and the revised capacity ratchet will be applied pursuant to Section B paragraph 10.4 and if, as a consequence, the capacity ratchet amount is either smaller or larger, the Overrun charge will be re-determined (and the difference between the Overrun Charge first calculated and the revised Overrun Charge will be invoiced and payable in accordance with Section K).

8.11 Where it is agreed or determined that the Daily Read Equipment is not functioning correctly, the Operator will at its expense as soon as is reasonably practicable repair or replace the Daily Read Equipment.

9 Provision of Meter Readings

9.1 The Operator will provide to each User (where required to do so in accordance with this Section M) each Valid Meter Reading for each of the User's Registered Supply Meter Points as soon as reasonably practical following the date of the Valid Meter Reading, but in any event shall do so by not later than the 2nd Day following the date of the Valid Meter Reading.

126

This article is from: