CONSTRUCTION MANAGEMENT & COST CONTROL-TALITON

Page 1

CONSTRUCTION MANAGEMENT & COST CONTROL

CONSTRUCTION MANAGEMENT AND COST CONTROL – FINAL PRESENTATION


PREFACE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


CONTENT

01 FIRM VISION

06 FIELDWORK MANAGEMENT

02 PROJECT INFORMATION

07 PROGRESS TRACKING PLAN

03 COST ESTIMATE

08 QUALITY ASSURANCE PLAN

04 COST CONCLUSION

09 AAAAAAAAAAAAAAA

05 METHODOLOGY

10 APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 FIRM VISION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

ABOUT US


01

ABOUT US

FIRM VISION

DR.CHAVALIT TEERAPITTAYATRAKUL

DR.NUTIDA KOSAIYAKANONT

DR.CHAIYASIT JAIKLA

DR.GANSIREE WUNTHEERADACH

DR.THIDANUT HOMYAMYEN

DR.THANAPORN KORSAWATPAT

DR. WARALUK IMMANEE

DR.TERAPONG BUNMA

TALITON FOUNDED BY DR. CHAVALIT THEERAPITHAYATHATKUL IN 2010 - HAS BEEN RECOGNIZED WORLDWIDE FOR ITS COMBINATION OF ENVIRONMENT AND SOCIAL PRINCIPLES AT EVERY STAGE OF DESIGN. WE HAVE DESIGNED INNOVATIVE PROJECTS THAT ARE DIVERSE, MODERN, STANDARDIZED AND WITH SAFETY IN MIND. AND WITH OVER 10 YEARS OF WORK EXPERIENCE, WE ARE THE LEADER IN THE CONSTRUCTION THAT HAS BEEN SATISFIED BY CUSTOMERS AND OUR WORK IS WIDELY ACCEPTED.

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 01-1

02 PROJECT INFORMATION

01-2

PROJECT BACKGROUND OBJECTIVE GENERAL INFORMATION

01-3

SITE LOCATION

01-4

FUNCTION / ZONING

02 PROCESS 03 BILL OF QUETITIES 04 MATERIAL CLASSIFICATION 05 GREEN CONSTRUCTION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 PROJECT BACKGROUND

02

PROJECT INFORMATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 PROJECT BACKGROUND

02

PROJECT INFORMATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 PROJECT BACKGROUND

02

PROJECT INFORMATION

SITE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 PROJECT BACKGROUND

02

PROJECT INFORMATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

01 PROJECT BACKGROUND

PROJECT INFORMATION

( FUNCTIONAL )

1

ST

FLOOR PLAN

2 ND FLOOR PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

01 PROJECT BACKGROUND

PROJECT INFORMATION

( FUNCTIONAL )

3 RD FLOOR PLAN

4 TH FLOOR PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

01 PROJECT BACKGROUND

PROJECT INFORMATION

( FUNCTIONAL )

5 TH FLOOR PLAN

6 TH FLOOR PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

01 PROJECT BACKGROUND

PROJECT INFORMATION

( FUNCTIONAL )

SLAB FLOOR PLAN

ROOF FLOOR PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

01 PROJECT BACKGROUND

PROJECT INFORMATION

( FUNCTIONAL )

1 ST FLOOR PLAN

TOTAL AREA 10,451 SQM.

2 ND FLOOR PLAN

3 RD FLOOR PLAN

4 TH FLOOR PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

1,850 SQM.

5 TH FLOOR PLAN

1,633 SQM.

1,550 SQM.

6 TH FLOOR PLAN

1,405 SQM.

SLAB

1,672 SQM.

FLOOR PLAN

710 SQM.

ROOF

1,547 SQM.

FLOOR PLAN

84 SQM.


02

02 PROCESS

PROJECT INFORMATION

1 2 3 4 5 6 7

8

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

03 BILL OF QUETITIES

PROJECT INFORMATION

BILL OF QUETITIES

DIRECT COST

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

INDIRECT COST


02

04 MATERIAL CLASSIFICATION

PROJECT INFORMATION

MATERIAL CLASSIFICATION

STRUCTURE

ARCHITECTURE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SYSTEM


02

05 GREEN CONSTRUCTION

PROJECT INFORMATION

GREEN CONSTRUCTURE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02

05 GREEN CONSTRUCTION

PROJECT INFORMATION

REDUCE REUSE RECYCLE DISPOSAL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01

03 COST ESTIMATE

STRUCTURAL PART

02 ARCHITECTURAL PART 03 SANITARY SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING PART

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

F4

F5

F6

F8

F9

MF1

MF2

MF3

MF4 0

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

F4

F5

F6


03

01 STRUCTURAL PART

COST ESTIMATE

F8

F9

MF1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

MF2

MF3

MF4


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

F4

F5

F6


03

01 STRUCTURAL PART

COST ESTIMATE

F8

F9

MF1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

MF2

MF3

MF4


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

F4

F5

F6


03

01 STRUCTURAL PART

COST ESTIMATE

F8

F9

MF1

MF2

0.04 + 0.04 + 0.14 + .014 + 1.76 + 54.91 + 2.29 + 4.58

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

MF3

MF4


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

F4

F5

F6


03

01 STRUCTURAL PART

COST ESTIMATE

F8

F9

MF1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

MF2

MF3

MF4


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

❖ ❖

F1 F2 F4 F5

F6 F8 F9 MF1 MF2 MF3 MF4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

F1A

F1

F2

F4

F5

F6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

F8

F9

MF1

MF2

MF3

MF4

DB12

DB16

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

DB20

DB25


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

C1A

C1

C4

C5

C1B

C6

C1B

C8

C2

C9

C2 C10

C2A

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

CX1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C1

C4

C5

C1B

C6

C1B

C8

C2

C9

C2 C10

C2A

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

CX1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C1

C1B

C1B

C2

C2

C4

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C4

C9

C1

C5

C10

C1B

C6

CX1

C2

C8 C1A C1 C1B C2 C4 C5 C6 C8 C9 C10 CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C1B

C4

C1

C2

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C4

C9

C1

C5

C10

C1B

C6

CX1

C2

C8 C1A C1 C1B C2 C4 C5 C6 C8 C9 C10 CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C1A

C1B

C4

C1

C2

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C9

C5

C10

C6

CX1

C8

C4 C5 C6 C8 C9 C10 CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C9

C5

C10

C6

CX1

C8

C4 C5 C6 C8 C9 C10 CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C9

C5

C10

C6

CX1

C8

C4 C5 C6 C8 C9 C10 CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C4

C5

C6

C8

C9

C10

CX1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ C5 C6 C8

C5 C6 C8

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

C5

C6

C8

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

C5

C5

C6

C8

C6

C6

C8

C9

C8

C9

C9

C9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

C5

C8

C6

C9

C6

C6

C8

C8

C9

C9

C8

C9


03

01 STRUCTURAL PART

COST ESTIMATE

C5

C8

C5

C6

C6

C9

C6

C8

C9

C9

C8

C9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

GB1

GB3

GB2

GB4

GB5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

B1

B3

B5

B2

B4

B6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B7 0

4

8

16


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

GB1

GB5

B4

GB2

B1

B5

GB3

B2

B6

GB4

B3

B7


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

GB1

GB5

B4

GB2

B1

B5

GB3

B2

B6

GB4

B3

B7


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

S1

S3

GS1 S1

S2

S4

GS2 S2

S3

S4

GS1

GS1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

S1

S2

S3

S4

GS1

GS2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

PTS1

SW3

PTS2

PTS4

PB1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

PTS1

PTS3

S6

PTS2

S1

PB1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

PTS1

S1

PTS2

S6

PTS3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

PTS1

PTS3

PTS2

S1

PB1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

PTS1 PTS2 PTS3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

S1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

PTS1

PTS3

S6

PTS2

S1

PB1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

PTS1

S1

PTS2

S6

PTS3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

PTS1

PTS3

PTS2

PB1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

PTS1 PTS2 PTS3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ ❖ ❖ ❖

S1

S6

RS6

S5

RS1

PTA

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

Ø

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

01

01-6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6


03

01 STRUCTURAL PART

COST ESTIMATE

SC1

SC2 SB4 SB4 R1 R2 R3 P1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

SC1

S1

SC2

S2

SB1

S3

SB2

S4

SB3

S5

SB4

S6

SB5

SC1

R1

SC1

R2

SC1

R3

SC1

R4

SC1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

SB1 SB2 SB4 SB5 R1 R2 R4 P1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

SC1

S1

SC2

S2

SB1

S3

SB2

S4

SB3

S5

SB4

S6

SB5

SC1

R1

SC1

R2

SC1

R3

SC1

R4

SC1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

S5

Ø

S5.1

Ø

S6

Ø

S6.1

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

จำนวน (รอยต่อ/ชุด)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

01 STRUCTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


02 ARCHITECTURAL PART

03

COST ESTIMATE

C1 C2 C3 C4/C5

C1 C2 C3 C4/C5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

C1 C2 C3 C4/C5

C1 C2 C3 C4/C5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

C1 C2 C3 C4/C5

C1 C2 C3 C4/C5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

C1 C2 C3 C4/C5

C1 C2 C3 C4/C5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

232.71

145.36 4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

A5

A4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

B2

B3


03

02 ARCHITECTURAL PART

COST ESTIMATE

C2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

A1

B1


03

02 ARCHITECTURAL PART

COST ESTIMATE

A3 C3

C1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

A2


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


03

02 ARCHITECTURAL PART

COST ESTIMATE

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

F1

F8

F2

F9

F3

F10

F4

F11

F5

F12

F6

F13

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY )

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


03

02 ARCHITECTURAL PART

COST ESTIMATE

00 00

00 00

00 00

00

00 CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

00


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • • • • • • •

• • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • • • • •

• • • • • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • • • • •

• • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • •

• • • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-7

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • •

• • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

❖ BILL OF QUANTITY

)

• • • •

• • • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-8

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

02 ARCHITECTURAL PART

COST ESTIMATE

02 ARCHITECTURAL

02-9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9

PART


02 ARCHITECTURAL PART

03

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

03

COST ESTIMATE

❖ BILL OF QUANTITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 AIR CONDITIONING PART

COST ESTIMATE

03-1

03 SANITARY SYSTEM PART 03-1 03-2 03-3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 SANITARY SYSTEM PART

MEDTHODOLOGY

Water Pump 1 Flow rate 25 gpm Head 40 m. Water Pump 2 Flow rate 40 gpm Head 15 m.

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Fountain Water Pump Flow rate 100 gpm Head 10 m.

Water Tank Quality 25 m3 3 set at the roof top


03

03 SANITARY SYSTEM PART

MEDTHODOLOGY

Sanitary System Booster Pump Water Pump Fountain Water Pump Water Meter Dia.40 Modulating Float Valve Dia.40 Level Switch

2 2 1 1 1 1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

ชุด ชุด ชุด ชุด ชุด ชุด

72,600 8,878 18,700 22,375 49,000 600

145,200 17,756 18,700 22,375 49,000 600

1,500 1,500 1,500 -

3,000 3,000 1,500 -

148,200 20,756 20,200 22,375 49,000 600


03 SANITARY SYSTEM PART

03

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

Wasted Water Treatment Tank Manholes 600*600

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 SANITARY SYSTEM PART

COST ESTIMATE

PVC Class 8.5 -Dia.50mm -Dia.65mm -Dia.80mm -Dia.100mm -Dia.150mm -Dia.200mm

331.95 240.2161 298.8 203.29 94.05 9.72

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

83 61 75 51 24 3

155 245 340 550 1,165 1,875

12865 14945 25500 28050 27960 5625


03

03 SANITARY SYSTEM PART

COST ESTIMATE

Wasted Water Treatment Tank

2

Manholes 600*600

21

Water Meter Dia.40

1

บ่อดักขยะ

2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 SANITARY SYSTEM PART

COST ESTIMATE

Wastewater Treatment Tank - 10cu.m/day - 15cu.m/day

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Aeration Pump - 200L/min - 120L/min

Water Meter Dia.40


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 SANITARY SYSTEM PART

COST ESTIMATE

FIRE DEPARTMENT CONNECTOR 65X65X100

FIRE HOSE CABINET + PORTABLE FIRE EXTINGUISHER 15 LB. Black Steel Pipe Dia.100

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

03 SANITARY SYSTEM PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

BOQ


03

03 SANITARY SYSTEM PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

BOQ


03

03 SANITARY SYSTEM PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

BOQ


03

03 SANITARY SYSTEM PART

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

BOQ


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

03

COST ESTIMATE

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

04-1

04

ELECTRICAL SYSTEM PART 04-1 04-2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ EQUIPMENT

On-pole Dropout fuse

Lightning arrester

Concrete pole (MEA standard)

H-Platform electrical HV Cable

Oil Type Hermetically Sealed Transformer 1000 kVA

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Spacer supporting


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ CALCULATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ BILL OF QUALITY

4.1 4.1.1 4.1.2

งำนภำยนอกอำคำร Medium Voltage Incoming Section Transformer Section รวมงานของ 4.1

122.2 2 124.2

รวม รวม รวม

รำยกำร

จำนวน

หน่ วย

2

เฉพาะวัสดุ เฉพาะวัสดุ

88468 206760 292174

เฉพาะงาน เฉพาะงาน

รำคำวัสดุ จำนวนเงิ น

รำคำหน่ วยละ

จำนวนเงิ น

ชุด

7600

15200

30% ของค่าวัสดุ

4560

19760

2

ชุด

8160

1630

30% ของค่าวัสดุ

4896

21216

6

ชุด

4542

27252

900

5400

32652

111.2

เมตร

183

20386

55

6116

26502

1

เหมา

24000

24000

30% ของค่าวัสดุ

7200

31200

122.2

รวม

Oil Type Hermetically Sealed Transformer 1000 kVA.

1

ชุด

205000

205000

H-Platform with accessaried

1

ชุด

1760

1760

2

ชุด

Medium Voltage Incoming Section

4.1.1.1

On-pole Dropout fuse 24kV, 30A Lightning arrester 30kV, 5kA Concrete pole (MEA standard) 12m. High w/ accessories

4.1.1.4

HV Cable 50 Sq.mm. SAC-36 kV. Spacer supporting รวมงานของ 4.1.1

4.1.2

ค่ำแรงงำน

รำคำหน่ วยละ

4.1.1

4.1.1.3

131330 267888 399218

รวมค่ำวัสดุ และ ค่ำแรงงำน

ลำดับที่

4.1.1.2

28172 62028 90200

88468

28172

131330

30% ของค่าวัสดุ

61500

266500

30% ของค่าวัสดุ

528

2288

62028

268788

Transformer Section

รวมงานของ 4.1.2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

206760

หมำยเหตุ


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ MDB-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ MDB-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ CAP-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ CAP-1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-2

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-5

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-LIFT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-LIFT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-SR

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ SDB-SR

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LOAD PANEL & NON-FUSE SAFETY SWITCH

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LOAD PANEL & NON-FUSE SAFETY SWITCH

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LOAD PANEL & NON-FUSE SAFETY SWITCH

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LOAD PANEL & NON-FUSE SAFETY SWITCH

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ LV FEEDER

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ BILL OF QUALITY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Lighting


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ BILL OF QUALITY

TOTAL 2,645,504.40 บาท

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Lighting


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE ❖ Receptacle & Disconnecting switch (Safety switch) System

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

Ф1/4“ Ф /4"

Ф1/4“ Ф1/4" Ф /4"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

Ф1/4" Ф /4"

Ф1/4" Ф /4" CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

Ф1/4" Ф /4"

Ф1/4" Ф /4"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

Ф1/4" Ф /4"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

Ф1“ Ф1 “

Ф1/4“

Ф1/ " Ф1/ "

Ф1/ "

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ BILL OF QUALITY

Ф1/4" Ф1/2" Ф1/4" Ф3/4"

TOTAL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

2,154,585.66

Branch Circuit System


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ TELEPHONE AND COMPUTER CABLING

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SYSTEM


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

FD

Ф1/2“

Ф1/2“

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

Ф1/2“

Ф1/2“

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

Ф1/2“

Ф1/2“

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ BILL OF QUALITY

Ф1/2" Ф3/4"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

Telephone & Computer Cabling Sys


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ Riser Diagram

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ Plan 1-4

41

30

7

8

8

30

13

8

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ Plan 3-roof

25 4

30

3

8

-

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ Fire Alarm System

˚ ˚

Ф1/2"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ CCTV System

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

04

COST ESTIMATE

❖ EMERGENCY LIGHTING & FIRE ALARM SYSTEM

Ф1/2"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ Public Address System

Ф½

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ Public Address System

Ф1/2"

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ EQUIPMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

❖ CALCULATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04 ELECTRICAL SYSTEM PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03

04 ELECTRICAL SYSTEM PART

FIRM VISION

❖ GROUNDING & LIGHTNING PROTECTION

แปลนพืน้ ชัน้ 3

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SYSTEM


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ GROUNDING & LIGHTNING PROTECTION

แปลนพืน้ ชัน้ หลังคา

แปลนพืน้ ชัน้ SLAB หลังคา

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SYSTEM


03

04 ELECTRICAL SYSTEM PART

COST ESTIMATE

❖ GROUNDING & LIGHTNING PROTECTION

ลำดับที่

รำยกำร

4.2.9

Grounding & Lightning Protection System

รำคำวัสดุ

ค่ำแรงงำน

SYSTEM

รวมค่ำวัสดุ และ ค่ำแรงงำน

จำนวน

หน่ วย

369.8

m

117

43266.6

0

43266.6

Exothermic Welding

2

lot

290

580

0

580

Bare Copper 95 Sq.mm.

7.5

m

451

3382.5

55

412.5

3795

Bare Copper 70 Sq.mm.

700.2

m

327

228965.4

45

31509

260474.4

Bare Copper 50 Sq.mm.

47

m

229

10763

40

1880

12643

Bare Copper 25 Sq.mm.

20

m

120

2400

25

500

2900

m

9.5

0

20

0

0

Aluminum tape 25x4mm.

PVC Dia 1" Ground Test Box

28

set

2,500

70000

150

4200

74200

Air Terminal Ø16x600mm.

4

set

1,500

6000

50

200

6200

Air Terminal Ø16x300mm.

18

set

800

14400

50

900

15300

Copper Clad Steel Ground Rod Dia 16x2400mm.

18

set

1,780

32040

0

32040

Copper ground busbar 300x100x6mm. With isulator support

3

set

2,550

7650

0

7650

Accessories & Supporting ( etc .Aluminium Square Tape 25x4 MM.)

1

lot

24,000

24000

0

24000

443,447.5

39,601.5

483,049

รวมงานของ 4.2.9

TOTAL 4 8 3 , 0 4 9 บาท CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

หมำยเหตุ

2.5% ของค่าวัสดุ และค่าแรงงาน


03

05 AIR CONDITIONING PART

COST ESTIMATE

05 AIR CONDITIONING PART

05-1

05-1 05-2

05-3 05-4 05-5 05-6

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

AIR CONDITIONING SYSTEM

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ CONSTRUCTION DETAIL

CONSTRUCTION DETAIL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ CONSTRUCTION DETAIL

CONSTRUCTION DETAIL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ CONSTRUCTION DETAIL

CONSTRUCTION DETAIL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE VRV

❖ AIR CONDITIONING SYSTEM BOQ

AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 AIR CONDITIONING PART

03

COST ESTIMATE

❖ AIR CONDITIONING SYSTEM BOQ

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01

04 COST CONCLUSION

STRUCTURAL PART

02 ARCHITECTURAL PART 03 SANITATION SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING AND VENTILATION SYSTEMS PART

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04

01 STRUCTURAL PART

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04

01 STRUCTURAL PART

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04

01 STRUCTURAL PART

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


04

01 STRUCTURAL PART

COST CONCLUSION

❖ BILL OF QUANTITIES

Ø

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

04

COST CONCLUSION

❖ BILL OF QUANTITIES

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 MEDTHODOLOGY

01 BILL OF QUETITIES ( BOQ ) 02 03 04

05 06 S-CURVE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

BILL OF QUETITIES ( BOQ )

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

BILL OF QUETITIES ( BOQ )

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

05

MEDTHODOLOGY

MEDTHODOLOGY

STRUCTURE

ARCHITECTURE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SYSTEM


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05

MEDTHODOLOGY

05

MEDTHODOLOGY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01

06 FIELDWORK MANAGEMENT

CONSTRUCTION SAFETY

02 PERSONNEL 03 CONSTRUCTION AREA SIGN 04 CONSTRUCTION TOOL 05 FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 CONSTRUCTION SAFETY

06

FIELDWORK MANAGEMENT

WORK AREAS

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 CONSTRUCTION SAFETY

06

FIELDWORK MANAGEMENT

FIELD MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

02 PERSONNEL

FIELDWORK MANAGEMENT

• • • •

• • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

03 CONSTRUCTION AREA SIGN

FIELDWORK MANAGEMENT

PROJECT SIGN คณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฏสงขลา อาคารปฏิบัติการ เลขที่ 160 หมู่ที่ 4 ถนนกาญจนวนิช ตาบลเขารูปช้าง อาเภอเมือง จังหวัดสงขลา

• • • • • • • • • • • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

โครงการ ผู้รับจ้าง สัญญาจ้าง ระยะเวลา

: อาคารปฏิบัติการ คณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฏสงขลา : บริษัท ตะลีโตน คอนสตรัคชัน จากัด โทร 0๒-๗00-๙00 : เลขที่ xxx/๒๕๖๓ ลงวันที่ xx มกราคม ๒๕๖๕ : เริ่มต้น พฤศจิกายนพ.ศ. ๒๕๖๓ สิน้ สุด กุมภาพันธ์ พ.ศ. ๒๕๖๕ วงเงินค่าก่อสร้าง : ๑๔๗,ooo,ooo บาท (ร้อยสีส่ ิบเจ็ดล้านบาท) เจ้าหน้าที/่ วิศวกรผู้รับจ้าง : นายชัยสิทธิ์ ใจกล้า นายธีรพงศ์ บุญมา


06

04 CONSTRUCTION TOOL

FIELDWORK MANAGEMENT

MECHANICAL PLAN

• • • •

• • • •

• • •

o o o o o o

o o o o o o o o o o

o o o o o o

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

04 CONSTRUCTION TOOL

FIELDWORK MANAGEMENT

MECHANICAL PLAN

• •

• •

• • • • • •

o o o

o o o

o o o o o

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

• • • •

o o o o o


06

05 CONSTRUCTION TOOL

FIELDWORK MANAGEMENT

LAND LEVELING TRACTOR&BACKHOE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

SURVEYOR CAMERA


05 CONSTRUCTION TOOL

06

FIELDWORK MANAGEMENT

HARDSCAPE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

05 CONSTRUCTION TOOL

FIELDWORK MANAGEMENT

FOUNDATION

1

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

2

3

4


05 CONSTRUCTION TOOL

06

FIELDWORK MANAGEMENT

TRANSPORTATION

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

05 CONSTRUCTION TOOL

FIELDWORK MANAGEMENT

CORE OF BUILDING CONCRETE PUMP

1

SLIP FORM

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

2

3

4


05 CONSTRUCTION TOOL

06

FIELDWORK MANAGEMENT

MISCELLANEOUS WORK

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


06

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

1

16 8

7 12

18 13

17

14

3

4

5

10 6

20

19

19 15

11

1

2

2

9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


05

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

1

16 8

7 12

18 13

17 21 14

3

4

5

10 6

20

19

19 15

11

1

2

2

9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

1

16

22 8

7 12

18 13

17 21 14

3

4

5

10 6

20

19

19 15

11

1

2

2

9

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

136

221

SQ.M.

1ST FLOOR PLAN

2ND FLOOR PLAN

SQ.M.

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

• • •

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2

• • •

• • •


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06

06 FIELDWORK MANAGEMENT

FIELDWORK MANAGEMENT

MORNING TALK

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2

5


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

1 2 3 4

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


06 FIELDWORK MANAGEMENT

06

FIELDWORK MANAGEMENT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2


01

07 PROGRESS TRACKING PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

PROGRESS TRACKING REPORT

02 EXAMPLE OF PROGRESS TRACKING REPORT


07

01 PROGRESS TRACKING REPORT

PROGRESS TRACKING PLAN

01

02

DAILY REPORT

WEEKLY REPORT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

03 MONTHLY REPORT

04 PAYMENT REPORT


02 EXAMPLE OF PROGRESS TRACKING REPORT

07

PROGRESS TRACKING PLAN

DAILY REPORT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

WEEKLY REPORT


01

08 QUALITY ASSURANCE PLAN

STRUCTURAL PART

02 ARCHITECTURAL PART 03 ARCHITECTURAL PART 04 ARCHITECTURAL PART 05 ARCHITECTURAL PART

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


QUALITY ASSURANCE PLAN

08

QUALITY ASSURANCE PLAN

ISO – 9000

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


QUALITY ASSURANCE PLAN

08

QUALITY ASSURANCE PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


QUALITY ASSURANCE PLAN

08

QUALITY ASSURANCE PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


QUALITY ASSURANCE PLAN

08

QUALITY ASSURANCE PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


QUALITY ASSURANCE PLAN

08

QUALITY ASSURANCE PLAN

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


09 PROJECT SUMMARY

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

01

SUMMARY OF CONTENT AND REFERENCES


01 SUMMARY OF CONTENT AND REFERENCES

09

PROJECT SUMMARY

❖ CIRCLE CHART

14.22%

28.12%

.

57.66%

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01 SUMMARY OF CONTENT AND REFERENCES

09

PROJECT SUMMARY

❖ CIRCLE CHART

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


01

10 APPENDIX

STRUCTURAL PART

02 ARCHITECTURAL PART 03 SANITARY SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING PART

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

01 STRUCTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


02 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

❖ BACK UP SHEET


10

02 ARCHITECTURAL PART

APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

❖ BACK UP SHEET


10

02 ARCHITECTURAL PART

APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

❖ BACK UP SHEET


10

02 ARCHITECTURAL PART

APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

❖ BACK UP SHEET


10

02 ARCHITECTURAL PART

APPENDIX

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

❖ BACK UP SHEET


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


10

02 ARCHITECTURAL PART

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


03 SANITARY SYSTEM PART

10

APPENDIX

❖ Backup Sheet

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - VRV SYSTEM SCHEDULE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - EXHAUST FAN SCHEDULE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - EXHAUST FAN SCHEDULE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET -EXHAUST FAN SCHEDUL

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - EXHAUST FAN SCHEDULE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET - EXHAUST FAN SCHEDULE

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


05 ARCHITECTURAL PART

10

APPENDIX

❖ BACK UP SHEET

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1


MEMBER

NUTIDA K.

CHAVALIT T.

CHAIYASIT J. 59020011

59020017

THIDANAT H.

GANSIREE W.

THANAPORN K.

59020008

59020026

59020005

CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1

59020021

WARALUK I. 59020057

TERAPONG B. 59020028