CONSTRUCTION MANAGEMENT & COST CONTROL
CONSTRUCTION MANAGEMENT AND COST CONTROL – FINAL PRESENTATION
PREFACE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
CONTENT
01 FIRM VISION
06 FIELDWORK MANAGEMENT
02 PROJECT INFORMATION
07 PROGRESS TRACKING PLAN
03 COST ESTIMATE
08 QUALITY ASSURANCE PLAN
04 COST CONCLUSION
09 AAAAAAAAAAAAAAA
05 METHODOLOGY
10 APPENDIX
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 FIRM VISION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
ABOUT US
01
ABOUT US
FIRM VISION
DR.CHAVALIT TEERAPITTAYATRAKUL
DR.NUTIDA KOSAIYAKANONT
DR.CHAIYASIT JAIKLA
DR.GANSIREE WUNTHEERADACH
DR.THIDANUT HOMYAMYEN
DR.THANAPORN KORSAWATPAT
DR. WARALUK IMMANEE
DR.TERAPONG BUNMA
TALITON FOUNDED BY DR. CHAVALIT THEERAPITHAYATHATKUL IN 2010 - HAS BEEN RECOGNIZED WORLDWIDE FOR ITS COMBINATION OF ENVIRONMENT AND SOCIAL PRINCIPLES AT EVERY STAGE OF DESIGN. WE HAVE DESIGNED INNOVATIVE PROJECTS THAT ARE DIVERSE, MODERN, STANDARDIZED AND WITH SAFETY IN MIND. AND WITH OVER 10 YEARS OF WORK EXPERIENCE, WE ARE THE LEADER IN THE CONSTRUCTION THAT HAS BEEN SATISFIED BY CUSTOMERS AND OUR WORK IS WIDELY ACCEPTED.
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 01-1
02 PROJECT INFORMATION
01-2
PROJECT BACKGROUND OBJECTIVE GENERAL INFORMATION
01-3
SITE LOCATION
01-4
FUNCTION / ZONING
02 PROCESS 03 BILL OF QUETITIES 04 MATERIAL CLASSIFICATION 05 GREEN CONSTRUCTION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 PROJECT BACKGROUND
02
PROJECT INFORMATION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 PROJECT BACKGROUND
02
PROJECT INFORMATION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 PROJECT BACKGROUND
02
PROJECT INFORMATION
❖
SITE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 PROJECT BACKGROUND
02
PROJECT INFORMATION
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
01 PROJECT BACKGROUND
PROJECT INFORMATION
( FUNCTIONAL )
1
ST
FLOOR PLAN
2 ND FLOOR PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
01 PROJECT BACKGROUND
PROJECT INFORMATION
( FUNCTIONAL )
3 RD FLOOR PLAN
4 TH FLOOR PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
01 PROJECT BACKGROUND
PROJECT INFORMATION
( FUNCTIONAL )
5 TH FLOOR PLAN
6 TH FLOOR PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
01 PROJECT BACKGROUND
PROJECT INFORMATION
( FUNCTIONAL )
SLAB FLOOR PLAN
ROOF FLOOR PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
01 PROJECT BACKGROUND
PROJECT INFORMATION
( FUNCTIONAL )
1 ST FLOOR PLAN
TOTAL AREA 10,451 SQM.
2 ND FLOOR PLAN
3 RD FLOOR PLAN
4 TH FLOOR PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
1,850 SQM.
5 TH FLOOR PLAN
1,633 SQM.
1,550 SQM.
6 TH FLOOR PLAN
1,405 SQM.
SLAB
1,672 SQM.
FLOOR PLAN
710 SQM.
ROOF
1,547 SQM.
FLOOR PLAN
84 SQM.
02
02 PROCESS
PROJECT INFORMATION
1 2 3 4 5 6 7
8
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
03 BILL OF QUETITIES
PROJECT INFORMATION
BILL OF QUETITIES
DIRECT COST
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
INDIRECT COST
02
04 MATERIAL CLASSIFICATION
PROJECT INFORMATION
MATERIAL CLASSIFICATION
STRUCTURE
ARCHITECTURE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SYSTEM
02
05 GREEN CONSTRUCTION
PROJECT INFORMATION
GREEN CONSTRUCTURE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02
05 GREEN CONSTRUCTION
PROJECT INFORMATION
REDUCE REUSE RECYCLE DISPOSAL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01
03 COST ESTIMATE
STRUCTURAL PART
02 ARCHITECTURAL PART 03 SANITARY SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING PART
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
F4
F5
F6
F8
F9
MF1
MF2
MF3
MF4 0
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
F4
F5
F6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F8
F9
MF1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
MF2
MF3
MF4
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
F4
F5
F6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F8
F9
MF1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
MF2
MF3
MF4
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
F4
F5
F6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F8
F9
MF1
MF2
0.04 + 0.04 + 0.14 + .014 + 1.76 + 54.91 + 2.29 + 4.58
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
MF3
MF4
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
F4
F5
F6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F8
F9
MF1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
MF2
MF3
MF4
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
❖ ❖
F1 F2 F4 F5
F6 F8 F9 MF1 MF2 MF3 MF4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F1A
F1
F2
F4
F5
F6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
F8
F9
MF1
MF2
MF3
MF4
DB12
DB16
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
DB20
DB25
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
C1A
C1
C4
C5
C1B
C6
C1B
C8
C2
C9
C2 C10
C2A
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
CX1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C1
C4
C5
C1B
C6
C1B
C8
C2
C9
C2 C10
C2A
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
CX1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C1
C1B
C1B
C2
C2
C4
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C4
C9
C1
C5
C10
C1B
C6
CX1
C2
C8 C1A C1 C1B C2 C4 C5 C6 C8 C9 C10 CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C1B
C4
C1
C2
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C4
C9
C1
C5
C10
C1B
C6
CX1
C2
C8 C1A C1 C1B C2 C4 C5 C6 C8 C9 C10 CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C1A
C1B
C4
C1
C2
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C9
C5
C10
C6
CX1
C8
C4 C5 C6 C8 C9 C10 CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C9
C5
C10
C6
CX1
C8
C4 C5 C6 C8 C9 C10 CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C9
C5
C10
C6
CX1
C8
C4 C5 C6 C8 C9 C10 CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C4
C5
C6
C8
C9
C10
CX1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ C5 C6 C8
C5 C6 C8
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
C5
C6
C8
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
C5
C5
C6
C8
C6
C6
C8
C9
C8
C9
C9
C9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
C5
C8
C6
C9
C6
C6
C8
C8
C9
C9
C8
C9
03
01 STRUCTURAL PART
COST ESTIMATE
❖
C5
C8
C5
C6
C6
C9
C6
C8
C9
C9
C8
C9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
GB1
GB3
GB2
GB4
GB5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
B1
B3
B5
B2
B4
B6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B7 0
4
8
16
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
GB1
GB5
B4
GB2
B1
B5
GB3
B2
B6
GB4
B3
B7
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
GB1
GB5
B4
GB2
B1
B5
GB3
B2
B6
GB4
B3
B7
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
S1
S3
GS1 S1
S2
S4
GS2 S2
S3
S4
GS1
GS1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
S1
S2
S3
S4
GS1
GS2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
PTS1
SW3
PTS2
PTS4
PB1
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
PTS1
PTS3
S6
PTS2
S1
PB1
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
PTS1
S1
PTS2
S6
PTS3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
PTS1
PTS3
PTS2
S1
PB1
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
PTS1 PTS2 PTS3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
S1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
PTS1
PTS3
S6
PTS2
S1
PB1
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
PTS1
S1
PTS2
S6
PTS3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
PTS1
PTS3
PTS2
PB1
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
PTS1 PTS2 PTS3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ ❖ ❖ ❖
❖
S1
S6
RS6
S5
RS1
PTA
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
Ø
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
01
01-6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
STRUCTURAL PART 01-1 01-2 01-3 01-4 01-5 01-6
03
01 STRUCTURAL PART
COST ESTIMATE
❖
SC1
SC2 SB4 SB4 R1 R2 R3 P1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
SC1
S1
SC2
S2
SB1
S3
SB2
S4
SB3
S5
SB4
S6
SB5
SC1
R1
SC1
R2
SC1
R3
SC1
R4
SC1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
SB1 SB2 SB4 SB5 R1 R2 R4 P1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
SC1
S1
SC2
S2
SB1
S3
SB2
S4
SB3
S5
SB4
S6
SB5
SC1
R1
SC1
R2
SC1
R3
SC1
R4
SC1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
S5
Ø
S5.1
Ø
S6
Ø
S6.1
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖
จำนวน (รอยต่อ/ชุด)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
01 STRUCTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
C1 C2 C3 C4/C5
C1 C2 C3 C4/C5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
C1 C2 C3 C4/C5
C1 C2 C3 C4/C5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
C1 C2 C3 C4/C5
C1 C2 C3 C4/C5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
C1 C2 C3 C4/C5
C1 C2 C3 C4/C5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
232.71
145.36 4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
A5
A4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
B2
B3
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
C2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
A1
B1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
A3 C3
C1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
A2
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
F1
F8
F2
F9
F3
F10
F4
F11
F5
F12
F6
F13
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY )
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖
00 00
00 00
00 00
00
00 CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
00
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
• • • • • • • •
• • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
• • • • • •
• • • • • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
•
• • • • • •
• • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
•
• • • • •
•
•
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
•
• • •
• • • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
• •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-7
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
• • •
• • • •
•
•
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
❖ BILL OF QUANTITY
)
• • • •
• • • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-8
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
02 ARCHITECTURAL PART
COST ESTIMATE
02 ARCHITECTURAL
02-9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02-1 02-2 02-3 02-4 02-5 02-6 02-7 02-8 02-9
PART
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
03
COST ESTIMATE
❖ BILL OF QUANTITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 AIR CONDITIONING PART
COST ESTIMATE
03-1
03 SANITARY SYSTEM PART 03-1 03-2 03-3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 SANITARY SYSTEM PART
MEDTHODOLOGY
❖
Water Pump 1 Flow rate 25 gpm Head 40 m. Water Pump 2 Flow rate 40 gpm Head 15 m.
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Fountain Water Pump Flow rate 100 gpm Head 10 m.
Water Tank Quality 25 m3 3 set at the roof top
03
03 SANITARY SYSTEM PART
MEDTHODOLOGY
❖
Sanitary System Booster Pump Water Pump Fountain Water Pump Water Meter Dia.40 Modulating Float Valve Dia.40 Level Switch
2 2 1 1 1 1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
ชุด ชุด ชุด ชุด ชุด ชุด
72,600 8,878 18,700 22,375 49,000 600
145,200 17,756 18,700 22,375 49,000 600
1,500 1,500 1,500 -
3,000 3,000 1,500 -
148,200 20,756 20,200 22,375 49,000 600
03 SANITARY SYSTEM PART
03
MEDTHODOLOGY
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
Wasted Water Treatment Tank Manholes 600*600
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
PVC Class 8.5 -Dia.50mm -Dia.65mm -Dia.80mm -Dia.100mm -Dia.150mm -Dia.200mm
331.95 240.2161 298.8 203.29 94.05 9.72
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
83 61 75 51 24 3
155 245 340 550 1,165 1,875
12865 14945 25500 28050 27960 5625
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
Wasted Water Treatment Tank
2
Manholes 600*600
21
Water Meter Dia.40
1
บ่อดักขยะ
2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
Wastewater Treatment Tank - 10cu.m/day - 15cu.m/day
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Aeration Pump - 200L/min - 120L/min
Water Meter Dia.40
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
FIRE DEPARTMENT CONNECTOR 65X65X100
FIRE HOSE CABINET + PORTABLE FIRE EXTINGUISHER 15 LB. Black Steel Pipe Dia.100
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
BOQ
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
BOQ
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
BOQ
03
03 SANITARY SYSTEM PART
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
BOQ
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
03
COST ESTIMATE
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
04-1
04
ELECTRICAL SYSTEM PART 04-1 04-2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ EQUIPMENT
On-pole Dropout fuse
Lightning arrester
Concrete pole (MEA standard)
H-Platform electrical HV Cable
Oil Type Hermetically Sealed Transformer 1000 kVA
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Spacer supporting
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ CALCULATION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ BILL OF QUALITY
4.1 4.1.1 4.1.2
งำนภำยนอกอำคำร Medium Voltage Incoming Section Transformer Section รวมงานของ 4.1
122.2 2 124.2
รวม รวม รวม
รำยกำร
จำนวน
หน่ วย
2
เฉพาะวัสดุ เฉพาะวัสดุ
88468 206760 292174
เฉพาะงาน เฉพาะงาน
รำคำวัสดุ จำนวนเงิ น
รำคำหน่ วยละ
จำนวนเงิ น
ชุด
7600
15200
30% ของค่าวัสดุ
4560
19760
2
ชุด
8160
1630
30% ของค่าวัสดุ
4896
21216
6
ชุด
4542
27252
900
5400
32652
111.2
เมตร
183
20386
55
6116
26502
1
เหมา
24000
24000
30% ของค่าวัสดุ
7200
31200
122.2
รวม
Oil Type Hermetically Sealed Transformer 1000 kVA.
1
ชุด
205000
205000
H-Platform with accessaried
1
ชุด
1760
1760
2
ชุด
Medium Voltage Incoming Section
4.1.1.1
On-pole Dropout fuse 24kV, 30A Lightning arrester 30kV, 5kA Concrete pole (MEA standard) 12m. High w/ accessories
4.1.1.4
HV Cable 50 Sq.mm. SAC-36 kV. Spacer supporting รวมงานของ 4.1.1
4.1.2
ค่ำแรงงำน
รำคำหน่ วยละ
4.1.1
4.1.1.3
131330 267888 399218
รวมค่ำวัสดุ และ ค่ำแรงงำน
ลำดับที่
4.1.1.2
28172 62028 90200
88468
28172
131330
30% ของค่าวัสดุ
61500
266500
30% ของค่าวัสดุ
528
2288
62028
268788
Transformer Section
รวมงานของ 4.1.2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
206760
หมำยเหตุ
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ MDB-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ MDB-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ CAP-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ CAP-1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-2
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-5
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-LIFT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-LIFT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-SR
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ SDB-SR
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LOAD PANEL & NON-FUSE SAFETY SWITCH
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LOAD PANEL & NON-FUSE SAFETY SWITCH
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LOAD PANEL & NON-FUSE SAFETY SWITCH
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LOAD PANEL & NON-FUSE SAFETY SWITCH
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ LV FEEDER
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ BILL OF QUALITY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Lighting
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ BILL OF QUALITY
TOTAL 2,645,504.40 บาท
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Lighting
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE ❖ Receptacle & Disconnecting switch (Safety switch) System
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
Ф1/4“ Ф /4"
Ф1/4“ Ф1/4" Ф /4"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
Ф1/4" Ф /4"
Ф1/4" Ф /4" CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
Ф1/4" Ф /4"
Ф1/4" Ф /4"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
Ф1/4" Ф /4"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖
Ф1“ Ф1 “
Ф1/4“
Ф1/ " Ф1/ "
Ф1/ "
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ BILL OF QUALITY
Ф1/4" Ф1/2" Ф1/4" Ф3/4"
TOTAL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
2,154,585.66
Branch Circuit System
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ TELEPHONE AND COMPUTER CABLING
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SYSTEM
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
FD
❖
Ф1/2“
Ф1/2“
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖
Ф1/2“
Ф1/2“
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖
Ф1/2“
Ф1/2“
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ BILL OF QUALITY
Ф1/2" Ф3/4"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
Telephone & Computer Cabling Sys
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ Riser Diagram
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ Plan 1-4
41
30
7
8
8
30
13
8
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ Plan 3-roof
25 4
30
3
8
-
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ Fire Alarm System
˚ ˚
Ф1/2"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ CCTV System
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
04
COST ESTIMATE
❖ EMERGENCY LIGHTING & FIRE ALARM SYSTEM
Ф1/2"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ Public Address System
Ф½
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ Public Address System
Ф1/2"
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ EQUIPMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖ CALCULATION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04 ELECTRICAL SYSTEM PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03
04 ELECTRICAL SYSTEM PART
FIRM VISION
❖ GROUNDING & LIGHTNING PROTECTION
แปลนพืน้ ชัน้ 3
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SYSTEM
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ GROUNDING & LIGHTNING PROTECTION
แปลนพืน้ ชัน้ หลังคา
แปลนพืน้ ชัน้ SLAB หลังคา
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SYSTEM
03
04 ELECTRICAL SYSTEM PART
COST ESTIMATE
❖ GROUNDING & LIGHTNING PROTECTION
ลำดับที่
รำยกำร
4.2.9
Grounding & Lightning Protection System
รำคำวัสดุ
ค่ำแรงงำน
SYSTEM
รวมค่ำวัสดุ และ ค่ำแรงงำน
จำนวน
หน่ วย
369.8
m
117
43266.6
0
43266.6
Exothermic Welding
2
lot
290
580
0
580
Bare Copper 95 Sq.mm.
7.5
m
451
3382.5
55
412.5
3795
Bare Copper 70 Sq.mm.
700.2
m
327
228965.4
45
31509
260474.4
Bare Copper 50 Sq.mm.
47
m
229
10763
40
1880
12643
Bare Copper 25 Sq.mm.
20
m
120
2400
25
500
2900
m
9.5
0
20
0
0
Aluminum tape 25x4mm.
PVC Dia 1" Ground Test Box
28
set
2,500
70000
150
4200
74200
Air Terminal Ø16x600mm.
4
set
1,500
6000
50
200
6200
Air Terminal Ø16x300mm.
18
set
800
14400
50
900
15300
Copper Clad Steel Ground Rod Dia 16x2400mm.
18
set
1,780
32040
0
32040
Copper ground busbar 300x100x6mm. With isulator support
3
set
2,550
7650
0
7650
Accessories & Supporting ( etc .Aluminium Square Tape 25x4 MM.)
1
lot
24,000
24000
0
24000
443,447.5
39,601.5
483,049
รวมงานของ 4.2.9
TOTAL 4 8 3 , 0 4 9 บาท CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
หมำยเหตุ
2.5% ของค่าวัสดุ และค่าแรงงาน
03
05 AIR CONDITIONING PART
COST ESTIMATE
05 AIR CONDITIONING PART
05-1
05-1 05-2
05-3 05-4 05-5 05-6
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
AIR CONDITIONING SYSTEM
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ CONSTRUCTION DETAIL
CONSTRUCTION DETAIL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ CONSTRUCTION DETAIL
CONSTRUCTION DETAIL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ CONSTRUCTION DETAIL
CONSTRUCTION DETAIL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE VRV
❖ AIR CONDITIONING SYSTEM BOQ
AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 AIR CONDITIONING PART
03
COST ESTIMATE
❖ AIR CONDITIONING SYSTEM BOQ
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01
04 COST CONCLUSION
STRUCTURAL PART
02 ARCHITECTURAL PART 03 SANITATION SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING AND VENTILATION SYSTEMS PART
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04
01 STRUCTURAL PART
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04
01 STRUCTURAL PART
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04
01 STRUCTURAL PART
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
04
01 STRUCTURAL PART
COST CONCLUSION
❖ BILL OF QUANTITIES
Ø
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
04
COST CONCLUSION
❖ BILL OF QUANTITIES
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 MEDTHODOLOGY
01 BILL OF QUETITIES ( BOQ ) 02 03 04
05 06 S-CURVE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
BILL OF QUETITIES ( BOQ )
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
BILL OF QUETITIES ( BOQ )
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
05
MEDTHODOLOGY
MEDTHODOLOGY
STRUCTURE
ARCHITECTURE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SYSTEM
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05
MEDTHODOLOGY
05
MEDTHODOLOGY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01
06 FIELDWORK MANAGEMENT
CONSTRUCTION SAFETY
02 PERSONNEL 03 CONSTRUCTION AREA SIGN 04 CONSTRUCTION TOOL 05 FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 CONSTRUCTION SAFETY
06
FIELDWORK MANAGEMENT
WORK AREAS
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01 CONSTRUCTION SAFETY
06
FIELDWORK MANAGEMENT
FIELD MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
06
02 PERSONNEL
FIELDWORK MANAGEMENT
•
• • • •
• • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
•
•
•
•
06
03 CONSTRUCTION AREA SIGN
FIELDWORK MANAGEMENT
PROJECT SIGN คณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฏสงขลา อาคารปฏิบัติการ เลขที่ 160 หมู่ที่ 4 ถนนกาญจนวนิช ตาบลเขารูปช้าง อาเภอเมือง จังหวัดสงขลา
• • • • • • • • • • • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
โครงการ ผู้รับจ้าง สัญญาจ้าง ระยะเวลา
: อาคารปฏิบัติการ คณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฏสงขลา : บริษัท ตะลีโตน คอนสตรัคชัน จากัด โทร 0๒-๗00-๙00 : เลขที่ xxx/๒๕๖๓ ลงวันที่ xx มกราคม ๒๕๖๕ : เริ่มต้น พฤศจิกายนพ.ศ. ๒๕๖๓ สิน้ สุด กุมภาพันธ์ พ.ศ. ๒๕๖๕ วงเงินค่าก่อสร้าง : ๑๔๗,ooo,ooo บาท (ร้อยสีส่ ิบเจ็ดล้านบาท) เจ้าหน้าที/่ วิศวกรผู้รับจ้าง : นายชัยสิทธิ์ ใจกล้า นายธีรพงศ์ บุญมา
06
04 CONSTRUCTION TOOL
FIELDWORK MANAGEMENT
MECHANICAL PLAN
• • • •
• • • •
• • •
o o o o o o
o o o o o o o o o o
o o o o o o
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
06
04 CONSTRUCTION TOOL
FIELDWORK MANAGEMENT
MECHANICAL PLAN
• •
• •
• • • • • •
o o o
o o o
o o o o o
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
• • • •
o o o o o
06
05 CONSTRUCTION TOOL
FIELDWORK MANAGEMENT
LAND LEVELING TRACTOR&BACKHOE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
SURVEYOR CAMERA
05 CONSTRUCTION TOOL
06
FIELDWORK MANAGEMENT
HARDSCAPE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
06
05 CONSTRUCTION TOOL
FIELDWORK MANAGEMENT
FOUNDATION
1
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
2
3
4
05 CONSTRUCTION TOOL
06
FIELDWORK MANAGEMENT
TRANSPORTATION
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
06
05 CONSTRUCTION TOOL
FIELDWORK MANAGEMENT
CORE OF BUILDING CONCRETE PUMP
1
SLIP FORM
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
2
3
4
05 CONSTRUCTION TOOL
06
FIELDWORK MANAGEMENT
MISCELLANEOUS WORK
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
06
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
1
16 8
7 12
18 13
17
14
3
4
5
10 6
20
19
19 15
11
1
2
2
9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
05
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
1
16 8
7 12
18 13
17 21 14
3
4
5
10 6
20
19
19 15
11
1
2
2
9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
1
16
22 8
7 12
18 13
17 21 14
3
4
5
10 6
20
19
19 15
11
1
2
2
9
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
136
221
SQ.M.
1ST FLOOR PLAN
2ND FLOOR PLAN
SQ.M.
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
• • •
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
• • •
• • •
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06
06 FIELDWORK MANAGEMENT
FIELDWORK MANAGEMENT
MORNING TALK
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
5
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
1 2 3 4
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
06 FIELDWORK MANAGEMENT
06
FIELDWORK MANAGEMENT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 2
01
07 PROGRESS TRACKING PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
PROGRESS TRACKING REPORT
02 EXAMPLE OF PROGRESS TRACKING REPORT
07
01 PROGRESS TRACKING REPORT
PROGRESS TRACKING PLAN
01
02
DAILY REPORT
WEEKLY REPORT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 MONTHLY REPORT
04 PAYMENT REPORT
02 EXAMPLE OF PROGRESS TRACKING REPORT
07
PROGRESS TRACKING PLAN
DAILY REPORT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
WEEKLY REPORT
01
08 QUALITY ASSURANCE PLAN
STRUCTURAL PART
02 ARCHITECTURAL PART 03 ARCHITECTURAL PART 04 ARCHITECTURAL PART 05 ARCHITECTURAL PART
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
QUALITY ASSURANCE PLAN
08
QUALITY ASSURANCE PLAN
ISO – 9000
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
QUALITY ASSURANCE PLAN
08
QUALITY ASSURANCE PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
QUALITY ASSURANCE PLAN
08
QUALITY ASSURANCE PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
QUALITY ASSURANCE PLAN
08
QUALITY ASSURANCE PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
QUALITY ASSURANCE PLAN
08
QUALITY ASSURANCE PLAN
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
09 PROJECT SUMMARY
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
01
SUMMARY OF CONTENT AND REFERENCES
01 SUMMARY OF CONTENT AND REFERENCES
09
PROJECT SUMMARY
❖ CIRCLE CHART
14.22%
28.12%
.
57.66%
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
ญ
01 SUMMARY OF CONTENT AND REFERENCES
09
PROJECT SUMMARY
❖ CIRCLE CHART
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
ญ
01
10 APPENDIX
STRUCTURAL PART
02 ARCHITECTURAL PART 03 SANITARY SYSTEM PART 04 ELECTRICAL SYSTEM PART 05 AIR CONDITIONING PART
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
01 STRUCTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
02 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
–
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
❖ BACK UP SHEET
10
02 ARCHITECTURAL PART
APPENDIX
–
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
❖ BACK UP SHEET
10
02 ARCHITECTURAL PART
APPENDIX
–
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
❖ BACK UP SHEET
10
02 ARCHITECTURAL PART
APPENDIX
–
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
❖ BACK UP SHEET
10
02 ARCHITECTURAL PART
APPENDIX
–
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
❖ BACK UP SHEET
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
10
02 ARCHITECTURAL PART
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
03 SANITARY SYSTEM PART
10
APPENDIX
❖ Backup Sheet
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - VRV SYSTEM SCHEDULE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - EXHAUST FAN SCHEDULE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - EXHAUST FAN SCHEDULE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET -EXHAUST FAN SCHEDUL
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - EXHAUST FAN SCHEDULE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - AIR COOLED SPLIT TYPE UNIT
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET - EXHAUST FAN SCHEDULE
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
05 ARCHITECTURAL PART
10
APPENDIX
❖ BACK UP SHEET
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
MEMBER
NUTIDA K.
CHAVALIT T.
CHAIYASIT J. 59020011
59020017
THIDANAT H.
GANSIREE W.
THANAPORN K.
59020008
59020026
59020005
CONSTRUCTION MANAGEMENT AND COST ESTIMATE – PART 1
59020021
WARALUK I. 59020057
TERAPONG B. 59020028