NAVA DE BANGKOK - KLONG SAN Final Presentation

Page 1

NAVA DE BANGKOK -

05 08 11 17 21 26 28 57

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

K L O N G

S A N

-


PREFACE

NAVA DE BANGKOK HOTEL (KLONG SAN)

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

044 002


PROJECT MEMBERS

CHAIYASIT J. 59020011

THIDANAT H. 59020026

TERAPONG B. 59020028

CHAVALIT T. 59020008

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

GANSIREE S. 59020005

NUTIDA K.

59020017

THANAPORN K. 59020021

WARALUK I. 59020057

003


PROJECT PROCESS

Relationship Diagram User Diagram Functional Diagram Area Requirement Schedule time use Analysis

Site Analysis View & Image Analysis Environmental Analysis Code & Regulation Analysis Site Specification Zoning Diagram

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Site Lay-out Form and Space Shade Shadow Texture Colour Materials Structure and Construction Mechanical and Equipment Sustainable

044 004


TABLE OF CONTENT

01

PROJECT BACKGROUND ❖ ❖ ❖ ❖ ❖

PROJECT INFORMATION TARGET GROUP PROJECT AREA SITE INFORMATION CASE STUDY

04-3 SANITARY SYSTEM

❖ ❖ ❖ ❖

SANITARY EQUIPMENT COLD WATER SYSTEM WASTE AND SOILED DRAINAGE WATER

❖ ❖ ❖ ❖ ❖ ❖ ❖

02

03

04-1

DESIGN PHRASE

STRUCTURAL PHASE

ELECTRICAL SYSTEM

CONCEPT DESIGN DEVELOP PLAN SECTION ELEVATION ROOMTYPE PERSPECTIVE

❖ ❖

04-4

❖ ❖ ❖ ❖ ❖

FIRE ALARM AND EMERGENCY DEVICES FIRE ALARM SYSTEM FIRE FIGHTING SYSTEM FIRE REEL HOSE CABINET FIRE TYPE HEAT DECTECTOR

❖ ❖ ❖ ❖ ❖

04-5

FIRE PROTECTION SYSTEM ❖

STRUCTURAL CONCEPT BUILDING MATERIAL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

VERTICAL TRANSPORTATION LIGHTING PROTECTION OTHER SYSTEM SECURITY SYSTEM GARBAGE MANAGEMENT ACOUSTIC SYSTEM

AIR CONDITIONAL SYSTEM ❖ ❖ ❖ ❖ ❖

05

OTHER SYSTEM

❖ ❖ ❖ ❖ ❖ ❖

POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM

04-2

06

COST & CONSTRUCTION MANAGEMENT ❖ ❖ ❖ ❖ ❖ ❖ ❖

POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM

PROJECT CONCLUSION ❖ ❖ ❖

EIA LEED CHECKLIST BIBLIOGRAPHY

044 005


01

PROJECT BACKGROUND ❖ ❖ ❖ ❖ ❖

PROJECT INFORMATION TARGET GROUP PROJECT AREA SITE INFORMATION CASE STUDY

006


01

PROJECT BACKGROUND

PROJECT INFORMATION ❖

TOR

NAVA DE BANGKOK

BUSINESS & TRAVEL

BUSINESS & HOTEL

MEETING 1,600 600 400 100

SQ.M. SQ.M SQ.M SQ.M

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

1,200 UNIT

FOOD & RESTAURANT THAI, CHINESE JAPANESE, HALAN ITALION, FRACE VIETNAMESE

4,500 MILLION BATH

RELAX • YOGA • GYM • SWIMMIN G POOL • SPA 007


01

PROJECT BACKGROUND

PROJECT INFORMATION ❖

TARGET GROUP

BUSINESSMAN EXPLOITATIVE TRAVEL

JET

SETTER

TOURIST PLEASURE FIRST TRAVEL

“BUSINESS & TRAVEL”

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

008


01

PROJECT BACKGROUND

AREA PROJECT ❖ GUEST ROOM

TYPE OFGUEST ROOM GRAND ROOM

JUNIOR SUITE

EXECUTIVE SUITE

PRESIDENTAL SUITE

(40 SQ.M.)

(85 SQ.M.)

(130 SQ.M.)

(180 SQ.M.)

01 02 03

1,000

42,480

80

8,075

116

4,940

6

1,260

ROOMS

SQ.M.

ROOMS

SQ.M.

ROOMS

SQ.M.

ROOMS

SQ.M.

04

SERVICE ROOM

05 06 07 08

SERVICE ROOM LENIN ROOM CLEANING STORAGE

15 15 6

SQ.M.

SQ.M.

TRASH ROOM FOOD PREPARATION ROOM

6 10

SQ.M. SQ.M.

SQ.M.

09

X 60 STOREY

TOTAL AREA CIRCULATION 15% TOTAL GUESTROOM AREA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

3,120

59,875.00

SQ.M.

8,981.25

SQ.M.

68,858.00

SQ.M.

SQ.M.

009


01

PROJECT BACKGROUND

AREA PROJECT ❖ FRONT OF HOUSE

PUBLIC SPACE

FOOD AND BEVERAGE

BUSINESS AREA

CONCESSION

1,942

2,486

826

559

SQ.M.

SQ.M.

SQ.M.

SQ.M.

01 02 03 04 05 06

FUNTION AREA

SPECIAL ACCOMODATION

3,044

1,004

SQ.M.

SQ.M.

07 08 09

TOTAL AREA TOTAL AREA

8,075.00 SQ.M. 59,875 SQM.

CIRCULATION 30% CIRCULATION 15%

3,566.00 SQ.M. 8,981.25 SQM.

TOTAL FOH AREA AREA TOTAL GUESTROOM

11,641.00 SQ.M. 68,858 SQM.

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

010


01

PROJECT BACKGROUND

AREA PROJECT ❖ BACK OF HOUSE

ADMINISTRATION

GENERAL SERVICE SPACE

EMPLOYEE FACILITY

02

759

1,773

1,629

03

SQ.M.

SQ.M.

SQ.M.

01

04 05 06

H.K. & LAUNDRY

MECHANICAL AREA

ENGINEER &MAINTENANCE

FOOD PREPARATION

1,268

4,056

712

829

SQ.M.

SQ.M.

SQ.M.

SQ.M.

07 08 09

TOTAL AREA TOTAL AREA CIRCULATION CIRCULATION 15% TOTAL BOH AREA TOTAL GUESTROOM AREA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

10,197.00 SQ.M. 59,875 SQM. 2,540.00 SQ.M. 8,981.25 SQM. 12,489.00 SQ.M. 68,858 SQM. 011


01

PROJECT BACKGROUND

AREA PROJECT ❖ TOILET AND CAR

GUEST ROOM

OFFICE (BOH)

120

85

EVENT ROOM

HALL

170

278

FOOD AND

10

2

20

LIMOUSINE & TAXI

TOURISM BUS

MOTORCYCLE

BEVERAGE

SHOP

50

39

10

3

SPECIAL CAR PARK

TOTAL CARS AREA / CAR TOTAL PARKING AREA

742.00 CARS 35.00 SQ.M. 25,970.00 SQ.M.

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TOTAL CARS AREA / CAR TOTAL PARKING AREA

SERVICES CAR

781.00 CARS 35.00 SQ.M. 27,315.00 SQ.M.

TRUCK

TOTAL

781

012


01

PROJECT BACKGROUND

AREA PROJECT ❖ ELEVATOR CALCULATION

PASSENGER LIFT

SERVICE LIFT

TOTAL

SERVICE LIFT

PASSENGER LIFT

7

11

HALL CALL DESTINATION ELEVATOR SYSTEM FLOOR FLOOR

TRACTION ELEVATOR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

11

11

013


01

PROJECT BACKGROUND

AREA PROJECT ❖ TOTAL AREA

DISALABLE AREA 29%

PARKING 21 %

SALES

119,619

BOH 10.4 %

AREA

SQ.M.

GUEST ROOM 58 %

FOH 10.4 % GUEST ROOM

FRONT OF HOUSE

SALABLE AREA

71 %

BACK OF HOUSE

SALABLE AREA 71% SALABLA AREA

PARKING

DISALABLE AREA

▪ GUEST ROOM (NO CIRCULATION)

▪ CIRCULATION OF GUEST ROOM

▪ FOOD AND BEVERAGE

▪ ADMINISTRATION

▪ SPECIAL ACCOMODATION ▪ BUSINESS AREA ▪ CONCESSION AND SUBRENTAL SPACE

DISALABLE AREA

29 %

▪ GENERAL SERVICE SPACE ▪ EMPLOYEE FACILITY ▪ HOUSE KEEPING AND LAUNDRY

▪ MULTI –PURPOSE AREA

▪ ENGINEER AND MAINTENACE

▪ FUNCTION AREA

▪ MECHANICAL AREA

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

014


01

PROJECT BACKGROUND

SITE INFORMATION ❖ DISTRICT

KLONGSAN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

015


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE COMPARISON

FAR OSR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

016


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE COMPARISON

ICON SIAM

1

2

BTS

BTS

3

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

017


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE COMPARISON

FAR OSR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

018


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE COMPARISON

12.25 RAI

2,940,000,000 B

8

0.75 KM

819

3

FAR

6

0.30 KM

OSR

5

0.30 KM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

019


01

PROJECT BACKGROUND

SITE INFORMATION ❖ ACCESSIBILITY

TAKSIN BRIDGE

U-TURN

TAKSIN BRIDGE

U-TURN POINT

NAVA

DE BANGKOK

NAVA

DE BANGKOK

U-TURN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

020


01

PROJECT BACKGROUND

SITE INFORMATION ❖ ACCESSIBILITY

TOURIST ATTRACTIONS BY BOAT

CHAO PHRAYA RIVER

THRIVE - EXPRESS BOAT * PRIVATE BOAT * AVAILABLE ( ADDITIONAL CHARGE ) FREE BOAT ( 06.00 AM. – 06.00 PM. )

ROUTE A : HERITAGE ROUTE ROUTE B : COMMERCIAL / LANDMARK

** ระยะเวลาขึน้ อยูก่ บั ความล่าช้าของเรือ ** INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

021


01

PROJECT BACKGROUND

SITE INFORMATION ❖ ACCESSIBILITY

TOURIST ATTRACTIONS PRACHATHIPOK

BY TRAIN KLONG SAN

BTS

CHAROEN NAKHON

ICON SIAM

KRUNG THONBURI

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

022


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SURROUNDING

ICON SIAM

COMMERCIAL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

COMMUNITY MALL

DEPARTMENT STORE

- VANILLA MOON

- ICON SIAM - CENTRAL SILOM COMPLEX - RIVER CITY BANGKOK - SILOM COMPLEX - THE MALL THA PHRA - CHAMCHURI SQUARE 023


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SURROUNDING

ICON SIAM

COMPETTITIVE HOTEL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

HOTEL ( RIVERSIDE )

HOTEL

- MILLENNIUM HILTON BANGKOK - THE PENINSULA BANGKOK - IBIS BANGKOK RIVERSIDE - ROYAL ORCHID SHERATON - SHANGRI-LA HOTEL - MANDARIN ORIENTAL

- PULLMAN BANGKOK HOTEL G - W BANGKOK - LEBUA AT STATE TOWER - NOVOTEL BANGKOK SILOM ROAD - EASTIN GRAND HOTEL SATHORN - AMARA BANGKOK 024


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SURROUNDING

ICON ICON SIAMSIAM

OFFICE

OFFICE BUILDING - WORLD TRADING COMPANY - EARTH COMPANY LIMITED - UNION WEALTH CORPORATION - CLC CORPORATION CO.,LTD. - TEIJIN CORPORATION THAILAND T.C.NATURAL CO.,LTD

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

025


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SURROUNDING

ICON SIAM

TOURIST ATTRACTIONS

ETC.

TEMPLE

TCDC ASIATIQUE THE RIVERFRONT - CHINA TOWN - GIANT SWING - KING POWER MAHANAKHON

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

026


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE ANALYSIS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

027


01

PROJECT BACKGROUND

SITE INFORMATION ❖ SITE REGULATION

2,940,000,000 B

8

0.75 KM

819

12.25 RAI

FAR

6

0.30 KM

OSR

5

0.30 KM

SITE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

19,800 12.25

SQ.M. RAI

AREA REQUIERMENT

119,610

SQ.M.

FAR 6 FAR BONUS 20% OSR 5 (5%FAR) BAF

118,800 + 23,760 5,940 2,970

SQ.M. SQ.M. (LEED) SQ.M. (5%FAR) SQ.M. (50%OSR)

028


01

PROJECT BACKGROUND

CASE STUDY ❖ DESIGN CASE

²

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

²

²

²

²

029


01

PROJECT BACKGROUND

CASE STUDY ❖ STRUCTURE CASE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

030


01

PROJECT BACKGROUND

CASE STUDY ❖ SUSTAINABLE •

SCG 100TH YEARS BUILDING

SUSTAINABLE • • SITES

• • •

• • •

• • •

• • •

• •

• • • •

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

031


01

PROJECT BACKGROUND

CASE STUDY ❖ SUSTAINABLE • Site selection • Development density and community connectivity • Alternative transportation SUSTAINABLE public transportation access SITES • Alternative transportation low-emitting and fuelefficient vehicles • Alternative transportation parking capacity • Site development maximize open space • Heat island effect – nonroof • Tenant design and construction guidelines

• Water efficient landscaping • Water use reduction

• Increased ventilation • Construction IAQ management plan - during construction • Low-emitting materials adhesives and sealants • Low-emitting materials paints and coatings • Indoor chemical and pollutant source control • Thermal comfort – design • Daylight and views - views INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Pearl River Tower

Optimize energy performance On-site renewable energy Enhanced commissioning Enhanced refrigerant management • Measurement and verification - base building • Measurement and verification - tenant submetering • • • •

• •

• Construction waste management • Recycled content • Regional materials

• Optimize energy performance • Enhanced commissioning • Water efficient landscaping • Water use reduction

032


02

DESIGN PHRASE

❖ ❖ ❖ ❖ ❖ ❖ ❖

CONCEPT DESIGN DEVELOP PLAN SECTION ELEVATION ROOMTYPE PERSPECTIVE

001


02

DESIGN PHASE

PROJECT CONCEPT “ THRIVE ALONG THE RIVER ”

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

002


02

DESIGN PHASE

PROJECT CONCEPT ❖ ZONING CONCEPT River origin

RIVERINE SOCIETY

Abundance

Delta

Riverine society GARDEN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PEOPLE

CULTURE 003


02 DESIGN PHASE

MASS DESIGN CONCEPT ❖ MASS ALTERNATIVE MASS (TOWER) - 01

MASS (TOWER) - 02

MASS (TOWER) - 03

MASS (TOWER) - 04

c

1 RIVERVIEW

1 RIVERVIEW

1 RIVERVIEW

1 RIVERVIEW

2 ROOMS

2 ROOMS

2 ROOMS

2 ROOMS

3 CHARACTOR

3 CHARACTOR

3 CHARACTOR

3 CHARACTOR

4 WIND

4 WIND

4 WIND

4 WIND

5 SUNLIGHT

5 SUNLIGHT

5 SUNLIGHT

5 SUNLIGHT

6 SHADING

6 SHADING

6 SHADING

6 SHADING

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

004


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ CORE ALTERNATIVE

1

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

2

3

005


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ MASS ALTERNATIVE

2

1

❖ ❖

❖ ❖

❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

006


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON

W

JUPITER COMMUNICATIONS NAVA

NAGA RESIDENCE ICON SIAM THE RIVER HOTEL

CHATRIUM HOTEL

PENINSULA HOTEL

IBIS BANGKOK RIVERSIDE

N

S SHANGRI-LA HOTEL

MANDARIN ORIENTAL HOTEL

CENTRE POINT HOTEL

E INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

007


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON NAVA DE BANGKOK

THE RIVER HOTEL

JUPITER COMMUNICATIONS

CHATRIUM HOTEL

SHANGRI-LA HOTEL

CENTRE POINT HOTEL

PENINSULA HOTEL ICON SIAM

CHAO PHRAYA RIVER

EAST

PERCEPTION

E

NAVA DE BANGKOK THE RIVER HOTEL PENINSULA HOTEL

SHANGRI-LA HOTEL

JUPITER COMMUNICATIONS

CHATRIUM HOTEL

CENTRE POINT HOTEL

ICON SIAM

WEST

PERCEPTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

W

008


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ MASS SURROUND COMPARISON NAVA DE BANGKOK THE RIVER HOTEL

JUPITER COMMUNICATIONS CENTRE POINT HOTEL

PENINSULA HOTEL ICON SIAM

CHAO PHRAYA RIVER

NORTH

N

SOUTH

S

PERCEPTION

NAVA DE BANGKOK

ICON SIAM JUPITER COMMUNICATIONS CHATRIUM HOTEL

SHANGRI-LA HOTEL

CENTRE POINT HOTEL

CHAO PHRAYA RIVER

PERCEPTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

009


02

DESIGN PHASE

MASS DESIGN CONCEPT MASS SURROUND COMPARISON

NAVA DE BANGKOK

BIRD EYE VIEW PERCEPTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

010


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ WIND SIMULATION

BEFORE

CONSTRUCTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

011


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ WIND SIMULATION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

012


02

DESIGN PHASE

MASS DESIGN CONCEPT ❖ SUN SIMULATION % SHADOW 0% 10%

TIMING

20%

8.00-17.00

30% 40% 50%

60% 70%

12 MONTHS

80% 90% 100% 90%

JANUARY

FEBRUARY

MARCH

APRIL

MAY

JUNE

JULY

AUGUST

SEPTEMBER

OCTOBER

NOVEMBER

DECEMBER

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

013


02

DESIGN PHASE

ZONING CONCEPT TOWER

GUEST ROOM ZONE 3 ❖ ❖ ❖ ❖

PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL

GUEST ROOM ZONE 2 PODIUM

❖ ❖

EXECUTIVE SUITE GRAND ROOM

PODIUM ❖ ❖ ❖ ❖ ❖

RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING

GUEST ROOM ZONE 1 ❖ ❖

EXECUTIVE SUITE GRAND ROOM

GRAND BALLROOM ❖ MEETING ROOM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

014


02

DESIGN DESIGN PHASE PHASE

ZONING CONCEPT ❖ PODIUM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

015


02

DESIGN PHASE

ZONING CONCEPT ❖ TOWER

PRIVATE POOL

PRIVATE LOBBY

SKY LOUNGE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

016


02

DESIGN PHASE

ZONING CONCEPT ❖ ROOM TYPE USER BEHAVIOR

70%

30%

BUSINESSMAN

TOURIST

TWIN BEDROOM

70% GROUP WORK SINGLE BEDROOM

30%

SINGLE WORK

CON NECT

CON NECT

TWIN BEDROOM

PARTNER WORK

SINGLE BEDROOM

TWIN BEDROOM

GROUP TOURIST

FAMILY

PARTNER TOURIST

TWIN BEDROOM

CONNEC T

TWIN BEDROOM

SINGLE BEDROOM

SINGLE BEDROOM

ROOM REQUIREMENT SHOWER

VANITY

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

FAST WIFI

CHARGER

DESK

TUB

017


02

DESIGN PHASE

ZONING CONCEPT ❖ ROOM TYPE

TYPE

A

GRAND ROOM

45 SQ.M.

TYPE

B

JUNIOR SUITE

85 SQ.M.

TYPE

C

EXECUTIVE SUITE

85 SQ.M.

TYPE

D

PRESIDENTAL SUITE

260 SQ.M.

SINGLE BEDROOM KINGBED

SINGLE BEDROOM KINGBED

SINGLE BEDROOM KINGBED

SINGLE BEDROOM KINGBED

TWIN BEDROOM CONNECT

TWIN BEDROOM CONNECT

TWIN BEDROOM CONNECT

TWIN BEDROOM CONNECT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

018


02

DESIGN PHASE

ZONING CONCEPT ❖ ZONING ROOM TYPE

PRESIDENTAL SUITE

TYPE

D

FLOOR

64-65

2

3

FLOORS

ROOMS

6 ROOMS

FLOOR 64 TYPE

FLOOR 56

EXECUTIVE SUITE

C

FLOOR

56-63 TYPE

2

8

FLOORS

ROOMS

16 ROOMS

JUNIOR SUITE

B

FLOOR

56-63

FLOOR 44

10

8

FLOORS

ROOMS

80 ROOMS

TRANSFER FLOOR FLOOR

44

TYPE

ROOM

EXECUTIVE SUITE

C

FLOOR

5-55 TYPE

2

50

FLOORS

ROOMS

GRAND ROOM

A

FLOOR

5-55 FLOOR 5

SUMMARY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

1 FLOOR

10

50

FLOORS

ROOMS

1,202

100 ROOMS

1000 ROOMS

ROOMS

019


02

DESIGN PHASE

PLAN ❖ 1ST FLLOR PLAN LOBBY

HALAL RESTAURANT

PARKING

BUSPARKING

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

LOBBY PARKING LOUNGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

1ST FLOOR PLAN - LOBBY 020


02

DESIGN PHASE

SECTION ❖

PODIUM SECTION HIGH ZONE

LOW ZONE 11TH

FLOOR

+49.20

10TH

FLOOR

+45.40

9TH

FLOOR

+41.60

8TH

FLOOR

+37.80

7TH

FLOOR

+34.00

6TH

FLOOR

+30.20

5TH

FLOOR

+26.40

4TH

FLOOR

+22.60

3RD

FLOOR

+14.00

2ND

FLOOR

+8.40

PARKING BUILDING

BUSINESS AREA

LOBBY

DROP OFF 2ST

FLOOR

PARKING

G FLOOR

PARKING

B1 FLOOR

PARKING

B2 FLOOR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

+2.80 +0.00 -2.80 -5.60

021


02

DESIGN PHASE

SECTION ❖

PODIUM SECTION SERVICE LOFT

FIRE EXIT 11TH

10TH

FLOOR FLOOR

FLOOR

9TH

+49.20

+37.80

7TH

FLOOR

+34.00

5TH

4TH

GRAND ROOM

+41.60

FLOOR

FLOOR

SERVICE ROOM

+45.40

8TH

6TH

HIGH ZONE

SERVICE ROOM SERVICE ROOM

SERVICE ROOM

+30.20

FLOOR

+26.40

FLOOR

+22.60

SERVICE ROOM SERVICE ROOM SERVICE ROOM

SWIMMING POOL 3RD

FLOOR

+14.00

2ND

FLOOR

+8.40

FLOOR

G FLOOR B1 FLOOR B2 FLOOR

SERVICE ROOM

STARBUCK GARDEN

2ST

SERVICE ROOM

+2.80 +0.00

LOUNGE

LOUNGE

STAFF DINING

STAFF LOUNGE

-2.80 -5.60

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

022


03

ARCHITECTURAL DRAWING

MAIN ENTRANCE INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN

023


03

ARCHITECTURAL DRAWING

PERSPECTIVE

SWIMMING POOL

LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN

LOUNGE 024


03

ARCHITECTURAL DRAWING

PLAZA INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN

025


02

DESIGN PHASE

PLAN ❖ CORE DETAILS

ELECTRIC SHAFT STO

TELE SHAFT

EE AHU

MAID

HIGH ZONE

SERVICE LIFT

FRESH AIR SHAFT

FACILITIES

NET

CHILLED WATER SHAFT

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

HIGH ZONE FIREMAN LIFT

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

LOW ZONE

STO

0

5

10

20

30

CORE DETAILS 026


02

DESIGN PHASE

PLAN ❖ GROUND FLOOR PLAN STORAGE RECEIVING OFFICE

ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE

PARKING CHEF ROOM

ST.

DRY ST.

DRINK ST.

MEAT ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

ADMINISTRATOR

ENGINEERING ROOM

LINEN ROOM

CONTROL ROOM

STAFF DINING STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

HOUSE KEEPING

BABY ROOM

FLOWER

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TV REPAIR KEY SHOP

CARPENTER CHOP

PAINT SHOP

PLUMBLING SHOP

UNHOLD STORY SHOP

EE SHOP

0

5

10

20

30

GROUND FLOOR PLAN – BACK OF HOUSE 027


02

DESIGN PHASE

PLAN ❖ B1 FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

B1 FLOOR PLAN – CAR PARKING 028


02

DESIGN PHASE

PLAN ❖ B2 FLOOR PLAN

PUMBLING AND BOILING ROOM

MECHANICAL TREATMENT

MAIN TANK ROOM

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PUMP ROOM

0

5

10

20

30

B2 FLOOR PLAN – CAR PARKING 029


02

DESIGN PHASE

PLAN ❖ 2ND FLOOR PLAN

VIETNAM RESTAURANT ITALIAN RESTAURANT

JAPANESE RESTAURANT

FRENCH RESTAURANT

PARKING

STARBUCK COFFEE SHOP

PRE-FUNCTION

BUSINESS AREA

PREFUNCTION

GRAND BALLROOM PRE-FUNCTION RENTAL AREA

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

2ND FLOOR PLAN – GRAND BALLROOM 030


02

DESIGN PHASE

SECTION ❖

RESTAURANT SECTION

4th FLOOR

+19.60

BAR SWIMMING POOL

FLOOR

3rd

+14.00 2nd

MACHINE

THAI RESTUARANT

FLOOR

JAPANESE

VIETNAMESE

STORAGE

+8.40

CHINESE 1st

FLOOR

+3.50

G FLOOR

HALAL

STORAGE

FOOD PREPARE

CHECK IN (LOADING DROP)

ALLDAY DINING RESTUARANT KITCHEN

+0.00

B1 FLOOR

-2.80

RAIN WATER HARVEASTING SYSTEM

0

5

10

20

30

RESTAURANT SECTION INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

031


02

DESIGN PHASE

SECTION ❖

GRAND BALLROOM SECTION

0

5

10

20

30

GRAND BALLROOM SECTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

032


02

DESIGN PHASE

PERSPECTIVE ❖

INTERIOR DESIGN GRAND BALLROOM

GRAND BALLROOM INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

033


02

DESIGN PHASE

PLAN ❖ 3RD FLOOR PLAN FACILITIES

VIETNAM RESTAURANT ITALIAN RESTAURANT

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BALLROOM BACK OF HOUSE BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

3RD FLOOR PLAN - FACILITIES 034


02

DESIGN PHASE

PLAN ❖ 4TH FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

4TH FLOOR PLAN 035


02

DESIGN PHASE

PLAN ❖ 5TH-55TH FLOOR PLAN GUESTROOM

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

5TH – 55TH FLOOR PLAN – GUEST ROOM 036


02

DESIGN PHASE

PLAN ❖ PLAN EXECUTIVE SUITE AND GRAND ROOM

TYPE

C

EXECUTIVE SUITE FLOOR

5-55

50

2

FLOORS

ROOMS

100 ROOMS

EXECUTIVE SUITE A

TYPE

A

GRAND ROOM FLOOR

5-55

50

10

FLOORS

ROOMS

EXECUTIVE SUITE B

1000 ROOMS

GRAND ROOM A

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

GRAND ROOM B

037


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN GRAND ROOM

TYPE

A

GRAND ROOM FLOOR

5-55

50

10

FLOORS

ROOMS

1000 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

GRAND ROOM A

GRAND ROOM B

038


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN GRAND ROOM

TYPE

A

GRAND ROOM FLOOR

5-55

50

10

FLOORS

ROOMS

1000 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

GRAND ROOM A

GRAND ROOM B

039


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN EXECUTIVE SUITE

TYPE

C

EXECUTIVE SUITE FLOOR

5-55

50

2

FLOORS

ROOMS

100 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

EXECUTIVE SUITE A

EXECUTIVE SUITE B

040


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN EXECUTIVE SUITE

TYPE

C

EXECUTIVE SUITE FLOOR

5-55

50

2

FLOORS

ROOMS

100 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

EXECUTIVE SUITE A

EXECUTIVE SUITE B

041


02

DESIGN PHASE

PLAN ❖ 44TH FLOOR PLAN SKY LOUGE

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

44TH FLOOR PLAN – SKY LOUNGE 042


02

DESIGN PHASE

SECTION ❖

SKY LOUGE SECTION SERVICE HIGH LIFT HALL ZONE 72TH

FLOOR

+231.80

71TH

FLOOR

+228.00

70TH

FLOOR

+224.20

69TH

FLOOR

+220.40

68TH

FLOOR

+216.60

67TH

FLOOR

+212.80

66TH

FLOOR

+209.00

65TH

FLOOR

+205.20

LIFT HALL

RESTAURANT 64TH

FLOOR

+201.40 BAR

63TH

FLOOR

+197.60

62TH

FLOOR

+193.80

61TH

FLOOR

+190.00

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

BAR

043


02

DESIGN PHASE

PERSPECTIVE ❖

SKY LOUGE

SKY LOUNGE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

044


02

DESIGN PHASE

PLAN ❖ 45TH FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

45TH FLOOR PLAN – CORE TRANFER 045


02

DESIGN PHASE

PLAN ❖ 46TH FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

46TH FLOOR PLAN – PRIVATE POOL 046


02

DESIGN PHASE

PERSPECTIVE ❖

PRIVATE POOL

PRIVATE POOL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

047


02

DESIGN PHASE

PLAN ❖ 56TH-63TH FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

56TH – 63TH FLOOR PLAN 048


02

DESIGN PHASE

PLAN ❖ PLAN EXECUTIVE SUITE AND JUNIOR SUITE

TYPE

D

EXECUTIVE SUITE FLOOR

56-63

8

2

FLOORS

ROOMS

16 ROOMS

EXECUTIVE SUITE A

TYPE

B

JUNIOR SUITE FLOOR

56-63

8

10

FLOORS

ROOMS

EXECUTIVE SUITE B

80 ROOMS

JUNIOR SUITE A

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

JUNIOR SUITE B

049


02

DESIGN PHASE

PLAN ❖ 64TH-65TH FLOOR PLAN

LOBBY PARKING LOUGE RESTAURANT

RENTAL SREA MEETING AREA MECHANICAL AREA BUSINESS AREA

BALLROOM BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

5

10

20

30

64TH – 65TH FLOOR PLAN 050


02

DESIGN PHASE

PLAN ❖ PLAN PRESIDENTAL SUITE

TYPE

D

PRESIDENTAL SUITE FLOOR

64-65

PRESIDENTAL SUITE A

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

2

3

FLOORS

ROOMS

6 ROOMS

PRESIDENTAL SUITE B

051


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE B

TYPE

D

PRESIDENTAL SUITE FLOOR

64-65

2

3

FLOORS

ROOMS

6 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PRESIDENTAL SUITE B

052


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE B

TYPE

D

PRESIDENTAL SUITE FLOOR

64-65

2

3

FLOORS

ROOMS

6 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PRESIDENTAL SUITE B

053


02

DESIGN PHASE

PERSPECTIVE INTERIOR DESIGN PRESIDENTAL SUITE A

TYPE

D

PRESIDENTAL SUITE FLOOR

64-65

2

3

FLOORS

ROOMS

6 ROOMS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PRESIDENTAL SUITE A

054


02

DESIGN PHASE

SECTION ❖

SECTION A- A TOWER

GUEST ROOM ZONE 3 ❖ ❖ ❖ ❖

PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL

GUEST ROOM ZONE 2 PODIUM

❖ ❖

EXECUTIVE SUITE GRAND ROOM

PODIUM ❖ ❖ ❖ ❖ ❖

0

5

10

20

30

SECTION A-A

RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING

GRAND BALLROOM

GUEST ROOM ZONE 1 ❖ ❖

EXECUTIVE SUITE GRAND ROOM

❖ MEETING ROOM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

055


02

DESIGN PHASE

ELEVATION ❖

DAY ELEVATION

EAST

ELEVATION

NORTH

WEST

ELEVATION

ELEVATION

0

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

20

40

60

SOUTH

ELEVATION

80

056


02

DESIGN PHASE

ELEVATION ❖

NIGHT ELEVATION

EAST

ELEVATION

NORTH

WEST

ELEVATION

ELEVATION

0

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

20

40

60

SOUTH

ELEVATION

80

057


03

STRUCTURAL PHASE ❖ ❖

STRUCTURAL CONCEPT BUILDING MATERIAL

090


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT ❖

STRUCTURAL DIAGRAM

TOWER

GUEST ROOM ZONE 3

7

zone

❖ ❖ ❖ ❖

PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL

GUEST ROOM ZONE 2 ❖ ❖

PODIUM

PODIUM ❖ ❖ ❖ ❖ ❖

EXECUTIVE SUITE GRAND ROOM

GUEST ROOM ZONE 1 ❖ ❖

EXECUTIVE SUITE GRAND ROOM

RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING

UNDERGROUND

GRAND BALLROOM ❖ MEETING ROOM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

BASEMENT CAR PARKING FOUNDATION

091


03

POST TENTION FLOOR

STRUCTURAL CONCEPT

STRUCTURAL PHASE

SLOPE COLUMN

❖ GUEST ROOM ZONE 1 TRUSS BEAM

➢ DETAILS A STEEL BRACING

CONSTRUCTION

PHASE 1

➢ DETAILS A GUEST ROOM ZONE 1 CRITERIA

❖ ❖ ❖ ❖ ❖ ❖

CONCRETE CORE

WITHOUT LARGE BEAM STRAPPING WITHOUT COLUMN OPEN SPACE TO RIVER VIEW UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

EXPLOSION DIAGRAM

TRUSS BEAM DIAGRAM

FORCE

DIAGRAM

STRUCTURE

WALL

CANTILEVER

DEPTH

(M)

(M)

(M)

-

-

0.15

-

-

0.30

STEEL

@ 5.50

-

6.80

REINFORCED

5.50

-

-

5.50

10.00

7.80

MATERIAL

REINFORCED

REINFORCED

CONCRETE

CONCRETE

FLOOR

POST TENTION

BEAM

TRUSS

COLUMN

SLOPE COLUMN

BRACING

BRACING

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

SPAN

SYSTEM

CONCRETE

WITH STRANDS

CONCRETE STEEL

092


03

STRUCTURAL PHASE

➢ DETAILS A

STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 1

CONCRETE CORE

CONSTRUCTION

PHASE 1

GUEST ROOM ZONE 1 CRITERIA

❖ ❖ ❖ ❖ ❖ ❖

WITHOUT LARGE BEAM STRAPPING WITHOUT COLUMN OPEN SPACE TO RIVER VIEW UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

STEEL BRACING

TRUSS BEAMS WITH TEEL BRACING ISOMETRIC

CONCRETE CORE 43.00 M. 8.70 M. 8.70 M.

DEPTH 6.80 M. CONCRETE CORE 43.00 M. @ 5.50 M. DEPTH 7.80 M.

TRUSS BEAM TOP VIEW

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TRUSS BEAMS WITH TEEL BRACING ELEVATION

093


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT

TRUSS BEAM

CONCRETE CORE

❖ GUEST ROOM ZONE 2

➢ DETAILS A

CONSTRUCTION

PHASE 1

POST TENTION FLOOR

GUEST ROOM ZONE 2 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖

CAST-IN-PLACE CONCRETE COLUMN

NON-REFLECTIVE STRUCTURE REDUCED COSTS SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

EXPLOSION DIAGRAM

TRUSS BEAM DIAGRAM

FORCE

DIAGRAM

STRUCTURE

WALL

SYSTEM

MATERIAL

REINFORCED

REINFORCED

CONCRETE

CONCRETE CONCRETE

SPAN

CANTILEVER

DEPTH

(M)

(M)

(M)

-

-

0.15

-

-

0.30

FLOOR

POSTENTION

BEAM

TRUSS

STEEL

@ 5.50

10.80

3.40

CAST-IN-PLACE

REINFORCED

CONCRETE

CONCRETE

5.50

-

1.20 × 0.80

COLUMN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

WITH STRANDS

094


03

STRUCTURAL PHASE

➢ DETAILS A

STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 2

CONCRETE CORE

CONSTRUCTION

PHASE 1

GUEST ROOM ZONE 2 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖

NON-REFLECTIVE STRUCTURE REDUCED COSTS SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

TRUSS BEAM ISOMETRIC

CANTILEVER 14.00 M. 10.80 M. CONCRETE CORE 43.00 M. CANTILEVER 10.80 M.

14.00 M.

CONCRETE CORE 43.00 M. DEPTH 3.40 M.

@ 5.50 M.

TRUSS BEAM TOP VIEW

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TRUSS BEAM ELEVATION

095


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT

CAST IN PLACE CONCRETE ROOF

❖ GUEST ROOM ZONE 3 TRUSS BEAM

CONSTRUCTION

➢ DETAILS A

PHASE 1

CABLE COLUMN

GUEST ROOM ZONE 3

PRECAST SLABS FLOOR

CRITERIA ❖ ❖ ❖ ❖ ❖ ❖

SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST

➢ DETAILS B CONCRETE CORE ➢ DETAILS B EXPLOSION DIAGRAM

TRUSS BEAM DIAGRAM

FORCE

DIAGRAM

STRUCTURE

WALL

SYSTEM

MATERIAL

REINFORCED

REINFORCED

CONCRETE

CONCRETE CONCRETE

SPAN

CANTILEVER

DEPTH

(M)

(M)

(M)

-

-

0.15

10.00

-

0.30

FLOOR

PRECAST SLABS

BEAM

TRUSS

STEEL

@ 5.50

-

7.60

COLUMN

CABLE COLUMN

STEEL CABLE

5.50

20.00

3.80

CAST IN PLACE

REINFORCED

CONCRETE

CONCRETE

5.50

-

-

ROOF

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

WITH STRANDS

096


03

STRUCTURAL PHASE

➢ DETAILS A

STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 3

CONCRETE CORE

CONSTRUCTION

PHASE 1

GUEST ROOM ZONE 3 CRITERIA ❖ ❖ ❖ ❖ ❖ ❖

SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST

TRUSS BEAM ISOMETRIC

14.00 M. CONCRETE CORE 43.00 M. 14.00 M. CONCRETE CORE 43.00 M. DEPTH 6.80 M.

@ 5.50 M.

TRUSS BEAM TOP VIEW

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TRUSS BEAM ELEVATION

097


03

STRUCTURAL PHASE PRECAST SLABS FLOOR

➢ DETAILS B

STRUCTURAL CONCEPT ❖ GUEST ROOM ZONE 3

CONSTRUCTION

CONCRETE CORE

PHASE 1

GUEST ROOM ZONE 3

CABLE COLUMN

CRITERIA

CABLE COLUMN WITH PRECAST SLABS ❖ ❖ ❖ ❖ ❖ ❖

ISOMETRIC

SMALL COLUMN SUPPORTS CORE STRUCTURE SYSTEM ABLE TO HANDLE FORCE EFFICIENTLY OPEN SPACE TO RIVER VIEW SUITABLE FOR TAKING DOWN THE SPACE BUILD FAST

STEEL HINGE PIN DIAMETER 0.20 M.

TENSION FORCE CABLE COLUMN DIAMETER 0.20 M.

CASE STUDY

MEDIA TIC BUILDING

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

JOINT

DETAIL

098


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT ❖ PODIUM

POST TENTION FLOOR

CAST IN PLACE CONCRETE WITH GREEN ROOF

CAST IN PLACE CONCRETE FLOOR

CONSTRUCTION

PHASE 1

CAST IN PLACE CONCRETE POOL

PODIUM CRITERIA

❖ ❖ ❖ ❖ ❖ ❖ ❖

NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF INFINITY POOL

FORCE

CAST IN PLACE CONCRETE COLUMN

EXPLOSION

➢ DETAILS A

STRUCTURE

DIAGRAM

SYSTEM

MATERIAL

DIAGRAM WALL

FLOOR

COLUMN

REINFORCED

CONCRETE

CONCRETE

WITH STRANDS

POSTENTION

CONCRETE

CONCRETE

WITH STRANDS

CONCRETE WITH GREEN ROOF

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

WITH STRANDS

CAST-IN-PLACE

CAST IN PLACE ROOF

CONCRETE

CONCRETE WITH STRANDS

SPAN

(M)

CROSS SECTION AREA (SQ.M.)

DEPTH

(M)

-

-

0.15

8.00 – 12.00

-

0.30

8.00 – 12.00

0.40 × 1.20

-

-

-

0.80

099


03

STRUCTURAL PHASE

➢ DETAILS A

STRUCTURAL CONCEPT ❖ PODIUM

PHASE 1

CRITERIA

❖ ❖ ❖ ❖ ❖ ❖ ❖

CAST IN PLACE CONCRETE

NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF INFINITY POOL

S W I M M I N G

CONSTRUCTION

PODIUM

POOL TOP COPING

P O O L

GUTTER TOP GRILL

OVERFLOW SWIMMING POOL RETAINING WALL WITH GUTTER SECTION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

100


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT

TRUSS BEAM

POTTED PLANT

❖ GRAND BALLROOM

METAL SHEET ROOF

➢ DETAILS A

POST TENTION FLOOR

CONSTRUCTION

PHASE 1

CAST IN PLACE CONCRETE FLOOR

GRAND BALLROOM CRITERIA

❖ ❖ ❖ ❖ ❖ ❖

NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

CAST-IN-PLACE CONCRETE COLUMN ➢ DETAILS A EXPLOSION DIAGRAM

STRUCTURE

SYSTEM

FORCE

DIAGRAM

WALL

FLOOR

BEAM

COLUMN

ROOF

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MATERIAL CONCRETE

ACOUSTIC INS

WITH STRANDS

CAST IN PLACE

CONCRETE

CONCRETE

WITH STRANDS

CAST-IN-PLACE

CONCRETE

CONCRETE

WITH STRANDS

CAST-IN-PLACE

CONCRETE

CONCRETE

WITH STRANDS

TRUSS BEAM WITH

STEEL WITH METAL

METAL SHEET

SHEET

SPAN

CANTILEVER

DEPTH

(M)

(M)

(M)

-

-

0.25

10.00

0.50

0.30

10.00

0.50

1.00

20.00–27.00

-

0.40 × 1.20

20.00–27.00

-

2.00 101


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT ❖ GRAND BALLROOM

CONSTRUCTION

PHASE 1

GRAND BALLROOM CRITERIA

❖ ❖ ❖ ❖ ❖ ❖

NON-REFLECTIVE STRUCTURE GREEN ROOF AREA SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

➢ DETAILS A

SECTION A INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

WALL

SECTION

SECTION B 102


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT ❖ BASEMENT CAR PARKING

CONSTRUCTION

CAST IN PLACE CONCRETE FLOOR CAST IN PLACE CONCRETE RAMP

RETAINING WALL

PHASE 1

CAST IN PLACE CONCRETE COLUMN

BASEMENT CAR PARKING CRITERIA

❖ ❖ ❖ ❖

SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

EXPLOSION DIAGRAM

FORCE

STRUCTURE

DIAGRAM

OUTSIDE

5.6 m

WALL

CAR PARKING

FLOOR

BEAM

COLUMN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

SYSTEM

RETAINING WALL

MATERIAL

CONCRETE WITH STRANDS

CAST IN PLACE

CONCRETE

CONCRETE

WITH STRANDS

CAST IN PLACE

CONCRETE

CONCRETE

WITH STRANDS

CAST IN PLACE

CONCRETE

CONCRETE

WITH STRANDS

SPAN (M)

CROSS SECTION AREA (SQ.M.)

DEPTH (M)

-

-

0.60

-

-

0.30

10.00

-

0.80

10.00

0.40 × 1.20

103


03

STRUCTURAL PHASE

STRUCTURAL CONCEPT ❖ FOUNDATION

MATT FOUNDATION ❖

CONSTRUCTION

BEARING PILE

PHASE 1

FOUNDATION ❖

CRITERIA

❖ ❖ ❖ ❖

SIMPLE STRUCTURE UNCOMPLICATED STRUCTURE SIMPLE GEOMETRY AND ORDER REDUCE THE HEAT IN ITSELF

HARD SOIL LAYER ❖

EXPLOSION DIAGRAM

FORCE

DIAGRAM

STRUCTURE

SYSTEM

FOUNDATION

MATT FOUNDATION

PILE

BEARING PILE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MATERIAL CONCRETE WITH STRANDS

CONCRETE WITH STRANDS

SPAN

LENGTH

DEPTH

(M)

(M)

(M)

-

-

5.00

8.00 – 12.00

60.00

-

104


03

STRUCTURAL PHASE

BUILDING MATERIAL

❖ TOWER

OPAQUE MATERIAL

TRANSPARENT

ALUMINIUM COMPOSITE

MATERIAL

CURTAIN WALL 4 SIDED

1

1

A

2

TRANPARENT

2

MATERIAL

1

OPAQUE B

MATERIAL

2

2

3

A

B B

A A

B

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

105


03

STRUCTURAL PHASE

BUILDING MATERIAL

❖ PODIUM

TRANSPARENT

OPAQUE

MATERIAL

MATERIAL

SLOPING CURTAIN WALL

SOLID SURFACE

3

INTERIOR

1

TRANSPARENT

MATERIAL

MATERIAL

SOLID SURFACE

2

1

2

3

OPAQUE MATERIAL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

106


03

STRUCTURAL PHASE

BUILDING MATERIAL

❖ CAR PARKING

TRANSPARENT

OPAQUE

MATERIAL

MATERIAL

PERFORATED MESH

SOLAR FACADE - BIPV

2

OPAQUE MATERIAL

4 3

2

2

5

1 1 TRANSPARENT 2

MATERIAL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

6

7

1

107


03

STRUCTURAL PHASE

BUILDING MATERIAL

❖ LAND SCAPE SOFT SCAPE

HARD SCAPE

MATERIAL

MATERIAL

2

1

HARD SCAPE MATERIAL

SOFT SCAPE MATERIAL

1

2

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

108


04-1 ELECTRICAL SYSTEM ❖ ❖ ❖ ❖ ❖

POWER LOAD ZONNING LIGHTING PLANNING NATURAL LIGHT ELECTRIC POWER SOLAR CELL SYSTEM


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ POWER LOAD ZONING

ZONING 3

TOWER

TOTAL

3,442

ZONING 2

BALLROOM

KVA

ZONING 1

❖ ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PODIUM& PARKING


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ LOAD ESTIMATE CALCULATION ²

PODIUM

BALLROOM

TOWER

PARKING

PUBLIC SPACE FOOD&BEVERAGE BUSINESS AREA CONCESSION SPECIAL ACCOMODATION ADMINISTRATION WC GENERAL SERVICE EMPLOYEE FACILITY H.K.&LAUNDRY MECHANIC AREA ENGINEER&MAINTENANCE BALLROOM MEETING ROOM WC GUEST ROOM CIRCULATION SERVICE ROOM PARKING AREA MECHANIC AREA

1,942 2,486 826 559 1,004 759 2,013 1,773 1,629 1,268 1,056 712 1,600 1,262 384 56,755 8,981 900 27,315 861

²

²

-

2

-

4,972 -

10 15 10 15 15 15 2 2 2 15 15

7,590 26,595 16,290 19,020 15,840 10,680 3,200 2,524 113,510 13,500 12,915

² 10 18 22 22 22 30 8 8 20 20 8 8 20 20 8 10 25 8 8 8

19,420 44,748 18,172 12,298 22,088 22,770 16,104 14,184 32,580 25,360 8,448 5,696 32,000 25,240 3,072 567,550 224,525 7,200 218,520 6,888 -

70 90 70 50 70 70 20 20 50 10 10 10 90 70 20 4 70 20

135,940 223,740 57,820 27,950 70,280 53,130 40,260 35,460 81,450 12,680 10,560 7,120 144,000 88,340 7,680 238,371 628,670 18,000 -

155,360 273,460 75,992 40,248 92,368 83,490 56,364 76,239 130,320 57,060 34,848 23,496 179,200 116,104 10,752 919,431 853,195 38,700 218,520 6,888

TOTAL TOTAL LOAD BUILDING

3,442,035 VA

3,442 KVA

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ POWER LOAD ZONING

ZONING 1

1

PODIUM&PARKING

-

PODIUM 1,099 KVA PARKING 225 KVA

TOTAL 1,324 KVA

EMDB

EMERGENCY MAIN DISTRIBUTION BOARD

GEN

GENERATOR

RMU

AUTOMATIC TRANSFER SWITCH

ATS

RING MAIN UNIT

TM

TRANSFORMER

MDB MAIN DISTRIBUTION BOARD

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

LP

LOAD PANEL

DB

DISTRIBUTION BOARD


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ POWER LOAD ZONING

ZONING 2

2

BALLROOM&MEETING RM

-

MEETING ROOM 179 KVA BALLROOM 116 KVA

TOTAL 306 KVA

EMDB

GEN

EMERGENCY MAIN DISTRIBUTION BOARD GENERATOR

RMU AUTOMATIC TRANSFER SWITCH ATS

RING MAIN UNIT

TM

TRANSFORMER

MDB MAIN DISTRIBUTION BOARD LP

LOAD PANEL

DB

DISTRIBUTION BOARD

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ POWER LOAD ZONING

ZONING 3

3

TOWER

-

TOWER 1,811 KVA

TOTAL 1,811 KVA

EMDB

GEN

EMERGENCY MAIN DISTRIBUTION BOARD

GENERATOR

RMU AUTOMATIC TRANSFER SWITCH ATS

RING MAIN UNIT

TM

TRANSFORMER

MDB MAIN DISTRIBUTION BOARD LP

LOAD PANEL

DB

DISTRIBUTION BOARD

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ LIGHTING PLANNING CONCEPT

100 200 300 400 500

LAW

LIGHTING TYPE

LUX LUMEN/SQ.M.

ARRANGEMENT

LUX LUMEN/SQ.M.

MANUAL

MOTION ACTIVATED SENSOR

PHOTOELECTRIC LIGHT SENSOR

LUX LUMEN/SQ.M.

INDOOR OUTDOOR INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

ANALOG TIME SWITCH


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ OUTDOOR LUMINAIRES AND LAMPS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ LANDSCAPE LIGHTING PLAN

)

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ LANDSCAPE LIGHT SECTION

) INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ INDOOR LUMINAIRES AND LAMPS

LED PENDANT

W 68 H 1140 D 90 cm 36W DAY LIGHT WORK SPACE

DOWNLIGHT LED

FLAT LED QUADRATE

W 27 H 23.5 D 18 cm 40W WARM LIGHT

chandelier

LED PANEL LIGHT

W80 x D80 x H75 cm WARM LIGHT

W 9 H 45 cm 2 x G4 LED MAX 5 W WARM LIGHT

48W 30x120CM 48w DAY LIGHT

LOBBY

GUESTROOM

FACILITY

LOBBY, LOUNGE

LED STRIP

LED CLONY

LED FLUORESCENT

SURFACE LUMINAIRE

CHIP DLP PROJECTOR

W300 x D1220 x H85 mm 2 x 14W DAY LIGHT

W120 x D1155 x H105 mm 6M 4.8W/M DAY LIGHT

RESTAURANT SHOP

OFFICE, EMPLOYEE AREA

610-350LM 48w WARM LIGHT

6M 4.8W/M WARM LIGHT

W120 x D1155 x H105 mm 18/36W DAY LIGHT

CIRCULATION, GUESTROOM

RESTAURANT SHOP

OFFICE, EMPLOYEE AREA

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ 1ST FLOOR LIGHTING PLAN

S

0

5

10

20

2nd FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

30


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ GUEST ROOM LIGHTING PLAN

S

0

5

10

20

5TH – 55TH GUEST ROOM INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

30


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ NATURAL LIGHT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ ELECTRIC POWER

0

5

10

20

30

5TH – 55TH GUEST ROOM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-1

ELECTRICAL SYSTEM

ELECTRICAL SYSTEM ❖ SOLARCELL SYSTEM

×

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-2

AIR CONDITIONAL SYSTEM ❖ ❖ ❖ ❖

WATER COOLED WATER CHILLER AIR CONDITIONAL SYSTEM OF BUILDING RISER DIAGRAM VENTILATION SYSTEM


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER

CHILLER

HRV

PRE-COOL FRESH AIR

COOLING TOWER

AHU

VAV

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER

HRVS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

PRECOOLED

AHU


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖ AIR CONDITIONAL SYSTEM OF BUILDING

TOWER TOWER

PODIUM PODIUM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM PODIUM

❖ RISER DIAGRAM

PODIUM 1,942

932,160

-

BUSINESS AREA

826

396,480

-

CONCESSION

559

268,320

-

1,004

481,920

-

ADMINISTRATION

759

364,320

-

WC

234

112,320

GENERAL SERVICE

1,773

851,040

-

EMPLOYEE FACILITY

1,629

781,920

-

H.K.&LAUNDRY

1,268

608,640

-

MECHANIC AREA

1,056

506,880

-

WC

352

168,960

-

ENGINEER&MAINTENANCE

712

341,760

BALLROOM

1,600

768,000

-

MEETING ROOM

1,262

605,760

-

384

184,320

2,486

1,193,280

829

397,920

PUBLIC SPACE

SPECIAL ACCOMODATION

WC FOOD&BEVERAGE FOOD PREPARATION

2,555,520

3,259,200

1,558,080 1,591,200

RM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

COOLING TOWER

SUPPLY WATER

CHILLER

RETURN WATER

AHU

SUPPLY AIR

FHU

RETURN AIR


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖ WATER COOLED WATER CHILLER

GUEST ROOM

56,755

45,404,000

-

CIRCULATION

8,981

4,310,880

-

SKY LOUNGE

1,450

696,000

50,410,880

RM

RM

RM

COOLING TOWER

SUPPLY WATER

CHILLER

RETURN WATER

AHU

SUPPLY AIR

FHU

RETURN AIR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

TOWER TOWER


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖

HEAT RECOVER VENTILATION PRE-COOLED FRESH AIR VARIABLE AIR VOLUME AIR HANDIMG UNIT COOLING TOWER CHILLER SUPPLY WATER RETURN WATER AHU/FCU

FRESH AIR

RETURN DUCT

RETURN AIR

SUPPLY DUCT

COOLING WATER SUPPLY

RETURN AIR

COOLING WATER RETURN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION


04-2

AIR CONDITIONAL SYSTEM

AIR CONDITIONAL SYSTEM ❖ VENTILATION SYSTEM

WC

VENTILATION SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

LIFT

VENTILATION SYSTEM

PARKING

VENTILATION SYSTEM


04-3

SANITARY SYSTEM

❖ ❖ ❖ ❖

SANITARY EQUIPMENT COLD WATER SYSTEM WASTE AND SOILED SYSTEM DRAINAGE WATER SYSTEM

133


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ SUMMARY PARKING ZONE o

o

o

o

FACILITY ZONE o

o

o

o

RESTAURANT ZONE

TOWER ZONE o

o

o

o

HALL ZONE o

o

o

o

BALLROOM ZONE

o

o

o

o

o

o

o

o

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

134


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ SANITARY EQUIPMENT CALCULATION COLD WATER SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

135


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ SANITARY EQUIPMENT CALCULATION 1000

60,000

226,800

226.80

WATER REUSE SYSTEM สุขภัณฑ์ อ่ำงล้ำงมือ ฝักบัว

อ่ำงอำบน้ำ อ่ำงล้ำงทั่วไป

จำนวน

ค่ำ FU

รวม

1,562.00

2.00

3,124.00

1,110.00

4.00

4,440.00

1,204.00

4.00

4,816.00

1,204.00

2.25

2,709.00

รวมค่ำ FU

อัตรำควำมเร็ว

ตัวคูณลด

ควำมเร็วทีแ่ ท้จริง(ลิตร/นำที)

อัตรำกำรใช้นำ้ สูงสุด(ลิตร/ชม.)

ประสิทธภำพเครือ ่ งสูบนำ้ (ลิตร/นำที)

15,089

4,392.41

0.61

2,679.37

160,762.13

5,358.74

SOIL WATER SYSTEM • • •

453 INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

1,607

3,600

18 136


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ SANITARY EQUIPMENT

70%

20%

30% WASHBASIN AND FAUCET

WATER CLOSET

SHOWER AND BATHTUB

CENCOR FAUCET

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

137


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ SANITARY EQUIPMENT INFORMATION WASTE SYSTEM

COLD WATER SYSTEM(DOWNFEED)

TOWER

WATER REUSE SYSTEM GREY WATER

RAIN DRANAGE WATER SYSTEM

COLD WATER SYSTEM(UPFEED)

PODIUM m

Ø Ø

BASEMENT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Ø ROOFDRAIN

138


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ COLD WATER SYSTEM FLOOR 64

P

FLOOR 64

T

P

T

COLD WATER SYSTEM EQUIPMENT FLOOR 44

FLOOR 44

P

T

P

T

Ø Ø Ø

FLOOR B2

M

P

T

SECTION A

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

M

P

T

M

SECTION B

139


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ COLD WATER SYSTEM

M MECHANI CAL TREATME NT

PAR KING

P

T

MAIN TANK ROOM

P P P

GROUND FLOOR PLAN

B2 FLOOR PLAN

SYMBOL

T

P

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

M

140


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ REUSE WATER AND DRANAIGE SYSTEM FLOOR 64

FLOOR 64 S S S S S S S S S S S S S S S S S S S

S S S S S S S S S S S S S S S

S S S S

S S S S

FLOOR 44

S S

FLOOR 44

S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S

S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S

TO LANDSCAPE TO SEWER

S

W C

S

W C

SECTION A

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Ø Ø Ø

W C

W C

FLOOR B2

COLD WATER SYSTEM EQUIPMENT

S

S

W C

S

W C

SECTION B

M TO LANDSCAPE TO SEWER

141


04-3

SANITARY SYSTEM

SANITARY SYSTEM ❖ DRAINAGE WATER SYSTEM

1:200

1:200

1:200

STORAGE RECEIVING OFFICE ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE PARKING CHEF ROOM

ST.

DRINK MEAT ST. ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

1:200

DRY ST.

ADMINISTRATOR

ENGINEERING ROOM LINEN ROOM STAFF DINING

STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

1:200

HOUSE KEEPING

BABY ROOM

1:200

CONTROL ROOM TV REPAIR KEY SHOP

FLOWER

CARPENTER CHOP PAINT SHOP

UNHOLD STORY SHOP

PLUMBLING SHOP

1:200

EE SHOP

1:200

SYMBOL

0

5

10

20

30

GROUND FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

142


04-4

FIRE PROTECTION SYSTEM ❖ ❖ ❖ ❖ ❖ ❖ ❖

FIRE ALARM AND EMERGENCY DEVICES FIRE ALARM SYSTEM DIAGRAM FIRE FIGHTING SYSTEM DIAGRAM FIRE REEL HOSE CABINET FIRE TYPE HEAT DECTECTOR / SMOKE DETECTOR SPRINKLER SYSTEM

143


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE

FIRE ALARM CONTROL PANEL (FCP)

ADDRESSABLE MODULE (RTU)

HEAT DETECTOR

SMOKE DETECTOR

ALARM DEVICES

DUCT SMOKE DETECTOR

EMERGENCY TELEPHONE

MANUAL STATION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

144


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE ALARM SYSTEM DIAGRAM

FIRE ALARM SYSTEM DIAGRAM SIGN OTHER SYSTEM FIRE BRIGADE

LOOP 1

FIRE ALARM CONTROL

MONITOR MODULE

SMOKE DETECTOR

LOOP 2

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

OTHER SYSTEM

CONTROL MODULE

RELAY MODULE

HEAT DETECTOR

BELL

SPEAKER

MANUAL STSTION

STROBE

145


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE FIGHTING SYSTEM RELATIONSHIP DIAGRAM

FIRE FIGHTING SYSTEM RELATIONSHIP DIAGRAM SIGN

FIRE TRUCK

FIRE WATER TANK

GENERATOR

FUEL TANK

FIRE DEPARTMENT CONNECTION

FIRE PUMP

FIRE ALARM CONTROL

FIRE HOSE CABINET AND STANDPIPE

OUTDOOR

INDOOR

INDOOR SPRINKLE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

146


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE TYPE AND EQUIPMENT FIRE PUMP

JOCKEY PUMP

20.00 m.

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

147


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE PUMP SYSTEM

,,

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

148


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE HOSE REEL CABINET

กงล้อสำย SRI Auto Swing Hose Reel ขนำดสำย 1"x 30เมตร(100ฟุต)

เครื่องดับเพลิง"SATURN" ชนิดผงเคมี แห้ง ขนำด 10lbs, 2A-2B

Angle Valve, ชนิดทองเหลือง ขนำด 2.5"(NPT/NST)

"NIBCO" BRS Ball V., T-FP-40, UL/FM, 350psi

DOOR AND GLASS TYPE FULL(G)

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

149


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR

SMOKE DETECTOR ชนิดจุด ควำมสูงฝ้ำมีระยำม่สง ู มำก แต่ใช้กับควำมสูงไม่เกิน 10.00 เมตร ระยะห่ำงอุปกรณ์ควรติดตั้งมีระยะห่ำง ไม่เกิน 7.00 เมตร

SMOKE DETECTOR ชนิดยิงลำแสง ควำมสูงฝ้ำมีระยะมำก แต่ใช้กับควำมสูงไม่เกิน 25.00 เมตร ระยะห่ำงอุปกรณ์ควรติดตั้งมีระยะห่ำง ไม่เกิน 9.00 เมตร

HEAT DETECTOR ใช้กำรตรวจจับควำมร้อนเนือ ่ งจำก ควำมร้อนจำกควันรถ

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

150


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR

HALAL RESTAURANT

PARKING

BUSPARK ING

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

0

5

10

20

30

1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

151


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SMOKE DETECTOR AND HEAT DETECTOR

LOW RISE PLAN

HIGHG RISE PLAN

0

5

10

20

30

TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

152


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM

แบ่งระบบหัวจ่ำยน้ำ

1

2

3

4

อัตโนมัติเป็น 4 ประเภท

WET PIPE SYSTEM

DRY PIPE SYSTEM

PRE-ACTION SYSTEM

หัวจ่ำยน้ำ

4 ประเภท CONCEAL

PENDENT

SIDEWALL

UPRIGHT

DELUGE SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

153


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM CONCEAL

PENDENT

SIDEWALL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

154


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ SPRINKLER SYSTEM

HALAL RESTAURANT

PARKING

BUSPARK ING

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

0

5

10

20

30

1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

155


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE

LOW RISE PLAN

HIGH RISE PLAN

0

5

10

20

30

TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

156


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE EXIT AND ASSEMBLY POINT

STORAGE RECEIVING OFFICE ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE PARKING CHEF ROOM

ST.

DRY ST.

DRINK MEAT ST. ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

ADMINISTRATOR

ENGINEERING ROOM LINEN ROOM STAFF DINING

STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

HOUSE KEEPING

BABY ROOM

FLOWER

CONTROL ROOM TV REPAIR KEY SHOP

CARPENTER CHOP PAINT SHOP

UNHOLD STORY SHOP

PLUMBLING SHOP

EE SHOP

0

5

10

20

30

GROUND FLOOR PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

157


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE EXIT AND ASSEMBLY POINT

HALAL RESTAURANT

PARKING

BUSPARK ING

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

0

5

10

20

30

1ST FLOOR PLAN - LOBBY INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

158


04-4

FIRE PROTECTION SYSTEM

FIRE PROTECTION SYSTEM ❖ FIRE ALARM AND EMERGENCY DEVICE

LOW RISE PLAN

HIGH RISE PLAN

0

5

10

20

30

TYPICAL GUEST ROOM PLAN INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

159


04-5 OTHER SYSTEM

❖ ❖ ❖ ❖ ❖ ❖

VERTICAL TRANSPORTATION LIGHTING PROTECTION OTHER SYSTEM SECURITY SYSTEM GARBAGE MANAGEMENT SYSTEM ACOUSTIC SYSTEM

160


04-5

OTHER SYSTEM

VERTICAL TRANSPORTATION ❖ PASSENGER ELEVATOR HALL CALL DESTINATION ELEVATOR SYSTEM FLOOR FLOOR

11

11

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

161


03

STRUCTURAL PHASE

VERTICAL TRANSPORTATION ❖ FREIGHT / FIREMAN ELEVATOR

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

162


03

STRUCTURAL PHASE

VERTICAL TRANSPORTATION ❖ ESCALATOR

º

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

º

163


03

STRUCTURAL PHASE

LIGHTING PROTECTION ❖ LIGHTING PROTECTION METHOD

LIGHTING RED

DOWN CONDUCTOR SYSTEM

SURGE PROTECTION DATA AND COMMUNICATIONS INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

SURGE PRATECTION ELECTRICAL NETWORK

GROUNDING SYSTEM

164


03

STRUCTURAL PHASE

FIRE PROTECTION SYSTEM ❖ LIGHTING PROTECTION METHOD

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

165


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ CONCEPT DESIGN PA SYSTEM

SOUND REINFORCEMENT SYSTEM (PA)

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

166


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ CONCEPT DESIGN PA SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

167


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ SOUND SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

168


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ FIBER OPTIC INTERNET

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

169


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM

STORAGE RECEIVING OFFICE

ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE

PARKING CHEF ROOM

ST.

DRY ST.

DRINK ST.

MEAT ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

ADMINISTRATOR

ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

HOUSE KEEPING

BABY ROOM

FLOWER

SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

CONTROL ROOM TV REPAIR KEY SHOP

CARPENTER CHOP

PAINT SHOP

PLUMBLING SHOP

UNHOLD STORY SHOP

EE SHOP

GROUND FLOOR PLAN – BACK OF HOUSE

170


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM

HALAL RESTAURANT

PARKING

BUSPARKI NG

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

1ST

FLOOR PLAN - LOBBY

171


03

STRUCTURAL PHASE

OTHER SYSTEM ❖ INTERNET & TELEPHONE SYSTEM

LOW RISE PLAN

SERVER SWITCH WIFI ROUTER IP – PBX TELEPHONE ROUTER/HUB LAN FIBER OPTIC INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

HIGHG RISE PLAN

TYPICAL GUEST ROOM PLAN

172


03

STRUCTURAL PHASE

SECURITY EQUIPMENT ❖ SECURITY EQUIPMENT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

173


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV SYSTEM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

174


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ SECURITY EQUIPMENT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

175


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

STORAGE RECEIVING OFFICE

ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE

PARKING CHEF ROOM

ST.

DRY ST.

DRINK ST.

MEAT ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

ADMINISTRATOR

ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

HOUSE KEEPING

BABY ROOM

FLOWER

CONTROL ROOM TV REPAIR KEY SHOP

CARPENTER CHOP

PAINT SHOP

PLUMBLING SHOP

UNHOLD STORY SHOP

EE SHOP

GROUND FLOOR PLAN – BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

176


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

MECHANIC AL TREATMEN T

B1 FLOOR PLAN – CAR PARKING

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MAIN TANK ROOM

PUMP ROOM

B2 FLOOR PLAN – CAR PARKING

177


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

HALAL RESTAURANT

PARKING

BUSPARKI NG

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

1ST

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

FLOOR PLAN - LOBBY

178


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

VIETNAM RESTAURAN T

ITALIAN RESTAURAN T

JAPANESE RESTAURAN T

ITALIAN RESTAURAN T

FRENCH RESTAURAN T

VIETNAM RESTAURAN T

PARKIN G

STARBUCK COFFEE SHOP

PRE-FUNCTION

BUSINESS AREA

PREFUNCTION

GRAND BALLROOM PRE-FUNCTION RENTAL AREA

2ND FLOOR PLAN – GRAND BALLROOM

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

3RD FLOOR PLAN - FACILITIES

179


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

4TH FLOOR PLAN

5TH – 55TH

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

FLOOR PLAN – GUEST ROOM

44TH FLOOR PLAN – SKY LOUNGE

180


03

STRUCTURAL PHASE

SECURITY SYSTEM ❖ CCTV PLAN

45TH FLOOR PLAN – CORE TRANFER

56TH – 63TH FLOOR PLAN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

46TH FLOOR PLAN – PRIVATE POOL

64TH – 65TH FLOOR PLAN

181


03

STRUCTURAL PHASE

WINDOW WASHING EQUIPMENT ❖ GONDOLA

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

182


03

STRUCTURAL PHASE

BUILDING AUTOMATION SYSTEM ❖ CONCEPT OF BAS

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

183


03

STRUCTURAL PHASE

GARBAGE MANAGEMENT SYSTEM ❖ WASTE CALCULATION

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

184


03

STRUCTURAL PHASE

GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION

STORAGE RECEIVING OFFICE

ALL DAY DINING INTERNATIONAL RESTAURANT

MAIN KITCHEN GARBAGE

PARKING CHEF ROOM

ST.

DRY ST.

DRINK ST.

MEAT ST.

VEG ST.

PURCHASING DEPARTMENT

WASH

STAFF KITCHEN

ADMINISTRATOR

ENGINEERING ROOM LINEN ROOM STAFF DINING STAFF LOCKER UNIFORM ROOM

CHINESE RESTAURANT

HOUSE KEEPING

BABY ROOM

FLOWER

CONTROL ROOM TV REPAIR KEY SHOP

CARPENTER CHOP

PAINT SHOP

PLUMBLING SHOP

UNHOLD STORY SHOP

EE SHOP

1ST

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

FLOOR PLAN - LOBBY

185


03

STRUCTURAL PHASE

GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION

HALAL RESTAURANT

PARKING

BUSPARKI NG

ALL DAY DINING KITCHEN

RENTAL AREA

LOUGE

LOUGE BAR

LIFT HALL

LOBBY

PRE-FUNCTION MEETING ROOM L MEETING ROOM M

MEETING ROOM S

SERVICE CORRIDOR

GROUND FLOOR PLAN – BACK OF HOUSE

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

186


03

STRUCTURAL PHASE

GARBAGE MANAGEMENT SYSTEM ❖ GARBAGE SERVICE CIRCULATION

LOW RISE PLAN

HIGHG RISE PLAN

TYPICAL GUEST ROOM PLAN

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

187


03

STRUCTURAL PHASE

ACOUSTIC SYSTEM ❖ ACOUSTIC MATERIAL

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

188


05

COST & CONSTRUCTION MANAGEMENT ❖ ❖ ❖ ❖ ❖ ❖ ❖

189


05

COST & CONSTRUCTION MANAGEMENT

1 2 3 4 5 6

1 2 3 4 5 6 7 8 9

3

9

8

7

4

5

6 2

5 1 2 INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

3

1 4

1 2 3 4 5

190


05

COST & CONSTRUCTION MANAGEMENT

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

191


05

COST & CONSTRUCTION MANAGEMENT

MONTH 1 ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MONTH 1-2 ❖ ❖ ❖ ❖

192


05

COST & CONSTRUCTION MANAGEMENT

MONTH 2-4 ❖ ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MONTH 4-6 ❖ ❖ ❖

193


05

COST & CONSTRUCTION MANAGEMENT

MONTH 6-7 ❖ ❖ ❖

MONTH 8 ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

194


05

COST & CONSTRUCTION MANAGEMENT

MONTH 8-9 ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MONTH 9-16 ❖ ❖ ❖ ❖ ❖

195


05

COST & CONSTRUCTION MANAGEMENT

MONTH 16

MONTH 17

❖ ❖ ❖

❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

196


05

COST & CONSTRUCTION MANAGEMENT

MONTH 18-21 ❖ ❖ ❖ ❖ ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MONTH 22 ❖ ❖ ❖ ❖ ❖ ❖ ❖

197


05

COST & CONSTRUCTION MANAGEMENT

MONTH 23-24 ❖ ❖ ❖ ❖ ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

MONTH 25-35 ❖ ❖

❖ ❖

198


05

COST & CONSTRUCTION MANAGEMENT

MONTH 36 ❖ ❖ ❖ ❖ ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

199


05

COST & CONSTRUCTION MANAGEMENT

❖ GENARAL INFORMATION

COST ESTIMATION 2019

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

200


05

COST & CONSTRUCTION MANAGEMENT

CONSTRUCTION PERIOD 36 months

TOTAL BUILDING COST : 7,106,044,493 THB or 59,217 THB/SQM

Construction Cost Summary F

ARCHITECTURAL 3,647,574,500

OPERATION 386,026,725

STRUCTURAL 1,459,029,800

SITE DEVELOPMENT 182,378,725

FACTOR F 1,014,691,743

INITIAL FEE 416,343,000

Payment Direct

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Indirect

201


05

COST & CONSTRUCTION MANAGEMENT

CONSTRUCTION COST SEGMENTATION PAYMENT

10

ARCHITECTURAL 3,647,574,500

64 45

11 24

1,641,408,525 401,233,195 875,417,880 364,757,450 218,854,470 145,902,980

51

Demolishing Preparation Cleaning

35

25

9 181,432,561 196,873,630 7,720,535

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Tower Podium Carpark System work

510,660,430 364,757,450 145,902,980 437,708,940

30

OPERATION 386,026,725

2

47

Tower Podium Carpark Interior Tower Interior Podium Furniture

STRUCTURAL 1,459,029,800

10

7 30

12 17

25

SITE DEVELOPMENT 182,378,725 Hard Scape Soft Scape Concrete Courtyard Fetch Pond Trees

54,713,618 45,594,681 31,004,383 21,885,447 16,414,085 12,766,511

202


05

COST & CONSTRUCTION MANAGEMENT

COST & CONSTRUCTION MANAGEMENT Construction Plan Schedule ลำดับ

รำยกำร

วัน

มูลค่ำกำรก่อสร้ำง(บำท)

M1

ร้อยละ W1

W2

M2

W3

W4

W1

W2

M3

W3

W4

W1

A

หมวดงำนรือ้ ถอนอำคำร

40

181,432,561

3.20

0.64

0.64

0.64

0.64

0.64

B

หมวดงำนเตรียมพืน้ ที่ก่อสร้ำงและอำนวยกำร

75

133,041,076

2.34

0.23

0.23

0.23

0.23

0.23

1.ทำรั้วชั่วครำวรอบพืน้ ที่ก่อสร้ำง

10

15,469,893

0.27

0.27

2.สำนักงำนภำคสนำมสำหรับผู้คุมงำน/ผู้ว่ำจ้ำง

16

17,016,882

0.30

0.15

0.15

3.งำนติดตั้งเครื่องจักร

22

32,486,774

0.57

0.19

0.19

0.19

4.งำนขุดดิน/ถมดิน

30

37,127,742

0.65

0.16

0.16

0.16

5.งำนเชื่อมต่อไฟฟ้ำ/ประปำชั่วครำว

15

12,375,914

0.22

0.11

0.11

6.งำนถนนชั่วครำว

22

18,563,871

0.33

0.11

0.11

0.11

C

หมวดวิศวกรรมโครงสร้ำง

751

1,459,029,800

25.71

0.25

C1

งำนโครงสร้ำงใต้ดิน

150

277,215,662

4.88

0.24

1.งำนเจำะเสำเข็ม

75

118,487,339

2.09

0.26

2.งำนทดสอบเสำเข็ม/ตัดเสำเข็ม

40

3,193,729

0.06

75

C3

C4

D

E

F

G

H

0.23

0.23

W2

M4

W3

W4

W1

W2

M5

W3

W4

W1

W2

M6

W3

W4

W1

W2

M7

W3

W4

W1

W2

M8

W3

0.23

0.23

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.24

0.26

0.26

0.26

0.26

0.26

0.26

0.26

0.01

0.01

0.01

0.01

0.01

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.22

0.14

0.14

0.14

0.14

W4

W1

W2

M9

W3

W4

W1

W2

M10

W3

W4

W1

W2

M11

W3

W4

W1

W2

M12

W3

W4

W1

W2

M13

W3

W4

W1

W2

M14

W3

W4

W1

W2

M15

W3

W4

W1

W2

M16

W3

W4

W1

W2

M17

W3

W4

W1

W2

M18

W3

W4

W1

W2

M19

W3

W4

W1

W2

M20

W3

W4

W1

W2

M21

W3

W4

W1

W2

M22

W3

W4

W1

W2

M23

W3

W4

W1

W2

M24

W3

W4

W1

W2

M25

W3

W4

W1

W2

M26

W3

W4

0.25

0.25

0.25

0.25

0.25

0.14

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

122,319,814

2.16

75

78,565,729

1.38

0.14

0.14

0.14

0.14

งำนโครงสร้ำงเหนือดิน อำคำรจอดรถ

150

131,312,682

2.31

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

1.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 1-3

40

35,108,864

0.62

0.12

0.12

0.12

0.12

0.12

2.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 4-6

40

35,108,864

0.62

0.12

0.12

0.12

0.12

0.12

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.11

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.17

0.27

0.27

0.27

0.44

0.44

0.44

0.44

0.44 0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06 0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.06

0.14

0.25

0.25

##

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

##

0.15

0.15

##

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

##

0.04

0.04

##

0.06

##

0.06

0.06

0.06

0.06

0.06

0.06 0.04

0.04

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.25

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.05

0.05

61,094,953

1.08

335,576,854

5.91

0.17

0.17

0.17

0.17

0.17

0.17

134,230,742

2.37

0.40

0.40

0.40

0.40

0.40

0.40

40

77,182,676

1.36

0.27

0.27

3.งำนโครงสร้ำง Widespan BANQUET HALL

40

124,163,436

2.19

งำนโครงสร้ำงเหนือดิน TOWER

365

408,528,344

7.20

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

1.งำนโครงสร้ำงคำ้ ยันพิเศษรอบแกนอำคำร

60

245,117,006

4.32

0.54

0.54

0.54

0.54

0.54

0.54

0.54

0.54

2.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 5-9

30

13,889,964

0.24

0.06

0.06

3.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 10-14

30

13,889,964

0.24

4.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 15-19

30

13,889,964

0.24

5.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 20-24

30

13,889,964

0.24

6.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 25-29

30

13,889,964

0.24

7.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 30-34

30

13,889,964

0.24

8.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 35-39

30

13,889,964

0.24

9.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 40-45

30

13,889,964

0.24

10.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 46-47

30

8,170,567

0.14

11.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 48-52

30

13,889,964

0.24

12.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 52-57

30

13,889,964

0.24

13.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ 58-60

30

8,170,567

0.14

0.04

0.04

14.งำนโครงสร้ำงเสำ/พืน้ /ห้องเครื่องลิฟต์ ชั้นดำดฟ้ำ

30

8,170,567

0.14

0.04

0.04

0.04

0.04

หมวดงำนระบบวิศวกรรมประกอบอำคำร

545

306,396,258

5.40

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

##

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

##

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

0.07

1.งำนระบบไฟฟ้ำและสื่อสำร

440

59,905,277

1.06

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

##

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

##

0.02

0.02

0.02

0.02

0.02

0.02

2.งำนระบบปรับอำกำศและระบำยอำกำศ

410

51,386,637

0.91

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

##

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

##

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

3.งำนระบบสุขำภิบำล

440

44,928,958

0.79

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

##

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

##

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

4.งำนระบบป้องกันอัคคีภยั

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

##

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

##

0.01

0.01

0.06

0.04

410

42,867,997

0.76

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

5.งำนระบบลิฟต์และบันไดเลื่อน

90

31,051,818

0.55

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.05

6.งำนระบบรักษำควำมปลอดภัย

120

29,677,844

0.52

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

7.งำนระบบไฟฟ้ำพลังงำนแสงอำทิตย์

90

31,876,203

0.56

0.05

0.05

0.05

8.งำนระบบ BAS

30

14,701,524

0.26

หมวดงำนสถำปั ตยกรรม

515

2,918,059,600

51.42

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

##

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

##

1.งำนก่ออิฐผนัง

365

392,842,223

6.92

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

##

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

##

2.งำนผนังฉำบปูนและตกแต่งผิวผนัง

365

245,354,090

4.32

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

##

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

3.งำนฝ้ำเพดำน

330

334,949,685

5.90

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

##

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

4.งำนประตู/หน้ำต่ำง

315

337,706,472

5.95

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

##

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

0.14

5.งำนตกแต่งผิวพืน้

365

336,328,079

5.93

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

##

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

0.12

6.งำนสุขภัณฑ์

120

301,868,234

5.32

7.งำนทำสี

365

241,218,909

4.25

8.ตกแต่งภำยนอก

240

707,116,001

12.46

9.งำนเบ็ดเตล็ดและเก็บตกงำนตำบแบบ

120

85,323,380

1.50

หมวดงำนสถำปั ตยกรรมภำยใน

365

583,611,920

10.28

0.2

0.21

0.21

0.21

0.2

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.2

0.21

0.21

0.21

0.2

0.21

0.21

0.21

0.2

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.2

0.21

0.21

0.21

0.2

0.21

0.2

0.21

1.งำนตกแต่งภำยในส่วน PODIUM

365

152,687,379

2.69

0

0.04

0.04

0.04

0

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0

0.04

0.04

0.04

0

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0.04

0

0.04

0.04

0.04

0

0.04

0

0.04

2.งำนตกแต่งภำยในส่วน TOWER

365

364,757,450

6.43

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.1

0.13

0.13

0.13

0.1

0.13

0.1

0.13

0.1

0.13

0.13

0.13

0.1

3.งำนตกแต่งภำยในส่วน BANQUET HALL

270

0

0.03

0.03

0.03

0

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0.03

0

0.03

0.03

0.03

0

0.03

0.03

0.03

0

0.03

0.03

0.03

0.03

0.03

0.03

0.03

หมวดงำนผังบริเวณและภูมิทัศน์

180

182,378,725

3.21

0.1

0.13

0.13

0.13

0.1

0.13

0.1

0.13

0.1

0.13

0.13

0.13

0.1

1.SOFT SCAPE

60

45,594,681

0.80

2.HARD SCAPE

60

54,713,618

0.96

3.งำนต้นไม้ยืนต้น ไม้ประดับ

30

12,766,511

0.22

4.ลำนคอนกรีตและถนนคอนกรีต

45

31,004,383

0.55

5.งำนสระนำ้

30

16,414,085

0.29

6.รั้ว

60

21,885,447

0.39

หมวดงำนทดสอบเดินระบบ

40

63,832,554

1.ทดสอบระบบส่วน อำคำรจอดรถ

10

1,276,651

2.ทดสอบระบบส่วน PODIUM และ BANQUET HALL

10

21,064,743

3.ทดสอบระบบส่วน TOWER

10

M29

W3

W4

W1

W2

M30

W3

W4

W1

W2

M31

W3

W4

W1

W2

0.25

0.25

0.03

0.03

0.03

0.03

0.05

0.05

0.05

0.05

0.05

0.05

0.05

0.07

0.07

0.07

0.07

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.69

0.33

0.33

0.33

0.33

0.33

0.33

0.33

0.33

0.33

0.33

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

0.39

1.04

1.04

1.04

1.04

1.04

1.04

1.04

1.04

1.04

1.04

1

1.04

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.1

0.13

0.1

0.1

0.134

0.1

0.1

0.1

0.134

0.1

0.1

0.1

0.134

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.12

0.12 0.06

0.06

0.06

0.06

1.12

0.2

0.22

0.2

0.2

0.224

0.02

0.02

0.37

0.37

31,916,277

0.56

0.56 0.01

0

0

0.005

0

0.023

0

0

0

0.023

0.09

1.17

1,276,651

0.02

หมวดงำนเก็บกวำด ทำควำมสะอำด

45

7,720,535

0.14

หมวดงำนครุภณ ั ฑ์

120

145,902,980

2.57

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

##

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.09

0.69

0.69

##

0.09

0.09

0.13

##

0.13

0.14

##

0.14

0.12

##

0.12

0.09

##

0.09

0.69

0.69

0.69

0.69

0.69

0.69

0.13

0.13

0.13

0.13

0.13

0.13

0.13

0.14

0.14

0.14

0.14

0.14

0.12

0.12

0.12

0.33

0.33

0.33

0.33

0.33

0.33

0.09

0.09

0.09

0.09

0.09

0.09

0.39

0.39

0.12

0.1 0.1

0.07

0.07

W4

M33

M34

M35

M36

W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

M7

M8

M9

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

0.09

0.1

0.09

0.1

0.09

0.1

0.07

0.1

0.07

0.12

0.1

0.12

0.12

0.12

0.39

0.07

0.2 M1

M32 W3

0.25

0.69

J

ค่ำ FACTOR F 1.1788 (ไม่รวมครุภณ ั ฑ์)

W2

0.69

I

มูลค่ำรวม (ไม่รวมครุภณ ั ฑ์) + FACTIR F 1.1788

W1

0.69

66,167,091

416,343,000

W4

0.25

75

5,529,106,770

M28

W3

0.25

75

5,675,009,750

W2

0.25

250

มูลค่ำทุกหมวด

W1

0.25

1.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ ชั้น 4/หลังคำ

มูลค่ำ (ไม่รวมครุภณ ั ฑ์)

W4

0.25

1.งำนโครงสร้ำงเสำ/พืน้ /ช่องลิฟต์ ชั้น 1-3/หลังคำ

Francise Initial fee

M27

W3

0.25

งำนโครงสร้ำงเหนือดิน PODIUM

30

W2

0.25

3.งำนโครงสร้ำงเสำ/คำน/พืน้ /ช่องลิฟต์ ชั้น 7/หลังคำ

4.ทดสอบระบบส่วนอื่นๆ

W1

0.16

4.งำนโครงสร้ำงใต้ดินชั้น 1-2

3.งำนฐำนรำก/ตอหม้อ/คำนคอดิน

C2

0.23

0.16 M23

0.2

0.16

0.2

0.16 M24

0.07

0.16

0.07

0.16

0.2

0.16 M25

0.16

0.16

0.16

0.16 M26

0.16

0.16

M2

M3

M4

M5

M6

M27

M28

M29

M30

M31

1.81

1.52

1.20

1.24

1.41

1.37

2.39

2.45

3.94

4.30

4.12

4.09

4.29

4.39

4.16

4.08

4.01

4.08

4.12

4.07

4.32

4.67

4.20

4.96

5.49

5.10

3.79

1.05

0.92

0.40

3.89

5.40

6.60

7.84

9.26

10.62

13.01

15.45

19.40

23.69

27.81

31.90

36.19

40.58

44.74

48.82

52.82

56.90

61.02

65.09

69.41

74.08

78.28

83.24

88.73

93.83

97.63

98.68

99.60

100.00

M32

M33

M34

M35

M36

100

1,014,691,743 6,960,141,513 145,902,980

งำนครุภณ ั ฑ์ มูลค่ำงำนต่อเดือน (บำท) มูลค่ำรวมสุทธิ

7,106,044,493

มูลค่ำงำนต่อเดือน (ร้อยละ) มูลค่ำงำนสะสม (ร้อยละ)

2.08

TOTAL CONSTRUCTION PERIOD 2 Years 7 Months INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

203


06

PROJECT CONCLUSION ❖ ❖ ❖

EIA LEED CHECKLIST BIBLIOGRAPHY

204


06

PROJECT CONCLUSION

EIA ❖ SETBACK -

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

205


06

PROJECT CONCLUSION

EIA ❖ PLANTS LIST

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

206


06

PROJECT CONCLUSION

EIA ❖

GREEN AREA

-

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

207


06

PROJECT CONCLUSION

OTTV ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

208


06

PROJECT CONCLUSION

RTTV

WALL SECTION

Detail

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

209


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ CRITERIA

1.)

LEED BD+C

SUSTAINABLE SITES LOCATION AND TRANSPORTATION

26%

NEW CONSTRUCTION AND MAJOR RENOVENTION

2.)

ENERGY AND ATMOSPHERE

33%

TOTAL SCORE : 1 1 0

3.)

INDOOR ENVIRONMENT QUALITY

16%

4.)

WATER EFFICIENCY

11%

5.)

MATERIAL AND RESOURCES

13%

6.)

INNOVATION & REGIONAL PRIORITY

10%

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

210


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ SUSTAINABLE SITES

SS

( 22 ) 26

อ LAYOUT PLAN

RAINWATER MANAGEMENT REDUCED PARKING FOOTPRINT

0

0

Y N N

LIGHT POLLUTION REDUCTION

Y Y ACCESS TO QUALITY TRANSIT

N Y 0

BICYCLE FACILITIES , GREEN VEHECLES

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

Y Y Y Y Y Y Y

SUSTAINABLE SITES PREREQ CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT

0

CONSTRUCTION ACTIVITY POLLUTION PREVENTION SITE ASSESSMENT SITE DEVELOPMENT - PROTECT OR RESTORE HABITAT OPEN SPACE RAINWATER MANAGEMENT HEAT ISLAND REDUCTION LIGHT POLLUTION REDUCTION LOCATION AND TRANSPORTATION

CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT CREDIT

SENSITIVE LAND PROTECTION HIGH PRIORITY SITE SURROUNDING DENSITY AND DIVERSE USES ACCESS TO QUALITY TRANSIT BICYCLE FACILITIES REDUCED PARKING FOOTPRINT GREEN VEHICLES

7 REQUIRED

1 1 1 2 1 1

15 1 2 5 4 1 1 1 211


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ ENERGY AND ATMOSPHERE

E&A

GREEN POWER AND CARBON OFFSETS

( 20 ) 33

ATMOSPHERE

MINIMUM ENERGY PERFORMANCE

BUILDING-LEVEL ENERGY METERING

0 DEMAND RESPONSE BASELINE ENERGY EFFICIENCY

PEAK PERIOD

DEMAND LIMITING DEMAND SHEDDING

DEMAND

DEMAND SHIFTING

0 PREREQ

FUNDAMENTAL COMMISSIONING AND VERIFICATION

REQUIRED

Y

PREREQ

MINIMUM ENERGY PERFORMANCE

REQUIRED

Y

PREREQ

BUILDING-LEVEL ENERGY METERING

REQUIRED

Y

PREREQ

FUNDAMENTAL REFRIGERANT MANAGEMENT

REQUIRED

CREDIT

ENHANCED COMMISSIONING

6

CREDIT

OPTIMIZE ENERGY PERFORMANCE

16

CREDIT

ADVANCED ENERGY METERING

1

CREDIT

DEMAND RESPONSE

2

N

CREDIT

RENEWABLE ENERGY PRODUCTION

3

N

CREDIT

ENHANCED REFRIGERANT MANAGEMENT

1

CREDIT

GREEN POWER AND CARBON OFFSETS

2

BUILDING

Y N Y

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

33

Y

N

TIME OF THE DAY

ENERGY AND ATMOSPHERE

Y

212


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ WATER EFFICIENCY

E&A

COOLING TOWER USE

( 11 ) 13 COOLING TOWER

0

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

WATER EFFICIENCY

11

Y

PREREQ

OUTDOOR WATER USE REDUCTION

REQUIRED

Y

PREREQ

INDOOR WATER USE REDUCTION

REQUIRED

Y

PREREQ

BUILDING-LEVEL WATER METERING

REQUIRED

Y

CREDIT

OUTDOOR WATER USE REDUCTION

Y

CREDIT

INDOOR WATER USE REDUCTION

Y Y

CREDIT CREDIT

COOLING TOWER WATER USE WATER METERING

2 6 2 1 213


06

PROJECT CONCLUSION

LEED CHECKLIST ❖

INDOOR ENVIRONMENT QUALITY

EQ

ACOUSTIC PERFORMANCE

( 16 ) 16

THERMAL COMPORT LOW-EMITTING MATERIAL

REVERBERATION TIME REQUIRMENTS HOTEL 0.6

:

ROOM OR SUITE :

T60 < 0.8 ** T60 ( SEC )

HOTEL : STCc 55 STCc 50

REDUCE INDOOR TAMPERATURE

QUALITY VIEW

STCc 60

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

,

AT 500Hz

, 1000Hz

:

HOTEL ROOM :

: ,

:

COMOM HALLWAY :

RETAIL

:

** MINIMUM COMPOSIE SOUND TRANSMISSION CLASS RATING FOR ADJACENT SPACES **

0

N

BANQUET ROOM

SOUND ISOLATION

2000Hz **

: T60 <

0

INDOOR ENVIRONMENTAL QUALITY

16

Y

PREREQ MINIMUM INDOOR AIR QUALITY PERFORMANCE

REQUIRED

Y

PREREQ ENVIRONMENTAL TOBACCO SMOKE CONTROL

REQUIRED

Y

CREDIT

ENHANCED INDOOR AIR QUALITY STRATEGIES

2

Y

CREDIT

LOW-EMITTING MATERIALS

3

Y

CREDIT

CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PLAN

1

Y

CREDIT

INDOOR AIR QUALITY ASSESSMENT

2

Y

CREDIT

THERMAL COMFORT

1

Y

CREDIT

INTERIOR LIGHTING

Y

CREDIT

DAYLIGHT

Y

CREDIT

QUALITY VIEWS

2 3 1

Y

CREDIT

ACOUSTIC PERFORMANCE

1 214


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ MATERIAL AND RESOURCES

M&R

CONSTRUCTION : MATERIAL

( 11 ) ❖

13 ENVIRONMENTAL PRODUCT DECLARATIONS

SOURCING OF RAW MATERIAL

STORAGE AND COLLECTION OF RECYCLABLES + CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLANNING

0

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

0

MATERIALS AND RESOURCES

Y

PREREQ

Y

PREREQ

Y

CREDIT

Y

CREDIT

Y

CREDIT

Y

CREDIT

Y

CREDIT

STORAGE AND COLLECTION OF RECYCLABLES CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLANNING BUILDING LIFE-CYCLE IMPACT REDUCTION BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION ENVIRONMENTAL PRODUCT DECLARATIONS BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION SOURCING OF RAW MATERIALS BUILDING PRODUCT DISCLOSURE AND OPTIMIZATION MATERIAL INGREDIENTS CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

11 REQUIRED REQUIRED

3 2 2 2 2

215


06

PROJECT CONCLUSION

LEED CHECKLIST ❖ INNOVENTION

INN

TRANSPARENT FAÇADE CURTAIN WALL : 4 SIDES ( LOW-E )

(5) 6

SOLAR ENERGY

DESIGN PATTERN

LOW – E GLASS

INSEE SUPERBLOCK

LOW – E POTENTIAL

FRAME DETAILS TYPICAL MULLION

GREEN MATERIAL RECYCLE MATERIAL ZERO WASTE 0

0

Y

0

5

N

CREDIT INNOVATION CREDIT LEED ACCREDITED PROFESSIONAL

5 1

0

REGIONAL PRIORITY

4

N N N N INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

INNOVATION

TYPICAL TRANSOM

CREDIT CREDIT CREDIT CREDIT

REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT REGIONAL PRIORITY: SPECIFIC CREDIT

1 1 1 1 216


06

PROJECT CONCLUSION

LEED CHECKLIST

TOTALS

❖ TOTAL SCORE

PLATINUM CERTIFIED

CERTIFIED: 40 TO 49 POINTS

1.)

POSSIBLE POINTS : ,

SILVER: 50 TO 59 POINTS

SUSTAINABLE SITES LOCATION AND TRANSPORTATION

2.)

ENERGY AND ATMOSPHERE

3.)

INDOOR ENVIRONMENT QUALITY

4.)

WATER EFFICIENCY

TOTAL

( 83 ) 110

,

GOLD: 60 TO 79 POINTS

110 , PLATINUM: 80 TO 110

( 22 POINTS )

( 20 POINTS )

( 16 POINTS )

( 9 POINTS ) 5.)

MATERIAL AND RESOURCES

( 11 POINTS ) 6.)

INNOVATION & REGIONAL PRIORITY

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

( 5 POINTS )

217


06

PROJECT CONCLUSION

PROJECT CONCLUSION ❖ NAVA DE BANGKOK “ THRIVE ALONG THE RIVER ”

70% 30% TYPE

A TYPE

B TYPE

C TYPE

D

BUSINESSMAN

PODIUM

TOWER

PODIUM

GUEST ROOM ZONE 3

❖ ❖ ❖ ❖ ❖

RESTAURANT LOBBY LOUNGE SWIMMING POOL CAR PARKING

TOURIST GRAND BALLROOM

GRAND ROOM

❖ MEETING ROOM

❖ ❖ ❖ ❖

PRESIDENTAL SUITE JUNIOR SUITE SKY LOUNGE PRIVATE POOL

GUEST ROOM ZONE 2 ❖ ❖

EXECUTIVE SUITE GRAND ROOM

45 SQ.M.

JUNIOR SUITE 85 SQ.M.

EXECUTIVE SUITE

GUEST ROOM ZONE 1 ❖ ❖

EXECUTIVE SUITE GRAND ROOM

85 SQ.M.

PRESIDENTAL SUITE 260 SQ.M.

UNDERGROUND ❖

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

BASEMENT

218


06

PROJECT CONCLUSION

BIBLIOGRAPHY ❖ REFERENCES

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

219


NAVA DE BANGKOK -

05 08 11 17 21 26 28 57

INTEGRATE BUILDING TECHNOLOGY AND ARCHITECTURAL DESIGN – FINAL PRESENTATION

K L O N G

S A N

-


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.