S h a h e n d a
a m r
WORK
i s m a i l
FOLIO
sample of w orks 2017 2018
SHAHE NDA AMR ISMA I L MOS S A L A M 01.01.1995 shahenda.amr@outlook.com Languages: Arabic - Mother Tongue English - Fluent
I am a reliable and professional architect with the ability to resolve problems independently and work effectively within teams.
I always strive to bring in new creative ideas within the group to develop and empower the intended design concept.
I am easily adapting to work changes
and
finding
quick
solutions, in addition to a wide knowledge of versatile software fields indicated bellow.
AUGUST 2014
AUGUST 2015
July July 2015 2016
Spring - fall 2016 - 2017
MIMAR Engineering Consultants DEC2017 - CURRENT POSITION JUNIOR ARCHITECT
OFFICE + RESIDENTIAL
LEISURE & ENTERTAINMENT GOVERNMENTAL
RESIDENTIAL
COMMERCIAL
COMMERCIAL + RESIDENTIAL
PROJECT TYPES
DESIGN DEPARTMENT - Developing architectural plans. - Creating project theme, mood and graphic presentations. - Developing and illustrating the project’s conceptual process.
Design District Development
Baba Kurkur Park
Algerian Embassy
Fast Rent Car Service Centre
Airport City
Zayed Housing Programme
TECHNICAL DEPARTMENT - Preparing architectural drawings and details for tender submissions, tender addendum, IFC packages and IFC revisions. - Handling RFIs from the designers and contractors.
S a m p l e o f works TECHNICAL PARKLANE RESIDENCES R esidential to w ers DESIGN D E S I G N D istrict D E V E L O P M E N T A L G E R I A N E M B A S S Y, C O N S U L A T E AND AMBASSADOR’S RESIDENCE FAST RENT CAR SERVICE CENTER B aba K urkur P ark
PR OJ E CT T IT L E
PARKLANE RESIDENCES C LIENT
DU BAI S O U TH
S CO PE
DD STAG E ( DETAI L E D DE SI G N )
LOC AT IO N
DU BAI S O U TH , DX B
P roject description [ g + 13 floors ] residential buildings The pr op o sed l o cati o n o f Pa r k lan e is in wa lk in g d i s t a nc e t o p l anne d c o m m uni ty fac ilities such as the gr e e n be lt , co m m u n ity r e t a i l , and p a r k s a m o ng s t o t he r s . The c ommuni ty is g e ar e d t o wa r ds sm a lle r st ar t e r fa m i l i e s w i t h t w o o r t hr e e c hildr en, with a p ri me fo cu s o n 2 a n d 3 be dr o om o p t i o ns fo r t o w nho m e s and g arden a p artments and o n e 1 be dr o o m a pa r t m e nt s w i t h t e r rac e s ove r l o o k i ng t he green b elt.
RESP O NSIBILITI E S • Developi n g p lan s, sect io n s, e le vat io n s a n d sch e dul e s t o c o m p l y w i t h t he i nt e nd e d d esign and th e co mm e n t s f r o m t h e clie n t & t h e aut ho r i ty. • Coordinati o n b etween a r ch it e ct u ra l drawin gs a nd M E P d raw i ng s .
P
PLOT NO RF-
B
TAX -OFF TAXI DROP E ENTRANC
VEHICULAR EXIT PARKLANE RESIDE
R E FO ANC E 1 R T N AR E ESIDENC ICUL VEH KLANE R PAR
4.0 M WIDE ROAD CAR PARKING SHADE
F
P-OF
PLOT LIMIT
OAD
DRO
IDE R
W 4.0 M
R
PLOT LIMIT
1ST FLOO LINE
ING CAR PARK E D A H S
F-25
PLOT NO R
PLOT LIMIT
PLOT LIMIT
-97B T RF PLO -31 T RF PLO
R
1ST FLOO LINE
FF
XI DROP-O EXIT
VEHICULA R ENTRAN CE FOR PARKLANE RESIDENC E2
FOR ENCE 1
V PAR EHICUL KLA A NE R EXIT RES IDE FOR NCE 1&
2
DROP-
OFF
PLOT LIMIT
PLOT LIMIT
SETBACK LIMIT
F-97B
PLOT NO R
SETBACK
LIMIT
F-19
PLOT NO R
PLOT LIMIT
PL OT P PLOT LIMIT LOT RFRF 19 -97 B
DWG -0121-02
PRO
BUILDING
ZONE CODE
RD
P R OJ ECT T IT L E
R esidentia l towers CL IENT
P rivate
S C O PE
IF T STA G E ( DETAIL E D DE SI G N )
LOC AT IO N
WADI A L SA FA , DX B
P roject description [ g + P + 9 floors ] residential buildings
R E S P O N S IBIL ITI ES • Fac ade red esi g n o n t h e R EVI T m o de l • Work o n al l co rresp o n din g drawin gs (pla n s, se c t i o ns , elevatio ns, sched ul e s, fir e & safe ty pla n s)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
GENERAL NOTES :
A
A
B
C
D
E
F
G
H
J
K
L
1. ALL DIMENSIONS ARE IN METRIC. 2. DO NOT SCALE FROM THIS DRAWING. 3. ALL DIMENSIONS TO BE VERIFIED ON SITE. 4. ALL MATERIALS TO BE APPROVED BY ARCHITECT/ENGINEER. 5. CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR APPROVAL. 6. THIS DRAWING TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, MEP, SE, DETAILS & SPECIFICATIONS. CONTRACTOR SHALL CO-ORDINATE THESE DRAWINGS AND REPORT ANY DISCREPANCY FOR CLARIFICATION BEFORE PROCEEDING WITH WORKS
M
B
A
B
LIFE SAFETY LEGEND : 2 HOURS FIRE RATED WALL 1 HOUR FIRE RATED WALL
DN
GENERATOR
1.5 HOUR FIRE RATED DOOR
FD90
C
1 FD60
2
D
FD90
EXIT
1
OVERALL TRAVEL DISTANCE DIAGONAL DISTANCE
FD90
EXIT
EXIT SEPARATION
2
TEL. ROOM
EXIT CORES AREA
E X I T FD90 FD90
3
D
CIRCULATION AREA
3
EXIT
ENTRANCE
C
1 HOUR FIRE RATED DOOR
FD60
EXIT
RESIDENTIAL AREA
L.V.
EXIT
E
E
MAX. TRAVEL DISTANCE 36.70 M
SUBSTATION
4
F
5
FD60
PARKING
6
GARBAGE
FD90
7
EXIT
G
4
FD90 STAIR 01
A (SEP
N RATIO
DIST
A NC
6.8 E 2
6
) 0 M
8
FD60 EXIT
FD90 EXIT
EXIT FD90
BATH
H
GUARD ROOM
9
STAIR 02
G
7
8 H
F
5
9
EXIT
SECURITY & CONTROL
10
J
10
11
K
IA (D
N GO
AL
DI S
T
C AN
E
61
.9
0
J
M)
11
1 JULY 2018 ISSUED FOR CONSTRUCTION MIMAR REV.NO. DATE DESCRIPTION APRVD BY T his drawing and the design it covers are the property of the CONSULT ANT . T hese drawings are loaned on the borrower's express agreement that they will not be reproduced, copied, loaned, exhibited or used except in the limited way, if any, permitted by written consent of the CONSULT ANT .
K
CLIENT:
GHE YAT H MOHAMMAD GHE YAT H
L
L
PROJECT TITLE:
PROPOSE D G+2P+10 RE SIDE NT IAL BUILDING ON PLOT NO. 6458059, WADI AL-SAFA 3, DUBAI
M
M
CONSULTANT:
A
B
C
D
E
F
G
H
J
K
L
M.E.Engineering Consultants
M
1 A-901
P
CHKD BY:
LIFE SAFETY - GROUND FLOOR PLAN 1 : 100
A.M.
4
M
5
L
6
K
J
7
+53.82 T.O.P
8
H
G
F +53.20
9
10
11
12
E
T.O.P +52.90 T.O.P
13
D
14
15
C
16
+53.82 T.O.P
B
17
JULY 2018
N
A-901
1
19
20
A
100
3900
+49.60 T.O.P
D
+49.80 T.O.P
A
3600
+49.60 T.O.P
+48.20 S.S.L ROOF PLAN
EXTERNAL FINISHING A WHITE EXTERNAL B
3600
3500
+45.90 T.O.P
1200
P
+51.80 S.S.L UPPER ROOF PLAN
A
A
DRAWING NO.
A.M.
+52.60 T.O.P
300 1300
+49.80 T.O.P
LIFE SAFETY - GROUND FLOOR PLAN
REV NO.
18
D
304.03 GB REGULATION EXTERNAL PAINTED WALL MINIMUM LIGHT REFLECTIVE (LRV) VALUES OF 45% FOR 75% OF EXTERNAL WALL AREA
DRAWING TITLE:
1 : 100 @ A1
Date
3
C.Z.
A.M.
PA:
Scale
2
455DXB16
PM:
Drawn by
1
N
E-mail: mimar@mimar-group.com P.O. BOX 119487, Dubai - U A E. TEL: +971 4 282 77 11 FAX: +971 4 286 77 11 www.mimar-group.com Dubai Sharjah Abu Dhabi Ajman Doha Cairo Tripoli Baghdad
PROJ. NO.
1/8/2019 3:05:22 PM
N
+44.70 S.S.L TENTH FLOOR PLAN
LIGHT RED EXTERN
D
GREY EXTERNAL P
E
GREY GLASS HAND
F POWDER COATED AS PER APPROVED
3600
A
LIGHT YELLOW EX
C
6000
+41.10 S.S.L NINETH FLOOR PLAN
3600
6800
REV D
1200
C
+37.50 S.S.L EIGHTH FLOOR PLAN
3600
B
3600
2400
E
A
35900
37300
3600
2400 1200
2400
C B
+30.30 S.S.L SIXTH FLOOR PLAN
53820 3600
3600
2400
1200
+23.10 S.S.L FOURTH FLOOR PLAN
D
+19.50 S.S.L THIRD FLOOR PLAN
+15.90 S.S.L SECOND FLOOR PLAN
2800
3600
1200
1200
2400
3600
1200
E
2400
1200
+26.70 S.S.L FIFTH FLOOR PLAN
3600
2400
7200
53820
3600
2400 1200
304.04 GB REGULATION ORIENTATION OF GLAZED FACADE SHADING DEVICE PROVIDED FOR ALL EXPOSED WINDOWS 405.01 GB REGULATION NATURAL DAYLIGHT PROVIDED 405.02 GB REGULATION VIEW PROVIDED
1200
1200
+33.90 S.S.L SEVENTH FLOOR PLAN
F
+7.80 S.S.L SECOND PODIUM FLOOR PLAN
3600
8900
15900
F
6600
4500
0
+12.30 S.S.L FIRST FLOOR PLAN
ELEVATION 01 1 : 100
4200
3000
1 A-201
3000
2700
+4.20 S.S.L FIRST PODIUM FLOOR PLAN
+0.00 S.S.L GROUND FLOOR PLAN
1. ALL DIMENSIONS ARE IN METRIC. 2. DO NOT SCALE FROM THIS DRAWIN 3. ALL DIMENSIONS TO BE VERIFIED O 4. ALL MATERIALS TO BE APPROVED B 5. CONTRACTOR SHOULD SUBMIT SHO 6. THIS DRAWING TO BE READ IN CON ARCHITECTURAL, MEP, SE, DETAILS & SPE SHALL CO-ORDINATE THESE DRAWINGS AN DISCREPANCY FOR CLARIFICATION BEFOR
A
B
LIFE SAFETY LEGEND : 2 HOURS FIRE RATED WALL
A
B
C
D
E
F
G
H
J
K
L
M
1 HOUR FIRE RATED WALL 1.5 HOUR FIRE RATED DOOR
FD90
C
1 HOUR FIRE RATED DOOR
FD60
OVERALL TRAVEL DISTANCE DIAGONAL DISTANCE EXIT SEPARATION
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY
BALCONY EXIT CORES AREA
D
M M
.80 12
.20
CE TAN
TH PA
DIS
L
ON
VE
MM
X.
CO
TRA
12
M M
MA
.00 27
.10
CE
11
TAN
TH PA
DIS L
ON
VE
MM
M
TRA
0
M
.3
CO
0
0
20
.8
.9
20 0
3
BATH BEDROOM
BATH BATH
E
.3
20
TH
NC
14
2
E
PA
TA
TH
F
NC
ON
M
M
DIS
TA
MM
DIS
CO
BEDROOM
BEDROOM
PA
RESIDENTIAL AREA
EL
0
0
11.3
17.6
X.
AV
H
MA
TR
BEDROOM
LIVING
CE
P AT
T AN
ON
LIVING
BATH KITCHEN
M
KITCHEN
BATH
BATH
TOI.
TOI.
M
FD60
CIRCULATION AREA
X.
BEDROOM
DIS
ON
MM
0 M
MM
EL
0 M
10.1
20.5
CO
AV
CO
H
CE
PA T
T AN
ON
DIS
MM
TR
LIVING
VEL
CO
VE L
X.
BEDROOM LIVING
TRA
T RA
BEDROOM
X.
X.
3 MA
MA
MA
2 E
1
MA
1
KITCHEN
TOI.
FD60
KITCHEN
TOI.
FD60
KITCHEN
FD60
LIVING BALCONY
BATH
BEDROOM
BATH
FD90
FD60
FD60
TEL
FD90
4 STAIR 01
TOI.
5
KITCHEN
FD60
KITCHEN
M .70 M
24
0
E
8.8
NC TA
TH PA
DIS EL
ON
AV
6
CO
0
.20
8.5
19
TH
E
PA
M
BALCONY
EXIT
LIVING
FD90 W.M.C FD90 STAIR 02
9
(DIA
TOI. KITCHEN
GO
NA
IS L D
TA
E NC
53.
00
M
8
7
NC
STUDIO
MA
TA
MM
0
ON
TR
2.5 E 2
DIS
X.
A NC
MM
PA
DIST
EL
FD60
(S E
BEDROOM
ION RAT
CO
7
LIVING
AV
H
ELEC.
TR
FD90
X.
KITCHEN
M)
MA
BALCONY
5
BATH
BATH
GARBAGE FD90
LIVING
6
J
FD60
EXIT
4 G
CORRIDOR
8
M)
9
BATH
10
MA
10
1 JULY 2018 ISSUED FOR CONSTRUCTION REV.NO. DATE DESCRIPT T his drawing and the design it covers are the pro drawings are loaned on the borrower's express a reproduced, copied, loaned, exhibited or used ex permitted by written consent of the CONSULT AN
X. TR
K
EL
CO
AV TA
ON
M
.70
.10
14
CLIENT:
17
TH
BEDROOM
E
PA
NC
BATH
DIS
MM
BEDROOM
M
11
11
L
GHE YAT H MOHAMM
BALCONY
PROJECT TITLE:
PROPOSE D G+2P+10 BUILDING ON PLOT WADI AL-SAFA
M
A
B
C
D
E
F
G
H
J
K
L
M
CONSULTANT:
1
LIFE SAFETY - TYPICAL FLOOR PLAN (2ND - 9TH)
A-905
1 : 100
N
M.E.Engineering C
EP.O. BOX 119487, Dubai - U A E. TEL: +971 4 282 77 11 FAX: +971 4 286 77 Dubai Sharjah Abu Dhabi Ajman Doha
PROJ. NO. CHKD BY:
P
A.M.
PA:
A.M.
Scale
3
4
5
6
1
2
7
3
8
4
5
+53.20 T.O.P
10
9
6
7
8
11
9
12
10
+53.82 T.O.P
+52.90 T.O.P
13
14
15
+49.80 T.O.P
1200
+44.70 S.S.L TENTH FLOOR PLAN
3600 6000
+41.10 S.S.L NINETH FLOOR PLAN
1200
1200 2400
3600
1200 2400
3600
1200 2400
3600
53820
1200 2400
3600
+23.10 S.S.L FOURTH FLOOR PLAN
3600
2400
+26.70 S.S.L FIFTH FLOOR PLAN
+19.50 S.S.L THIRD FLOOR PLAN
3600
2400 E
2400
E
+30.30 S.S.L SIXTH FLOOR PLAN
+15.90 S.S.L SECOND FLOOR PLAN
1200
1200
A
+33.90 S.S.L SEVENTH FLOOR PLAN
1200
1200 2400
3600
+12.30 S.S.L FIRST FLOOR PLAN
+7.80 S.S.L SECOND PODIUM FLOOR PLAN
F
3600
11900
13700
8900
11700
4500
0
2800
C
4000
B
0
2400 2400
D
B
C D
+37.50 S.S.L EIGHTH FLOOR PLAN
1200
1200 2400
A
1200
2400
1200
2400
2400
A
1200
B
3600
1200 2400 1200 2400 1200 1200
1200
2400
E
1 : 100
4200
ELEVATION 04
3000
1
3000
+4.20 S.S.L FIRST PODIUM FLOOR PLAN
A-204
EXTERNAL FINISHING LEG
A WHITE EXTERNAL PAI B
3500
1200 6000
4800 2400 1200 2400 1200 2400
34200
304.04 GB REGULATION ORIENTATION OF GLAZED FACADE SHADING DEVICE PROVIDED FOR ALL EXPOSED WINDOWS 405.01 GB REGULATION NATURAL DAYLIGHT PROVIDED 405.02 GB REGULATION VIEW PROVIDED
19
3600
+48.20 S.S.L ROOF PLAN C
3900
2700
2700 2400
300
A
B
D
JULY 2018
18
2800
+49.80 T.O.P
+48.20 T.O.P
C
DRAWIN
1
11
A
A
REV NO.
+51.80 S.S.L UPPER ROOF PLAN
2800
+49.80 T.O.P
+49.60 T.O.P
17
LIFE SAFET PLAN
+52.60 T.O.P D
304.03 GB REGULATION EXTERNAL PAINTED WALL MINIMUM LIGHT REFLECTIVE (LRV) VALUES OF 45% FOR 75% OF EXTERNAL WALL AREA
16
DRAWING TITLE:
A.M.
1 : 100 @ A1
Date
2
C.Z.
PM:
Drawn by
1
455DXB16
+0.00 S.S.L GROUND FLOOR PLAN
LIGHT YELLOW EXTER
C
LIGHT RED EXTERNAL
D
GREY EXTERNAL PAIN
E
GREY GLASS HANDRA
F POWDER COATED ALU AS PER APPROVED S
REV
P R OJ ECT T IT L E
D E S I G N D istrict D E V E L O PM E N T CL IENT
DUBAI DESIGN DISTRICT
SCOPE
C O MP ETI TI O N E N TRY
LOC AT I O N DU BAI DE S I G N DI S TR I CT, DX B
P roject description A new low ri se wo rl d clas s de sign dist r ict de ve lo pm e nt t o a c t a s a g l o b a l d e s t i nat i o n for des igners fro m al l ove r t h e wo r ld a n d e n co u rag i ng a l l as p e c t s o f d e s i g n a nd i n novation. t h e design i s to i n co rp orat e de sign e r wo r k sh o ps and o f fi c e s i n a d d i t i o n t o r e t ai l a n d f & b facil iti es.
R E S P O N S IBIL ITI ES • Graphic a l co n cep t d i a gra m s, fo r m st u die s, su n and w i nd a na l y s i s • Loc ation a n a lysis and gra ph ica l pr e se n t a t io n o f c l i e nt b r i e f a nd t he i nt e nd e d d esign visio n.
DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018
DXB
PRESPECTIVE SECTION
C E N TR AL C OU RTYARD
APPROACH TO COU RTYARD
FORM DEVELOPMENT
DESIGN DISTRICT DEVELOPMENT
page 42
DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018
DXB
PRESPECTIVE SECTION
DESIGN DISTRICT DEVELOPMENT
DESIGN DISTRICT DEVELOPMENT
page 61
7 TH OCTOBER 2018
DXB
DESIGN DISTRICT DEVELOPMENT
page 61 C UTTIN G P LAN ES
F R O NT A L E NT R A NC E F R A M E
STAGGERED MASS
FORM DEVELOPMENT
DESIGN DISTRICT DEVELOPMENT
page 43
NT
DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018
DXB
DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018 7 TH OCTOBER 2018
DXB
DESIGN DISTRICT DEVELOPMENT
DXB
DESIGN PROPOSAL [FORM STUDY] THE KEY PROPERTIES OF THE PROPOSED FORM THAT PORTRAYS THE DESIRED THEME OF AN INNOVATIVE DESIGN CENTER.
DESIGN PROPOSAL [FORM STUDY]
SITE DIAGRAMS [WIND DIRECTION]
THE KEY PROPERTIES OF THE PROPOSED FORM THAT PORTRAYS THE DESIRED THEME OF AN INNOVATIVE DESIGN DESIGN DISTRICT DEVELOPMENT CENTER. MASS POTENTIALS
DESIGN DISTRICT DEVELOPMENT
page 44
STATISTICS SHOW THAT THW WIND FLOW DIRECTION FOR DUBAI REMAINS GENERALLY CONSTANT FLOWING FROM THE NORTHWEST. 7 TH OCTOBER 2018
DXB
SITE DIAGRAMS
DESIGN DISTRICT DEVELOPMENT
DXB
STR EET F RO N TAG E
STEPPED STAGGER ED M ASS; C RE ATING A DY NAM IC Y ET NON PER PLEX ING FOR M DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018
DXB
7 TH OCTOBER 2018
DESIGN DISTRICT DEVELOPMENT
F R A MI NG T O ADD SISS O N TH E SITE E DM I APH GRA AM S T R E E T E NT R AN CE
page 44
STREET F RO N TAG E
DESIGN DISTRICT DEVELOPMENT
page 48
O UTDO O R C O R R IDOR S
DESIGN DISTRICT DEVELOPMENT
STEPPE D STAGGE RED MASS; CREA TI N G A DY N AM I C YET N O N PER PLEXI N G FO RM
DXB
7 TH OCTOBER 2018
DESIGN DISTRICT DEVELOPMENT
DXB
THE WIND DIREC
STEPPED STAGGER ED M ASS; CR EATING A DY NAM IC Y ET NON PER PLEX ING FOR M
PUBLIC COURT.
7 TH OCTOBER 2018
DXB
C EN TRAL I ZED S O C I AL C O URT OUTDOOR TER R ACES
S T R E E T F R ON TAGE
SITE DIAGRAMS
F R A M I NG TO ADD E M PH A SI S O N TH E S T R E E T EN TR AN CE D E S I G N ODUTDO I S T R I COR T D ECOR VELO M E N TS RPIDOR
MASS PROPERTIES
OUTDO O R CO RRI DO RS
page 45
STEPPED STAG G ERED MASS; C REATI N G A DYN AMI C YET N O N PERP L EX I N G F O RM
N ORTH WESTERN P REVAILIN G WIN D
7 TH OCTOBER 2018
C EN TRAL I ZED S O C I AL C O URT
C E NTRAL IZE D S OCI A L C OU RT H ASI S O N T HE
OUTDOOR TER R ACES
THE WIND DIRECTION MAINTAINS A COOL BREEZE WITHIN THE CENTRAL
O UTDO O R TERRAC ES O UTDO O R C O RRI DO RS
PUBLIC COURT.
MASS PROPERTIES
DESIGN DISTRICT DEVELOPMENT
DESIGN DISTRICT DEVELOPMENT
page 45
S TEPPE D STAGGE RED M ASS; C REA TI N G A DY N AM I C YE T N O N P ER PLEXI N G FO RM CEN TR ALI Z ED SO C I AL CO UR T
SITE DIAGRAMS
DESIGN DISTRICT DEVELOPMENT
O UTDO O R TERRAC ES
DESIGN DISTRICT DEVELOPMENT
OU T D OOR CO R RI DO RS
RAL I ZED SOCIAL T O UTDO O R TER RACE S
DESIGN DISTRICT DEVELOPMENT
page 45
page 45
page 45
page 49
7 TH OCTOBER 2018
7 TH OCTOBER 2018
SITE DIAG [SUN PAT
SITE DIAGRAMS DIAGRAMS [SUN SITE PATH]
SUN PATH DIAGRA SEASONAL-AND-H (AND LENGTH OF D ORBITS AROUND T SUN IS A MAJOR FA AND IN THE PERFO
[SUN PATH]
SUN PATH DIAGRAM REFERS TO THE APPARENT SIGNIFICANT SUN PATH DIAGRAM REFERS TO THE APPARENT SIGNIFICANT SEASONAL-AND-HOURLY POSITIONAL CHANGES OF THE SUN SEASONAL-AND-HOURLY POSITIONAL CHANGES OF THE SUN (AND LENGTH OF DAYLIGHT) AS THE ROTATES, (AND LENGTH OF DAYLIGHT) AS THEEARTH EARTH ROTATES, AND AND ORBITS AROUND THE SUN. THE RELATIVE POSITION OF ORBITS AROUND THE SUN. THE RELATIVE POSITIONTHE OF THE SUN IS A MAJOR FACTOR IN THE HEAT GAIN OF THE BUILDINGS SUN IS A MAJOR IN THE OF HEAT GAINENERGY OF THE BUILDINGS AND IN FACTOR THE PERFORMANCE THE SOLAR SYSTEMS. AND IN THE PERFORMANCE OF THE SOLAR ENERGY SYSTEMS.
THE STAGGERED DESIGN CREATES CONSTANTLY SHADED OUTDOOR CORRIDORS
ONSTANTLY SHADED OUTDOOR CORRIDORS
OOR CORRIDORS DESIGN DISTRICT DEVELOPMENT
7 TH OCTOBER 2018
DXB
page 46
SITE DIAGRAMS
B E
M
7 TH OCTOBER 2018
C
page 46
D 2
1
2
1
E
J
U
N
E
DESIGN DISTRICT DEVELOPMENT
E
R
DESIGN DISTRICT DEVELOPMENT
SITE DIAGRAMS
DESIGN DISTRICT DEVELOPMENT
page 47
P R OJ ECT T IT L E
ALGERIAN EMBASSY, CONSULATE AND AMBASSADOR’S RESIDENCE CL IENT
ALGERIAN EMBASSY
SCOPE
C O MP ETI TI O N E N TRY
LOC AT I O N EMBASS I E S ’ DI STR I CT, AU H
P roject description Th e des ign ap p ro ach is in t e n de d t o a ddr e ss t h e ve r y d e m a nd i ng ne e d s o f t he c ontemporary emb a ssy de sign ; se cu r ity, wh ich com p r i s e s p r i va c y a nd f unc t i o nal s egr egatio n o f th e emb a ssy ’s co m po n e n t s t o e n su r e s m o o t h and e f fi c i e nt c i r c ul a t i o n o f v isitor s a n d staff. A lso, t h e pr o po se d de sign co ns i d e r s t he i m p o r t a nc e o f t he i m age of th e emb assy a n d t h e a m ba ssado r ’s h o us e a s t he r e p r e s e nt at i ve s o f A l g er ia in UA E.
R E S P O N S IBIL ITI ES • Graphic a l co ncep t d ia gra m s,zo n n in g, vo lu m e t r i c c o m p o s i t i o n d e ve l o p m e nt , cir culati o n and il lustra t io n o f pr iva cy a n d se cu r i ty f e a t ur e s i n t he d e s i g n • Loc ation analysis and graph ica l pr e se n t at io n o f c l i e nt b r i e f a nd t he i nt e nd e d d esign visio n. • C omprehen si ve resear ch o n Alge r ia n Ar ch it e ct ur e a nd d e s i g n b e nc hm ar k i ng
VOLUMETRIC COMPOSITION OF THE GROUND FLOOR
1
2
EXTRUSION OF THE BLOCK
3
SUBTRACTION OF COURTYARDS AND ENGLISH COURTS
SUBTRACTION OF OPENINGS AND STREET ACCESS POINTS
VOLUMETRIC COMPOSITION OF THE FIRST FLOOR
1
2
3
4
THE EMBASSY THE AMBASSADOR’S RESIDENCE
EXTRUSION OF THE BLOCK
SEPARATION OF FUNCTIONS
REFINING THE MASS
SPLITTING THE MASS OF THE EMBASSY FROM THE AMBASSADOR’S RESIDENCE
COLLECTION OF FUNCTIONS
SUBTRACTION OF COURTYARDS AND ENGLISH COURTS
VOLUMETRIC COMPOSITION OF THE SECOND FLOOR
1
2
3
R
THE AMBASSADOR’S RESIDENCE
CO EFIN LL IN EC G TIO TH N E OF M FU AS NC S TIO NS
THE EMBASSY
EXTRUSION OF THE BLOCK
SEPARATION OF FUNCTIONS SPLITTING THE MASS OF THE EMBASSY FROM THE AMBASSADOR’S RESIDENCE
4
SUBTRACTION OF COURTYARDS AND ENGLISH COURTS
5
CONNECTING BRIDGE FROM THE AMBASSADOR’S RESIDENCE TO HIS EMBASSY OFFICE
The main formal outdoor courtyard is centered between the embassy and the residence giving an opulent green and water space symbolizing the Moorish garden. The Moorish garden can host water features and sculptures that symbolizes the Algerian culture such as the Martyrs memorial.
use of ‘English courts’; used as a method of getting sufficient natural ventilation and light to spaces on the plot edge to give extended security, privacy and control of exposure from the surrounding neighbors.
SPACIAL RELATION OF COLLECTIVE COURTS WITHIN THE FUNCTIONAL ZONES THE EMBASS
Y & CONSULA
TE
AMBASSADO
R’S RESIDEN
REGISTERING HALL ATTRIUM
FORMAL CENTERAL COURTYARD
CE
FAMILY ENTRANCE ATTRIUM
OUTDOOR FAMILY COURTYARD
SPACIAL RELATION OF COLLECTIVE COURTS WITHIN THE FUNCTIONAL ZONES The volume is composed and refined Another employed design element is the THE EMBASSY & CONSULATE through articulating grand open spaces multiple height atriums of the main embassy and accessibility points in the ground entrance as well as the residence. The floor and compact massing on the upper embassy entrance was given such significant levels. Another major tool that is utilized opulent volume and articulation for the use in the composition is the embassy’s in the formal receptionsARMBand celebrations. ASS ESID ADOR’S ENC E atrium and the residence’s courtyard. Additionally, the proposal demonstrates the The main formal outdoor courtyard is use of ‘English courts’; used as a method centered between the embassy and the of getting sufficient natural ventilation residence giving an opulent green and and light to spaces on the plot edge to give water space symbolizing the Moorish extended security, privacy and control of garden. The Moorish garden can host exposure from the surrounding neighbors. water features and sculptures that symbolizes the Algerian culture such as the Martyrs memorial. CONNECTING BRIDGE FROM THE AMBASSADOR’S RESIDENCE TO HIS EMBASSY OFFICE
FORMAL CENTERAL COURTYARD
RESIDENCE SERVICE CORE
ENGLISH COURT
USED AS A MEANS OF GETTING SUFFICIENT NATURAL VENTILATION AND LIGHTING TO THE SPACES AND YET PROVIDE PRIVACY AND SECURITY
SPACIAL RELATION OF COLLECTIVE COURTS WITHIN THE FUNCTIONAL ZONES THE EMBASS
Y & CONSUL
ATE
AMBASSADO
R’S RESIDEN
REGISTERING HALL ATTRIUM
FORMAL CENTERAL COURTYARD
FAMILY ENTRANCE ATTRIUM
CE
OUTDOOR FAMILY COURTYARD
SPACIAL RELATION OF COLLECTIVE COURTS WITHIN THE FUNCTIONAL ZONES THE EMBASSY & CONSULATE
EMBASSY OF ALGERIA
AUH
NOV 2018
DESIGN CONCEPT - OPTION 1
1
3
2
4
OPTION 1
F A C A D E
T R E A T M E N T
EMBASSY OF ALGERIA
O P T I O N
1
page
72
AUH
NOV 2018
1
2 FACADE TREATMENT THE MODERN FACADE TREATMENT REDUCES HEAT GAIN AND MINIMIZE UNWANTED SUN RAYS WHICH IMPROVES THE SOLAR PERFORMANCE OF THE BUILDING.
SUN BREAKERS
SUN BREAKERS
PERFORATED SCREEN
THE FACADE SURFACE OF THE BRIDGE CONNECTING THE TWO MASSES IS PROTECTED BY SUN BREAKING ELEMENTS THAT AGAIN, REDUCES HEAT GAIN.
3 F A C A D E
T R E A T M E N T B
THE PRIVATE OUTDOOR OPEN TO SKY COURT IS PROTECTED BY A PERFORATED SCREEN TO PROVIDE PRIVACY FOR THE RESIDENTS.
4 page
73
EMBASSY OF ALGERIA
AUH
NOV 2018
DESIGN CONCEPT - OPTION 2
1
3
2
4
OPTION 2
F A C A D E
T R E A T M E N T
EMBASSY OF ALGERIA
O P T I O N
2
page
80
AUH
NOV 2018
1
2 FACADE TREATMENT THE FACADE DESIGN REFLECTS THE PRIDE AND IDENTITY OF THE ALGERIAN CULTURE BY USING TRADITIONAL ELEMENTS SUCH AS ARCHES AND ARCADES.
MINIMUM OPENINGS
TRADITIONAL WALL
THE BRIDGE CONNECTING THE TWO MASSES HAS MINIMUM OPENINGS FOR PRIVACY AND SECURITY CONCERNS. THESE OPENINGS PROVIDE SUFFICIENT LIGHT.
THE PRIVATE OUTDOOR OPEN TO SKY COURT IS PROTECTED BY SOLID WALLS.
3 F A C A D E
T R E A T M E N T B
4 page
81
P R OJ ECT T IT L E
FAST RENT CAR SERVICE CENTER C LIENT
fast rent
SC O PE
DESIG N P R O P O SAL
LOC AT I O N DU B AI I N D U STR I AL CI TY, DX B
P roject description O f fic e bui ld ing + ma in st o r e + wo r k sh o p f o r a ca r s e r v i c e a nd r e nt al c e nt e r
RE SP O N S IBIL ITI ES • d es igning an a rch itect u ra l pla n t h a t fu lfills t h e re q ui r e m e nt s i n t he r e q ue s t e d spac e pro g ra m. • Prepar in g fu ll d esig n pr e se n t a t io n r e po r t . • Cr eating 3 D mo d el (R EVI T ) a n d sch e m at ic r e n de r.
G+M FAST RENT CAR SERVICE CENTER
PLANS
NOVEMBER 2018
DUBAI
PROVIDED PARKING 351 CAR PARKING + 25 BUS PARKING + 38 VISITOR CAR PARKING
SCALE 1:500
Page | 7
P R OJ ECT T IT L E
B aba K urkur Park CL IENT
P R I V AT E I N V E S T O R
SCOPE
DESIG N P R O P O SAL
LOC AT I O N
K IR K U R , I R A Q
P roject description T he desi g n inten tio n is t o pr ov ide a la r ge sca le ur b a n p a r k i nt o Kur k uk ’s c i ty fabric. The p ro p o sed de ve lo pm e n t pr o po se s la r g e g r e e n s p a c e s , p l ay a r e as , r etail sh o p s, ca fe a n d r e st a u ra n t s a s we ll a s r e s i d e nt i a l b ui l d i ng s
RE S P O N S IBIL I T I ES • Graphica l co n cep t d ia gra m s,zo n n in g, , cir cu lat io n a nd i l l us t rat i o n o f e l e m e nt s and fea tu res in the pr o po se d de sign • Locatio n anal ysi s a n d gra ph ica l pr e se n t a t io n of c l i e nt b r i e f and t he i nt e nd e d design vi si o n . • Com p rehen si ve rese a r ch o n sim ila r pr o je ct s and c a s e s t ud i e s f o r r e f e r e nc e and mo o d b o ard s.
A KURKUR PARK
FOUNTAIN
RESIDENTIAL BUILDINGS
FITENESS CENTER
PARK ENTRANCE
COMMUNITY CENTER • HYPERMARKET • CINEMA COMPLEX • RETAIL SHOPS F&B • CAFE
PARK ENTRANCE
S a a t T i
13TH DECEMBER 2018
STATEMENT SPINE a bold spine that cuts dramatically through the park . It is designed to be a colorful pedestrian entertainent walkway that defines the character of the park and gives it a unique identity. The idea is to evoke a fun and joyful spirit in the garden as well as to introduce a notable change in the fabric of kirkuk city WATER FEATUTE RETAIL PARK MAIN ENTRANCE
T ET E E E R R ST ST N D A I DA M H G A B
WATER FEATUTE
BABA KURKUR PARK
STEP
13TH DECEMBER 2018
BABA KURKUR PARK
STEP
1
BABA KURKUR PARK
STEP
2
13TH DECEMBER 2018
3
ENTRANCES SPINE MAIN ENTRANCE
ET ET R ET R E T S S N D AI A M HD G BA
APPROACH & STRATEGY
IDENTITY AND CHARACTER
PARK ENTRANCES & SPINE
ZONNING STUDY
LITY & PURPOSE
NAL BUILDINGS
ZONNING STUDY
GREEN AREAS
page 46
ZONNING STUDY
BABA KURKUR PARK
BABA KURKUR PARK
STEP
RECREATION & SERENITY
COLORED TILING
STEP
4
page 47
13TH DECEMBER 2018
5
F
FUNCTIONALITY & PURPOSE
LEISURE & ENTERTAINMENT
FUNCTIONAL BUILDINGS
PLAY AREAS& SPORTS’ FIELDS
ZONNING STUDY
ZONNING STUDY
13TH DECEMBER 2018
RETAIL SHOPS
BABA KURKUR PARK
7.6% PLOT COVERAGE
RESIDENTIAL BUILDINGS
2.3% PLOT COVERAGE
FITNESS CENTER
0.7% PLOT COVERAGE
COMMUNITY CENTER
2.0% PLOT COVERAGE
page 50
ZONNING STUDY
page 49
COM
BABA KURKUR PARK
RETAIL RETAIL RETAIL
13TH DECEMBER 2018
COMMUNITY COMMUNITY COMMUNITY CENTER CENTER CENTER RESIDENTIAL RESIDENTIAL RESIDENTIAL
FITNESS FITNESS FITNESS CENTER CENTER CENTER 52 52 52 page pagepage 52 page
U TTTI U LUUTPPP U AAAPRRREEA EAAA RSSS EAS
BABA KURKUR PARK
13TH DECEMBER 2018
BABA KURKUR BABA BABA KURKUR BABA PARK KURKUR KURKUR PARK PARK PARK BABA KURKUR PARK
13TH DECEMBER 13TH 2018 DECEMBER 13TH DECEMBER 13TH 2018 DECEMBER 2018 2018
BABA KURKUR PARK
13TH DECEMBER 2018
RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL
G+12G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12 G+12G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 G+12 RETAIL
G+12
COMMUNITY CENTER
G+12
BUILT UP AREAS
G+12
13TH DECEMBER 2018
53,289 53,289 53,289 53,289 FITNESS CENTER 53,289 53,289 RESIDENTIAL SQM SQM SQM SQM TOTAL TOTAL TOTAL TOTAL SQM SQMTOTAL 504504 504 PARKING 504 PARKING PARKING PARKING TOTAL
RESIDENTIAL
53,289 SQMTOTAL
G+12
page 52
504 PARKING504 PARKING
3 BEDROOM 3 BEDROOM 33BEDROOM BEDROOM 4,440 4,440 4,440 4,440336 336 336 336 168168 168 UNITS 168 UNITS UNITS3 BEDROOM 3 UNITS BEDROOM 4,440 4,440 336 336 PER PER PER PER APPARTMENT APPARTMENT APPARTMENT APPARTMENT 168 UNITS168 UNITS
3BR 3BR 3BR 2BR 3BR2BR 2BR 2BR 3BR
2BR
3BR
2BR
3BR 3BR 3BR 2BR 3BR2BR 2BR 2BR
13 DECEMBER 2018 TH
2 BEDROOM 22BEDROOM BEDROOM 2 BEDROOM 3BR 2BR 3BR 168168 168 UNITS 168 UNITS UNITS2 BEDROOM X 7XBUILDINGS X7X7BUILDINGS BUILDINGS 7 BUILDINGS 2 UNITS BEDROOM
2BR PER PER APPARTMENT APPARTMENT BUILDING BUILDING BUILDING BUILDING UNITS UNITS UNITS UNITS PARKING UNITS BUILDING BUILDING UNITS UNITS 168 UNITS168504 X 7 BUILDINGS X 7 BUILDINGS
BABA KURKUR PARK
BABA KURKUR PARK
BABA KURKUR PARK
13TH DECEMBER 2018
RETAIL
14,544 SQM 400 PARKING
COMMUNITY CENTER
5,740 SQM
page 54
BUILT UP AREAS
G
4,440 336
G
3 BEDROOM
168 UNITS
PER APPARTMENT BUILDING UNITS G+M BABA KURKUR PARK
BUILT UP AREAS BUILT UP AREAS
BABA KURKUR PARK BUILT UP AREAS
13TH DECEMBER 2018
page 54 page page 5454 page 54
BUILT B UU PBI U A L TIRLBEU TUAPIU SLP AT RAUERPAESAA RS E A S
BUILT UP AREAS
13TH DECEMBER 2018
G+M
G
RETAIL
RETAIL
page 54
RETAIL
14,544 3BR 2BR14,54414,544 SQM SQM SQM 400 PARKING 400 PARKING 400 PARKING
2 BEDROOM
168 UNITS G+M
3BR 2BR
COMMUNITYCOMMUNITY XCOMMUNITY 7CENTER BUILDINGS CENTER CENTER 5,7405,740 5,740 SQM SQM SQM page 54
BABA KURKUR PARK
page 53
BUILT UP AREAS
13TH DECEMBER 2018
page 53
13TH DECEMBER 2018
13TH DECEMBER 2018
page 53
page 53
G+M
G+M
G+M
FITNESS FITNESS FITNESS CENTER CENTER CENTER
1,3181,318 1,318 SQM SQM SQM
+ 97 1 5 5 13 2 913 1 shahe n da .a mr@outl ook.com
S h a h e n d a
a m r
i s m a i l