORAGE AND COLLECTION OF RECYCLABLES + CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLANNING
❖
0
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
❖
0
MATERIALS AND RESOURCES
Y
PREREQ
Y
PREREQ
Y
CREDIT
Y
CREDIT
Y
CREDIT
Y
CREDIT
Y
CREDIT
STORAGE AND COLLECTION OF RECYCLABLES CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLANNING BUILDING LIFE-CYCLE IMPACT REDUCTION BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION ENVIRONMENTAL PRODUCT DECLARATIONS BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION SOURCING OF RAW MATERIALS BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION MATERIAL INGREDIENTS CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
11 REQUIRED REQUIRED
3 2 2 2 2
215
06
PROJECT CONCLUSION
LEED CHECKLIST ❖ INNOVENTION
INN
TRANSPARENT FAÇADE CURTAIN WALL : 4 SIDES ( LOW-E )
(5) 6
SOLAR ENERGY
DESIGN PATTERN
LOW – E GLASS
INSEE SUPERBLOCK
LOW – E POTENTIAL
FRAME DETAILS TYPICAL MULLION
GREEN MATERIAL RECYCLE MATERIAL ZERO WASTE 0
0
Y
0
5
N
CREDIT INNOVATION CREDIT LEED ACCREDITED PROFESSIONAL
5 1
0
REGIONAL PRIORITY
4
N N N N INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
INNOVATION
TYPICAL TRANSOM
CREDIT CREDIT CREDIT CREDIT
REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT
1 1 1 1 216
06
PROJECT CONCLUSION
LEED CHECKLIST
TOTALS
❖ TOTAL SCORE
PLATINUM CERTIFIED
CERTIFIED: 40 TO 49 POINTS
1.)
POSSIBLE POINTS : ,
SILVER: 50 TO 59 POINTS
SUSTAINABLE SITES LOCATION AND TRANSPORTATION
2.)
ENERGY AND ATMOSPHERE
3.)
INDOOR ENVIRONMENT QUALITY
4.)
WATER EFFICIENCY
TOTAL
( 83 ) 110
,
GOLD: 60 TO 79 POINTS
110 , PLATINUM: 80 TO 110
( 22 POINTS )
( 20 POINTS )
( 16 POINTS )
( 9 POINTS ) 5.)
MATERIAL AND RESOURCES
( 11 POINTS ) 6.)
INNOVATION & REGIONAL PRIORITY
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
( 5 POINTS )
217
06
PROJECT CONCLUSION
PROJECT CONCLUSION ❖ NAVA DE BANGKOK “ THRIVE ALONG THE RIVER ”
70% 30% TYPE
A TYPE
B TYPE
C TYPE
D
BUSINESSMAN
PODIUM
TOWER
PODIUM
GUEST ROOM ZONE 3
❖ ❖ ❖ ❖ ❖
RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING
TOURIST GRAND BALLROOM
GRAND ROOM
❖ MEETING ROOM
❖ ❖ ❖ ❖
PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL
GUEST ROOM ZONE 2 ❖ ❖
EXECUTIVE SUITE GRAND ROOM
45 SQ.M.
JUNIOR SUITE 85 SQ.M.
EXECUTIVE SUITE
GUEST ROOM ZONE 1 ❖ ❖
EXECUTIVE SUITE GRAND ROOM
85 SQ.M.
PRESIDENTAL SUITE 260 SQ.M.
UNDERGROUND ❖
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
BASEMENT
218
06
PROJECT CONCLUSION
BIBLIOGRAPHY ❖ REFERENCES
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION
219
NAVA DE BANGKOK -
05 08 11 17 21 26 28 57
INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN â&#x20AC;&#x201C; FINAL PRESENTATION
K L O N G
S A N
-