DESIGNFOLIO

Page 1

SHAHENDA AMR ISMAIL

D E S I G N FO LIO sample of works



S H A H E N DA AMR I SMAI L 01.01.1995 shahenda.amr@outlook.com

GERMAN UNIVERSITY IN CAIRO Cairo, Egypt

'17

Cumulative GPA of grade A Bachelor Project of grade A+

QUEEN INT. PVT SCHOOL Dubai, UAE

British Curriculum | IGCSE




WHERE I'VE BEEN AUGUST 2015

July 2015

July 2016

Sp 2

ATKINS | DUBAI ARCHITECTURAL INTERN Member of the master planning team, constructing 3D models of topography and urban blocks. In addition to landscape design and preparing a design presentation report.

BREWER SMITH BREWER GROUP | DUBAI ARCHITECTURAL INTERN - Working on the Bluewaters residential project using Revit, including 3D modeling, landscaping and design modifications. - Schematic design and concept development, in addition to 3D modeling, preparing reports and rendering including post production.

GERMAN U

JUNIOR TEAC

- Assisting the Managment an

- Joining the A


N

pring - fall 2016 2017

UNIVERSITY IN CAIRO | CAIRO

CHING ASSISTANT

Design Studio V as well as the Project nd Construction Managment (PMCM) teams.

Autodesk Revit teaching staff.

DEC - AUG 2017 2019

MIMAR ENGINEERING CONSULATANCY | DUBAI JUNIOR ARCHITECT - Preparing architectural drawings and details for tender submisions, tender addendums, IFC packages and IFC revisions. - Handling RFIs from the designers and contractors.

JUNIOR DESIGN ARCHITECT - Developing architectural plans. - Graphic presentation, preparing conceptual diagrams and project presentation.

CURRENT


SOME OF

WHAT I DID DESIGN DISTRICT DEVELOPMENT THE ISLAND (LAS VEGAS HOSPITALITY BRANDS) - (A) BK PARK THE EGYPTIAN FILM MUSEUM BARAJEEL ART MUSEUM AN ALEXANDRIAN NEIGHBORHOOD THE ISLAND (LAS VEGAS HOSPITALITY BRANDS) - (B)

COMMERCIAL

RESIDENTIAL

GOVERNMENTAL


NEW CAIRO RESIDENCE AL MARAYAH RESIDENCE MD RESIDENCE FIRST SECURITY HQ & TRAINING CENTER BARAJEEL ART MUSEUM MBP RESIDENCE

ENTERTAINMENT

MUSEUM

URBAN


DESIGN DISTRICT DEVELOPMENT SCOPE

DESIGN PROPOSAL

LOCATION

DUBAI DESIGN DISTRICT, DXB

A new low rise world class design district development to act as a global destination for designers from all over the world and encouraging all aspects of design and innovation. The design is to incorporate designer workshops and offices in addition to retail and f & b facilities.


Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS


DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018

DXB

PRESPECTIVE SECTION

C E N TR AL C OU RTYARD

APPROACH TO COU RTYARD

FORM DEVELOPMENT

DESIGN DISTRICT DEVELOPMENT

page 42


DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018

DXB

PRESPECTIVE SECTION

DESIGN DISTRICT DEVELOPMENT

DESIGN DISTRICT DEVELOPMENT

page 61

7 TH OCTOBER 2018

DXB

DESIGN DISTRICT DEVELOPMENT

page 61 C UTTIN G P LAN ES

F R O NT A L E NT R A NC E F R A M E

STAGGERED MASS

FORM DEVELOPMENT

DESIGN DISTRICT DEVELOPMENT

page 43


NT

DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018

DXB

DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018 7 TH OCTOBER 2018

DXB

DESIGN DISTRICT DEVELOPMENT

DXB

DESIGN PROPOSAL [FORM STUDY] THE KEY PROPERTIES OF THE PROPOSED FORM THAT PORTRAYS THE DESIRED THEME OF AN INNOVATIVE DESIGN CENTER.

DESIGN PROPOSAL [FORM STUDY]

SITE DIAGRAMS [WIND DIRECTION]

THE KEY PROPERTIES OF THE PROPOSED FORM THAT PORTRAYS THE DESIRED THEME OF AN INNOVATIVE DESIGN DESIGN DISTRICT DEVELOPMENT CENTER. MASS POTENTIALS

DESIGN DISTRICT DEVELOPMENT

page 44

STATISTICS SHOW THAT THW WIND FLOW DIRECTION FOR DUBAI REMAINS GENERALLY CONSTANT FLOWING FROM THE NORTHWEST. 7 TH OCTOBER 2018

DXB

SITE DIAGRAMS

DESIGN DISTRICT DEVELOPMENT

DXB

STR EET F RO N TAG E

STEPPED STAGGER ED M ASS; C RE ATING A DY NAM IC Y ET NON PER PLEX ING FOR M DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018

DXB

7 TH OCTOBER 2018

DESIGN DISTRICT DEVELOPMENT

F R A MI NG T O ADD SISS O N TH E SITE E DM I APH GRA AM S T R E E T E NT R AN CE

page 44

STREET F RO N TAG E

DESIGN DISTRICT DEVELOPMENT

page 48

O UTDO O R C O R R IDOR S

DESIGN DISTRICT DEVELOPMENT

STEPPE D STAGGE RED MASS; CREA TI N G A DY N AM I C YET N O N PER PLEXI N G FO RM

DXB

7 TH OCTOBER 2018

DESIGN DISTRICT DEVELOPMENT

DXB

THE WIND DIREC

STEPPED STAGGER ED M ASS; CR EATING A DY NAM IC Y ET NON PER PLEX ING FOR M

PUBLIC COURT.

7 TH OCTOBER 2018

DXB

C EN TRAL I ZED S O C I AL C O URT OUTDOOR TER R ACES

S T R E E T F R ON TAGE

SITE DIAGRAMS

F R A M I NG TO ADD E M PH A SI S O N TH E S T R E E T EN TR AN CE D E S I G N ODUTDO I S T R I COR T D ECOR VELO M E N TS RPIDOR

MASS PROPERTIES

OUTDO O R CO RRI DO RS

page 45

STEPPED STAG G ERED MASS; C REATI N G A DYN AMI C YET N O N PERP L EX I N G F O RM

N ORTH WESTERN P REVAILIN G WIN D

7 TH OCTOBER 2018

C EN TRAL I ZED S O C I AL C O URT

C E NTRAL IZE D S OCI A L C OU RT H ASI S O N T HE

OUTDOOR TER R ACES

THE WIND DIRECTION MAINTAINS A COOL BREEZE WITHIN THE CENTRAL

O UTDO O R TERRAC ES O UTDO O R C O RRI DO RS

PUBLIC COURT.

MASS PROPERTIES

DESIGN DISTRICT DEVELOPMENT

DESIGN DISTRICT DEVELOPMENT

page 45

S TEPPE D STAGGE RED M ASS; C REA TI N G A DY N AM I C YE T N O N P ER PLEXI N G FO RM CEN TR ALI Z ED SO C I AL CO UR T

SITE DIAGRAMS

DESIGN DISTRICT DEVELOPMENT

O UTDO O R TERRAC ES

DESIGN DISTRICT DEVELOPMENT

OU T D OOR CO R RI DO RS

RAL I ZED SOCIAL T O UTDO O R TER RACE S

DESIGN DISTRICT DEVELOPMENT

page 45

page 45

page 45

page 49


7 TH OCTOBER 2018

7 TH OCTOBER 2018

SITE DIAG [SUN PAT

SITE DIAGRAMS DIAGRAMS [SUN SITE PATH]

SUN PATH DIAGRA SEASONAL-AND-H (AND LENGTH OF D ORBITS AROUND T SUN IS A MAJOR FA AND IN THE PERFO

[SUN PATH]

SUN PATH DIAGRAM REFERS TO THE APPARENT SIGNIFICANT SUN PATH DIAGRAM REFERS TO THE APPARENT SIGNIFICANT SEASONAL-AND-HOURLY POSITIONAL CHANGES OF THE SUN SEASONAL-AND-HOURLY POSITIONAL CHANGES OF THE SUN (AND LENGTH OF DAYLIGHT) AS THE ROTATES, (AND LENGTH OF DAYLIGHT) AS THEEARTH EARTH ROTATES, AND AND ORBITS AROUND THE SUN. THE RELATIVE POSITION OF ORBITS AROUND THE SUN. THE RELATIVE POSITIONTHE OF THE SUN IS A MAJOR FACTOR IN THE HEAT GAIN OF THE BUILDINGS SUN IS A MAJOR IN THE OF HEAT GAINENERGY OF THE BUILDINGS AND IN FACTOR THE PERFORMANCE THE SOLAR SYSTEMS. AND IN THE PERFORMANCE OF THE SOLAR ENERGY SYSTEMS.

THE STAGGERED DESIGN CREATES CONSTANTLY SHADED OUTDOOR CORRIDORS

ONSTANTLY SHADED OUTDOOR CORRIDORS

OOR CORRIDORS DESIGN DISTRICT DEVELOPMENT

7 TH OCTOBER 2018

DXB

page 46

SITE DIAGRAMS

B E

M

7 TH OCTOBER 2018

C

page 46

D 2

1

2

1

E

J

U

N

E

DESIGN DISTRICT DEVELOPMENT

E

R

DESIGN DISTRICT DEVELOPMENT

SITE DIAGRAMS

DESIGN DISTRICT DEVELOPMENT

page 47


THE ISLAND (A)

LAS VEGAS TOP HOSPITALITY BRANDS

SCOPE

DETAILED DESIGN

LOCATION

DUBAI, UAE

Responsibilities

DRAWING 3D MODELING

VISUALIZATION / RENDERS

(PLANS, SECTIONS, DETAILS)



A highly anticipated legacy development, which formally introduces a selection of Las Vegas’ top hospitality brands to Dubai. Located on a 26-acre man-made island off the coast of Dubai, The Island will introduce the first MGM, Aria and Bellagio-branded hotels in the Middle East, as well as a number of other key amenities and attractions. The Island is a highly technical project, both in terms of scale and design, with the potential to have a significant legacy impact on Dubai’s continued appeal as an international holiday destination.

MGM HOTEL 1 ARIA HOTEL BELLAGIO HOTEL

MGM HOTEL 2



EXECUTIVE /PREMIUM LEISURE CLUB

CORRIDOR

LOBBY BAR&CAFE

PLENUM

MGM 2 VERTICAL PLENUM

L02 OCEAN DRIVE SSL +13.300

GENERATOR ROOM 3

DD

FFL +12.850

ELEC RM

SERVICES ZONE

1570

1800mm LANDSCAPING SERVICES ZONE

SERVICES ZONE

L01 (PARKING) SSL +9.000 4400

INTERNAL RETAIL AND F&B INTERNAL RETAIL AND F&B EXTERNAL LANDSCAPE

L00 GROUND (PARKING) SSL +5.500

LOBBY

LOBBY

LOBBY

TAO

LOBBY

AIR LOCK

SSL +5.800

PARKING

1800

PUBLIC RAMP DOWN FROM B1

SERVICES ZONE

SERVICE ROAD

-

SECTION 01 SCALE

CARPENTRY &

FFL -2.950 UPHOLSTERY WORKSHOP

1550 700 2400

PAINT WORKSHOP

W

SSL -4.000

1

2

4051

1 : 200

VP OF ENG'G.

CORRIDOR ENGINEERING SSL +1.200 OFFICE

SERVICES ZONE BOH CORRIDOR

SSL -5.150

1

700

EP-01

1450

SERVICES ZONE

2400

PARKING

PARKING

GREASE INTERCEPTOR

SSL +4.650 EXHAUST PLENUM

EXTRACT FAN ROOM 01

2400

SERVICES ZONE

SERVICES ZONE

3320

2380

PARKING

2450

PARKING

950

SERVICES ZONE

SSL +5.000

EXHAUST PLENUM

ER-09

2450

1430

SERVICES ZONE

COLUMN BEHIND

1000

PARKING

2450

3120 2450

SERVICES ZONE

2450

BASEMENT 2 (PARKING 2) SSL -3.050

PART OF STRUCTURAL BEAM

1000

BASEMENT 1 (PARKING 1) SSL +0.650

2100

SSL +4.780 EXHAUST PLENUM DD

4051

+20.100 F&B TERRACE

MGM LINK

CENTRAL PLAZA EXTERNAL LANDSCAPE

L02 OCEAN DRIVE SSL +13.300

DD

1280

SSL +12.700

L01 (PARKING) SSL +9.000

SERVICES ZONE

LANDSCAPE

SERVICES ZONE

MGM AHU 2

2450

SERVICES ZONE

PARKING

FFL +0.650

PARKING

SERVICES ZONE

PLENUM

CENTRAL FEATURE ACB

PARKING

B

4500

1000

SERVICES ZONE

5130

700

SERVICES ZONE

PARKING

BASEMENT 2 (PARKING 2) SSL -3.050

PLENUM

SSL +4.050

2450

2450

BASEMENT 1 (PARKING 1) SSL +0.650

3150

SERVICES ZONE

2100

DD

PLENUM

2180

SSL +5.800

SSL +5.500

L00 GROUND (PARKING) SSL +5.500

RETAIL F&B MAIN LOBBY

TAO

MEP

FFL -3.450

BASEMENT 2 SSL -4.250 SSL -5.150

4

CENTRAL FEATURE SUBSTATION

PLENUM

FOR MGM1 SUBSTATION 02

4052 800mm DRAINAGE / FINISHES ZONE

SECTION 02 SCALE

1 : 200

6915 4750

DD

BASEMENT 2 (PARKING 2) SSL -3.050

SERVICES ZONE

PARKING

930 2450

SSL +0.650

3380 3250

PARKING SERVICES ZONE

-

SECTION 03 SCALE

1 : 200

SSL

RETAIL AND F&

PARKING NUSR ET FFL +5.950

LEMON GRASS

PARKING SERVICES ZONE

MGM VALET RAMP DOWN FROM GRD PARKING

SSL +1.550

MGM 1 LV ROOM 01

PARKING MEP TRENCH

3

GENERATOR

SERVICES ZONE

800

2450

SERVICES ZONE

4600

SERVICES ZONE

2450

PARKING

1000

1000

2450

SUPPLY FAN ROOM 06

BASEMENT 1 (PARKING 1) SSL +0.650

2450

800 3250

2100

SERVICES ZONE

FFL +5.500

4600

4850

PARKING 2150

PARKING DD

SERVICES ZONE

2450

3500

HVAC (FOR CE)

FFL +9.000

2150

930 3380

PARKING

PARKING SERVICES ZONE

L00 GROUND (PARKING) SSL +5.500

SERVICES ZONE

2450

SERVICES ZONE L01 (PARKING) SSL +9.000

STORE

SSL +12.700

MGM 1

1

4053

Sim

PARKING SERVICES ZONE

4220

SSL +12.700

1000

L02 OCEAN DRIVE SSL +13.300

COLONIAL TEA LOUNGE (FOH)

COLONIAL TEA LOUNGE (FOH)

TERRACE

PLENUM

-

CORRIDOR

2

DRAINAGE TRENCH

SSL -4.250

DISPATCH


COPYRIGHT © 2019 BREWER SMITH AND BREWER FOR LOCAL AUTHORITY USE ONLY

A0

ORIGINAL SHEET SIZE

APPROVAL CLIENT

1

6551

RAMP UP TO MGM GUEST DROP OFF

SERVICE ACCESS

KEY PLAN

OCEAN DRIVE

800

DD

4

KEY PLAN SCALE

1 : 6000

4800

-

FFL +6.600

LOADING DOCK

ATTIC SLAB

1900

MAIN SERVICE ROAD FFL -3.200

EXHAUST PLENUM

MGM 1 & 2 HEAT EXCHANGER ROOM

DD

1400

EXHAUST PLENUM

4500

4500

SERVICES ZONE

SSL +3.600 EXHAUST PLENUM

1950

SSL +5.500

1200

SSL +5.000

BUGGY WORKSHOP

FINAL EXHAUST AIR POSITION & DETAIL BY LANDSCAPE ARCHITECT

EXTERNAL PROMENADE

SSL +5.800

3340

FFL +6.600

NOTES - GENERAL

FFL -3.050

1. THIS DRAWING HAS BEEN PRODUCED FOR A CLIENT FOR THE PROJECT AS SHOWN HEREIN REQUIRE PRIOR CONSENT. IT IS NOT INTENDED PERSON OR FOR ANY OTHER PURPOSE AND B AFFILIATES AND PERMITTED ASSIGNEES ACCE FOR ANY SUCH USE. 2. DIMENSIONS ARE NOT TO BE SCALED FROM T 3. ALL DIMENSIONS ARE IN MILLIMETRES AND LE NOTED OTHERWISE. 4. ANY DISCREPANCIES, EITHER BETWEEN WRITT DIMENSIONS OR WITHIN THESE DRAWINGS SH IMMEDIATE ATTENTION OF THE RESPECTIVE C EXECUTING THE WORKS. 5. THIS DRAWING IS TO BE READ IN CONJUNCTI DOCUMENTATION FORMING THE CONSTRUC 6. ALL EXISTING DIMENSIONS/ LEVELS ETC. INDIC TO BE VERIFIED ON SITE. 7. CONTRACTOR TO SUBMIT COORDINATED SH RESPECTIVE CONSULTANT'S APPROVAL AS RE COMMENCEMENT OF WORKS AT SITE. 8. ALL LEVELS ARE TO LOCAL MUNICIPALITY DA 9. ANNOTATIONS AS FOLLOWS:

3

4051

NBS: SUB-CLAUSE DESCRIPTION

SPECIFICATION SPEC ASSOCIATED DESCR

GENERAL ANNOTATION

MGM DROP OFF

AS

ACOUSTIC SEAL

PD

P

BL

BOLLARD

PL-#

P

DB

ELECTRICAL DISTRIBUTION BRD.

MD

MUNICIPALITY DATUM

RWP

R

FD

FLOOR DRAIN

SSL

S

FFL

FINISHED FLOOR LEVEL

SL-#

S

FH

FIRE HYDRANT

SPE

FHC

FIRE HOSE REEL

STPR

S P S

FS

FIRE SEAL

TOW

T

FW BR

FLOOR WASTE CAR PARK ENTERANCE BARRIER

WP

W

WL

S W

±0.000

P

TAGS/NOTATION SYMBOLS

#

REFERENCE SECTIONA DRAWING NO.

#

CALL OUT DETAIL NO. CALL OUT DRAWING

#

AESG CALL OUT DETA AESG CALL OUT DRAW

####

5300

####

MGM/F&B VALET PICK UP

±0.000

SSL +12.700 SERVICE ACCESS

DD

####

MATERIALS AND FINISHES

OCEAN DRIVE

MGM CANOPY

CONCRETE STRUCTURE

CONCRETE (NON-LOAD BEARIN BLOCKWORK WALL PRECAST LIGHTWEIGHT PANEL

COCKTAIL

CEMENT PARTICLE BOARD CLAD PLASTERBOARD PARTITION

FISH ISSUING CHILLER

FISH PREP

1080

DD

KITCHEN CORRIDOR

GRATING VOID FORMER INSULATED BLOCKWORK WALL

1520

POULTRY FREEZER FFL -3.100

2700

KITCHEN CORRIDOR

2700

BULK DRY GOODS CRATE/CAN WASH

SERVICES ZONE

PANTRY

2700

FEMALE CHANGING CALL CENTRE MEETING MNGR. FFL +1.700 ROOM

600 X 600 PAVING INACCESSIBLE ROOF

1520

KITCHEN CORRIDOR

1420

MGM GYM

TERRACE DECKING SERVICES ZONE

2700

3680

SSL +5.800

FIRE STOPPING SYSTEM

KITCHEN CORRIDOR

INTERLOCKING BRICK / BLOCK P

TOPSOIL AND GROWING MEDIA SEEDING / TURFING (GRASS)

SSL -4.000

RENDER/ SCREED/ L.W. CONC./ EARTH

PLASTERBOARD WALL LINING / C PURPOSE MADE METALWORK

5

STRUCTURAL STEEL

6

4052

EXPOSED TIMBER

4052

GENERAL GLAZING INSULATION SERVICE ZONE

1. ALL BLOCKWORK WALL BETWEEN AIR CONDITIONE CONDITIONED AREAS TO BE THERMALLY INSULATED T BY INSULATED CLADDING OR INSULATED GLAZING. 2. ALL CONCRETE AND MASONRY SURFACES DIRECT TO BE COATED WITH DAMPROOFING UNLESS NOTED 3. SECTIONS TO BE READ IN CONJUNCTION WITH SEC DD SCOPE

D C B A

REVISION

MGM 100% DETAILED DESIGN 100% SCHEMATIC DESIGN SUBMISSION 85% SCHEMATIC DESIGN SUBMISSION 50% SCHEMATIC DESIGN SUBMISSION DESCRIPTION

CLIENT

MGM VALET RAMP DOWN TO OCEAN DRIVE

FFL +20.100

3840

CLIENT'S REPRESENTATIVE

DD

L +12.850

CONSULTANT / STRUCTURAL CONSULTANT

SSL +12.700

1470

t f e a

RETAIL F&B CORRIDOR

4500

&B

TEN CON TEN RETAIL AND F&B

EXTERNAL PROMENADE

+971 4 294 2042 +971 4 294 2101 info@bsbgulf.com P.O. Box 50667, Dubai, UAE

SUBCONSULTANT

2220

SSL +6.050

2450

DD PROJECT

BOH CORRIDOR

SSL -3.750

ISSUING KITCHEN CHILLER CORRIDOR

SERVICES ZONE PASTRY

1480

SERVICES ZONE

MEP NOTE :

2700

AIR COMPRESSOR

1730

CLEAN LINEN

2450

2450

1770

DRIVEWAY

ALL SECONDARY STEEL REQUIRED FOR MEP SERVICES, PLANT AND EQUIPMENT SUPPORT, AS WELL AS ALL NECESSARY MAINTENANCE ACCESS WALKWAYS AND GANTRIES IS SHOWN INDICATIVELY ONLY TO SATISFY THE MEP CONSULTANT’ S REQUIREMENTS. THE FINAL SIZES, DETAILS, LOCATION AND EXTENTS ARE TO BE DESIGNED AND POSITIONED BY THE SPECIALIST MEP SUBCONTRACTOR, WITH THE MAIN CONTRACTOR TAKING FULL RESPONSIBILITY FOR FINAL COORDINATION WITH ALL OTHER DISCIPLINES, CONSTRUCTION AND INSTALLATIONS.

CHILLER

FFL -2.950 SSL -3.750

SSL -5.150

THE ISLAND DUBAI, UAE PLOT NO. 3622792 DRAWING TITLE

PODIUM (MGM 1 & 2) WALL SECTIONS 1-3

NOTE

TO BE FURTHER DEVELOPED AND COORDINATED IN LINE WITH RELATED BUILDING ASSETS DETAILED DESIGN PROGRAMME.

2

4053

3

4053

FOR APPROVAL

DRAWN

BSBG CHECKED

SCALE As indicated DATE

RG/AJH

A

30.01.20

P

CLIENT DRAWING No.

R1029- 01-BSB-DWG- ALL-AR MUNICIPALITY DRAWING No.

A-01- 4001


MGM HOTEL 2

BELLAGIO HOTEL

MGM LINK


ARIA HOTEL

BELLAGIO HOTEL

BELLAGIO HOTEL

MGM HOTEL 1


BK PARK SCOPE

DESIGN PROPOSAL

LOCATION

KIRKUR, IRAQ

The design intention is to provide a large scale urban park into Kurkuk’s city fabric. The proposed development proposes large green spaces, play areas, retail shops, cafe and restaurants as well as residential buildings

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS



A KURKUR PARK

FOUNTAIN

RESIDENTIAL BUILDINGS

FITENESS CENTER

PARK ENTRANCE

COMMUNITY CENTER • HYPERMARKET • CINEMA COMPLEX • RETAIL SHOPS F&B • CAFE

PARK ENTRANCE

S a a t T i


13TH DECEMBER 2018

STATEMENT SPINE a bold spine that cuts dramatically through the park . It is designed to be a colorful pedestrian entertainent walkway that defines the character of the park and gives it a unique identity. The idea is to evoke a fun and joyful spirit in the garden as well as to introduce a notable change in the fabric of kirkuk city WATER FEATUTE RETAIL PARK MAIN ENTRANCE

T ET E E E R R ST ST N D A I DA M H G A B

WATER FEATUTE


BABA KURKUR PARK

STEP

13TH DECEMBER 2018

BABA KURKUR PARK

STEP

1

BABA KURKUR PARK

STEP

2

13TH DECEMBER 2018

3

ENTRANCES SPINE MAIN ENTRANCE

ET ET R ET R E T S S N D AI A M HD G BA

APPROACH & STRATEGY

IDENTITY AND CHARACTER

PARK ENTRANCES & SPINE

ZONNING STUDY

LITY & PURPOSE

NAL BUILDINGS

ZONNING STUDY

GREEN AREAS

page 46

ZONNING STUDY

BABA KURKUR PARK

BABA KURKUR PARK

STEP

RECREATION & SERENITY

COLORED TILING

STEP

4

page 47

13TH DECEMBER 2018

5

F

FUNCTIONALITY & PURPOSE

LEISURE & ENTERTAINMENT

FUNCTIONAL BUILDINGS

PLAY AREAS& SPORTS’ FIELDS

ZONNING STUDY

ZONNING STUDY

13TH DECEMBER 2018

RETAIL SHOPS

BABA KURKUR PARK

7.6% PLOT COVERAGE

RESIDENTIAL BUILDINGS

2.3% PLOT COVERAGE

FITNESS CENTER

0.7% PLOT COVERAGE

COMMUNITY CENTER

2.0% PLOT COVERAGE

page 50

ZONNING STUDY

page 49

COM


BABA KURKUR PARK

RETAIL RETAIL RETAIL

13TH DECEMBER 2018

COMMUNITY COMMUNITY COMMUNITY CENTER CENTER CENTER RESIDENTIAL RESIDENTIAL RESIDENTIAL

FITNESS FITNESS FITNESS CENTER CENTER CENTER 52 52 52 page pagepage 52 page

U TTTI U LUUTPPP U AAAPRRREEA EAAA RSSS EAS

BABA KURKUR PARK

13TH DECEMBER 2018

BABA KURKUR BABA BABA KURKUR BABA PARK KURKUR KURKUR PARK PARK PARK BABA KURKUR PARK

13TH DECEMBER 13TH 2018 DECEMBER 13TH DECEMBER 13TH 2018 DECEMBER 2018 2018

BABA KURKUR PARK

13TH DECEMBER 2018

RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL

G+12G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 RETAIL

G+12

COMMUNITY CENTER

G+12

BUILT UP AREAS

G+12

13TH DECEMBER 2018

53,289 53,289 53,289 53,289 FITNESS CENTER 53,289 53,289 RESIDENTIAL SQM SQM SQM SQM TOTAL TOTAL TOTAL TOTAL SQM SQMTOTAL 504504 504 PARKING 504 PARKING PARKING PARKING TOTAL

RESIDENTIAL

53,289 SQMTOTAL

G+12

page 52

504 PARKING504 PARKING

3 BEDROOM 3 BEDROOM 33BEDROOM BEDROOM 4,440 4,440 4,440 4,440336 336 336 336 168168 168 UNITS 168 UNITS UNITS3 BEDROOM 3 UNITS BEDROOM 4,440 4,440 336 336 PER PER PER PER APPARTMENT APPARTMENT APPARTMENT APPARTMENT 168 UNITS168 UNITS

3BR 3BR 3BR 2BR 3BR2BR 2BR 2BR 3BR

2BR

3BR

2BR

3BR 3BR 3BR 2BR 3BR2BR 2BR 2BR

13 DECEMBER 2018 TH

2 BEDROOM 22BEDROOM BEDROOM 2 BEDROOM 3BR 2BR 3BR 168168 168 UNITS 168 UNITS UNITS2 BEDROOM X 7XBUILDINGS X7X7BUILDINGS BUILDINGS 7 BUILDINGS 2 UNITS BEDROOM

2BR PER PER APPARTMENT APPARTMENT BUILDING BUILDING BUILDING BUILDING UNITS UNITS UNITS UNITS PARKING UNITS BUILDING BUILDING UNITS UNITS 168 UNITS168504 X 7 BUILDINGS X 7 BUILDINGS

BABA KURKUR PARK

BABA KURKUR PARK

BABA KURKUR PARK

13TH DECEMBER 2018

RETAIL

14,544 SQM 400 PARKING

COMMUNITY CENTER

5,740 SQM

page 54

BUILT UP AREAS

G

4,440 336

G

3 BEDROOM

168 UNITS

PER APPARTMENT BUILDING UNITS G+M BABA KURKUR PARK

BUILT UP AREAS BUILT UP AREAS

BABA KURKUR PARK BUILT UP AREAS

13TH DECEMBER 2018

page 54 page page 5454 page 54

BUILT B UU PBI U A L TIRLBEU TUAPIU SLP AT RAUERPAESAA RS E A S

BUILT UP AREAS

13TH DECEMBER 2018

G+M

G

RETAIL

RETAIL

page 54

RETAIL

14,544 3BR 2BR14,54414,544 SQM SQM SQM 400 PARKING 400 PARKING 400 PARKING

2 BEDROOM

168 UNITS G+M

3BR 2BR

COMMUNITYCOMMUNITY XCOMMUNITY 7CENTER BUILDINGS CENTER CENTER 5,7405,740 5,740 SQM SQM SQM page 54

BABA KURKUR PARK

page 53

BUILT UP AREAS

13TH DECEMBER 2018

page 53

13TH DECEMBER 2018

13TH DECEMBER 2018

page 53

page 53

G+M

G+M

G+M

FITNESS FITNESS FITNESS CENTER CENTER CENTER

1,3181,318 1,318 SQM SQM SQM


THE EGYPTIAN FILM MUSEUM SCOPE

STUDENT WORK

LOCATION

CAIRO, EGYPT

The design is based on the concept of layering illustrated through diagrams and info graphs of urban and cinema culture analysis. The idea is to introduce a new layer to the existing mixture of urban developments.


Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)



Movies act as an invaluable documentation of the layers of the social level, political situation and lifestyle and all the components that a place struggles with and ends up the way we perceive it now. Thereby to convey this key of understandmentof a full, un-blurred vision of our urban scene; the urban context of the museum must be as much full of history and acting as a focal point in the city; presented in the selected urban context between Attaba and Opera Squares. Through my own perception of the situation, I have decided to include the Opera parking building and the Attaba Square into my design process. Researching on both the urban layers and the Egyptian film layers, I collected data that I then translated into diagrams; combined in a conceptual diagrammatic representation that is abstracted and refined to turn into architecture. The Diagram of layers reflects on the Museum in both form and circulation to house a cycle of planned routes with transitional spaces for completely interesting journey.

Extracting lines

Visualizing the Layers


Azbakeya Garden

Post Office

Opera Parking Garage


Site collage 1

National Theater

Fire Station and Police Station

Conceptual Section - showing circulation idea

Prespective Visualization





The design presented is based on the concept of layering illustrated through diagrams and info graphs of urban and cinema culture analysis. The idea is to synchronize with the existing mixture of urban development (i.e. the area’s layers of Islamic Cairo pattern, Khedivial Downtown grid and the transportation layer). This concept was further developed through series of sequential sketches and physical modeling, guided through problem definition and proposing solutions. Therefore, the museum was designed as an additional layer to integrate with the existing layers. The challenges posed were diluted through attentive steps by integrating the museum with the context visually, physically and functionally, while considering the resultant impact of the outcome. For instance, the lack of public spaces and pedestrian routes was treated by studying the context of the area, reviewing its TIS - Traffic Impact System and thus designing a spacious public platform

connecting Attaba Square to the museum, in addition Attaba Auditorium.


B

C

+8.00

+6.00

Exhibition Hall 3 +4.00 Cafeteria / Waiting Area +4.00

The Dark Void Exhibition (For 3D movie scene projection)

+8.00

Walk In Movie Scene +6.00

Exhibition Hall 1 +8.00

A

+8.00

A

Screening Cubicle +6.00

Screening Cubicle +6.00

Exhibition Hall 2 +4.00

Screening Cubicle +6.00

Walk In Movie Scene +8.00

Walk In Movie Scene +4.00

+12.00

+4.00

+6.00

B

Level 1 - Main Exhibition floor

+8.00

C


Special exhibition features


Library, Mediatheque, Sound Archive, Administration and Screening hall

Urban Stage and Special Exhibition

Exhibition Slab

Ground Floor

Underground Floor

Figure 77, 3D Split axonometric


Mediatheque

Exhibition Hall

Exhibition Hall

Urban Stage

The Dark Void Exhibition Exhibition Hall

Entrance Hall

Service Corridor

Reception Office

Lockers

Toilets

Restaurant

Administration

Library

Special Exhibition Hall

Urban Stage Exhibition Hall

Screening Cubicle

Screening Cubicle

Screening Cubicle

Walk In Movie Scene

Entrance Hall

Mediatheque Adminstration Department Screening Room

Foyer Exhibition Hall

Exhibition Hall Foyer

Exhibition Hall

Exhibition Hall

Exhibition Hall Exhibition Hall

Exhibition Hall

Exhibition Hall

Reception Office Digitalization Lab

Event Hall Restaurant

Services and Storage




BARAJEEL ART MUSEUM SCOPE

COMPETITION ENTRY

LOCATION

SHARJAH, UAE


Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)


the interior spaces are designed to offer maximum functionality yet be visually appealing. The skylights are designed to reflect the direct sun rays through their deep cone sections. The effect of the light evolves expressive and emotional qualities that create lightened sensations in tone with the inspiration process.


The design intent is to offer a space that is meditative yet reflective in purpose. Spatial purity is one of our main design focuses by simplifying the program and using rational geometries. The only way to perceive a city is to dwell, similarity the ultimate way to perceive art is to take ample time to observe, comprehend and interpret. The building is designed on the architectural promenade. Its experience is in the movement through spaces. Our vision is not only to propose an exhibition space but to offer a platform for all designers. It’s not just a museum but a creative entity that is the destination of inventiveness, innovation and imagination.


1. The three main design entries.

2. Creating visual yet functional integration between the elements.

3. Canonizing the design approach by one enclosed entity.

4. Creating a statement by defying rigidity.


THE ENTRANCE LOBBY

VIEW ON INSPIRATION COURT

VIEW FROM EXHIBITION HALL 2 ON THE CENTRAL ATRIUM


A

Rotating Exhibition

Rotating Exhibition

Rotating Exhibition

+5.50

+5.50

B

B

Library

+2.50 +5.50

Exhibition Hall 1

±0.00

±0.00 +4.00

+4.00

Video Room +2.50

+4.00

Archive

Exhibition Hall 2

A


The “inspire” circle

VIEW FROM THE “LEARN” CIRCLE ON THE CENTRAL ATRIUM

CORRIDOR ADJACENT TO THE “LEARN” CIRCLE HEADED TOWARDS THE LIBRARY


AN ALEXANDRIAN NEIGHBORHOOD SCOPE

STUDENT WORK

LOCATION

CAIRO, EGYPT

The idea is to apply a sustainable sprawl in these brown-field in Alexandria. The term is a challenge to combine the two seemingly opposing vocabs to form not only a new term but also a new definition and a new investigative idea to test in context.

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)



The notion of a sustainable sprawl is to introduce a neighborhood concept that encourages the use of public outdoor spaces and is flexible to the functional needs of the society.



The concept is to build public spaces on different scales to savor the tastes of the diverse society in the area. The neighborhood is a space to meet, socialize, relax and play for all different age groups. Internal courts are introduced with direct views from the buildings for kids to play freely while parents feel safe watching them.



NW - SE Topography

NE - SW Topography



STEP 1


STEP 2

STEP 3


A

B

B

A B

A

B

A

B

A

B

A



Section A-A

Section B-B


Student Dorms

Family 1-2 kids

Workers / Singles

Elderly

Family 3-4 kids


THE ISLAND (B)

LAS VEGAS TOP HOSPITALITY BRANDS

SCOPE

CONCEPT & SCHEMATIC DESIGN

LOCATION

DUBAI, UAE

+ ENSCAPE

Responsibilities

DESIGN DEVELOPMENT

VISUALIZATION / RENDERS

ANALYSIS & CONCEPT DIAGRAMS

DRAWING (PLANS, SECTIONS, DETAILS)







HW TIMBER JOIST SYSTEM WITH BOLTED CONNECTIONS AND HIDDEN BASE PLATE STEEL SUPPORT ON THE FLOOR


A SMOOTH WHITE RENDER FINISH CONCRETE FRAME INCORPORATING A SOLID ROOF INFILL SHADING STRUCTURE










RETAIL

SHISHA PREP 7 m²

+5.500 FFL +4.700 SSL

+5.500 FFL +4.700 SSL

SEATING DECK +5.500 FFL

FLOOR DRAIN

+5.500 FFL

FLOOR DRAIN

A SMOOTH WHITE RENDER FINISH CONCRETE FRAME INCORPORATING A SOLID ROOF INFILL SHADING STRUCTURE WITH A RATTAN SCREEN SUPPORTED BY A HW TIMBER FRAME

COLD ROOM 4 m²

FD

+5.500 FFL +4.700 SSL KITCHEN

CONDIMENT

CONDIMENT

30 m²

DISHWASH

FLOOR DRAIN

9 m²

FD

TRASH 4 m²

+5.500 FFL

+5.500 FFL +4.700 SSL +5.500 FFL

F&B WCs 21 m²

FLOOR DRAIN

+5.400 FFL/SSL

IDF

9 m²

+5.400 FFL/SSL TOR +4.550 ELECTRICAL ROOM 12 m²

GREASE TRAP 18 m²

+5.400 FFL +2.600 SSL

+5.400 FFL/SSL

RD LVL +5.350 FFL

KITCHEN VENT PLANT ROOM 22 m²

+4.200 FFL/SSL

+4.200 FFL/SSL

PLANT ROOM BELOW

WOVEN FROND CLADING WITH INSULATION AND SOLID ROOF PANELS FINISH ARCHITECTURAL HW TIMBER JOISTS TO SUPPORT THE ROOF PANELS SYSTEM 300mm DEEP (ASSUMED)*

ARCHITECTURAL HW TIMBER JOISTS ON CONCRETE BEAMS EXTENDED 2100MM FROM THE FACE OF THE CONCRETE COLUMNS 400mm DEEP (ASSUMED)*

LOOSE LONGITUDINAL FABRIC SHEETS SUSPENDED FROM THE HW TIMBER JOISTS

R S T

SMOOTH WHITE RENDER FINISH CONCRETE BEAMS AND COLUMNS WITH BRASS INLAY 300mm WIDE X 500mm DEEP BEAMS ON 300mm X 350mm COLUMNS (ASSUMED)*

STE CON

50mm (ASS


SOLID PANELS INSULATION FROND ROOF HW TIMBER JOIST

400mm DEEP (ASSUMED)*

RATTAN TIMBER SCREEN

SMOOTH WHITE RENDER FINISH CONCRETE BEAMS LOOSE FABRIC SUSPENDED FROM THE HW TIMBER JOISTS

300mm WIDE X 500mm DEEP (ASSUMED)*

RATTAN TIMBER SCREEN SUPPORTED BY A HW TIMBER FRAME

EEL SUPPORTS TO FIX THE SCREEN INTO THE NCRETE COLUMNSCOLUMNS

m DEEP X 50mm WIDE X 450mm LONG SUMED)*

SMOOTH WHITE RENDER CONCRETE COLUMN 300mm X 350mm (ASSUMED)*

BRASS INLAY


NEW CAIRO RESIDENCE SCOPE

STUDENT WORK

LOCATION

CAIRO, EGYPT

The design experiments with the contrast of the Solid and Void to create courtyards and open spaces both horizontally (In plan) and vertically (in section/elevation); thereby, serving an intended wider vision of “Framing Views”. The division of the units of each block is oriented and shaped according to its orientation. The heights of all the Blocks are decided according to a 1:1 or 1:1.5 ratio to the open space or the street. This is to make sure all masses receive good amount of light and ventilation and for the masses to be proportional to its context.

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)





Functional Distribution Commercial / Rented Duplexes Triplexes Appartments

Ground Floor

Site Plan

First Floor

Second Floor

Third Floor





MD RESIDENCE SCOPE

DESIGN PROPOSAL

LOCATION

DUBAI, UAE


Responsibilities

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)






AL MARAYAH RESIDENCE SCOPE

DESIGN PROPOSAL

LOCATION

ABUDHABI, UAE

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS

DRAWING (PLANS, SECTIONS, DETAILS)







FIRST SECURITY GROUP HQ & TRAINING CENTER SCOPE

DESIGN PROPOSAL

LOCATION

DUBAI, UAE

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS









MBP RESIDENCE SCOPE

DESIGN APPROACH

LOCATION

DUBAI, UAE

Responsibilities

DESIGN DEVELOPMENT

ANALYSIS & CONCEPT DIAGRAMS

VISUALIZATION / RENDERS











+971551329131 shahenda.amr@outlook.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.